Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1 Workshop MO-0001A-1A-12” 1/5 SW-001 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

2 Workshop MO-0001A-1A-12” 1/5 SW-003 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

3 Workshop MO-0001A-1A-12” 1/5 SW-004 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

4 Workshop MO-0001A-1A-12” 1/5 SW-006 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Flange

5 Workshop MO-0001A-1A-12” 1/5 SW-007 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Tee/Tee

6 Workshop MO-0001A-1A-12” 1/5 SW-009 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

7 Workshop MO-0001A-1A-12” 1/5 SW-010 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

8 Workshop MO-0001A-1A-12” 1/5 SW-011 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

9 Workshop MO-0001A-1A-12” 1/5 SW-012 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

10 Workshop MO-0001A-1A-12” 1/5 SW-013 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

11 Workshop MO-0001A-1A-12” 1/5 SW-014 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
12 Workshop MO-0001A-1A-12” 1/5 SW-015 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

13 Workshop MO-0001A-1A-12” 1/5 SW-015A BRW WPS-2016-23 GTAW/SMAW 1/2" SCH80 A106/A105 Pipe/scokolet

14 Workshop MO-0001A-1A-12” 1/5 SW-016 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

15 Workshop MO-0001A-1A-12” 2/5 SW-017 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

16 Workshop MO-0001A-1A-12” 2/5 SW-018 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

17 Workshop MO-0001A-1A-12” 2/5 SW-019R BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

18 Workshop MO-0001A-1A-12” 2/5 SW-036 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A105 Tee/Flange

19 Workshop MO-0001-1A-12” 2/7 SW-029 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

20 Workshop MO-0001-1A-12” 2/7 SW-030 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

21 Workshop DO-0001-1A-12” 3/7 SW-043 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Reducer/90Elbow

22 Workshop DO-0001-1A-12” 3/7 SW-044 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
23 Workshop DO-0001-1A-12” 3/7 SW-045 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

24 Workshop MO-0001-1A-12” 3/7 SW-046 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Reducer/90Elbow

25 Workshop MO-0001-1A-12” 3/7 SW-047 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

26 Workshop MO-0001-1A-12” 3/7 SW-048 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

27 Workshop JF-0001-1A-12” 3/7 SW-042 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Reducer/90Elbow

28 Workshop MO-0001-1A-12” 3/7 SW-043 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

29 Workshop JF-0001-1A-12” 3/7 SW-044 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

30 Workshop DO-0001-1A-12” 2/7 SW-026 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

31 Workshop DO-0001-1A-12” 2/7 SW-027 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

32 Workshop JF-0001-1A-12” 2/7 SW-025 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

33 Workshop JF-0001-1A-12” 2/7 SW-026 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
34 Workshop JF-0001-1A-12” 2/7 SW-015 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Tee/90Elbow

35 Workshop DO-0001-1A-12” 4/7 SW-049 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Tee/90Elbow

36 Workshop JF-0001-1A-12” 4/7 SW-048 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Tee/90Elbow

37 Workshop MO-0001-1A-12” 4/7 SW-052 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Tee/90Elbow

38 Workshop DO-0001-1A-12” 2/7 SW-016 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Tee/90Elbow

39 Workshop MO-0001-1A-12” 2/7 SW-019 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Tee/90Elbow

40 Workshop DO-0001-1A-12” 1/7 SW-003 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

41 Workshop DO-0001-1A-12” 1/7 SW-002 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

42 Workshop JF-0001-1A-12” 2/7 SW-027 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

43 Workshop JF-0001-1A-12” 2/7 SW-024 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

44 Workshop JF-0001-1A-12” 1/7 SW-002 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
45 Workshop JF-0001-1A-12” 1/7 SW-003 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

46 Workshop JF-0001-1A-12” 1/7 SW-013 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

47 Workshop JF-0001-1A-12” 4/7 SW-054 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

48 Workshop JF-0001-1A-12” 4/7 SW-053 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

49 Workshop JF-0001-1A-12” 4/7 SW-059 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

50 Workshop MO-0001-1A-12” 1/7 SW-002 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

51 Workshop MO-0001-1A-12” 1/7 SW-017 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

52 Workshop JF-0001-1A-12” 4/7 SW-047 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

53 Workshop DO-0001-1A-12” 1/7 SW-005 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

54 Workshop JF-0001-1A-12” 1/7 SW-006 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

55 Workshop JF-0001-1A-12” 1/7 SW-007 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
56 Workshop MO-0001-1A-12” 1/7 SW-008 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

57 Workshop MO-0001-1A-12” 1/7 SW-015 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

58 Workshop MO-0001-1A-12” 1/7 SW-014 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

59 Workshop JF-0001-1A-12” 3/7 SW-037 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Reducer

60 Workshop MO-0001-1A-12” 3/7 SW-041 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Reducer

61 Workshop MO-0001-1A-12” 1/7 SW-004 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

62 Workshop MO-0001-1A-12” 1/7 SW-005 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Reducer

63 Workshop JF-0001-1A-12” 7/7 SW-092 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

64 Workshop MO-0001-1A-12” 7/7 SW-097 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

65 Workshop MO-0001-1A-12” 7/7 SW-098 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

66 Workshop MO-0001-1A-12” 4/7 SW-057 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
67 Workshop MO-0001-1A-12” 7/7 SW-103 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

68 Workshop MO-0001-1A-12” 7/7 SW-104 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

69 Workshop MO-0001-1A-12” 7/7 SW-105 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

70 Workshop JF-0001-1A-12” 7/7 SW-098 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

71 Workshop JF-0001-1A-12” 7/7 SW-099 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

72 Workshop JF-0001-1A-12” 7/7 SW-96 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

73 Workshop MO-0001-1A-12” 4/7 SW-051 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

74 Workshop MO-0001-1A-12” 4/7 SW-053 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

75 Workshop JF-0001-1A-12” 4/7 SW-049 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

76 Workshop MO-0001-1A-12” 2/7 SW-028 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

77 Workshop MO-0001-1A-12” 2/7 SW-031 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
78 Tank Farm DO-0015-1A-14” 2/2 FW-32 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

79 Tank Farm JF-0012-1A-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

80 Tank Farm DO-0015-1A-14” 2/2 FW-30 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

81 Tank Farm MO-0062-1A-14” 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

82 Tank Farm MO-0062-1A-14” 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A234 Tee/Reducer

83 Tank Farm MO-0062-1A-14” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Reducer

84 Tank Farm MO-0062-1A-14” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

85 Tank Farm DO-0015-1A-14” 2/2 FW-28 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

86 Tank Farm MO-0062-1A-14” 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

87 Tank Farm JF-0012-1A-10" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

88 Tank Farm MO-0021-1A-16” 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 16” SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
89 Tank Farm DO-0015-1A-14” 1/2 FW-23 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

90 Tank Farm MO-0021-1A-16” 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 16” SCH20 A106/A234 Pipe/90Elbow

91 Tank Farm MO-0021-1A-16” 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 16” SCH20 A106/A234 Pipe/Tee

92 Tank Farm MO-0021-1A-16” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 16” SCH20 A106/A234 Pipe/Tee

93 Tank Farm DO-0015-1A-14” 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

94 Tank Farm DO-0015-1A-14” 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

95 Tank Farm DO-0015-1A-14” 1/2 FW-24 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

96 Tank Farm DO-0015-1A-14” 1/2 FW-25 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

97 Tank Farm JF-0012-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

98 Tank Farm JF-0012-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

99 Tank Farm MO-0021-1A-16” 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 16” SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
100 Tank Farm MO-0021-1A-16” 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 16” SCH20 A106/A234 Pipe/Tee

101 Tank Farm DO-0015-1A-14” 1/2 FW-20 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

102 Tank Farm JF-0012-1A-10" 1/1 FW-18 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

103 Tank Farm JF-0012-1A-10" 1/1 FW-17 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

104 Tank Farm MO-0021-1A-16” 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 16” SCH20 A106/A234 Pipe/90Elbow

105 Workshop DO-0001-1A-12” 4/7 SW-050 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

106 Workshop DO-0001-1A-12” 4/7 SW-048 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

107 Workshop DO-0001-1A-12” 7/7 SW-094 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

108 Workshop DO-0001-1A-12” 7/7 SW-095 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

109 Workshop DO-0001-1A-12” 5/7 SW-064 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

110 Workshop DO-0001-1A-12” 3/7 SW-038 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
111 Workshop DO-0001-1A-12” 4/7 SW-055 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

112 Workshop DO-0001-1A-12” 7/7 SW-100 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

113 Workshop DO-0001-1A-12” 7/7 SW-101 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

114 Workshop DO-0001-1A-12” 7/7 SW-84 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

115 Workshop DO-0001-1A-12” 2/7 SW-028 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

116 Workshop DO-0001-1A-12” 2/7 SW-025 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

117 Tank Farm MO-0004-1A-12” 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

118 Tank Farm MO-0005-1A-12” 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

119 Tank Farm MO-0005-1A-12” 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

120 Tank Farm MO-0021-1A-16” 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 16” SCH20 A106/A234 Pipe/Tee

121 Tank Farm MO-0021-1A-16” 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 16” SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
122 Tank Farm DO-0016-1A-8” 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

123 Tank Farm JF-0013-1A-8” 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

124 Tank Farm MO-0022-1A-8” 1/4 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

125 Tank Farm MO-0005-1A-12” 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

126 Tank Farm MO-0005-1A-12” 1/1 FW-30 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

127 Tank Farm DO-0002-1A-12” 2/2 FW-38 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

128 Tank Farm MO-0003-1A-12” 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

129 Tank Farm JF-0002-1A-12” 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

130 Tank Farm DO-0015-1A-14” 1/2 FW-15 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

131 Tank Farm DO-0015-1A-14” 1/2 FW-17 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

132 Tank Farm MO-0021-1A-16” 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 16” SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
133 Tank Farm DO-0002-1A-12” 2/2 FW-36 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

134 Tank Farm MO-0005-1A-12” 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

135 Tank Farm MO-0062-1A-14” 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

136 Tank Farm MO-0062-1A-14” 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

137 Tank Farm MO-0005-1A-12” 1/1 FW-32 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

138 Tank Farm MO-0015-1A-12” 1/1 FW-11 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

139 Tank Farm MO-0015-1A-12” 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

140 Tank Farm MO-0004-1A-12” 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

141 Tank Farm MO-0003-1A-12” 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

142 Tank Farm DO-0015-1A-14” 1/2 FW-21 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

143 Tank Farm MO-0062-1A-14” 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
144 Tank Farm DO-0002-1A-12” 2/2 FW-44 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

145 Tank Farm JF-0012-1A-10" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

146 Tank Farm MO-0022-1A-8” 4/4 FW-68 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

147 Tank Farm JF-0012-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

148 Tank Farm JF-0012-1A-10" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

149 Tank Farm MO-0022-1A-8” 3/4 FW-50 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

150 Tank Farm MO-0022-1A-8” 3/4 FW-49 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

151 Tank Farm MO-0022-1A-8” 1/4 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

152 Tank Farm MO-0022-1A-8” 1/4 FW-23 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

153 Tank Farm MO-0022-1A-8” 1/4 FW-24 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

154 Tank Farm MO-0022-1A-8” 4/4 FW-73 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
155 Tank Farm MO-0022-1A-8” 4/4 FW-74 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

156 Tank Farm MO-0022-1A-8” 4/4 FW-70 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

157 Tank Farm MO-0022-1A-8” 1/4 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

158 Tank Farm MO-0022-1A-8” 1/4 FW-10 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

159 Tank Farm MO-0022-1A-8” 1/4 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

160 Tank Farm MO-0022-1A-8” 1/4 FW-21 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

161 Tank Farm DO-0002-1A-12” 2/2 FW-38A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

162 Tank Farm JF-0013-1A-8” 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

163 Tank Farm JF-0013-1A-8” 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

164 Tank Farm MO-0119-1A-12” 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

165 Tank Farm MO-0119-1A-12” 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
166 Tank Farm MO-0119-1A-12” 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

167 Tank Farm MO-0022-1A-8” 4/4 FW-75 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A105 Tee/Blind Flange

168 Tank Farm MO-0003-1A-12” 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Blind Flange

169 Tank Farm DO-0002-1A-12” 2/2 FW-45 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Blind Flange

170 Tank Farm MO-0005-1A-12” 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Blind Flange

171 Tank Farm DO-0054-1A-14" 1/3 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Blind Flange

172 Tank Farm DO-0054-1A-14" 1/3 FW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

173 Tank Farm DO-0054-1A-14" 1/3 FW-14 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

174 Tank Farm JF-0013-1A-8” 1/1 FW-14G BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Tee

175 Tank Farm MO-0056-1A-12” 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

176 Tank Farm MO-0056-1A-12” 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
177 Tank Farm JF-0002-1A-12” 1/2 FW-19A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

178 Tank Farm MO-0021-1A-16” 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 16” SCH20 A106/A105 Pipe/Blind Flange

179 Tank Farm DO-0015-1A-14” 1/2 FW-26 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A105 Tee/Blind Flange

180 Tank Farm MO-0056-1A-12” 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Blind Flange

181 Tank Farm MO-0060-1A-12” 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Blind Flange

182 Tank Farm MO-0060-1A-12” 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

183 Tank Farm JF-0013-1A-8” 1/1 FW-14E BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

184 Tank Farm MO-0015-1A-12” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

185 Tank Farm MO-0015-1A-12” 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

186 Tank Farm MO-0056-1A-12” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

187 Tank Farm MO-0060-1A-12” 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
188 Tank Farm MO-0060-1A-12” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A105 Tee/Blind Flange

189 Tank Farm MO-0054-1A-14” 1/2 FW-10 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

190 Tank Farm MO-0121-1A-10” 1/2 FW-31 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

191 Tank Farm MO-0121-1A-10” 1/2 FW-29 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

192 Tank Farm MO-0019-1A-14” 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

193 Tank Farm MO-0062-1A-14” 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Blind Flange

194 Tank Farm JF-0013-1A-8” 1/1 FW-14F BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

195 Tank Farm MO-0019-1A-14” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A105 Tee/Blind Flange

196 Tank Farm MO-0019-1A-14” 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

197 Tank Farm MO-0019-1A-14” 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Blind Flange

198 Tank Farm MO-0056-1A-12” 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
199 Tank Farm MO-0003-1A-12” 1/1 FW-26A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

200 Tank Farm MO-0119-1A-12” 1/2 FW-32 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

201 Tank Farm MO-0119-1A-12” 1/2 RW-34 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

202 Tank Farm MO-0019-1A-14” 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Blind Flange

203 Tank Farm MO-0019-1A-14” 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

204 Tank Farm MO-0019-1A-14” 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

205 Tank Farm MO-0019-1A-14” 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Blind Flange

206 Tank Farm JF-0013-1A-8” 1/1 FW-14D BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Pipe

207 Tank Farm MO-0121-1A-10” 1/2 FW-30 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

208 Tank Farm MO-0040-1A-10” 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

209 Tank Farm MO-0047-1A-12” 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Blind Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
210 Tank Farm MO-0047-1A-12” 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

211 Tank Farm MO-0047-1A-12” 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

212 Tank Farm DO-0016-1A-8” 1/1 FW-16B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Pipe

213 Tank Farm DO-0016-1A-8” 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

214 Tank Farm MO-0119-1A-12” 1/2 RW-33 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

215 Tank Farm MO-0040-1A-10” 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Blind Flange

216 Tank Farm MO-0015-1A-12” 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Blind Flange

217 Tank Farm MO-0015-1A-12” 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

218 Tank Farm MO-0056-1A-12” 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

219 Tank Farm MO-0056-1A-12” 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

220 Tank Farm MO-0005-1A-12” 1/1 FW-28A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
221 Tank Farm MO-0121-1A-10” 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

222 Tank Farm MO-0121-1A-10” 1/2 FW-13 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

223 Tank Farm MO-0040-1A-10” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

224 Tank Farm MO-0040-1A-10” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

225 Tank Farm MO-0054-1A-14” 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

226 Tank Farm MO-0054-1A-14” 1/2 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

227 Tank Farm MO-0047-1A-12” 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

228 Tank Farm MO-0022-1A-8” 1/4 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

229 Tank Farm MO-0022-1A-8” 1/4 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

230 Tank Farm DO-0016-1A-8” 1/1 FW-16A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

231 Tank Farm MO-0019-1A-14” 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
232 Tank Farm MO-0056-1A-12” 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

233 Tank Farm MO-0015-1A-12” 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

234 Tank Farm MO-0015-1A-12” 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

235 Tank Farm MO-0040-1A-10” 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

236 Tank Farm MO-0060-1A-12” 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

237 Tank Farm MO-0060-1A-12” 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

238 Tank Farm MO-0022-1A-8” 1/4 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

239 Tank Farm MO-0022-1A-8” 1/4 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

240 Tank Farm MO-0022-1A-8” 1/4 FW-25 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

241 Tank Farm MO-0005-1A-12” 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

242 Tank Farm JF-0002-1A-12” 1/2 FW-19G BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
243 Tank Farm JF-0013-1A-8” 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

244 Tank Farm MO-0121-1A-10” 1/2 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

245 Tank Farm MO-0121-1A-10” 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

246 Tank Farm MO-0121-1A-10” 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

247 Tank Farm MO-0019-1A-14” 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

248 Tank Farm MO-0015-1A-12” 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

249 Tank Farm MO-0056-1A-12” 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

250 Tank Farm MO-0056-1A-12” 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

251 Tank Farm JF-0013-1A-8” 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

252 Tank Farm MO-0004-1A-12” 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A105 Tee/Flange

253 Tank Farm MO-0015-1A-12” 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
254 Tank Farm MO-0015-1A-12” 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

255 Tank Farm MO-0022-1A-8” 1/4 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

256 Tank Farm MO-0022-1A-8” 1/4 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

257 Workshop DO-0001-1A-12” 2/7 SW-029 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

258 Workshop DO-0001-1A-12” 2/7 SW-019 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

259 Workshop JF-0001-1A-12” 2/7 SW-018 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

260 Workshop DO-0001-1A-12” 1/7 SW-014 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

261 Workshop DO-0001-1A-12” 2/7 SW-023 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

262 Workshop JF-0001-1A-12” 2/7 SW-022 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

263 Workshop MO-0001-1A-12” 2/7 SW-26 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

264 Workshop JF-0001-1A-12” 3/7 SW-045 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
265 Workshop DO-0001-1A-12” 3/7 SW-046 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

266 Workshop MO-0001-1A-12” 3/7 SW-049 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

267 Workshop JF-0001-1A-12” 3/7 SW-029 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

268 Workshop MO-0001-1A-12” 2/7 SW-033 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

269 Workshop DO-0001-1A-12” 3/7 SW-030 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

270 Workshop DO-0001-1A-12” 7/7 SW-097 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

271 Workshop MO-0001-1A-12” 2/7 SW-032 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

272 Workshop MO-0001-1A-12” 4/7 SW-60 BRW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/scokolet

273 Workshop MO-0001-1A-12” 3/7 SW-044 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

274 Workshop MO-0001-1A-12” 3/7 SW-045 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

275 Workshop MO-0001-1A-12” 2/7 SW-23 BRW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
276 Workshop MO-0001-1A-12” 2/7 SW-022 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

277 Workshop JF-0001-1A-12” 7/7 SW-93TR1 BW WPS-2016-23 GTAW/SMAW 12" SCH40 A106/A234 Pipe/90Elbow

278 Workshop JF-0001-1A-12” 4/7 SW-046 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

279 Workshop JF-0001-1A-12” 4/7 SW-050 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

280 Workshop JF-0001-1A-12” 7/7 SW-095 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

281 Workshop DO-0001-1A-12” 4/7 SW-047 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

282 Workshop DO-0001-1A-12” 4/7 SW-051 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

283 Workshop MO-0001-1A-12” 1/7 SW-007 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

284 Workshop MO-0001-1A-12” 7/7 SW-100 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

285 Tank Farm MO-0022-1A-8” 1/4 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

286 Tank Farm JF-0002-1A-12” 1/2 FW-21 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
287 Tank Farm DO-0002-1A-12” 2/2 FW-42B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/pipe

288 Tank Farm MO-0054-1A-14” 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

289 Tank Farm JF-0041-1A-8” 2/2 FW-42 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

290 Tank Farm JF-0041-1A-8” 2/2 FW-43 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

291 Tank Farm JF-0041-1A-8” 2/2 FW-36 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/90Elbow

292 Tank Farm JF-0041-1A-8” 2/2 FW-38 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

293 Tank Farm DO-0016-1A-8” 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

294 Tank Farm MO-0060-1A-12” 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

295 Tank Farm MO-0022-1A-8” 1/4 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

296 Tank Farm MO-0022-1A-8” 1/4 FW-12 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

297 Tank Farm MO-0047-1A-12” 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
298 Tank Farm MO-0060-1A-12” 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

299 Tank Farm MO-0056-1A-12” 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

300 Tank Farm MO-0060-1A-12” 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

301 Tank Farm MO-0054-1A-14” 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

302 Tank Farm MO-0022-1A-8” 1/4 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

303 Tank Farm JF-0002-1A-12” 1/2 FW-19F BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/pipe

304 Tank Farm MO-0003-1A-12” 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

305 Tank Farm JF-0041-1A-8” 2/2 FW-37 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

306 Tank Farm MO-0054-1A-14” 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

307 Tank Farm MO-0060-1A-12” 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

308 Tank Farm MO-0054-1A-14” 2/2 FW-15 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
309 Tank Farm MO-0056-1A-12” 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

310 Tank Farm JF-0041-1A-8” 2/2 FW-62 NA WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

311 Tank Farm JF-0041-1A-8” 2/2 FW-60 NA WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

312 Tank Farm MO-0047-1A-12” 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

313 Tank Farm MO-0047-1A-12” 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

314 Tank Farm MO-0054-1A-14” 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

315 Tank Farm MO-0060-1A-12” 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

316 Tank Farm MO-0019-1A-14” 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

317 Tank Farm JF-0002-1A-12” 1/2 FW-19 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

318 Tank Farm MO-0021-1A-16” 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 16” SCH20 A106/A234 Pipe/Tee

319 Tank Farm JF-0041-1A-8” 2/2 FW-61 NA WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
320 Tank Farm JF-0013-1A-8” 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

321 Tank Farm DO-0002-1A-12” 2/2 FW-43 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

322 Tank Farm JF-0013-1A-8” 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

323 Tank Farm DO-0016-1A-8” 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

324 Tank Farm MO-0040-1A-10” 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

325 Tank Farm DO-0002-1A-12” 2/2 FW-37 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

326 Tank Farm DO-0005-1A-12” 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

327 Tank Farm DO-0005-1A-12” 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

328 Tank Farm DO-0005-1A-12” 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

329 Tank Farm DO-0005-1A-12” 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

330 Tank Farm DO-0016-1A-8” 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
331 Tank Farm DO-0010-1A-12" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

332 Tank Farm DO-0010-1A-12" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

333 Tank Farm DO-0010-1A-12" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

334 Tank Farm DO-0010-1A-12" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

335 Tank Farm DO-0017-1A-12" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

336 Tank Farm DO-0017-1A-12" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

337 Tank Farm DO-0017-1A-12" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

338 Tank Farm DO-0017-1A-12" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

339 Tank Farm DO-0015-1A-14” 2/2 FW-27B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

340 Tank Farm JF-0013-1A-8” 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

341 Tank Farm JF-0013-1A-8” 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
342 Tank Farm JF-0002-1A-12” 1/2 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

343 Tank Farm MO-0062-1A-14” 1/1 FW-5B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

344 Tank Farm JF-0013-1A-8” 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Reducer

345 Tank Farm DO-0016-1A-8” 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

346 Tank Farm DO-0016-1A-8” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

347 Tank Farm MO-0047-1A-12” 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

348 Tank Farm DO-0010-1A-12" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

349 Tank Farm MO-0040-1A-10” 1/1 FW-5A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

350 Tank Farm JF-0012-1A-10" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

351 Tank Farm DO-0002-1A-12” 2/2 FW-42 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

352 Tank Farm DO-0010-1A-12" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
353 Tank Farm DO-0005-1A-12” 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

354 Tank Farm JF-0013-1A-8” 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Reducer

355 Tank Farm MO-0119-1A-12” 1/2 FW-18A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

356 Tank Farm MO-0002-1A-12" 1/1 FW-35 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Reducer

357 Tank Farm MO-0002-1A-12" 1/1 FW-34 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

358 Tank Farm MO-0003-1A-12” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

359 Tank Farm MO-0060-1A-12” 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

360 Tank Farm MO-0054-1A-14” 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

361 Tank Farm MO-0019-1A-14” 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

362 Tank Farm JF-0041-1A-8” 2/2 FW-41 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Reducer

363 Tank Farm JF-0041-1A-8” 2/2 FW-40 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
364 Tank Farm JF-0041-1A-8” 2/2 FW-44 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Reducer

365 Tank Farm DO-0005-1A-12” 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

366 Tank Farm DO-0005-1A-12” 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

367 Tank Farm DO-0010-1A-12" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

368 Tank Farm DO-0010-1A-12" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

369 Tank Farm JF-0002-1A-12” 1/2 FW-19D BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

370 Tank Farm MO-0004-1A-12” 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

371 Tank Farm MO-0005-1A-12” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

372 Tank Farm MO-0002-1A-12" 1/1 FW-33 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Tee/Tee

373 Tank Farm DO-0017-1A-12" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

374 Tank Farm DO-0017-1A-12" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
375 Tank Farm MO-0119-1A-12” 1/2 FW-18B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

376 Tank Farm DO-0005-1A-12” 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

377 Tank Farm DO-0017-1A-12" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

378 Tank Farm JF-0005-1A-12" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

379 Tank Farm JF-0005-1A-12" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

380 Tank Farm MO-0023-1A-12" 1/2 FW-22 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

381 Tank Farm MO-0023-1A-12" 1/2 FW-23 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

382 Tank Farm DO-0017-1A-12" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

383 Tank Farm MO-0011-1A-12" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

384 Tank Farm MO-0011-1A-12" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

385 Tank Farm MO-0011-1A-12" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
386 Tank Farm DO-0002-1A-12” 2/2 FW-42A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

387 Tank Farm MO-0023-1A-12" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

388 Tank Farm MO-0023-1A-12" 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

389 Tank Farm MO-0023-1A-12" 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

390 Tank Farm MO-0004-1A-12” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

391 Tank Farm MO-0004-1A-12” 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

392 Tank Farm MO-0004-1A-12” 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

393 Tank Farm MO-0022-1A-8” 4/4 FW-66A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

394 Tank Farm JF-0005-1A-12" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

395 Tank Farm JF-0005-1A-12" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

396 Tank Farm JF-0014-1A-12" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
397 Tank Farm JF-0014-1A-12" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

398 Tank Farm MO-0023-1A-12" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

399 Tank Farm JF-0014-1A-12" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

400 Tank Farm JF-0014-1A-12" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

401 Tank Farm JF-0014-1A-12" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

402 Tank Farm JF-0005-1A-12" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

403 Tank Farm MO-0119-1A-12” 1/2 FW-18 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

404 Tank Farm MO-0003-1A-12” 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

405 Tank Farm MO-0011-1A-12" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

406 Tank Farm MO-0119A-1A-12" 1/2 FW-26 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

407 Tank Farm MO-0023-1A-12" 1/2 FW-19 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
408 Tank Farm MO-0009-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

409 Tank Farm MO-0009-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

410 Tank Farm MO-0008-1A-2" 2/2 FW-14 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

411 Tank Farm JF-0017-1A-10" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

412 Tank Farm JF-0017-1A-10" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

413 Tank Farm JF-0017-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

414 Tank Farm MO-0024-1A-10" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

415 Tank Farm MO-0024-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

416 Tank Farm MO-0024-1A-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

417 Tank Farm MO-0024-1A-10" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

418 Tank Farm MO-0005-1A-12” 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
419 Tank Farm MO-0024-1A-10" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

420 Tank Farm MO-0024-1A-10" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

421 Tank Farm MO-0024-1A-10" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

422 Tank Farm MO-0023-1A-12" 1/2 FW-10 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

423 Tank Farm MO-0023-1A-12" 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

424 Tank Farm MO-0005-1A-12” 1/1 FW-33 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

425 Tank Farm MO-0027-1A-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

426 Tank Farm MO-0027-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

427 Tank Farm JF-0013-1A-8” 1/1 FW-14A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

428 Tank Farm MO-0063-1A-10" 2/2 FW-34 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

429 Tank Farm MO-0063-1A-10" 2/2 FW-33 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
430 Tank Farm JF-0005-1A-12" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Tee/45Elbow

431 Tank Farm JF-0024-1A-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

432 Tank Farm JF-0024-1A-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

433 Tank Farm MO-0043-1A-8" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

434 Tank Farm MO-0043-1A-8" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

435 Tank Farm MO-0043-1A-8" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

436 Tank Farm MO-0043-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

437 Tank Farm MO-0043-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

438 Tank Farm MO-0119A-1A-12" 1/2 FW-25 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

439 Tank Farm MO-0030-1A-10" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

440 Tank Farm JF-0041a-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
441 Tank Farm JF-0041a-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

442 Tank Farm MO-0030-1A-10" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

443 Tank Farm MO-0030-1A-10" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 Reducer/Flange

444 Tank Farm MO-0063-1A-10" 2/2 FW-31 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

445 Tank Farm MO-0063-1A-10" 2/2 FW-28 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

446 Tank Farm JF-0017-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

447 Tank Farm MO-0030-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

448 Tank Farm MO-0030-1A-10" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

449 Tank Farm MO-0027-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

450 Tank Farm MO-0027-1A-10" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

451 Tank Farm MO-0043-1A-8" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
452 Tank Farm MO-0043-1A-8" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

453 Tank Farm DO-0016-1A-8” 1/1 FW-10A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

454 Tank Farm MO-0121a-1A-10" 1/1 FW-37 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

455 Tank Farm MO-0121a-1A-10" 1/1 FW-36 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

456 Tank Farm MO-0121a-1A-10" 1/1 FW-35 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

457 Tank Farm MO-0026-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Reducer

458 Tank Farm MO-0033-1A-12" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

459 Tank Farm MO-0033-1A-12" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

460 Tank Farm MO-0033-1A-12" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

461 Tank Farm MO-0033-1A-12" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

462 Tank Farm MO-0027-1A-10" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
463 Tank Farm MO-0030-1A-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

464 Tank Farm MO-0030-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

465 Tank Farm MO-0027-1A-10" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

466 Tank Farm MO-0027-1A-10" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 Reducer/Flange

467 Tank Farm MO-0022-1A-8” 4/4 FW-67 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

468 Tank Farm MO-0063-1A-10" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

469 Tank Farm MO-0063-1A-10" 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

470 Tank Farm JF-0041a-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

471 Tank Farm JF-0041a-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

472 Tank Farm MO-0043-1A-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

473 Tank Farm JF-0041a-1A-8" 1/1 FW-37 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
474 Tank Farm MO-0121a-1A-10" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

475 Tank Farm MO-0063-1A-10" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

476 Tank Farm DO-0002-1A-12” 2/2 FW-39 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

477 Tank Farm DO-0024-1A-8" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

478 Tank Farm DO-0024-1A-8" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

479 Tank Farm MO-0039-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

480 Tank Farm JF-0009-1A-10" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

481 Tank Farm JF-0009-1A-10" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

482 Tank Farm JF-0009-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

483 Tank Farm JF-0017-1A-10" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

484 Tank Farm MO-0033-1A-12" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
485 Tank Farm MO-0026-1A-6" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 6" SCH20 A106/A234 Pipe/90Elbow

486 Tank Farm MO-0026-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH20 A106/A234 Pipe/90Elbow

487 Tank Farm DO-0031-1A-8" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

488 Tank Farm MO-0023-1A-12" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

489 Tank Farm MO-0026-1A-6" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

490 Tank Farm MO-0026-1A-6" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

491 Tank Farm MO-0063-1A-10" 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

492 Tank Farm MO-0063-1A-10" 1/2 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

493 Tank Farm MO-0063-1A-10" 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

494 Tank Farm MO-0063-1A-10" 1/2 FW-19 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

495 Tank Farm MO-0025-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
496 Tank Farm MO-0025-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

497 Tank Farm MO-0025-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

498 Tank Farm MO-0025-1A-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

499 Tank Farm MO-0026-1A-6" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

500 Tank Farm DO-0031-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

501 Tank Farm MO-0063-1A-10" 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

502 Tank Farm DO-0015-1A-14” 2/2 FW-31 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

503 Tank Farm DO-0018-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

504 Tank Farm JF-0006-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

505 Tank Farm DO-0006-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

506 Tank Farm MO-0012-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
507 Tank Farm DO-0031-1A-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

508 Tank Farm DO-0031-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

509 Tank Farm MO-0023-1A-12" 2/2 FW-35 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

510 Tank Farm MO-0023-1A-12" 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

511 Tank Farm DO-0023-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

512 Tank Farm DO-0023-1A-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

513 Tank Farm MO-0026-1A-6" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

514 Tank Farm MO-0026-1A-6" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

515 Tank Farm DO-0006-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

516 Tank Farm JF-0006-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

517 Tank Farm JF-0015-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
518 Tank Farm JF-0024-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

519 Tank Farm MO-0120a-1A-8" 1/1 FW-37 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

520 Tank Farm JF-0002-1A-12” 1/2 FW-19B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

521 Tank Farm MO-0120a-1A-8" 1/1 FW-38 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

522 Tank Farm MO-0120a-1A-8" 1/1 FW-39 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

523 Tank Farm DO-0011-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

524 Tank Farm MO-0012-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

525 Tank Farm DO-0035-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

526 Tank Farm DO-0036-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

527 Tank Farm JF-0012-1A-10" 1/1 FW-4E BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

528 Tank Farm DO-0027-1A-8" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
529 Tank Farm DO-0027-1A-8" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

530 Tank Farm DO-0029-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

531 Tank Farm DO-0024-1A-8" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

532 Tank Farm DO-0026-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

533 Tank Farm DO-0027-1A-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

534 Tank Farm JF-0002-1A-12” 1/2 FW-19C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

535 Tank Farm JF-0012-1A-10" 1/1 FW-4G BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

536 Tank Farm JF-0020-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

537 Tank Farm JF-0020-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

538 Tank Farm JF-0020-1A-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

539 Tank Farm JF-0020-1A-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
540 Tank Farm DO-0027-1A-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

541 Tank Farm JF-0015-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

542 Tank Farm JF-0006-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

543 Tank Farm DO-0035-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

544 Tank Farm DO-0035-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

545 Tank Farm DO-0035-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

546 Tank Farm DO-0035-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

547 Tank Farm DO-0031-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

548 Tank Farm DO-0024-1A-8" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

549 Tank Farm DO-0024-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Reducer

550 Tank Farm DO-0024-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
551 Tank Farm DO-0023-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

552 Tank Farm JF-0020-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

553 Tank Farm JF-0020-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

554 Tank Farm JF-0020-1A-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

555 Tank Farm JF-0020-1A-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

556 Tank Farm MO-0023-1A-12" 2/2 FW-34 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

557 Tank Farm MO-0023-1A-12" 2/2 FW-33 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

558 Tank Farm MO-0023-1A-12" 2/2 FW-31 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

559 Tank Farm MO-0023-1A-12" 2/2 FW-32 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

560 Tank Farm DO-0031-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

561 Tank Farm DO-0031-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
562 Tank Farm MO-0084-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

563 Tank Farm MO-0085-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

564 Tank Farm MO-0086-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

565 Tank Farm MO-0087-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

566 Tank Farm MO-0088-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

567 Tank Farm MO-0089-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

568 Tank Farm MO-0090-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

569 Tank Farm MO-0091-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

570 Tank Farm MO-0092-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

571 Tank Farm MO-0093-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

572 Tank Farm MO-0094-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
573 Tank Farm MO-0095-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

574 Tank Farm MO-0056-1A-12” 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

575 Tank Farm DO-0016-1A-8” 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

576 Tank Farm MO-0022-1A-8” 4/4 FW-65 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

577 Tank Farm MO-0120a-1A-8" 1/1 FW-35 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

578 Tank Farm MO-0120a-1A-8" 1/1 FW-36 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

579 Tank Farm DO-0054a-1A-14” 2/2 FW-44 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A105 Tee/Flange

580 Tank Farm DO-0030-1A-8" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

581 Tank Farm DO-0030-1A-8" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

582 Tank Farm MO-0022-1A-8” 4/4 FW-63 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

583 Tank Farm DO-0026-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
584 Tank Farm DO-0023-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

585 Tank Farm DO-0021-1A-14" 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

586 Tank Farm DO-0021-1A-14" 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

587 Tank Farm DO-0027-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

588 Tank Farm DO-0027-1A-8" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

589 Tank Farm DO-0026-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

590 Tank Farm DO-0031-1A-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

591 Tank Farm DO-0031-1A-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

592 Tank Farm DO-0031-1A-8" 1/1 FW-10 BRW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Weldolet

593 Tank Farm DO-0026-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

594 Tank Farm DO-0024-1A-8" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
595 Tank Farm MO-0022-1A-8” 4/4 FW-57 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

596 Tank Farm MO-0022-1A-8” 4/4 FW-56 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

597 Tank Farm MO-0022-1A-8” 4/4 FW-59 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

598 Tank Farm MO-0022-1A-8” 4/4 FW-60 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

599 Tank Farm MO-0022-1A-8” 4/4 FW-61 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

600 Tank Farm DO-0021-1A-14" 1/2 FW-13 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

601 Tank Farm MO-0064-1A-10" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

602 Tank Farm MO-0064-1A-10" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

603 Tank Farm MO-0064-1A-10" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

604 Tank Farm DO-0038-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

605 Tank Farm DO-0037-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
606 Tank Farm DO-0039-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

607 Tank Farm DO-0040-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

608 Tank Farm DO-0041-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

609 Tank Farm DO-0006-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

610 Tank Farm DO-0018-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

611 Tank Farm DO-0026-1A-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

612 Tank Farm DO-0029-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

613 Tank Farm DO-0029-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

614 Tank Farm JF-0026-1A-6" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

615 Tank Farm DO-0029-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

616 Tank Farm DO-0011-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
617 Tank Farm DO-0018-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

618 Tank Farm DO-0024-1A-8" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

619 Tank Farm MO-0064-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

620 Tank Farm MO-0064-1A-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

621 Tank Farm DO-0054a-1A-14” 2/2 FW-39 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

622 Tank Farm MO-0005-1A-12” 1/1 FW-28B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

623 Tank Farm DO-0024-1A-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

624 Tank Farm DO-0024-1A-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

625 Tank Farm DO-0027-1A-8" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

626 Tank Farm DO-0027-1A-8" 1/1 FW-21` BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

627 Tank Farm DO-0054a-1A-14” 2/2 FW-37 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
628 Tank Farm MO-0064-1A-10" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

629 Tank Farm MO-0064-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

630 Tank Farm DO-0023-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

631 Tank Farm DO-0037-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

632 Tank Farm DO-0037-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

633 Tank Farm DO-0037-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

634 Tank Farm DO-0037-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

635 Tank Farm DO-0054a-1A-14” 2/2 FW-42 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

636 Tank Farm DO-0021-1A-14" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

637 Tank Farm DO-0036-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

638 Tank Farm DO-0036-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
639 Tank Farm DO-0036-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

640 Tank Farm DO-0032-1A-4" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Reducer

641 Tank Farm JF-0015-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

642 Tank Farm JF-0006-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

643 Tank Farm DO-0022-1A-10" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

644 Tank Farm DO-0022-1A-10" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

645 Tank Farm DO-0022-1A-10" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Reducer

646 Tank Farm JF-0013-1A-8” 1/1 FW-14B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

647 Tank Farm DO-0022-1A-10" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

648 Tank Farm DO-0022-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

649 Tank Farm DO-0025-1A-10" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
650 Tank Farm DO-0025-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

651 Tank Farm MO-0093-1A-4" 1/1 FW-1A BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

652 Tank Farm MO-0092-1A-4" 1/1 FW-1A BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

653 Tank Farm MO-0089-1A-4" 1/1 FW-1A BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

654 Tank Farm MO-0088-1A-4" 1/1 FW-1A BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

655 Tank Farm DO-0054a-1A-14” 2/2 FW-43 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

656 Tank Farm DO-0054a-1A-14” 2/2 FW-47 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

657 Tank Farm MO-0019-1A-14” 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

658 Tank Farm MO-0084-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

659 Tank Farm MO-0084-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

660 Tank Farm MO-0089-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
661 Tank Farm MO-0089-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

662 Tank Farm DO-0039-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

663 Tank Farm DO-0039-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

664 Tank Farm DO-0039-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

665 Tank Farm DO-0039-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

666 Tank Farm DO-0022-1A-10" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

667 Tank Farm DO-0022-1A-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

668 Tank Farm DO-0016-1A-8” 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

669 Tank Farm DO-0016-1A-8” 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

670 Tank Farm MO-0044-1A-10" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

671 Tank Farm MO-0044-1A-10" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
672 Tank Farm MO-0044-1A-10" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

673 Tank Farm MO-0120a-1A-8" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

674 Tank Farm MO-0120a-1A-8" 1/1 FW-43 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

675 Tank Farm MO-0120a-1A-8" 1/1 FW-42 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

676 Tank Farm MO-0091-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

677 Tank Farm MO-0092-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

678 Tank Farm MO-0093-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

679 Tank Farm MO-0094-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

680 Tank Farm MO-0095-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

681 Tank Farm MO-0028-1A-6" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

682 Tank Farm MO-0028-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
683 Tank Farm MO-0119-1A-12” 1/2 FW-17 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

684 Tank Farm MO-0028-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

685 Tank Farm MO-0028-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

686 Tank Farm JF-0020-1A-8" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

687 Tank Farm JF-0020-1A-8" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

688 Tank Farm MO-0087-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

689 Tank Farm MO-0088-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

690 Tank Farm MO-0089-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

691 Tank Farm MO-0090-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

692 Tank Farm MO-0091-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

693 Tank Farm MO-0031-1A-6" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
694 Tank Farm MO-0031-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

695 Tank Farm MO-0031-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

696 Tank Farm DO-0040-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Flange

697 Tank Farm DO-0040-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

698 Tank Farm DO-0040-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

699 Tank Farm DO-0040-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

700 Tank Farm DO-0038-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

701 Tank Farm DO-0038-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

702 Tank Farm DO-0038-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

703 Tank Farm DO-0038-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

704 Tank Farm DO-0041-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
705 Tank Farm DO-0041-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

706 Tank Farm DO-0041-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

707 Tank Farm DO-0041-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

708 Tank Farm MO-0045-1A--6" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

709 Tank Farm MO-0045-1A--6" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

710 Tank Farm MO-0045-1A--6" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

711 Tank Farm JF-0013-1A-8” 1/1 FW-14C BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

712 Tank Farm MO-0045-1A--6" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

713 Tank Farm MO-0045-1A--6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

714 Tank Farm MO-0045-1A--6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Reducer

715 Tank Farm MO-0029-1A-6" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
716 Tank Farm MO-0029-1A-6" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

717 Tank Farm MO-0029-1A-6" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

718 Tank Farm MO-0085-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

719 Tank Farm MO-0085-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

720 Tank Farm MO-0093-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

721 Tank Farm MO-0093-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

722 Tank Farm MO-0088-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

723 Tank Farm MO-0088-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

724 Tank Farm MO-0087-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

725 Tank Farm MO-0087-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

726 Tank Farm MO-0086-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
727 Tank Farm MO-0086-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

728 Tank Farm MO-0084-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

729 Tank Farm MO-0085-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

730 Tank Farm MO-0086-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

731 Tank Farm MO-0087-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

732 Tank Farm MO-0088-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

733 Tank Farm MO-0089-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

734 Tank Farm JF-0023-1A-6" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

735 Tank Farm JF-0023-1A-6" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

736 Tank Farm JF-0023-1A-6" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

737 Tank Farm JF-0023-1A-6" 1/1 FW-03 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
738 Tank Farm JF-0023-1A-6" 1/1 FW-04 SW WPS-2016-23 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

739 Tank Farm MO-0045-1A--6" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

740 Tank Farm MO-0045-1A--6" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

741 Tank Farm MO-0045-1A--6" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

742 Tank Farm MO-0045-1A--6" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

743 Tank Farm MO-0045-1A--6" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

744 Tank Farm MO-0032-1A-6" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

745 Tank Farm MO-0032-1A-6" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

746 Tank Farm MO-0005-1A-12” 1/1 FW-28C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

747 Tank Farm MO-0029-1A-6" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

748 Tank Farm MO-0029-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
749 Tank Farm MO-0029-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Reducer

750 Tank Farm MO-0046-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

751 Tank Farm MO-0046-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

752 Tank Farm MO-0046-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

753 Tank Farm MO-0029-1A-6" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

754 Tank Farm MO-0029-1A-6" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

755 Tank Farm MO-0045-1A--6" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

756 Tank Farm MO-0065-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

757 Tank Farm MO-0065-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

758 Tank Farm JF-0024-1A-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

759 Tank Farm JF-0024-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
760 Tank Farm FW-6015-1B-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

761 Tank Farm FW-6015-1B-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A234/A234 Tee/90Elbow

762 Tank Farm MO-0022-1A-8” 4/4 FW-69 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

763 Tank Farm DO-0025-1A-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

764 Tank Farm DO-0025-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

765 Tank Farm DO-0035-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

766 Tank Farm DO-0036-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

767 Tank Farm DO-0037-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

768 Tank Farm DO-0038-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

769 Tank Farm DO-0039-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

770 Tank Farm DO-0040-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
771 Tank Farm DO-0041-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

772 Tank Farm MO-0095-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

773 Tank Farm MO-0095-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

774 Tank Farm MO-0065-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

775 Tank Farm MO-0065-1A-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

776 Tank Farm DO-0016-1A-8” 1/1 FW-12A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

777 Tank Farm FW-6016-1B-10" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

778 Tank Farm FW-6016-1B-10" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

779 Tank Farm MO-0044-1A-10" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

780 Tank Farm MO-0044-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

781 Tank Farm MO-0094-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
782 Tank Farm MO-0094-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

783 Tank Farm DO-0028-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

784 Tank Farm DO-0028-1A-10" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

785 Tank Farm MO-0040-1A-10” 1/1 FW-06 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

786 Tank Farm MO-0040-1A-10” 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

787 Tank Farm MO-0063-1A-10" 2/2 FW-22 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

788 Tank Farm MO-0063-1A-10" 2/2 FW-23 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

789 Tank Farm MO-0091-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

790 Tank Farm MO-0091-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

791 Tank Farm MO-0022-1A-8” 4/4 FW-64 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

792 Tank Farm JF-0024-1A-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
793 Tank Farm JF-0024-1A-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

794 Tank Farm DO-0025-1A-10" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

795 Tank Farm DO-0025-1A-10" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

796 Tank Farm DO-0025-1A-10" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

797 Tank Farm MO-0066-1A-6" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

798 Tank Farm MO-0066-1A-6" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

799 Tank Farm MO-0066-1A-6" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 Tee/Flange

800 Tank Farm DO-0014-1A-14" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

801 Tank Farm DO-0014-1A-14" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

802 Tank Farm DO-0014-1A-14" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

803 Tank Farm MO-0090-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
804 Tank Farm MO-0090-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

805 Tank Farm MO-0022-1A-8” 4/4 FW-58 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

806 Tank Farm DO-0028-1A-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

807 Tank Farm DO-0028-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

808 Tank Farm MO-0065-1A-6" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

809 Tank Farm DO-0028-1A-10" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

810 Tank Farm MO-0092-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

811 Tank Farm MO-0092-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

812 Tank Farm JF-0021-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

813 Tank Farm JF-0021-1A-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

814 Tank Farm MO-0022-1A-8” 2/4 FW-43 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
815 Tank Farm MO-0066-1A-6" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

816 Tank Farm MO-0066-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

817 Tank Farm MO-0066-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

818 Tank Farm FW-6023-1B-14" 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

819 Tank Farm FW-6024-1B-14" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

820 Tank Farm FW-6024-1B-14" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

821 Tank Farm DO-0014-1A-14" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

822 Tank Farm MO-0066-1A-6" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

823 Tank Farm MO-0066-1A-6" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 90Elbow/Flange

824 Tank Farm MO-0022-1A-8” 2/4 FW-44 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

825 Tank Farm MO-0032-1A-6" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
826 Tank Farm MO-0032-1A-6" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

827 Tank Farm MO-0032-1A-6" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

828 Tank Farm MO-0022-1A-8” 2/4 FW-34 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

829 Tank Farm MO-0032-1A-6" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

830 Tank Farm MO-0032-1A-6" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

831 Tank Farm DO-0020-1A-14" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

832 Tank Farm JF-0026-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

833 Tank Farm JF-0026-1A-6" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

834 Tank Farm MO-0066-1A-6" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

835 Tank Farm MO-0066-1A-6" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

836 Tank Farm MO-0066-1A-6" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
837 Tank Farm MO-0029-1A-6" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

838 Tank Farm MO-0029-1A-6" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

839 Tank Farm DO-0009-1A-12" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

840 Tank Farm DO-0009-1A-12" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

841 Tank Farm DO-0009-1A-12" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

842 Tank Farm MO-0022-1A-8” 2/4 FW-35 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

843 Tank Farm MO-0022-1A-8” 2/4 FW-31 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

844 Tank Farm MO-0022-1A-8” 2/4 FW-29 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

845 Tank Farm MO-0068-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

846 Tank Farm MO-0068-1A-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

847 Tank Farm MO-0068-1A-6" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
848 Tank Farm MO-0068-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

849 Tank Farm MO-0068-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

850 Tank Farm DO-0020-1A-14" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

851 Tank Farm DO-0020-1A-14" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

852 Tank Farm DO-0020-1A-14" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

853 Tank Farm JF-0021-1A-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

854 Tank Farm JF-0021-1A-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

855 Tank Farm FW-6024-1B-14" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

856 Tank Farm FW-6024-1B-14" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

857 Tank Farm FW-6024-1B-14" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

858 Tank Farm JF-0026-1A-6" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 90Elbow/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
859 Tank Farm JF-0026-1A-6" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

860 Tank Farm MO-0069-1A-6" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 90Elbow/Flange

861 Tank Farm MO-0069-1A-6" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

862 Tank Farm MO-0069-1A-6" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

863 Tank Farm MO-0069-1A-6" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

864 Tank Farm MO-0069-1A-6" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 Tee/Flange

865 Tank Farm FW-6025-1B-8" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 8" SCH40 A106/A106 Pipe/Pipe

866 Tank Farm FW-6009-1B-8" 1/1 FW-22C BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

867 Tank Farm MO-0022-1A-8” 2/4 FW-42A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

868 Tank Farm MO-0069-1A-6" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

869 Tank Farm MO-0069-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
870 Tank Farm MO-0069-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 90Elbow/Reducer

871 Tank Farm MO-0014-1A-14" 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

872 Tank Farm FW-6024-1B-14" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

873 Tank Farm JF-0025-1A-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

874 Tank Farm JF-0025-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

875 Tank Farm FW-6025-1B-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

876 Tank Farm JF-0021-1A-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

877 Tank Farm JF-0021-1A-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

878 Tank Farm DO-0009-1A-12" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

879 Tank Farm JF-0026-1A-6" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

880 Tank Farm JF-0026-1A-6" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
881 Tank Farm JF-0026-1A-6" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Flange

882 Tank Farm MO-0022-1A-8” 2/4 FW-41 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

883 Tank Farm MO-0022-1A-8” 2/4 FW-36 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

884 Tank Farm MO-0022-1A-8” 2/4 FW-37 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

885 Tank Farm JF-0025-1A-6" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

886 Tank Farm JF-0025-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

887 Tank Farm JF-0025-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

888 Tank Farm MO-0014-1A-14" 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

889 Tank Farm MO-0014-1A-14" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

890 Tank Farm MO-0014-1A-14" 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

891 Tank Farm FW-6010-1B-10" 2/2 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
892 Tank Farm MO-0069-1A-6" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

893 Tank Farm MO-0069-1A-6" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

894 Tank Farm MO-0069-1A-6" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 90Elbow/90Elbow

895 Tank Farm MO-0067-1A-10" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

896 Tank Farm MO-0067-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

897 Tank Farm FW-6023-1B-14" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

898 Tank Farm FW-6010-1B-10" 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

899 Tank Farm FW-6018-1B-10" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

900 Tank Farm FW-6027-1B-8" 1/1 FW-3A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

901 Tank Farm FW-6028-1B-8" 1/1 FW-3A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

902 Tank Farm MO-0022-1A-8” 2/4 FW-42 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
903 Tank Farm MO-0067-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

904 Tank Farm MO-0067-1A-10" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 6" SCH20 A106/A234 Pipe/Reducer

905 Tank Farm MO-0067-1A-10" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

906 Tank Farm MO-0067-1A-10" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

907 Tank Farm FW-6023-1B-14" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

908 Tank Farm MO-0022-1A-8” 4/4 FW-62 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

909 Tank Farm FW-6026-1B-10" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

910 Tank Farm FW-6026-1B-10" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

911 Tank Farm FW-6010-1B-10" 2/2 FW-38 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

912 Tank Farm FW-6023-1B-14" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

913 Tank Farm FW-6010-1B-10" 2/2 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
914 Tank Farm JF-0020-1A-8" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

915 Tank Farm MO-0022-1A-8” 2/4 FW-45 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

916 Tank Farm FW-6023-1B-14" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

917 Tank Farm FW-6010-1B-10" 2/2 FW-21 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

918 Tank Farm FW-6010-1B-10" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

919 Tank Farm FW-6010-1B-10" 2/2 FW-1A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A53 Pipe/Pipe

920 Tank Farm FW-6003-1B-12" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

921 Tank Farm FW-6004-1B-12" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

922 Tank Farm FW-6023-1B-14" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

923 Tank Farm FW-6023-1B-14" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

924 Tank Farm FW-6028-1B-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
925 Tank Farm FW-6027-1B-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

926 Tank Farm JF-0022-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

927 Tank Farm JF-0022-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

928 Tank Farm MO-0022-1A-8” 2/4 FW-40 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

929 Tank Farm FW-6004-1B-12" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Reducer

930 Tank Farm FW-6003-1B-12" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Reducer

931 Tank Farm MO-0022-1A-8” 2/4 FW-27 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

932 Tank Farm FW-6003-1B-12" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/90Elbow

933 Tank Farm FW-6002-1B-12" 1/1 FW-16 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Reducer

934 Tank Farm FW-6002-1B-12" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

935 Tank Farm FW-6009-1B-8" 1/1 FW-22B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
936 Tank Farm FW-6025-1B-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

937 Tank Farm FW-6028-1B-8" 1/1 FW-3B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

938 Tank Farm FW-6027-1B-8" 1/1 FW-3B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

939 Tank Farm FW-6014-1B-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

940 Tank Farm FW-6014-1B-10" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

941 Tank Farm FW-6010-1B-10" 2/2 FW-16 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

942 Tank Farm FW-6003-1B-12" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A105 Pipe/Flange

943 Tank Farm FW-6003-1B-12" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Reducer/90Elbow

944 Tank Farm FW-6009-1B-8" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

945 Tank Farm FW-6018-1B-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

946 Tank Farm FW-6010-1B-10" 2/2 FW-13 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
947 Tank Farm MO-0022-1A-8” 2/4 FW-28 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

948 Tank Farm FW-6011-1B-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

949 Tank Farm FW-6011-1B-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A234/A234 Tee/90Elbow

950 Tank Farm FW-6025-1B-8" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

951 Tank Farm FW-6027-1B-8" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

952 Tank Farm FW-6028-1B-8" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

953 Tank Farm FW-6009-1B-8" 1/1 FW-25 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

954 Tank Farm FW-6004-1B-12" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A105 Pipe/Flange

955 Tank Farm FW-6004-1B-12" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/90Elbow

956 Tank Farm FW-6004-1B-12" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/90Elbow

957 Tank Farm FW-6016-1B-10" 1/1 FW-23 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
958 Tank Farm FW-6016-1B-10" 1/1 FW-20 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

