You are on page 1of 75

WELDER QUALIFICATION TEST RECORD

Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL


PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. :P2AE16

WELDER NAME UMA SHANKAR WELDER ID No.: : W-01 PHOTO

NATIONALITY INDIAN DATE : 02-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 7.1mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.1 & A 5.5 AWS A 5.1 & A 5.5
AWS Class E-6010 ,E-7010 P1 E-6010 ,E-7010 P1
F. No: F3 F3
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Root,Hot,F&C - Downhill Root,Hot,F&C - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity Root-EN Other-EP Root-EN Other-EP
Visual Examination
Root : ACCEPTED Capping : ACCEPTED Report No: PQR-VT-001 Date: 02-09-12
Radiographic Test Result
Radiographic Result : ACCEPTED Radiography Inspection Report No: PLP-RT-PQR-001 Date: 02-09-12
Mechanical Test Result
Mechanical Test Result: ACCEPTED BCTS Report No: 1273 P,1273 H,1273 Date: 04-09-12
Welder is Qualified on Test Coupon - PQR-001
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of API
1104 (20th Edition,October 2005)
Welding Test Date: 02-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

UMA SHANKAR Page 1 of 2 W-01


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

UMA SHANKAR Page 2 of 2 W-01


UMA SHANKAR Page 3 of 2 W-01
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. :P2AE16

WELDER NAME YUSUF ANSARI WELDER ID No.: : W-02 PHOTO

NATIONALITY INDIAN DATE : 02-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 7.1mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.1 & A 5.5 AWS A 5.1 & A 5.5
AWS Class E-6010 ,E-7010 P1 E-6010 ,E-7010 P1
F. No: F3 F3
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Root,Hot,F&C - Downhill Root,Hot,F&C - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity Root-EN Other-EP Root-EN Other-EP
Visual Examination
Root : ACCEPTED Capping : ACCEPTED Report No: PQR-VT-001 Date: 02-09-12
Radiographic Test Result

Radiographic Result : ACCEPTED Radiography Inspection Report No: PLP-RT-PQR-001 Date: 02-09-12

Mechanical Test Result


Mechanical Test Result: ACCEPTED BCTS Report No: 1273 P,1273 H,1273 Date: 04-09-12
Welder is Qualified on Test Coupon - PQR-001
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of API
1104 (20th Edition,October 2005)
Welding Test Date: 02-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

YUSUF ANSARI Page 4 of 2 W-02


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

YUSUF ANSARI Page 5 of 2 W-02


YUSUF ANSARI Page 6 of 2 W-02
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME KRISHANANDAN RAI WELDER ID No.: : W-03 PHOTO

NATIONALITY INDIAN DATE : 05-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G Fixed 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No: WQT-VT-001 Date: 05-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT-001 Date: 06-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-001
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of API
1104 (20th Edition,October 2005)

Welding Test Date: 05-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

KRISHANANDAN RAI W-03


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

KRISHANANDAN RAI W-03


KRISHANANDAN RAI W-03
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME RAJESH KUMAR WELDER ID No.: : W-04 PHOTO

NATIONALITY INDIAN DATE : 05-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5.2mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No: WQT-VT-002 Date: 05-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT-001 Date: 06-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-001
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of API
1104 (20th Edition,October 2005)

Welding Test Date: 05-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

RAJESH KUMAR W-04


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

RAJESH KUMAR W-04


RAJESH KUMAR W-04
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME SURENDRA YADAV WELDER ID No.: : W-05 PHOTO

NATIONALITY INDIAN DATE : 06-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5.1mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No: WQT-VT-003 Date: 06-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT-002,002 RS Date: 11-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-002
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of API
1104 (20th Edition,October 2005)

Welding Test Date: 06-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

SURENDRA YADAV W-05


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

SURENDRA YADAV W-05


SURENDRA YADAV W-05
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME OMPRAKASH WELDER ID No.: : W-06 PHOTO

NATIONALITY INDIAN DATE : 06-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5 mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No:WQT-VT-004 Date: 06-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT-002,002 RS Date: 11-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-002
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of API
1104 (20th Edition,October 2005)

