PROJECT:
NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B)
Venkatrama
Digitally signed by Venkatraman
This document is issued pursuant to an Agreement between Petrofac Facilities Management Limited and Zallaf Libya Exploration and Production Oil & Gas
Company which agreement sets forth the entire rights, obligations and liabilities of those parties with respect to the content and use of the report. Reliance by
any other party on the contents of the document shall be at its own risk. Petrofac makes no warranty or representation, expressed or implied, to any other party
with respect to the accuracy, completeness or usefulness of the information contained in this report and assumes no liabilities with respect to any other party’s
use of or damages resulting from such use of any information, conclusions or recommendations disclosed in this document.
PROJECT: PROJECT NO: CLIENT: DOCUMENT NUMBER:
NC-200 ERAWIN FIELD EPF JI-2047 ZALLAF ENG052-20ERW-000-
PHASE- I (PLAN B) QA-WQS-0004-000
HOLDS
Hold No. Section Description
ABBREVIATIONS
Abbreviation Description
PROJECT: PROJECT NO: CLIENT: DOCUMENT NUMBER:
NC-200 ERAWIN FIELD EPF JI-2047 ZALLAF ENG052-20ERW-000-
PHASE- I (PLAN B) QA-WQS-0004-000
CONTENTS
CONTENTS ........................................................................................................................................ 3
PROPOSED WELDING PROCEDURE SPECIFICATION FOR WELDING OF MAINLINE
( PWPS/ML/001)6”x9.525MM ………………………………………………………………………………… 4
PROJECT: PROJECT NO: CLIENT: DOCUMENT NUMBER:
NC-200 ERAWIN FIELD EPF JI-2047 ZALLAF ENG052-20ERW-000-
PHASE- I (PLAN B) QA-WQS-0004-000
JOINT DESIGN
9.525 mm
9.525mm
PROJECT: PROJECT NO: CLIENT: DOCUMENT NUMBER:
NC-200 ERAWIN FIELD EPF JI-2047 ZALLAF ENG052-20ERW-000-
PHASE- I (PLAN B) QA-WQS-0004-000
WELDING PARAMETERS
Bead Electrode Voltage Amper Polarity Technique Speed Average Heat input
Number Size and age
mm/min KJ/mm
type
Root E6010 (A 5.1) 17 ~ 34 TBR TBR
61 ~ 109 DCEP Stringer
Ø 2.5/3.2
Hot E7010(A 5.1) 18 ~ 30 74 ~ 103 TBR TBR
DCEP Weaving
Ø 3.2
Fill E7010(A 5.1) 22~32 76 ~ 103 TBR TBR
DCEP Weaving
Ø 3.2
Cap E7010(A 5.1) 22 ~ 32 74 ~ 107 DCEP Weaving TBR TBR
Ø 3.2/4.0
Notes:
1. Weaving shall not exceed 3 times electrode diameter.
2. Ensure machine and tools and tackles are calibrated and record welding machine type and make . The ranges for Arc Energy, Voltage and Amperage shall be
recorded during qualification.
3 Wind speed shelter shall be provided to protect weld area from high winds, rain, sand or dust, airborne moisture.
4 The beveled surface and adjacent material over a distance of at least 50mm shall be smooth, uniform, and free from laminations, Scale, paint, grease and other
foreign material that adversely affect weld quality before commencement of welding.
5. Number of runs on this WPS may vary from actual depending on the material thickness being welded and record during qualification. Wet or contaminated electrodes shall
not be used for welding.
6. Internal Line-up clamp shall not be removed until completion of the root pass and hot pass . Joint shall be completed within 24hrs from the time of hot pass completion.
7. In case shift ends without joint completion, at least 4 passes must be deposited the joint shall be cooled in a slow and uniform manner and joint shall be preheated to the
required preheat temp on resumption of welding.