959 Tank Farm FW-6010-1B-10" 1/2 FW-01 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

960 Tank Farm FW-6002-1B-12" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/90Elbow

961 Tank Farm FW-6002-1B-12" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Reducer/90Elbow

962 Tank Farm FW-6002-1B-12" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A105 Pipe/Flange

963 Tank Farm MO-0022-1A-8” 2/4 FW-38 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

964 Tank Farm FW-6025-1B-8" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

965 Tank Farm FW-6025-1B-8" 1/1 FW-9B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

966 Tank Farm DO-0027-1A-8" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

967 Tank Farm FW-6010-1B-10" 2/2 FW-12 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

968 Tank Farm FW-6201-1B-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
969 Tank Farm FW-6201-1B-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

970 Tank Farm FW-6201-1B-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

971 Tank Farm FW-6201-1B-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

972 Tank Farm FW-6201-1B-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

973 Tank Farm PW-6002-1B-8" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

974 Tank Farm PW-6002-1B-8" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

975 Tank Farm FW-6008-1B-10" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

976 Tank Farm FW-6008-1B-10" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

977 Tank Farm FW-6008-1B-10" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

978 Tank Farm FW-6008-1B-10" 1/1 FW-24 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

979 Tank Farm FW-6010-1B-10" 2/2 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
980 Tank Farm FW-6010-1B-10" 2/2 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

981 Tank Farm FW-6010-1B-10" 2/2 FW-18 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

982 Tank Farm FW-6010-1B-10" 2/2 FW-17 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

983 Tank Farm FW-6012-1B-10" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

984 Tank Farm FW-6012-1B-10" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

985 Tank Farm FW-6014-1B-10" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

986 Tank Farm FW-6011-1B-10" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

987 Tank Farm FW-6012-1B-10" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

988 Tank Farm FW-6024-1B-14" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

989 Tank Farm FW-6026-1B-10" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

990 Tank Farm FW-6026-1B-10" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
991 Tank Farm FW-6025-1B-8" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

992 Tank Farm FW-6008-1B-10" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

993 Tank Farm FW-6008-1B-10" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

994 Tank Farm PW-6002-1B-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

995 Tank Farm FW-6023-1B-14" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

996 Tank Farm FW-6012-1B-10" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

997 Tank Farm FW-6012-1B-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

998 Tank Farm FW-6012-1B-10" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

999 Tank Farm PW-6001-1B-8" 1/2 FW-26 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1000 Tank Farm PW-6001-1B-8" 1/2 FW-25 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1001 Tank Farm PW-6001-1B-8" 1/2 FW-24 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1002 Tank Farm DO-0002-1A-12” 2/2 FW-40 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

1003 Tank Farm DO-0002-1A-12” 2/2 FW-41 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

1004 Tank Farm FW-6008-1B-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1005 Tank Farm FW-6008-1B-10" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Reducer

1006 Tank Farm FW-6008-1B-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Reducer

1007 Tank Farm FW-6027-1B-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1008 Tank Farm FW-6028-1B-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1009 Tank Farm FW-6025-1B-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1010 Tank Farm FW-6009-1B-8" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1011 Tank Farm FW-6201-1B-8" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1012 Tank Farm FW-6009-1B-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1013 Tank Farm FW-6009-1B-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1014 Tank Farm FW-6012-1B-10" 1/1 FW-20 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

1015 Tank Farm FW-6012-1B-10" 1/1 FW-23 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

1016 Tank Farm FW-6016-1B-10" 1/1 FW-19 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

1017 Tank Farm FW-6016-1B-10" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1018 Tank Farm FW-6016-1B-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1019 Tank Farm FW-6016-1B-10" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Reducer

1020 Tank Farm FW-6008-1B-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1021 Tank Farm FW-6008-1B-10" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1022 Tank Farm MO-0002-1A-12" 1/1 FW-2A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1023 Tank Farm MO-0001-1A-12” 6/7 FW-84A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1024 Tank Farm JF-0001-1A-12” 6/7 FW-79A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1025 Tank Farm DO-0001-1A-12” 6/7 FW-81A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1026 Tank Farm FW-6026-1B-10" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

1027 Tank Farm FW-6006-1B-4" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

1028 Tank Farm FW-6006-1B-4" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Reducer

1029 Tank Farm FW-6006-1B-4" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Reducer

1030 Tank Farm FW-6006-1B-4" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Reducer

1031 Tank Farm FW-6006-1B-4" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

1032 Tank Farm FW-6006-1B-4" 1/1 FW-17 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

1033 Tank Farm FW-6005-1B-4" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

1034 Tank Farm FW-6005-1B-4" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1035 Tank Farm FW-6005-1B-4" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Reducer

1036 Tank Farm FW-6005-1B-4" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

1037 Tank Farm FW-6005-1B-4" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

1038 Tank Farm FW-6005-1B-4" 1/1 FW-17 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

1039 Tank Farm JF-0002-1A-12” 1/2 FW-3A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1040 Tank Farm DO-0002-1A-12” 1/2 FW-3A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1041 Tank Farm FW-6026-1B-10" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

1042 Tank Farm FW-6023-1B-14" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

1043 Tank Farm JF-0023-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1044 Tank Farm JF-0023-1A-6" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1045 SRC MO-0001A-1A-12” 3/5 FW-37A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1046 SRC MO-0001A-1A-12” 3/5 FW-37B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1047 SRC MO-0001A-1A-12” 3/5 FW-37C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1048 SRC MO-0001A-1A-12” 3/5 FW-37D BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1049 SRC MO-0001A-1A-12” 3/5 FW-37E BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1050 SRC MO-0001A-1A-12” 3/5 FW-37F BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1051 SRC MO-0001A-1A-12” 3/5 FW-41 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1052 SRC MO-0001A-1A-12” 4/5 FW-46C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1053 SRC MO-0001A-1A-12” 3/5 FW-45 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1054 SRC MO-0001A-1A-12” 4/5 FW-46B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1055 Tank Farm FW-6009-1B-8" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1056 Tank Farm FW-6009-1B-8" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1057 Tank Farm FW-6009-1B-8" 1/1 FW-17 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1058 Tank Farm FW-6001-1B -8" 1/1 FW-08 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1059 Tank Farm JF-0022-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

1060 Tank Farm JF-0022-1A-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1061 Tank Farm FW-6007-1B 10" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

1062 Tank Farm FW-6015-1B-10" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

1063 Tank Farm FW-6009-1B-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1064 Tank Farm FW-6001-1B -8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1065 Tank Farm FW-6009-1B-8" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1066 Tank Farm FW-6009-1B-8" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1067 Tank Farm DO-0030-1A-8" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1068 Tank Farm DO-0030-1A-8" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

1069 Tank Farm MO-0001-1A-12” 6/7 FW-84 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

1070 Tank Farm DO-0001-1A-12” 6/7 FW-81 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

1071 Tank Farm FW-6009-1B-8" 1/1 FW-27 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

1072 Tank Farm JF-0022-1A-6" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1073 Tank Farm JF-0023-1A-6" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1074 Tank Farm JF-0023-1A-6" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 90Elbow/ Flange

1075 Tank Farm FW-6009-1B-8" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1076 Tank Farm FW-6009-1B-8" 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1077 Tank Farm PW-6001-1B-8" 1/2 FW-12 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1078 Tank Farm PW-6001-1B-8" 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1079 Tank Farm PW-6001-1B-8" 1/2 FW-08 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1080 Tank Farm PW-6001-1B-8" 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1081 Tank Farm JF-0001-1A-12” 6/7 FW-79 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1082 Tank Farm FW-6009-1B-8" 1/1 FW-30 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1083 Tank Farm FW-6010-1B-10" 2/2 FW-34A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

1084 Tank Farm FW-6026-1B-10" 1/1 FW-11A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A53 Pipe/Pipe

1085 Tank Farm PW-6001-1B-8" 1/2 FW-10 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1086 Tank Farm PW-6001-1B-8" 1/2 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1087 Tank Farm FW-6009-1B-8" 1/1 FW-32 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1088 Tank Farm DO-0030-1A-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

1089 Tank Farm MO-0032-1A-6" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1090 Tank Farm MO-0032-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 90Elbow/Reducer

1091 Tank Farm MO-0032-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1092 Tank Farm FW-6001-1B -8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1093 Tank Farm FW-6009-1B-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1094 Tank Farm DO-0001-1A-12” 6/7 FW-82 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1095 Tank Farm PW-6002-1B-8" 1/1 FW-11A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

1096 Tank Farm PW-6001-1B-8" 1/2 FW-23A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

1097 Tank Farm FW-6009-1B-8" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1098 Tank Farm PW-6001-1B-8" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1099 Tank Farm JF-0001-1A-12” 6/7 FW-80 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/90Elbow

1100 Tank Farm MO-0120-1A-8" 1/2 FW-37 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1101 Tank Farm MO-0120-1A-8" 1/2 FW-17 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

1102 Tank Farm DO-0030-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

1103 Tank Farm DO-0030-1A-8" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

1104 Tank Farm MO-0120-1A-8" 1/2 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1105 Tank Farm MO-0120-1A-8" 1/2 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1106 Tank Farm FW-6009-1B-8" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1107 Tank Farm FW-6009-1B-8" 1/1 FW-08 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1108 Tank Farm FW-6001-1B -16" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A105 Pipe/Flange

1109 Tank Farm MO-0120-1A-8" 1/2 FW-34 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1110 Tank Farm MO-0001-1A-12” 6/7 FW-85 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1111 Tank Farm FW-6009-1B-8" 1/1 FW-33B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1112 Tank Farm FW-6001-1B -16" 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee

1113 Tank Farm MO-0002-1A-12" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1114 Tank Farm FW-6001-1B -16" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/45Elbow

1115 Tank Farm MO-0120-1A-8" 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1116 Tank Farm MO-0120-1A-8" 1/2 FW-16 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1117 Tank Farm JF-0002-1A-12” 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1118 Tank Farm DO-0002-1A-12” 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1119 Tank Farm MO-0120-1A-8" 1/2 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1120 Tank Farm MO-0120-1A-8" 1/2 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

1121 Tank Farm FW-6001-1B -16" 2/2 FW-17 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/45Elbow

1122 Tank Farm DO-0021-1A-14" 2/2 FW-31 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1123 Tank Farm MO-0083-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1124 Tank Farm MO-0083-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1125 Tank Farm MO-0082-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1126 Tank Farm MO-0082-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1127 Tank Farm MO-0120-1A-8" 2/2 FW-56 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1128 Tank Farm MO-0120-1A-8" 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1129 Tank Farm MO-0120-1A-8" 1/2 FW-18 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1130 Tank Farm MO-0120-1A-8" 2/2 FW-41 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1131 Tank Farm MO-0120-1A-8" 2/2 FW-42 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1132 Tank Farm DO-0021-1A-14" 2/2 FW-30 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/weldolet

1133 Tank Farm DO-0021-1A-14" 2/2 FW-29 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1134 Tank Farm DO-0021-1A-14" 2/2 FW-28 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

1135 Tank Farm DO-0021-1A-14" 2/2 FW-27 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

1136 Tank Farm MO-0120-1A-8" 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

1137 Tank Farm MO-0120-1A-8" 2/2 FW-39 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1138 Tank Farm MO-0120-1A-8" 2/2 FW-40 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1139 Tank Farm MO-0082-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1140 Tank Farm MO-0083-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1141 Tank Farm JF-0027-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1142 Tank Farm JF-0028-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Reducer

1143 Tank Farm JF-0027-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1144 Tank Farm MO-0027-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1145 Tank Farm MO-0028-1A-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1146 Tank Farm MO-0028-1A-6" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1147 Tank Farm MO-0001-1A-12” 6/7 FW-84D BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1148 Tank Farm JF-0001-1A-12” 6/7 FW-79D BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1149 Tank Farm MO-0120-1A-8" 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

1150 Tank Farm MO-0120-1A-8" 2/2 FW-43 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1151 Tank Farm MO-0120-1A-8" 2/2 FW-44 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1152 Tank Farm MO-0120-1A-8" 2/2 FW-53 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

1153 Tank Farm MO-0120-1A-8" 2/2 FW-54 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1154 Tank Farm MO-0001-1A-12” 6/7 FW-84C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1155 Tank Farm JF-0001-1A-12” 6/7 FW-79C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1156 Tank Farm MO-0083-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1157 Tank Farm JF-0027-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1158 Tank Farm MO-0082-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1159 Tank Farm JF-0028-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1160 Tank Farm DO-0039-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Weldolet

1161 Tank Farm DO-0040-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Weldolet

1162 Tank Farm DO-0041-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Weldolet

1163 Tank Farm DO-0042-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Weldolet

1164 Tank Farm DO-0001-1A-12” 6/7 FW-81D BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1165 Tank Farm DO-0001-1A-12” 6/7 FW-81C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1166 Tank Farm JF-0028-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1167 Tank Farm DO-0042-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

1168 Tank Farm DO-0042-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1169 Tank Farm FW-6010-1B-10" 2/2 FW-24 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1170 Tank Farm MO-0082-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1171 Tank Farm JF-0027-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1172 Tank Farm JF-0028-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1173 Tank Farm DO-0021-1A-14" 2/2 FW-23 BRW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Weldolet

1174 Tank Farm DO-0021-1A-14" 2/2 FW-24 BRW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Weldolet

1175 Tank Farm FW-6001-1B -16" 1/2 FW-09 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee

1176 Tank Farm JF-0002-1A-12” 1/2 FW-14A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1177 Tank Farm FW-6001-1B -16" 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1178 Tank Farm DO-0002-1A-12” 1/2 FW-33A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1179 Tank Farm FW-6001-1B -16" 1/2 FW-06 SOW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A105 Pipe/Flange

1180 Tank Farm MO-0001-1A-12” 6/7 FW-82A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1181 Tank Farm DO-0001-1A-12” 6/7 FW-79A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1182 Tank Farm JF-0001-1A-12” 6/7 FW-79B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1183 Tank Farm DO-0021-1A-14" 2/2 FW-25 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

1184 Tank Farm DO-0021-1A-14" 2/2 FW-26 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

1185 Tank Farm FW-6001-1B -16" 2/2 FW-21 SOW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee

1186 Tank Farm FW-6001-1B -16" 2/2 FW-24 SOW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A105 Pipe/Flange

1187 Tank Farm MO-0001-1A-12” 6/7 FW-82 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1188 Tank Farm JF-0001-1A-12” 6/7 FW-77 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1189 Tank Farm DO-0001-1A-12” 6/7 FW-79 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1190 Tank Farm DO-0035-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

1191 Tank Farm DO-0036-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

1192 Tank Farm DO-0037-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Weldolet

1193 Tank Farm DO-0038-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Weldolet

1194 Tank Farm FW-6001-1B -16" 2/2 FW-13 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee

1195 Tank Farm FW-6010-1B-10" 1/2 FW-02 BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet

1196 Tank Farm FW-6010-1B-10" 1/2 FW-03 BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet

1197 Tank Farm PW-6002-1B-8" 1/1 FW-15 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1198 Tank Farm PW-6001-1B-8" 1/2 FW-23 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1199 Tank Farm FW-6001-1B -16" 2/2 FW-22 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1200 Tank Farm FW-6010-1B-10" 2/2 FW-22 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1201 Tank Farm FW-6010-1B-10" 2/2 FW-37 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1202 Tank Farm FW-6001-1B -16" 2/2 FW-19 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/45Elbow

1203 Tank Farm DO-0001-1A-12” 6/7 FW-75 BRW WPS-2016-23 GTAW/SMAW 3/4" SCH80 A106/A105 Pipe/Scokolet

1204 Tank Farm JF-0001-1A-12” 6/7 FW-73 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Scokolet

1205 Tank Farm MO-0001-1A-12” 6/7 FW-83 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1206 Tank Farm MO-0023-1A-12" 2/2 FW-27 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

1207 Tank Farm MO-0023-1A-12" 2/2 FW-28 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

1208 Tank Farm MO-0023-1A-12" 2/2 FW-29 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

1209 Tank Farm MO-0023-1A-12" 2/2 FW-30 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

1210 Tank Farm FW-6001-1B -16" 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1211 Tank Farm FW-6027-1B-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1212 Tank Farm FW-6027-1B-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1213 Tank Farm FW-6028-1B-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1214 Tank Farm FW-6028-1B-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1215 Tank Farm FW-6001-1B -16" 1/2 FW-7B BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A53 Pipe/Pipe

1216 Tank Farm MO-0120-1A-8" 1/2 FW-21(TR1) BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

1217 Tank Farm FW-6001-1B -16" 1/2 FW-7A BW WPS-2016-23 GTAW/SMAW 16” SCH20 A53/A53 Pipe/Pipe

1218 Tank Farm MO-0002-1A-12" 1/1 FW-03 BRW WPS-2016-23 GTAW/SMAW 2" SCH40 A106/A105 Pipe/Weldolet

1219 Tank Farm JF-0002-1A-12” 1/2 FW-04 BRW WPS-2016-23 GTAW/SMAW 2" SCH40 A106/A105 Pipe/Weldolet

1220 Tank Farm DO-0002-1A-12” 1/2 FW-04 BRW WPS-2016-23 GTAW/SMAW 2" SCH40 A106/A105 Pipe/Weldolet

1221 Tank Farm MO-0120-1A-8" 2/2 FW-55 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1222 Tank Farm MO-0120-1A-8" 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1223 Tank Farm DO-0042-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1224 Tank Farm DO-0042-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

1225 Tank Farm MO-0002-1A-12" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/pipe

1226 Tank Farm JF-0002-1A-12” 1/2 FW-2B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/pipe

1227 Tank Farm DO-0002-1A-12” 1/2 FW-2B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/pipe

1228 Tank Farm MO-0084-1A-4" 1/1 FW-1A BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

1229 Tank Farm FW-6026-1B-10" 1/1 FW-03(TR2) BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

1230 Tank Farm DO-0002-1A-12” 1/2 FW-2C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/pipe

1231 Tank Farm JF-0002-1A-12” 1/2 FW-17 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1232 Tank Farm FW-6001-1B -16" 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1233 Tank Farm FW-6001-1B -16" 2/2 FW-14 BRW WPS-2016-23 GTAW/SMAW 4" SCH20 A53/A105 Pipe/Weldolet

1234 Tank Farm FW-0009-1C-14" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1235 Tank Farm FW-0011-1C-14" 1/1 FW-14A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1236 Tank Farm FW-6001-1B -16" 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee

1237 Tank Farm FW-0009-1C-14" 1/1 FW-2A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1238 Tank Farm FW-0011-1C-14" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1239 Tank Farm MO-0085-1A-4" 1/1 FW-1A BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

1240 Tank Farm MO-0086-1A-4" 1/1 FW-1A BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

1241 Tank Farm MO-0087-1A-4" 1/1 FW-1A BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

1242 Tank Farm FW-6023-1B-14" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

1243 Tank Farm DO-0042-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1244 Tank Farm FW-6023-1B-14" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

1245 Tank Farm JF-0002-1A-12” 1/2 FW-2A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/pipe

1246 Tank Farm DO-0002-1A-12” 1/2 FW-2A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/pipe

1247 Tank Farm MO-0002-1A-12" 1/1 FW-1B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/pipe

1248 Tank Farm FW-6001-1B -16" 1/2 FW-10 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee

1249 Tank Farm FW-6024-1B-14" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

1250 Tank Farm FW-0011-1C-14" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1251 Tank Farm FW-0009-1C-14" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1252 Tank Farm FW-0011-1C-14" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1253 Tank Farm FW-6024-1B-14" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

1254 Tank Farm FW-6001-1B -16" 2/2 FW-23 BRW WPS-2016-23 GTAW/SMAW 4" SCH20 A53/A234 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1255 SRC MO-0001A-1A-12” 2/5 FW-32D BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1256 SRC MO-0001A-1A-12” 2/5 FW-32E BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1257 SRC MO-0001A-1A-12” 2/5 FW-32F BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1258 SRC MO-0001A-1A-12” 2/5 FW-32G BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1259 SRC MO-0001A-1A-12” 2/5 FW-32H BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1260 SRC MO-0001A-1A-12” 2/5 FW-34A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1261 SRC MO-0001A-1A-12” 2/5 FW-35 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

1262 SRC MO-0001A-1A-12” 3/5 FW-37 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

1263 SRC MO-0001A-1A-12” 3/5 FW-46 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1264 SRC MO-0001A-1A-12” 4/5 FW-46A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1265 SRC MO-0001A-1A-12” 3/5 FW-39 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1266 SRC MO-0001A-1A-12” 3/5 FW-42 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1267 SRC MO-0001A-1A-12” 3/5 SW-43 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1268 SRC MO-0001A-1A-12” 3/5 SW-44 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1269 SRC MO-0001A-1A-12” 4/5 FW-46D BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1270 SRC MO-0001A-1A-12” 4/5 FW-46E BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1271 SRC MO-0001A-1A-12” 4/5 FW-46F BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1272 SRC MO-0001A-1A-12” 4/5 FW-47 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1273 SRC MO-0001A-1A-12” 4/5 FW-48 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1274 SRC MO-0001A-1A-12” 4/5 FW-48A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1275 SRC MO-0001A-1A-12” 4/5 FW-48B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1276 SRC MO-0001A-1A-12” 4/5 FW-48C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1277 SRC MO-0001A-1A-12” 4/5 FW-48D BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1278 SRC MO-0001A-1A-12” 4/5 FW-48E BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1279 SRC MO-0001A-1A-12” 4/5 FW-48F BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/90Elbow

1280 SRC MO-0001A-1A-12” 4/5 FW-51 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1281 SRC MO-0001A-1A-12” 4/5 FW-52 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1282 SRC MO-0001A-1A-12” 2/5 FW-32A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1283 SRC MO-0001A-1A-12” 2/5 FW-32B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1284 SRC MO-0001A-1A-12” 2/5 FW-32C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

1285 Tank Farm FW-0011-1C-14" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1286 Tank Farm FW-0009-1C-14" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1287 Tank Farm FW-0009-1C-14" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1288 Tank Farm FW-0009-1C-14" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1289 Tank Farm FW-6009-1B-8" 1/1 FW-33 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Blind Flange

1290 Tank Farm FW-6009-1B-8" 1/1 FW-33A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

1291 Tank Farm FW-0011-1C-14" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1292 Tank Farm FW-0011-1C-14" 1/1 RW-20 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1293 Tank Farm FW-0009-1C-14" 1/1 RW-8C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1294 Tank Farm FW-6010-1B-10" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1295 Tank Farm FW-6010-1B-10" 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1296 Tank Farm FW-6010-1B-10" 2/2 FW-23 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1297 Tank Farm FW-0009-1C-14" 1/1 FW-12A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1298 Tank Farm MO-0002-1A-12" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1299 Tank Farm FW-0009-1C-14" 1/1 FW-8A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Pipe

1300 Tank Farm FW-6009-1B-8" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1301 Tank Farm MO-0003-1A-12” 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1302 Tank Farm FW-6010-1B-10" 2/2 FW-26 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

1303 Tank Farm FW-6026-1B-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

1304 Tank Farm FW-6025-1B-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1305 Tank Farm JF-0002-1A-12” 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1306 Tank Farm FW-0009-1C-14" 1/1 RW-10A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1307 Tank Farm DO-0002-1A-12” 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1308 Tank Farm FW-0009-1C-14" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1309 Tank Farm FW-6026-1B-10" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1310 Tank Farm MO-0005-1A-12” 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1311 Tank Farm FW-6010-1B-10" 2/2 FW-25 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1312 Tank Farm FW-6009-1B-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1313 Tank Farm FW-6025-1B-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1314 Tank Farm FW-0009-1C-14" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1315 Tank Farm FW-0009-1C-14" 1/1 FW-12B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1316 Tank Farm PW-6001-1B-8" 1/2 FW-13A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1317 Tank Farm PW-6001-1B-8" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1318 Tank Farm MO-0021-1A-16” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A106/A105 Pipe/Flange

1319 Tank Farm FW-6010-1B-10" 2/2 FW-28 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

1320 Tank Farm FW-0009-1C-14" 1/1 FW-18A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1321 Tank Farm PW-6001-1B-8" 1/2 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1322 Tank Farm PW-6001-1B-8" 2/2 FW-30A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

1323 Tank Farm MO-0014-1A-14" 1/2 FW-16A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

1324 Tank Farm FW-0010-1C-14" 1/1 FW-23A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1325 Tank Farm FW-0009-1C-14" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1326 Tank Farm FW-6009-1B-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1327 Tank Farm FW-6009-1B-8" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1328 Tank Farm JF-0002-1A-12” 1/2 FW-15 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1329 Tank Farm DO-0002-1A-12” 2/2 FW-34 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1330 Tank Farm FW-0009-1C-14" 1/1 FW-20A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1331 Tank Farm FW-2001A-1D-8" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1332 Tank Farm FW-0010-1C-14" 1/1 FW-23C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1333 Tank Farm FW-2001A-1D-8" 1/1 FW-14 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1334 Tank Farm FW-2001A-1D-8" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1335 Tank Farm FW-2001A-1D-8" 1/1 FW-18 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1336 Tank Farm MO-0003-1A-12” 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1337 Tank Farm FW-0010-1C-14" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1338 Tank Farm FS-6207-1D-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1339 Tank Farm FW-2002-1D-8" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1340 Tank Farm FW-2001A-1D-8" 1/1 FW-17 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1341 Tank Farm FS-6203-1D-8" 1/2 FW-09 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1342 Tank Farm FS-6207-1D-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1343 Tank Farm FS-6207-1D-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1344 Tank Farm DO-0002-1A-12” 1/2 FW-33 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1345 Tank Farm DO-0002-1A-12” 2/2 FW-35 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1346 Tank Farm FS-6203-1D-8" 1/2 FW-10 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1347 Tank Farm FS-6203-1D-8" 2/2 FW-38 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1348 Tank Farm FW-2001A-1D-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1349 Tank Farm FS-6207-1D-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1350 Tank Farm JF-0002-1A-12” 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1351 Tank Farm JF-0002-1A-12” 1/2 FW-16 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1352 Tank Farm FW-0003-1C-14" 1/1 FW-1F BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1353 Tank Farm FS-6207-1D-8" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1354 Tank Farm FS-6203-1D-8" 2/2 FW-36 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Flange

1355 Tank Farm FW-2001A-1D-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1356 Tank Farm FW-2001A-1D-8" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1357 Tank Farm FS-6207-1D-8" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1358 Tank Farm FW-0010-1C-14" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

1359 Tank Farm FW-2001A-1D-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1360 Tank Farm FW-2001A-1D-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1361 Tank Farm FS-6207-1D-8" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1362 Tank Farm FS-6207-1D-8" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1363 Tank Farm FS-6207-1D-8" 1/1 FW-19 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1364 Tank Farm FS-6207-1D-8" 1/1 FW-22 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1365 Tank Farm FW-2001A-1D-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1366 Tank Farm FW-0008-1C-14" 2/2 FW-29A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

1367 Tank Farm FS-6207-1D-8" 1/1 FW-07 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1368 Tank Farm FS-6207-1D-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1369 Tank Farm FS-6207-1D-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1370 Tank Farm FS-6207-1D-8" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1371 Tank Farm MO-0003-1A-12” 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1372 Tank Farm FW-0010-1C-14" 1/1 FW-30 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

1373 Tank Farm FW-2001A-1D-8" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1374 Tank Farm FW-2001b-1D-8" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1375 Tank Farm FS-6207-1D-8" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1376 Tank Farm FS-6207-1D-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1377 Tank Farm FS-6207-1D-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1378 Tank Farm FS-6207-1D-8" 1/1 FW-16 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1379 Tank Farm FS-6203-1D-8" 1/2 FW-16 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1380 Tank Farm FW-2001A-1D-8" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1381 Tank Farm FW-2001A-1D-8" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1382 Tank Farm MO-0005-1A-12” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Flange

1383 Tank Farm FS-6203-1D-8" 1/2 FW-06 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1384 Tank Farm FW-3005-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1385 Tank Farm FW-3006-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1386 Tank Farm FW-3007-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1387 Tank Farm FW-3008-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1388 Tank Farm FW-3009-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1389 Tank Farm FW-3010-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1390 Tank Farm FW-3011-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1391 Tank Farm FW-3012-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1392 Tank Farm FW-3013-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1393 Tank Farm FW-3014-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1394 Tank Farm FW-3015-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1395 Tank Farm FW-3016-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1396 Tank Farm FW-3017-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1397 Tank Farm FW-3018-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1398 Tank Farm FW-3019-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1399 Tank Farm FW-3020-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1400 Tank Farm FW-3021-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1401 Tank Farm FW-3022-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1402 Tank Farm FW-3023-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1403 Tank Farm FW-3024-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1404 Tank Farm FW-3025-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1405 Tank Farm FW-3026-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1406 Tank Farm FW-3027-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1407 Tank Farm FW-3028-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1408 Tank Farm FW-3029-1D-2" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1409 Tank Farm FS-6203-1D-8" 2/2 FW-35 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1410 Tank Farm FS-6203-1D-8" 1/2 FW-11 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1411 Tank Farm MO-0005-1A-12” 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1412 Tank Farm FS-6203-1D-8" 1/2 FW-07 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1413 Tank Farm FW-2001A-1D-8" 1/1 FW-19 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1414 Tank Farm MO-0005-1A-12” 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1415 Tank Farm FS-6203-1D-8" 1/2 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1416 Tank Farm FS-6207-1D-8" 1/1 FW-35 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1417 Tank Farm FS-6207-1D-8" 1/1 FW-36 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1418 Tank Farm FS-6207-1D-8" 1/1 FW-37 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1419 Tank Farm FS-6207-1D-8" 1/1 FW-38 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1420 Tank Farm FS-6207-1D-8" 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

1421 Tank Farm FS-6207-1D-8" 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1422 Tank Farm MO-0021-1A-16” 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A106/A234 Pipe/Tee

1423 Tank Farm FS-6203-1D-8" 1/2 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1424 Tank Farm FS-6203-1D-8" 1/2 FW-08 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1425 Tank Farm FS-6204-1D-8" 1/2 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1426 Tank Farm FS-6204-1D-8" 1/2 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1427 Tank Farm FW-3005-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1428 Tank Farm FW-3006-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1429 Tank Farm FW-3007-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1430 Tank Farm FW-3008-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1431 Tank Farm FW-3009-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1432 Tank Farm FW-3010-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1433 Tank Farm FW-3011-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1434 Tank Farm FW-3012-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1435 Tank Farm FW-3013-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1436 Tank Farm FW-3014-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1437 Tank Farm FS-6203-1D-8" 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 Tee/90Elbow

1438 Tank Farm FW-3015-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1439 Tank Farm FW-3016-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1440 Tank Farm FW-3017-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1441 Tank Farm FW-3018-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1442 Tank Farm FW-3019-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1443 Tank Farm FW-3020-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1444 Tank Farm FW-3021-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1445 Tank Farm FW-3022-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1446 Tank Farm FW-3023-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1447 Tank Farm FW-3024-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1448 Tank Farm FW-3025-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1449 Tank Farm FW-3026-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1450 Tank Farm FW-3027-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1451 Tank Farm FW-3028-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1452 Tank Farm FW-3029-1D-2" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1453 Tank Farm FW-2001A-1D-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1454 Tank Farm FW-2001A-1D-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1455 Tank Farm FW-1306-1D-2½" 1/1 FW-1035 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

1456 Tank Farm MO-0004-1A-12” 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1457 Tank Farm MO-0004-1A-12” 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

1458 Tank Farm FW-2004-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1459 Tank Farm FW-2005-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1460 Tank Farm FW-2006-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1461 Tank Farm FW-2007-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1462 Tank Farm FW-2008-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1463 Tank Farm FW-2009-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1464 Tank Farm FW-2010-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1465 Tank Farm FW-2011-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1466 Tank Farm FW-2012-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1467 Tank Farm FW-2013-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1468 Tank Farm FW-2014-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1469 Tank Farm FW-2015-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1470 Tank Farm FW-2016-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1471 Tank Farm FW-2017-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1472 Tank Farm FW-2018-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1473 Tank Farm FW-2019-1D-2" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1474 Tank Farm FS-6207-1D-8" 1/1 FW-43 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1475 Tank Farm FS-6207-1D-8" 1/1 FW-48 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1476 Tank Farm FS-6207-1D-8" 1/1 FW-44 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1477 Tank Farm FS-6207-1D-8" 1/1 FW-45 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1478 Tank Farm FS-6207-1D-8" 1/1 FW-46 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1479 Tank Farm FS-6207-1D-8" 1/1 FW-47 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1480 Tank Farm FW-2001A-1D-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1481 Tank Farm FS-6203-1D-8" 2/2 FW-32 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1482 Tank Farm FS-6203-1D-8" 2/2 FW-33 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1483 Tank Farm FS-6203-1D-8" 2/2 FW-34 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1484 Tank Farm FS-6204-1D-8" 2/2 FW-27 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

1485 Tank Farm FS-6206-1D-8'' 2/2 FW-52 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1486 Tank Farm FS-6206-1D-8'' 2/2 FW-53 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Tee

1487 Tank Farm FS-6206-1D-8'' 2/2 FW-61 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1488 Tank Farm FS-6206-1D-8'' 2/2 FW-60 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Tee

1489 Tank Farm FW-2004-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1490 Tank Farm FW-2005-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1491 Tank Farm FW-2006-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1492 Tank Farm FW-2007-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1493 Tank Farm FW-2008-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1494 Tank Farm FW-2009-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1495 Tank Farm FW-2010-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1496 Tank Farm FW-2011-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1497 Tank Farm FW-2012-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1498 Tank Farm FW-2013-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1499 Tank Farm FW-2014-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1500 Tank Farm FW-2015-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1501 Tank Farm FW-2016-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1502 Tank Farm FW-2017-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1503 Tank Farm FW-2018-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1504 Tank Farm FW-2019-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1505 Tank Farm FW-3005-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1506 Tank Farm FW-3006-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1507 Tank Farm FW-3007-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1508 Tank Farm FW-3008-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1509 Tank Farm FW-3009-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1510 Tank Farm FW-3010-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1511 Tank Farm FW-3011-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1512 Tank Farm FW-3012-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1513 Tank Farm FW-3013-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1514 Tank Farm FW-3014-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1515 Tank Farm FW-3015-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1516 Tank Farm FW-3016-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1517 Tank Farm FW-3017-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1518 Tank Farm FW-3018-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1519 Tank Farm FS-6206-1D-8'' 2/2 FW-44 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1520 Tank Farm FS-6206-1D-8'' 2/2 FW-45 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1521 Tank Farm FS-6206-1D-8'' 2/2 FW-46 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1522 Tank Farm FS-6206-1D-8'' 2/2 FW-47 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1523 Tank Farm FS-6205-1D-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1524 Tank Farm FW-3025-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1525 Tank Farm FW-3002-1D-8" 1/2 FW-16 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1526 Tank Farm FS-6205-1D-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1527 Tank Farm FW-3019-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1528 Tank Farm FW-3020-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1529 Tank Farm FW-3021-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1530 Tank Farm FW-3022-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1531 Tank Farm FW-3023-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1532 Tank Farm FW-3024-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1533 Tank Farm FW-3025-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1534 Tank Farm FW-3026-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1535 Tank Farm FW-3027-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1536 Tank Farm FW-3028-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1537 Tank Farm FW-3029-1D-2" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1538 Tank Farm FW-3005-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1539 Tank Farm FW-3006-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1540 Tank Farm FW-3007-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1541 Tank Farm FW-3008-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1542 Tank Farm FW-3009-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1543 Tank Farm FW-3010-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1544 Tank Farm FW-3011-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1545 Tank Farm FW-3012-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1546 Tank Farm FW-3013-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1547 Tank Farm FW-3014-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1548 Tank Farm FW-3015-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1549 Tank Farm FW-3016-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1550 Tank Farm FW-3017-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1551 Tank Farm FW-3018-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1552 Tank Farm FW-3019-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1553 Tank Farm FW-3020-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1554 Tank Farm FW-3021-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1555 Tank Farm FW-3022-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1556 Tank Farm FW-3023-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1557 Tank Farm FW-3002-1D-8" 1/2 FW-20 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1558 Tank Farm FW-3002-1D-8" 1/2 FW-21 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1559 Tank Farm FW-3026-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1560 Tank Farm FW-3002-1D-8" 1/2 FW-17 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1561 Tank Farm FS-6201-1D-8" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1562 Tank Farm FS-6201-1D-8" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1563 Tank Farm FS-6201-1D-8" 1/1 FW-23 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1564 Tank Farm FS-6203-1D-8" 2/2 FW-31 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1565 Tank Farm FS-6204-1D-8" 2/2 FW-46A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

1566 Tank Farm FS-6203-1D-8" 2/2 FW-37 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1567 Tank Farm FS-6203-1D-8" 2/2 FW-30 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1568 Tank Farm FS-6203-1D-8" 2/2 FW-29 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1569 Tank Farm FS-6205-1D-8" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1570 Tank Farm FS-6205-1D-8" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1571 Tank Farm FW-2001b-1D-8" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1572 Tank Farm FW-2001b-1D-8" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1573 Tank Farm FS-6207-1D-8" 1/1 FW-23 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1574 Tank Farm FS-6207-1D-8" 1/1 FW-32 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1575 Tank Farm FS-6207-1D-8" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1576 Tank Farm FS-0501-1D-4" 1/1 FW-261A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

1577 Tank Farm FS-6206-1D-8'' 1/2 FW-27 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1578 Tank Farm FS-6206-1D-8'' 1/2 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Tee

1579 Tank Farm FS-6206-1D-8'' 1/2 FW-26 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1580 Tank Farm FS-6206-1D-8'' 1/2 FW-29 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1581 Tank Farm FS-6205-1D-8" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1582 Tank Farm FS-6205-1D-8" 1/1 FW-14 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1583 Tank Farm FS-6205-1D-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1584 Tank Farm FS-6205-1D-8" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1585 Tank Farm FW-3005-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1586 Tank Farm FW-3006-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1587 Tank Farm FW-3007-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1588 Tank Farm FW-3008-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1589 Tank Farm FW-3009-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1590 Tank Farm FW-3010-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1591 Tank Farm FW-3011-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1592 Tank Farm FW-3012-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1593 Tank Farm FW-3013-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1594 Tank Farm FW-3014-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1595 Tank Farm FW-3015-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1596 Tank Farm FW-3016-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1597 Tank Farm FW-3017-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1598 Tank Farm FW-3018-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1599 Tank Farm FW-3019-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1600 Tank Farm FW-3020-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1601 Tank Farm FW-3021-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1602 Tank Farm FW-3022-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1603 Tank Farm FW-3023-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1604 Tank Farm FW-3024-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1605 Tank Farm FW-3027-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1606 Tank Farm FW-3028-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1607 Tank Farm FW-3029-1D-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1608 Tank Farm FW-3001b-1D-8" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1609 Tank Farm FW-3001b-1D-8" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1610 Tank Farm FW-3001b-1D-8" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1611 Tank Farm FW-3001b-1D-8" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1612 Tank Farm FW-3001b-1D-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1613 Tank Farm FW-3001b-1D-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1614 Tank Farm FW-2001b-1D-8" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1615 Tank Farm FW-2001b-1D-8" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1616 Tank Farm FW-2001b-1D-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1617 Tank Farm FW-2001b-1D-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1618 Tank Farm FW-2001b-1D-8" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1619 Tank Farm FW-2002-1D-8" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1620 Tank Farm FW-2002-1D-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1621 Tank Farm FW-2002-1D-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1622 Tank Farm FW-2002-1D-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1623 Tank Farm FS-6205-1D-8" 1/1 FW-15 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1624 Tank Farm FS-6205-1D-8" 1/1 FW-16 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1625 Tank Farm FS-6205-1D-8" 1/1 FW-23 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1626 Tank Farm FS-6205-1D-8" 1/1 FW-32 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1627 Tank Farm FS-6205-1D-8" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1628 Tank Farm FS-6205-1D-8" 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1629 Tank Farm FS-6206-1D-8'' 1/2 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1630 Tank Farm FS-6206-1D-8'' 1/2 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1631 Tank Farm FS-6206-1D-8'' 1/2 FW-16 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1632 Tank Farm FS-6206-1D-8'' 1/2 FW-19 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1633 Tank Farm FS-6206-1D-8'' 1/2 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1634 Tank Farm FS-6206-1D-8'' 1/2 FW-05 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1635 Tank Farm FW-2001b-1D-8" 1/1 FW-07 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1636 Tank Farm FW-2001b-1D-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1637 Tank Farm FW-2001b-1D-8" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1638 Tank Farm FW-3002b-1D-8" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1639 Tank Farm FW-3002b-1D-8" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1640 Tank Farm FW-3002b-1D-8" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1641 Tank Farm FW-3002b-1D-8" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1642 Tank Farm FW-3002b-1D-8" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1643 Tank Farm FW-3002b-1D-8" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1644 Tank Farm FW-3002b-1D-8" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1645 Tank Farm FW-3003-1D-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1646 Tank Farm FW-3003-1D-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1647 Tank Farm FW-3003-1D-8" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1648 Tank Farm FS-6205-1D-8" 1/1 FW-21 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1649 Tank Farm FS-6205-1D-8" 1/1 FW-22 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1650 Tank Farm FS-6205-1D-8" 1/1 FW-35 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1651 Tank Farm FS-6205-1D-8" 1/1 FW-36 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1652 Tank Farm FS-6206-1D-8'' 2/2 FW-48 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1653 Tank Farm FS-6204-1D-8" 1/2 FW-07 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1654 Tank Farm FS-6205-1D-8" 1/1 FW-33 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1655 Tank Farm FS-6205-1D-8" 1/1 FW-34 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1656 Tank Farm FS-6204-1D-8" 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1657 Tank Farm FS-6204-1D-8" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1658 Tank Farm FS-6204-1D-8" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1659 Tank Farm FS-6204-1D-8" 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1660 Tank Farm FW-2001b-1D-8" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1661 Tank Farm FW-2001b-1D-8" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1662 Tank Farm FS-6206-1D-8'' 1/2 FW-06 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1663 Tank Farm FS-6206-1D-8'' 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1664 Tank Farm FS-6206-1D-8'' 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1665 Tank Farm FS-6206-1D-8'' 1/2 FW-15 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1666 Tank Farm FS-0401-1D-4" 1/1 FW-175 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

1667 Tank Farm FS-0401-1D-4" 1/1 FW-174A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

1668 Tank Farm FS-6204-1D-8" 1/2 FW-16 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1669 Tank Farm FS-6204-1D-8" 1/2 FW-19 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1670 Tank Farm FS-6204-1D-8" 1/2 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1671 Tank Farm FW-3004-1D-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1672 Tank Farm FW-3004-1D-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1673 Tank Farm FW-2002-1D-8" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1674 Tank Farm FW-2002-1D-8" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1675 Tank Farm FW-2004-1D-2" 1/1 FW-03 SOW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Flange

1676 Tank Farm FW-2005-1D-2" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1677 Tank Farm FW-2006-1D-2" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1678 Tank Farm FW-2007-1D-2" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1679 Tank Farm FW-2008-1D-2" 1/1 FW-03 SOW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Flange

1680 Tank Farm FW-2009-1D-2" 1/1 FW-03 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

1681 Tank Farm FW-2010-1D-2" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1682 Tank Farm FW-2011-1D-2" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1683 Tank Farm FW-2012-1D-2" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1684 Tank Farm FW-2013-1D-2" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1685 Tank Farm FW-2014-1D-2" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1686 Tank Farm FW-2015-1D-2" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1687 Tank Farm FW-2016-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

1688 Tank Farm FW-2017-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

1689 Tank Farm FW-2018-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

1690 Tank Farm FW-2019-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

1691 Tank Farm FW-3016-1D-2" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1692 Tank Farm FW-3017-1D-2" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1693 Tank Farm FW-2004-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1694 Tank Farm FW-2005-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1695 Tank Farm FW-2006-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1696 Tank Farm FW-2007-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1697 Tank Farm FW-2008-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1698 Tank Farm FW-2009-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1699 Tank Farm FW-2010-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1700 Tank Farm FW-2011-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1701 Tank Farm FW-2012-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1702 Tank Farm FW-2013-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1703 Tank Farm FW-2014-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1704 Tank Farm FW-2015-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1705 Tank Farm FW-2016-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1706 Tank Farm FW-2017-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1707 Tank Farm FW-2018-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1708 Tank Farm FW-2019-1D-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1709 Tank Farm FS-6204-1D-8" 1/2 FW-02 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1710 Tank Farm FS-6205-1D-8" 1/1 FW-17 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1711 Tank Farm FS-6205-1D-8" 1/1 FW-20 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1712 Tank Farm FS-6205-1D-8" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1713 Tank Farm FS-6205-1D-8" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1714 Tank Farm FS-6207-1D-8" 1/1 FW-40 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1715 Tank Farm FS-6207-1D-8" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1716 Tank Farm FS-6207-1D-8" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1717 Tank Farm FS-6207-1D-8" 1/1 FW-17 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1718 Tank Farm FS-6207-1D-8" 1/1 FW-18 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1719 Tank Farm FS-6207-1D-8" 1/1 FW-33 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1720 Tank Farm FS-6207-1D-8" 1/1 FW-34 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1721 Tank Farm FS-6207-1D-8" 1/1 FW-41 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1722 Tank Farm FS-6207-1D-8" 1/1 FW-42 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1723 Tank Farm FS-6204-1D-8" 1/2 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1724 Tank Farm FW-2001b-1D-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1725 Tank Farm FW-2001b-1D-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1726 Tank Farm FW-3003-1D-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1727 Tank Farm FW-3003-1D-8" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1728 Tank Farm FW-3004-1D-8" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1729 Tank Farm FW-2002-1D-8" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1730 Tank Farm FW-2002-1D-8" 1/1 FW-20 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1731 Tank Farm FW-2002-1D-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1732 Tank Farm FW-2002-1D-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1733 Tank Farm FS-6206-1D-8'' 2/2 FW-32 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1734 Tank Farm FS-6206-1D-8'' 2/2 FW-41 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1735 Tank Farm FS-6206-1D-8'' 2/2 FW-33 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1736 Tank Farm FS-6206-1D-8'' 2/2 FW-40 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1737 Tank Farm FW-3005-1D-2" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1738 Tank Farm FW-3005-1D-2" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1739 Tank Farm FW-3006-1D-2" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1740 Tank Farm FW-3006-1D-2" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1741 Tank Farm FW-3015-1D-2" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1742 Tank Farm FW-3015-1D-2" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1743 Tank Farm FW-3016-1D-2" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1744 Tank Farm FW-3017-1D-2" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

1745 Tank Farm FS-6205-1D-8" 1/1 FW-38 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1746 Tank Farm FS-6205-1D-8" 1/1 FW-39 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1747 Tank Farm FS-6204-1D-8" 2/2 FW-42 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1748 Tank Farm FS-6204-1D-8" 2/2 FW-43 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1749 Tank Farm FS-6204-1D-8" 2/2 FW-45 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1750 Tank Farm FS-6204-1D-8" 2/2 FW-44 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1751 Tank Farm FW-3001b-1D-8" 1/1 FW-07 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1752 Tank Farm FW-3001b-1D-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1753 Tank Farm FW-3001b-1D-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1754 Tank Farm FS-6207-1D-8" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1755 Tank Farm FS-6207-1D-8" 1/1 FW-26 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1756 Tank Farm FS-6206-1D-8'' 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1757 Tank Farm FS-6206-1D-8'' 1/2 FW-09 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1758 Tank Farm FS-6206-1D-8'' 2/2 FW-55 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1759 Tank Farm FS-6206-1D-8'' 2/2 FW-54 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1760 Tank Farm FS-6206-1D-8'' 2/2 FW-34 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1761 Tank Farm FS-6206-1D-8'' 2/2 FW-35 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1762 Tank Farm FS-6204-1D-8" 2/2 FW-36 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1763 Tank Farm FS-6204-1D-8" 2/2 FW-37 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1764 Tank Farm FS-6204-1D-8" 2/2 FW-38 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1765 Tank Farm FS-6204-1D-8" 2/2 FW-39 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1766 Tank Farm FW-2004-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1767 Tank Farm FW-2005-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1768 Tank Farm FW-2006-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1769 Tank Farm FW-2007-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1770 Tank Farm FW-2008-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1771 Tank Farm FW-2009-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1772 Tank Farm FW-2010-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1773 Tank Farm FW-2011-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1774 Tank Farm FW-2012-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1775 Tank Farm FW-2013-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1776 Tank Farm FW-2014-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1777 Tank Farm FW-2015-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1778 Tank Farm FW-2016-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1779 Tank Farm FW-2017-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1780 Tank Farm FW-2018-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1781 Tank Farm FW-2019-1D-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1782 Tank Farm FS-0201-1D-6" 1/1 FW-46 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1783 Tank Farm FS-0201-1D-6" 1/1 FW-47 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1784 Tank Farm FS-0201-1D-6" 1/1 FW-48 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1785 Tank Farm FS-0201-1D-6" 1/1 FW-49 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1786 Tank Farm FW-2002-1D-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1787 Tank Farm FW-2002-1D-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1788 Tank Farm FW-2002-1D-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1789 Tank Farm FW-2002-1D-8" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1790 Tank Farm FW-2002-1D-8" 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1791 Tank Farm FW-3002-1D-8" 1/2 FW-03 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1792 Tank Farm FW-3002-1D-8" 1/2 FW-09 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1793 Tank Farm FS-6205-1D-8" 1/1 FW-37 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1794 Tank Farm FS-6205-1D-8" 1/1 FW-40 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1795 Tank Farm FS-6204-1D-8" 2/2 FW-60 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1796 Tank Farm FS-6204-1D-8" 2/2 FW-61 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1797 Tank Farm FW-2002-1D-8" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1798 Tank Farm FW-2002-1D-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1799 Tank Farm FW-2002-1D-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1800 Tank Farm FW-2002-1D-8" 1/1 FW-17 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1801 Tank Farm FS-0101-1D-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1802 Tank Farm FS-0101-1D-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1803 Tank Farm FS-0101-1D-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1804 Tank Farm FS-0101-1D-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1805 Tank Farm FW-3005-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1806 Tank Farm FW-3006-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1807 Tank Farm FW-3007-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1808 Tank Farm FW-3008-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1809 Tank Farm FW-3009-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1810 Tank Farm FW-3010-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1811 Tank Farm FW-3011-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1812 Tank Farm FW-3012-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1813 Tank Farm FW-3013-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1814 Tank Farm FW-3014-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1815 Tank Farm FW-3015-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1816 Tank Farm FW-3016-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1817 Tank Farm FW-3017-1D-2" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1818 Tank Farm FS-6204-1D-8" 1/2 FW-08 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1819 Tank Farm FS-6204-1D-8" 1/2 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1820 Tank Farm FS-6204-1D-8" 1/2 FW-10 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1821 Tank Farm FS-6204-1D-8" 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1822 Tank Farm FS-6204-1D-8" 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1823 Tank Farm FS-6204-1D-8" 1/2 FW-13 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1824 Tank Farm FW-2002-1D-8" 1/1 FW-18 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1825 Tank Farm FW-2002-1D-8" 1/1 FW-19 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1826 Tank Farm FW-2002-1D-8" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1827 Tank Farm FW-2002-1D-8" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1828 Tank Farm FS-1101-1D-6" 1/1 FW-462 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1829 Tank Farm FS-1101-1D-6" 1/1 FW-463 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1830 Tank Farm FS-1101-1D-6" 1/1 FW-464 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1831 Tank Farm FS-1101-1D-6" 1/1 FW-465 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1832 Tank Farm FS-1201-1D-6" 1/1 FW-507 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1833 Tank Farm FS-1201-1D-6" 1/1 FW-508 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1834 Tank Farm FS-1201-1D-6" 1/1 FW-509 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1835 Tank Farm FS-1201-1D-6" 1/1 FW-510 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1836 Tank Farm FW-2004-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1837 Tank Farm FW-2005-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1838 Tank Farm FW-2006-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1839 Tank Farm FW-2007-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1840 Tank Farm FW-2008-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1841 Tank Farm FW-2009-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1842 Tank Farm FW-2010-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1843 Tank Farm FW-2011-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1844 Tank Farm FW-2012-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1845 Tank Farm FW-2013-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1846 Tank Farm FW-2014-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1847 Tank Farm FW-2015-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1848 Tank Farm FW-2016-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1849 Tank Farm FW-2017-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1850 Tank Farm FW-2018-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1851 Tank Farm FW-2019-1D-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

1852 Tank Farm FW-2002-1D-8" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

1853 Tank Farm FW-2002-1D-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1854 Tank Farm FW-0014-1D-10" 1/2 FW-01 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

1855 Tank Farm FW-0014-1D-10" 1/2 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1856 Tank Farm FW-0014-1D-10" 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1857 Tank Farm FW-0014-1D-10" 1/2 FW-11 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

1858 Tank Farm FS-1301-1D-6" 1/1 FW-552 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1859 Tank Farm FS-1301-1D-6" 1/1 FW-553 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1860 Tank Farm FS-1301-1D-6" 1/1 FW-554 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1861 Tank Farm FS-1301-1D-6" 1/1 FW-555 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

1862 Tank Farm FS-0201-1D-6" 1/1 FW-46A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A53 Pipe/Pipe

1863 Tank Farm FW-0014-1D-10" 1/2 FW-28 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1864 Tank Farm FW-0014-1D-10" 1/2 FW-19 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1865 Tank Farm FS-6204-1D-8" 2/2 FW-24 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1866 Tank Farm FS-6204-1D-8" 2/2 FW-25 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1867 Tank Farm FS-6204-1D-8" 2/2 FW-32 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1868 Tank Farm FS-6204-1D-8" 2/2 FW-33 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1869 Tank Farm FW-0014-1D-10" 1/2 FW-13 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

1870 Tank Farm FW-0014-1D-10" 1/2 FW-12 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1871 Tank Farm FW-0014-1D-10" 1/2 FW-27 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1872 Tank Farm FW-0014-1D-10" 1/2 FW-26 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1873 Tank Farm FW-3018-1D-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1874 Tank Farm FW-3019-1D-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1875 Tank Farm FW-3020-1D-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1876 Tank Farm FW-3021-1D-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1877 Tank Farm FW-3022-1D-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1878 Tank Farm FW-3023-1D-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1879 Tank Farm FW-3024-1D-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1880 Tank Farm FW-3025-1D-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1881 Tank Farm FW-3026-1D-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1882 Tank Farm FW-3027-1D-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1883 Tank Farm FW-3028-1D-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1884 Tank Farm FW-3029-1D-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

1885 Tank Farm FW-0014-1D-10" 1/2 FW-23 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1886 Tank Farm FW-0014-1D-10" 1/2 FW-22 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

1887 Tank Farm FW-0014-1D-10" 1/2 FW-18 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

1888 Tank Farm FW-0014-1D-10" 1/2 FW-30 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

1889 Tank Farm FW-0014-1D-10" 1/2 FW-33 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1890 Tank Farm FW-0014-1D-10" 1/2 FW-25 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1891 Tank Farm FW-0014-1D-10" 1/2 FW-21 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1892 Tank Farm FS-0201-1D-6" 1/1 FW-56 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1893 Tank Farm FS-0201-1D-6" 1/1 FW-57 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1894 Tank Farm FS-0201-1D-6" 1/1 FW-58 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1895 Tank Farm FS-0201-1D-6" 1/1 FW-50 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1896 Tank Farm FS-0101-1D-6" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1897 Tank Farm FS-0101-1D-6" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1898 Tank Farm FS-0101-1D-6" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1899 Tank Farm FS-1101-1D-6" 1/1 FW-472 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1900 Tank Farm FS-1101-1D-6" 1/1 FW-473 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1901 Tank Farm FS-1101-1D-6" 1/1 FW-474 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1902 Tank Farm FS-1201-1D-6" 1/1 FW-517 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1903 Tank Farm FS-1201-1D-6" 1/1 FW-518 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1904 Tank Farm FS-1201-1D-6" 1/1 FW-519 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1905 Tank Farm FS-1301-1D-6" 1/1 FW-562 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1906 Tank Farm FS-1301-1D-6" 1/1 FW-563 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1907 Tank Farm FS-1301-1D-6" 1/1 FW-564 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1908 Tank Farm FS-6205-1D-8" 1/1 FW-08 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1909 Tank Farm FS-6205-1D-8" 1/1 FW-07 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1910 Tank Farm FS-6205-1D-8" 1/1 FW-25 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1911 Tank Farm FS-6205-1D-8" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1912 Tank Farm FS-6205-1D-8" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