Welding Test Date: 06-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

OMPRAKASH W-06
NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

OMPRAKASH W-06
OMPRAKASH W-06
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME VINOD KUMAR TYAGI WELDER ID No.: : W-07 PHOTO

NATIONALITY INDIAN DATE : 09-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5.2 mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No: WQT-VT-005 Date: 09-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT-003 Date: 09-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-003
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of
API 1104 (20th Edition,October 2005)
Welding Test Date: 09-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

VINOD KUMAR TYAGI W-07


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

VINOD KUMAR TYAGI W-07


VINOD KUMAR TYAGI W-07
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME BABU LAL SAHANI WELDER ID No.: : W-08 PHOTO

NATIONALITY INDIAN DATE : 09-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5.3 mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No:WQT-VT- 006 Date: 09-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT-004 Date: 09-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-004
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of API
1104 (20th Edition,October 2005)

Welding Test Date: 09-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

BABU LAL SAHANI W-08


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

BABU LAL SAHANI W-08


BABU LAL SAHANI W-08
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME SHYAM LAL GUPTA WELDER ID No.: : W-09 PHOTO

NATIONALITY INDIAN DATE : 09-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5 mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No: WQT-VT-007 Date: 09-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No:PLP-RT-WQT-004 Date: 09-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-004
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of API
1104 (20th Edition,October 2005)

Welding Test Date: 09-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

SHYAM LAL GUPTA W-09


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

SHYAM LAL GUPTA W-09


SHYAM LAL GUPTA W-09
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME KARAM CHAND WELDER ID No.: : W-10 PHOTO

NATIONALITY INDIAN DATE : 11-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 7.1 mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.1 & A 5.5 AWS A 5.1 & A 5.5
AWS Class E-6010, E-7010 P1 E-6010, E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Root, Hot, F&C - Downhill Root,Hot, F&C - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity ROOT: EN, OTHER PASS : EP EP
Visual Examination
Root and Hotpass: Accepted Filling &Capping : Accepted Report No: WQT-VT-008 Date: 11-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT-005 Date: 11-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-005
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of API
1104 (20th Edition,October 2005)

Welding Test Date: 11-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

KARAM CHAND W-10


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

KARAM CHAND W-10


KARAM CHAND W-10
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME KARAM CHAND WELDER ID No.: : W-10 PHOTO

NATIONALITY INDIAN DATE : 18-09-12

WPS NO. P2AE16-G-QA-WPS-9055-A4, REV.B


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 7.1mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.1 & A 5.5 AWS A 5.1 & A 5.5
AWS Class E-6010,E-7010 P1 E-6010,E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Root(Uphill),Hot,F&C- Downhill Root(Uphill),Hot,F&C- Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Root and Hotpass: Accepted Filling &Capping : Accepted Report No: WQT-VT-013 Date: 18-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT-008 Date: 18-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-08
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of
API 1104 (20th Edition,October 2005)

Welding Test Date: 18-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

SHIV KUMAR SINGH W-12


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

SHIV KUMAR SINGH W-12


SHIV KUMAR SINGH W-12
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME MUKESH KUMAR DAS WELDER ID No.: : W-11 PHOTO

NATIONALITY INDIAN DATE : 18-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 7.1mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.1 & A 5.5 AWS A 5.1 & A 5.5
AWS Class E-6010, E-7010 P1 E-6010, E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Root, Hot, F&C - Downhill Root,Hot, F&C - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity ROOT: EN, OTHER PASS : EP EP
Visual Examination
Root and Hotpass: Accepted Filling &Capping : Accepted Report No: WQT-VT-015 Date: 18-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT- 009 Date: 18-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-009
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of
API 1104 (20th Edition,October 2005)