8. Cleaning and / or grinding during passes shall be done using Power Brushing, (Pneumatic)/ Grinding/ Chipping Hamer
9. Lowering shall be permitted after completion of root and hot pass until then shall be held by side booms and supported on sandbags with sufficient clearance between
the pipe and ground/trench
10. All electrodes batch tests shall be documented by an inspection certificate in accordance with EN 10204 Type 3.1
11. Arc strikes shall not be permitted outside the weld bevel
12. On the end of the shift / work, end caps shall be provided to open end of pipes.
13. The working clearance around the pipe at the weld shall be as per requirement.
14. Each pipe shall be swabbed prior to alignment with pipeline, all sand, loose scale and foreign substances shall be removed from inside pipes
1. Visual Examination shall be as per ASME Section V, article 9 & Acceptance criteria shall
be as per 6.4 of API1104.
2. Non – Destructive Testing shall be radiography, ultrasonic and magnetic particle
examination
on the completed joints only for PQR.
3. Tensile Test shall be as per clause 5.6.2, Figure 3 and Table 2 of API 1104.
4. Nick Break Test shall be as per clause 5.6.3, Figure 3 and Table 2 of API 1104.
5. Bend Test shall be as per clause 5.6.4, Figure 3 and Table 2 of API 1104.
6. Impact Test shall be as per clause 7.4 (d) of ENG052-20ERW-000-QA-SPC-0003-000 at 3
O’ Clock position.
7. Hardness and Macro shall be as clause 7.4 (e) & (f) of ENG052-20ERW-000-QA-SPC-
0003-000 at 6 O’ clock position.
PAGE NO:
7 OF 7
Approved Pipeline PQR Matrix for NC200‐Erawin Field Development Project
Coupon size Required Mechanical Testing and location reference Remarks
Nick Break
(API 1104,
Fig.3 and
Tensile Bend Table‐2)
Job
(API 1104, (API 1104, (Fig.10 ‐
Range qualified as per Hardness Impact Dimension
Material Grade Material product forms qualified for production Fig.3 and Fig.3 and Fillet, and Macro @
Material 1 material 2 API 1104 @ 6 O" @ 3 to be
Sl. No WPS PQR Table‐2) Table‐2) Fig.11 for 6 O'Clock
clock O'Clock Covered
(Table ‐ 5 (Table ‐ 5 branch
for repair) for repair) connectio
n)
(Table ‐ 5
for repair)
Dia Thk. Dia Thk. Barred Line Pipe Dia. and WPS
Matl 1 Matl 2 Elbow Tee IJ O'Let Ind. Bend Flange Pipe NPS Thk. mm Number of specimens / samples required PWPS
In. mm In. mm Tee Doubling thickness Description