1913 Tank Farm FS-6205-1D-8" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1914 Tank Farm FS-6205-1D-8" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1915 Tank Farm FS-6201-1D-8" 1/1 FW-18 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1916 Tank Farm FS-6205-1D-8" 1/1 FW-27 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1917 Tank Farm FS-6205-1D-8" 1/1 FW-28 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1918 Tank Farm FS-6205-1D-8" 1/1 FW-26 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1919 Tank Farm FS-6205-1D-8" 1/1 FW-29 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1920 Tank Farm FS-6205-1D-8" 1/1 FW-30 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1921 Tank Farm FS-6204-1D-8" 2/2 FW-54 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1922 Tank Farm FS-6204-1D-8" 2/2 FW-55 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1923 Tank Farm FS-6204-1D-8" 2/2 FW-40 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1924 Tank Farm FS-6204-1D-8" 2/2 FW-41 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1925 Tank Farm FS-6204-1D-8" 2/2 FW-34 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1926 Tank Farm FS-6204-1D-8" 2/2 FW-35 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1927 Tank Farm FS-6204-1D-8" 2/2 FW-48 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1928 Tank Farm FS-6204-1D-8" 2/2 FW-49 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1929 Tank Farm FS-6201-1D-8" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

1930 Tank Farm FS-6204-1D-8" 2/2 FW-26 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

1931 Tank Farm FS-6207-1D-8" 1/1 FW-27 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

1932 Tank Farm FS-6207-1D-8" 1/1 FW-30 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

1933 Tank Farm FS-6207-1D-8" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

1934 Tank Farm FS-6207-1D-8" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

1935 Tank Farm FS-6206-1D-8'' 1/2 FW-10 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

1936 Tank Farm FS-6206-1D-8'' 1/2 FW-13 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1937 Tank Farm FS-6206-1D-8'' 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

1938 Tank Farm FS-6206-1D-8'' 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

1939 Tank Farm FS-6206-1D-8'' 2/2 FW-56 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

1940 Tank Farm FS-6206-1D-8'' 2/2 FW-59 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

1941 Tank Farm FS-6206-1D-8'' 2/2 FW-57 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

1942 Tank Farm FS-6206-1D-8'' 2/2 FW-58 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

1943 Tank Farm FS-6206-1D-8'' 2/2 FW-36 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

1944 Tank Farm FS-6206-1D-8'' 2/2 FW-39 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

1945 Tank Farm FS-6206-1D-8'' 2/2 FW-37 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

1946 Tank Farm FS-6206-1D-8'' 2/2 FW-38 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

1947 Tank Farm FW-0014-1D-10" 2/2 FW-55 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1948 Tank Farm FW-0014-1D-10" 2/2 FW-45 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

1949 Tank Farm FW-0014-1D-10" 2/2 FW-43 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

1950 Tank Farm FW-0014-1D-10" 1/2 FW-31 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

1951 Tank Farm FW-0014-1D-10" 1/2 FW-17 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

1952 Tank Farm FW-0014-1D-10" 1/2 FW-24 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1953 Tank Farm FW-0014-1D-10" 1/2 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1954 Tank Farm FW-0014-1D-10" 1/2 FW-32 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1955 Tank Farm FW-0014-1D-10" 1/2 FW-08 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1956 Tank Farm FW-0014-1D-10" 1/2 FW-09 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1957 Tank Farm FW-0014-1D-10" 2/2 FW-52 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1958 Tank Farm FS-6204-1D-8" 2/2 FW-50 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1959 Tank Farm FS-6204-1D-8" 2/2 FW-51 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1960 Tank Farm FS-6204-1D-8" 2/2 FW-52 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1961 Tank Farm FS-6204-1D-8" 2/2 FW-53 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1962 Tank Farm FS-6204-1D-8" 2/2 FW-56 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1963 Tank Farm FS-6204-1D-8" 2/2 FW-57 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1964 Tank Farm FS-6204-1D-8" 2/2 FW-58 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

1965 Tank Farm FS-6204-1D-8" 2/2 FW-59 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1966 Tank Farm PW-6001-1B-8" 1/2 FW-23B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

1967 Tank Farm PW-6002-1B-8" 1/1 FW-11B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

1968 Tank Farm FW-6026-1B-10" 1/1 FW-11B BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A53 Pipe/Pipe

1969 Tank Farm FW-6010-1B-10" 2/2 FW-34B BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1970 Tank Farm FS-1201-1D-6" 1/1 FW-507A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A53 Pipe/Pipe

1971 Tank Farm FS-1201-1D-6" 1/1 FW-511 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1972 Tank Farm FS-0201-1D-6" 1/1 FW-51 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1973 Tank Farm FS-0201-1D-6" 1/1 FW-52 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

1974 Tank Farm FS-0201-1D-6" 1/1 FW-53 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

1975 Tank Farm FS-0201-1D-6" 1/1 FW-54 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

1976 Tank Farm FS-0201-1D-6" 1/1 FW-55 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

1977 Tank Farm FS-0201-1D-6" 1/1 FW-59 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

1978 Tank Farm FS-0201-1D-6" 1/1 FW-64 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1979 Tank Farm FS-0101-1D-6" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

1980 Tank Farm FS-0101-1D-6" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1981 Tank Farm FS-0101-1D-6" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

1982 Tank Farm FS-0101-1D-6" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

1983 Tank Farm FS-0101-1D-6" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

1984 Tank Farm FS-6204-1D-8" 2/2 FW-31 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

1985 Tank Farm FS-6204-1D-8" 2/2 FW-30 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

1986 Tank Farm FS-6204-1D-8" 2/2 FW-29 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

1987 Tank Farm FS-6204-1D-8" 2/2 FW-28 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

1988 Tank Farm FS-6204-1D-8" 2/2 FW-46 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1989 Tank Farm FS-6204-1D-8" 2/2 FW-47 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1990 Tank Farm FS-6204-1D-8" 1/2 FW-14 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1991 Tank Farm FS-6204-1D-8" 1/2 FW-15 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
1992 Tank Farm FS-6204-1D-8" 1/2 FW-20 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1993 Tank Farm FS-6204-1D-8" 1/2 FW-21 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1994 Tank Farm FS-6204-1D-8" 1/2 FW-22 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1995 Tank Farm FS-6204-1D-8" 1/2 FW-23 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

1996 Tank Farm FW-0014-1D-10" 2/2 FW-41 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

1997 Tank Farm FW-0014-1D-10" 2/2 FW-40 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

1998 Tank Farm FW-0014-1D-10" 2/2 FW-39 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

1999 Tank Farm FW-0014-1D-10" 2/2 FW-38 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

2000 Tank Farm FW-0014-1D-10" 2/2 FW-42 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

2001 Tank Farm FW-0014-1D-10" 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

2002 Tank Farm FW-0014-1D-10" 1/2 FW-15 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2003 Tank Farm FW-0014-1D-10" 1/2 FW-16 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

2004 Tank Farm FW-0014-1D-10" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

2005 Tank Farm FW-0014-1D-10" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

2006 Tank Farm FW-0014-1D-10" 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

2007 Tank Farm FW-0014-1D-10" 1/2 FW-07 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2008 Tank Farm FW-0014-1D-10" 2/2 FW-51 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2009 Tank Farm FW-0014-1D-10" 2/2 FW-50 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

2010 Tank Farm FW-0014-1D-10" 2/2 FW-48 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

2011 Tank Farm FW-0014-1D-10" 2/2 FW-49 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

2012 Tank Farm FW-0014-1D-10" 2/2 FW-37 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

2013 Tank Farm FW-0014-1D-10" 2/2 FW-36 BW WPS-2016-23 GTAW 2" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2014 Tank Farm FW-0014-1D-10" 2/2 FW-35 BW WPS-2016-23 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

2015 Tank Farm FS-0101-1D-6" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2016 Tank Farm FS-0101-1D-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A53 Pipe/Pipe

2017 Tank Farm FS-0303-1D-3" 1/1 FW-167 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2018 Tank Farm FS-0303-1D-3" 1/1 FW-166 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2019 Tank Farm FS-0303-1D-3" 1/1 FW-165 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2020 Tank Farm FS-0303-1D-3" 1/1 FW-164 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2021 Tank Farm FS-0303-1D-3" 1/1 FW-163 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2022 Tank Farm FS-0303-1D-3" 1/1 FW-162 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2023 Tank Farm FS-0303-1D-3" 1/1 FW-161 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2024 Tank Farm FS-0303-1D-3" 1/1 FW-160 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2025 Tank Farm FS-0101-1D-6" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2026 Tank Farm FS-0101-1D-6" 1/1 FW-19 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2027 Tank Farm FS-1101-1D-6" 1/1 FW-467 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2028 Tank Farm FS-1101-1D-6" 1/1 FW-468 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2029 Tank Farm FS-1101-1D-6" 1/1 FW-466 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2030 Tank Farm FS-1101-1D-6" 1/1 FW-462A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A53 Pipe/Pipe

2031 Tank Farm FS-1101-1D-6" 1/1 FW-469 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2032 Tank Farm FS-1101-1D-6" 1/1 FW-470 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2033 Tank Farm FS-1101-1D-6" 1/1 FW-475 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2034 Tank Farm FS-1101-1D-6" 1/1 FW-480 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2035 Tank Farm FS-1103-1D-4" 1/1 FW-494 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2036 Tank Farm FS-1102-1D-4" 1/1 FW-481 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2037 Tank Farm FS-1101-1D-6" 1/1 FW-471 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2038 Tank Farm FS-1102-1D-4" 1/1 FW-481A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A53 Pipe/Pipe

2039 Tank Farm FS-1103-1D-4" 1/1 FW-494A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A53 Pipe/Pipe

2040 Tank Farm FS-1201-1D-6" 1/1 FW-513 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2041 Tank Farm FS-1201-1D-6" 1/1 FW-514 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2042 Tank Farm FS-1201-1D-6" 1/1 FW-515 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2043 Tank Farm FS-1201-1D-6" 1/1 FW-520 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2044 Tank Farm FS-0302-1D-3" 1/1 FW-136 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2045 Tank Farm FS-0302-1D-3" 1/1 FW-135 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2046 Tank Farm FS-0302-1D-3" 1/1 FW-134 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2047 Tank Farm FS-0302-1D-3" 1/1 FW-133 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2048 Tank Farm FS-0302-1D-3" 1/1 FW-132 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2049 Tank Farm FS-0302-1D-3" 1/1 FW-131 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2050 Tank Farm FS-0302-1D-3" 1/1 FW-130 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2051 Tank Farm FS-0302-1D-3" 1/1 FW-129 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2052 Tank Farm FW-3018-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2053 Tank Farm FW-3019-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2054 Tank Farm FW-3020-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2055 Tank Farm FW-3021-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2056 Tank Farm FW-3022-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2057 Tank Farm FW-3023-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2058 Tank Farm FW-3024-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2059 Tank Farm FW-3025-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2060 Tank Farm FW-3026-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2061 Tank Farm FW-3027-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2062 Tank Farm FW-3028-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2063 Tank Farm FW-3029-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2064 Tank Farm FW-2003-1D-2" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A234 Pipe/Tee

2065 Tank Farm FS-1301-1D-6" 1/1 FW-565 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2066 Tank Farm FS-1301-1D-6" 1/1 FW-560 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2067 Tank Farm FS-1301-1D-6" 1/1 FW-559 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2068 Tank Farm FS-1301-1D-6" 1/1 FW-558 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2069 Tank Farm FS-0402-1D-3" 1/1 FW-212 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2070 Tank Farm FS-0402-1D-3" 1/1 FW-213 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2071 Tank Farm FS-0402-1D-3" 1/1 FW-214 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2072 Tank Farm FS-0402-1D-3" 1/1 FW-215 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2073 Tank Farm FS-0402-1D-3" 1/1 FW-216 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2074 Tank Farm FS-0402-1D-3" 1/1 FW-217 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2075 Tank Farm FS-0402-1D-3" 1/1 FW-218 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2076 Tank Farm FS-0402-1D-3" 1/1 FW-219 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2077 Tank Farm FS-0402-1D-3" 1/1 FW-220 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2078 Tank Farm FS-0402-1D-3" 1/1 FW-221 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2079 Tank Farm FW-0014-1D-10" 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2080 Tank Farm FW-0014-1D-10" 1/2 FW-29 BRW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Weldolet

2081 Tank Farm FW-0014-1D-10" 2/2 FW-47 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

2082 Tank Farm FW-3002-1D-8" 1/2 FW-15 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2083 Tank Farm FW-3002-1D-8" 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2084 Tank Farm FW-3002-1D-8" 1/2 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2085 Tank Farm FW-3002-1D-8" 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2086 Tank Farm FW-3002-1D-8" 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2087 Tank Farm FS-6203-1D-8" 1/2 FW-05 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2088 Tank Farm FS-6203-1D-8" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2089 Tank Farm FS-6203-1D-8" 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2090 Tank Farm FS-6203-1D-8" 1/2 FW-20 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2091 Tank Farm FS-6201-1D-8" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2092 Tank Farm FS-0403-1D-3" 1/1 FW-254 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2093 Tank Farm FS-0403-1D-3" 1/1 FW-253 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2094 Tank Farm FS-0403-1D-3" 1/1 FW-252 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2095 Tank Farm FS-0403-1D-3" 1/1 FW-251 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2096 Tank Farm FS-0403-1D-3" 1/1 FW-250 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2097 Tank Farm FS-0403-1D-3" 1/1 FW-249 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2098 Tank Farm FW-2001-1D-8" 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2099 Tank Farm FW-3002-1D-8" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2100 Tank Farm FW-3002-1D-8" 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2101 Tank Farm FS-1201-1D-6" 1/1 FW-522 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2102 Tank Farm FS-1301-1D-6" 1/1 FW-569B SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

2103 Tank Farm FS-1301-1D-6" 1/1 FW-567 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

2104 Tank Farm FS-1301-1D-6" 1/1 FW-570 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2105 Tank Farm FS-1301-1D-6" 1/1 FW-557 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2106 Tank Farm FS-1201-1D-6" 1/1 FW-512 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2107 Tank Farm FS-1201-1D-6" 1/1 FW-525 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2108 Tank Farm FS-1301-1D-6" 1/1 FW-569A SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

2109 Tank Farm FS-1301-1D-6" 1/1 FW-561 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2110 Tank Farm FS-1201-1D-6" 1/1 FW-516 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2111 Tank Farm FW-3021-1D-2" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

2112 Tank Farm FW-3020-1D-2" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2113 Tank Farm FW-3024-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

2114 Tank Farm FW-3025-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

2115 Tank Farm FW-3026-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

2116 Tank Farm FW-3027-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

2117 Tank Farm FW-3028-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

2118 Tank Farm FW-3029-1D-2" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

2119 Tank Farm FW-3022-1D-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2120 Tank Farm FW-3023-1D-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2121 Tank Farm FW-3024-1D-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2122 Tank Farm FW-3025-1D-2" 1/1 FW-11 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2123 Tank Farm FW-3026-1D-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2124 Tank Farm FW-3027-1D-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2125 Tank Farm FW-3028-1D-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2126 Tank Farm FW-3029-1D-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2127 Tank Farm FW-0014-1D-10" 2/2 FW-34 BRW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Weldolet

2128 Tank Farm FW-0014-1D-10" 2/2 FW-34A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2129 Tank Farm FW-2001-1D-8" 1/2 FW-02 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2130 Tank Farm FS-1102-1D-4" 1/1 FW-482 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2131 Tank Farm FS-1102-1D-4" 1/1 FW-483 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2132 Tank Farm FS-1102-1D-4" 1/1 FW-484 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2133 Tank Farm FS-1102-1D-4" 1/1 FW-485 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2134 Tank Farm FS-1103-1D-4" 1/1 FW-495 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2135 Tank Farm FS-1103-1D-4" 1/1 FW-496 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2136 Tank Farm FS-1103-1D-4" 1/1 FW-497 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2137 Tank Farm FS-1103-1D-4" 1/1 FW-498 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2138 Tank Farm FS-1301-1D-6" 1/1 FW-552A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2139 Tank Farm FS-1301-1D-6" 1/1 FW-556 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2140 Tank Farm FS-0403-1D-3" 1/1 FW-248 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2141 Tank Farm FS-0403-1D-3" 1/1 FW-247 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2142 Tank Farm FS-0403-1D-3" 1/1 FW-246 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2143 Tank Farm FS-0403-1D-3" 1/1 FW-245 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2144 Tank Farm FS-0502-1D-3" 1/1 FW-304 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2145 Tank Farm FS-0502-1D-3" 1/1 FW-303 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2146 Tank Farm FS-6203-1D-8" 2/2 FW-42 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2147 Tank Farm FS-6203-1D-8" 2/2 FW-41 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2148 Tank Farm FS-6203-1D-8" 2/2 FW-40 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2149 Tank Farm FS-6203-1D-8" 2/2 FW-39 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2150 Tank Farm FS-6201-1D-8" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2151 Tank Farm FS-6201-1D-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Reducer

2152 Tank Farm FS-6201-1D-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Reducer

2153 Tank Farm FS-6201-1D-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2154 Tank Farm FS-6201-1D-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2155 Tank Farm FW-3001b-1D-8" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2156 Tank Farm FW-3001-1D-8" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2157 Tank Farm FW-3001-1D-8" 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2158 Tank Farm FW-3001-1D-8" 1/2 FW-03 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2159 Tank Farm FW-3002b-1D-8" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Flange

2160 Tank Farm FW-3002-1D-8" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2161 Tank Farm FW-3002-1D-8" 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2162 Tank Farm VL-0005-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

2163 Tank Farm VL-0007-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

2164 Tank Farm VL-0009-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

2165 Tank Farm VL-0010-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

2166 Tank Farm FS-0303-1D-3" 1/1 FW-169 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2167 Tank Farm FS-0303-1D-3" 1/1 FW-168 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2168 Tank Farm FS-0502-1D-3" 1/1 FW-306 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2169 Tank Farm FS-0502-1D-3" 1/1 FW-305 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2170 Tank Farm FS-0503-1D-3" 1/1 FW-335 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2171 Tank Farm FS-0503-1D-3" 1/1 FW-334 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2172 Tank Farm FS-0503-1D-3" 1/1 FW-333 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2173 Tank Farm FS-0503-1D-3" 1/1 FW-332 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2174 Tank Farm FS-0602-1D-3" 1/1 FW-379 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2175 Tank Farm FS-0602-1D-3" 1/1 FW-378 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2176 Tank Farm FS-0603-1D-3" 1/1 FW-402 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2177 Tank Farm FS-0603-1D-3" 1/1 FW-401 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2178 Tank Farm FW-3001-1D-8" 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2179 Tank Farm FW-3001-1D-8" 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2180 Tank Farm FS-6206-1D-8'' 1/2 FW-04 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

2181 Tank Farm FS-0202-1D-3" 1/1 FW-65 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2182 Tank Farm FS-0203-1D-3" 1/1 FW-78 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2183 Tank Farm FS-0102-1D-3" 1/1 FW-20 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2184 Tank Farm FS-0103-1D-3" 1/1 FW-33 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2185 Tank Farm FS-1202-1D-4" 1/1 FW-526 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2186 Tank Farm FS-1203-1D-4" 1/1 FW-539 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2187 Tank Farm FS-1302-1D-4" 1/1 FW-571 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2188 Tank Farm FS-1303-1D-4" 1/1 FW-584 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2189 Tank Farm FW-3001-1D-8" 1/2 FW-09 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2190 Tank Farm FW-3001-1D-8" 1/2 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2191 Tank Farm FW-3001-1D-8" 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2192 Tank Farm FW-3001-1D-8" 1/2 FW-04 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2193 Tank Farm FW-3001-1D-8" 1/2 FW-10 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2194 Tank Farm FS-0301-1D-4" 1/1 FW-91 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2195 Tank Farm FS-0301-1D-4" 1/1 FW-93 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2196 Tank Farm FS-0401-1D-4" 1/1 FW-174 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2197 Tank Farm FS-0401-1D-4" 1/1 FW-176 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2198 Tank Farm FS-0501-1D-4" 1/1 FW-261 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2199 Tank Farm FS-0601-1D-4" 1/1 FW-340 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2200 Tank Farm FS-0701-1D-4" 1/1 FW-407 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2201 Tank Farm FW-2001-1D-8" 2/2 FW-27 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2202 Tank Farm FW-2001-1D-8" 2/2 FW-26 BRW WPS-2016-23 GTAW 8" SCH20 A53/A105 Pipe/Weldolet

2203 Tank Farm FW-3011-1D-2" 1/1 FW-09 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

2204 Tank Farm FW-2001-1D-8" 2/2 FW-25 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2205 Tank Farm FW-3011-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2206 Tank Farm FW-2001-1D-8" 2/2 FW-24 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2207 Tank Farm FW-3012-1D-2" 1/1 FW-09 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

2208 Tank Farm FW-2001-1D-8" 2/2 FW-23 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2209 Tank Farm FW-3012-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2210 Tank Farm FW-2001-1D-8" 2/2 FW-22 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2211 Tank Farm FW-3014-1D-2" 1/1 FW-09 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2212 Tank Farm FW-2001-1D-8" 2/2 FW-21 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2213 Tank Farm FW-3014-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

2214 Tank Farm FW-2001-1D-8" 2/2 FW-20 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2215 Tank Farm FW-3018-1D-2" 1/1 FW-09 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

2216 Tank Farm FW-2001-1D-8" 2/2 FW-19 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2217 Tank Farm FW-3019-1D-2" 1/1 FW-09 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

2218 Tank Farm FW-2001-1D-8" 2/2 FW-18 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2219 Tank Farm FW-1305-1D-2½" 1/1 FW-1026 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2220 Tank Farm FW-2001-1D-8" 2/2 FW-17 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2221 Tank Farm FW-1304-1D-2½" 1/1 FW-1017 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2222 Tank Farm FW-2001-1D-8" 1/2 FW-16 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2223 Tank Farm FW-2001-1D-8" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Weldolet

2224 Tank Farm FW-2001-1D-8" 1/2 FW-15 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2225 Tank Farm FW-2001-1D-8" 1/2 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2226 Tank Farm FW-2001-1D-8" 1/2 FW-14 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2227 Tank Farm FW-2001-1D-8" 1/2 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2228 Tank Farm FW-2001-1D-8" 1/2 FW-13 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2229 Tank Farm FW-2001-1D-8" 1/2 FW-1A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2230 Tank Farm FW-2001-1D-8" 1/2 FW-12 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2231 Tank Farm FW-1302-1D-2½" 1/1 FW-999 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2232 Tank Farm FW-2001-1D-8" 1/2 FW-11 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2233 Tank Farm FW-0305-1D-2½" 1/1 FW-250 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2234 Tank Farm FW-2001-1D-8" 1/2 FW-10 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2235 Tank Farm FW-0305-1D-2½" 1/1 FW-251 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2236 Tank Farm FW-2001-1D-8" 1/2 FW-09 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2237 Tank Farm FW-2001-1D-8" 1/2 FW-14A SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2238 Tank Farm FW-2001-1D-8" 1/2 FW-14B SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2239 Tank Farm FW-2001-1D-8" 2/2 FW-19A SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2240 Tank Farm FW-2001-1D-8" 2/2 FW-19B SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2241 Tank Farm FW-2001-1D-8" 2/2 FW-24A SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2242 Tank Farm FW-2001-1D-8" 2/2 FW-24B SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2243 Tank Farm FW-3001-1D-8" 2/2 FW-36 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2244 Tank Farm FW-3001-1D-8" 2/2 FW-35 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2245 Tank Farm FW-3001-1D-8" 2/2 FW-35A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2246 Tank Farm FW-3001-1D-8" 2/2 FW-34 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2247 Tank Farm FW-3001-1D-8" 2/2 FW-34A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2248 Tank Farm FW-3001-1D-8" 2/2 FW-33 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2249 Tank Farm FW-3001-1D-8" 2/2 FW-32 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2250 Tank Farm FW-3001-1D-8" 2/2 FW-31A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2251 Tank Farm FW-3001-1D-8" 2/2 FW-31 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2252 Tank Farm FW-3001-1D-8" 2/2 FW-30A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2253 Tank Farm FW-3001-1D-8" 2/2 FW-30 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2254 Tank Farm FW-3001-1D-8" 2/2 FW-29A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2255 Tank Farm FW-3001-1D-8" 2/2 FW-29 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2256 Tank Farm FW-3001-1D-8" 2/2 FW-28A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2257 Tank Farm FW-3001-1D-8" 2/2 FW-28 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2258 Tank Farm FW-3001-1D-8" 2/2 FW-27A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2259 Tank Farm FW-3001-1D-8" 2/2 FW-27 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2260 Tank Farm FW-3001-1D-8" 2/2 FW-24A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2261 Tank Farm FW-3001-1D-8" 2/2 FW-26 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2262 Tank Farm FW-3001-1D-8" 2/2 FW-25 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2263 Tank Farm FW-3001-1D-8" 2/2 FW-24 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2264 Tank Farm FW-3001-1D-8" 2/2 FW-23A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2265 Tank Farm FW-3001-1D-8" 2/2 FW-23 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2266 Tank Farm FW-3001-1D-8" 1/2 FW-22A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2267 Tank Farm FW-3001-1D-8" 1/2 FW-22 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2268 Tank Farm FW-3001-1D-8" 1/2 FW-21A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2269 Tank Farm FW-3001-1D-8" 1/2 FW-21 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

2270 Tank Farm FW-3001-1D-8" 1/2 FW-20A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2271 Tank Farm FW-3001-1D-8" 1/2 FW-20 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

2272 Tank Farm FW-3001-1D-8" 1/2 FW-17A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2273 Tank Farm FW-3001-1D-8" 1/2 FW-19 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2274 Tank Farm FW-3001-1D-8" 1/2 FW-18 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2275 Tank Farm FW-3001-1D-8" 1/2 FW-17 BRW WPS-2016-23 GTAW 8" SCH20 A53/A105 Pipe/Weldolet

2276 Tank Farm FW-3001-1D-8" 1/2 FW-15 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2277 Tank Farm FW-3001-1D-8" 1/2 FW-16 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2278 Tank Farm FW-3002-1D-8" 2/2 FW-16 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2279 Tank Farm FW-3002-1D-8" 2/2 FW-17 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2280 Tank Farm FW-3002-1D-8" 1/2 FW-18 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2281 Tank Farm FW-3002-1D-8" 1/2 FW-19 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2282 Tank Farm FW-3002-1D-8" 2/2 FW-20 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2283 Tank Farm FW-3002-1D-8" 2/2 FW-21 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2284 Tank Farm FW-3002-1D-8" 1/2 FW-22 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2285 Tank Farm FW-3002-1D-8" 1/2 FW-23 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2286 Tank Farm FW-3002-1D-8" 1/2 FW-23A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2287 Tank Farm FW-3002-1D-8" 1/2 FW-24 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2288 Tank Farm FW-3002-1D-8" 1/2 FW-24A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2289 Tank Farm FW-3002-1D-8" 2/2 FW-25 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2290 Tank Farm FW-3002-1D-8" 2/2 FW-25A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2291 Tank Farm FW-3002-1D-8" 2/2 FW-26 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2292 Tank Farm FW-3002-1D-8" 2/2 FW-26A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2293 Tank Farm FW-3002-1D-8" 2/2 FW-27 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2294 Tank Farm FW-3002-1D-8" 2/2 FW-27A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2295 Tank Farm FW-3002-1D-8" 2/2 FW-28 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2296 Tank Farm FW-3002-1D-8" 2/2 FW-28A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2297 Tank Farm FW-3002-1D-8" 2/2 FW-29 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2298 Tank Farm FW-3002-1D-8" 2/2 FW-29C BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2299 Tank Farm FW-3002-1D-8" 2/2 FW-29A SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2300 Tank Farm FW-3002-1D-8" 2/2 FW-29B SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2301 Tank Farm FW-3002-1D-8" 2/2 FW-30 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2302 Tank Farm FW-3002-1D-8" 2/2 FW-30A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2303 Tank Farm FW-3002-1D-8" 2/2 FW-31 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2304 Tank Farm FW-3002-1D-8" 2/2 FW-31A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2305 Tank Farm FW-3002-1D-8" 2/2 FW-32 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2306 Tank Farm FW-3002-1D-8" 2/2 FW-32A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2307 Tank Farm FW-3002-1D-8" 2/2 FW-33 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2308 Tank Farm FW-3002-1D-8" 2/2 FW-33A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2309 Tank Farm FW-3002-1D-8" 2/2 FW-34 BRW WPS-2016-23 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2310 Tank Farm FW-3002-1D-8" 2/2 FW-34A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2311 Tank Farm FW-3002-1D-8" 2/2 FW-35 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2312 Tank Farm FW-0304-1D-2½" 1/1 FW-223 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2313 Tank Farm FW-0304-1D-2½" 1/1 FW-224 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2314 Tank Farm FW-0303-1D-2½" 1/1 FW-196 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2315 Tank Farm FW-0303-1D-2½" 1/1 FW-197 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2316 Tank Farm VL-0011-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

2317 Tank Farm FW-0402-1D-2½" 1/1 FW-327 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2318 Tank Farm FW-0402-1D-2½" 1/1 FW-328 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2319 Tank Farm FW-0306-1D-2½" 1/1 FW-277 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2320 Tank Farm FW-0306-1D-2½" 1/1 FW-278 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2321 Tank Farm FW-0405-1D-2½" 1/1 FW-414 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2322 Tank Farm FW-0405-1D-2½" 1/1 FW-415 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2323 Tank Farm FW-0404-1D-2½" 1/1 FW-385 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2324 Tank Farm FW-0404-1D-2½" 1/1 FW-386 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2325 Tank Farm FW-0403-1D-2½" 1/1 FW-356 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2326 Tank Farm FW-0403-1D-2½" 1/1 FW-357 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2327 Tank Farm FW-0505-1D-2½" 1/1 FW-570 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2328 Tank Farm FW-0505-1D-2½" 1/1 FW-571 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2329 Tank Farm FW-0504-1D-2½" 1/1 FW-545 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2330 Tank Farm FW-0504-1D-2½" 1/1 FW-546 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2331 Tank Farm FW-0503-1D-2½" 1/1 FW-520 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2332 Tank Farm FW-0503-1D-2½" 1/1 FW-521 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2333 Tank Farm FW-0502-1D-2½" 1/1 FW-495 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2334 Tank Farm FW-0502-1D-2½" 1/1 FW-500 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2335 Tank Farm FW-0406-1D-2½" 1/1 FW-443 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2336 Tank Farm FW-0406-1D-2½" 1/1 FW-444 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2337 Tank Farm FW-1101-1D-6" 1/1 FW-843 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

2338 Tank Farm FW-1202-1D-2½" 1/1 FW-922 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2339 Tank Farm FW-1202-1D-2½" 1/1 FW-923 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2340 Tank Farm FW-1203-1D-2½" 1/1 FW-931 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2341 Tank Farm FW-1203-1D-2½" 1/1 FW-932 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2342 Tank Farm FW-1204-1D-2½" 1/1 FW-940 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2343 Tank Farm FW-1204-1D-2½" 1/1 FW-941 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2344 Tank Farm FW-0102-1D-3" 1/1 FW-26 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2345 Tank Farm FW-0102-1D-3" 1/1 FW-27 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2346 Tank Farm FW-1206-1D-2½" 1/1 FW-958 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2347 Tank Farm FW-1206-1D-2½" 1/1 FW-959 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2348 Tank Farm FW-1205-1D-2½" 1/1 FW-949 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2349 Tank Farm FW-1205-1D-2½" 1/1 FW-950 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2350 Tank Farm FW-1205-1D-2½" 1/1 FW-951 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2351 Tank Farm FW-0302-1D-2½" 1/1 FW-183 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2352 Tank Farm FW-0302-1D-2½" 1/1 FW-184 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2353 Tank Farm FW-0302-1D-2½" 1/1 FW-169 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2354 Tank Farm FW-0302-1D-2½" 1/1 FW-170 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2355 Tank Farm FW-3001b-1D-8" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2356 Tank Farm FS-6202-1D-6" 1/1 FW-29 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2357 Tank Farm FS-6202-1D-6" 1/1 FW-30 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2358 Tank Farm FS-6202-1D-6" 1/1 FW-31 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2359 Tank Farm FS-6202-1D-6" 1/1 FW-32 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2360 Tank Farm FS-6202-1D-6" 1/1 FW-33 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2361 Tank Farm FS-6202-1D-6" 1/1 FW-34 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2362 Tank Farm FS-6201-1D-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2363 Tank Farm FS-6201-1D-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2364 Tank Farm FS-6201-1D-8" 1/1 FW-17 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2365 Tank Farm FW-2001A-1D-8" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2366 Tank Farm FS-6203-1D-8" 2/2 FW-25 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2367 Tank Farm FS-6201-1D-8" 1/1 FW-14 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2368 Tank Farm FS-0303-1D-3" 1/1 FW-154 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2369 Tank Farm FS-0303-1D-3" 1/1 FW-155 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2370 Tank Farm FS-0302-1D-3" 1/1 FW-138 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2371 Tank Farm FS-0302-1D-3" 1/1 FW-137 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2372 Tank Farm FS-0302-1D-3" 1/1 FW-123 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2373 Tank Farm FS-0302-1D-3" 1/1 FW-124 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2374 Tank Farm FS-0402-1D-3" 1/1 FW-223 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2375 Tank Farm FS-0402-1D-3" 1/1 FW-222 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2376 Tank Farm FS-0402-1D-3" 1/1 FW-206 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2377 Tank Farm FS-0402-1D-3" 1/1 FW-207 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2378 Tank Farm FS-0403-1D-3" 1/1 FW-256 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2379 Tank Farm FS-0403-1D-3" 1/1 FW-255 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2380 Tank Farm FS-0403-1D-3" 1/1 FW-239 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2381 Tank Farm FS-0403-1D-3" 1/1 FW-240 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2382 Tank Farm FS-0502-1D-3" 1/1 FW-302 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2383 Tank Farm FS-0502-1D-3" 1/1 FW-301 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2384 Tank Farm FS-0502-1D-3" 1/1 FW-300 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2385 Tank Farm FS-0502-1D-3" 1/1 FW-299 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2386 Tank Farm FS-0502-1D-3" 1/1 FW-293 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2387 Tank Farm FS-0502-1D-3" 1/1 FW-294 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2388 Tank Farm FS-1102-1D-4" 1/1 FW-487 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2389 Tank Farm FS-1102-1D-4" 1/1 FW-490 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2390 Tank Farm FS-1102-1D-4" 1/1 FW-486 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2391 Tank Farm FS-1102-1D-4" 1/1 FW-488 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2392 Tank Farm FS-1102-1D-4" 1/1 FW-489 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2393 Tank Farm FS-1102-1D-4" 1/1 FW-491 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2394 Tank Farm FS-1103-1D-4" 1/1 FW-500 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2395 Tank Farm FS-1103-1D-4" 1/1 FW-502 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2396 Tank Farm FS-1103-1D-4" 1/1 FW-499 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2397 Tank Farm FS-1103-1D-4" 1/1 FW-501 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2398 Tank Farm FS-1103-1D-4" 1/1 FW-503 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2399 Tank Farm FS-1103-1D-4" 1/1 FW-504 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2400 Tank Farm FS-1202-1D-4" 1/1 FW-528 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2401 Tank Farm FS-1202-1D-4" 1/1 FW-529 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2402 Tank Farm FS-1202-1D-4" 1/1 FW-527 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2403 Tank Farm FS-1202-1D-4" 1/1 FW-530 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2404 Tank Farm FS-1203-1D-4" 1/1 FW-540 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2405 Tank Farm FS-1203-1D-4" 1/1 FW-541 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2406 Tank Farm FS-1203-1D-4" 1/1 FW-542 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2407 Tank Farm FS-1203-1D-4" 1/1 FW-543 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2408 Tank Farm FS-1302-1D-4" 1/1 FW-572 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2409 Tank Farm FS-1302-1D-4" 1/1 FW-575 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2410 Tank Farm FS-1302-1D-4" 1/1 FW-574 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2411 Tank Farm FS-1302-1D-4" 1/1 FW-573 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2412 Tank Farm FS-1303-1D-4" 1/1 FW-585 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2413 Tank Farm FS-1303-1D-4" 1/1 FW-586 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2414 Tank Farm FS-1303-1D-4" 1/1 FW-587 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2415 Tank Farm FS-1303-1D-4" 1/1 FW-588 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2416 Tank Farm FW-2001A-1D-8" 1/1 FW-20 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2417 Tank Farm FW-2001A-1D-8" 1/1 FW-20A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

2418 Tank Farm FS-6203-1D-8" 1/2 FW-12 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2419 Tank Farm FS-6203-1D-8" 1/2 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2420 Tank Farm FS-6203-1D-8" 1/2 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2421 Tank Farm FS-6203-1D-8" 1/2 FW-17 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2422 Tank Farm FS-6201-1D-8" 1/1 FW-10B SW WPS-2016-21 GTAW 1/2" SCH160 A53/A234 Pipe/90Elbow

2423 Tank Farm FS-6201-1D-8" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

2424 Tank Farm FS-6203-1D-8" 2/2 FW-28 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2425 Tank Farm FS-6201-1D-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2426 Tank Farm FS-6203-1D-8" 2/2 FW-27 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2427 Tank Farm FS-6203-1D-8" 2/2 FW-26 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2428 Tank Farm FS-0503-1D-3" 1/1 FW-331 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2429 Tank Farm FS-0503-1D-3" 1/1 FW-330 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2430 Tank Farm FS-0503-1D-3" 1/1 FW-329 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2431 Tank Farm FS-0503-1D-3" 1/1 FW-328 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2432 Tank Farm FS-0503-1D-3" 1/1 FW-322 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2433 Tank Farm FS-0503-1D-3" 1/1 FW-323 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2434 Tank Farm FS-0602-1D-3" 1/1 FW-372 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2435 Tank Farm FS-0602-1D-3" 1/1 FW-373 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2436 Tank Farm FS-0603-1D-3" 1/1 FW-395 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2437 Tank Farm FS-0603-1D-3" 1/1 FW-396 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2438 Tank Farm FS-0702-1D-3" 1/1 FW-439 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2439 Tank Farm FS-0702-1D-3" 1/1 FW-440 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2440 Tank Farm FS-0703-1D-3" 1/1 FW-456 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2441 Tank Farm FS-0703-1D-3" 1/1 FW-457 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2442 Tank Farm FW-2001-1D-8" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2443 Tank Farm FW-2001-1D-8" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2444 Tank Farm FW-2001-1D-8" 1/2 FW-03 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2445 Tank Farm FW-3001-1D-8" 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2446 Tank Farm FW-3001-1D-8" 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2447 Tank Farm FW-3001-1D-8" 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2448 Tank Farm FW-3002b-1D-8" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

2449 Tank Farm FW-3002b-1D-8" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

2450 Tank Farm FW-3002b-1D-8" 1/1 FW-07 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2451 Tank Farm FS-6202-1D-6" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2452 Tank Farm FS-6202-1D-6" 1/1 FW-28 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2453 Tank Farm FS-6202-1D-6" 1/1 FW-38 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2454 Tank Farm FS-6202-1D-6" 1/1 FW-39 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2455 Tank Farm FS-6202-1D-6" 1/1 FW-49 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2456 Tank Farm FS-6201-1D-8" 1/1 FW-28 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2457 Tank Farm FS-6202-1D-6" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Flange

2458 Tank Farm FS-6202-1D-6" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Flange

2459 Tank Farm FS-6202-1D-6" 1/1 FW-08 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Flange

2460 Tank Farm FS-6202-1D-6" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Flange

2461 Tank Farm FS-6202-1D-6" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Flange

2462 Tank Farm FS-6202-1D-6" 1/1 FW-14 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Flange

2463 Tank Farm FS-6202-1D-6" 1/1 FW-15 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Flange

2464 Tank Farm FS-6202-1D-6" 1/1 FW-16 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2465 Tank Farm FS-6202-1D-6" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Flange

2466 Tank Farm FS-6202-1D-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

2467 Tank Farm FW-3002b-1D-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2468 Tank Farm FS-6203-1D-8" 2/2 FW-21 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2469 Tank Farm FS-6203-1D-8" 2/2 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2470 Tank Farm FS-6203-1D-8" 2/2 FW-24 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2471 Tank Farm FS-6201-1D-8" 1/1 FW-27 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2472 Tank Farm FS-6201-1D-8" 1/1 FW-29A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

2473 Tank Farm FS-6201-1D-8" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2474 Tank Farm FS-6201-1D-8" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2475 Tank Farm FS-6201-1D-8" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2476 Tank Farm FW-3001-1D-8" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2477 Tank Farm FW-3002-1D-8" 2/2 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2478 Tank Farm FS-1302-1D-4" 1/1 FW-577 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2479 Tank Farm FS-1302-1D-4" 1/1 FW-580 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2480 Tank Farm FS-1303-1D-4" 1/1 FW-590 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2481 Tank Farm FS-1303-1D-4" 1/1 FW-593 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2482 Tank Farm FS-1203-1D-4" 1/1 FW-545 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2483 Tank Farm FS-1203-1D-4" 1/1 FW-548 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2484 Tank Farm FS-1202-1D-4" 1/1 FW-534 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2485 Tank Farm FS-1202-1D-4" 1/1 FW-532 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2486 Tank Farm FS-0401-1D-4" 1/1 FW-181 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2487 Tank Farm FS-0401-1D-4" 1/1 FW-182 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2488 Tank Farm FS-0401-1D-4" 1/1 FW-183 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2489 Tank Farm FS-0401-1D-4" 1/1 FW-184 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2490 Tank Farm FS-0301-1D-4" 1/1 FW-101 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2491 Tank Farm FS-0501-1D-4" 1/1 FW-268 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2492 Tank Farm FS-0501-1D-4" 1/1 FW-269 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2493 Tank Farm FS-0501-1D-4" 1/1 FW-270 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2494 Tank Farm FS-0501-1D-4" 1/1 FW-271 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2495 Tank Farm FS-0501-1D-4" 1/1 FW-263 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2496 Tank Farm FS-0601-1D-4" 1/1 FW-347 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2497 Tank Farm FS-0601-1D-4" 1/1 FW-348 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2498 Tank Farm FS-0601-1D-4" 1/1 FW-349 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2499 Tank Farm FS-0601-1D-4" 1/1 FW-350 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2500 Tank Farm FS-0601-1D-4" 1/1 FW-342 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2501 Tank Farm FS-0701-1D-4" 1/1 FW-414 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2502 Tank Farm FS-0701-1D-4" 1/1 FW-416 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2503 Tank Farm FS-0701-1D-4" 1/1 FW-415 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2504 Tank Farm FS-0701-1D-4" 1/1 FW-417 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2505 Tank Farm FS-0701-1D-4" 1/1 FW-409 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2506 Tank Farm FS-6202-1D-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

2507 Tank Farm FS-6201-1D-8" 1/1 FW-24 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2508 Tank Farm FS-6202-1D-6" 1/1 FW-07 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2509 Tank Farm FS-6202-1D-6" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

2510 Tank Farm FS-6202-1D-6" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

2511 Tank Farm FS-6202-1D-6" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

2512 Tank Farm FS-1202-1D-4" 1/1 FW-533 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2513 Tank Farm FS-1202-1D-4" 1/1 FW-535 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2514 Tank Farm FS-1202-1D-4" 1/1 FW-531 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2515 Tank Farm FS-1202-1D-4" 1/1 FW-536 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2516 Tank Farm FS-1302-1D-4" 1/1 FW-579 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2517 Tank Farm FS-1302-1D-4" 1/1 FW-578 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2518 Tank Farm FW-0701-1D-6" 1/1 FW-737 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2519 Tank Farm FW-0701-1D-6" 1/1 FW-753 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2520 Tank Farm FW-0701-1D-6" 1/1 FW-748 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2521 Tank Farm FW-0701-1D-6" 1/1 FW-743 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2522 Tank Farm FW-0701-1D-6" 1/1 FW-742 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2523 Tank Farm FW-0701-1D-6" 1/1 FW-741 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2524 Tank Farm FW-0701-1D-6" 1/1 FW-740 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2525 Tank Farm FW-0701-1D-6" 1/1 FW-739 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2526 Tank Farm FW-0701-1D-6" 1/1 FW-738 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2527 Tank Farm FS-1302-1D-4" 1/1 FW-576 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2528 Tank Farm FS-1302-1D-4" 1/1 FW-581 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2529 Tank Farm FS-1303-1D-4" 1/1 FW-589 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2530 Tank Farm FS-1303-1D-4" 1/1 FW-591 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2531 Tank Farm FS-1303-1D-4" 1/1 FW-592 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2532 Tank Farm FS-1303-1D-4" 1/1 FW-594 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2533 Tank Farm FS-1203-1D-4" 1/1 FW-544 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2534 Tank Farm FS-1203-1D-4" 1/1 FW-546 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2535 Tank Farm FS-1203-1D-4" 1/1 FW-547 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2536 Tank Farm FS-1203-1D-4" 1/1 FW-549 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2537 Tank Farm FS-6206-1D-8'' 1/2 FW-28 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

2538 Tank Farm FS-6206-1D-8'' 1/2 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

2539 Tank Farm FS-6206-1D-8'' 1/2 FW-20 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2540 Tank Farm FS-6206-1D-8'' 1/2 FW-21 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2541 Tank Farm FS-6206-1D-8'' 1/2 FW-22 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2542 Tank Farm FS-6202-1D-6" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2543 Tank Farm FS-6202-1D-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2544 Tank Farm FS-6203-1D-8" 2/2 FW-23 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2545 Tank Farm FS-6203-1D-8" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2546 Tank Farm FW-3002b-1D-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2547 Tank Farm FW-1101-1D-6" 1/1 FW-819 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/90Elbow

2548 Tank Farm FW-0101-1D-6" 1/1 FW-16 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2549 Tank Farm FS-0301-1D-4" 1/1 FW-96 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2550 Tank Farm FS-0301-1D-4" 1/1 FW-97 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2551 Tank Farm FS-0301-1D-4" 1/1 FW-106 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2552 Tank Farm FS-0301-1D-4" 1/1 FW-111 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2553 Tank Farm FS-0401-1D-4" 1/1 FW-179 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2554 Tank Farm FS-0401-1D-4" 1/1 FW-180 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2555 Tank Farm FS-0401-1D-4" 1/1 FW-189 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2556 Tank Farm FS-0401-1D-4" 1/1 FW-194 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2557 Tank Farm FS-0501-1D-4" 1/1 FW-266 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2558 Tank Farm FS-0501-1D-4" 1/1 FW-267 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2559 Tank Farm FS-0501-1D-4" 1/1 FW-276 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2560 Tank Farm FS-0501-1D-4" 1/1 FW-281 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2561 Tank Farm FS-0601-1D-4" 1/1 FW-345 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2562 Tank Farm FS-0601-1D-4" 1/1 FW-346 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2563 Tank Farm FS-0601-1D-4" 1/1 FW-355 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2564 Tank Farm FS-0601-1D-4" 1/1 FW-360 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2565 Tank Farm FS-0701-1D-4" 1/1 FW-412 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2566 Tank Farm FS-0701-1D-4" 1/1 FW-413 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2567 Tank Farm FS-0701-1D-4" 1/1 FW-422 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2568 Tank Farm FS-0701-1D-4" 1/1 FW-427 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2569 Tank Farm FS-0303-1D-3" 1/1 FW-159 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2570 Tank Farm FS-0303-1D-3" 1/1 FW-158 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2571 Tank Farm FS-0303-1D-3" 1/1 FW-157 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2572 Tank Farm FS-0303-1D-3" 1/1 FW-156 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2573 Tank Farm FS-6202-1D-6" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2574 Tank Farm FS-6202-1D-6" 1/1 FW-21 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2575 Tank Farm FS-6202-1D-6" 1/1 FW-22 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2576 Tank Farm FS-6202-1D-6" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2577 Tank Farm FS-6202-1D-6" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2578 Tank Farm FS-6202-1D-6" 1/1 FW-25 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2579 Tank Farm FS-6202-1D-6" 1/1 FW-37 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2580 Tank Farm FS-6202-1D-6" 1/1 FW-45 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2581 Tank Farm FS-6202-1D-6" 1/1 FW-40 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2582 Tank Farm FS-6202-1D-6" 1/1 FW-41 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2583 Tank Farm FS-6202-1D-6" 1/1 FW-42 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2584 Tank Farm FS-6202-1D-6" 1/1 FW-43 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2585 Tank Farm FS-6202-1D-6" 1/1 FW-44 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2586 Tank Farm FS-6202-1D-6" 1/1 FW-46 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2587 Tank Farm FS-6202-1D-6" 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Reducer

2588 Tank Farm FS-6202-1D-6" 1/1 FW-50 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2589 Tank Farm FS-1103-1D-4" 1/1 FW-505 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2590 Tank Farm FS-1103-1D-4" 1/1 FW-506 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2591 Tank Farm FS-1202-1D-4" 1/1 FW-537 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2592 Tank Farm FS-1202-1D-4" 1/1 FW-538 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2593 Tank Farm FS-1203-1D-4" 1/1 FW-550 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2594 Tank Farm FS-1203-1D-4" 1/1 FW-551 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2595 Tank Farm FS-1302-1D-4" 1/1 FW-582 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2596 Tank Farm FS-1302-1D-4" 1/1 FW-583 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2597 Tank Farm FS-1303-1D-4" 1/1 FW-595 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2598 Tank Farm FS-1303-1D-4" 1/1 FW-596 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2599 Tank Farm FW-0701-1D-6" 1/1 FW-744 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2600 Tank Farm FW-0701-1D-6" 1/1 FW-745 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2601 Tank Farm FW-0701-1D-6" 1/1 FW-736 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2602 Tank Farm FW-0701-1D-6" 1/1 FW-735 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2603 Tank Farm FS-0303-1D-3" 1/1 FW-170 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2604 Tank Farm FS-0303-1D-3" 1/1 FW-171 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2605 Tank Farm FS-0303-1D-3" 1/1 FW-172 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2606 Tank Farm FS-0303-1D-3" 1/1 FW-173 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2607 Tank Farm FS-0303-1D-3" 1/1 FW-153 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2608 Tank Farm FS-0303-1D-3" 1/1 FW-152 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2609 Tank Farm FS-0303-1D-3" 1/1 FW-151 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2610 Tank Farm FS-0303-1D-3" 1/1 FW-150 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2611 Tank Farm FS-0303-1D-3" 1/1 FW-149 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2612 Tank Farm FS-0303-1D-3" 1/1 FW-148 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2613 Tank Farm FS-0303-1D-3" 1/1 FW-147 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2614 Tank Farm FS-0303-1D-3" 1/1 FW-146 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2615 Tank Farm FS-0303-1D-3" 1/1 FW-145 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2616 Tank Farm FS-0303-1D-3" 1/1 FW-144 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2617 Tank Farm FS-0303-1D-3" 1/1 FW-143 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2618 Tank Farm FW-0702-1D-2½ " 1/1 FW-754 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2619 Tank Farm FW-0702-1D-2½ " 1/1 FW-754A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2620 Tank Farm FW-0703-1D-2½" 1/1 FW-767 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2621 Tank Farm FW-0703-1D-2½" 1/1 FW-767A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2622 Tank Farm FW-0704-1D-2½" 1/1 FW-780 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2623 Tank Farm FW-0704-1D-2½" 1/1 FW-780A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2624 Tank Farm FW-0705-1D-2½" 1/1 FW-793 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2625 Tank Farm FW-0705-1D-2½" 1/1 FW-793A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2626 Tank Farm FW-0706-1D-2½" 1/1 FW-806 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2627 Tank Farm FW-0706-1D-2½" 1/1 FW-806A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2628 Tank Farm FW-0009-1C-14" 1/1 FW-2B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

2629 Tank Farm FW-0601-1D-6" 1/1 FW-635 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2630 Tank Farm FW-0601-1D-6" 1/1 FW-619 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2631 Tank Farm FW-0601-1D-6" 1/1 FW-618 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2632 Tank Farm FW-0601-1D-6" 1/1 FW-617 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2633 Tank Farm FW-0601-1D-6" 1/1 FW-627 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2634 Tank Farm FW-0601-1D-6" 1/1 FW-628 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2635 Tank Farm FW-0601-1D-6" 1/1 FW-629 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2636 Tank Farm FW-0601-1D-6" 1/1 FW-626 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2637 Tank Farm FW-0601-1D-6" 1/1 FW-630 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2638 Tank Farm FW-0601-1D-6" 1/1 FW-625 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2639 Tank Farm FW-0601-1D-6" 1/1 FW-624 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2640 Tank Farm FW-0601-1D-6" 1/1 FW-623 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2641 Tank Farm FW-0601-1D-6" 1/1 FW-622 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2642 Tank Farm FW-0601-1D-6" 1/1 FW-621 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2643 Tank Farm FW-0601-1D-6" 1/1 FW-620 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2644 Tank Farm FW-0602-1D-2½" 1/1 FW-636 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2645 Tank Farm FW-0602-1D-2½" 1/1 FW-636A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2646 Tank Farm FW-0603-1D-2½" 1/1 FW-655 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2647 Tank Farm FW-0603-1D-2½" 1/1 FW-655A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2648 Tank Farm FW-0604-1D-2½" 1/1 FW-674 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2649 Tank Farm FW-0604-1D-2½" 1/1 FW-674A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2650 Tank Farm FW-0605-1D-2½" 1/1 FW-693 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2651 Tank Farm FW-0605-1D-2½" 1/1 FW-693A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2652 Tank Farm FW-0606-1D-2½" 1/1 FW-712 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2653 Tank Farm FW-0606-1D-2½" 1/1 FW-712A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2654 Tank Farm FW-0201-1D-6" 1/1 FW-93 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2655 Tank Farm FW-0201-1D-6" 1/1 FW-76 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2656 Tank Farm FW-0201-1D-6" 1/1 FW-85 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2657 Tank Farm FW-0201-1D-6" 1/1 FW-86 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2658 Tank Farm FW-0201-1D-6" 1/1 FW-87 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2659 Tank Farm FW-1101-1D-6" 1/1 FW-820 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/90Elbow