Welding Test Date: 18-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

MUKESH KUMAR DAS W-11


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

MUKESH KUMAR DAS W-11


MUKESH KUMAR DAS W-11
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME SHIV KUMAR SINGH WELDER ID No.: : W-12

NATIONALITY INDIAN DATE : 16-09-12

WPS NO. P2AE16-G-QA-WPS-9055-A4, REV.B


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification
Process SMAW
Process Type Manual
Backing N/A
Material Spec API 5L X 52M PSL2
Type of Groove Single-V Groove
Pipe Thickness
Groove 7.1mm
Fillet None
Diameter
Groove 16" Dia
Fillet None
Position 5G
Filler Metal
AWS SPEC No. AWS A 5.1 & A 5.5
AWS Class E-6010,E-7010 P1
Group No. 1
Electrode Trade Name BOHLER
Position
Weld Progression Root(Uphill),Hot,F&C- Downhill
Gas Type None
Backing Gas None
Electrical Characteristics
Current DC
Polarity EP
Visual Examination
Root and Hotpass: Accepted Filling &Capping : Accepted Report No: WQT-VT-009
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT-006
ACCEPTED
Mechanical Test Result
Mechanical Test Result: ACCEPTED BCTS Report No: M1405
Welder is Qualified on Test Coupon - WQT-06
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirem
API 1104 (20th Edition,October 2005)

Welding Test Date: 16-09-12 Test Conducted by: Punj Lloyd Ltd, Duba

PLL Representative HJATL / ENOC Representative


SIGNATURE

SHIV KUMAR SINGH W-12


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL

SHIV KUMAR SINGH W-12


SHIV KUMAR SINGH W-12
PHOTO

bove welder is qualified for the following ranges


Range Qualified
SMAW
Manual
N/A
API 5L X 52M PSL2
Single-V Groove

4.8 mm to 19.1 mm
None

Above 12.75" OD
None
5G

AWS A 5.1 & A 5.5


E-6010,E-7010 P1
1
BOHLER

Root(Uphill),Hot,F&C- Downhill
None
None

DC
EP
Visual Examination
Date: 16-09-12
Radiographic Test Result

Date: 16-09-12

Mechanical Test Result


Date: 23-09-12
06
e correct and the coupons were prepared,welded & tested as per the requirements of

Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

HJATL / ENOC Representative

SHIV KUMAR SINGH W-12


RENEWAL STATUS
CERTIFIED BY

ENOC

SHIV KUMAR SINGH W-12


SHIV KUMAR SINGH W-12
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME RAMESH PRASAD WELDER ID No.: : W-13 PHOTO

NATIONALITY INDIAN DATE : 16-09-12

WPS NO. P2AE16-G-QA-WPS-9055-A4 ,REV.B


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 7.1mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.1 & A 5.5 AWS A 5.1 & A 5.5
AWS Class E-6010,E-7010 P1 E-6010,E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Root(Uphill),Hot,F&C - Downhill Root(Uphill),Hot,F&C(Downhill)
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Root and Hotpass: Accepted Filling &Capping : Accepted Report No: WQT-VT-010 Date: 16-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT-006 Date: 16-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: ACCEPTED BCTS Report No: M1405 Date: 23-09-12
Welder is Qualified on Test Coupon - WQT-06
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of
API 1104 (20th Edition,October 2005)

Welding Test Date: 16-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

RAMESH PRASAD W-13


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

RAMESH PRASAD W-13


RAMESH PRASAD W-13
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME CHANDRA PRAKASH GUPTA WELDER ID No.: : W-14 PHOTO

NATIONALITY INDIAN DATE : 16-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5.2 mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No:WQT-VT- 011 Date: 16-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT- 007 Date: 17-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-007
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of API
1104 (20th Edition,October 2005)

Welding Test Date: 16-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

CHANDRA PRAKASH GUPTA W-14


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

CHANDRA PRAKASH GUPTA W-14


CHANDRA PRAKASH GUPTA W-14
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME RAJESH KUMAR SHAH WELDER ID No.: : W-15 PHOTO