Pipe Pipe 2 Root
3 sets
PQR‐ML‐ (Seamless ‐ (Seamless ‐ Bend, 6"‐
1 6" 9.525 6" 9.525 X 2.375" ‐ 12" 4.8 ‐ 19.1 2 Nos. 2 Nos. 1 Nos. 1 Nos. (WCL, FL, Mainline PWPS/ML/001
001 N) N) 2 Face 9.525mm
FL+2mm)
API 5L X42 API 5L X42 Bend
Pipe Pipe 2 Root
3 sets
PQR‐TI‐ (Seamless ‐ (Seamless ‐ Bend, 6"‐ Tie‐in & Pipe IJ
2 6" 9.525 6" 9.525 Pipe X 2.375" ‐ 12" 4.8 ‐ 19.1 2 Nos. 2 Nos. 1 Nos. 1 Nos. (WCL, FL,
002 N) N) 2 Face 9.525mm to Pipeline
FL+2mm)
API 5L X42 API 5L X42 Bend
Pipe Pipe 2 Root
3 sets
PQR‐ML‐ (Seamless ‐ (Seamless ‐ Bend, 8"‐
3 8" 9.525 8" 9.525 X 2.375" ‐ 12" 4.8 ‐ 19.1 2 Nos. 2 Nos. 1 Nos. 1 Nos. (WCL, FL, Mainline PWPS/ML/003
003 N) N) 2 Face 9.525mm
FL+2mm)
API 5L X42 API 5L X42 Bend
Pipe Pipe 2 Root
3 sets
PQR‐TI‐ (Seamless ‐ (Seamless ‐ Bend, 8"‐ Tie‐in & Pipe IJ
4 8" 9.525 8" 9.525 Pipe X 2.375" ‐ 12" 4.8 ‐ 19.1 2 Nos. 2 Nos. 1 Nos. 1 Nos. (WCL, FL,
004 N) N) 2 Face 9.525mm to Pipeline
FL+2mm)
API 5L X42 API 5L X42 Bend
Pipe Pipe 2 Root
3 sets
PQR‐ML‐ (Seamless ‐ (Seamless ‐ Bend, 12"‐
5 12" 9.525 12" 9.525 X 2.375" ‐ 12" 4.8 ‐ 19.1 2 Nos. 2 Nos. 1 Nos. 1 Nos. (WCL, FL, Mainline PWPS/ML/005
005 N) N) 2 Face 9.525mm
FL+2mm)
API 5L X42 API 5L X42 Bend
Pipe Pipe 2 Root
3 sets
PQR‐TI‐ (Seamless ‐ (Seamless ‐ Bend, 12"‐ Tie‐in & Pipe IJ
6 12" 9.525 12" 9.525 Pipe X 2.375" ‐ 12" 4.8 ‐ 19.1 2 Nos. 2 Nos. 1 Nos. 1 Nos. (WCL, FL,
006 N) N) 2 Face 9.525mm to Pipeline
FL+2mm)
API 5L X42 API 5L X42 Bend
6"‐
Pipe Pipe 1 Root 9.525mm Full Repair ‐
3 sets
PQR‐FR‐ (Seamless ‐ (Seamless ‐ Bend, 8" ‐ Mainline ,Tie
7 8"/12" 9.525 8"/12" 9.525 X 2.375" ‐ 12" 4.8 ‐ 19.1 1 Nos. 1 Nos. 1 Nos. 1 Nos. (WCL, FL, PWPS/FR/007
007 N) N) 1 Face 9.255mm In& Pipe IJ to
FL+2mm)
API 5L X42 API 5L X42 Bend 12" ‐ Pipeline
9.525mm
6"‐
Pipe Pipe 9.525mm Partial Repair ‐
3 sets
PQR‐PR‐ (Seamless ‐ (Seamless ‐ 1 Root 8" ‐ Mainline ,Tie
8 8"/12" 9.525 8"/12" 9.525 X 2.375" ‐ 12" 4.8 ‐ 19.1 1 Nos. 1 Nos. 1 Nos. 1 Nos. (WCL, FL, PWPS/PR/008
008 N) N) Bend, 9.255mm In& Pipe IJ to
FL+2mm)
API 5L X42 API 5L X42 12" ‐ Pipeline
9.525mm
6"‐
Pipe Pipe 9.525mm Cover Repair ‐
PQR‐CR‐ (Seamless ‐ (Seamless ‐ 1Face 8" ‐ Mainline ,Tie
9 8"/12" 9.525 8"/12" 9.525 X 2.375" ‐ 12" 4.8 ‐ 19.1 NA NA 1 Nos. 1 Nos. NA PWPS/CR/009
009 N) N) Bend, 9.255mm In& Pipe IJ to
API 5L X42 API 5L X42 12" ‐ Pipeline
9.525mm
6"‐
Flange &
Pipe 2 Root 9.525mm