2660 Tank Farm FW-0201-1D-6" 1/1 FW-74 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2661 Tank Farm FW-0201-1D-6" 1/1 FW-88 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2662 Tank Farm FW-0201-1D-6" 1/1 FW-84 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2663 Tank Farm FW-0201-1D-6" 1/1 FW-83 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2664 Tank Farm FW-0201-1D-6" 1/1 FW-82 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2665 Tank Farm FW-0201-1D-6" 1/1 FW-81 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2666 Tank Farm FW-0201-1D-6" 1/1 FW-80 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2667 Tank Farm FW-0201-1D-6" 1/1 FW-79 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2668 Tank Farm FW-0201-1D-6" 1/1 FW-78 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2669 Tank Farm FW-0201-1D-6" 1/1 FW-77 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2670 Tank Farm FW-0202-1D-3" 1/1 FW-94 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2671 Tank Farm FW-0202-1D-3" 1/1 FW-94A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2672 Tank Farm FW-0203-1D-3" 1/1 FW-103 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2673 Tank Farm FW-0203-1D-3" 1/1 FW-103A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2674 Tank Farm FW-0204-1D-3" 1/1 FW-112 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2675 Tank Farm FW-0204-1D-3" 1/1 FW-112A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2676 Tank Farm FW-0205-1D-3" 1/1 FW-121 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2677 Tank Farm FW-0205-1D-3" 1/1 FW-121A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2678 Tank Farm FW-0206-1D-3" 1/1 FW-130 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2679 Tank Farm FW-0206-1D-3" 1/1 FW-130A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2680 Tank Farm FS-0702-1D-3" 1/1 FW-428A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2681 Tank Farm FS-1102-1D-4" 1/1 FW-492 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2682 Tank Farm FS-1102-1D-4" 1/1 FW-493 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2683 Tank Farm FS-0202-1D-3" 1/1 FW-76 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2684 Tank Farm FS-0202-1D-3" 1/1 FW-77 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2685 Tank Farm FS-0202-1D-3" 1/1 FW-72 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2686 Tank Farm FS-0202-1D-3" 1/1 FW-68 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2687 Tank Farm FS-0202-1D-3" 1/1 FW-66 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2688 Tank Farm FS-0202-1D-3" 1/1 FW-67 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2689 Tank Farm FS-0202-1D-3" 1/1 FW-69 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2690 Tank Farm FS-0203-1D-3" 1/1 FW-90 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2691 Tank Farm FS-0203-1D-3" 1/1 FW-89 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2692 Tank Farm FS-0203-1D-3" 1/1 FW-87 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2693 Tank Farm FS-0203-1D-3" 1/1 FW-84 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2694 Tank Farm FS-0203-1D-3" 1/1 FW-81 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2695 Tank Farm FS-0102-1D-3" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2696 Tank Farm FS-0102-1D-3" 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2697 Tank Farm FS-0102-1D-3" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2698 Tank Farm FS-0102-1D-3" 1/1 FW-31 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2699 Tank Farm FS-0102-1D-3" 1/1 FW-32 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2700 Tank Farm FS-0103-1D-3" 1/1 FW-36 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2701 Tank Farm FS-0103-1D-3" 1/1 FW-40 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2702 Tank Farm FS-0103-1D-3" 1/1 FW-42 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2703 Tank Farm FS-0103-1D-3" 1/1 FW-44 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2704 Tank Farm FS-0103-1D-3" 1/1 FW-45 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2705 Tank Farm FS-0302-1D-3" 1/1 FW-128 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2706 Tank Farm FS-0302-1D-3" 1/1 FW-127 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2707 Tank Farm FS-0302-1D-3" 1/1 FW-126 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2708 Tank Farm FS-0302-1D-3" 1/1 FW-125 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2709 Tank Farm FS-0302-1D-3" 1/1 FW-122 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2710 Tank Farm FS-0302-1D-3" 1/1 FW-121 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2711 Tank Farm FS-0302-1D-3" 1/1 FW-120 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2712 Tank Farm FS-0302-1D-3" 1/1 FW-119 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2713 Tank Farm FS-0302-1D-3" 1/1 FW-118 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2714 Tank Farm FS-0302-1D-3" 1/1 FW-117 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2715 Tank Farm FS-0302-1D-3" 1/1 FW-116 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2716 Tank Farm FS-0302-1D-3" 1/1 FW-115 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2717 Tank Farm FS-0302-1D-3" 1/1 FW-114 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2718 Tank Farm FS-0302-1D-3" 1/1 FW-113 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2719 Tank Farm FS-0302-1D-3" 1/1 FW-112 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2720 Tank Farm FS-0302-1D-3" 1/1 FW-112A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2721 Tank Farm FS-0303-1D-3" 1/1 FW-143A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2722 Tank Farm FS-0301-1D-4" 1/1 FW-103 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2723 Tank Farm FS-6202-1D-6" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2724 Tank Farm FS-6202-1D-6" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

2725 Tank Farm FS-6202-1D-6" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Reducer

2726 Tank Farm FS-6202-1D-6" 1/1 FW-47 BW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A234 Pipe/Tee

2727 Tank Farm FS-6202-1D-6" 1/1 FW-48 SOW WPS-2016-23 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Flange

2728 Tank Farm FS-6202-1D-6" 1/1 FW-35 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2729 Tank Farm FS-6202-1D-6" 1/1 FW-36 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2730 Tank Farm FS-0301-1D-4" 1/1 FW-102 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2731 Tank Farm FS-0301-1D-4" 1/1 FW-98 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2732 Tank Farm FS-0301-1D-4" 1/1 FW-92 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2733 Tank Farm FS-0301-1D-4" 1/1 FW-94 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2734 Tank Farm FS-0301-1D-4" 1/1 FW-95 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2735 Tank Farm FS-0301-1D-4" 1/1 FW-91A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2736 Tank Farm FW-0702-1D-2½ " 1/1 FW-755 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2737 Tank Farm FW-0702-1D-2½ " 1/1 FW-756 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2738 Tank Farm FW-0703-1D-2½" 1/1 FW-768 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2739 Tank Farm FW-0703-1D-2½" 1/1 FW-769 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2740 Tank Farm FW-0704-1D-2½" 1/1 FW-781 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2741 Tank Farm FW-0704-1D-2½" 1/1 FW-782 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2742 Tank Farm FW-0705-1D-2½" 1/1 FW-794 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2743 Tank Farm FW-0705-1D-2½" 1/1 FW-795 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2744 Tank Farm FW-0706-1D-2½" 1/1 FW-807 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2745 Tank Farm FW-0706-1D-2½" 1/1 FW-808 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2746 Tank Farm FW-0702-1D-2½ " 1/1 FW-757 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2747 Tank Farm FW-0702-1D-2½ " 1/1 FW-760 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2748 Tank Farm FW-0702-1D-2½ " 1/1 FW-758 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2749 Tank Farm FW-0702-1D-2½ " 1/1 FW-759 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2750 Tank Farm FW-0703-1D-2½" 1/1 FW-771 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2751 Tank Farm FW-0703-1D-2½" 1/1 FW-772 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2752 Tank Farm FW-0703-1D-2½" 1/1 FW-770 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2753 Tank Farm FW-0703-1D-2½" 1/1 FW-773 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2754 Tank Farm FW-0704-1D-2½" 1/1 FW-783 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2755 Tank Farm FW-0704-1D-2½" 1/1 FW-786 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2756 Tank Farm FW-0704-1D-2½" 1/1 FW-784 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2757 Tank Farm FW-0704-1D-2½" 1/1 FW-785 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2758 Tank Farm FW-0705-1D-2½" 1/1 FW-797 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2759 Tank Farm FW-0705-1D-2½" 1/1 FW-798 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2760 Tank Farm FW-0705-1D-2½" 1/1 FW-796 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2761 Tank Farm FW-0705-1D-2½" 1/1 FW-799 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2762 Tank Farm FW-0706-1D-2½" 1/1 FW-809 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2763 Tank Farm FW-0706-1D-2½" 1/1 FW-812 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2764 Tank Farm FW-0706-1D-2½" 1/1 FW-810 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2765 Tank Farm FW-0706-1D-2½" 1/1 FW-811 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2766 Tank Farm FW-3002-1D-8" 1/2 FW-04 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2767 Tank Farm FW-3002-1D-8" 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2768 Tank Farm FW-3002-1D-8" 1/2 FW-10 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2769 Tank Farm FW-3002-1D-8" 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2770 Tank Farm FW-6201-1B-8" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2771 Tank Farm FW-6201-1B-8" 1/1 FW-24 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

2772 Tank Farm FW-6201-1B-8" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2773 Tank Farm FS-6203-1D-8" 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

2774 Tank Farm FS-0402-1D-3" 1/1 FW-211 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2775 Tank Farm FS-0402-1D-3" 1/1 FW-210 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2776 Tank Farm FS-0402-1D-3" 1/1 FW-209 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2777 Tank Farm FS-0402-1D-3" 1/1 FW-208 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2778 Tank Farm FS-0402-1D-3" 1/1 FW-205 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2779 Tank Farm FS-0402-1D-3" 1/1 FW-204 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2780 Tank Farm FS-0402-1D-3" 1/1 FW-203 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2781 Tank Farm FS-0402-1D-3" 1/1 FW-202 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2782 Tank Farm FS-0402-1D-3" 1/1 FW-201 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2783 Tank Farm FS-0402-1D-3" 1/1 FW-200 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2784 Tank Farm FS-0402-1D-3" 1/1 FW-199 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2785 Tank Farm FS-0402-1D-3" 1/1 FW-198 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2786 Tank Farm FS-0402-1D-3" 1/1 FW-197 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2787 Tank Farm FS-0402-1D-3" 1/1 FW-196 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2788 Tank Farm FS-0402-1D-3" 1/1 FW-195 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2789 Tank Farm FW-0301-1D-6" 1/1 FW-145 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2790 Tank Farm FW-0301-1D-6" 1/1 FW-161 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2791 Tank Farm FW-0301-1D-6" 1/1 FW-153 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2792 Tank Farm FW-0301-1D-6" 1/1 FW-152 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2793 Tank Farm FW-0301-1D-6" 1/1 FW-151 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2794 Tank Farm FW-0301-1D-6" 1/1 FW-156 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2795 Tank Farm FW-0301-1D-6" 1/1 FW-150 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2796 Tank Farm FW-0301-1D-6" 1/1 FW-149 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2797 Tank Farm FW-0301-1D-6" 1/1 FW-148 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2798 Tank Farm FW-0301-1D-6" 1/1 FW-147 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2799 Tank Farm FW-0301-1D-6" 1/1 FW-146 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2800 Tank Farm FW-0302-1D-2½" 1/1 FW-162 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2801 Tank Farm FW-0302-1D-2½" 1/1 FW-162A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2802 Tank Farm FW-0303-1D-2½" 1/1 FW-189 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2803 Tank Farm FW-0303-1D-2½" 1/1 FW-189A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2804 Tank Farm FW-0301-1D-6" 1/1 FW-144 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2805 Tank Farm FW-0301-1D-6" 1/1 FW-143 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2806 Tank Farm FW-0304-1D-2½" 1/1 FW-216 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2807 Tank Farm FW-0304-1D-2½" 1/1 FW-216A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2808 Tank Farm FW-0305-1D-2½" 1/1 FW-243 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2809 Tank Farm FW-0305-1D-2½" 1/1 FW-243A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2810 Tank Farm FW-0306-1D-2½" 1/1 FW-270 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2811 Tank Farm FW-0306-1D-2½" 1/1 FW-270A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2812 Tank Farm FS-0202-1D-3" 1/1 FW-70 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2813 Tank Farm FS-0202-1D-3" 1/1 FW-71 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2814 Tank Farm FS-0202-1D-3" 1/1 FW-73 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2815 Tank Farm FS-0202-1D-3" 1/1 FW-74 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2816 Tank Farm FS-0202-1D-3" 1/1 FW-75 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2817 Tank Farm FS-0203-1D-3" 1/1 FW-79 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2818 Tank Farm FS-0203-1D-3" 1/1 FW-80 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2819 Tank Farm FS-0203-1D-3" 1/1 FW-82 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2820 Tank Farm FS-0203-1D-3" 1/1 FW-83 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2821 Tank Farm FS-0203-1D-3" 1/1 FW-85 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2822 Tank Farm FS-0203-1D-3" 1/1 FW-86 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2823 Tank Farm FS-0203-1D-3" 1/1 FW-88 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2824 Tank Farm FS-0102-1D-3" 1/1 FW-21 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2825 Tank Farm FS-0102-1D-3" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2826 Tank Farm FS-0102-1D-3" 1/1 FW-24 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2827 Tank Farm FS-0102-1D-3" 1/1 FW-25 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2828 Tank Farm FS-0102-1D-3" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2829 Tank Farm FS-0102-1D-3" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2830 Tank Farm FS-0102-1D-3" 1/1 FW-30 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2831 Tank Farm FS-0103-1D-3" 1/1 FW-34 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2832 Tank Farm FS-0103-1D-3" 1/1 FW-35 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2833 Tank Farm FS-0103-1D-3" 1/1 FW-37 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2834 Tank Farm FS-0103-1D-3" 1/1 FW-38 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2835 Tank Farm FS-0103-1D-3" 1/1 FW-39 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2836 Tank Farm FS-0103-1D-3" 1/1 FW-41 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2837 Tank Farm FS-0103-1D-3" 1/1 FW-43 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2838 Tank Farm FW-0702-1D-2½ " 1/1 FW-763 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2839 Tank Farm FW-0702-1D-2½ " 1/1 FW-766 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2840 Tank Farm FW-0702-1D-2½ " 1/1 FW-764 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2841 Tank Farm FW-0702-1D-2½ " 1/1 FW-765 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2842 Tank Farm FW-0703-1D-2½" 1/1 FW-776 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2843 Tank Farm FW-0703-1D-2½" 1/1 FW-779 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2844 Tank Farm FW-0703-1D-2½" 1/1 FW-778 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2845 Tank Farm FW-0703-1D-2½" 1/1 FW-777 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2846 Tank Farm FW-0704-1D-2½" 1/1 FW-789 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2847 Tank Farm FW-0704-1D-2½" 1/1 FW-792 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2848 Tank Farm FW-0704-1D-2½" 1/1 FW-790 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2849 Tank Farm FW-0704-1D-2½" 1/1 FW-791 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2850 Tank Farm FW-0705-1D-2½" 1/1 FW-803 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2851 Tank Farm FW-0705-1D-2½" 1/1 FW-804 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2852 Tank Farm FW-0705-1D-2½" 1/1 FW-800 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2853 Tank Farm FW-0705-1D-2½" 1/1 FW-805 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2854 Tank Farm FW-0706-1D-2½" 1/1 FW-815 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2855 Tank Farm FW-0706-1D-2½" 1/1 FW-818 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2856 Tank Farm FW-0706-1D-2½" 1/1 FW-816 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2857 Tank Farm FW-0706-1D-2½" 1/1 FW-817 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2858 Tank Farm FW-0101-1D-6" 1/1 FW-07 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2859 Tank Farm FW-0101-1D-6" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2860 Tank Farm FW-0101-1D-6" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2861 Tank Farm FW-0101-1D-6" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2862 Tank Farm FW-0101-1D-6" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2863 Tank Farm FW-0101-1D-6" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

2864 Tank Farm FW-0101-1D-6" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2865 Tank Farm FW-0101-1D-6" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2866 Tank Farm FW-0101-1D-6" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2867 Tank Farm FW-0101-1D-6" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2868 Tank Farm FW-0101-1D-6" 1/1 FW-24 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2869 Tank Farm FW-0102-1D-3" 1/1 FW-25 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2870 Tank Farm FW-0102-1D-3" 1/1 FW-25A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2871 Tank Farm FW-0103-1D-3" 1/1 FW-34 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2872 Tank Farm FW-0103-1D-3" 1/1 FW-34A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2873 Tank Farm FW-0104-1D-3" 1/1 FW-43 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2874 Tank Farm FW-0104-1D-3" 1/1 FW-43A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2875 Tank Farm FW-0105-1D-3" 1/1 FW-52 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2876 Tank Farm FW-0105-1D-3" 1/1 FW-52A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2877 Tank Farm FW-0106-1D-3" 1/1 FW-61 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2878 Tank Farm FW-0106-1D-3" 1/1 FW-61A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2879 Tank Farm FS-0202-1D-3" 1/1 FW-65A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2880 Tank Farm FS-0203-1D-3" 1/1 FW-78A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2881 Tank Farm FS-0102-1D-3" 1/1 FW-20A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

2882 Tank Farm FS-0103-1D-3" 1/1 FW-33A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2883 Tank Farm FS-1202-1D-4" 1/1 FW-526A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2884 Tank Farm FS-1203-1D-4" 1/1 FW-539A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2885 Tank Farm FS-1302-1D-4" 1/1 FW-571A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2886 Tank Farm FS-1303-1D-4" 1/1 FW-584A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

2887 Tank Farm FW-1301-1D-6" 1/1 FW-971 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2888 Tank Farm FW-1301-1D-6" 1/1 FW-972 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2889 Tank Farm FW-1301-1D-6" 1/1 FW-973 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2890 Tank Farm FW-1301-1D-6" 1/1 FW-986 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2891 Tank Farm FW-1301-1D-6" 1/1 FW-994 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

2892 Tank Farm FW-1301-1D-6" 1/1 FW-985 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2893 Tank Farm FW-1301-1D-6" 1/1 FW-989 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2894 Tank Farm FW-1301-1D-6" 1/1 FW-984 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2895 Tank Farm FW-1301-1D-6" 1/1 FW-983 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2896 Tank Farm FW-1301-1D-6" 1/1 FW-982 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2897 Tank Farm FW-1301-1D-6" 1/1 FW-981 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2898 Tank Farm FW-1301-1D-6" 1/1 FW-980 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2899 Tank Farm FW-1301-1D-6" 1/1 FW-979 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2900 Tank Farm FW-1301-1D-6" 1/1 FW-978 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2901 Tank Farm FW-1301-1D-6" 1/1 FW-977 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2902 Tank Farm FW-1301-1D-6" 1/1 FW-976 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2903 Tank Farm FW-1301-1D-6" 1/1 FW-975 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

2904 Tank Farm FW-1301-1D-6" 1/1 FW-974 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2905 Tank Farm FW-1302-1D-2½" 1/1 FW-995 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2906 Tank Farm FW-1302-1D-2½" 1/1 FW-995A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2907 Tank Farm FW-1303-1D-2½" 1/1 FW-1004 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2908 Tank Farm FW-1303-1D-2½" 1/1 FW-1004A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2909 Tank Farm FW-1304-1D-2½" 1/1 FW-1013 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2910 Tank Farm FW-1304-1D-2½" 1/1 FW-1013A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2911 Tank Farm FW-1305-1D-2½" 1/1 FW-1022 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2912 Tank Farm FW-1305-1D-2½" 1/1 FW-1022A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2913 Tank Farm FW-1306-1D-2½" 1/1 FW-1031 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2914 Tank Farm FW-1306-1D-2½" 1/1 FW-1031A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

2915 Tank Farm FS-0403-1D-3" 1/1 FW-244 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2916 Tank Farm FS-0403-1D-3" 1/1 FW-242 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2917 Tank Farm FS-0403-1D-3" 1/1 FW-241 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2918 Tank Farm FS-0403-1D-3" 1/1 FW-238 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2919 Tank Farm FS-0403-1D-3" 1/1 FW-237 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2920 Tank Farm FS-0403-1D-3" 1/1 FW-236 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2921 Tank Farm FS-0403-1D-3" 1/1 FW-235 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2922 Tank Farm FS-0403-1D-3" 1/1 FW-234 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2923 Tank Farm FS-0403-1D-3" 1/1 FW-233 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2924 Tank Farm FS-0403-1D-3" 1/1 FW-232 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2925 Tank Farm FS-0403-1D-3" 1/1 FW-231 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2926 Tank Farm FS-0403-1D-3" 1/1 FW-230 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2927 Tank Farm FS-0403-1D-3" 1/1 FW-229 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2928 Tank Farm FW-0602-1D-2½" 1/1 FW-638 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2929 Tank Farm FW-0602-1D-2½" 1/1 FW-637 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2930 Tank Farm FW-0603-1D-2½" 1/1 FW-657 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2931 Tank Farm FW-0603-1D-2½" 1/1 FW-656 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2932 Tank Farm FW-0604-1D-2½" 1/1 FW-676 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2933 Tank Farm FW-0604-1D-2½" 1/1 FW-675 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2934 Tank Farm FW-0605-1D-2½" 1/1 FW-695 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2935 Tank Farm FW-0605-1D-2½" 1/1 FW-694 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2936 Tank Farm FW-0606-1D-2½" 1/1 FW-714 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2937 Tank Farm FW-0606-1D-2½" 1/1 FW-713 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2938 Tank Farm FW-0602-1D-2½" 1/1 FW-651 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2939 Tank Farm FW-0602-1D-2½" 1/1 FW-654 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2940 Tank Farm FW-0602-1D-2½" 1/1 FW-653 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2941 Tank Farm FW-0602-1D-2½" 1/1 FW-652 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2942 Tank Farm FW-0603-1D-2½" 1/1 FW-670 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2943 Tank Farm FW-0603-1D-2½" 1/1 FW-673 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2944 Tank Farm FW-0603-1D-2½" 1/1 FW-672 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2945 Tank Farm FW-0603-1D-2½" 1/1 FW-671 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2946 Tank Farm FW-0604-1D-2½" 1/1 FW-689 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2947 Tank Farm FW-0604-1D-2½" 1/1 FW-692 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2948 Tank Farm FW-0604-1D-2½" 1/1 FW-690 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2949 Tank Farm FW-0604-1D-2½" 1/1 FW-691 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2950 Tank Farm FW-0605-1D-2½" 1/1 FW-708 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2951 Tank Farm FW-0605-1D-2½" 1/1 FW-711 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2952 Tank Farm FW-0605-1D-2½" 1/1 FW-710 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2953 Tank Farm FW-0605-1D-2½" 1/1 FW-709 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2954 Tank Farm FW-0606-1D-2½" 1/1 FW-727 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2955 Tank Farm FW-0606-1D-2½" 1/1 FW-730 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

2956 Tank Farm FW-0606-1D-2½" 1/1 FW-729 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2957 Tank Farm FW-0606-1D-2½" 1/1 FW-728 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

2958 Tank Farm FW-0202-1D-3" 1/1 FW-95 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2959 Tank Farm FW-0202-1D-3" 1/1 FW-96 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2960 Tank Farm FW-0203-1D-3" 1/1 FW-104 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2961 Tank Farm FW-0203-1D-3" 1/1 FW-105 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2962 Tank Farm FW-0204-1D-3" 1/1 FW-114 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2963 Tank Farm FW-0204-1D-3" 1/1 FW-113 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2964 Tank Farm FW-0205-1D-3" 1/1 FW-122 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2965 Tank Farm FW-0205-1D-3" 1/1 FW-123 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2966 Tank Farm FW-0206-1D-3" 1/1 FW-131 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2967 Tank Farm FW-0206-1D-3" 1/1 FW-132 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2968 Tank Farm FS-0402-1D-3" 1/1 FW-227 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2969 Tank Farm FS-0402-1D-3" 1/1 FW-226 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2970 Tank Farm FS-0402-1D-3" 1/1 FW-225 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2971 Tank Farm FS-0402-1D-3" 1/1 FW-224 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2972 Tank Farm FS-0301-1D-4" 1/1 FW-105 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2973 Tank Farm FS-0301-1D-4" 1/1 FW-104 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2974 Tank Farm FS-0401-1D-4" 1/1 FW-188 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2975 Tank Farm FS-0401-1D-4" 1/1 FW-187 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2976 Tank Farm FS-0401-1D-4" 1/1 FW-177 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

2977 Tank Farm FS-0401-1D-4" 1/1 FW-178 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

2978 Tank Farm FW-0103-1D-3" 1/1 FW-35 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2979 Tank Farm FW-0103-1D-3" 1/1 FW-36 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2980 Tank Farm FW-0104-1D-3" 1/1 FW-44 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2981 Tank Farm FW-0104-1D-3" 1/1 FW-45 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2982 Tank Farm FW-0105-1D-3" 1/1 FW-53 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2983 Tank Farm FW-0105-1D-3" 1/1 FW-54 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2984 Tank Farm FW-0106-1D-3" 1/1 FW-62 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2985 Tank Farm FW-0106-1D-3" 1/1 FW-63 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2986 Tank Farm FW-0202-1D-3" 1/1 FW-97 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2987 Tank Farm FW-0202-1D-3" 1/1 FW-100 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2988 Tank Farm FW-0202-1D-3" 1/1 FW-98 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2989 Tank Farm FW-0202-1D-3" 1/1 FW-99 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2990 Tank Farm FW-0203-1D-3" 1/1 FW-106 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2991 Tank Farm FW-0203-1D-3" 1/1 FW-109 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2992 Tank Farm FW-0203-1D-3" 1/1 FW-108 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
2993 Tank Farm FW-0203-1D-3" 1/1 FW-107 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2994 Tank Farm FW-0204-1D-3" 1/1 FW-115 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2995 Tank Farm FW-0204-1D-3" 1/1 FW-118 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2996 Tank Farm FW-0204-1D-3" 1/1 FW-116 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2997 Tank Farm FW-0204-1D-3" 1/1 FW-117 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

2998 Tank Farm FW-0205-1D-3" 1/1 FW-124 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

2999 Tank Farm FW-0205-1D-3" 1/1 FW-127 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3000 Tank Farm FW-0205-1D-3" 1/1 FW-125 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3001 Tank Farm FW-0205-1D-3" 1/1 FW-126 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3002 Tank Farm FW-0206-1D-3" 1/1 FW-133 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3003 Tank Farm FW-0206-1D-3" 1/1 FW-136 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3004 Tank Farm FW-0206-1D-3" 1/1 FW-134 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3005 Tank Farm FW-0206-1D-3" 1/1 FW-135 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3006 Tank Farm FW-0102-1D-3" 1/1 FW-28 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3007 Tank Farm FW-0102-1D-3" 1/1 FW-31 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3008 Tank Farm FW-0102-1D-3" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3009 Tank Farm FW-0102-1D-3" 1/1 FW-30 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3010 Tank Farm FW-0103-1D-3" 1/1 FW-37 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3011 Tank Farm FW-0103-1D-3" 1/1 FW-38 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3012 Tank Farm FW-0103-1D-3" 1/1 FW-39 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3013 Tank Farm FW-0103-1D-3" 1/1 FW-40 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3014 Tank Farm FW-0104-1D-3" 1/1 FW-46 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3015 Tank Farm FW-0104-1D-3" 1/1 FW-49 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3016 Tank Farm FW-0104-1D-3" 1/1 FW-47 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3017 Tank Farm FW-0104-1D-3" 1/1 FW-48 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3018 Tank Farm FW-0105-1D-3" 1/1 FW-55 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3019 Tank Farm FW-0105-1D-3" 1/1 FW-58 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3020 Tank Farm FW-0105-1D-3" 1/1 FW-56 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3021 Tank Farm FW-0105-1D-3" 1/1 FW-57 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3022 Tank Farm FW-0106-1D-3" 1/1 FW-64 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3023 Tank Farm FW-0106-1D-3" 1/1 FW-67 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3024 Tank Farm FW-0106-1D-3" 1/1 FW-65 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3025 Tank Farm FW-0106-1D-3" 1/1 FW-66 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3026 Tank Farm FW-0602-1D-2½" 1/1 FW-639 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3027 Tank Farm FW-0602-1D-2½" 1/1 FW-642 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3028 Tank Farm FW-0602-1D-2½" 1/1 FW-640 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3029 Tank Farm FW-0602-1D-2½" 1/1 FW-641 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3030 Tank Farm FW-0603-1D-2½" 1/1 FW-660 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3031 Tank Farm FW-0603-1D-2½" 1/1 FW-659 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3032 Tank Farm FW-0603-1D-2½" 1/1 FW-658 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3033 Tank Farm FW-0603-1D-2½" 1/1 FW-661 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3034 Tank Farm FW-0604-1D-2½" 1/1 FW-677 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3035 Tank Farm FW-0604-1D-2½" 1/1 FW-680 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3036 Tank Farm FW-0604-1D-2½" 1/1 FW-678 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3037 Tank Farm FW-0604-1D-2½" 1/1 FW-679 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3038 Tank Farm FW-0605-1D-2½" 1/1 FW-697 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3039 Tank Farm FW-0605-1D-2½" 1/1 FW-698 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3040 Tank Farm FW-0605-1D-2½" 1/1 FW-696 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3041 Tank Farm FW-0605-1D-2½" 1/1 FW-699 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3042 Tank Farm FW-0606-1D-2½" 1/1 FW-715 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3043 Tank Farm FW-0606-1D-2½" 1/1 FW-718 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3044 Tank Farm FW-0606-1D-2½" 1/1 FW-716 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3045 Tank Farm FW-0606-1D-2½" 1/1 FW-717 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3046 Tank Farm FW-0602-1D-2½" 1/1 FW-643 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3047 Tank Farm FW-0602-1D-2½" 1/1 FW-644 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3048 Tank Farm FW-0603-1D-2½" 1/1 FW-662 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3049 Tank Farm FW-0603-1D-2½" 1/1 FW-663 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3050 Tank Farm FW-0604-1D-2½" 1/1 FW-681 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3051 Tank Farm FW-0604-1D-2½" 1/1 FW-682 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3052 Tank Farm FW-0605-1D-2½" 1/1 FW-700 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3053 Tank Farm FW-0605-1D-2½" 1/1 FW-701 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3054 Tank Farm FW-0606-1D-2½" 1/1 FW-719 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3055 Tank Farm FW-0606-1D-2½" 1/1 FW-720 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3056 Tank Farm FW-0401-1D-6" 1/1 FW-319 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3057 Tank Farm FW-0401-1D-6" 1/1 FW-311 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3058 Tank Farm FW-0401-1D-6" 1/1 FW-303 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3059 Tank Farm FW-0301-1D-6" 1/1 FW-141 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

3060 Tank Farm FW-0301-1D-6" 1/1 FW-142 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3061 Tank Farm FW-0401-1D-6" 1/1 FW-310 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3062 Tank Farm FW-0401-1D-6" 1/1 FW-314 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

3063 Tank Farm FW-0401-1D-6" 1/1 FW-309 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

3064 Tank Farm FW-0401-1D-6" 1/1 FW-308 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

3065 Tank Farm FW-0401-1D-6" 1/1 FW-307 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

3066 Tank Farm FW-0401-1D-6" 1/1 FW-306 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

3067 Tank Farm FW-0401-1D-6" 1/1 FW-305 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

3068 Tank Farm FW-0401-1D-6" 1/1 FW-304 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3069 Tank Farm FW-0402-1D-2½" 1/1 FW-320 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3070 Tank Farm FW-0402-1D-2½" 1/1 FW-320A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3071 Tank Farm FW-0403-1D-2½" 1/1 FW-349 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3072 Tank Farm FW-0403-1D-2½" 1/1 FW-349A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3073 Tank Farm FW-0404-1D-2½" 1/1 FW-378 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3074 Tank Farm FW-0404-1D-2½" 1/1 FW-378A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3075 Tank Farm FW-0405-1D-2½" 1/1 FW-407 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3076 Tank Farm FW-0405-1D-2½" 1/1 FW-407A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3077 Tank Farm FW-0406-1D-2½" 1/1 FW-436 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3078 Tank Farm FW-0406-1D-2½" 1/1 FW-436A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3079 Tank Farm FW-1302-1D-2½" 1/1 FW-996 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3080 Tank Farm FW-1302-1D-2½" 1/1 FW-997 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3081 Tank Farm FW-1303-1D-2½" 1/1 FW-1005 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3082 Tank Farm FW-1303-1D-2½" 1/1 FW-1006 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3083 Tank Farm FW-1304-1D-2½" 1/1 FW-1014 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3084 Tank Farm FW-1304-1D-2½" 1/1 FW-1015 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3085 Tank Farm FW-1305-1D-2½" 1/1 FW-1023 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3086 Tank Farm FW-1305-1D-2½" 1/1 FW-1024 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3087 Tank Farm FW-1306-1D-2½" 1/1 FW-1033 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3088 Tank Farm FW-1306-1D-2½" 1/1 FW-1032 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3089 Tank Farm FW-1102-1D-2½" 1/1 FW-847 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3090 Tank Farm FW-1102-1D-2½" 1/1 FW-848 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3091 Tank Farm FW-1102-1D-2½" 1/1 FW-849 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3092 Tank Farm FW-1103-1D-2½" 1/1 FW-856 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3093 Tank Farm FW-1103-1D-2½" 1/1 FW-857 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3094 Tank Farm FW-1103-1D-2½" 1/1 FW-858 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3095 Tank Farm FW-1104-1D-2½" 1/1 FW-865 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3096 Tank Farm FW-1104-1D-2½" 1/1 FW-866 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3097 Tank Farm FW-1104-1D-2½" 1/1 FW-867 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3098 Tank Farm FW-1105-1D-2½" 1/1 FW-874 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3099 Tank Farm FW-1105-1D-2½" 1/1 FW-875 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3100 Tank Farm FW-1105-1D-2½" 1/1 FW-876 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3101 Tank Farm FW-1106-1D-2½" 1/1 FW-883 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3102 Tank Farm FW-1106-1D-2½" 1/1 FW-884 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3103 Tank Farm FW-1106-1D-2½" 1/1 FW-885 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3104 Tank Farm FW-1301-1D-6" 1/1 FW-987 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3105 Tank Farm FW-1301-1D-6" 1/1 FW-988 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3106 Tank Farm FW-1101-1D-6" 1/1 FW-838 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3107 Tank Farm FW-1101-1D-6" 1/1 FW-839 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3108 Tank Farm FW-1101-1D-6" 1/1 FW-840 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3109 Tank Farm FS-0502-1D-3" 1/1 FW-298 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3110 Tank Farm FS-0502-1D-3" 1/1 FW-297 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3111 Tank Farm FS-0502-1D-3" 1/1 FW-296 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3112 Tank Farm FS-0502-1D-3" 1/1 FW-295 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3113 Tank Farm FS-0502-1D-3" 1/1 FW-292 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3114 Tank Farm FS-0502-1D-3" 1/1 FW-291 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3115 Tank Farm FS-0502-1D-3" 1/1 FW-290 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3116 Tank Farm FS-0502-1D-3" 1/1 FW-289 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3117 Tank Farm FS-0502-1D-3" 1/1 FW-288 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3118 Tank Farm FS-0502-1D-3" 1/1 FW-287 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3119 Tank Farm FS-0502-1D-3" 1/1 FW-286 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3120 Tank Farm FS-0502-1D-3" 1/1 FW-285 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3121 Tank Farm FS-0502-1D-3" 1/1 FW-284 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3122 Tank Farm FS-0502-1D-3" 1/1 FW-283 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3123 Tank Farm FS-0502-1D-3" 1/1 FW-282 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3124 Tank Farm FS-0502-1D-3" 1/1 FW-282A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3125 Tank Farm FS-0503-1D-3" 1/1 FW-311 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3126 Tank Farm FS-0503-1D-3" 1/1 FW-311A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

3127 Tank Farm FS-0501-1D-4" 1/1 FW-272 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

3128 Tank Farm FS-0501-1D-4" 1/1 FW-273 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3129 Tank Farm FS-0501-1D-4" 1/1 FW-262 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3130 Tank Farm FS-0501-1D-4" 1/1 FW-264 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3131 Tank Farm FS-0501-1D-4" 1/1 FW-265 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3132 Tank Farm FW-0202-1D-3" 1/1 FW-101 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3133 Tank Farm FW-0202-1D-3" 1/1 FW-102 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3134 Tank Farm FW-0203-1D-3" 1/1 FW-110 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3135 Tank Farm FW-0203-1D-3" 1/1 FW-111 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3136 Tank Farm FW-0204-1D-3" 1/1 FW-119 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3137 Tank Farm FW-0204-1D-3" 1/1 FW-120 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3138 Tank Farm FW-0205-1D-3" 1/1 FW-128 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3139 Tank Farm FW-0205-1D-3" 1/1 FW-129 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3140 Tank Farm FW-0206-1D-3" 1/1 FW-137 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3141 Tank Farm FW-0206-1D-3" 1/1 FW-138 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3142 Tank Farm FW-0102-1D-3" 1/1 FW-32 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3143 Tank Farm FW-0102-1D-3" 1/1 FW-33 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3144 Tank Farm FW-0103-1D-3" 1/1 FW-41 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3145 Tank Farm FW-0103-1D-3" 1/1 FW-42 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3146 Tank Farm FW-0104-1D-3" 1/1 FW-50 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3147 Tank Farm FW-0104-1D-3" 1/1 FW-51 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3148 Tank Farm FW-0105-1D-3" 1/1 FW-59 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3149 Tank Farm FW-0105-1D-3" 1/1 FW-60 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3150 Tank Farm FW-0106-1D-3" 1/1 FW-68 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3151 Tank Farm FW-0106-1D-3" 1/1 FW-69 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3152 Tank Farm FW-0010-1C-14" 1/1 FW-31A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

3153 Tank Farm FW-0602-1D-2½" 1/1 FW-645 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3154 Tank Farm FW-0602-1D-2½" 1/1 FW-646 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3155 Tank Farm FW-0602-1D-2½" 1/1 FW-647 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3156 Tank Farm FW-0602-1D-2½" 1/1 FW-648 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3157 Tank Farm FW-0603-1D-2½" 1/1 FW-664 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3158 Tank Farm FW-0603-1D-2½" 1/1 FW-665 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3159 Tank Farm FW-0603-1D-2½" 1/1 FW-666 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3160 Tank Farm FW-0603-1D-2½" 1/1 FW-667 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3161 Tank Farm FW-0604-1D-2½" 1/1 FW-683 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3162 Tank Farm FW-0604-1D-2½" 1/1 FW-684 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3163 Tank Farm FW-0604-1D-2½" 1/1 FW-685 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3164 Tank Farm FW-0604-1D-2½" 1/1 FW-686 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3165 Tank Farm FW-0605-1D-2½" 1/1 FW-702 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3166 Tank Farm FW-0605-1D-2½" 1/1 FW-703 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3167 Tank Farm FW-0605-1D-2½" 1/1 FW-704 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3168 Tank Farm FW-0605-1D-2½" 1/1 FW-705 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3169 Tank Farm FW-0606-1D-2½" 1/1 FW-721 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3170 Tank Farm FW-0606-1D-2½" 1/1 FW-722 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3171 Tank Farm FW-0606-1D-2½" 1/1 FW-723 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3172 Tank Farm FW-0606-1D-2½" 1/1 FW-724 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3173 Tank Farm FS-0403-1D-3" 1/1 FW-260 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3174 Tank Farm FS-0403-1D-3" 1/1 FW-259 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3175 Tank Farm FS-0403-1D-3" 1/1 FW-258 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3176 Tank Farm FS-0403-1D-3" 1/1 FW-257 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3177 Tank Farm FS-0503-1D-3" 1/1 FW-327 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3178 Tank Farm FS-0503-1D-3" 1/1 FW-326 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3179 Tank Farm FS-0503-1D-3" 1/1 FW-325 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3180 Tank Farm FS-0503-1D-3" 1/1 FW-324 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3181 Tank Farm FS-0503-1D-3" 1/1 FW-321 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3182 Tank Farm FS-0503-1D-3" 1/1 FW-320 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3183 Tank Farm FS-0503-1D-3" 1/1 FW-319 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3184 Tank Farm FS-0503-1D-3" 1/1 FW-318 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3185 Tank Farm FS-0503-1D-3" 1/1 FW-317 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3186 Tank Farm FS-0503-1D-3" 1/1 FW-316 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3187 Tank Farm FS-0503-1D-3" 1/1 FW-315 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3188 Tank Farm FS-0503-1D-3" 1/1 FW-314 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3189 Tank Farm FS-0503-1D-3" 1/1 FW-313 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3190 Tank Farm FS-0503-1D-3" 1/1 FW-312 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3191 Tank Farm FW-1301-1D-6" 1/1 FW-991 SOW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

3192 Tank Farm FW-1103-1D-2½" 1/1 FW-860 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3193 Tank Farm FW-1104-1D-2½" 1/1 FW-869 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3194 Tank Farm FW-1105-1D-2½" 1/1 FW-878 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3195 Tank Farm FW-1106-1D-2½" 1/1 FW-887 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3196 Tank Farm FW-1101-1D-6" 1/1 FW-826 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3197 Tank Farm FW-1101-1D-6" 1/1 FW-827 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3198 Tank Farm FW-1101-1D-6" 1/1 FW-828 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3199 Tank Farm FW-1101-1D-6" 1/1 FW-829 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3200 Tank Farm FW-1101-1D-6" 1/1 FW-830 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3201 Tank Farm FW-1101-1D-6" 1/1 FW-831 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3202 Tank Farm FW-1101-1D-6" 1/1 FW-832 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3203 Tank Farm FW-0702-1D-2½ " 1/1 FW-761 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3204 Tank Farm FW-0702-1D-2½ " 1/1 FW-762 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3205 Tank Farm FW-0606-1D-2½" 1/1 FW-725 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3206 Tank Farm FW-0606-1D-2½" 1/1 FW-726 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3207 Tank Farm FW-0703-1D-2½" 1/1 FW-774 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3208 Tank Farm FW-0703-1D-2½" 1/1 FW-775 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3209 Tank Farm FW-0604-1D-2½" 1/1 FW-687 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3210 Tank Farm FW-0604-1D-2½" 1/1 FW-688 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3211 Tank Farm FW-0704-1D-2½" 1/1 FW-787 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3212 Tank Farm FW-0704-1D-2½" 1/1 FW-788 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3213 Tank Farm FW-0605-1D-2½" 1/1 FW-707 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3214 Tank Farm FW-0605-1D-2½" 1/1 FW-706 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3215 Tank Farm FW-0705-1D-2½" 1/1 FW-802 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3216 Tank Farm FW-0601-1D-6" 1/1 FW-632 SOW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

3217 Tank Farm FW-0602-1D-2½" 1/1 FW-649 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3218 Tank Farm FW-0602-1D-2½" 1/1 FW-650 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3219 Tank Farm FW-0706-1D-2½" 1/1 FW-813 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3220 Tank Farm FW-0706-1D-2½" 1/1 FW-814 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3221 Tank Farm FW-0603-1D-2½" 1/1 FW-668 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3222 Tank Farm FW-0603-1D-2½" 1/1 FW-669 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3223 Tank Farm FW-0501-1D-6" 1/1 FW-487 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3224 Tank Farm FW-0501-1D-6" 1/1 FW-479 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3225 Tank Farm FW-0501-1D-6" 1/1 FW-471 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3226 Tank Farm FW-0301-1D-6" 1/1 FW-139 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

3227 Tank Farm FW-0501-1D-6" 1/1 FW-469 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3228 Tank Farm FW-0501-1D-6" 1/1 FW-478 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3229 Tank Farm FW-0501-1D-6" 1/1 FW-482 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3230 Tank Farm FW-0501-1D-6" 1/1 FW-476 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

3231 Tank Farm FW-0501-1D-6" 1/1 FW-475 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

3232 Tank Farm FW-0501-1D-6" 1/1 FW-474 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

3233 Tank Farm FW-0501-1D-6" 1/1 FW-473 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

3234 Tank Farm FW-0501-1D-6" 1/1 FW-472 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3235 Tank Farm FW-0502-1D-2½" 1/1 FW-488 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3236 Tank Farm FW-0502-1D-2½" 1/1 FW-488A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3237 Tank Farm FW-0504-1D-2½" 1/1 FW-538 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3238 Tank Farm FW-0504-1D-2½" 1/1 FW-538A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3239 Tank Farm FW-0503-1D-2½" 1/1 FW-513 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3240 Tank Farm FW-0503-1D-2½" 1/1 FW-513A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3241 Tank Farm FW-0505-1D-2½" 1/1 FW-563 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3242 Tank Farm FW-0505-1D-2½" 1/1 FW-563A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3243 Tank Farm FW-0506-1D-2½" 1/1 FW-588 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3244 Tank Farm FW-0506-1D-2½" 1/1 FW-588A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3245 Tank Farm FW-1101-1D-6" 1/1 FW-825 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3246 Tank Farm FW-1101-1D-6" 1/1 FW-833 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3247 Tank Farm FW-1101-1D-6" 1/1 FW-834 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3248 Tank Farm FW-1101-1D-6" 1/1 FW-835 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3249 Tank Farm FW-1101-1D-6" 1/1 FW-836 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3250 Tank Farm FW-1101-1D-6" 1/1 FW-837 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3251 Tank Farm FW-1101-1D-6" 1/1 FW-841 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3252 Tank Farm FW-1101-1D-6" 1/1 FW-846 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3253 Tank Farm FW-1102-1D-2½" 1/1 FW-851 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3254 Tank Farm FW-1102-1D-2½" 1/1 FW-847A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3255 Tank Farm FW-1102-1D-2½" 1/1 FW-850 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3256 Tank Farm FW-1102-1D-2½" 1/1 FW-853 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3257 Tank Farm FW-1103-1D-2½" 1/1 FW-856A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3258 Tank Farm FW-1103-1D-2½" 1/1 FW-862 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3259 Tank Farm FW-1103-1D-2½" 1/1 FW-859 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3260 Tank Farm FW-1104-1D-2½" 1/1 FW-865A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3261 Tank Farm FW-1104-1D-2½" 1/1 FW-868 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3262 Tank Farm FW-1104-1D-2½" 1/1 FW-871 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3263 Tank Farm FW-1105-1D-2½" 1/1 FW-877 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3264 Tank Farm FW-1105-1D-2½" 1/1 FW-880 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3265 Tank Farm FW-1105-1D-2½" 1/1 FW-874A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3266 Tank Farm FW-1106-1D-2½" 1/1 FW-883A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3267 Tank Farm FW-1106-1D-2½" 1/1 FW-886 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3268 Tank Farm FW-1106-1D-2½" 1/1 FW-889 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3269 Tank Farm FS-0503-1D-3" 1/1 FW-336 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3270 Tank Farm FS-0503-1D-3" 1/1 FW-338 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3271 Tank Farm FS-0503-1D-3" 1/1 FW-337 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3272 Tank Farm FS-0503-1D-3" 1/1 FW-339 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3273 Tank Farm FS-0601-1D-4" 1/1 FW-341 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

3274 Tank Farm FS-0601-1D-4" 1/1 FW-343 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

3275 Tank Farm FS-0601-1D-4" 1/1 FW-344 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

3276 Tank Farm FS-0601-1D-4" 1/1 FW-340A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

3277 Tank Farm FS-0502-1D-3" 1/1 FW-310 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3278 Tank Farm FS-0502-1D-3" 1/1 FW-309 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3279 Tank Farm FS-0502-1D-3" 1/1 FW-308 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3280 Tank Farm FS-0502-1D-3" 1/1 FW-307 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3281 Tank Farm FS-0602-1D-3" 1/1 FW-377 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3282 Tank Farm FS-0602-1D-3" 1/1 FW-376 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3283 Tank Farm FS-0602-1D-3" 1/1 FW-375 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3284 Tank Farm FS-0602-1D-3" 1/1 FW-374 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3285 Tank Farm FS-0602-1D-3" 1/1 FW-371 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3286 Tank Farm FS-0602-1D-3" 1/1 FW-370 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3287 Tank Farm FS-0602-1D-3" 1/1 FW-369 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3288 Tank Farm FS-0602-1D-3" 1/1 FW-368 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3289 Tank Farm FS-0602-1D-3" 1/1 FW-367 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3290 Tank Farm FS-0602-1D-3" 1/1 FW-366 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3291 Tank Farm FS-0602-1D-3" 1/1 FW-365 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3292 Tank Farm FS-0602-1D-3" 1/1 FW-364 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3293 Tank Farm FS-0602-1D-3" 1/1 FW-363 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3294 Tank Farm FS-0602-1D-3" 1/1 FW-362 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3295 Tank Farm FS-0602-1D-3" 1/1 FW-361 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3296 Tank Farm FS-0603-1D-3" 1/1 FW-400 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3297 Tank Farm FS-0603-1D-3" 1/1 FW-399 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3298 Tank Farm FS-0603-1D-3" 1/1 FW-398 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3299 Tank Farm FS-0603-1D-3" 1/1 FW-397 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3300 Tank Farm FW-1201-1D-6" 1/1 FW-898 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3301 Tank Farm FW-1201-1D-6" 1/1 FW-897 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3302 Tank Farm FW-1201-1D-6" 1/1 FW-899 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3303 Tank Farm FW-1201-1D-6" 1/1 FW-912 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3304 Tank Farm FW-1201-1D-6" 1/1 FW-920 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3305 Tank Farm FW-1201-1D-6" 1/1 FW-901 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3306 Tank Farm FW-1201-1D-6" 1/1 FW-902 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3307 Tank Farm FW-1201-1D-6" 1/1 FW-903 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3308 Tank Farm FW-1201-1D-6" 1/1 FW-904 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3309 Tank Farm FW-1201-1D-6" 1/1 FW-905 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3310 Tank Farm FW-1201-1D-6" 1/1 FW-906 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3311 Tank Farm FW-1201-1D-6" 1/1 FW-907 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3312 Tank Farm FW-1201-1D-6" 1/1 FW-908 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3313 Tank Farm FW-1201-1D-6" 1/1 FW-909 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3314 Tank Farm FW-1201-1D-6" 1/1 FW-910 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3315 Tank Farm FW-1201-1D-6" 1/1 FW-911 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3316 Tank Farm FW-1201-1D-6" 1/1 FW-915 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3317 Tank Farm FW-1202-1D-2½" 1/1 FW-921 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3318 Tank Farm FW-1202-1D-2½" 1/1 FW-921A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3319 Tank Farm FW-1203-1D-2½" 1/1 FW-930 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3320 Tank Farm FW-1203-1D-2½" 1/1 FW-930A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3321 Tank Farm FW-1204-1D-2½" 1/1 FW-939 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3322 Tank Farm FW-1204-1D-2½" 1/1 FW-939A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3323 Tank Farm FW-1205-1D-2½" 1/1 FW-948 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3324 Tank Farm FW-1205-1D-2½" 1/1 FW-948A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3325 Tank Farm PW-5403-1S2-3" 1/1 FW-01 SOW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

3326 Tank Farm PW-5403-1S2-3" 1/1 FW-02 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/90Elbow

3327 Tank Farm PW-5403-1S2-3" 1/1 FW-03 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/90Elbow

3328 Tank Farm PW-5403-1S2-3" 1/1 FW-04 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/90Elbow

3329 Tank Farm PW-5403-1S2-3" 1/1 FW-05 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/90Elbow

3330 Tank Farm PW-5403-1S2-3" 1/1 FW-06 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/90Elbow

3331 Tank Farm PW-5403-1S2-3" 1/1 FW-07 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/90Elbow

3332 Tank Farm PW-5403-1S2-3" 1/1 FW-08 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

3333 Tank Farm PW-5403-1S2-3" 1/1 FW-09 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3334 Tank Farm PW-5403-1S2-3" 1/1 FW-10 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

3335 Tank Farm PW-5403-1S2-3" 1/1 FW-11 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

3336 Tank Farm PW-5403-1S2-3" 1/1 FW-12 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

3337 Tank Farm PW-5403-1S2-3" 1/1 FW-13 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

3338 Tank Farm PW-5403-1S2-3" 1/1 FW-14 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

3339 Tank Farm PW-5403-1S2-3" 1/1 FW-15 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

3340 Tank Farm PW-5403-1S2-3" 1/1 FW-16 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Reducer

3341 Tank Farm PW-5403-1S2-3" 1/1 FW-17 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

3342 Tank Farm PW-5403-1S2-3" 1/1 FW-18 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

3343 Tank Farm PW-5403-1S2-3" 1/1 FW-19 BW WPS-2016-27 GTAW 3" SCH10S A312/A312 Pipe/Pipe

3344 Tank Farm PW-5403-1S2-3" 1/1 FW-20 BW WPS-2016-27 GTAW 3" SCH10S A312/A312 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3345 Tank Farm PW-5403-1S2-3" 1/1 FW-20A BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

3346 Tank Farm PW-5403-1S2-3" 1/1 FW-20B BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

3347 Tank Farm PW-5403-1S2-3" 1/1 FW-21 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

3348 Tank Farm PW-5403-1S2-3" 1/1 FW-22 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/45Elbow

3349 Tank Farm PW-5403-1S2-3" 1/1 FW-23 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/45Elbow

3350 Tank Farm PW-5403-1S2-3" 1/1 FW-24 BW WPS-2016-27 GTAW 3" SCH10S A312/A312 Pipe/Pipe

3351 Tank Farm PW-5403-1S2-3" 1/1 FW-25 BW WPS-2016-27 GTAW 3" SCH10S A312/A312 Pipe/Pipe

3352 Tank Farm PW-5403-1S2-3" 1/1 FW-26 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

3353 Tank Farm PW-5403-1S2-3" 1/1 FW-27 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

3354 Tank Farm PW-5403-1S2-3" 1/1 FW-28 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

3355 Tank Farm PW-5403-1S2-3" 1/1 FW-29 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3356 Tank Farm PW-5403-1S2-3" 1/1 FW-30 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

3357 Tank Farm PW-5403-1S2-3" 1/1 FW-31 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

3358 Tank Farm PW-5403-1S2-3" 1/1 FW-32 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

3359 Tank Farm FW-1206-1D-2½" 1/1 FW-957 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3360 Tank Farm FW-1206-1D-2½" 1/1 FW-957A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Tee

3361 Tank Farm FS-6201-1D-8" 1/1 FW-04 BRW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Weldolet

3362 Tank Farm FS-6201-1D-8" 1/1 FW-05 BRW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Weldolet

3363 Tank Farm FS-6201-1D-8" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3364 Tank Farm FS-6201-1D-8" 1/1 FW-10 BRW WPS-2016-23 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