NATIONALITY INDIAN DATE : 18-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5.1 mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No:WQT-VT- 012 Date: 16-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT- 007 Date: 17-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-007
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of API
1104 (20th Edition,October 2005)

Welding Test Date: 16-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

RAJESH KUMAR SHAH W-15


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

RAJESH KUMAR SHAH W-15


RAJESH KUMAR SHAH W-15
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME NARESH KUMAR YADAV WELDER ID No.: : W-16 PHOTO

NATIONALITY INDIAN DATE : 18-09-12

WPS NO. P2AE16-G-QA-WPS-9055-A4 ,REV.B


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 7.1mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.1 & A 5.5 AWS A 5.1 & A 5.5
AWS Class E-6010,E-7010 P1 E-6010,E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Root(Uphill),Hot,F&C- Downhill Root(Uphill),Hot,F&C- Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Root and Hotpass: Accepted Filling &Capping : Accepted Report No: WQT-VT-014 Date: 18-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT-008 Date: 18-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-008
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of
API 1104 (20th Edition,October 2005)

Welding Test Date: 18-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

NARESH KUMAR YADAV W-16


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

NARESH KUMAR YADAV W-16


NARESH KUMAR YADAV W-16
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME SAHABUDDIN WELDER ID No.: : W-17 PHOTO

NATIONALITY INDIAN DATE : 18-09-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 7.1mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.1 & A 5.5 AWS A 5.1 & A 5.5
AWS Class E-6010, E-7010 P1 E-6010, E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Root, Hot, F&C - Downhill Root,Hot, F&C - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity ROOT: EN, OTHER PASS : EP EP
Visual Examination
Root and Hotpass: Accepted Filling &Capping : Accepted Report No: WQT-VT-016 Date: 18-09-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT- 009 Date: 18-09-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-009
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of
API 1104 (20th Edition,October 2005)

Welding Test Date: 18-09-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

SAHABUDDIN W-17
NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

SAHABUDDIN W-17
SAHABUDDIN W-17
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME SANJAY MAHTO WELDER ID No.: : W-18 PHOTO

NATIONALITY INDIAN DATE : 03-11-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5.2 mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No:WQT-VT- 017 Date: 24-10-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PL-RT-WQT- 011 Date: 28-10-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-011
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of
API 1104 (20th Edition,October 2005)

Welding Test Date: 24-10-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

SANJAY MAHTO W-18


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

SANJAY MAHTO W-18


SANJAY MAHTO W-18
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME ANANT RAM JAISWAL WELDER ID No.: : W-19 PHOTO

NATIONALITY INDIAN DATE : 03-11-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5.2 mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No:WQT-VT- 018 Date: 24-10-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PL-RT-WQT- 011 Date: 28-10-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-011
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of
API 1104 (20th Edition,October 2005)

Welding Test Date: 24-10-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

ANANT RAM JAISWAL W-19


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

ANANT RAM JAISWAL W-19


ANANT RAM JAISWAL W-19
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME OMPRAKASH PRASAD WELDER ID No.: : W-20 PHOTO

NATIONALITY INDIAN DATE : 03-11-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5.2 mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No:WQT-VT- 019 Date: 24-10-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PL-RT-WQT- 010 Date: 28-10-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-010
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of
API 1104 (20th Edition,October 2005)

Welding Test Date: 24-10-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

OMPRAKASH PRASAD W-20


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

OMPRAKASH PRASAD W-20


OMPRAKASH PRASAD W-20
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME NARVADESHWAR GUPTA WELDER ID No.: : W-21 PHOTO