3 sets Fittings to
PQR‐PF‐ (Seamless ‐ Test Ring ‐ Bend, 8" ‐
10 6" 9.525 6" 9.525 X X X X X X 2.375" ‐ 12" 4.8 ‐ 19.1 2 Nos. 2 Nos. 1 Nos. 1 Nos. (WCL, FL, Pipeline &
010 N) A694 F42 2 Face 9.255mm
FL+2mm) Fittings to
API 5L X42 Bend 12" ‐
Flange
9.525mm
6"‐
Pipe 1 Root 9.525mm Full Repair ‐
3 sets
PQR‐FR‐ (Seamless ‐ Test Ring ‐ Bend, 8" ‐ Flange &
11 6" 9.525 6" 9.525 X X X X X X 2.375" ‐ 12" 4.8 ‐ 19.1 1 Nos. 1 Nos. 1 Nos. 1 Nos. (WCL, FL,
011 N) A694 F42 1 Face 9.255mm Fittings to
FL+2mm)
API 5L X42 Bend 12" ‐ Pipeline
9.525mm
6"‐
Pipe 9.525mm Partial Repair ‐
3 sets
PQR‐PR‐ (Seamless ‐ Test Ring ‐ 1 Root 8" ‐ Flange &
12 6" 9.525 6" 9.525 X X X X X X 2.375" ‐ 12" 4.8 ‐ 19.1 1 Nos. 1 Nos. 1 Nos. 1 Nos. (WCL, FL,
012 N) A694 F42 Bend, 9.255mm Fittings to
FL+2mm)
API 5L X42 12" ‐ Pipeline
9.525mm
6"‐
Pipe Test Ring ‐ 2 Root 9.525mm
3 sets
PQR‐PH‐ (Seamless ‐ Hot Bend Bend, 8" ‐ Hot bend to
13 12" 9.525 12" 9.525 X X 2.375" ‐ 12" 4.8 ‐ 19.1 2 Nos. 2 Nos. 1 Nos. 1 Nos. (WCL, FL,
013 N) API 5L 2 Face 9.255mm Pipeline
FL+2mm)
API 5L X42 X42/X52 Bend 12" ‐
9.525mm
6"‐
Pipe Test Ring ‐ 1 Root 9.525mm
3 sets Full Repair ‐
PQR‐FR‐ (Seamless ‐ Hot Bend Bend, 8" ‐
14 12" 9.525 12" 9.525 X X 2.375" ‐ 12" 4.8 ‐ 19.1 1 Nos. 1 Nos. 1 Nos. 1 Nos. (WCL, FL, Hot bend to
014 N) API 5L 1 Face 9.255mm
FL+2mm) Pipeline
API 5L X42 X42/X52 Bend 12" ‐
9.525mm
6"‐
Pipe Test Ring ‐ 9.525mm
3 sets Partial Repair ‐
PQR‐PR‐ (Seamless ‐ Hot Bend 1 Root 8" ‐
15 12" 9.525 12" 9.525 X X 2.375" ‐ 12" 4.8 ‐ 19.1 1 Nos. 1 Nos. 1 Nos. 1 Nos. (WCL, FL, Hot bend to
015 N) API 5L Bend, 9.255mm
FL+2mm) Pipeline
API 5L X42 X42/X52 12" ‐
9.525mm
6"‐
9.525mm
Pipe
8" ‐
PQR‐PO‐ O‐let ‐ (Seamless ‐ O‐let to
16 2" As per Std 6"/8"/12" 9.525 X X <2.375 4.8 ‐ 19.1 NA NA 2Nos 1 Nos. 1 Nos. NA 9.255mm
016 A694 F42 N) Pipeline
12" ‐
API 5L X42
9.525mm
2" ‐ o‐let
6"‐
Pipe Pipe 9.525mm
Wear pad extracted
PQR‐WP‐ (Seamless ‐ (Seamless ‐ 8" ‐ Sleeves fillet to
17 6" 9.525 from X All All NA NA 2Nos 1 Nos. 1 Nos. NA
017 N) N) 9.255mm Pipeline
6" 9.525mm
API 5L X42 API 5L X42 12" ‐
9.525mm
1. Above proposal is based in API 1104 ‐ 2017 & R3‐ GENERAL ENGINEERING SPECIFICATION GES R.03‐NEW PIPELINE WELDING AND REPAIRS
2. Cap repair wherever not identified shall be performed based on partial repair PQRs
3. Above matrix is based on clause 5.2.8 ( b) of R3