3365 Tank Farm FW-0006-1C-14" 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3366 Tank Farm FW-0006-1C-14" 1/2 FW-13A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3367 Tank Farm FW-0402-1D-2½" 1/1 FW-333 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3368 Tank Farm FW-0402-1D-2½" 1/1 FW-334 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3369 Tank Farm FW-0402-1D-2½" 1/1 FW-335 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3370 Tank Farm FW-0402-1D-2½" 1/1 FW-336 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3371 Tank Farm FW-0402-1D-2½" 1/1 FW-337 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3372 Tank Farm FW-0402-1D-2½" 1/1 FW-338 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3373 Tank Farm FW-0402-1D-2½" 1/1 FW-339 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3374 Tank Farm FW-0402-1D-2½" 1/1 FW-340 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3375 Tank Farm FW-0402-1D-2½" 1/1 FW-341 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3376 Tank Farm FW-0402-1D-2½" 1/1 FW-342 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3377 Tank Farm FW-0402-1D-2½" 1/1 FW-343 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3378 Tank Farm FW-0402-1D-2½" 1/1 FW-344 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3379 Tank Farm FW-0403-1D-2½" 1/1 FW-362 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3380 Tank Farm FW-0403-1D-2½" 1/1 FW-363 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3381 Tank Farm FW-0403-1D-2½" 1/1 FW-364 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3382 Tank Farm FW-0403-1D-2½" 1/1 FW-365 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3383 Tank Farm FW-0403-1D-2½" 1/1 FW-366 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3384 Tank Farm FW-0403-1D-2½" 1/1 FW-367 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3385 Tank Farm FW-0403-1D-2½" 1/1 FW-368 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3386 Tank Farm FW-0403-1D-2½" 1/1 FW-369 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3387 Tank Farm FW-0403-1D-2½" 1/1 FW-370 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3388 Tank Farm FW-0403-1D-2½" 1/1 FW-371 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3389 Tank Farm FW-0403-1D-2½" 1/1 FW-372 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3390 Tank Farm FW-0403-1D-2½" 1/1 FW-373 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3391 Tank Farm FW-0404-1D-2½" 1/1 FW-391 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3392 Tank Farm FW-0404-1D-2½" 1/1 FW-392 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3393 Tank Farm FW-0404-1D-2½" 1/1 FW-393 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3394 Tank Farm FW-0404-1D-2½" 1/1 FW-394 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3395 Tank Farm FW-0404-1D-2½" 1/1 FW-395 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3396 Tank Farm FW-0404-1D-2½" 1/1 FW-396 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3397 Tank Farm FW-0404-1D-2½" 1/1 FW-397 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3398 Tank Farm FW-0404-1D-2½" 1/1 FW-398 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3399 Tank Farm FW-0404-1D-2½" 1/1 FW-399 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3400 Tank Farm FW-0404-1D-2½" 1/1 FW-400 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3401 Tank Farm FW-0404-1D-2½" 1/1 FW-401 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3402 Tank Farm FW-0404-1D-2½" 1/1 FW-402 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3403 Tank Farm FW-0405-1D-2½" 1/1 FW-420 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3404 Tank Farm FW-0405-1D-2½" 1/1 FW-421 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3405 Tank Farm FW-0405-1D-2½" 1/1 FW-422 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3406 Tank Farm FW-0405-1D-2½" 1/1 FW-423 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3407 Tank Farm FW-0405-1D-2½" 1/1 FW-424 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3408 Tank Farm FW-0405-1D-2½" 1/1 FW-425 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3409 Tank Farm FW-0405-1D-2½" 1/1 FW-426 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3410 Tank Farm FW-0405-1D-2½" 1/1 FW-427 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3411 Tank Farm FW-0405-1D-2½" 1/1 FW-428 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3412 Tank Farm FW-0405-1D-2½" 1/1 FW-429 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3413 Tank Farm FW-0405-1D-2½" 1/1 FW-430 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3414 Tank Farm FW-0405-1D-2½" 1/1 FW-431 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3415 Tank Farm FW-0406-1D-2½" 1/1 FW-449 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3416 Tank Farm FW-0406-1D-2½" 1/1 FW-450 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3417 Tank Farm FW-0406-1D-2½" 1/1 FW-451 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3418 Tank Farm FW-0406-1D-2½" 1/1 FW-452 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3419 Tank Farm FW-0406-1D-2½" 1/1 FW-453 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3420 Tank Farm FW-0406-1D-2½" 1/1 FW-454 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3421 Tank Farm FW-0406-1D-2½" 1/1 FW-455 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3422 Tank Farm FW-0406-1D-2½" 1/1 FW-456 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3423 Tank Farm FW-0406-1D-2½" 1/1 FW-457 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3424 Tank Farm FW-0406-1D-2½" 1/1 FW-458 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3425 Tank Farm FW-0406-1D-2½" 1/1 FW-459 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3426 Tank Farm FW-0406-1D-2½" 1/1 FW-460 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3427 Tank Farm FW-0502-1D-2½" 1/1 FW-501 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3428 Tank Farm FW-0502-1D-2½" 1/1 FW-502 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3429 Tank Farm FW-0502-1D-2½" 1/1 FW-503 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3430 Tank Farm FW-0502-1D-2½" 1/1 FW-504 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3431 Tank Farm FW-0502-1D-2½" 1/1 FW-505 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3432 Tank Farm FW-0502-1D-2½" 1/1 FW-506 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3433 Tank Farm FW-0502-1D-2½" 1/1 FW-507 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3434 Tank Farm FW-0502-1D-2½" 1/1 FW-508 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3435 Tank Farm FW-0503-1D-2½" 1/1 FW-526 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3436 Tank Farm FW-0503-1D-2½" 1/1 FW-527 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3437 Tank Farm FW-0503-1D-2½" 1/1 FW-528 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3438 Tank Farm FW-0503-1D-2½" 1/1 FW-529 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3439 Tank Farm FW-0503-1D-2½" 1/1 FW-530 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3440 Tank Farm FW-0503-1D-2½" 1/1 FW-531 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3441 Tank Farm FW-0503-1D-2½" 1/1 FW-532 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3442 Tank Farm FW-0503-1D-2½" 1/1 FW-533 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3443 Tank Farm FW-0504-1D-2½" 1/1 FW-551 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3444 Tank Farm FW-0504-1D-2½" 1/1 FW-552 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3445 Tank Farm FW-0504-1D-2½" 1/1 FW-553 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3446 Tank Farm FW-0504-1D-2½" 1/1 FW-554 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3447 Tank Farm FW-0504-1D-2½" 1/1 FW-555 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3448 Tank Farm FW-0504-1D-2½" 1/1 FW-556 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3449 Tank Farm FW-0504-1D-2½" 1/1 FW-557 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3450 Tank Farm FW-0504-1D-2½" 1/1 FW-558 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3451 Tank Farm FW-0505-1D-2½" 1/1 FW-576 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3452 Tank Farm FW-0505-1D-2½" 1/1 FW-577 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3453 Tank Farm FW-0505-1D-2½" 1/1 FW-578 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3454 Tank Farm FW-0505-1D-2½" 1/1 FW-579 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3455 Tank Farm FW-0505-1D-2½" 1/1 FW-580 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3456 Tank Farm FW-0505-1D-2½" 1/1 FW-581 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3457 Tank Farm FW-0505-1D-2½" 1/1 FW-582 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3458 Tank Farm FW-0505-1D-2½" 1/1 FW-583 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3459 Tank Farm FW-0506-1D-2½" 1/1 FW-601 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3460 Tank Farm FW-0506-1D-2½" 1/1 FW-602 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3461 Tank Farm FW-0506-1D-2½" 1/1 FW-603 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3462 Tank Farm FW-0506-1D-2½" 1/1 FW-604 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3463 Tank Farm FW-0506-1D-2½" 1/1 FW-605 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3464 Tank Farm FW-0506-1D-2½" 1/1 FW-606 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3465 Tank Farm FW-0506-1D-2½" 1/1 FW-607 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3466 Tank Farm FW-0506-1D-2½" 1/1 FW-608 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3467 Tank Farm FW-0302-1D-2½" 1/1 FW-175 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3468 Tank Farm FW-0302-1D-2½" 1/1 FW-176 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3469 Tank Farm FW-0302-1D-2½" 1/1 FW-177 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3470 Tank Farm FW-0302-1D-2½" 1/1 FW-178 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3471 Tank Farm FW-0302-1D-2½" 1/1 FW-179 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3472 Tank Farm FW-0302-1D-2½" 1/1 FW-180 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3473 Tank Farm FW-0302-1D-2½" 1/1 FW-181 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3474 Tank Farm FW-0302-1D-2½" 1/1 FW-182 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3475 Tank Farm FW-0303-1D-2½" 1/1 FW-202 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3476 Tank Farm FW-0303-1D-2½" 1/1 FW-203 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3477 Tank Farm FW-0303-1D-2½" 1/1 FW-204 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3478 Tank Farm FW-0303-1D-2½" 1/1 FW-205 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3479 Tank Farm FW-0303-1D-2½" 1/1 FW-206 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3480 Tank Farm FW-0303-1D-2½" 1/1 FW-207 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3481 Tank Farm FW-0303-1D-2½" 1/1 FW-208 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3482 Tank Farm FW-0303-1D-2½" 1/1 FW-209 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3483 Tank Farm FW-0303-1D-2½" 1/1 FW-210 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3484 Tank Farm FW-0303-1D-2½" 1/1 FW-211 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3485 Tank Farm FW-0304-1D-2½" 1/1 FW-229 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3486 Tank Farm FW-0304-1D-2½" 1/1 FW-230 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3487 Tank Farm FW-0304-1D-2½" 1/1 FW-231 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3488 Tank Farm FW-0304-1D-2½" 1/1 FW-232 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3489 Tank Farm FW-0304-1D-2½" 1/1 FW-233 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3490 Tank Farm FW-0304-1D-2½" 1/1 FW-234 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3491 Tank Farm FW-0304-1D-2½" 1/1 FW-235 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3492 Tank Farm FW-0304-1D-2½" 1/1 FW-236 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3493 Tank Farm FW-0304-1D-2½" 1/1 FW-237 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3494 Tank Farm FW-0304-1D-2½" 1/1 FW-238 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3495 Tank Farm FW-0305-1D-2½" 1/1 FW-256 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3496 Tank Farm FW-0305-1D-2½" 1/1 FW-257 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3497 Tank Farm FW-0305-1D-2½" 1/1 FW-258 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3498 Tank Farm FW-0305-1D-2½" 1/1 FW-259 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3499 Tank Farm FW-0305-1D-2½" 1/1 FW-260 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3500 Tank Farm FW-0305-1D-2½" 1/1 FW-261 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3501 Tank Farm FW-0305-1D-2½" 1/1 FW-262 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3502 Tank Farm FW-0305-1D-2½" 1/1 FW-263 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3503 Tank Farm FW-0305-1D-2½" 1/1 FW-264 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3504 Tank Farm FW-0305-1D-2½" 1/1 FW-265 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3505 Tank Farm FW-0306-1D-2½" 1/1 FW-283 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3506 Tank Farm FW-0306-1D-2½" 1/1 FW-284 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3507 Tank Farm FW-0306-1D-2½" 1/1 FW-285 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3508 Tank Farm FW-0306-1D-2½" 1/1 FW-286 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3509 Tank Farm FW-0306-1D-2½" 1/1 FW-287 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3510 Tank Farm FW-0306-1D-2½" 1/1 FW-288 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3511 Tank Farm FW-0306-1D-2½" 1/1 FW-289 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3512 Tank Farm FW-0306-1D-2½" 1/1 FW-290 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3513 Tank Farm FW-0306-1D-2½" 1/1 FW-291 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3514 Tank Farm FW-0306-1D-2½" 1/1 FW-292 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3515 Tank Farm FW-3018-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3516 Tank Farm FW-3019-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3517 Tank Farm FW-3020-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3518 Tank Farm FW-3021-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3519 Tank Farm FW-3022-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3520 Tank Farm FW-3023-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3521 Tank Farm FW-3024-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3522 Tank Farm FW-3025-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3523 Tank Farm FW-3026-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3524 Tank Farm FW-3027-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3525 Tank Farm FW-3028-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3526 Tank Farm FW-3029-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3527 Tank Farm FW-3018-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3528 Tank Farm FW-3019-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3529 Tank Farm FW-3020-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3530 Tank Farm FW-3021-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3531 Tank Farm FW-3022-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3532 Tank Farm FW-3023-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3533 Tank Farm FW-3024-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3534 Tank Farm FW-3025-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3535 Tank Farm FW-3026-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3536 Tank Farm FW-3027-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3537 Tank Farm FW-3028-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3538 Tank Farm FW-3029-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3539 Tank Farm FW-3018-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3540 Tank Farm FW-3019-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3541 Tank Farm FW-3020-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3542 Tank Farm FW-3021-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3543 Tank Farm FW-3022-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3544 Tank Farm FW-3023-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3545 Tank Farm FW-3024-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3546 Tank Farm FW-3025-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3547 Tank Farm FW-3026-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3548 Tank Farm FW-3027-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3549 Tank Farm FW-3028-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3550 Tank Farm FW-3029-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3551 Tank Farm FW-3018-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3552 Tank Farm FW-3019-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3553 Tank Farm FW-3020-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3554 Tank Farm FW-3021-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3555 Tank Farm FW-3022-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3556 Tank Farm FW-3023-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3557 Tank Farm FW-3024-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3558 Tank Farm FW-3025-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3559 Tank Farm FW-3026-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3560 Tank Farm FW-3027-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3561 Tank Farm FW-3028-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3562 Tank Farm FW-3029-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3563 Tank Farm FW-3018-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3564 Tank Farm FW-3019-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3565 Tank Farm FW-3020-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3566 Tank Farm FW-3021-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3567 Tank Farm FW-3022-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3568 Tank Farm FW-3023-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3569 Tank Farm FW-3024-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3570 Tank Farm FW-3025-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3571 Tank Farm FW-3026-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3572 Tank Farm FW-3027-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3573 Tank Farm FW-3028-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3574 Tank Farm FW-3029-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3575 Tank Farm FW-3005-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3576 Tank Farm FW-3006-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3577 Tank Farm FW-3007-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3578 Tank Farm FW-3008-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3579 Tank Farm FW-3009-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3580 Tank Farm FW-3010-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3581 Tank Farm FW-3011-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3582 Tank Farm FW-3012-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3583 Tank Farm FW-3013-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3584 Tank Farm FW-3014-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3585 Tank Farm FW-3015-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3586 Tank Farm FW-3016-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3587 Tank Farm FW-3017-1D-2" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3588 Tank Farm FW-3005-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3589 Tank Farm FW-3006-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3590 Tank Farm FW-3007-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3591 Tank Farm FW-3008-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3592 Tank Farm FW-3009-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3593 Tank Farm FW-3010-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3594 Tank Farm FW-3011-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3595 Tank Farm FW-3012-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3596 Tank Farm FW-3013-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3597 Tank Farm FW-3014-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3598 Tank Farm FW-3015-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3599 Tank Farm FW-3016-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3600 Tank Farm FW-3017-1D-2" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3601 Tank Farm FW-3005-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3602 Tank Farm FW-3006-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3603 Tank Farm FW-3007-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3604 Tank Farm FW-3008-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3605 Tank Farm FW-3009-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3606 Tank Farm FW-3010-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3607 Tank Farm FW-3011-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3608 Tank Farm FW-3012-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3609 Tank Farm FW-3013-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3610 Tank Farm FW-3014-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3611 Tank Farm FW-3015-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3612 Tank Farm FW-3016-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3613 Tank Farm FW-3017-1D-2" 1/1 FW-06 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3614 Tank Farm FW-3005-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3615 Tank Farm FW-3006-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3616 Tank Farm FW-3007-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3617 Tank Farm FW-3008-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3618 Tank Farm FW-3009-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3619 Tank Farm FW-3010-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3620 Tank Farm FW-3011-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3621 Tank Farm FW-3012-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3622 Tank Farm FW-3013-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3623 Tank Farm FW-3014-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3624 Tank Farm FW-3015-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3625 Tank Farm FW-3016-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3626 Tank Farm FW-3017-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3627 Tank Farm FW-3005-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3628 Tank Farm FW-3006-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3629 Tank Farm FW-3007-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3630 Tank Farm FW-3008-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3631 Tank Farm FW-3009-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3632 Tank Farm FW-3010-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3633 Tank Farm FW-3011-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3634 Tank Farm FW-3012-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3635 Tank Farm FW-3013-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3636 Tank Farm FW-3014-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3637 Tank Farm FW-3015-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3638 Tank Farm FW-3016-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3639 Tank Farm FW-3017-1D-2" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3640 Tank Farm FW-2003-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3641 Tank Farm FW-2004-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3642 Tank Farm FW-2005-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

3643 Tank Farm FW-2006-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

3644 Tank Farm FW-2007-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

3645 Tank Farm FW-2008-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

3646 Tank Farm FW-2009-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

3647 Tank Farm FW-2010-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

3648 Tank Farm FW-2011-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3649 Tank Farm FW-2012-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

3650 Tank Farm FW-2013-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

3651 Tank Farm FW-2014-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

3652 Tank Farm FW-2015-1D-2" 1/1 FW-4A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3653 Tank Farm FW-2016-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3654 Tank Farm FW-2017-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3655 Tank Farm FW-2018-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3656 Tank Farm FW-2019-1D-2" 1/1 FW-03 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3657 Tank Farm FW-2003-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3658 Tank Farm FW-2004-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3659 Tank Farm FW-2005-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3660 Tank Farm FW-2006-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3661 Tank Farm FW-2007-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3662 Tank Farm FW-2008-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3663 Tank Farm FW-2009-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3664 Tank Farm FW-2010-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3665 Tank Farm FW-2011-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3666 Tank Farm FW-2012-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3667 Tank Farm FW-2013-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3668 Tank Farm FW-2014-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3669 Tank Farm FW-2015-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3670 Tank Farm FW-2016-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3671 Tank Farm FW-2017-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3672 Tank Farm FW-2018-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3673 Tank Farm FW-2019-1D-2" 1/1 FW-02 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3674 Tank Farm FW-2003-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3675 Tank Farm FW-2004-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3676 Tank Farm FW-2005-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3677 Tank Farm FW-2006-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3678 Tank Farm FW-2007-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3679 Tank Farm FW-2008-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3680 Tank Farm FW-2009-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3681 Tank Farm FW-2010-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3682 Tank Farm FW-2011-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3683 Tank Farm FW-2012-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3684 Tank Farm FW-2013-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3685 Tank Farm FW-2014-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3686 Tank Farm FW-2015-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3687 Tank Farm FW-2016-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3688 Tank Farm FW-2017-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3689 Tank Farm FW-2018-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3690 Tank Farm FW-2019-1D-2" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/CPLG

3691 Tank Farm FW-0006-1C-14" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3692 Tank Farm FW-0006-1C-14" 1/2 FW-05 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

3693 Tank Farm FW-0502-1D-2½" 1/1 FW-490 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3694 Tank Farm FW-0502-1D-2½" 1/1 FW-489 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3695 Tank Farm FW-0503-1D-2½" 1/1 FW-514 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3696 Tank Farm FW-0503-1D-2½" 1/1 FW-515 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3697 Tank Farm FW-0504-1D-2½" 1/1 FW-539 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3698 Tank Farm FW-0504-1D-2½" 1/1 FW-540 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3699 Tank Farm FW-0505-1D-2½" 1/1 FW-564 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3700 Tank Farm FW-0505-1D-2½" 1/1 FW-565 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3701 Tank Farm FW-0506-1D-2½" 1/1 FW-589 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3702 Tank Farm FW-0506-1D-2½" 1/1 FW-590 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3703 Tank Farm FW-0402-1D-2½" 1/1 FW-321 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3704 Tank Farm FW-0402-1D-2½" 1/1 FW-322 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3705 Tank Farm FW-0403-1D-2½" 1/1 FW-350 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3706 Tank Farm FW-0403-1D-2½" 1/1 FW-351 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3707 Tank Farm FW-0404-1D-2½" 1/1 FW-379 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3708 Tank Farm FW-0404-1D-2½" 1/1 FW-380 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3709 Tank Farm FW-0405-1D-2½" 1/1 FW-408 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3710 Tank Farm FW-0405-1D-2½" 1/1 FW-409 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3711 Tank Farm FW-0406-1D-2½" 1/1 FW-437 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3712 Tank Farm FW-0406-1D-2½" 1/1 FW-438 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3713 Tank Farm FW-0302-1D-2½" 1/1 FW-163 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3714 Tank Farm FW-0302-1D-2½" 1/1 FW-164 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3715 Tank Farm FW-0303-1D-2½" 1/1 FW-190 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3716 Tank Farm FW-0303-1D-2½" 1/1 FW-191 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3717 Tank Farm FW-0304-1D-2½" 1/1 FW-217 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3718 Tank Farm FW-0304-1D-2½" 1/1 FW-218 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3719 Tank Farm FW-0305-1D-2½" 1/1 FW-244 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3720 Tank Farm FW-0305-1D-2½" 1/1 FW-245 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3721 Tank Farm FW-0306-1D-2½" 1/1 FW-271 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3722 Tank Farm FW-0306-1D-2½" 1/1 FW-272 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3723 Tank Farm FW-1302-1D-2½" 1/1 FW-998 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3724 Tank Farm FW-1302-1D-2½" 1/1 FW-1000 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3725 Tank Farm FW-1302-1D-2½" 1/1 FW-1001 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3726 Tank Farm FW-1302-1D-2½" 1/1 FW-1002 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3727 Tank Farm FW-1302-1D-2½" 1/1 FW-1003 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3728 Tank Farm FW-1303-1D-2½" 1/1 FW-1012 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3729 Tank Farm FW-1303-1D-2½" 1/1 FW-1011 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3730 Tank Farm FW-1303-1D-2½" 1/1 FW-1010 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3731 Tank Farm FW-1303-1D-2½" 1/1 FW-1009 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3732 Tank Farm FW-1303-1D-2½" 1/1 FW-1008 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3733 Tank Farm FW-1303-1D-2½" 1/1 FW-1007 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3734 Tank Farm FW-1304-1D-2½" 1/1 FW-1021 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3735 Tank Farm FW-1304-1D-2½" 1/1 FW-1020 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3736 Tank Farm FW-1304-1D-2½" 1/1 FW-1019 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3737 Tank Farm FW-1304-1D-2½" 1/1 FW-1018 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3738 Tank Farm FW-1304-1D-2½" 1/1 FW-1016 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3739 Tank Farm FW-1305-1D-2½" 1/1 FW-1030 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3740 Tank Farm FW-1305-1D-2½" 1/1 FW-1029 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3741 Tank Farm FW-1305-1D-2½" 1/1 FW-1028 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3742 Tank Farm FW-1305-1D-2½" 1/1 FW-1027 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3743 Tank Farm FW-1305-1D-2½" 1/1 FW-1025 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3744 Tank Farm FW-1306-1D-2½" 1/1 FW-1039 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3745 Tank Farm FW-1306-1D-2½" 1/1 FW-1038 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3746 Tank Farm FW-1306-1D-2½" 1/1 FW-1307 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3747 Tank Farm FW-1306-1D-2½" 1/1 FW-1306 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3748 Tank Farm FW-1306-1D-2½" 1/1 FW-1034 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3749 Tank Farm FW-1102-1D-2½" 1/1 FW-855 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3750 Tank Farm FW-1102-1D-2½" 1/1 FW-854 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3751 Tank Farm FW-1102-1D-2½" 1/1 FW-852 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3752 Tank Farm FW-1103-1D-2½" 1/1 FW-864 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3753 Tank Farm FW-1103-1D-2½" 1/1 FW-863 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3754 Tank Farm FW-1103-1D-2½" 1/1 FW-861 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3755 Tank Farm FW-1104-1D-2½" 1/1 FW-873 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3756 Tank Farm FW-1104-1D-2½" 1/1 FW-872 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3757 Tank Farm FW-1104-1D-2½" 1/1 FW-870 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3758 Tank Farm FW-1105-1D-2½" 1/1 FW-882 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3759 Tank Farm FW-1105-1D-2½" 1/1 FW-881 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3760 Tank Farm FW-1105-1D-2½" 1/1 FW-879 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3761 Tank Farm FW-1106-1D-2½" 1/1 FW-891 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3762 Tank Farm FW-1106-1D-2½" 1/1 FW-890 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3763 Tank Farm FW-1106-1D-2½" 1/1 FW-888 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3764 Tank Farm FW-1202-1D-2½" 1/1 FW-929 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3765 Tank Farm FW-1202-1D-2½" 1/1 FW-928 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3766 Tank Farm FW-1202-1D-2½" 1/1 FW-927 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3767 Tank Farm FW-1202-1D-2½" 1/1 FW-926 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3768 Tank Farm FW-1202-1D-2½" 1/1 FW-925 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3769 Tank Farm FW-1202-1D-2½" 1/1 FW-924 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3770 Tank Farm FW-1203-1D-2½" 1/1 FW-938 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3771 Tank Farm FW-1203-1D-2½" 1/1 FW-937 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3772 Tank Farm FW-1203-1D-2½" 1/1 FW-936 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3773 Tank Farm FW-1203-1D-2½" 1/1 FW-935 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3774 Tank Farm FW-1203-1D-2½" 1/1 FW-934 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3775 Tank Farm FW-1203-1D-2½" 1/1 FW-933 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3776 Tank Farm FW-1204-1D-2½" 1/1 FW-947 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3777 Tank Farm FW-1204-1D-2½" 1/1 FW-946 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3778 Tank Farm FW-1204-1D-2½" 1/1 FW-945 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3779 Tank Farm FW-1204-1D-2½" 1/1 FW-944 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3780 Tank Farm FW-1204-1D-2½" 1/1 FW-943 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3781 Tank Farm FW-1204-1D-2½" 1/1 FW-942 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3782 Tank Farm FW-1205-1D-2½" 1/1 FW-956 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3783 Tank Farm FW-1205-1D-2½" 1/1 FW-955 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3784 Tank Farm FW-1205-1D-2½" 1/1 FW-954 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3785 Tank Farm FW-1205-1D-2½" 1/1 FW-953 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3786 Tank Farm FW-1205-1D-2½" 1/1 FW-952 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3787 Tank Farm FW-1206-1D-2½" 1/1 FW-965 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3788 Tank Farm FW-1206-1D-2½" 1/1 FW-964 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3789 Tank Farm FW-1206-1D-2½" 1/1 FW-963 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3790 Tank Farm FW-1206-1D-2½" 1/1 FW-962 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3791 Tank Farm FW-1206-1D-2½" 1/1 FW-961 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3792 Tank Farm FW-1206-1D-2½" 1/1 FW-960 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3793 Tank Farm FS-0603-1D-3" 1/1 FW-394 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3794 Tank Farm FS-0603-1D-3" 1/1 FW-393 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3795 Tank Farm FS-0603-1D-3" 1/1 FW-392 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3796 Tank Farm FS-0603-1D-3" 1/1 FW-391 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3797 Tank Farm FS-0603-1D-3" 1/1 FW-390 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3798 Tank Farm FS-0603-1D-3" 1/1 FW-389 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3799 Tank Farm FS-0603-1D-3" 1/1 FW-388 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3800 Tank Farm FS-0603-1D-3" 1/1 FW-387 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3801 Tank Farm FS-0603-1D-3" 1/1 FW-386 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3802 Tank Farm FS-0603-1D-3" 1/1 FW-385 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3803 Tank Farm FS-0603-1D-3" 1/1 FW-384 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3804 Tank Farm FS-0603-1D-3" 1/1 FW-384A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3805 Tank Farm FS-0602-1D-3" 1/1 FW-361A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3806 Tank Farm FS-0602-1D-3" 1/1 FW-383 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3807 Tank Farm FS-0602-1D-3" 1/1 FW-382 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3808 Tank Farm FS-0602-1D-3" 1/1 FW-381 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3809 Tank Farm FS-0602-1D-3" 1/1 FW-380 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3810 Tank Farm FS-0601-1D-4" 1/1 FW-351 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3811 Tank Farm FS-0601-1D-4" 1/1 FW-352 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3812 Tank Farm FW-0006-1C-14" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3813 Tank Farm FW-0006-1C-14" 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/45Elbow

3814 Tank Farm FW-0006-1C-14" 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3815 Tank Farm FW-0006-1C-14" 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3816 Tank Farm FW-0006-1C-14" 1/2 FW-06 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

3817 Tank Farm FW-0006-1C-14" 1/2 FW-13 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3818 Tank Farm FW-1301-1D-6" 1/1 FW-990 BRW WPS-2016-21 GTAW 6" SCH40 A53/A105 Pipe/CPLG

3819 Tank Farm FW-1301-1D-6" 1/1 FW-993 BRW WPS-2016-21 GTAW 6" SCH40 A53/A105 Pipe/CPLG

3820 Tank Farm FW-1101-1D-6" 1/1 FW-842 BRW WPS-2016-21 GTAW 6" SCH40 A53/A105 Pipe/CPLG

3821 Tank Farm FW-1101-1D-6" 1/1 FW-845 BRW WPS-2016-21 GTAW 6" SCH40 A53/A105 Pipe/CPLG

3822 Tank Farm FS-0201-1D-6" 1/1 FW-60 BW WPS-2016-21 GTAW 6" SCH40 A53/A105 Pipe/CPLG

3823 Tank Farm FS-0201-1D-6" 1/1 FW-63 BW WPS-2016-21 GTAW 6" SCH40 A53/A105 Pipe/CPLG

3824 Tank Farm FS-0101-1D-6" 1/1 FW-18 BW WPS-2016-21 GTAW 6" SCH40 A53/A105 Pipe/CPLG

3825 Tank Farm FS-0101-1D-6" 1/1 FW-15 BW WPS-2016-21 GTAW 6" SCH40 A53/A105 Pipe/CPLG

3826 Tank Farm FS-1101-1D-6" 1/1 FW-479 BW WPS-2016-21 GTAW 6" SCH40 A53/A105 Pipe/CPLG

3827 Tank Farm FS-1101-1D-6" 1/1 FW-476 BW WPS-2016-21 GTAW 6" SCH40 A53/A105 Pipe/CPLG

3828 Tank Farm FS-1201-1D-6" 1/1 FW-524 BW WPS-2016-21 GTAW 6" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3829 Tank Farm FS-1201-1D-6" 1/1 FW-521 BW WPS-2016-21 GTAW 6" SCH40 A53/A105 Pipe/CPLG

3830 Tank Farm FS-1301-1D-6" 1/1 FW-566 BRW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

3831 Tank Farm FS-1301-1D-6" 1/1 FW-569 BRW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

3832 Tank Farm FS-0702-1D-3" 1/1 FW-438 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3833 Tank Farm FS-0702-1D-3" 1/1 FW-437 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3834 Tank Farm FS-0702-1D-3" 1/1 FW-436 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3835 Tank Farm FS-0702-1D-3" 1/1 FW-435 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3836 Tank Farm FS-0702-1D-3" 1/1 FW-434 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3837 Tank Farm FS-0702-1D-3" 1/1 FW-433 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3838 Tank Farm FS-0702-1D-3" 1/1 FW-432 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3839 Tank Farm FS-0702-1D-3" 1/1 FW-431 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3840 Tank Farm FS-0702-1D-3" 1/1 FW-430 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3841 Tank Farm FS-0702-1D-3" 1/1 FW-429 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3842 Tank Farm FS-0702-1D-3" 1/1 FW-428 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3843 Tank Farm FS-0703-1D-3" 1/1 FW-449 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3844 Tank Farm FS-0703-1D-3" 1/1 FW-448 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3845 Tank Farm FS-0703-1D-3" 1/1 FW-447 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3846 Tank Farm FS-0703-1D-3" 1/1 FW-446 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3847 Tank Farm FS-0703-1D-3" 1/1 FW-445 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3848 Tank Farm FW-0006-1C-14" 2/2 FW-29 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3849 Tank Farm FW-0006-1C-14" 1/2 FW-18 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3850 Tank Farm FW-0006-1C-14" 1/2 FW-21 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3851 Tank Farm FW-0006-1C-14" 1/2 FW-25 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3852 Tank Farm FW-0006-1C-14" 1/2 FW-24 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

3853 Tank Farm FW-0006-1C-14" 1/2 FW-23 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/90Elbow

3854 Tank Farm FW-0006-1C-14" 1/2 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3855 Tank Farm FW-0006-1C-14" 1/2 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

3856 Tank Farm FS-0702-1D-3" 1/1 FW-444 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3857 Tank Farm FS-0702-1D-3" 1/1 FW-443 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3858 Tank Farm FS-0702-1D-3" 1/1 FW-442 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3859 Tank Farm FS-0702-1D-3" 1/1 FW-441 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3860 Tank Farm FS-0703-1D-3" 1/1 FW-455 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3861 Tank Farm FS-0703-1D-3" 1/1 FW-454 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3862 Tank Farm FS-0703-1D-3" 1/1 FW-453 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3863 Tank Farm FS-0703-1D-3" 1/1 FW-452 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3864 Tank Farm FS-0703-1D-3" 1/1 FW-451 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3865 Tank Farm FS-0703-1D-3" 1/1 FW-450 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3866 Tank Farm FS-0703-1D-3" 1/1 FW-461 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3867 Tank Farm FS-0703-1D-3" 1/1 FW-460 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3868 Tank Farm FS-0703-1D-3" 1/1 FW-459 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

3869 Tank Farm FS-0703-1D-3" 1/1 FW-458 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

3870 Tank Farm FS-0703-1D-3" 1/1 FW-445A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

3871 Tank Farm FW-0006-1C-14" 2/2 FW-43 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3872 Tank Farm FW-0006-1C-14" 2/2 FW-44 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3873 Tank Farm FW-0006-1C-14" 2/2 FW-28 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3874 Tank Farm FW-0006-1C-14" 2/2 FW-27 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3875 Tank Farm FS-0701-1D-4" 1/1 FW-408 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

3876 Tank Farm FS-0701-1D-4" 1/1 FW-410 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

3877 Tank Farm FS-0701-1D-4" 1/1 FW-411 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

3878 Tank Farm FS-0701-1D-4" 1/1 FW-407A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

3879 Tank Farm FS-0701-1D-4" 1/1 FW-419 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

3880 Tank Farm FS-0701-1D-4" 1/1 FW-418 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

3881 Tank Farm FW-0009-1C-14" 1/1 RW-24 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/45Elbow

3882 Tank Farm FW-0009-1C-14" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3883 Tank Farm FS-0301-1D-4" 1/1 FW-107 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3884 Tank Farm FS-0301-1D-4" 1/1 FW-110 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/CPLG

3885 Tank Farm FS-0501-1D-4" 1/1 FW-277 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/CPLG

3886 Tank Farm FS-0501-1D-4" 1/1 FW-280 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/CPLG

3887 Tank Farm FS-0501-1D-4" 1/1 FW-275 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

3888 Tank Farm FS-0501-1D-4" 1/1 FW-274 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

3889 Tank Farm FS-0601-1D-4" 1/1 FW-356 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/CPLG

3890 Tank Farm FS-0601-1D-4" 1/1 FW-359 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/CPLG

3891 Tank Farm FS-0601-1D-4" 1/1 FW-354 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

3892 Tank Farm FS-0601-1D-4" 1/1 FW-353 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

3893 Tank Farm FS-0701-1D-4" 1/1 FW-421 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

3894 Tank Farm FS-0701-1D-4" 1/1 FW-420 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3895 Tank Farm FW-0006-1C-14" 2/2 FW-37 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3896 Tank Farm FW-0006-1C-14" 2/2 FW-42 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3897 Tank Farm FW-0006-1C-14" 2/2 FW-33 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3898 Tank Farm FW-0006-1C-14" 2/2 FW-34 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3899 Tank Farm FW-0009-1C-14" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/45Elbow

3900 Tank Farm FW-0009-1C-14" 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/45Elbow

3901 Tank Farm FW-0009-1C-14" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3902 Tank Farm FW-0302-1D-2½" 1/1 FW-168 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3903 Tank Farm FW-0302-1D-2½" 1/1 FW-165 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3904 Tank Farm FW-0302-1D-2½" 1/1 FW-166 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3905 Tank Farm FW-0302-1D-2½" 1/1 FW-167 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3906 Tank Farm FW-0303-1D-2½" 1/1 FW-194 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3907 Tank Farm FW-0303-1D-2½" 1/1 FW-193 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3908 Tank Farm FW-0303-1D-2½" 1/1 FW-195 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3909 Tank Farm FW-0303-1D-2½" 1/1 FW-192 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3910 Tank Farm FW-0304-1D-2½" 1/1 FW-222 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3911 Tank Farm FW-0304-1D-2½" 1/1 FW-221 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3912 Tank Farm FW-0304-1D-2½" 1/1 FW-220 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3913 Tank Farm FW-0304-1D-2½" 1/1 FW-219 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3914 Tank Farm FW-0305-1D-2½" 1/1 FW-249 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3915 Tank Farm FW-0305-1D-2½" 1/1 FW-248 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3916 Tank Farm FW-0305-1D-2½" 1/1 FW-247 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3917 Tank Farm FW-0305-1D-2½" 1/1 FW-246 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3918 Tank Farm FW-0306-1D-2½" 1/1 FW-276 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3919 Tank Farm FW-0306-1D-2½" 1/1 FW-273 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3920 Tank Farm FW-0306-1D-2½" 1/1 FW-275 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3921 Tank Farm FW-0306-1D-2½" 1/1 FW-274 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3922 Tank Farm FW-0402-1D-2½" 1/1 FW-324 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3923 Tank Farm FW-0402-1D-2½" 1/1 FW-325 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3924 Tank Farm FW-0402-1D-2½" 1/1 FW-326 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3925 Tank Farm FW-0402-1D-2½" 1/1 FW-323 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3926 Tank Farm FW-0403-1D-2½" 1/1 FW-352 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3927 Tank Farm FW-0403-1D-2½" 1/1 FW-355 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3928 Tank Farm FW-0403-1D-2½" 1/1 FW-353 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3929 Tank Farm FW-0403-1D-2½" 1/1 FW-354 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3930 Tank Farm FW-0404-1D-2½" 1/1 FW-382 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3931 Tank Farm FW-0404-1D-2½" 1/1 FW-383 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3932 Tank Farm FW-0404-1D-2½" 1/1 FW-384 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3933 Tank Farm FW-0404-1D-2½" 1/1 FW-381 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3934 Tank Farm FW-0405-1D-2½" 1/1 FW-410 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3935 Tank Farm FW-0405-1D-2½" 1/1 FW-413 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3936 Tank Farm FW-0405-1D-2½" 1/1 FW-412 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3937 Tank Farm FW-0405-1D-2½" 1/1 FW-411 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3938 Tank Farm FW-0406-1D-2½" 1/1 FW-440 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3939 Tank Farm FW-0406-1D-2½" 1/1 FW-441 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3940 Tank Farm FW-0406-1D-2½" 1/1 FW-439 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3941 Tank Farm FW-0406-1D-2½" 1/1 FW-442 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3942 Tank Farm FW-0502-1D-2½" 1/1 FW-494 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3943 Tank Farm FW-0502-1D-2½" 1/1 FW-491 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3944 Tank Farm FW-0502-1D-2½" 1/1 FW-492 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3945 Tank Farm FW-0502-1D-2½" 1/1 FW-493 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3946 Tank Farm FW-0503-1D-2½" 1/1 FW-517 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3947 Tank Farm FW-0503-1D-2½" 1/1 FW-518 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3948 Tank Farm FW-0503-1D-2½" 1/1 FW-516 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3949 Tank Farm FW-0503-1D-2½" 1/1 FW-519 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3950 Tank Farm FW-0504-1D-2½" 1/1 FW-541 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3951 Tank Farm FW-0504-1D-2½" 1/1 FW-544 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3952 Tank Farm FW-0504-1D-2½" 1/1 FW-542 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3953 Tank Farm FW-0504-1D-2½" 1/1 FW-543 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3954 Tank Farm FW-0505-1D-2½" 1/1 FW-568 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3955 Tank Farm FW-0505-1D-2½" 1/1 FW-567 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3956 Tank Farm FW-0505-1D-2½" 1/1 FW-566 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3957 Tank Farm FW-0505-1D-2½" 1/1 FW-569 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3958 Tank Farm FW-0506-1D-2½" 1/1 FW-594 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3959 Tank Farm FW-0506-1D-2½" 1/1 FW-591 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

3960 Tank Farm FW-0506-1D-2½" 1/1 FW-592 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3961 Tank Farm FW-0506-1D-2½" 1/1 FW-593 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

3962 Tank Farm FW-0003b-1C-14" 1/1 FW-5A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

3963 Tank Farm FW-0006-1C-14" 2/2 FW-32 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

3964 Tank Farm PW-6001-1B-8" 2/2 FW-36A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

3965 Tank Farm PW-6001-1B-8" 2/2 FW-36F BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

3966 Tank Farm PW-6001-1B-8" 2/2 FW-36E BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

3967 Tank Farm FW-0009-1C-14" 1/1 FW-22 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

3968 Tank Farm FW-0007-1C-14" 1/1 FW-2B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Pipe

3969 Tank Farm FW-0006-1C-14" 2/2 FW-31 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

3970 Tank Farm FW-0006-1C-14" 2/2 FW-30 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3971 Tank Farm FW-0006-1C-14" 2/2 FW-35 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3972 Tank Farm FW-0008-1C-14" 1/2 FW-1B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

3973 Tank Farm FW-0008-1C-14" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

3974 Tank Farm FW-0009-1C-14" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3975 Tank Farm FW-0009-1C-14" 1/1 FW-27A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/45Elbow

3976 Tank Farm PW-6001-1B-8" 2/2 FW-35 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

3977 Tank Farm PW-6001-1B-8" 2/2 FW-36 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

3978 Tank Farm PW-6001-1B-8" 2/2 FW-36B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

3979 Tank Farm PW-6001-1B-8" 2/2 FW-36D BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

3980 Tank Farm PW-6001-1B-8" 2/2 FW-36G BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

3981 Tank Farm PW-6001-1B-8" 2/2 FW-36I BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

3982 Tank Farm PW-6001-1B-8" 2/2 FW-36K BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3983 Tank Farm PW-6001-1B-8" 2/2 FW-36M BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

3984 Tank Farm FW-0001-1C-14" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

3985 Tank Farm FW-0011-1C-14" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3986 Tank Farm FW-0011-1C-14" 1/1 RW-19 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

3987 Tank Farm FW-0001-1C-14" 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

3988 Tank Farm FW-0001-1C-14" 1/1 RW-01 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

3989 Tank Farm FW-0006-1C-14" 1/2 FW-22 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

3990 Tank Farm FW-0002-1C-14" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/45Elbow

3991 Tank Farm FW-0003-1C-14" 1/1 FW-1C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

3992 Tank Farm PW-6001-1B-8" 2/2 FW-33 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

3993 Tank Farm PW-6001-1B-8" 2/2 FW-34 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
3994 Tank Farm PW-6001-1B-8" 2/2 FW-32A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

3995 Tank Farm PW-6001-1B-8" 2/2 FW-34A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

3996 Tank Farm PW-6001-1B-8" 2/2 FW-34B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

3997 Tank Farm PW-6001-1B-8" 2/2 FW-36R BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

3998 Tank Farm FW-0009-1C-14" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

3999 Tank Farm PW-6001-1B-8" 2/2 FW-36H BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4000 Tank Farm PW-6001-1B-8" 2/2 FW-36J BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4001 Tank Farm FW-0009-1C-14" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4002 Tank Farm FW-0009-1C-14" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4003 Tank Farm FW-0009-1C-14" 1/1 FW-22A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4004 Tank Farm PW-6001-1B-8" 2/2 FW-36L BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4005 Tank Farm FW-0009-1C-14" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

4006 Tank Farm FW-0009-1C-14" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

4007 Tank Farm FW-0009-1C-14" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4008 Tank Farm FW-0006-1C-14" 1/2 FW-26 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4009 Tank Farm FW-0001-1C-14" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4010 Tank Farm FW-0003b-1C-14" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4011 Tank Farm FW-0003b-1C-14" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4012 Tank Farm FW-0003b-1C-14" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

4013 Tank Farm FW-0009-1C-14" 1/1 FW-8B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4014 Tank Farm FW-0008-1C-14" 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4015 Tank Farm FW-0003b-1C-14" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A234 Tee/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4016 Tank Farm FW-0006-1C-14" 2/2 FW-36 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4017 Tank Farm FW-0006-1C-14" 2/2 FW-35A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

4018 Tank Farm FW-0302-1D-2½" 1/1 FW-171 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4019 Tank Farm FW-0302-1D-2½" 1/1 FW-174 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4020 Tank Farm FW-0302-1D-2½" 1/1 FW-185 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4021 Tank Farm FW-0302-1D-2½" 1/1 FW-188 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4022 Tank Farm FW-0302-1D-2½" 1/1 FW-172 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4023 Tank Farm FW-0302-1D-2½" 1/1 FW-173 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4024 Tank Farm FW-0302-1D-2½" 1/1 FW-186 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4025 Tank Farm FW-0302-1D-2½" 1/1 FW-187 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4026 Tank Farm FW-0303-1D-2½" 1/1 FW-198 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4027 Tank Farm FW-0303-1D-2½" 1/1 FW-201 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4028 Tank Farm FW-0303-1D-2½" 1/1 FW-212 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4029 Tank Farm FW-0303-1D-2½" 1/1 FW-215 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4030 Tank Farm FW-0303-1D-2½" 1/1 FW-199 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4031 Tank Farm FW-0303-1D-2½" 1/1 FW-200 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4032 Tank Farm FW-0303-1D-2½" 1/1 FW-213 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4033 Tank Farm FW-0303-1D-2½" 1/1 FW-214 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4034 Tank Farm FW-0304-1D-2½" 1/1 FW-225 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4035 Tank Farm FW-0304-1D-2½" 1/1 FW-226 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4036 Tank Farm FW-0304-1D-2½" 1/1 FW-227 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4037 Tank Farm FW-0304-1D-2½" 1/1 FW-228 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4038 Tank Farm FW-0304-1D-2½" 1/1 FW-239 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4039 Tank Farm FW-0304-1D-2½" 1/1 FW-240 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4040 Tank Farm FW-0304-1D-2½" 1/1 FW-241 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4041 Tank Farm FW-0304-1D-2½" 1/1 FW-242 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4042 Tank Farm FW-0305-1D-2½" 1/1 FW-252 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4043 Tank Farm FW-0305-1D-2½" 1/1 FW-253 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4044 Tank Farm FW-0305-1D-2½" 1/1 FW-254 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4045 Tank Farm FW-0305-1D-2½" 1/1 FW-255 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4046 Tank Farm FW-0305-1D-2½" 1/1 FW-266 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4047 Tank Farm FW-0305-1D-2½" 1/1 FW-267 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4048 Tank Farm FW-0305-1D-2½" 1/1 FW-268 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4049 Tank Farm FW-0305-1D-2½" 1/1 FW-269 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4050 Tank Farm FW-0306-1D-2½" 1/1 FW-279 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4051 Tank Farm FW-0306-1D-2½" 1/1 FW-280 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4052 Tank Farm FW-0306-1D-2½" 1/1 FW-281 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4053 Tank Farm FW-0306-1D-2½" 1/1 FW-282 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4054 Tank Farm FW-0306-1D-2½" 1/1 FW-293 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4055 Tank Farm FW-0306-1D-2½" 1/1 FW-294 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4056 Tank Farm FW-0306-1D-2½" 1/1 FW-295 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4057 Tank Farm FW-0306-1D-2½" 1/1 FW-296 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4058 Tank Farm FW-0502-1D-2½" 1/1 FW-496 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4059 Tank Farm FW-0502-1D-2½" 1/1 FW-497 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4060 Tank Farm FW-0502-1D-2½" 1/1 FW-498 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4061 Tank Farm FW-0502-1D-2½" 1/1 FW-499 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4062 Tank Farm FW-0502-1D-2½" 1/1 FW-509 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4063 Tank Farm FW-0502-1D-2½" 1/1 FW-510 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4064 Tank Farm FW-0502-1D-2½" 1/1 FW-511 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4065 Tank Farm FW-0502-1D-2½" 1/1 FW-512 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4066 Tank Farm FW-0503-1D-2½" 1/1 FW-522 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4067 Tank Farm FW-0503-1D-2½" 1/1 FW-523 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4068 Tank Farm FW-0503-1D-2½" 1/1 FW-524 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4069 Tank Farm FW-0503-1D-2½" 1/1 FW-525 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4070 Tank Farm FW-0503-1D-2½" 1/1 FW-534 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4071 Tank Farm FW-0503-1D-2½" 1/1 FW-535 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4072 Tank Farm FW-0503-1D-2½" 1/1 FW-536 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4073 Tank Farm FW-0503-1D-2½" 1/1 FW-537 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4074 Tank Farm FW-0504-1D-2½" 1/1 FW-547 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4075 Tank Farm FW-0504-1D-2½" 1/1 FW-548 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4076 Tank Farm FW-0504-1D-2½" 1/1 FW-549 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4077 Tank Farm FW-0504-1D-2½" 1/1 FW-550 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4078 Tank Farm FW-0504-1D-2½" 1/1 FW-559 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4079 Tank Farm FW-0504-1D-2½" 1/1 FW-560 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4080 Tank Farm FW-0504-1D-2½" 1/1 FW-561 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4081 Tank Farm FW-0504-1D-2½" 1/1 FW-562 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4082 Tank Farm FW-0505-1D-2½" 1/1 FW-572 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4083 Tank Farm FW-0505-1D-2½" 1/1 FW-573 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4084 Tank Farm FW-0505-1D-2½" 1/1 FW-574 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4085 Tank Farm FW-0505-1D-2½" 1/1 FW-575 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4086 Tank Farm FW-0505-1D-2½" 1/1 FW-584 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4087 Tank Farm FW-0505-1D-2½" 1/1 FW-587 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4088 Tank Farm FW-0505-1D-2½" 1/1 FW-585 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4089 Tank Farm FW-0505-1D-2½" 1/1 FW-586 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4090 Tank Farm FW-0506-1D-2½" 1/1 FW-597 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4091 Tank Farm FW-0506-1D-2½" 1/1 FW-598 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4092 Tank Farm FW-0506-1D-2½" 1/1 FW-599 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4093 Tank Farm FW-0506-1D-2½" 1/1 FW-600 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4094 Tank Farm DO-0021-1A-14" 2/2 FW-26A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

4095 Tank Farm FW-0402-1D-2½" 1/1 FW-329 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4096 Tank Farm FW-0402-1D-2½" 1/1 FW-332 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4097 Tank Farm FW-0402-1D-2½" 1/1 FW-330 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4098 Tank Farm FW-0402-1D-2½" 1/1 FW-331 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4099 Tank Farm FW-0402-1D-2½" 1/1 FW-346 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4100 Tank Farm FW-0402-1D-2½" 1/1 FW-347 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4101 Tank Farm FW-0402-1D-2½" 1/1 FW-348 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4102 Tank Farm FW-0402-1D-2½" 1/1 FW-345 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4103 Tank Farm FW-0403-1D-2½" 1/1 FW-358 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4104 Tank Farm FW-0403-1D-2½" 1/1 FW-359 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4105 Tank Farm FW-0403-1D-2½" 1/1 FW-360 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4106 Tank Farm FW-0403-1D-2½" 1/1 FW-361 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4107 Tank Farm FW-0403-1D-2½" 1/1 FW-374 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4108 Tank Farm FW-0403-1D-2½" 1/1 FW-375 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4109 Tank Farm FW-0403-1D-2½" 1/1 FW-376 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4110 Tank Farm FW-0403-1D-2½" 1/1 FW-377 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4111 Tank Farm FW-0404-1D-2½" 1/1 FW-387 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4112 Tank Farm FW-0404-1D-2½" 1/1 FW-390 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4113 Tank Farm FW-0404-1D-2½" 1/1 FW-388 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4114 Tank Farm FW-0404-1D-2½" 1/1 FW-389 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4115 Tank Farm FW-0404-1D-2½" 1/1 FW-403 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4116 Tank Farm FW-0404-1D-2½" 1/1 FW-404 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4117 Tank Farm FW-0404-1D-2½" 1/1 FW-405 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4118 Tank Farm FW-0404-1D-2½" 1/1 FW-406 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4119 Tank Farm FW-0405-1D-2½" 1/1 FW-416 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4120 Tank Farm FW-0405-1D-2½" 1/1 FW-417 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4121 Tank Farm FW-0405-1D-2½" 1/1 FW-418 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4122 Tank Farm FW-0405-1D-2½" 1/1 FW-419 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4123 Tank Farm FW-0405-1D-2½" 1/1 FW-432 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4124 Tank Farm FW-0405-1D-2½" 1/1 FW-433 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4125 Tank Farm FW-0405-1D-2½" 1/1 FW-434 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4126 Tank Farm FW-0405-1D-2½" 1/1 FW-435 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4127 Tank Farm FW-0406-1D-2½" 1/1 FW-445 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4128 Tank Farm FW-0406-1D-2½" 1/1 FW-448 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4129 Tank Farm FW-0406-1D-2½" 1/1 FW-446 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4130 Tank Farm FW-0406-1D-2½" 1/1 FW-447 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4131 Tank Farm FW-0406-1D-2½" 1/1 FW-461 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4132 Tank Farm FW-0406-1D-2½" 1/1 FW-462 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4133 Tank Farm FW-0406-1D-2½" 1/1 FW-463 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4134 Tank Farm FW-0406-1D-2½" 1/1 FW-464 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4135 Tank Farm FW-0003b-1C-14" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

4136 Tank Farm FW-0003b-1C-14" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4137 Tank Farm DO-0021-1A-14" 2/2 FW-22 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

4138 Tank Farm FW-0003-1C-14" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

4139 Tank Farm FW-0003-1C-14" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

4140 Tank Farm FW-0009-1C-14" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

4141 Tank Farm FW-0009-1C-14" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4142 Tank Farm DO-0021-1A-14" 1/2 FW-20 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

4143 Tank Farm DO-0021-1A-14" 1/2 FW-21 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

4144 Tank Farm MO-0023-1A-12" 2/2 FW-30A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

4145 Tank Farm FW-0008-1C-14" 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4146 Tank Farm FW-0008-1C-14" 1/2 FW-8A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4147 Tank Farm FW-0006-1C-14" 2/2 FW-29A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4148 Tank Farm FW-0010-1C-14" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4149 Tank Farm FW-0010-1C-14" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4150 Tank Farm MO-0023-1A-12" 2/2 FW-26B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

4151 Tank Farm MO-0063-1A-10" 2/2 FW-30 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

4152 Tank Farm MO-0094-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

4153 Tank Farm MO-0090-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

4154 Tank Farm FW-0010-1C-14" 1/1 FW-23B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4155 Tank Farm FW-0008-1C-14" 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4156 Tank Farm FW-0008-1C-14" 1/2 FW-6A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4157 Tank Farm FW-0008-1C-14" 1/2 FW-6B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4158 Tank Farm FW-0008-1C-14" 1/2 FW-6C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4159 Tank Farm DO-0021-1A-14" 1/2 FW-18 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

4160 Tank Farm FW-0005-1C-8" 1/1 FW-20C BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4161 Tank Farm FW-0005-1C-8" 1/1 FW-20B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4162 Tank Farm FW-0005-1C-8" 1/1 FW-20A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4163 Tank Farm FW-0007-1C-14" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

4164 Tank Farm FW-0008-1C-14" 1/2 FW-8B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4165 Tank Farm FW-0008-1C-14" 1/2 FW-10 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

4166 Tank Farm FW-0010-1C-14" 1/1 FW-9B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4167 Tank Farm DO-0021-1A-14" 1/2 FW-15 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

4168 Tank Farm FW-0008-1C-14" 1/2 FW-09 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

4169 Tank Farm MO-0063-1A-10" 2/2 FW-26A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4170 Tank Farm MO-0063-1A-10" 2/2 FW-29 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

4171 Tank Farm MO-0021-1A-16” 1/1 FW-27A BW WPS-2016-23 GTAW/SMAW 16" SCH20 A234/A234 Tee/Reducer

4172 Tank Farm MO-0021-1A-16” 1/1 FW-25A BW WPS-2016-23 GTAW/SMAW 16" SCH20 A234/A234 Tee/Reducer

4173 Tank Farm FW-6001-1B -16" 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee

4174 Tank Farm MO-0063-1A-10" 2/2 FW-27 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

4175 Tank Farm FW-6001-1B -16" 2/2 FW-16 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee

4176 Tank Farm DO-0015-1A-14” 1/2 FW-14A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A234 Tee/Reducer

4177 Tank Farm DO-0015-1A-14” 1/2 FW-1A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A234 Tee/Reducer

4178 Tank Farm DO-0015-1A-14” 1/2 FW-25A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A234 Tee/Reducer

4179 Tank Farm MO-0063-1A-10" 2/2 FW-26 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

4180 Tank Farm MO-0023-1A-12" 2/2 FW-26A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4181 Tank Farm MO-0082-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

4182 Tank Farm MO-0083-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

4183 Tank Farm MO-0021-1A-16” 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A106/A234 Pipe/90Elbow

4184 Tank Farm DO-0021-1A-14" 1/2 FW-14A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

4185 Tank Farm DO-0015-1A-14” 1/2 FW-22A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

4186 Tank Farm MO-0023-1A-12" 2/2 FW-25 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

4187 Tank Farm MO-0063-1A-10" 2/2 FW-25 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

4188 Tank Farm DO-0015-1A-14” 2/2 FW-27A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

4189 Tank Farm DO-0015-1A-14” 2/2 FW-27 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

4190 Tank Farm MO-0021-1A-16” 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 16" SCH20 A106/A106 Pipe/Pipe

4191 Tank Farm JF-0012-1A-10" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4192 Tank Farm MO-0062-1A-14” 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

4193 Tank Farm DO-0015-1A-14” 1/2 FW-19 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

4194 Tank Farm JF-0012-1A-10" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

4195 Tank Farm DO-0021-1A-14" 1/2 FW-17 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

4196 Tank Farm FW-6009-1B-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4197 Tank Farm FW-6002-1B-12" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/Tee

4198 Tank Farm FW-6009-1B-8" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Pipe

4199 Tank Farm FW-6003-1B-12" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/Tee

4200 Tank Farm FW-6009-1B-8" 1/1 FW-31A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4201 Tank Farm FW-6004-1B-12" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/Tee

4202 Tank Farm VL-0001-1A-10" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4203 Tank Farm FW-6005-1B-4" 1/1 FW-1A BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Weldolet