NATIONALITY INDIAN DATE : 03-11-12

WPS NO. P2AE16-G-QA-WPS-9052-A4,Rev.C


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 5.2 mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.5 AWS A 5.5
AWS Class E-7010 P1 E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Filling & Capping - Downhill Filling & Capping - Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Filling:Accepted Capping : Accepted Report No:WQT-VT- 020 Date: 24-10-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PL-RT-WQT- 010 Date: 28-10-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQT-010
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of
API 1104 (20th Edition,October 2005)

Welding Test Date: 24-10-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

NARVADESHWAR GUPTA W-21


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

NARVADESHWAR GUPTA W-21


NARVADESHWAR GUPTA W-21
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME KYAMUDDIN WELDER ID No.: : W-22 PHOTO

NATIONALITY INDIAN DATE : 31-12-12

WPS NO. P2AE16-G-QA-WPS-9055-A4 ,REV.B


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 7.1mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.1 & A 5.5 AWS A 5.1 & A 5.5
AWS Class E-6010,E-7010 P1 E-6010,E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Root(Uphill),Hot,F&C- Downhill Root(Uphill),Hot,F&C- Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Root and Hotpass: Accepted Filling &Capping : Accepted Report No: WQT-VT-021 Date: 22-12-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PLP-RT-WQT-011 Date: 27-12-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQTT-011
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of
API 1104 (20th Edition,October 2005)

Welding Test Date: 22-12-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

KYAMUDDIN W-22
NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

KYAMUDDIN W-22
KYAMUDDIN W-22
WELDER QUALIFICATION TEST RECORD
Project Falcon: BULK LIQUID TERMINAL IN JAFZA AND JET FUEL
PIPELINE TO DIA - PHASE 1

COMPANY ENOC/HJATL

CONTRACTOR PUNJ LLOYD LIMITED PROJECT No. : P2AE16

WELDER NAME RAM KRIPAL YADAV WELDER ID No.: : W-23 PHOTO

NATIONALITY INDIAN DATE : 31-12-12

WPS NO. P2AE16-G-QA-WPS-9055-A4 ,REV.B


The above welder is qualified for the following ranges
Variables Record Actual values used in Qualification Range Qualified
Process SMAW SMAW
Process Type Manual Manual
Backing N/A N/A
Material Spec API 5L X 52M PSL2 API 5L X 52M PSL2
Type of Groove Single-V Groove Single-V Groove
Pipe Thickness
Groove 7.1mm 4.8 mm to 19.1 mm
Fillet None None
Diameter
Groove 16" Dia Above 12.75" OD
Fillet None None
Position 5G 5G
Filler Metal
AWS SPEC No. AWS A 5.1 & A 5.5 AWS A 5.1 & A 5.5
AWS Class E-6010,E-7010 P1 E-6010,E-7010 P1
Group No. 1 1
Electrode Trade Name BOHLER BOHLER
Position
Weld Progression Root(Uphill),Hot,F&C- Downhill Root(Uphill),Hot,F&C- Downhill
Gas Type None None
Backing Gas None None
Electrical Characteristics
Current DC DC
Polarity EP EP
Visual Examination
Root and Hotpass: Accepted Filling &Capping : Accepted Report No: WQT-VT-022 Date: 22-12-12
Radiographic Test Result
Radiographic Result :
Radiography Inspection Report No: PL-RT-WQT-011 Date: 27-12-12
ACCEPTED
Mechanical Test Result
Mechanical Test Result: NA Report No: NA Date: NA
Welder is Qualified on Test Coupon - WQTT-011
We certify that the statements in this record are correct and the coupons were prepared,welded & tested as per the requirements of
API 1104 (20th Edition,October 2005)

Welding Test Date: 22-12-12 Test Conducted by: Punj Lloyd Ltd, Dubai,UAE

PLL Representative HJATL / ENOC Representative


SIGNATURE

RAM KRIPAL YADAV W-23


NAME

DATE

RENEWAL STATUS
CERTIFIED BY
SL NO. WPS NO. RENEWAL DATE EXPIRY DATE
PLL ENOC

RAM KRIPAL YADAV W-23


RAM KRIPAL YADAV W-23

You might also like