4204 Tank Farm FW-6006-1B-4" 1/1 FW-1A BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Weldolet

4205 Tank Farm VL-0001-1A-10" 1/1 FW-3A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

4206 Tank Farm FW-6001-1B -16" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/45Elbow

4207 Tank Farm MO-0127-1A-3" 1/1 FW-5B BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

4208 Tank Farm MO-0127-1A-3" 1/1 FW-5C BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

4209 Tank Farm MO-0127-1A-3" 1/1 FW-5D BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

4210 Tank Farm MO-0127-1A-3" 1/1 FW-5A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

4211 Tank Farm DO-0004-1A-2" 1/2 FW-4A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4212 Tank Farm JF-0044-1A-2" 1/2 FW-4D BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4213 Tank Farm MO-0008-1A-2" 2/2 FW-32A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4214 Tank Farm JF-0004-1A-2" 1/1 FW-12A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4215 Tank Farm MO-0043-1A-8" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

4216 Tank Farm MO-0043-1A-8" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

4217 Tank Farm MO-0043-1A-8" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

4218 Tank Farm FW-6201-1B-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

4219 Tank Farm FW-6201-1B-8" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

4220 Tank Farm JF-0044-1A-2" 1/2 FW-4A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4221 Tank Farm MO-0008-1A-2" 2/2 FW-32C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4222 Tank Farm JF-0004-1A-2" 1/1 FW-12D BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4223 Tank Farm FW-6003-1B-12" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/45Elbow

4224 Tank Farm FW-6004-1B-12" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4225 Tank Farm FW-6002-1B-12" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/45Elbow

4226 Tank Farm DO-0004-1A-2" 1/2 FW-17A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4227 Tank Farm MO-0008-1A-2" 1/2 FW-2B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4228 Tank Farm JF-0004-1A-2" 1/1 FW-2B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4229 Tank Farm MO-0008-1A-2" 1/2 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4230 Tank Farm JF-0004-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4231 Tank Farm DO-0004-1A-2" 1/2 FW-18 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4232 Tank Farm MO-0043-1A-8" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

4233 Tank Farm MO-0091-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

4234 Tank Farm MO-0095-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

4235 Tank Farm VL-0001-1A-10" 1/1 FW-02 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4236 Tank Farm VL-0001-1A-10" 1/1 FW-03 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

4237 Tank Farm VL-0001-1A-10" 1/1 FW-04 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

4238 Tank Farm VL-0001-1A-10" 1/1 FW-05 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

4239 Tank Farm MO-0021-1A-16” 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A106/A234 Pipe/90Elbow

4240 Tank Farm MO-0021-1A-16” 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A106/A234 Pipe/90Elbow

4241 Tank Farm DO-0004-1A-2" 1/2 FW-17C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4242 Tank Farm JF-0004-1A-2" 1/1 FW-2C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4243 Tank Farm MO-0008-1A-2" 1/2 FW-2C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4244 Tank Farm MO-0021-1A-16” 1/1 FW-7B BW WPS-2016-23 GTAW/SMAW 16" SCH20 A106/A106 Pipe/Pipe

4245 Tank Farm DO-0015-1A-14” 1/2 FW-22B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

4246 Tank Farm FW-6003-1B-12" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4247 Tank Farm FW-6002-1B-12" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/45Elbow

4248 Tank Farm FW-6002-1B-12" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A105 Pipe/Flange

4249 Tank Farm FW-6003-1B-12" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A105 Pipe/Flange

4250 Tank Farm FW-6004-1B-12" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/45Elbow

4251 Tank Farm FW-6004-1B-12" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A105 Pipe/Flange

4252 Tank Farm JF-0012-1A-10" 1/1 FW-6B BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

4253 Tank Farm DO-0004-1A-2" 1/2 FW-19A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4254 Tank Farm DO-0004-1A-2" 1/2 FW-19B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4255 Tank Farm DO-0004-1A-2" 1/2 FW-19C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4256 Tank Farm DO-0004-1A-2" 1/2 FW-19D BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4257 Tank Farm JF-0004-1A-2" 1/1 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4258 Tank Farm JF-0004-1A-2" 1/1 FW-1B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4259 Tank Farm JF-0004-1A-2" 1/1 FW-1C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4260 Tank Farm JF-0004-1A-2" 1/1 FW-1D BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4261 Tank Farm MO-0008-1A-2" 1/2 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4262 Tank Farm MO-0008-1A-2" 1/2 FW-1B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4263 Tank Farm MO-0008-1A-2" 1/2 FW-1C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4264 Tank Farm MO-0008-1A-2" 1/2 FW-1D BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4265 Tank Farm MO-0126-1A-3" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/Tee

4266 Tank Farm MO-0126-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4267 Tank Farm MO-0126-1A-3" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

4268 Tank Farm MO-0126-1A-3" 1/1 FW-4B BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4269 Tank Farm MO-0126-1A-3" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

4270 Tank Farm VL-0007-1A-3" 1/1 FW-13 BRW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Weldolet

4271 Tank Farm VL-0009-1A-3" 1/1 FW-13 BRW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Weldolet

4272 Tank Farm VL-0010-1A-3" 1/1 FW-13 BRW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Weldolet

4273 Tank Farm VL-0011-1A-3" 1/1 FW-13 BRW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Weldolet

4274 Tank Farm VL-0001-1A-10" 1/1 FW-06 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

4275 Tank Farm VL-0005-1A-3" 1/1 FW-13 BRW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Weldolet

4276 Tank Farm MO-0040-1A-10” 1/1 FW-3B BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

4277 Tank Farm DO-0004-1A-2" 1/2 FW-16 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4278 Tank Farm DO-0004-1A-2" 1/2 FW-17 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4279 Tank Farm JF-0004-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4280 Tank Farm JF-0004-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4281 Tank Farm MO-0008-1A-2" 1/2 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4282 Tank Farm MO-0008-1A-2" 1/2 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4283 Tank Farm MO-0008-1A-2" 1/2 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4284 Tank Farm MO-0008-1A-2" 1/2 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4285 Tank Farm MO-0126-1A-3" 1/1 FW-15A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/45Elbow

4286 Tank Farm MO-0126-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4287 Tank Farm MO-0126-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4288 Tank Farm MO-0126-1A-3" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/Tee

4289 Tank Farm DO-0015-1A-14” 1/2 FW-22 BW WPS-2016-23 GTAW/SMAW 14" SCH40 A106/A234 Pipe/90Elbow

4290 Tank Farm FW-6001-1B -16" 2/2 FW-18 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4291 Tank Farm JF-0020-1A-8" 1/1 FW-34A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

4292 Tank Farm JF-0020-1A-8" 1/1 FW-33 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

4293 Tank Farm JF-0020-1A-8" 1/1 FW-36A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Reducer

4294 Tank Farm JF-0020-1A-8" 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

4295 Tank Farm DO-0004-1A-2" 2/2 FW-24 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4296 Tank Farm DO-0004-1A-2" 2/2 FW-23 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4297 Tank Farm MO-0062-1A-14” 1/1 FW-7B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

4298 Tank Farm MO-0043-1A-8" 1/1 FW-21C BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

4299 Tank Farm VL-0001-1A-10" 1/1 FW-7C BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

4300 Tank Farm JF-0002-1A-12” 1/2 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4301 Tank Farm JF-0002-1A-12” 1/2 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4302 Tank Farm JF-0002-1A-12” 1/2 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

4303 Tank Farm DO-0002-1A-12” 1/2 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4304 Tank Farm DO-0002-1A-12” 1/2 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4305 Tank Farm DO-0002-1A-12” 1/2 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

4306 Tank Farm MO-0002-1A-12" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4307 Tank Farm MO-0002-1A-12" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4308 Tank Farm MO-0002-1A-12" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

4309 Tank Farm FW-6017-1B-8" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4310 Tank Farm FW-6017-1B-8" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

4311 Tank Farm FW-6013-1B-8" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

4312 Tank Farm FW-6013-1B-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4313 Tank Farm JF-0020-1A-8" 1/1 FW-34 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4314 Tank Farm MO-0022-1A-8” 3/4 FW-54 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

4315 Tank Farm JF-0020-1A-8" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

4316 Tank Farm MO-0021-1A-16” 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A106/A234 Pipe/90Elbow

4317 Tank Farm MO-0021-1A-16” 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A106/A234 Pipe/90Elbow

4318 Tank Farm MO-0022-1A-8” 3/4 FW-52 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

4319 Tank Farm MO-0022-1A-8” 3/4 FW-53 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

4320 Tank Farm MO-0022-1A-8” 4/4 FW-71 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

4321 Tank Farm MO-0022-1A-8” 3/4 FW-55 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 Tee/Reducer

4322 Tank Farm MO-0008-1A-2" 2/2 FW-28 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4323 Tank Farm MO-0008-1A-2" 2/2 FW-29 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4324 Tank Farm JF-0004-1A-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4325 Tank Farm JF-0004-1A-2" 1/1 FW-11 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4326 Tank Farm DO-0004-1A-2" 1/2 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4327 Tank Farm DO-0004-1A-2" 1/2 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4328 Tank Farm SA-0001-1B-2" 1/4 FW-18 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4329 Tank Farm SA-0001-1B-2" 1/4 FW-19 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4330 Tank Farm JF-0004-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4331 Tank Farm JF-0004-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4332 Tank Farm JF-0012-1A-10" 1/1 FW-4B BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

4333 Tank Farm MO-0022-1A-8” 1/4 FW-16A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

4334 Tank Farm JF-0020-1A-8" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4335 Tank Farm FW-6201-1B-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4336 Tank Farm VL-0001-1A-10" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

4337 Tank Farm DO-0015-1A-14” 2/2 FW-29 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

4338 Tank Farm FW-6016-1B-10" 1/1 FW-26A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

4339 Tank Farm FW-6012-1B-10" 1/1 FW-26A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

4340 Tank Farm FW-6008-1B-10" 1/1 FW-26A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

4341 Tank Farm FW-6019-1B-3" 1/1 FW-25A BRW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Weldolet

4342 Tank Farm MO-0008-1A-2" 2/2 FW-31 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4343 Tank Farm MO-0008-1A-2" 2/2 FW-30 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4344 Tank Farm MO-0008-1A-2" 1/2 FW-11 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4345 Tank Farm MO-0008-1A-2" 1/2 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4346 Tank Farm MO-0008-1A-2" 1/2 FW-13 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4347 Tank Farm DO-0004-1A-2" 1/2 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4348 Tank Farm JF-0044-1A-2" 1/2 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4349 Tank Farm JF-0044-1A-2" 1/2 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4350 Tank Farm SA-0001-1B-2" 2/4 FW-21 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4351 Tank Farm SA-0001-1B-2" 2/4 FW-22 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4352 Tank Farm SA-0001-1B-2" 2/4 FW-23 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4353 Tank Farm JF-0013-1A-8” 1/1 FW-12A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

4354 Tank Farm DO-0016-1A-8” 1/1 FW-8A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

4355 Tank Farm JF-0012-1A-10" 1/1 FW-4C BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

4356 Tank Farm VL-0001-1A-10" 1/1 FW-13A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4357 Tank Farm VL-0001-1A-10" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

4358 Tank Farm SA-0001a-1B-2" 2/2 FW-21 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4359 Tank Farm SA-0001a-1B-2" 2/2 FW-21A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4360 Tank Farm SA-0001a-1B-2" 2/2 FW-21B BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4361 Tank Farm SA-0001a-1B-2" 2/2 FW-15 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4362 Tank Farm SA-0001a-1B-2" 2/2 FW-19 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4363 Tank Farm SA-0001a-1B-2" 2/2 FW-19A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4364 Tank Farm SA-0001a-1B-2" 2/2 FW-19B BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4365 Tank Farm SA-0001a-1B-2" 2/2 FW-19C BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4366 Tank Farm SA-0001a-1B-2" 2/2 FW-18 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4367 Tank Farm SA-0001a-1B-2" 2/2 FW-17A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4368 Tank Farm SA-0001a-1B-2" 2/2 FW-17B BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4369 Tank Farm SA-0001a-1B-2" 2/2 FW-17C BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4370 Tank Farm SA-0001a-1B-2" 2/2 FW-17D BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4371 Tank Farm SA-0001a-1B-2" 2/2 FW-16 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4372 Tank Farm FW-6023-1B-14" 1/1 FW-08 BRW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Weldolet

4373 Tank Farm FW-6015-1B-10" 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

4374 Tank Farm FW-6011-1B-10" 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

4375 Tank Farm FW-6007-1B 10" 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

4376 Tank Farm DO-0004-1A-2" 1/2 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4377 Tank Farm DO-0004-1A-2" 1/2 FW-11 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4378 Tank Farm DO-0004-1A-2" 1/2 FW-11A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4379 Tank Farm JF-0004-1A-2" 1/1 FW-2A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4380 Tank Farm JF-0004-1A-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4381 Tank Farm SA-0001-1B-2" 2/4 FW-20 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4382 Tank Farm MO-0062-1A-14” 1/1 FW-5C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

4383 Tank Farm MO-0022-1A-8” 1/4 FW-16B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

4384 Tank Farm DO-0016-1A-8” 1/1 FW-8B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

4385 Tank Farm JF-0013-1A-8” 1/1 FW-12B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

4386 Tank Farm FW-6008-1B-10" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

4387 Tank Farm FW-6016-1B-10" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 10" SCH40 A53/A234 Pipe/45Elbow

4388 Tank Farm FW-6012-1B-10" 1/1 FW-25 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/45Elbow

4389 Tank Farm JF-0012-1A-10" 1/1 FW-4D BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4390 Tank Farm DO-0015-1A-14” 2/2 FW-31C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

4391 Tank Farm DO-0015-1A-14” 2/2 FW-31B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

4392 Tank Farm DO-0002-1A-12” 1/2 FW-05 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

4393 Tank Farm JF-0002-1A-12” 1/2 FW-05 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

4394 Tank Farm MO-0002-1A-12" 1/1 FW-04 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

4395 Tank Farm FW-0005-1C-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

4396 Tank Farm FW-0005-1C-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4397 Tank Farm FW-0005-1C-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4398 Tank Farm FW-0005-1C-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4399 Tank Farm FW-0005-1C-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4400 Tank Farm FW-6010-1B-10" 2/2 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4401 Tank Farm FW-6014-1B-10" 1/1 FW-12A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

4402 Tank Farm FW-6018-1B-10" 1/1 FW-12A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

4403 Tank Farm DO-0054-1A-14" 1/3 FW-16 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

4404 Tank Farm JF-0012-1A-10" 1/1 FW-4F BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

4405 Tank Farm SA-0001a-1B-2" 1/2 FW-13 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4406 Tank Farm SA-0001a-1B-2" 1/2 FW-12A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4407 Tank Farm SA-0001a-1B-2" 1/2 FW-11 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4408 Tank Farm SA-0001a-1B-2" 1/2 FW-8D BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4409 Tank Farm SA-0001a-1B-2" 1/2 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4410 Tank Farm SA-0001a-1B-2" 1/2 FW-8B BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4411 Tank Farm SA-0001a-1B-2" 1/2 FW-8A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4412 Tank Farm SA-0001a-1B-2" 1/2 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4413 Tank Farm SA-0001a-1B-2" 1/2 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4414 Tank Farm SA-0001a-1B-2" 1/2 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/45Elbow

4415 Tank Farm SA-0001a-1B-2" 1/2 FW-4A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4416 Tank Farm SA-0001a-1B-2" 1/2 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4417 Tank Farm SA-0001a-1B-2" 1/2 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4418 Tank Farm SA-0001a-1B-2" 1/2 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/45Elbow

4419 Tank Farm FW-6008-1B-10" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

4420 Tank Farm FW-6012-1B-10" 1/1 FW-24 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4421 Tank Farm FW-6016-1B-10" 1/1 FW-24 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

4422 Tank Farm FW-0005-1C-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 Tee/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4423 Tank Farm FW-0017-1C-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH20 A53/A234 Pipe/90Elbow

4424 Tank Farm FW-0018-1C-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH20 A53/A53 Pipe/Pipe

4425 Tank Farm FW-0018-1C-6" 1/1 FW-2A BW WPS-2016-23 GTAW/SMAW 6" SCH20 A53/A53 Pipe/Pipe

4426 Tank Farm FW-0018-1C-6" 1/1 FW-2C BW WPS-2016-23 GTAW/SMAW 6" SCH20 A53/A53 Pipe/Pipe

4427 Tank Farm MO-0021-1A-16” 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A106/A234 Pipe/90Elbow

4428 Tank Farm JF-0013-1A-8” 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

4429 Tank Farm JF-0013-1A-8” 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

4430 Tank Farm DO-0001-1A-12” 7/7 FW-99 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

4431 Tank Farm DO-0001-1A-12” 7/7 FW-98 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

4432 Tank Farm JF-0001-1A-12” 6/7 FW-77A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

4433 Tank Farm JF-0001-1A-12” 7/7 FW-97 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4434 Tank Farm MO-0001-1A-12” 7/7 FW-101 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

4435 Tank Farm MO-0001-1A-12” 7/7 FW-102 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

4436 Tank Farm FW-0007-1C-14" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

4437 Tank Farm MO-0040-1A-10” 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

4438 Tank Farm FW-0007-1C-14" 1/1 FW-2A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4439 Tank Farm MO-0062-1A-14” 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

4440 Tank Farm JF-0044-1A-2" 1/2 FW-10E BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4441 Tank Farm JF-0044-1A-2" 1/2 FW-10F BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4442 Tank Farm JF-0044-1A-2" 1/2 FW-10G BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4443 Tank Farm JF-0044-1A-2" 1/2 FW-10H BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4444 Tank Farm JF-0044-1A-2" 1/2 FW-10J BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4445 Tank Farm JF-0044-1A-2" 1/2 FW-10K BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4446 Tank Farm JF-0044-1A-2" 1/2 FW-10C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4447 Tank Farm DO-0004-1A-2" 2/2 FW-21A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4448 Tank Farm SA-0001-1B-2" 1/4 FW-16B BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4449 Tank Farm SA-0001-1B-2" 2/4 FW-28 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4450 Tank Farm SA-0001-1B-2" 2/4 FW-30 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4451 Tank Farm SA-0001-1B-2" 2/4 FW-32 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4452 Tank Farm SA-0001-1B-2" 3/4 FW-34 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4453 Tank Farm SA-0001-1B-2" 3/4 FW-39 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4454 Tank Farm SA-0001-1B-2" 3/4 FW-37 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4455 Tank Farm SA-0001-1B-2" 3/4 FW-42 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4456 Tank Farm FW-0005-1C-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

4457 Tank Farm FW-0005-1C-8" 1/1 FW-16A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4458 Tank Farm FW-0005-1C-8" 1/1 FW-16B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4459 Tank Farm FW-0005-1C-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4460 Tank Farm FW-0005-1C-8" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

4461 Tank Farm FW-0005-1C-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4462 Tank Farm FW-0004-1C-8" 1/1 FW-8H BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4463 Tank Farm PW-5416-1S2-2" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

4464 Tank Farm PW-5416-1S2-2" 1/1 FW-07 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

4465 Tank Farm PW-5416-1S2-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

4466 Tank Farm PW-5416-1S2-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4467 Tank Farm PW-5416-1S2-2" 1/1 FW-4A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4468 Tank Farm PW-5416-1S2-2" 1/1 FW-4B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4469 Tank Farm PW-5416-1S2-2" 1/1 FW-4C BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4470 Tank Farm SA-0002-1B-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4471 Tank Farm SA-0003-1B-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4472 Tank Farm SA-0003-1B-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4473 Tank Farm SA-0003-1B-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4474 Tank Farm SA-0003-1B-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4475 Tank Farm SA-0004-1B-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4476 Tank Farm SA-0004-1B-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4477 Tank Farm SA-0004-1B-2" 1/1 FW-08 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4478 Tank Farm SA-0004-1B-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4479 Tank Farm SA-0004-1B-2" 1/1 FW-21 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4480 Tank Farm SA-0004-1B-2" 1/1 FW-26 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4481 Tank Farm SA-0001-1B-2" 2/4 FW-31 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4482 Tank Farm SA-0001-1B-2" 2/4 FW-30A BW WPS-2016-21 GTAW 2" SCH20 A53/A53 Pipe/Pipe

4483 Tank Farm SA-0001-1B-2" 2/4 FW-30B BW WPS-2016-21 GTAW 2" SCH20 A53/A53 Pipe/Pipe

4484 Tank Farm SA-0001-1B-2" 2/4 FW-29 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4485 Tank Farm SA-0001-1B-2" 2/4 FW-28A BW WPS-2016-21 GTAW 2" SCH20 A53/A53 Pipe/Pipe

4486 Tank Farm SA-0001-1B-2" 2/4 FW-28B BW WPS-2016-21 GTAW 2" SCH20 A53/A53 Pipe/Pipe

4487 Tank Farm SA-0001-1B-2" 2/4 FW-27 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4488 Tank Farm SA-0001-1B-2" 2/4 FW-25 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4489 Tank Farm SA-0001-1B-2" 2/4 FW-26A BW WPS-2016-21 GTAW 2" SCH20 A53/A53 Pipe/Pipe

4490 Tank Farm SA-0001-1B-2" 2/4 FW-26B BW WPS-2016-21 GTAW 2" SCH20 A53/A53 Pipe/Pipe

4491 Tank Farm SA-0001-1B-2" 2/4 FW-26C BW WPS-2016-21 GTAW 2" SCH20 A53/A53 Pipe/Pipe

4492 Tank Farm SA-0001-1B-2" 2/4 FW-26D BW WPS-2016-21 GTAW 2" SCH20 A53/A53 Pipe/Pipe

4493 Tank Farm SA-0001-1B-2" 1/4 FW-16C BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4494 Tank Farm SA-0005-1B-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4495 Tank Farm SA-0005-1B-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4496 Tank Farm SA-0005-1B-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4497 Tank Farm SA-0005-1B-2" 1/1 FW-21 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4498 Tank Farm SA-0005-1B-2" 1/1 FW-26 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4499 Tank Farm SA-0005-1B-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4500 Tank Farm SA-0005-1B-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4501 Tank Farm SA-0005-1B-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4502 Tank Farm SA-0004-1B-2" 1/1 FW-07 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4503 Tank Farm SA-0004-1B-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4504 Tank Farm SA-0004-1B-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4505 Tank Farm SA-0004-1B-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4506 Tank Farm MO-0126-1A-3" 1/1 FW-10A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

4507 Tank Farm MO-0126-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4508 Tank Farm MO-0126-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4509 Tank Farm MO-0126-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4510 Tank Farm MO-0122-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4511 Tank Farm MO-0122-1A-3" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4512 Tank Farm FW-0004-1C-8" 1/1 FW-2A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4513 Tank Farm MO-0127-1A-3" 1/1 FW-7C BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

4514 Tank Farm MO-0127-1A-3" 1/1 FW-7B BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

4515 Tank Farm MO-0127-1A-3" 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

4516 Tank Farm MO-0127-1A-3" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4517 Tank Farm SA-0001-1B-2" 1/4 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4518 Tank Farm FW-0007-1C-14" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

4519 Tank Farm FW-0007-1C-14" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

4520 Tank Farm DO-0015-1A-14” 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A105 Pipe/Flange

4521 Tank Farm SA-0002-1B-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4522 Tank Farm SA-0002-1B-2" 1/1 FW-21 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4523 Tank Farm SA-0002-1B-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4524 Tank Farm DO-0004-1A-2" 2/2 FW-21B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4525 Tank Farm DO-0004-1A-2" 2/2 FW-21C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4526 Tank Farm DO-0004-1A-2" 2/2 FW-22 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4527 Tank Farm MO-0062-1A-14” 1/1 FW-23A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A234 Tee/Reducer

4528 Tank Farm MO-0062-1A-14” 1/1 FW-10A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A234 Tee/Reducer

4529 Tank Farm DO-0015-1A-14” 1/2 FW-16 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

4530 Tank Farm MO-0062-1A-14” 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

4531 Tank Farm FW-0007-1C-14" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

4532 Tank Farm FW-0008-1C-14" 2/2 FW-18E BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4533 Tank Farm FW-0008-1C-14" 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4534 Tank Farm JF-0012-1A-10" 1/1 FW-22A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A234/A234 90Elbow/Reducer

4535 Tank Farm JF-0012-1A-10" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A234/A234 Tee/Reducer

4536 Tank Farm DO-0001-1A-12” 7/7 FW-102 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

4537 Tank Farm JF-0001-1A-12” 7/7 FW-100 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

4538 Tank Farm MO-0001-1A-12” 7/7 FW-101A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

4539 Tank Farm MO-0062-1A-14” 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

4540 Tank Farm AD-0001-1S1-2" 1/2 FW-3A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4541 Tank Farm AD-0001-1S1-2" 1/2 FW-5A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4542 Tank Farm AD-0001-1S1-2" 1/2 FW-7A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4543 Tank Farm AD-0001-1S1-2" 1/2 FW-9A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4544 Tank Farm AD-0002-1S1-2" 1/2 FW-3A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4545 Tank Farm AD-0002-1S1-2" 1/2 FW-5A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4546 Tank Farm AD-0002-1S1-2" 1/2 FW-7A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4547 Tank Farm AD-0002-1S1-2" 1/2 FW-9A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4548 Tank Farm AD-0003-1S1-2" 1/2 FW-3A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4549 Tank Farm AD-0003-1S1-2" 1/2 FW-5A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4550 Tank Farm DO-0001-1A-12” 7/7 FW-85 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A234 Pipe/90Elbow

4551 Tank Farm DO-0001-1A-12” 7/7 FW-100A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

4552 Tank Farm JF-0001-1A-12” 7/7 FW-94 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/scokolet

4553 Tank Farm JF-0001-1A-12” 7/7 FW-98A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

4554 Tank Farm MO-0001-1A-12” 7/7 FW-92 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4555 Tank Farm MO-0001-1A-12” 7/7 FW-103A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

4556 Tank Farm SA-0001-1B-2" 3/4 FW-38 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4557 Tank Farm SA-0002-1B-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4558 Tank Farm SA-0002-1B-2" 1/1 FW-07 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4559 Tank Farm SA-0002-1B-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4560 Tank Farm SA-0002-1B-2" 1/1 FW-26 BW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4561 Tank Farm SA-0003-1B-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4562 Tank Farm SA-0003-1B-2" 1/1 FW-07 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4563 Tank Farm SA-0003-1B-2" 1/1 FW-08 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4564 Tank Farm SA-0003-1B-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4565 Tank Farm SA-0003-1B-2" 1/1 FW-21 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4566 Tank Farm SA-0003-1B-2" 1/1 FW-26 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4567 Tank Farm SA-0005-1B-2" 1/1 FW-08 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4568 Tank Farm SA-0005-1B-2" 1/1 FW-07 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4569 Tank Farm DO-0004-1A-2" 2/2 FW-25 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4570 Tank Farm DO-0004-1A-2" 2/2 FW-25A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4571 Tank Farm MO-0008-1A-2" 2/2 FW-16A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4572 Tank Farm MO-0008-1A-2" 2/2 FW-16B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4573 Tank Farm MO-0008-1A-2" 2/2 FW-16C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4574 Tank Farm SA-0001-1B-2" 2/4 FW-32A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4575 Tank Farm SA-0001-1B-2" 2/4 FW-32B BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4576 Tank Farm SA-0001-1B-2" 2/4 FW-32C BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4577 Tank Farm SA-0001-1B-2" 2/4 FW-32D BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4578 Tank Farm SA-0001-1B-2" 2/4 FW-33 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4579 Tank Farm FW-0007-1C-14" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4580 Tank Farm FW-0007-1C-14" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4581 Tank Farm FW-0007-1C-14" 1/1 FW-11B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4582 Tank Farm AD-0001-1S1-2" 1/2 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

4583 Tank Farm AD-0001-1S1-2" 1/2 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

4584 Tank Farm AD-0002-1S1-2" 1/2 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

4585 Tank Farm AD-0003-1S1-2" 1/2 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

4586 Tank Farm FW-0011-1C-14" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4587 Tank Farm JF-0041-1A-8” 2/2 FW-45 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4588 Tank Farm JF-0041-1A-8” 2/2 FW-46 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Reducer

4589 Tank Farm FW-0007-1C-14" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

4590 Tank Farm FW-0007-1C-14" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

4591 Tank Farm FW-0007-1C-14" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

4592 Tank Farm FW-0007-1C-14" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4593 Tank Farm FW-0004-1C-8" 1/1 FW-8A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4594 Tank Farm FW-0004-1C-8" 1/1 FW-8C BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4595 Tank Farm FW-0004-1C-8" 1/1 FW-8E BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4596 Tank Farm PW-5424-1S1-2" 1/1 FW-1A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

4597 Tank Farm FW-6007-1B 10" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

4598 Tank Farm FW-6007-1B 10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4599 Tank Farm FW-6007-1B 10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

4600 Tank Farm FW-6007-1B 10" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

4601 Tank Farm FW-6009-1B-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

4602 Tank Farm FW-6009-1B-8" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

4603 Tank Farm FW-0004-1C-8" 1/1 FW-8G BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4604 Tank Farm FW-0004-1C-8" 1/1 FW-8F BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4605 Tank Farm FW-0004-1C-8" 1/1 FW-8D BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4606 Tank Farm FW-0004-1C-8" 1/1 FW-8B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4607 Tank Farm FW-0008-1C-14" 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

4608 Tank Farm FW-0008-1C-14" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

4609 Tank Farm FW-0008-1C-14" 1/2 FW-05 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4610 Tank Farm MO-0119-1A-12” 1/2 FW-07 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

4611 Tank Farm FW-0009-1C-14" 1/1 FW-21 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

4612 Tank Farm FW-0004-1C-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4613 Tank Farm PW-5408A-1S2-2" 1/1 FW-1A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4614 Tank Farm PW-5408A-1S2-2" 1/1 FW-1B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4615 Tank Farm PW-5408A-1S2-2" 1/1 FW-1C BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4616 Tank Farm PW-5408A-1S2-2" 1/1 FW-1E BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4617 Tank Farm PW-5408A-1S2-2" 1/1 FW-1F BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4618 Tank Farm PW-5408A-1S2-2" 1/1 FW-1G BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4619 Tank Farm FW-0004-1C-8" 1/1 FW-8I BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4620 Tank Farm FW-0004-1C-8" 1/1 FW-8J BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4621 Tank Farm SA-0001-1B-2" 1/4 FW-16D BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4622 Tank Farm SA-0001-1B-2" 1/4 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4623 Tank Farm SA-0001-1B-2" 3/4 FW-43 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4624 Tank Farm SA-0001-1B-2" 1/4 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4625 Tank Farm SA-0001-1B-2" 1/4 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4626 Tank Farm SA-0001-1B-2" 1/4 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4627 Tank Farm SA-0001-1B-2" 1/4 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4628 Tank Farm SA-0001-1B-2" 1/4 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4629 Tank Farm SA-0001-1B-2" 3/4 FW-35 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4630 Tank Farm SA-0001-1B-2" 2/4 FW-26 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4631 Tank Farm MO-0008-1A-2" 2/2 FW-27 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4632 Tank Farm MO-0008-1A-2" 1/2 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4633 Tank Farm SA-0001-1B-2" 1/4 FW-17 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4634 Tank Farm JF-0044-1A-2" 1/2 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4635 Tank Farm DO-0004-1A-2" 1/2 FW-14 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4636 Tank Farm JF-0004-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4637 Tank Farm JF-0004-1A-2" 1/1 FW-12C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4638 Tank Farm DO-0004-1A-2" 1/2 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4639 Tank Farm DO-0004-1A-2" 1/2 FW-13 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4640 Tank Farm JF-0004-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4641 Tank Farm JF-0004-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4642 Tank Farm MO-0008-1A-2" 1/2 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4643 Tank Farm MO-0008-1A-2" 1/2 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4644 Tank Farm FW-6015-1B-10" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

4645 Tank Farm FW-6015-1B-10" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

4646 Tank Farm FW-6017-1B-8" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

4647 Tank Farm FW-6017-1B-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4648 Tank Farm FW-6011-1B-10" 1/1 FW-1A SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Tee

4649 Tank Farm FW-6011-1B-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

4650 Tank Farm FW-6013-1B-8" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

4651 Tank Farm FW-6013-1B-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4652 Tank Farm FW-6013-1B-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

4653 Tank Farm FW-6017-1B-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4654 Tank Farm FW-0008-1C-14" 2/2 FW-27 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

4655 Tank Farm FW-0008-1C-14" 2/2 FW-26 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4656 Tank Farm FW-0008-1C-14" 2/2 FW-21 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4657 Tank Farm FW-0008-1C-14" 2/2 FW-20A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4658 Tank Farm FW-0008-1C-14" 2/2 FW-20 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4659 Tank Farm FW-0008-1C-14" 2/2 FW-19 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4660 Tank Farm FW-0008-1C-14" 2/2 FW-18D BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4661 Tank Farm FW-0008-1C-14" 2/2 FW-18C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4662 Tank Farm MO-0022-1A-8” 1/4 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 Tee/90Elbow

4663 Tank Farm MO-0022-1A-8” 1/4 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

4664 Tank Farm MO-0022-1A-8” 1/4 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4665 Tank Farm FW-0004-1C-8" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

4666 Tank Farm MO-0127-1A-3" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4667 Tank Farm FW-0011-1C-14" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

4668 Tank Farm FW-0011-1C-14" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

4669 Tank Farm FW-0011-1C-14" 1/1 FW-3A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4670 Tank Farm FW-0011-1C-14" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

4671 Tank Farm FW-0011-1C-14" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4672 Tank Farm FW-1101-1D-6" 1/1 FW-821 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/90Elbow

4673 Tank Farm FW-0201-1D-6" 1/1 FW-75 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4674 Tank Farm FW-0101-1D-6" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4675 Tank Farm FW-0101-1D-6" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4676 Tank Farm FW-1101-1D-6" 1/1 FW-823 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4677 Tank Farm FW-1101-1D-6" 1/1 FW-824 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4678 Tank Farm FW-0004-1C-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4679 Tank Farm FW-0004-1C-8" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

4680 Tank Farm MO-0022-1A-8” 1/4 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

4681 Tank Farm MO-0022-1A-8” 1/4 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

4682 Tank Farm JF-0013-1A-8” 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

4683 Tank Farm JF-0013-1A-8” 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

4684 Tank Farm FW-0009-1C-14" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

4685 Tank Farm FW-0008-1C-14" 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

4686 Tank Farm JF-0041-1A-8” 2/2 FW-39 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4687 Tank Farm FW-0004-1C-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4688 Tank Farm FW-0004-1C-8" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4689 Tank Farm FW-0004-1C-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4690 Tank Farm FW-0004-1C-8" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4691 Tank Farm AD-0001-1S1-2" 1/2 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Scokolet

4692 Tank Farm AD-0001-1S1-2" 1/2 FW-13 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

4693 Tank Farm AD-0001-1S1-2" 1/2 FW-11A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4694 Tank Farm FW-0004-1C-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4695 Tank Farm FW-6016-1B-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4696 Tank Farm FW-6016-1B-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 90Elbow/Reducer

4697 Tank Farm FW-6016-1B-10" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4698 Tank Farm FW-6012-1B-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4699 Tank Farm FW-6012-1B-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 90Elbow/Reducer

4700 Tank Farm FW-6012-1B-10" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

4701 Tank Farm FW-6008-1B-10" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

4702 Tank Farm FW-0007-1C-14" 1/1 FW-11D BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4703 Tank Farm FW-0007-1C-14" 1/1 FW-11E BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4704 Tank Farm FW-0007-1C-14" 1/1 FW-11F BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4705 Tank Farm FW-0008-1C-14" 2/2 FW-29 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

4706 Tank Farm FW-0008-1C-14" 2/2 FW-28A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4707 Tank Farm SA-0001-1B-2" 1/4 FW-16A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4708 Tank Farm MO-0008-1A-2" 2/2 FW-32 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4709 Tank Farm DO-0004-1A-2" 1/2 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4710 Tank Farm JF-0004-1A-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4711 Tank Farm SA-0006-1B-2" 1/1 FW-08 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4712 Tank Farm SA-0006-1B-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4713 Tank Farm SA-0006-1B-2" 1/1 FW-21 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4714 Tank Farm SA-0006-1B-2" 1/1 FW-26 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4715 Tank Farm SA-0006-1B-2" 1/1 FW-07 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

4716 Tank Farm SA-0006-1B-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4717 Tank Farm SA-0006-1B-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4718 Tank Farm SA-0006-1B-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4719 Tank Farm SA-0006-1B-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4720 Tank Farm SA-0006-1B-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4721 Tank Farm FW-0009-1C-14" 1/1 FW-17 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4722 Tank Farm FW-0009-1C-14" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

4723 Tank Farm FW-0009-1C-14" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

4724 Tank Farm FW-0201-1D-6" 1/1 FW-70A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

4725 Tank Farm FW-0201-1D-6" 1/1 FW-70 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4726 Tank Farm FW-0201-1D-6" 1/1 FW-71 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4727 Tank Farm FW-0201-1D-6" 1/1 FW-72 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4728 Tank Farm FW-0201-1D-6" 1/1 FW-73 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4729 Tank Farm FW-0101-1D-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

4730 Tank Farm FW-0101-1D-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4731 Tank Farm FW-0101-1D-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4732 Tank Farm FW-0101-1D-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4733 Tank Farm FW-0101-1D-6" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4734 Tank Farm FW-0008-1C-14" 2/2 FW-28 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

4735 Tank Farm FW-0007-1C-14" 1/1 FW-11C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Pipe

4736 Tank Farm DO-0015-1A-14” 1/2 FW-07 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Scokolet

4737 Tank Farm DO-0015-1A-14” 1/2 FW-03 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

4738 Tank Farm DO-0015-1A-14” 1/2 FW-10 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

4739 Tank Farm JF-0012-1A-10" 1/1 FW-11 BRW WPS-2016-23 GTAW/SMAW 1/2" SCH40 A106/A105 Pipe/Scokolet

4740 Tank Farm JF-0012-1A-10" 1/1 FW-15 BRW WPS-2016-23 GTAW/SMAW 1½" SCH40 A106/A105 Pipe/Scokolet

4741 Tank Farm JF-0012-1A-10" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4742 Tank Farm MO-0021-1A-16” 1/1 FW-14 BRW WPS-2016-21 GTAW 1/2" SCH40 A106/A105 Pipe/Scokolet

4743 Tank Farm MO-0021-1A-16” 1/1 FW-17 BRW WPS-2016-21 GTAW 1½" SCH40 A106/A105 Pipe/Scokolet

4744 Tank Farm MO-0021-1A-16” 1/1 FW-19 BRW WPS-2016-21 GTAW 1/2" SCH40 A106/A105 Pipe/Scokolet

4745 Tank Farm DO-0016-1A-8” 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

4746 Tank Farm DO-0016-1A-8” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

4747 Tank Farm DO-0016-1A-8” 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

4748 Tank Farm PW-5424-1S1-2" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

4749 Tank Farm PW-5424-1S1-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/90Elbow

4750 Tank Farm PW-5424-1S1-2" 1/1 FW-2A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4751 Tank Farm PW-5424-1S1-2" 1/1 FW-2B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4752 Tank Farm PW-5424-1S1-2" 1/1 FW-2C BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4753 Tank Farm PW-5424-1S1-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

4754 Tank Farm PW-5424-1S1-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

4755 Tank Farm PW-5424-1S1-2" 1/1 FW-4A BW WPS-2016-27 GTAW 2" SCH10S A312/A403 Pipe/90Elbow

4756 Tank Farm PW-5424-1S1-2" 1/1 FW-4B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4757 Tank Farm PW-5424-1S1-2" 1/1 FW-4C BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

4758 Tank Farm PW-5424-1S1-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4759 Tank Farm PW-5424-1S1-2" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A403 Pipe/90Elbow

4760 Tank Farm FW-0007-1C-14" 1/1 FW-11A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4761 Tank Farm FW-0007-1C-14" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4762 Tank Farm FW-0004-1C-8" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4763 Tank Farm FW-0004-1C-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4764 Tank Farm FW-0007-1C-14" 1/1 FW-6B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4765 Tank Farm FW-0007-1C-14" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4766 Tank Farm FW-0004-1C-8" 1/1 FW-07 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4767 Tank Farm PW-5408A-1S2-2" 1/1 FW-1H BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4768 Tank Farm PW-5408A-1S2-2" 1/1 FW-1I BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4769 Tank Farm PW-5408A-1S2-2" 1/1 FW-1J BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4770 Tank Farm PW-5408A-1S2-2" 1/1 FW-1K BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4771 Tank Farm PW-5408A-1S2-2" 1/1 FW-5A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4772 Tank Farm FW-0004-1C-8" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

4773 Tank Farm FW-0003b-1C-14" 1/1 FW-19B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4774 Tank Farm FW-0003b-1C-14" 1/1 FW-19A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4775 Tank Farm FW-0003b-1C-14" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4776 Tank Farm FW-0003b-1C-14" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4777 Tank Farm FW-0003b-1C-14" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4778 Tank Farm FW-0008-1C-14" 2/2 FW-22 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

4779 Tank Farm FW-0008-1C-14" 2/2 FW-23 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4780 Tank Farm FW-0008-1C-14" 2/2 FW-24 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4781 Tank Farm FW-0008-1C-14" 2/2 FW-25 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4782 Tank Farm FW-1301-1D-6" 1/1 FW-966 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4783 Tank Farm FW-1301-1D-6" 1/1 FW-967 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4784 Tank Farm FW-1301-1D-6" 1/1 FW-968 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4785 Tank Farm FW-1301-1D-6" 1/1 FW-969 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4786 Tank Farm FW-1301-1D-6" 1/1 FW-970 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4787 Tank Farm FW-1202-1D-2½" 1/1 FW-922 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4788 Tank Farm FW-1202-1D-2½" 1/1 FW-923 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4789 Tank Farm MO-0121-1A-10” 1/2 FW-16 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Scokolet

4790 Tank Farm MO-0121-1A-10” 1/2 FW-20 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

4791 Tank Farm MO-0121-1A-10” 1/2 FW-24 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

4792 Tank Farm MO-0119-1A-12” 1/2 FW-19 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Scokolet

4793 Tank Farm MO-0119-1A-12” 1/2 FW-23 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

4794 Tank Farm MO-0119-1A-12” 1/2 FW-27 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

4795 Tank Farm FW-0003b-1C-14" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4796 Tank Farm MO-0124-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4797 Tank Farm MO-0124-1A-3" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

4798 Tank Farm MO-0124-1A-3" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4799 Tank Farm MO-0124-1A-3" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

4800 Tank Farm MO-0126-1A-3" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4801 Tank Farm DO-0004-1A-2" 2/2 FW-27 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4802 Tank Farm MO-0122-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4803 Tank Farm MO-0126-1A-3" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4804 Tank Farm JF-0044-1A-2" 1/2 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4805 Tank Farm SA-0001-1B-2" 2/4 FW-24 BW WPS-2016-21 GTAW 2" SCH40 A234/A234 Pipe/Tee

4806 Tank Farm SA-0001-1B-2" 1/4 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4807 Tank Farm SA-0001-1B-2" 1/4 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4808 Tank Farm SA-0006-1B-2" 1/1 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

4809 Tank Farm MO-0124-1A-3" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4810 Tank Farm MO-0124-1A-3" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4811 Tank Farm MO-0124-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4812 Tank Farm MO-0124-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4813 Tank Farm FW-6009-1B-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

4814 Tank Farm FW-6007-1B 10" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

4815 Tank Farm FW-6007-1B 10" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

4816 Tank Farm PW-5408A-1S2-2" 1/1 FW-5B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4817 Tank Farm PW-5408A-1S2-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

4818 Tank Farm PW-5408A-1S2-2" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4819 Tank Farm PW-5408A-1S2-2" 1/1 FW-08 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

4820 Tank Farm PW-5408A-1S2-2" 1/1 FW-10 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

4821 Tank Farm PW-5408A-1S2-2" 1/1 FW-5C BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4822 Tank Farm PW-5408A-1S2-2" 1/1 FW-5D BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4823 Tank Farm FW-6011-1B-10" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

4824 Tank Farm FW-6011-1B-10" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

4825 Tank Farm FW-6017-1B-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

4826 Tank Farm FW-6015-1B-10" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

4827 Tank Farm FW-6015-1B-10" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

4828 Tank Farm MO-0121-1A-10” 2/2 FW-55 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4829 Tank Farm MO-0121-1A-10” 2/2 FW-56 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4830 Tank Farm MO-0121-1A-10” 2/2 FW-35 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4831 Tank Farm MO-0121-1A-10” 2/2 FW-47 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4832 Tank Farm MO-0121-1A-10” 2/2 FW-52 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4833 Tank Farm MO-0127-1A-3" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4834 Tank Farm MO-0119-1A-12” 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4835 Tank Farm MO-0119-1A-12” 1/2 FW-15 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4836 Tank Farm MO-0119-1A-12” 2/2 FW-41 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4837 Tank Farm MO-0121-1A-10” 1/2 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4838 Tank Farm MO-0121-1A-10” 1/2 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4839 Tank Farm MO-0121-1A-10” 2/2 FW-57 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A105 Tee/Flange

4840 Tank Farm MO-0121-1A-10” 2/2 FW-61 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4841 Tank Farm MO-0126-1A-3" 1/1 FW-14A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

4842 Tank Farm MO-0126-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4843 Tank Farm MO-0126-1A-3" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4844 Tank Farm MO-0122-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

4845 Tank Farm SA-0006-1B-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4846 Tank Farm FW-6014-1B-10" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

4847 Tank Farm FW-6018-1B-10" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

4848 Tank Farm FW-6010-1B-10" 2/2 FW-21A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

4849 Tank Farm FW-0003b-1C-14" 1/1 FW-19C BW WPS-2016-23 GTAW/SMAW 8" SCH40 A53/A53 Pipe/Pipe

4850 Tank Farm FW-0003b-1C-14" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH40 A53/A234 Pipe/90Elbow

4851 Tank Farm FW-0003b-1C-14" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4852 Tank Farm FW-0003b-1C-14" 1/1 FW-14 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

4853 Tank Farm PW-5414A-1S1-4" 1/1 FW-7B BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

4854 Tank Farm PW-5414A-1S1-4" 1/1 FW-11 BW WPS-2016-27 GTAW 4" SCH10S A312/A403 Pipe/90Elbow

4855 Tank Farm PW-5414A-1S1-4" 1/1 FW-05 BW WPS-2016-27 GTAW 4" SCH10S A312/A403 Pipe/90Elbow

4856 Tank Farm PW-5414A-1S1-4" 1/1 FW-06 BRW WPS-2016-27 GTAW 1" SCH10S A312/A182 Pipe/Scokolet

4857 Tank Farm PW-5414A-1S1-4" 1/1 FW-07 BRW WPS-2016-27 GTAW 1" SCH10S A312/A182 Pipe/Scokolet

4858 Tank Farm PW-5414A-1S1-4" 1/1 FW-6A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

4859 Tank Farm PW-5414A-1S1-4" 1/1 FW-7A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

4860 Tank Farm PW-5414A-1S1-4" 1/1 FW-04 BW WPS-2016-27 GTAW 4" SCH10S A312/A403 Pipe/90Elbow

4861 Tank Farm PW-5414A-1S1-4" 1/1 FW-10 BW WPS-2016-27 GTAW 4" SCH10S A312/A403 Pipe/90Elbow

4862 Tank Farm PW-5408A-1S2-2" 1/1 FW-9A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4863 Tank Farm PW-5408A-1S2-2" 1/1 FW-1D BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4864 Tank Farm PW-5408A-1S2-2" 1/1 FW-9B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

4865 Tank Farm MO-0121-1A-10” 2/2 FW-33 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

4866 Tank Farm MO-0121-1A-10” 2/2 FW-45 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

4867 Tank Farm MO-0121-1A-10” 2/2 FW-46 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4868 Tank Farm MO-0121-1A-10” 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4869 Tank Farm MO-0121-1A-10” 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4870 Tank Farm MO-0119-1A-12” 2/2 FW-44 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4871 Tank Farm MO-0119-1A-12” 1/2 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4872 Tank Farm MO-0119-1A-12” 1/2 FW-16 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4873 Tank Farm MO-0127-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4874 Tank Farm MO-0127-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/90Elbow

4875 Tank Farm MO-0127-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/90Elbow

4876 Tank Farm MO-0121-1A-10” 2/2 FW-36 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4877 Tank Farm MO-0121-1A-10” 2/2 FW-37 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4878 Tank Farm MO-0121-1A-10” 2/2 FW-44 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4879 Tank Farm DO-0004-1A-2" 2/2 FW-25B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

4880 Tank Farm DO-0004-1A-2" 2/2 FW-26 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4881 Tank Farm SA-0005-1B-2" 1/1 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4882 Tank Farm SA-0005-1B-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4883 Tank Farm SA-0004-1B-2" 1/1 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4884 Tank Farm SA-0004-1B-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4885 Tank Farm SA-0003-1B-2" 1/1 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4886 Tank Farm SA-0003-1B-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4887 Tank Farm SA-0002-1B-2" 1/1 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

4888 Tank Farm SA-0002-1B-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4889 Tank Farm FW-6014-1B-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

4890 Tank Farm FW-6014-1B-10" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

4891 Tank Farm FW-6014-1B-10" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

4892 Tank Farm FW-6014-1B-10" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

4893 Tank Farm FW-6018-1B-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

4894 Tank Farm FW-6018-1B-10" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

4895 Tank Farm FW-6018-1B-10" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4896 Tank Farm FW-6018-1B-10" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

4897 Tank Farm FW-6010-1B-10" 2/2 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

4898 Tank Farm FW-6010-1B-10" 2/2 FW-11 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

4899 Tank Farm PW-5414A-1S1-4" 1/1 FW-08 BW WPS-2016-27 GTAW 4" SCH10S A312/A403 Pipe/90Elbow

4900 Tank Farm PW-5414A-1S1-4" 1/1 FW-09 BW WPS-2016-27 GTAW 4" SCH10S A312/A403 Pipe/90Elbow

4901 Tank Farm PW-5417-1S1-1" 1/1 FW-01 BRW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Scokolet

4902 Tank Farm PW-5432-1S1-1" 1/1 FW-01 BRW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Scokolet

4903 Tank Farm FW-0301-1D-6" 1/1 FW-140 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4904 Tank Farm FW-0006-1C-14" 1/2 FW-13B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

4905 Tank Farm FW-0401-1D-6" 1/1 FW-297 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4906 Tank Farm FW-0401-1D-6" 1/1 FW-298 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4907 Tank Farm FW-0401-1D-6" 1/1 FW-299 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4908 Tank Farm FW-0401-1D-6" 1/1 FW-300 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4909 Tank Farm FW-0401-1D-6" 1/1 FW-301 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4910 Tank Farm FW-0401-1D-6" 1/1 FW-302 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4911 Tank Farm PW-5408A-1S2-2" 1/1 FW-09 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

4912 Tank Farm FW-6201-1B-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4913 Tank Farm FW-6201-1B-8" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4914 Tank Farm FW-6201-1B-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

4915 Tank Farm FW-6201-1B-8" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Flange

4916 Tank Farm FW-6201-1B-8" 1/1 FW-19A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

4917 Tank Farm FW-6201-1B-8" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4918 Tank Farm MO-0119-1A-12” 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

4919 Tank Farm MO-0119-1A-12” 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

4920 Tank Farm MO-0119-1A-12” 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4921 Tank Farm MO-0119-1A-12” 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4922 Tank Farm MO-0119-1A-12” 2/2 FW-50 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4923 Tank Farm MO-0119-1A-12” 2/2 FW-55 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4924 Tank Farm DO-0054-1A-14" 2/3 FW-23 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4925 Tank Farm DO-0054-1A-14" 2/3 FW-28 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4926 Tank Farm DO-0054-1A-14" 2/3 FW-32 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4927 Tank Farm DO-0054-1A-14" 2/3 FW-37 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4928 Tank Farm MO-0121-1A-10” 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4929 Tank Farm MO-0121-1A-10” 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4930 Tank Farm MO-0121-1A-10” 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

4931 Tank Farm MO-0121-1A-10” 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

4932 Tank Farm JF-0044-1A-2" 2/2 FW-24 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4933 Tank Farm JF-0044-1A-2" 2/2 FW-25 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4934 Tank Farm JF-0044-1A-2" 2/2 FW-26 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4935 Tank Farm JF-0044-1A-2" 2/2 FW-27 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4936 Tank Farm JF-0044-1A-2" 2/2 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4937 Tank Farm JF-0044-1A-2" 2/2 FW-13 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4938 Tank Farm JF-0044-1A-2" 2/2 FW-14 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4939 Tank Farm JF-0044-1A-2" 2/2 FW-15 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4940 Tank Farm JF-0044-1A-2" 2/2 FW-17 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4941 Tank Farm JF-0044-1A-2" 2/2 FW-18 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4942 Tank Farm JF-0044-1A-2" 2/2 FW-19 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

4943 Tank Farm JF-0044-1A-2" 2/2 FW-21 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

4944 Tank Farm JF-0044-1A-2" 2/2 FW-29 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4945 Tank Farm JF-0044-1A-2" 2/2 FW-30 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

4946 Tank Farm SA-0001-1B-2" 3/4 FW-40A BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Pipe

4947 Tank Farm SA-0001-1B-2" 3/4 FW-40B BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Pipe

4948 Tank Farm SA-0001-1B-2" 3/4 FW-40C BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Pipe

4949 Tank Farm SA-0001-1B-2" 3/4 FW-41 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

4950 Tank Farm PW-5417-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4951 Tank Farm PW-5417-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

4952 Tank Farm PW-5417-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

4953 Tank Farm PW-5432-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A403 Pipe/90Elbow

4954 Tank Farm PW-5432-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A403 Pipe/90Elbow

4955 Tank Farm FW-0501-1D-6" 1/1 FW-470 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4956 Tank Farm FW-0501-1D-6" 1/1 FW-477 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/Tee

4957 Tank Farm FW-0501-1D-6" 1/1 FW-468 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4958 Tank Farm FW-0501-1D-6" 1/1 FW-467 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4959 Tank Farm FW-0501-1D-6" 1/1 FW-465 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4960 Tank Farm FW-0501-1D-6" 1/1 FW-466 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4961 Tank Farm FW-0601-1D-6" 1/1 FW-613 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4962 Tank Farm FW-0601-1D-6" 1/1 FW-615 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4963 Tank Farm FW-0601-1D-6" 1/1 FW-616 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4964 Tank Farm FW-0601-1D-6" 1/1 FW-614 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4965 Tank Farm FW-0601-1D-6" 1/1 FW-631 BRW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

4966 Tank Farm FW-0601-1D-6" 1/1 FW-634 BRW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

4967 Tank Farm FW-0701-1D-6" 1/1 FW-746 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4968 Tank Farm FW-0701-1D-6" 1/1 FW-747 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4969 Tank Farm FW-0701-1D-6" 1/1 FW-734 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4970 Tank Farm FW-0701-1D-6" 1/1 FW-731 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4971 Tank Farm FW-0701-1D-6" 1/1 FW-732 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

4972 Tank Farm FW-0701-1D-6" 1/1 FW-733 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4973 Tank Farm FW-6201-1B-8" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

4974 Tank Farm FW-6201-1B-8" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

4975 Tank Farm FW-6201-1B-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4976 Tank Farm FW-6201-1B-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

4977 Tank Farm FW-0006-1C-14" 1/2 FW-15 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

4978 Tank Farm FW-0006-1C-14" 1/2 FW-16 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

4979 Tank Farm FW-0006-1C-14" 1/2 FW-17 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4980 Tank Farm FW-0006-1C-14" 1/2 FW-09 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

4981 Tank Farm FW-0006-1C-14" 1/2 FW-10 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

4982 Tank Farm FW-0006-1C-14" 1/2 FW-11 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4983 Tank Farm FW-0006-1C-14" 2/2 FW-39 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4984 Tank Farm FW-0006-1C-14" 2/2 FW-40 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

4985 Tank Farm FW-0006-1C-14" 2/2 FW-41 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

4986 Tank Farm PW-5432-1S1-1" 1/1 FW-3A BW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/Pipe

4987 Tank Farm PW-5432-1S1-1" 1/1 FW-3C BW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/Pipe

4988 Tank Farm FW-6019-1B-3" 1/1 FW-20 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

4989 Tank Farm FW-6019-1B-3" 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet

4990 Tank Farm FW-6019-1B-3" 1/1 FW-10 BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet

4991 Tank Farm FW-6019-1B-3" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Reducer

4992 Tank Farm FW-6019-1B-3" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Reducer

4993 Tank Farm FW-6019-1B-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

4994 Tank Farm FW-6019-1B-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
4995 Tank Farm FW-6019-1B-3" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

4996 Tank Farm FW-6021-1B-3" 1/1 FW-20 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

4997 Tank Farm FW-6021-1B-3" 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/Weldolet

4998 Tank Farm FW-6021-1B-3" 1/1 FW-10 BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet

4999 Tank Farm FW-6021-1B-3" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Reducer

5000 Tank Farm FW-6021-1B-3" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Reducer

5001 Tank Farm FW-6021-1B-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5002 Tank Farm FW-6021-1B-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5003 Tank Farm FW-6021-1B-3" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5004 Tank Farm FW-6019-1B-3" 1/1 FW-21 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

5005 Tank Farm FW-6019-1B-3" 1/1 FW-22 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5006 Tank Farm FW-6021-1B-3" 1/1 FW-21 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

5007 Tank Farm FW-6021-1B-3" 1/1 FW-22 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

5008 Tank Farm SA-0007-1B-2" 1/1 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

5009 Tank Farm SA-0007-1B-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

5010 Tank Farm SA-0007-1B-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

5011 Tank Farm SA-0007-1B-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

5012 Tank Farm SA-0007-1B-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

5013 Tank Farm SA-0007-1B-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

5014 Tank Farm SA-0007-1B-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

5015 Tank Farm SA-0007-1B-2" 1/1 FW-07 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

5016 Tank Farm FW-0006-1C-14" 2/2 FW-38 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5017 Tank Farm FW-0701-1D-6" 1/1 FW-731A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

5018 Tank Farm FW-0601-1D-6" 1/1 FW-613A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

5019 Tank Farm FW-6006-1B-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

5020 Tank Farm FW-6006-1B-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

5021 Tank Farm FW-6006-1B-4" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

5022 Tank Farm FW-6005-1B-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

5023 Tank Farm FW-6005-1B-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/45Elbow

5024 Tank Farm FW-6005-1B-4" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

5025 Tank Farm FW-0501-1D-6" 1/1 FW-465A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/90Elbow

5026 Tank Farm FW-0001-1C-14" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5027 Tank Farm FW-0001-1C-14" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5028 Tank Farm FW-0001-1C-14" 1/1 RW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5029 Tank Farm FW-0008-1C-14" 2/2 FW-18 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5030 Tank Farm FW-0008-1C-14" 1/2 FW-16 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5031 Tank Farm FW-1201-1D-6" 1/1 FW-892 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

5032 Tank Farm FW-1201-1D-6" 1/1 FW-896 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

5033 Tank Farm FW-1201-1D-6" 1/1 FW-900 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

5034 Tank Farm FW-1201-1D-6" 1/1 FW-913 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

5035 Tank Farm FW-1201-1D-6" 1/1 FW-893 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

5036 Tank Farm FW-1201-1D-6" 1/1 FW-894 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

5037 Tank Farm FW-1201-1D-6" 1/1 FW-895 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

5038 Tank Farm FW-0008-1C-14" 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5039 Tank Farm FW-0008-1C-14" 1/2 FW-13 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

5040 Tank Farm FW-0008-1C-14" 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

5041 Tank Farm FW-0008-1C-14" 1/2 FW-15 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

5042 Tank Farm FW-0002-1C-14" 1/1 RW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5043 Tank Farm FW-0002-1C-14" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5044 Tank Farm FW-0002-1C-14" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5045 Tank Farm FW-0401-1D-6" 1/1 FW-297A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Tee/90Elbow

5046 Tank Farm FW-0301-1D-6" 1/1 FW-139A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Tee/90Elbow

5047 Tank Farm FW-0006-1C-14" 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

5048 Tank Farm FW-0006-1C-14" 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

5049 Tank Farm PW-5414A-1S1-4" 1/1 FW-1A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5050 Tank Farm PW-5414A-1S1-4" 1/1 FW-1B BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5051 Tank Farm PW-5414A-1S1-4" 1/1 FW-1C BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5052 Tank Farm PW-5414A-1S1-4" 1/1 FW-1D BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5053 Tank Farm PW-5414A-1S1-4" 1/1 FW-1E BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5054 Tank Farm FW-0002-1C-14" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Tee/Cap

5055 Tank Farm FW-0002-1C-14" 1/1 RW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

5056 Tank Farm FW-6019-1B-3" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/45Elbow

5057 Tank Farm FW-6019-1B-3" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/45Elbow

5058 Tank Farm FW-6019-1B-3" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

5059 Tank Farm FW-6201-1B-8" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

5060 Tank Farm FW-6201-1B-8" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5061 Tank Farm FW-6201-1B-8" 1/1 FW-23 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A105 90Elbow/Flange

5062 Tank Farm PW-5414-1S1-4" 1/1 FW-03 BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Tee

5063 Tank Farm PW-5414-1S1-4" 1/1 FW-4A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5064 Tank Farm PW-5414-1S1-4" 1/1 FW-4C BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5065 Tank Farm PW-5414-1S1-4" 1/1 FW-6A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5066 Tank Farm PW-5414-1S1-4" 1/1 FW-7B BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5067 Tank Farm PW-5414A-1S1-4" 1/1 FW-02 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5068 Tank Farm FW-0013-1C-10" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

5069 Tank Farm FW-0013-1C-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

5070 Tank Farm FW-0013-1C-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

5071 Tank Farm FW-0013-1C-10" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5072 Tank Farm FW-0012-1C-10" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

5073 Tank Farm FW-0012-1C-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

5074 Tank Farm FW-0012-1C-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

5075 Tank Farm FW-0012-1C-10" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

5076 Tank Farm FW-0003-1C-14" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5077 Tank Farm FW-0003-1C-14" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5078 Tank Farm PW-5414A-1S1-4" 1/1 FW-1F BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5079 Tank Farm PW-5414A-1S1-4" 1/1 FW-1G BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5080 Tank Farm PW-5414A-1S1-4" 1/1 FW-1H BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5081 Tank Farm PW-5414A-1S1-4" 1/1 FW-1I BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5082 Tank Farm PW-5414A-1S1-4" 1/1 FW-1J BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5083 Tank Farm PW-5414A-1S1-4" 1/1 FW-1K BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5084 Tank Farm FW-0001-1C-14" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5085 Tank Farm FW-0010-1C-14" 1/1 FW-1D BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5086 Tank Farm PW-5414A-1S1-4" 1/1 FW-11A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5087 Tank Farm PW-5414A-1S1-4" 1/1 FW-11B BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5088 Tank Farm PW-5432-1S1-1" 1/1 FW-06 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

5089 Tank Farm FW-0002-1C-14" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5090 Tank Farm FW-0002-1C-14" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5091 Tank Farm FW-0002-1C-14" 1/1 FW-8A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5092 Tank Farm FW-0003-1C-14" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5093 Tank Farm FW-0003-1C-14" 1/1 FW-1B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5094 Tank Farm FW-0002-1C-14" 1/1 FW-8B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5095 Tank Farm FW-0002-1C-14" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/45Elbow

5096 Tank Farm FW-0002-1C-14" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/45Elbow

5097 Tank Farm FW-0010-1C-14" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5098 Tank Farm PW-5417-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

5099 Tank Farm PW-5414-1S1-4" 1/1 FW-02 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Tee

5100 Tank Farm PW-5414A-1S1-4" 1/1 FW-03 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5101 Tank Farm PW-5407-1S2-1 ½" FW-2A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Pipe

5102 Tank Farm PW-5408-1S2-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5103 Tank Farm PW-5408-1S2-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5104 Tank Farm PW-5416-1S1-4" 1/5 FW-01 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5105 Tank Farm PW-5414A-1S1-4" 1/1 FW-01 SOW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Flange

5106 Tank Farm FW-0003b-1C-14" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5107 Tank Farm PW-5432-1S1-1" 1/1 FW-3B BW WPS-2016-27 GTAW 1" SCH10S A312/A312 Pipe/Pipe

5108 Tank Farm PW-5408-1S2-2" 1/1 FW-07 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5109 Tank Farm PW-5414-1S1-4" 1/1 FW-04 BRW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Scokolet

5110 Tank Farm PW-5414-1S1-4" 1/1 FW-07 BRW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Scokolet

5111 Tank Farm PW-5414-1S1-4" 1/1 FW-4D BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5112 Tank Farm PW-5414-1S1-4" 1/1 FW-05 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5113 Tank Farm PW-5417-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

5114 Tank Farm PW-5417-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

5115 Tank Farm FW-0018-1C-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5116 Tank Farm FW-0018-1C-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

5117 Tank Farm FW-0010-1C-14" 1/1 FW-1B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5118 Tank Farm FW-0010-1C-14" 1/1 FW-1C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5119 Tank Farm FW-0010-1C-14" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5120 Tank Farm FW-0010-1C-14" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5121 Tank Farm FW-0010-1C-14" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5122 Tank Farm FW-0010-1C-14" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5123 Tank Farm FW-0010-1C-14" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5124 Tank Farm FW-0010-1C-14" 1/1 FW-29 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

5125 Tank Farm MO-0023-1A-12" 1/2 FW-21A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5126 Tank Farm MO-0063-1A-10" 1/2 FW-21A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5127 Tank Farm MO-0043-1A-8" 1/1 FW-16A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

5128 Tank Farm JF-0020-1A-8" 1/1 FW-28B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

5129 Tank Farm DO-0021-1A-14" 1/2 FW-14B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

5130 Tank Farm FW-0010-1C-14" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

5131 Tank Farm FW-0010-1C-14" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

5132 Tank Farm FW-0010-1C-14" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

5133 Tank Farm FW-0010-1C-14" 1/1 FW-27 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

5134 Tank Farm FW-0010-1C-14" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

5135 Tank Farm FW-0010-1C-14" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

5136 Tank Farm FW-0010-1C-14" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

5137 Tank Farm FW-0010-1C-14" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5138 Tank Farm FW-0010-1C-14" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/45Elbow

5139 Tank Farm FW-0010-1C-14" 1/1 FW-07 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

5140 Tank Farm FW-0018-1C-6" 1/1 FW-2B BW WPS-2016-23 GTAW/SMAW 6" SCH20 A53/A53 Pipe/Pipe

5141 Tank Farm FW-0018-1C-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

5142 Tank Farm FW-0018-1C-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

5143 Tank Farm FW-0010-1C-14" 1/1 FW-19 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

5144 Tank Farm FW-0010-1C-14" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

5145 Tank Farm FW-0010-1C-14" 1/1 FW-21 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 90Elbow/Flange

5146 Tank Farm FW-0010-1C-14" 1/1 FW-15 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

5147 Tank Farm FW-0010-1C-14" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

5148 Tank Farm FW-0010-1C-14" 1/1 FW-18 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5149 Tank Farm FW-0010-1C-14" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

5150 Tank Farm FW-0010-1C-14" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

5151 Tank Farm MO-0023-1A-12" 1/2 FW-21 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5152 Tank Farm MO-0063-1A-10" 1/2 FW-21 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

5153 Tank Farm MO-0063-1A-10" 2/2 FW-24 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

5154 Tank Farm JF-0020-1A-8" 1/1 FW-30 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

5155 Tank Farm JF-0020-1A-8" 1/1 FW-32 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

5156 Tank Farm MO-0043-1A-8" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

5157 Tank Farm MO-0043-1A-8" 1/1 FW-16B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

5158 Tank Farm MO-0023-1A-12" 1/2 FW-24 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5159 Tank Farm DO-0021-1A-14" 1/2 FW-16 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5160 Tank Farm DO-0021-1A-14" 1/2 FW-19 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

5161 Tank Farm FW-6010-1B-10" 2/2 FW-27 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

5162 Tank Farm FW-6010-1B-10" 2/2 FW-29 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

5163 Tank Farm FW-6010-1B-10" 2/2 FW-30 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

5164 Tank Farm FW-6010-1B-10" 2/2 FW-31 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

5165 Tank Farm FW-6010-1B-10" 2/2 FW-32 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

5166 Tank Farm FW-6010-1B-10" 2/2 FW-33 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

5167 Tank Farm FW-6026-1B-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

5168 Tank Farm FW-6026-1B-10" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

5169 Tank Farm FW-6026-1B-10" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

5170 Tank Farm FW-6026-1B-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5171 Tank Farm FW-6201-1B-8" 1/1 FW-27 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5172 Tank Farm FW-6201-1B-8" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5173 Tank Farm FW-6201-1B-8" 1/1 FW-21A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

5174 Tank Farm FW-6201-1B-8" 1/1 FW-26 BRW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Weldolet

5175 Tank Farm FW-6201-1B-8" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Reducer

5176 Tank Farm FW-6201-1B-8" 1/1 FW-30 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Reducer

5177 Tank Farm FW-6201-1B-8" 1/1 FW-31 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

5178 Tank Farm FW-7401-1D-2 ½" 1/1 FW-08 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5179 Tank Farm FW-7401-1D-2 ½" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5180 Tank Farm FW-7401-1D-2 ½" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5181 Tank Farm FW-7401-1D-2 ½" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5182 Tank Farm FW-7401-1D-2 ½" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5183 Tank Farm FW-7401-1D-2 ½" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5184 Tank Farm FW-7401-1D-2 ½" 1/1 FW-14 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5185 Tank Farm FW-7401-1D-2 ½" 1/1 FW-15 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5186 Tank Farm FW-7401-1D-2 ½" 1/1 FW-16 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5187 Tank Farm FW-7401-1D-2 ½" 1/1 FW-17 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5188 Tank Farm FW-7501-1D-2 ½" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5189 Tank Farm FW-7501-1D-2 ½" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5190 Tank Farm FW-7501-1D-2 ½" 1/1 FW-14 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5191 Tank Farm FW-7501-1D-2 ½" 1/1 FW-15 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5192 Tank Farm FW-7501-1D-2 ½" 1/1 FW-16 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5193 Tank Farm FW-7501-1D-2 ½" 1/1 FW-17 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5194 Tank Farm FW-7501-1D-2 ½" 1/1 FW-25 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5195 Tank Farm FW-7501-1D-2 ½" 1/1 FW-26 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5196 Tank Farm FW-7301-1D-2½" 1/1 FW-36 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5197 Tank Farm FW-7301-1D-2½" 1/1 FW-37 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5198 Tank Farm FW-7301-1D-2½" 1/1 FW-38 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5199 Tank Farm FW-7301-1D-2½" 1/1 FW-39 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5200 Tank Farm FW-7301-1D-2½" 1/1 FW-40 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5201 Tank Farm FW-7301-1D-2½" 1/1 FW-41 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5202 Tank Farm FW-7301-1D-2½" 1/1 FW-42 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5203 Tank Farm FW-7301-1D-2½" 1/1 FW-43 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5204 Tank Farm FW-7301-1D-2½" 1/1 FW-44 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5205 Tank Farm FW-7301-1D-2½" 1/1 FW-45 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5206 Tank Farm FW-6201-1B-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5207 Tank Farm FW-7501-1D-2 ½" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5208 Tank Farm FW-7501-1D-2 ½" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5209 Tank Farm FW-7501-1D-2 ½" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5210 Tank Farm FW-7501-1D-2 ½" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5211 Tank Farm FW-7501-1D-2 ½" 1/1 FW-30 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5212 Tank Farm FW-7501-1D-2 ½" 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5213 Tank Farm FW-7501-1D-2 ½" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5214 Tank Farm FW-7501-1D-2 ½" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5215 Tank Farm FW-7501-1D-2 ½" 1/1 FW-20 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5216 Tank Farm FW-7501-1D-2 ½" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5217 Tank Farm FW-7501-1D-2 ½" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5218 Tank Farm FW-7501-1D-2 ½" 1/1 FW-38 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5219 Tank Farm FW-7501-1D-2 ½" 1/1 FW-39 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5220 Tank Farm FW-7501-1D-2 ½" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5221 Tank Farm FW-7501-1D-2 ½" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5222 Tank Farm FW-7501-1D-2 ½" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5223 Tank Farm FW-7501-1D-2 ½" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5224 Tank Farm FW-7301-1D-2½" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5225 Tank Farm FW-7301-1D-2½" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5226 Tank Farm FW-7301-1D-2½" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5227 Tank Farm FW-7301-1D-2½" 1/1 FW-01 BRW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Weldolet

5228 Tank Farm FW-7301-1D-2½" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5229 Tank Farm FW-7301-1D-2½" 1/1 FW-02 BRW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Weldolet

5230 Tank Farm FW-7301-1D-2½" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/90Elbow

5231 Tank Farm FW-7301-1D-2½" 1/1 FW-21 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5232 Tank Farm FW-7301-1D-2½" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5233 Tank Farm FW-7301-1D-2½" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5234 Tank Farm FW-7301-1D-2½" 1/1 FW-24 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5235 Tank Farm FW-7301-1D-2½" 1/1 FW-20 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5236 Tank Farm FW-7301-1D-2½" 1/1 FW-25 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5237 Tank Farm FW-0003b-1C-14" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5238 Tank Farm FW-0003b-1C-14" 1/1 FW-15 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5239 Tank Farm FW-0003-1C-14" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5240 Tank Farm FW-0009-1C-14" 1/1 FW-10B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5241 Tank Farm FW-0009-1C-14" 1/1 FW-26A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5242 Tank Farm FW-7301-1D-2½" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5243 Tank Farm FW-7301-1D-2½" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5244 Tank Farm FW-6201-1B-8" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5245 Tank Farm FW-6201-1B-8" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5246 Tank Farm FW-7401-1D-2 ½" 1/1 FW-26 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5247 Tank Farm FW-7401-1D-2 ½" 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5248 Tank Farm FW-7401-1D-2 ½" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5249 Tank Farm FW-7401-1D-2 ½" 1/1 FW-29 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5250 Tank Farm FW-7401-1D-2 ½" 1/1 FW-18 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5251 Tank Farm FW-7401-1D-2 ½" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5252 Tank Farm FW-7401-1D-2 ½" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5253 Tank Farm FW-7401-1D-2 ½" 1/1 FW-21 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5254 Tank Farm FW-7401-1D-2 ½" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5255 Tank Farm FW-7501-1D-2 ½" 1/1 FW-32 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5256 Tank Farm FW-7501-1D-2 ½" 1/1 FW-33 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5257 Tank Farm FW-7501-1D-2 ½" 1/1 FW-34 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5258 Tank Farm FW-7501-1D-2 ½" 1/1 FW-35 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5259 Tank Farm FW-7501-1D-2 ½" 1/1 FW-36 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5260 Tank Farm FW-7501-1D-2 ½" 1/1 FW-37 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5261 Tank Farm FW-7401-1D-2 ½" 1/1 FW-04 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5262 Tank Farm FW-7401-1D-2 ½" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5263 Tank Farm FW-7401-1D-2 ½" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5264 Tank Farm FW-7401-1D-2 ½" 1/1 FW-07 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5265 Tank Farm FW-7401-1D-2 ½" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5266 Tank Farm FW-7401-1D-2 ½" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5267 Tank Farm FW-0011-1C-14" 1/1 FW-08 BRW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Scokolet

5268 Tank Farm FW-7301-1D-2½" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/90Elbow

5269 Tank Farm FW-7301-1D-2½" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5270 Tank Farm FW-7301-1D-2½" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5271 Tank Farm FW-7301-1D-2½" 1/1 FW-14 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5272 Tank Farm FW-7301-1D-2½" 1/1 FW-15 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5273 Tank Farm FW-7301-1D-2½" 1/1 FW-16 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5274 Tank Farm FW-7301-1D-2½" 1/1 FW-30 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5275 Tank Farm FW-7301-1D-2½" 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5276 Tank Farm FW-7301-1D-2½" 1/1 FW-32 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5277 Tank Farm FW-7301-1D-2½" 1/1 FW-33 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5278 Tank Farm FW-7301-1D-2½" 1/1 FW-50 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5279 Tank Farm FW-7301-1D-2½" 1/1 FW-51 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5280 Tank Farm FW-7401-1D-2 ½" 1/1 FW-22 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5281 Tank Farm FW-7401-1D-2 ½" 1/1 FW-25 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5282 Tank Farm FW-7501-1D-2 ½" 1/1 FW-21 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5283 Tank Farm FW-7501-1D-2 ½" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5284 Tank Farm FW-7501-1D-2 ½" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5285 Tank Farm FW-7501-1D-2 ½" 1/1 FW-24 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5286 Tank Farm FW-7501-1D-2 ½" 1/1 FW-01 BRW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Weldolet

5287 Tank Farm FW-7501-1D-2 ½" 1/1 FW-40 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5288 Tank Farm FW-7501-1D-2 ½" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5289 Tank Farm DO-0021-1A-14" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A105 Tee/Flange

5290 Tank Farm FW-0007-1C-14" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5291 Tank Farm FW-0003-1C-14" 1/1 FW-1D BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5292 Tank Farm FW-0003-1C-14" 1/1 FW-1E BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5293 Tank Farm FW-0003-1C-14" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5294 Tank Farm FW-0003-1C-14" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5295 Tank Farm FS-6201-1D-8" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

5296 Tank Farm FS-6201-1D-8" 1/1 FW-10A SW WPS-2016-21 GTAW 1/2" SCH160 A53/A234 Pipe/90Elbow

5297 Tank Farm FS-6203-1D-8" 1/2 FW-9A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

5298 Tank Farm PW-6001-1B-8" 1/2 FW-02 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5299 Tank Farm PW-6001-1B-8" 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

5300 Tank Farm PW-6001-1B-8" 2/2 FW-29 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

5301 Tank Farm PW-6001-1B-8" 2/2 FW-30 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

5302 Tank Farm PW-6001-1B-8" 2/2 FW-31 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5303 Tank Farm PW-6001-1B-8" 2/2 FW-32 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

5304 Tank Farm PW-6001-1B-8" 1/2 FW-04 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5305 Tank Farm PW-5416-1S1-4" 2/5 FW-19 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5306 Tank Farm PW-5416-1S1-4" 2/5 FW-20 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5307 Tank Farm PW-5416-1S1-4" 2/5 FW-22 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Tee

5308 Tank Farm PW-5416-1S1-4" 2/5 FW-23 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Tee

5309 Tank Farm PW-5416-1S1-4" 1/5 FW-04 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Reducer

5310 Tank Farm FW-6025-1B-8" 1/1 FW-2A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

5311 Tank Farm FW-6025-1B-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5312 Tank Farm FW-6009-1B-8" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5313 Tank Farm FW-6009-1B-8" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5314 Tank Farm FW-6009-1B-8" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5315 Tank Farm FW-6009-1B-8" 1/1 FW-22A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

5316 Tank Farm FW-6009-1B-8" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5317 Tank Farm FW-6009-1B-8" 1/1 FW-18 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5318 Tank Farm PW-6001-1B-8" 1/2 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A105 90Elbow/Flange

5319 Tank Farm PW-6001-1B-8" 1/2 FW-16 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5320 Tank Farm PW-6001-1B-8" 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5321 Tank Farm PW-6001-1B-8" 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5322 Tank Farm PW-5416-1S1-4" 1/5 FW-02 BRW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Scokolet

5323 Tank Farm PW-5416-1S1-4" 1/5 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

5324 Tank Farm PW-5416-1S1-4" 1/5 FW-11B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5325 Tank Farm PW-5416-1S1-4" 1/5 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5326 Tank Farm PW-5416-1S1-4" 1/5 FW-07 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5327 Tank Farm PW-5416-1S1-4" 1/5 FW-08 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5328 Tank Farm PW-5416-1S1-4" 1/5 FW-09 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5329 Tank Farm PW-5416-1S1-4" 1/5 FW-10 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5330 Tank Farm PW-5416-1S1-4" 1/5 FW-11A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5331 Tank Farm PW-5416-1S1-4" 1/5 FW-13 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5332 Tank Farm PW-5416-1S1-4" 1/5 FW-14 SOW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

5333 Tank Farm PW-5416-1S1-4" 1/5 FW-16 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5334 Tank Farm PW-5416-1S1-4" 2/5 FW-25 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5335 Tank Farm PW-5416-1S1-4" 2/5 FW-26 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5336 Tank Farm PW-5416-1S1-4" 2/5 FW-27 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Tee

5337 Tank Farm PW-5416-1S1-4" 1/5 FW-1A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5338 Tank Farm PW-5416-1S1-4" 1/5 FW-03 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Tee

5339 Tank Farm PW-5416-1S1-4" 1/5 FW-17 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5340 Tank Farm PW-5416-1S1-4" 1/5 FW-1B BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5341 Tank Farm PW-5416-1S1-4" 1/5 FW-2A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5342 Tank Farm MO-0119-1A-12” 2/2 FW-36 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

5343 Tank Farm MO-0119-1A-12” 2/2 FW-48 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

5344 Tank Farm PW-5416-1S1-4" 2/5 FW-18 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5345 Tank Farm PW-5416-1S1-4" 2/5 FW-18A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5346 Tank Farm PW-5416-1S1-4" 2/5 FW-18B BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5347 Tank Farm PW-5416-1S1-4" 2/5 FW-18C BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5348 Tank Farm PW-5416-1S1-4" 2/5 FW-18D BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5349 Tank Farm PW-5416-1S1-4" 2/5 FW-21 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5350 Tank Farm PW-5416-1S1-4" 2/5 FW-24 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5351 Tank Farm SA-0001a-1B-2" 1/2 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

5352 Tank Farm SA-0001a-1B-2" 1/2 FW-8C BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

5353 Tank Farm SA-0001a-1B-2" 1/2 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

5354 Tank Farm DO-0021-1A-14" 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

5355 Tank Farm MO-0023-1A-12" 2/2 FW-26C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5356 Tank Farm SA-0001a-1B-2" 2/2 FW-14 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

5357 Tank Farm MO-0063-1A-10" 2/2 FW-26B BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5358 Tank Farm DO-0021-1A-14" 2/2 FW-24A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

5359 Tank Farm VL-0001-1A-10" 1/1 FW-7B BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

5360 Tank Farm MO-0043-1A-8" 1/1 FW-21B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

5361 Tank Farm MO-0023-1A-12" 2/2 FW-28A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5362 Tank Farm JF-0020-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Tee

5363 Tank Farm FW-0002-1C-14" 1/1 FW-11A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A234 Tee/45Elbow

5364 Tank Farm FW-0003b-1C-14" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Reducer

5365 Tank Farm FW-0003b-1C-14" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Reducer

5366 Tank Farm FW-0003b-1C-14" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5367 Tank Farm PW-6002-1B-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 Tee/90Elbow

5368 Tank Farm PW-6002-1B-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5369 Tank Farm PW-6002-1B-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5370 Tank Farm PW-6002-1B-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5371 Tank Farm PW-6002-1B-8" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5372 Tank Farm PW-6002-1B-8" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5373 Tank Farm PW-6002-1B-8" 1/1 FW-07 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5374 Tank Farm FW-6012-1B-10" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

5375 Tank Farm FW-6012-1B-10" 1/1 FW-07 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

5376 Tank Farm FW-6016-1B-10" 1/1 FW-05 BRW WPS-2016-21 GTAW 3/4" SCH20 A53/A105 Pipe/CPLG

5377 Tank Farm FW-6016-1B-10" 1/1 FW-06 BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/CPLG

5378 Tank Farm FW-6016-1B-10" 1/1 FW-07 BW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

5379 Tank Farm FW-6016-1B-10" 1/1 FW-11 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5380 Tank Farm FW-6016-1B-10" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

5381 Tank Farm FW-6016-1B-10" 1/1 FW-13 BW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

5382 Tank Farm FW-6016-1B-10" 1/1 FW-14 BW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

5383 Tank Farm FW-6016-1B-10" 1/1 FW-15 BW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

5384 Tank Farm FW-6016-1B-10" 1/1 FW-16 BW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

5385 Tank Farm FW-6016-1B-10" 1/1 FW-17 BW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

5386 Tank Farm FW-6016-1B-10" 1/1 FW-18 BW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

5387 Tank Farm FW-6008-1B-10" 1/1 FW-05 BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/CPLG

5388 Tank Farm FW-6008-1B-10" 1/1 FW-06 BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/CPLG

5389 Tank Farm FW-6008-1B-10" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

5390 Tank Farm FW-6008-1B-10" 1/1 FW-11 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5391 Tank Farm FW-6008-1B-10" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

5392 Tank Farm FW-6008-1B-10" 1/1 FW-13 BW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

5393 Tank Farm FW-6008-1B-10" 1/1 FW-14 BW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

5394 Tank Farm FW-6008-1B-10" 1/1 FW-15 BW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

5395 Tank Farm FW-6008-1B-10" 1/1 FW-16 BW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

5396 Tank Farm FW-6008-1B-10" 1/1 FW-17 BW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

5397 Tank Farm FW-6008-1B-10" 1/1 FW-18 BW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

5398 Tank Farm PW-5416-1S1-4" 1/5 FW-11 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5399 Tank Farm PW-5416-1S1-4" 2/5 FW-27A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5400 Tank Farm PW-5416-1S1-4" 2/5 FW-27B BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5401 Tank Farm PW-5416-1S1-4" 2/5 FW-27C BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5402 Tank Farm PW-5416-1S1-4" 2/5 FW-27D BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5403 Tank Farm PW-5416-1S1-4" 3/5 FW-28 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Tee

5404 Tank Farm PW-5416-1S1-4" 3/5 FW-29 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Tee

5405 Tank Farm PW-5416-1S1-4" 3/5 FW-29A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5406 Tank Farm PW-5416-1S1-4" 3/5 FW-30 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Tee

5407 Tank Farm PW-5416-1S1-4" 3/5 FW-31 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Tee

5408 Tank Farm PW-5416-1S1-4" 3/5 FW-31A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5409 Tank Farm PW-5416-1S1-4" 3/5 FW-31B BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5410 Tank Farm FW-6026-1B-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow

5411 Tank Farm FW-6026-1B-10" 1/1 FW-2A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A53 Pipe/Pipe

5412 Tank Farm FW-6026-1B-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5413 Tank Farm FW-6026-1B-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

5414 Tank Farm FW-6026-1B-10" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

5415 Tank Farm FW-0001-1C-14" 1/1 FW-08 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

5416 Tank Farm FW-0001-1C-14" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

5417 Tank Farm FW-0001-1C-14" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5418 Tank Farm PW-6002-1B-8" 1/1 FW-6A BRW WPS-2016-23 GTAW/SMAW 1" SCH80 A53/A105 Pipe/Weldolet

5419 Tank Farm FS-6206-1D-8'' 2/2 FW-42 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5420 Tank Farm FS-6206-1D-8'' 2/2 FW-43 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5421 Tank Farm FS-6206-1D-8'' 2/2 FW-49 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5422 Tank Farm FS-6206-1D-8'' 2/2 FW-50 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5423 Tank Farm FS-6206-1D-8'' 2/2 FW-51 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5424 Tank Farm FS-6206-1D-8'' 2/2 FW-62 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5425 Tank Farm FS-6206-1D-8'' 2/2 FW-63 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5426 Tank Farm FS-6206-1D-8'' 2/2 FW-64 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5427 Tank Farm FS-6206-1D-8'' 1/2 FW-23 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5428 Tank Farm FS-6206-1D-8'' 1/2 FW-24 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5429 Tank Farm FS-6206-1D-8'' 1/2 FW-25 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5430 Tank Farm FS-6206-1D-8'' 1/2 FW-30 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5431 Tank Farm FS-6206-1D-8'' 1/2 FW-31 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5432 Tank Farm VL-0001-1A-10" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

5433 Tank Farm MO-0063-1A-10" 2/2 FW-29A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

5434 Tank Farm MO-0043-1A-8" 1/1 FW-21D BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5435 Tank Farm MO-0043-1A-8" 1/1 FW-21E BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

5436 Tank Farm SA-0001a-1B-2" 2/2 FW-20 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

5437 Tank Farm PW-5426-1S1-2" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5438 Tank Farm PW-5426-1S1-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5439 Tank Farm PW-5426-1S1-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5440 Tank Farm PW-5426-1S1-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5441 Tank Farm PW-5426-1S1-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5442 Tank Farm PW-5426-1S1-2" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5443 Tank Farm PW-5426-1S1-2" 1/1 FW-07 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Gate

5444 Tank Farm PW-5427-1S1-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5445 Tank Farm PW-5427-1S1-2" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5446 Tank Farm PW-5428-1S1-2" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5447 Tank Farm PW-5428-1S1-2" 1/1 FW-07 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Gate

5448 Tank Farm PW-5428-1S1-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5449 Tank Farm PW-5428-1S1-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5450 Tank Farm PW-5428-1S1-2" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5451 Tank Farm PW-5428-1S1-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5452 Tank Farm PW-5428-1S1-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5453 Tank Farm VL-0004-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

5454 Tank Farm VL-0004-1A-3" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

5455 Tank Farm FW-6003-1B-12" 1/1 FW-09 BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/CPLG

5456 Tank Farm FW-6003-1B-12" 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5457 Tank Farm FW-6003-1B-12" 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH20 A53/A105 Pipe/Gate

5458 Tank Farm VL-0002-1A-3" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

5459 Tank Farm VL-0002-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

5460 Tank Farm VL-0003-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

5461 Tank Farm VL-0003-1A-3" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

5462 Tank Farm VL-0006-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

5463 Tank Farm VL-0006-1A-3" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

5464 Tank Farm VL-0008-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

5465 Tank Farm VL-0008-1A-3" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

5466 Tank Farm FW-0003b-1C-14" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5467 Tank Farm FW-0003b-1C-14" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5468 Tank Farm FW-0003b-1C-14" 1/1 FW-22A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5469 Tank Farm FW-0003b-1C-14" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5470 Tank Farm FW-0003b-1C-14" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5471 Tank Farm FW-6003-1B-12" 1/1 FW-05 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

5472 Tank Farm FW-6003-1B-12" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

5473 Tank Farm FW-6003-1B-12" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

5474 Tank Farm FW-6003-1B-12" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Flange

5475 Tank Farm FW-6002-1B-12" 1/1 FW-09 BRW WPS-2016-23 GTAW/SMAW 3/4" SCH20 A53/A105 Pipe/CPLG

5476 Tank Farm FW-6002-1B-12" 1/1 FW-10 BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/CPLG

5477 Tank Farm FW-6002-1B-12" 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

5478 Tank Farm FW-6002-1B-12" 1/1 FW-05 BRW WPS-2016-23 GTAW/SMAW 1" SCH80 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5479 Tank Farm FW-6002-1B-12" 1/1 FW-06 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

5480 Tank Farm FW-6002-1B-12" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

5481 Tank Farm FW-6002-1B-12" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

5482 Tank Farm FW-6004-1B-12" 1/1 FW-09 BRW WPS-2016-23 GTAW/SMAW 3/4" SCH80 A53/A105 Pipe/CPLG

5483 Tank Farm FW-6004-1B-12" 1/1 FW-10 BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/CPLG

5484 Tank Farm FW-6004-1B-12" 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

5485 Tank Farm FW-6004-1B-12" 1/1 FW-05 BRW WPS-2016-23 GTAW/SMAW 1" SCH80 A53/A105 Pipe/CPLG

5486 Tank Farm FW-6004-1B-12" 1/1 FW-06 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

5487 Tank Farm FW-6004-1B-12" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

5488 Tank Farm FW-6004-1B-12" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

5489 Tank Farm FW-6012-1B-10" 1/1 FW-05 BRW WPS-2016-23 GTAW/SMAW 3/4" SCH80 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5490 Tank Farm FW-6012-1B-10" 1/1 FW-06 BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/CPLG

5491 Tank Farm FW-6012-1B-10" 1/1 FW-11 BRW WPS-2016-23 GTAW/SMAW 1" SCH80 A53/A105 Pipe/CPLG

5492 Tank Farm FW-6012-1B-10" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

5493 Tank Farm FW-6012-1B-10" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

5494 Tank Farm FW-6012-1B-10" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

5495 Tank Farm FW-6012-1B-10" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

5496 Tank Farm FW-6012-1B-10" 1/1 FW-16 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

5497 Tank Farm FW-6012-1B-10" 1/1 FW-17 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

5498 Tank Farm FW-6012-1B-10" 1/1 FW-18 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

5499 Tank Farm VL-0002-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

5500 Tank Farm VL-0003-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5501 Tank Farm VL-0004-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

5502 Tank Farm VL-0006-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

5503 Tank Farm VL-0008-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

5504 Tank Farm PW-5432-1S1-1" 1/1 FW-04 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

5505 Tank Farm PW-5432-1S1-1" 1/1 FW-3D BW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/Pipe

5506 Tank Farm PW-5414A-1S1-4" 1/1 FW-12 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5507 Tank Farm PW-5414A-1S1-4" 1/1 FW-13 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5508 Tank Farm PW-5414A-1S1-4" 1/1 FW-14 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5509 Tank Farm PW-5414A-1S1-4" 1/1 FW-15 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5510 Tank Farm PW-5414A-1S1-4" 1/1 FW-16 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5511 Tank Farm PW-5408-1S2-2" 1/1 FW-08 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5512 Tank Farm PW-5407-1S2-1 ½" FW-19A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Pipe

5513 Tank Farm PW-5408-1S2-2" 1/1 FW-10 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5514 Tank Farm PW-5430-1S1-2" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5515 Tank Farm PW-5430-1S1-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5516 Tank Farm PW-5427-1S1-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5517 Tank Farm PW-5427-1S1-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5518 Tank Farm PW-5416-1S1-4" 3/5 FW-34 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5519 Tank Farm PW-5416-1S1-4" 3/5 FW-35 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5520 Tank Farm PW-5416-1S1-4" 4/5 FW-36 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5521 Tank Farm FW-7301-1D-2½" 1/1 FW-52 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5522 Tank Farm FW-7301-1D-2½" 1/1 FW-53 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5523 Tank Farm FW-7301-1D-2½" 1/1 FW-54 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5524 Tank Farm FW-7401-1D-2 ½" 1/1 FW-30 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5525 Tank Farm FW-7401-1D-2 ½" 1/1 FW-31 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5526 Tank Farm FW-7401-1D-2 ½" 1/1 FW-32 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5527 Tank Farm FW-7401-1D-2 ½" 1/1 FW-33 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5528 Tank Farm FW-7401-1D-2 ½" 1/1 FW-34 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5529 Tank Farm FW-7401-1D-2 ½" 1/1 FW-35 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5530 Tank Farm FW-7401-1D-2 ½" 1/1 FW-36 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5531 Tank Farm FW-7401-1D-2 ½" 1/1 FW-37 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5532 Tank Farm FW-7401-1D-2 ½" 1/1 FW-38 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5533 Tank Farm FW-7401-1D-2 ½" 1/1 FW-41 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5534 Tank Farm FW-7401-1D-2 ½" 1/1 FW-39 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Reducer

5535 Tank Farm FW-7401-1D-2 ½" 1/1 FW-40 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Reducer

5536 Tank Farm FW-7301-1D-2½" 1/1 FW-18 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5537 Tank Farm FW-7301-1D-2½" 1/1 FW-19 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5538 Tank Farm FW-7301-1D-2½" 1/1 FW-46 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5539 Tank Farm FW-7301-1D-2½" 1/1 FW-47 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5540 Tank Farm FW-7301-1D-2½" 1/1 FW-48 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5541 Tank Farm FW-7301-1D-2½" 1/1 FW-49 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

5542 Tank Farm PW-5416-1S1-4" 3/5 FW-32 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Tee

5543 Tank Farm PW-5416-1S1-4" 3/5 FW-33A BW WPS-2016-27 GTAW 4" SCH10S A182/A182 Tee/Reducer

5544 Tank Farm PW-5430-1S1-2" 1/1 FW-1A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5545 Tank Farm PW-5426-1S1-2" 1/1 FW-1A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5546 Tank Farm PW-5430-1S1-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5547 Tank Farm PW-5430-1S1-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5548 Tank Farm PW-5430-1S1-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5549 Tank Farm PW-5430-1S1-2" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5550 Tank Farm PW-5430-1S1-2" 1/1 FW-07 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Gate

5551 Tank Farm PW-5416-1S1-4" 3/5 FW-34C BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5552 Tank Farm FW-0008-1C-14" 2/2 FW-17 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5553 Tank Farm FW-0008-1C-14" 2/2 FW-18A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5554 Tank Farm FW-0008-1C-14" 2/2 FW-18B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5555 Tank Farm FW-0008-1C-14" 2/2 FW-16A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5556 Tank Farm FW-0008-1C-14" 2/2 FW-16B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5557 Tank Farm FW-0008-1C-14" 1/2 FW-1A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5558 Tank Farm FW-1101-1D-6" 1/1 FW-819A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

5559 Tank Farm FW-1101-1D-6" 1/1 FW-822 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

5560 Tank Farm FW-6010-1B-10" 2/2 FW-33A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A53 Pipe/Pipe

5561 Tank Farm FW-6010-1B-10" 2/2 FW-33B BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A53 Pipe/Pipe

5562 Tank Farm FW-6010-1B-10" 2/2 FW-34 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

5563 Tank Farm FW-6010-1B-10" 2/2 FW-35 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

5564 Tank Farm FW-6010-1B-10" 2/2 FW-36 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

5565 Tank Farm PW-6001-1B-8" 1/2 FW-20 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5566 Tank Farm PW-6001-1B-8" 1/2 FW-21 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5567 Tank Farm PW-6001-1B-8" 1/2 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5568 Tank Farm PW-6001-1B-8" 1/2 FW-27 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5569 Tank Farm PW-6002-1B-8" 1/1 FW-08 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

5570 Tank Farm PW-6002-1B-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5571 Tank Farm PW-6002-1B-8" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5572 Tank Farm PW-6002-1B-8" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

5573 Tank Farm PW-5416-1S1-4" 3/5 FW-34D BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5574 Tank Farm PW-5416-1S1-4" 1/5 FW-12 BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5575 Tank Farm PW-5416-1S1-4" 3/5 FW-33B BW WPS-2016-27 GTAW 2" SCH10S A182/A182 Pipe/Reducer

5576 Tank Farm MO-0092-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5577 Tank Farm MO-0093-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5578 Tank Farm MO-0094-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5579 Tank Farm MO-0095-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5580 Tank Farm MO-0091-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5581 Tank Farm PW-5416-1S1-4" 3/5 FW-29B BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5582 Tank Farm PW-5416-1S1-4" 3/5 FW-34A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5583 Tank Farm PW-5416-1S1-4" 3/5 FW-34B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5584 Tank Farm MO-0090-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5585 Tank Farm MO-0089-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5586 Tank Farm MO-0088-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5587 Tank Farm MO-0087-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5588 Tank Farm MO-0086-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5589 Tank Farm MO-0085-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5590 Tank Farm MO-0084-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5591 Tank Farm MO-0083-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5592 Tank Farm MO-0082-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5593 Tank Farm PW-5416-1S1-4" 1/5 FW-15 BW WPS-2016-27 GTAW 4" SCH10S A182/A182 Pipe/Tee

5594 Tank Farm PW-5416-1S1-4" 4/5 FW-36A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5595 Tank Farm PW-5416-1S1-4" 4/5 FW-37 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

5596 Tank Farm PW-5416-1S1-4" 4/5 FW-38 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

5597 Tank Farm PW-5416-1S1-4" 4/5 FW-39 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

5598 Tank Farm PW-5416-1S1-4" 4/5 FW-40 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

5599 Tank Farm PW-5416-1S1-4" 4/5 FW-42A BW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/Pipe

5600 Tank Farm PW-5416-1S1-4" 4/5 FW-42B BW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/Pipe

5601 Tank Farm PW-5416-1S1-4" 4/5 FW-42C BW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/Pipe

5602 Tank Farm VL-0001-1A-10" 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5603 Tank Farm VL-0001-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

5604 Tank Farm VL-0001-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

5605 Tank Farm VL-0001-1A-10" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

5606 Tank Farm VL-0001-1A-10" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

5607 Tank Farm VL-0001-1A-10" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

5608 Tank Farm PW-5407-1S2-1 ½" FW-01 SW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/90Elbow

5609 Tank Farm PW-5407-1S2-1 ½" FW-02 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5610 Tank Farm PW-5407-1S2-1 ½" FW-03 BW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Tee

5611 Tank Farm PW-5407-1S2-1 ½" FW-04 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5612 Tank Farm PW-5407-1S2-1 ½" FW-05 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5613 Tank Farm PW-5407-1S2-1 ½" FW-06 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5614 Tank Farm PW-5407-1S2-1 ½" FW-07 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5615 Tank Farm PW-5407-1S2-1 ½" FW-08 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5616 Tank Farm PW-5407-1S2-1 ½" FW-09 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5617 Tank Farm PW-5407-1S2-1 ½" FW-10 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5618 Tank Farm PW-5407-1S2-1 ½" FW-11 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5619 Tank Farm PW-5407-1S2-1 ½" FW-12 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5620 Tank Farm PW-5407-1S2-1 ½" FW-13 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5621 Tank Farm PW-5407-1S2-1 ½" FW-14 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Gate

5622 Tank Farm PW-5407-1S2-1 ½" FW-15 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Gate

5623 Tank Farm PW-5407-1S2-1 ½" FW-16 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5624 Tank Farm PW-5407-1S2-1 ½" FW-17 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5625 Tank Farm PW-5407-1S2-1 ½" FW-18 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Flange

5626 Tank Farm PW-5407-1S2-1 ½" FW-19 SW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5627 Tank Farm PW-5407-1S2-1 ½" FW-20 SW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5628 Tank Farm PW-5407-1S2-1 ½" FW-21 SW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5629 Tank Farm PW-5407-1S2-1 ½" FW-22 SW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5630 Tank Farm PW-5407-1S2-1 ½" FW-23 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5631 Tank Farm PW-5407-1S2-1 ½" FW-24 BW WPS-2016-27 GTAW 1½" SCH10S A312/A182 Pipe/Tee

5632 Tank Farm PW-5407-1S2-1 ½" FW-25 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5633 Tank Farm PW-5407-1S2-1 ½" FW-26 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5634 Tank Farm PW-5407-1S2-1 ½" FW-27 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5635 Tank Farm PW-5407-1S2-1 ½" FW-28 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5636 Tank Farm PW-5407-1S2-1 ½" FW-29 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5637 Tank Farm PW-5407-1S2-1 ½" FW-30 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5638 Tank Farm PW-5407-1S2-1 ½" FW-31 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5639 Tank Farm PW-5407-1S2-1 ½" FW-32 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5640 Tank Farm PW-5407-1S2-1 ½" FW-33 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5641 Tank Farm PW-5407-1S2-1 ½" FW-34 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

5642 Tank Farm PW-5407-1S2-1 ½" FW-35 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Gate

5643 Tank Farm PW-5407-1S2-1 ½" FW-40 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5644 Tank Farm PW-5407-1S2-1 ½" FW-41 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

5645 Tank Farm MO-0030-1A-10" 1/1 FW-10 BRW WPS-2016-23 GTAW/SMAW 1/2" SCH20 A106/A105 Pipe/Scokolet

5646 Tank Farm MO-0030-1A-10" 1/1 FW-04 BRW WPS-2016-23 GTAW/SMAW 1/2" SCH20 A106/A105 Pipe/Scokolet

5647 Tank Farm MO-0027-1A-10" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

5648 Tank Farm MO-0027-1A-10" 1/1 FW-10 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

5649 Tank Farm MO-0027-1A-10" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

5650 Tank Farm DO-0022-1A-10" 1/1 FW-10 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5651 Tank Farm DO-0022-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

5652 Tank Farm DO-0025-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A234/A105 Pipe/Reducer

5653 Tank Farm DO-0028-1A-10" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

5654 Tank Farm DO-0028-1A-10" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A234/A105 Reducer/Flange

5655 Tank Farm MO-0026-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A105 Reducer/Flange

5656 Tank Farm MO-0026-1A-6" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5657 Tank Farm MO-0025-1A-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 90Elbow/Tee

5658 Tank Farm JF-0028-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

5659 Tank Farm JF-0027-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

5660 Tank Farm VL-0001-1A-10" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

5661 Tank Farm VL-0001-1A-10" 1/1 FW-11A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

5662 Tank Farm VL-0001-1A-10" 1/1 FW-11B BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5663 Tank Farm DO-0031-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

5664 Tank Farm PW-5432-1S1-1" 1/1 FW-03 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

5665 Tank Farm PW-5432-1S1-1" 1/1 FW-02 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

5666 Tank Farm PW-5408-1S2-2" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5667 Tank Farm PW-5408-1S2-2" 1/1 FW-13 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5668 Tank Farm PW-5408-1S2-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5669 Tank Farm PW-5408-1S2-2" 1/1 FW-4A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5670 Tank Farm PW-5408-1S2-2" 1/1 FW-4B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5671 Tank Farm PW-5408-1S2-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5672 Tank Farm PW-5408-1S2-2" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5673 Tank Farm PW-5408-1S2-2" 1/1 FW-6A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5674 Tank Farm PW-5408-1S2-2" 1/1 FW-6B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5675 Tank Farm PW-5408-1S2-2" 1/1 FW-6C BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5676 Tank Farm PW-5408-1S2-2" 1/1 FW-8A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5677 Tank Farm PW-5408-1S2-2" 1/1 FW-8B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

5678 Tank Farm PW-5408-1S2-2" 1/1 FW-09 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5679 Tank Farm PW-5416-1S2-2" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5680 Tank Farm PW-5408-1S2-2" 1/1 FW-11 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5681 Tank Farm PW-5408-1S2-2" 1/1 FW-12 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5682 Tank Farm FW-7301-1D-2½" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5683 Tank Farm FW-7301-1D-2½" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

5684 Tank Farm PW-5408-1S2-2" 1/1 FW-14 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5685 Tank Farm MO-0029-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A105 Reducer/Flange

5686 Tank Farm MO-0029-1A-6" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5687 Tank Farm MO-0028-1A-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

5688 Tank Farm MO-0011-1A-12" 1/1 FW-10 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

5689 Tank Farm MO-0011-1A-12" 1/1 FW-11 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

5690 Tank Farm MO-0011-1A-12" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

5691 Tank Farm MO-0011-1A-12" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5692 Tank Farm MO-0011-1A-12" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5693 Tank Farm MO-0011-1A-12" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5694 Tank Farm MO-0011-1A-12" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

5695 Tank Farm MO-0011-1A-12" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5696 Tank Farm MO-0031-1A-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/90Elbow

5697 Tank Farm MO-0014-1A-14" 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

5698 Tank Farm MO-0014-1A-14" 1/2 FW-10 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

5699 Tank Farm MO-0014-1A-14" 1/2 FW-09 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

5700 Tank Farm MO-0012-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

5701 Tank Farm MO-0012-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

5702 Tank Farm MO-0012-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

5703 Tank Farm MO-0012-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

5704 Tank Farm MO-0012-1A-8" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

5705 Tank Farm AD-0002-1S1-2" 1/2 FW-09 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5706 Tank Farm AD-0002-1S1-2" 1/2 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5707 Tank Farm AD-0002-1S1-2" 1/2 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5708 Tank Farm AD-0002-1S1-2" 1/2 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5709 Tank Farm AD-0002-1S1-2" 1/2 FW-07 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5710 Tank Farm AD-0002-1S1-2" 1/2 FW-08 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5711 Tank Farm AD-0003-1S1-2" 1/2 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5712 Tank Farm AD-0003-1S1-2" 1/2 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5713 Tank Farm AD-0003-1S1-2" 1/2 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5714 Tank Farm AD-0003-1S1-2" 1/2 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5715 Tank Farm AD-0001-1S1-2" 1/2 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5716 Tank Farm AD-0001-1S1-2" 1/2 FW-07 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5717 Tank Farm AD-0001-1S1-2" 1/2 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5718 Tank Farm AD-0002-1S1-2" 1/2 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5719 Tank Farm AD-0002-1S1-2" 1/2 FW-10 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

5720 Tank Farm MO-0032-1A-6" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5721 Tank Farm MO-0032-1A-6" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5722 Tank Farm MO-0032-1A-6" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5723 Tank Farm MO-0032-1A-6" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5724 Tank Farm MO-0032-1A-6" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5725 Tank Farm MO-0029-1A-6" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5726 Tank Farm MO-0029-1A-6" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5727 Tank Farm MO-0029-1A-6" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5728 Tank Farm MO-0029-1A-6" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5729 Tank Farm MO-0029-1A-6" 1/1 FW-26A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

5730 Tank Farm MO-0029-1A-6" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

5731 Tank Farm MO-0026-1A-6" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5732 Tank Farm MO-0026-1A-6" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5733 Tank Farm MO-0026-1A-6" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5734 Tank Farm FW-0015-1C-14" 3/3 FW-35A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5735 Tank Farm FW-0015-1C-14" 2/3 FW-32A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5736 Tank Farm FW-0015-1C-14" 3/3 FW-35B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5737 Tank Farm FW-0015-1C-14" 2/3 FW-32B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5738 Tank Farm FW-0015-1C-14" 3/3 FW-35 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5739 Tank Farm FW-0015-1C-14" 3/3 FW-42 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A234 Tee/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5740 Tank Farm PW-5414-1S1-4" 1/1 FW-7A BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5741 Tank Farm PW-5414-1S1-4" 1/1 FW-08 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5742 Tank Farm PW-5414-1S1-4" 1/1 FW-09 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5743 Tank Farm PW-5414-1S1-4" 1/1 FW-10 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5744 Tank Farm PW-5414-1S1-4" 1/1 FW-11 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5745 Tank Farm PW-5414-1S1-4" 1/1 FW-01 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5746 Tank Farm PW-5414-1S1-4" 1/1 FW-3A BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/Pipe

5747 Tank Farm PW-5408A-1S2-2" 1/1 FW-13 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5748 Tank Farm PW-5408A-1S2-2" 1/1 FW-14 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

5749 Tank Farm PW-5414-1S1-4" 1/1 FW-06 BW WPS-2016-27 GTAW 4" SCH10S A312/A182 Pipe/90Elbow

5750 Tank Farm PW-5414-1S1-4" 1/1 FW-4B BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5751 Tank Farm PW-5414-1S1-4" 1/1 FW-3B BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

5752 Tank Farm MO-0029-1A-6" 1/1 FW-23A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5753 Tank Farm MO-0026-1A-6" 1/1 FW-23A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5754 Tank Farm MO-0084-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

5755 Tank Farm MO-0043-1A-8" 1/1 FW-21A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Pipe

5756 Tank Farm MO-0085-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Flange

5757 Tank Farm MO-0092-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Flange

5758 Tank Farm MO-0093-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Flange

5759 Tank Farm MO-0095-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Flange

5760 Tank Farm FW-0011-1C-14" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Cap

5761 Tank Farm FW-0011-1C-14" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5762 Tank Farm FW-0011-1C-14" 1/1 FW-09 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Scokolet

5763 Tank Farm FW-0011-1C-14" 1/1 FW-10 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

5764 Tank Farm FW-0011-1C-14" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Cap

5765 Tank Farm FW-0011-1C-14" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5766 Tank Farm FW-0011-1C-14" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5767 Tank Farm FW-0011-1C-14" 1/1 RW-21 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5768 Tank Farm MO-0017-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

5769 Tank Farm MO-0017-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

5770 Tank Farm MO-0017-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

5771 Tank Farm MO-0017-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

5772 Tank Farm MO-0022-1A-8” 4/4 FW-72 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5773 SRC DO-0001-1A-12” 1/7 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5774 SRC DO-0001-1A-12” 1/7 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5775 SRC DO-0001-1A-12” 1/7 FW-6A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5776 SRC DO-0001-1A-12” 1/7 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5777 SRC DO-0001-1A-12” 1/7 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5778 SRC DO-0001-1A-12” 1/7 FW-08 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

5779 SRC DO-0001-1A-12” 1/7 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5780 SRC DO-0001-1A-12” 1/7 FW-15 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5781 SRC DO-0001-1A-12” 1/7 FW-12 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

5782 SRC DO-0001-1A-12” 2/7 FW-17 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5783 SRC DO-0001-1A-12” 2/7 FW-18 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5784 SRC DO-0001-1A-12” 2/7 FW-20 BRW WPS-2016-23 GTAW/SMAW 1½" SCH80 A106/A105 Pipe/Scokolet

5785 SRC DO-0001-1A-12” 2/7 FW-24 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

5786 SRC DO-0001-1A-12” 3/7 FW-42 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

5787 SRC DO-0001-1A-12” 4/7 FW-52 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

5788 SRC DO-0001-1A-12” 4/7 FW-53 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5789 SRC DO-0001-1A-12” 4/7 FW-54 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5790 SRC DO-0001-1A-12” 4/7 FW-56 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5791 SRC DO-0001-1A-12” 4/7 FW-59A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5792 SRC DO-0001-1A-12” 4/7 FW-60 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5793 SRC DO-0001-1A-12” 4/7 FW-61 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5794 SRC DO-0001-1A-12” 4/7 FW-61A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5795 SRC DO-0001-1A-12” 4/7 FW-61B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5796 SRC DO-0001-1A-12” 4/7 FW-61C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5797 SRC DO-0001-1A-12” 4/7 FW-62 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5798 SRC DO-0001-1A-12” 5/7 FW-63 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5799 SRC DO-0001-1A-12” 5/7 FW-65 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5800 SRC DO-0001-1A-12” 5/7 FW-66 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5801 SRC DO-0001-1A-12” 5/7 FW-66A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5802 SRC DO-0001-1A-12” 1/7 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

5803 SRC DO-0001-1A-12” 5/7 FW-68 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5804 SRC DO-0001-1A-12” 7/7 FW-96 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

5805 SRC DO-0001-1A-12” 7/7 FW-89 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5806 SRC DO-0001-1A-12” 6/7 FW-81B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5807 SRC JF-0001-1A-12” 1/7 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5808 SRC JF-0001-1A-12” 1/7 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5809 SRC JF-0001-1A-12” 1/7 FW-05 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5810 SRC JF-0001-1A-12” 1/7 FW-5A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5811 SRC JF-0001-1A-12” 1/7 FW-7A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5812 SRC JF-0001-1A-12” 1/7 FW-7B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5813 SRC JF-0001-1A-12” 1/7 FW-8A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5814 SRC JF-0001-1A-12” 1/7 FW-12 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

5815 SRC JF-0001-1A-12” 1/7 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5816 SRC JF-0001-1A-12” 2/7 FW-16 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5817 SRC JF-0001-1A-12” 2/7 FW-17 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5818 SRC JF-0001-1A-12” 2/7 FW-23 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5819 SRC JF-0001-1A-12” 2/7 FW-28 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5820 SRC JF-0001-1A-12” 3/7 FW-43 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5821 SRC JF-0001-1A-12” 3/7 FW-41 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Reducer

5822 SRC JF-0001-1A-12” 3/7 FW-40 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5823 SRC JF-0001-1A-12” 3/7 FW-39 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5824 SRC JF-0001-1A-12” 4/7 FW-51A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5825 SRC JF-0001-1A-12” 4/7 FW-60A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5826 SRC JF-0001-1A-12” 4/7 FW-51 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

5827 SRC JF-0001-1A-12” 4/7 FW-52 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5828 SRC JF-0001-1A-12” 4/7 FW-55 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5829 SRC JF-0001-1A-12” 4/7 FW-60 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5830 SRC JF-0001-1A-12” 4/7 FW-61 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5831 SRC JF-0001-1A-12” 4/7 FW-62 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5832 SRC JF-0001-1A-12” 5/7 FW-62B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5833 SRC JF-0001-1A-12” 5/7 FW-62C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5834 SRC JF-0001-1A-12” 5/7 FW-63 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5835 SRC JF-0001-1A-12” 5/7 FW-64 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5836 SRC JF-0001-1A-12” 5/7 FW-64A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5837 SRC JF-0001-1A-12” 5/7 FW-66 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5838 SRC MO-0001-1A-12” 1/7 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5839 SRC MO-0001-1A-12” 1/7 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5840 SRC MO-0001-1A-12” 1/7 FW-5A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5841 SRC MO-0001-1A-12” 1/7 FW-09 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5842 SRC MO-0001-1A-12” 1/7 FW-9A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5843 SRC MO-0001-1A-12” 1/7 FW-15A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5844 SRC MO-0001-1A-12” 1/7 FW-15B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5845 SRC MO-0001-1A-12” 1/7 FW-16 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

5846 SRC MO-0001-1A-12” 2/7 FW-27 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

5847 SRC MO-0001-1A-12” 2/7 FW-20 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5848 SRC MO-0001-1A-12” 4/7 FW-50 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5849 SRC MO-0001-1A-12” 4/7 FW-54 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5850 SRC MO-0001-1A-12” 4/7 FW-55 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

5851 SRC MO-0001-1A-12” 4/7 FW-56 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5852 SRC MO-0001-1A-12” 4/7 FW-58 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5853 SRC MO-0001-1A-12” 4/7 FW-59 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5854 SRC MO-0001-1A-12” 4/7 FW-60A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5855 SRC MO-0001-1A-12” 4/7 FW-63 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5856 SRC MO-0001-1A-12” 4/7 FW-64 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5857 SRC MO-0001-1A-12” 4/7 FW-64A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5858 SRC MO-0001-1A-12” 4/7 FW-64B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5859 SRC MO-0001-1A-12” 4/7 FW-64C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5860 SRC MO-0001-1A-12” 4/7 FW-65 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5861 SRC MO-0001-1A-12” 5/7 FW-66 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 90Elbow/90Elbow

5862 SRC MO-0001-1A-12” 5/7 FW-67 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5863 SRC MO-0001-1A-12” 5/7 FW-68 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5864 SRC MO-0001-1A-12” 5/7 FW-69 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5865 SRC MO-0001-1A-12” 5/7 FW-69A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5866 SRC MO-0001-1A-12” 5/7 FW-71 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5867 SRC MO-0001-1A-12” 2/7 FW-21 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5868 SRC FW-0015-1C-14" 1/3 FW-02 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

5869 SRC FW-0015-1C-14" 2/3 FW-28D BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5870 SRC FW-0015-1C-14" 1/3 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5871 SRC FW-0015-1C-14" 1/3 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 90Elbow/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5872 SRC FW-0015-1C-14" 1/3 FW-11D BRW WPS-2016-21 GTAW/SMAW 2" SCH40 A53/A105 Pipe/Weldolet

5873 SRC FW-0015-1C-14" 1/3 FW-07 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5874 SRC FW-0015-1C-14" 1/3 FW-7A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5875 SRC FW-0015-1C-14" 1/3 FW-7B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5876 SRC FW-0015-1C-14" 1/3 FW-08 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5877 SRC FW-0015-1C-14" 1/3 FW-09 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5878 SRC FW-0015-1C-14" 1/3 FW-10 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5879 SRC FW-0015-1C-14" 1/3 FW-11 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5880 SRC FW-0015-1C-14" 1/3 FW-11A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5881 SRC FW-0015-1C-14" 1/3 FW-11B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5882 SRC FW-0015-1C-14" 1/3 FW-11C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5883 SRC FW-0015-1C-14" 1/3 FW-12 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5884 SRC FW-0015-1C-14" 1/3 FW-13 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A234 90Elbow/90Elbow

5885 SRC FW-0015-1C-14" 2/3 FW-28A SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5886 SRC FW-0015-1C-14" 1/3 FW-15 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5887 SRC FW-0015-1C-14" 1/3 FW-15A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5888 SRC FW-0015-1C-14" 1/3 FW-16 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5889 SRC FW-0015-1C-14" 1/3 FW-17 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5890 SRC FW-0015-1C-14" 1/3 FW-17A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5891 SRC FW-0015-1C-14" 1/3 FW-18 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5892 SRC FW-0015-1C-14" 1/3 FW-19 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5893 SRC FW-0015-1C-14" 2/3 FW-20 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5894 SRC FW-0015-1C-14" 2/3 FW-24 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5895 SRC FW-0015-1C-14" 2/3 FW-24A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5896 SRC FW-0015-1C-14" 2/3 FW-25 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5897 SRC FW-0015-1C-14" 2/3 FW-26 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5898 SRC FW-0015-1C-14" 2/3 FW-26A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5899 SRC FW-0015-1C-14" 2/3 FW-26B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5900 SRC FW-0015-1C-14" 2/3 FW-26C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5901 SRC FW-0015-1C-14" 2/3 FW-26D BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5902 SRC FW-0015-1C-14" 2/3 FW-26E BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5903 SRC MO-0001A-1A-12” 2/5 FW-20 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

5904 SRC MO-0001A-1A-12” 2/5 FW-21 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5905 SRC MO-0001A-1A-12” 2/5 FW-20C SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

5906 SRC MO-0001A-1A-12” 2/5 FW-23 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5907 SRC MO-0001A-1A-12” 2/5 FW-24 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5908 SRC MO-0001A-1A-12” 2/5 FW-25 BRW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Scokolet

5909 SRC MO-0001A-1A-12” 2/5 FW-29 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5910 SRC MO-0001A-1A-12” 2/5 FW-30 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5911 SRC MO-0001A-1A-12” 2/5 FW-31 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5912 SRC MO-0001A-1A-12” 2/5 FW-32 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5913 SRC MO-0001A-1A-12” 2/5 FW-33 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5914 SRC MO-0001A-1A-12” 2/5 FW-34 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5915 SRC MO-0001A-1A-12” 2/5 FW-32I BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5916 SRC MO-0001A-1A-12” 2/5 FW-32J BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Pipe

5917 SRC MO-0001A-1A-12” 5/5 FW-52A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

5918 SRC MO-0001A-1A-12” 3/5 FW-40 SOW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

5919 SRC MO-0001A-1A-12” 3/5 FW-38 BRW WPS-2016-21 GTAW/SMAW 1½" SCH80 A106/A105 Pipe/Scokolet

5920 SRC MO-0001A-1A-12” 2/5 FW-20A BRW WPS-2016-21 GTAW/SMAW 1/2" SCH80 A106/A105 Pipe/scokolet

5921 SRC MO-0001A-1A-12” 2/5 FW-20B SW WPS-2016-21 GTAW/SMAW 1/2" SCH80 A106/A234 Pipe/scokolet

5922 SRC MO-0001A-1A-12” 4/5 FW-49 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5923 SRC MO-0001A-1A-12” 4/5 FW-50 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5924 SRC MO-0001A-1A-12” 5/5 FW-57 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5925 SRC MO-0001A-1A-12” 5/5 FW-58 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5926 SRC MO-0001A-1A-12” 5/5 FW-59 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5927 SRC MO-0001A-1A-12” 5/5 FW-60 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5928 SRC MO-0001A-1A-12” 5/5 FW-64 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5929 SRC MO-0001A-1A-12” 5/5 FW-65 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5930 Tank Farm MO-0022-1A-8” 3/4 FW-48 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

5931 Tank Farm MO-0022-1A-8” 3/4 FW-51 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

5932 Tank Farm FW-0015-1C-14" 3/3 FW-41 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Cap

5933 Tank Farm FW-0015-1C-14" 3/3 FW-48 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Cap

5934 Tank Farm FW-0015-1C-14" 3/3 FW-40 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5935 Tank Farm FW-0015-1C-14" 3/3 FW-44 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

5936 Tank Farm FW-0015-1C-14" 3/3 FW-36 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

5937 Tank Farm FW-0015-1C-14" 3/3 FW-37 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5938 Tank Farm FW-0015-1C-14" 3/3 FW-39 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

5939 Tank Farm FW-0015-1C-14" 3/3 FW-43 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

5940 Tank Farm FW-0015-1C-14" 3/3 FW-38 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A234 Tee/Tee

5941 Tank Farm DO-0030-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 Reducer/Flange

5942 Tank Farm DO-0030-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 Reducer/90Elbow

5943 Tank Farm DO-0029-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 Tee/90Elbow

5944 Tank Farm DO-0029-1A-8" 1/1 FW-02 BRW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Scokolet

5945 Tank Farm DO-0027-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 Reducer/Flange

5946 Tank Farm DO-0027-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 90Elbow/Reducer

5947 Tank Farm DO-0027-1A-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

5948 Tank Farm DO-0026-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 Tee/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5949 Tank Farm DO-0026-1A-8" 1/1 FW-02 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Scokolet

5950 Tank Farm DO-0024-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 Reducer/Flange

5951 Tank Farm DO-0024-1A-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

5952 Tank Farm DO-0023-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 Tee/90Elbow

5953 Tank Farm DO-0023-1A-8" 1/1 FW-02 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Scokolet

5954 Tank Farm DO-0001-1A-12” 5/7 FW-73 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5955 Tank Farm DO-0001-1A-12” 6/7 FW-76 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Scokolet

5956 Tank Farm DO-0001-1A-12” 6/7 FW-77 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

5957 Tank Farm DO-0001-1A-12” 6/7 FW-78 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

5958 Tank Farm JF-0001-1A-12” 5/7 FW-71 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5959 SRC JF-0001-1A-12” 2/7 FW-19 BRW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5960 Tank Farm JF-0001-1A-12” 6/7 FW-74 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Scokolet

5961 Tank Farm JF-0001-1A-12” 6/7 FW-75 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

5962 Tank Farm JF-0001-1A-12” 6/7 FW-76 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

5963 Tank Farm MO-0001-1A-12” 5/7 FW-76 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5964 Tank Farm MO-0001-1A-12” 6/7 FW-78 BRW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Scokolet

5965 Tank Farm MO-0001-1A-12” 6/7 FW-79 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Scokolet

5966 Tank Farm MO-0001-1A-12” 6/7 FW-80 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

5967 Tank Farm MO-0001-1A-12” 6/7 FW-81 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

5968 Tank Farm MO-0025-1A-6" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5969 Tank Farm MO-0025-1A-6" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5970 Tank Farm DO-0024-1A-8" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5971 Tank Farm DO-0024-1A-8" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/45Elbow

5972 Tank Farm MO-0014-1A-14" 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

5973 Tank Farm MO-0014-1A-14" 1/2 FW-13 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

5974 Tank Farm MO-0014-1A-14" 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

5975 Tank Farm MO-0014-1A-14" 1/2 FW-15 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

5976 Tank Farm MO-0014-1A-14" 1/2 FW-16 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

5977 Tank Farm MO-0014-1A-14" 1/2 FW-17 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Scokolet

5978 Tank Farm MO-0014-1A-14" 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

5979 Tank Farm MO-0014-1A-14" 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5980 Tank Farm MO-0014-1A-14" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5981 Tank Farm MO-0014-1A-14" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5982 Tank Farm MO-0015-1A-12” 1/1 FW-12 SW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

5983 Tank Farm MO-0017-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

5984 Tank Farm MO-0019-1A-14” 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

5985 Tank Farm MO-0019-1A-14” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

5986 Tank Farm MO-0019-1A-14” 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

5987 Tank Farm MO-0019-1A-14” 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

5988 Tank Farm MO-0015-1A-12” 1/1 FW-13 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

5989 Tank Farm MO-0019-1A-14” 1/1 FW-17A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

5990 Tank Farm MO-0015-1A-12” 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5991 Tank Farm MO-0015-1A-12” 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

5992 Tank Farm MO-0015-1A-12” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
5993 Tank Farm MO-0015-1A-12” 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

5994 Tank Farm MO-0017-1A-8" 1/1 FW-5A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

5995 Tank Farm MO-0017-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

5996 Tank Farm FW-0015-1C-14" 3/3 FW-35E BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5997 Tank Farm FW-0015-1C-14" 3/3 FW-35F BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

5998 Tank Farm MO-0123-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A105 Reducer/Flange

5999 Tank Farm MO-0123-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6000 Tank Farm MO-0123-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6001 Tank Farm MO-0123-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6002 Tank Farm MO-0123-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6003 Tank Farm MO-0123-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6004 Tank Farm MO-0123-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/45Elbow

6005 Tank Farm MO-0123-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6006 Tank Farm MO-0123-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6007 Tank Farm MO-0022-1A-8” 1/4 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6008 Tank Farm MO-0022-1A-8” 2/4 FW-32 BRW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Weldolet

6009 Tank Farm MO-0022-1A-8” 2/4 FW-33 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6010 Tank Farm MO-0031-1A-6" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6011 Tank Farm MO-0031-1A-6" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6012 Tank Farm MO-0031-1A-6" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6013 Tank Farm MO-0031-1A-6" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6014 Tank Farm MO-0031-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6015 Tank Farm MO-0031-1A-6" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6016 Tank Farm MO-0028-1A-6" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6017 Tank Farm MO-0028-1A-6" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6018 Tank Farm MO-0028-1A-6" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6019 Tank Farm MO-0028-1A-6" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6020 Tank Farm MO-0031-1A-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6021 Tank Farm MO-0025-1A-6" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6022 Tank Farm MO-0025-1A-6" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6023 Tank Farm MO-0025-1A-6" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6024 Tank Farm MO-0022-1A-8” 2/4 FW-30 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

6025 Tank Farm MO-0022-1A-8” 3/4 FW-46 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6026 Tank Farm MO-0022-1A-8” 4/4 FW-66 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6027 Tank Farm MO-0022-1A-8” 2/4 FW-39 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6028 Tank Farm MO-0022-1A-8” 3/4 FW-47 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

6029 Tank Farm MO-0022-1A-8” 2/4 FW-26 BRW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Weldolet

6030 Tank Farm OW-0003-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

6031 Tank Farm OW-0003-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

6032 Tank Farm OW-0003-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

6033 Tank Farm OW-0003-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

6034 Tank Farm OW-0003-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

6035 Tank Farm OW-0003-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

6036 Tank Farm OW-0003-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6037 Tank Farm OW-0003-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

6038 Tank Farm MO-0124-1A-3" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6039 Tank Farm MO-0124-1A-3" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6040 Tank Farm MO-0124-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6041 Tank Farm MO-0124-1A-3" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/Tee

6042 Tank Farm MO-0124-1A-3" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6043 Tank Farm MO-0124-1A-3" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6044 Tank Farm MO-0124-1A-3" 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Scokolet

6045 Tank Farm MO-0124-1A-3" 1/1 FW-09 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Scokolet

6046 Tank Farm OW-1001-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6047 Tank Farm OW-1001-1A-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6048 Tank Farm OW-1001-1A-6" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

6049 Tank Farm OW-1001-1A-6" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6050 Tank Farm FW-0011-1C-14" 1/1 FW-14B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

6051 Tank Farm FW-7401-1D-2 ½" 1/1 FW-01 BRW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Weldolet

6052 Tank Farm FW-7401-1D-2 ½" 1/1 FW-02 BRW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Weldolet

6053 Tank Farm FW-0011-1C-14" 1/1 FW-14C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

6054 Tank Farm FW-0001-1C-14" 1/1 FW-9B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

6055 Tank Farm FW-0002-1C-14" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

6056 Tank Farm FW-0004-1C-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

6057 Tank Farm FW-0004-1C-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Cap

6058 Tank Farm FW-0004-1C-8" 1/1 FW-2B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6059 Tank Farm FW-7501-1D-2 ½" 1/1 FW-02 BRW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Weldolet

6060 Tank Farm FW-0005-1C-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

6061 Tank Farm FW-0005-1C-8" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Flange

6062 Tank Farm FW-0005-1C-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

6063 Tank Farm FW-0005-1C-8" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/90Elbow

6064 Tank Farm FW-0005-1C-8" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

6065 Tank Farm FW-0005-1C-8" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

6066 Tank Farm FW-0005-1C-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

6067 Tank Farm FW-0005-1C-8" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

6068 Tank Farm FW-0005-1C-8" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

6069 Tank Farm FW-0005-1C-8" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6070 Tank Farm FW-0005-1C-8" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

6071 Tank Farm FW-0005-1C-8" 1/1 FW-22A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Reducer

6072 Tank Farm FW-0005-1C-8" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Reducer

6073 Tank Farm FW-0017-1C-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

6074 Tank Farm FW-0017-1C-6" 1/1 FW-1B BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

6075 Tank Farm FW-0017-1C-6" 1/1 FW-1C BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

6076 Tank Farm FW-0017-1C-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

6077 Tank Farm FW-0017-1C-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

6078 Tank Farm FW-0017-1C-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

6079 Tank Farm FW-0017-1C-6" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

6080 Tank Farm FW-0018-1C-6" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6081 Tank Farm FW-0018-1C-6" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

6082 Tank Farm FW-0018-1C-6" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

6083 Tank Farm FW-0018-1C-6" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

6084 Tank Farm FW-0018-1C-6" 1/1 FW-09 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

6085 Tank Farm FW-0010-1C-14" 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

6086 Tank Farm FW-0010-1C-14" 1/1 FW-16 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

6087 Tank Farm FW-0010-1C-14" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/Tee

6088 Tank Farm FW-7101-1D-2½" 1/1 FW-01 BRW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Weldolet

6089 Tank Farm FW-7101-1D-2½" 1/1 FW-02 BRW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Weldolet

6090 Tank Farm FW-7101-1D-2½" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6091 Tank Farm FW-7101-1D-2½" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6092 Tank Farm FW-7101-1D-2½" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6093 Tank Farm FW-7101-1D-2½" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6094 Tank Farm FW-7101-1D-2½" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6095 Tank Farm FW-7101-1D-2½" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6096 Tank Farm FW-7101-1D-2½" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6097 Tank Farm FW-7101-1D-2½" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6098 Tank Farm FW-7101-1D-2½" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

6099 Tank Farm FW-7101-1D-2½" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

6100 Tank Farm FW-7101-1D-2½" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Reducer

6101 Tank Farm FW-7101-1D-2½" 1/1 FW-14 BW WPS-2016-21 GTAW 1" SCH40 A53/A234 Pipe/Reducer

6102 Tank Farm FW-7201-1D-2½" 1/1 FW-01 BRW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6103 Tank Farm FW-7201-1D-2½" 1/1 FW-1A BRW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Weldolet

6104 Tank Farm FW-7201-1D-2½" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6105 Tank Farm FW-7201-1D-2½" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6106 Tank Farm FW-7201-1D-2½" 1/1 FW-3A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A53 Pipe/Pipe

6107 Tank Farm FW-7201-1D-2½" 1/1 FW-3B BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A53 Pipe/Pipe

6108 Tank Farm FW-7201-1D-2½" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6109 Tank Farm FW-7201-1D-2½" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6110 SRC DO-0001-1A-12” 1/7 FW-7A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

6111 SRC DO-0001-1A-12” 1/7 FW-7B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A105 Tee/Flange

6112 SRC DO-0001-1A-12” 1/7 FW-7C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Tee/90Elbow

6113 SRC DO-0001-1A-12” 5/7 FW-74 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6114 SRC DO-0001-1A-12” 5/7 FW-72 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

6115 SRC DO-0001-1A-12” 5/7 FW-71 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

6116 SRC DO-0001-1A-12” 5/7 FW-69 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

6117 SRC DO-0001-1A-12” 6/7 FW-80 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

6118 SRC MO-0001-1A-12” 1/7 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

6119 SRC MO-0001-1A-12” 1/7 FW-18 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

6120 SRC MO-0001-1A-12” 5/7 FW-72 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

6121 SRC MO-0001-1A-12” 5/7 FW-75 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

6122 SRC MO-0001-1A-12” 5/7 FW-74 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

6123 SRC MO-0001-1A-12” 6/7 FW-84B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

6124 SRC MO-0001-1A-12” 6/7 FW-82B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6125 SRC JF-0001-1A-12” 5/7 FW-62A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

6126 SRC JF-0001-1A-12” 5/7 FW-67 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

6127 SRC JF-0001-1A-12” 5/7 FW-69B BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

6128 SRC JF-0001-1A-12” 5/7 FW-69A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

6129 SRC JF-0001-1A-12” 5/7 FW-69 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

6130 SRC JF-0001-1A-12” 5/7 FW-70 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

6131 SRC JF-0001-1A-12” 5/7 FW-72 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

6132 SRC FW-0015-1C-14" 1/3 FW-01 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

6133 SRC FW-0015-1C-14" 1/3 FW-1A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

6134 SRC FW-0015-1C-14" 1/3 FW-1B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/Tee

6135 SRC FW-0015-1C-14" 2/3 FW-21 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6136 SRC FW-0015-1C-14" 2/3 FW-22 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

6137 SRC FW-0015-1C-14" 2/3 FW-23 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

6138 SRC FW-0015-1C-14" 2/3 FW-27 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

6139 SRC FW-0015-1C-14" 2/3 FW-28 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

6140 SRC FW-0015-1C-14" 2/3 FW-28C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

6141 SRC FW-0015-1C-14" 2/3 FW-29 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A234/A234 90Elbow/90Elbow

6142 SRC FW-0015-1C-14" 2/3 FW-30 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

6143 SRC FW-0015-1C-14" 2/3 FW-31 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

6144 SRC FW-0015-1C-14" 2/3 FW-32 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

6145 SRC FW-0015-1C-14" 2/3 FW-32C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

6146 SRC FW-0015-1C-14" 2/3 FW-33 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6147 SRC FW-0015-1C-14" 2/3 FW-34 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A234 Pipe/90Elbow

6148 SRC FW-0015-1C-14" 3/3 FW-35H BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

6149 SRC FW-0015-1C-14" 3/3 FW-35G BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

6150 SRC FW-0015-1C-14" 3/3 FW-35D BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

6151 SRC FW-0015-1C-14" 3/3 FW-35C BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A53 Pipe/Pipe

6152 SRC FW-0015-1C-14" 2/3 FW-28B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

6153 SRC FW-0015-1C-14" 3/3 FW-39A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

6154 SRC FW-0015-1C-14" 3/3 FW-43A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

6155 SRC MO-0001A-1A-12” 2/5 FW-26 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6156 SRC MO-0001A-1A-12” 2/5 FW-27 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6157 SRC MO-0001A-1A-12” 2/5 FW-28 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6158 SRC MO-0001A-1A-12” 5/5 FW-53 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6159 SRC MO-0001A-1A-12” 5/5 FW-54 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6160 SRC MO-0001A-1A-12” 5/5 FW-55 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6161 SRC MO-0001A-1A-12” 5/5 FW-56 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6162 SRC MO-0001A-1A-12” 5/5 FW-61 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

6163 SRC MO-0001A-1A-12” 5/5 FW-62 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

6164 SRC MO-0001A-1A-12” 5/5 FW-63 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

6165 SRC MO-0001A-1A-12” 5/5 FW-64A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

6166 Tank Farm FW-7201-1D-2½" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6167 Tank Farm FW-7201-1D-2½" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6168 Tank Farm FW-7201-1D-2½" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6169 Tank Farm FW-7201-1D-2½" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6170 Tank Farm FW-7201-1D-2½" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6171 Tank Farm FW-7201-1D-2½" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6172 Tank Farm FW-7201-1D-2½" 1/1 FW-12 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

6173 Tank Farm FW-7201-1D-2½" 1/1 FW-13 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

6174 Tank Farm FW-7201-1D-2½" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Reducer

6175 Tank Farm FW-7201-1D-2½" 1/1 FW-15 BW WPS-2016-21 GTAW 1" SCH40 A53/A234 Pipe/Reducer

6176 Tank Farm FW-7701-1D-2½" 1/1 FW-01 BRW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Weldolet

6177 Tank Farm FW-7701-1D-2½" 1/1 FW-1A BRW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Weldolet

6178 Tank Farm FW-7701-1D-2½" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

6179 Tank Farm FW-7701-1D-2½" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6180 Tank Farm FW-7701-1D-2½" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6181 Tank Farm FW-7701-1D-2½" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6182 Tank Farm FW-7701-1D-2½" 1/1 FW-5A BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A53 Pipe/Pipe

6183 Tank Farm FW-7701-1D-2½" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6184 Tank Farm FW-7701-1D-2½" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6185 Tank Farm FW-7701-1D-2½" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6186 Tank Farm FW-7701-1D-2½" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6187 Tank Farm FW-7701-1D-2½" 1/1 FW-10 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

6188 Tank Farm FW-7701-1D-2½" 1/1 FW-11 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

6189 Tank Farm FW-7701-1D-2½" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/Reducer

6190 Tank Farm FW-7701-1D-2½" 1/1 FW-13 BW WPS-2016-21 GTAW 1" SCH40 A53/A234 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6191 Tank Farm FW-7501-1D-2 ½" 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6192 Tank Farm FW-7301-1D-2½" 1/1 FW-26 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

6193 Tank Farm FW-7301-1D-2½" 1/1 FW-27 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

6194 Tank Farm FW-7301-1D-2½" 1/1 FW-28 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

6195 Tank Farm FW-7301-1D-2½" 1/1 FW-29 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

6196 Tank Farm FW-7301-1D-2½" 1/1 FW-34 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

6197 Tank Farm FW-7301-1D-2½" 1/1 FW-35 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

6198 Tank Farm OW-1001-1A-6" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6199 Tank Farm OW-1001-1A-6" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

6200 Tank Farm OW-1001-1A-6" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6201 Tank Farm OW-1001-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6202 Tank Farm DO-0023-1A-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6203 Tank Farm DO-0023-1A-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

6204 Tank Farm DO-0023-1A-8" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

6205 Tank Farm DO-0023-1A-8" 1/1 FW-10A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

6206 Tank Farm DO-0030-1A-8" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6207 Tank Farm DO-0030-1A-8" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

6208 Tank Farm DO-0030-1A-8" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

6209 Tank Farm DO-0030-1A-8" 1/1 FW-24A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

6210 Tank Farm DO-0029-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6211 Tank Farm DO-0029-1A-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6212 Tank Farm OW-1001-1A-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6213 Tank Farm OW-1001-1A-6" 1/1 FW-1B BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6214 Tank Farm DO-0029-1A-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6215 Tank Farm DO-0029-1A-8" 1/1 FW-8A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

6216 Tank Farm DO-0026-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6217 Tank Farm DO-0026-1A-8" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

6218 Tank Farm DO-0026-1A-8" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6219 Tank Farm DO-0026-1A-8" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

6220 Tank Farm DO-0026-1A-8" 1/1 FW-10A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

6221 Tank Farm JF-0023-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 90Elbow/ Flange

6222 Tank Farm JF-0023-1A-6" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6223 Tank Farm JF-0023-1A-6" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6224 Tank Farm JF-0022-1A-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/90Elbow

6225 Tank Farm MO-0119-1A-12” 1/2 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6226 Tank Farm MO-0119-1A-12” 1/2 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6227 Tank Farm MO-0119-1A-12” 1/2 FW-06 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

6228 Tank Farm MO-0119-1A-12” 2/2 FW-35 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6229 Tank Farm MO-0119-1A-12” 2/2 FW-49 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6230 Tank Farm MO-0119-1A-12” 2/2 FW-56 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6231 Tank Farm MO-0119-1A-12” 2/2 FW-58 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6232 Tank Farm MO-0119-1A-12” 2/2 FW-59 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6233 Tank Farm MO-0119-1A-12” 2/2 FW-60 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6234 Tank Farm MO-0119-1A-12” 2/2 FW-61 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6235 Tank Farm MO-0119-1A-12” 2/2 FW-63A BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

6236 Tank Farm MO-0119-1A-12” 2/2 FW-62 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6237 Tank Farm MO-0119-1A-12” 2/2 FW-63 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6238 Tank Farm MO-0119-1A-12” 2/2 FW-47 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6239 Tank Farm MO-0119-1A-12” 2/2 FW-42 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6240 Tank Farm MO-0119-1A-12” 2/2 FW-43 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6241 Tank Farm MO-0119-1A-12” 2/2 FW-45 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

6242 Tank Farm MO-0119-1A-12” 2/2 FW-40 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6243 Tank Farm MO-0119-1A-12” 2/2 FW-39 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6244 Tank Farm MO-0119-1A-12” 2/2 FW-37 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6245 Tank Farm MO-0119-1A-12” 2/2 FW-38 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6246 Tank Farm JF-0041-1A-8” 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6247 Tank Farm JF-0041-1A-8” 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6248 Tank Farm JF-0041-1A-8” 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6249 Tank Farm JF-0041-1A-8” 1/2 FW-05 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6250 Tank Farm JF-0041-1A-8” 1/2 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6251 Tank Farm JF-0041-1A-8” 1/2 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

6252 Tank Farm JF-0041-1A-8” 1/2 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

6253 Tank Farm JF-0041-1A-8” 1/2 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6254 Tank Farm JF-0041-1A-8” 1/2 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6255 Tank Farm JF-0041-1A-8” 1/2 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6256 Tank Farm JF-0041-1A-8” 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6257 Tank Farm JF-0041-1A-8” 1/2 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6258 Tank Farm JF-0041-1A-8” 1/2 FW-14 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6259 Tank Farm JF-0041-1A-8” 1/2 FW-15 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6260 Tank Farm JF-0041-1A-8” 1/2 FW-19 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6261 Tank Farm JF-0041-1A-8” 1/2 FW-16 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6262 Tank Farm JF-0041-1A-8” 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6263 Tank Farm JF-0041-1A-8” 1/2 FW-28 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6264 Tank Farm JF-0041-1A-8” 1/2 FW-30 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6265 Tank Farm JF-0041-1A-8” 1/2 FW-31 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6266 Tank Farm JF-0041-1A-8” 1/2 FW-34 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6267 Tank Farm PW-6001-1B-8" 2/2 FW-37 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6268 Tank Farm PW-6001-1B-8" 2/2 FW-36N BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

6269 Tank Farm PW-6001-1B-8" 2/2 FW-36O BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

6270 Tank Farm PW-6001-1B-8" 2/2 FW-36P BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

6271 Tank Farm PW-6001-1B-8" 2/2 FW-36Q BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

6272 Tank Farm MO-0125-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6273 Tank Farm MO-0125-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6274 Tank Farm MO-0125-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6275 Tank Farm MO-0125-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6276 Tank Farm MO-0125-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/45Elbow

6277 Tank Farm MO-0125-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/45Elbow

6278 Tank Farm MO-0125-1A-4" 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6279 Tank Farm MO-0127-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6280 Tank Farm MO-0127-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6281 Tank Farm MO-0127-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6282 Tank Farm MO-0127-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6283 Tank Farm MO-0127-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6284 Tank Farm DO-0035-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6285 Tank Farm DO-0035-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6286 Tank Farm DO-0035-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6287 Tank Farm DO-0035-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6288 Tank Farm DO-0035-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6289 Tank Farm DO-0036-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6290 Tank Farm DO-0036-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6291 Tank Farm DO-0036-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6292 Tank Farm DO-0036-1A-4" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A234 90Elbow/90Elbow

6293 Tank Farm JF-0027-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6294 Tank Farm JF-0027-1A-4" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6295 Tank Farm JF-0027-1A-4" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6296 Tank Farm JF-0027-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6297 Tank Farm JF-0027-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6298 Tank Farm DO-0037-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6299 Tank Farm DO-0037-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6300 Tank Farm DO-0037-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6301 Tank Farm DO-0037-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6302 Tank Farm DO-0037-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6303 Tank Farm DO-0038-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6304 Tank Farm DO-0038-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6305 Tank Farm DO-0038-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6306 Tank Farm DO-0038-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6307 Tank Farm DO-0038-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6308 Tank Farm DO-0038-1A-4" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6309 Tank Farm DO-0038-1A-4" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6310 Tank Farm DO-0038-1A-4" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6311 Tank Farm DO-0038-1A-4" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6312 Tank Farm JF-0028-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6313 Tank Farm JF-0028-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6314 Tank Farm JF-0028-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6315 Tank Farm JF-0028-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6316 Tank Farm JF-0028-1A-4" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6317 Tank Farm PW-6001-1B-8" 1/2 FW-15 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

6318 Tank Farm PW-6001-1B-8" 1/2 FW-17 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

6319 Tank Farm PW-6001-1B-8" 1/2 FW-16A SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/scokolet

6320 Tank Farm PW-6001-1B-8" 1/2 FW-16B SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/scokolet

6321 Tank Farm PW-6001-1B-8" 1/2 FW-16C SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

6322 Tank Farm PW-6001-1B-8" 1/2 FW-16D SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6323 Tank Farm PW-6001-1B-8" 1/2 FW-16E BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

6324 Tank Farm PW-6002-1B-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

6325 Tank Farm PW-6002-1B-8" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

6326 Tank Farm PW-6002-1B-8" 1/1 FW-4B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

6327 Tank Farm PW-6002-1B-8" 1/1 FW-6B SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/scokolet

6328 Tank Farm PW-6002-1B-8" 1/1 FW-6C SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

6329 Tank Farm PW-6002-1B-8" 1/1 FW-6D SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

6330 Tank Farm PW-6001-1B-8" 2/2 FW-36C BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A53 Pipe/Pipe

6331 Tank Farm FW-6014-1B-10" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

6332 Tank Farm FW-6014-1B-10" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

6333 Tank Farm FW-6014-1B-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6334 Tank Farm FW-6014-1B-10" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A234 Pipe/90Elbow

6335 Tank Farm FW-6014-1B-10" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

6336 Tank Farm FW-6018-1B-10" 1/1 FW-02 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

6337 Tank Farm FW-6018-1B-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A53 Pipe/90Elbow

6338 Tank Farm FW-6018-1B-10" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A53 Pipe/90Elbow

6339 Tank Farm FW-6018-1B-10" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

6340 Tank Farm FW-6018-1B-10" 1/1 FW-06 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

6341 Tank Farm FW-6201-1B-8" 1/1 FW-12A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

6342 Tank Farm FW-6019-1B-3" 1/1 FW-11A SOW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Flange

6343 Tank Farm FW-6019-1B-3" 1/1 FW-11B SOW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Flange

6344 Tank Farm FW-6019-1B-3" 1/1 FW-06 BRW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6345 Tank Farm FW-6019-1B-3" 1/1 FW-07 BRW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/CPLG

6346 Tank Farm FW-6019-1B-3" 1/1 FW-08 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

6347 Tank Farm FW-6019-1B-3" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

6348 Tank Farm FW-6019-1B-3" 1/1 FW-13 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

6349 Tank Farm FW-6019-1B-3" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

6350 Tank Farm FW-6019-1B-3" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

6351 Tank Farm FW-6019-1B-3" 1/1 FW-16 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

6352 Tank Farm FW-6019-1B-3" 1/1 FW-17 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

6353 Tank Farm FW-6019-1B-3" 1/1 FW-18 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

6354 Tank Farm FW-6019-1B-3" 1/1 FW-19 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

6355 Tank Farm FW-6019-1B-3" 1/1 FW-21A BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6356 Tank Farm FW-6019-1B-3" 1/1 FW-21B SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet

6357 Tank Farm FW-6019-1B-3" 1/1 FW-21C SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

6358 Tank Farm FW-6019-1B-3" 1/1 FW-21D SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

6359 Tank Farm FW-6019-1B-3" 1/1 FW-21E SOW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Flange

6360 Tank Farm FW-6016-1B-10" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

6361 Tank Farm FW-6016-1B-10" 1/1 FW-21A BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet

6362 Tank Farm FW-6016-1B-10" 1/1 FW-21B SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet

6363 Tank Farm FW-6016-1B-10" 1/1 FW-21C SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

6364 Tank Farm FW-6016-1B-10" 1/1 FW-21D SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

6365 Tank Farm FW-6016-1B-10" 1/1 FW-21E SOW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Flange

6366 Tank Farm FW-6012-1B-10" 1/1 FW-21A BRW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6367 Tank Farm FW-6012-1B-10" 1/1 FW-21B SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Weldolet

6368 Tank Farm FW-6012-1B-10" 1/1 FW-21C SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

6369 Tank Farm FW-6012-1B-10" 1/1 FW-21D SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

6370 Tank Farm FW-6012-1B-10" 1/1 FW-21E SOW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Flange

6371 Tank Farm FW-6024-1B-14" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 14" SCH20 A53/A105 Pipe/Flange

6372 Tank Farm FW-6024-1B-14" 1/1 FW-08 BRW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Weldolet

6373 Tank Farm FW-6025-1B-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/45Elbow

6374 Tank Farm FW-6025-1B-8" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

6375 Tank Farm FW-6025-1B-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/90Elbow

6376 Tank Farm FW-6013-1B-8" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

6377 Tank Farm FW-6021-1B-3" 1/1 FW-06 BRW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6378 Tank Farm FW-6021-1B-3" 1/1 FW-07 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/CPLG

6379 Tank Farm FW-6021-1B-3" 1/1 FW-08 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

6380 Tank Farm FW-6021-1B-3" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

6381 Tank Farm FW-6021-1B-3" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

6382 Tank Farm FW-6021-1B-3" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

6383 Tank Farm FW-6021-1B-3" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

6384 Tank Farm FW-6021-1B-3" 1/1 FW-16 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

6385 Tank Farm FW-6021-1B-3" 1/1 FW-17 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

6386 Tank Farm FW-6021-1B-3" 1/1 FW-18 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

6387 Tank Farm FW-6021-1B-3" 1/1 FW-19 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

6388 Tank Farm FW-6021-1B-3" 1/1 FW-21A BRW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6389 Tank Farm FW-6021-1B-3" 1/1 FW-21B SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet

6390 Tank Farm FW-6021-1B-3" 1/1 FW-21C SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

6391 Tank Farm FW-6021-1B-3" 1/1 FW-21D SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

6392 Tank Farm FW-6021-1B-3" 1/1 FW-21E SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Flange

6393 Tank Farm FW-6021-1B-3" 1/1 FW-23 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

6394 Tank Farm FW-6021-1B-3" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/45Elbow

6395 Tank Farm FW-6021-1B-3" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/45Elbow

6396 Tank Farm FW-6021-1B-3" 1/1 FW-25A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

6397 Tank Farm FW-6021-1B-3" 1/1 FW-11A SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

6398 Tank Farm FW-6021-1B-3" 1/1 FW-11B SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

6399 Tank Farm FW-6023-1B-14" 1/1 FW-09 BRW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6400 Tank Farm FW-6023-1B-14" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/CPLG

6401 Tank Farm FW-6023-1B-14" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

6402 Tank Farm FW-6007-1B 10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A234/A234 Tee/90Elbow

6403 Tank Farm FW-6011-1B-10" 1/1 FW-05 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

6404 Tank Farm FW-6015-1B-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

6405 Tank Farm FW-6008-1B-10" 1/1 FW-21A SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Weldolet

6406 Tank Farm FW-6008-1B-10" 1/1 FW-21B SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

6407 Tank Farm FW-6008-1B-10" 1/1 FW-21C SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

6408 Tank Farm FW-6008-1B-10" 1/1 FW-21D SOW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Flange

6409 Tank Farm FW-6001-1B -16" 2/2 FW-15 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/Tee

6410 Tank Farm FW-6001-1B -16" 2/2 FW-20 BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6411 Tank Farm FW-6001-1B-16" 2/2 FW-19A BW WPS-2016-23 GTAW/SMAW 16" SCH20 A53/A53 Pipe/Pipe

6412 Tank Farm FW-6005-1B-4" 1/1 FW-05 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

6413 Tank Farm FW-6005-1B-4" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

6414 Tank Farm FW-6005-1B-4" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

6415 Tank Farm FW-6005-1B-4" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

6416 Tank Farm FW-6005-1B-4" 1/1 FW-09 BRW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/CPLG

6417 Tank Farm FW-6005-1B-4" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/CPLG

6418 Tank Farm FW-6005-1B-4" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

6419 Tank Farm FW-6004-1B-12" 1/1 FW-2A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A53 Pipe/Pipe

6420 Tank Farm FW-6006-1B-4" 1/1 FW-05 BRW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG

6421 Tank Farm FW-6006-1B-4" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6422 Tank Farm FW-6006-1B-4" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

6423 Tank Farm FW-6006-1B-4" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

6424 Tank Farm FW-6006-1B-4" 1/1 FW-09 BRW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/CPLG

6425 Tank Farm FW-6006-1B-4" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/CPLG

6426 Tank Farm FW-6006-1B-4" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

6427 Tank Farm FW-6002-1B-12" 1/1 FW-2A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A53 Pipe/Pipe

6428 Tank Farm FW-6003-1B-12" 1/1 FW-2A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A53 Pipe/Pipe

6429 Tank Farm FW-6010-1B-10" 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/Tee

6430 Tank Farm FW-6022-1B-3/4" 1/1 FW-01 SOW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Flange

6431 Tank Farm FW-6022-1B-3/4" 1/1 FW-02 SOW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Flange

6432 Tank Farm FW-6022-1B-3/4" 1/1 FW-03 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6433 Tank Farm FW-6022-1B-3/4" 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/90Elbow

6434 Tank Farm FW-6022-1B-3/4" 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/90Elbow

6435 Tank Farm FW-6022-1B-3/4" 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/90Elbow

6436 Tank Farm FW-6022-1B-3/4" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/90Elbow

6437 Tank Farm FW-6022-1B-3/4" 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/90Elbow

6438 Tank Farm FW-6022-1B-3/4" 1/1 FW-8A SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet

6439 Tank Farm FW-6020-1B-3/4" 1/1 FW-01 SOW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Flange

6440 Tank Farm FW-6020-1B-3/4" 1/1 FW-02 SOW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Flange

6441 Tank Farm FW-6020-1B-3/4" 1/1 FW-03 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/90Elbow

6442 Tank Farm FW-6020-1B-3/4" 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/90Elbow

6443 Tank Farm FW-6020-1B-3/4" 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6444 Tank Farm FW-6020-1B-3/4" 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/90Elbow

6445 Tank Farm FW-6020-1B-3/4" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/90Elbow

6446 Tank Farm FW-6020-1B-3/4" 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A234 Pipe/90Elbow

6447 Tank Farm FW-6020-1B-3/4" 1/1 FW-8A SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Weldolet

6448 Tank Farm FW-6010-1B-10" 1/2 FW-2A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A53 Pipe/Pipe

6449 Tank Farm FW-6016-1B-10" 1/1 FW-24 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

6450 Tank Farm FW-6018-1B-10" 1/1 FW-01 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

6451 Tank Farm FW-6028-1B-2" 1/1 FW-1A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

6452 Tank Farm FW-6028-1B-2" 1/1 FW-01 SW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

6453 Tank Farm FW-6028-1B-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6454 Tank Farm FW-6028-1B-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6455 Tank Farm FW-6028-1B-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6456 Tank Farm FW-6028-1B-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6457 Tank Farm FW-6028-1B-2" 1/1 FW-06 SW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Gate

6458 Tank Farm FW-6028-1B-2" 1/1 FW-4A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

6459 Tank Farm FW-6027-1B-2" 1/1 FW-1A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

6460 Tank Farm FW-6027-1B-2" 1/1 FW-01 SW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

6461 Tank Farm FW-6027-1B-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6462 Tank Farm FW-6027-1B-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6463 Tank Farm FW-6027-1B-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6464 Tank Farm FW-6027-1B-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6465 Tank Farm FW-6027-1B-2" 1/1 FW-06 SW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6466 Tank Farm FW-6027-1B-2" 1/1 FW-4A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

6467 Tank Farm FW-6029-1B-2" 1/1 FW-1A BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

6468 Tank Farm FW-6029-1B-2" 1/1 FW-01 SW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

6469 Tank Farm FW-6029-1B-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6470 Tank Farm FW-6029-1B-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6471 Tank Farm FW-6029-1B-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6472 Tank Farm FW-6029-1B-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6473 Tank Farm FW-6029-1B-2" 1/1 FW-06 SW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Gate

6474 Tank Farm FW-6028-1B-2" 1/1 FW-07 SW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Gate

6475 Tank Farm FW-6028-1B-2" 1/1 FW-08 SW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6476 Tank Farm FW-6028-1B-2" 1/1 FW-09 SW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6477 Tank Farm FW-6028-1B-2" 1/1 FW-10 SW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6478 Tank Farm FW-6028-1B-2" 1/1 FW-11 SW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6479 Tank Farm FW-6028-1B-2" 1/1 FW-12 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

6480 Tank Farm FW-6027-1B-2" 1/1 FW-07 SW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Gate

6481 Tank Farm FW-6027-1B-2" 1/1 FW-08 SW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6482 Tank Farm FW-6027-1B-2" 1/1 FW-09 SW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6483 Tank Farm FW-6027-1B-2" 1/1 FW-10 SW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6484 Tank Farm FW-6027-1B-2" 1/1 FW-11 SW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6485 Tank Farm FW-6027-1B-2" 1/1 FW-12 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

6486 Tank Farm FW-6029-1B-2" 1/1 FW-07 SW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Gate

6487 Tank Farm FW-6029-1B-2" 1/1 FW-08 SW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6488 Tank Farm FW-6029-1B-2" 1/1 FW-09 SW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6489 Tank Farm FW-6029-1B-2" 1/1 FW-10 SW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6490 Tank Farm FW-6029-1B-2" 1/1 FW-11 SW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

6491 Tank Farm FW-6029-1B-2" 1/1 FW-12 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

6492 Tank Farm VL-0005-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/45Elbow

6493 Tank Farm VL-0005-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/45Elbow

6494 Tank Farm VL-0005-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6495 Tank Farm VL-0005-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6496 Tank Farm VL-0005-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6497 Tank Farm VL-0005-1A-3" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

6498 Tank Farm VL-0005-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6499 Tank Farm VL-0005-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

6500 Tank Farm VL-0009-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/45Elbow

6501 Tank Farm VL-0009-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/45Elbow

6502 Tank Farm VL-0009-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6503 Tank Farm VL-0009-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6504 Tank Farm VL-0009-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6505 Tank Farm VL-0009-1A-3" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

6506 Tank Farm VL-0009-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6507 Tank Farm VL-0009-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

6508 Tank Farm VL-0007-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/45Elbow

6509 Tank Farm VL-0007-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6510 Tank Farm VL-0007-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6511 Tank Farm VL-0007-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6512 Tank Farm VL-0007-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6513 Tank Farm VL-0007-1A-3" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

6514 Tank Farm VL-0007-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6515 Tank Farm VL-0007-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

6516 Tank Farm VL-0010-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/45Elbow

6517 Tank Farm VL-0010-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/45Elbow

6518 Tank Farm VL-0010-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6519 Tank Farm VL-0010-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6520 Tank Farm VL-0010-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6521 Tank Farm VL-0010-1A-3" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

6522 Tank Farm VL-0010-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6523 Tank Farm VL-0010-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

6524 Tank Farm VL-0011-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/45Elbow

6525 Tank Farm VL-0011-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/45Elbow

6526 Tank Farm VL-0011-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6527 Tank Farm VL-0011-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6528 Tank Farm VL-0011-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6529 Tank Farm VL-0011-1A-3" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

6530 Tank Farm VL-0011-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6531 Tank Farm VL-0011-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6532 Tank Farm VL-0002-1A-3" 1/1 FW-10A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

6533 Tank Farm VL-0002-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6534 Tank Farm VL-0002-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6535 Tank Farm VL-0002-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6536 Tank Farm VL-0002-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

6537 Tank Farm VL-0002-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6538 Tank Farm VL-0002-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

6539 Tank Farm VL-0003-1A-3" 1/1 FW-10A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

6540 Tank Farm VL-0003-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6541 Tank Farm VL-0003-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6542 Tank Farm VL-0003-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6543 Tank Farm VL-0003-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

6544 Tank Farm VL-0003-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6545 Tank Farm VL-0003-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

6546 Tank Farm VL-0004-1A-3" 1/1 FW-10A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

6547 Tank Farm VL-0004-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6548 Tank Farm VL-0004-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6549 Tank Farm VL-0004-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6550 Tank Farm VL-0004-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

6551 Tank Farm VL-0004-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6552 Tank Farm VL-0004-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

6553 Tank Farm VL-0006-1A-3" 1/1 FW-10A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6554 Tank Farm VL-0006-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6555 Tank Farm VL-0006-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6556 Tank Farm VL-0006-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6557 Tank Farm VL-0006-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

6558 Tank Farm VL-0006-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6559 Tank Farm VL-0006-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

6560 Tank Farm VL-0008-1A-3" 1/1 FW-10A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

6561 Tank Farm VL-0008-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6562 Tank Farm VL-0008-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6563 Tank Farm VL-0008-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6564 Tank Farm VL-0008-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6565 Tank Farm VL-0008-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

6566 Tank Farm VL-0008-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

6567 Tank Farm FS-0101-1D-6" 1/1 FW-18A SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

6568 Tank Farm FS-0101-1D-6" 1/1 FW-18B SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6569 Tank Farm FS-0101-1D-6" 1/1 FW-18C SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6570 Tank Farm FS-0101-1D-6" 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

6571 Tank Farm FS-0101-1D-6" 1/1 FW-15A SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

6572 Tank Farm FS-0201-1D-6" 1/1 FW-60A SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

6573 Tank Farm FS-0201-1D-6" 1/1 FW-61 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

6574 Tank Farm FS-0201-1D-6" 1/1 FW-63A SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

6575 Tank Farm FS-0201-1D-6" 1/1 FW-63B SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6576 Tank Farm FS-0201-1D-6" 1/1 FW-63C SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6577 Tank Farm FS-0301-1D-4" 1/1 FW-99 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

6578 Tank Farm FS-0301-1D-4" 1/1 FW-100 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

6579 Tank Farm FS-0301-1D-4" 1/1 FW-108 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

6580 Tank Farm FS-0301-1D-4" 1/1 FW-110A SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

6581 Tank Farm FS-0301-1D-4" 1/1 FW-110B SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6582 Tank Farm FS-0301-1D-4" 1/1 FW-110C SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6583 Tank Farm FS-0301-1D-4" 1/1 FW-107A SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

6584 Tank Farm FS-0401-1D-4" 1/1 FW-185 BW WPS-2016-21 GTAW/SMAW 4" SCH40 A53/A234 Pipe/Tee

6585 Tank Farm FS-0401-1D-4" 1/1 FW-186 SOW WPS-2016-23 GTAW/SMAW 4" SCH40 A53/A105 Pipe/Flange

6586 Tank Farm FS-0401-1D-4" 1/1 FW-190 BRW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6587 Tank Farm FS-0401-1D-4" 1/1 FW-191 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

6588 Tank Farm FS-0401-1D-4" 1/1 FW-193 BRW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

6589 Tank Farm FS-0401-1D-4" 1/1 FW-190A SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

6590 Tank Farm FS-0401-1D-4" 1/1 FW-193A SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

6591 Tank Farm FS-0401-1D-4" 1/1 FW-193B SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6592 Tank Farm FS-0401-1D-4" 1/1 FW-193C SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6593 Tank Farm FS-0501-1D-4" 1/1 FW-278 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

6594 Tank Farm FS-0501-1D-4" 1/1 FW-280A SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

6595 Tank Farm FS-0501-1D-4" 1/1 FW-280B SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6596 Tank Farm FS-0501-1D-4" 1/1 FW-280C SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6597 Tank Farm FS-0501-1D-4" 1/1 FW-277A SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6598 Tank Farm FS-0601-1D-4" 1/1 FW-357 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

6599 Tank Farm FS-0601-1D-4" 1/1 FW-359A SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

6600 Tank Farm FS-0601-1D-4" 1/1 FW-359B SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6601 Tank Farm FS-0601-1D-4" 1/1 FW-359C SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6602 Tank Farm FS-0601-1D-4" 1/1 FW-356A SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

6603 Tank Farm FS-0701-1D-4" 1/1 FW-423 BRW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

6604 Tank Farm FS-0701-1D-4" 1/1 FW-424 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

6605 Tank Farm FS-0701-1D-4" 1/1 FW-426 BRW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

6606 Tank Farm FS-0701-1D-4" 1/1 FW-426A SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

6607 Tank Farm FS-0701-1D-4" 1/1 FW-426B SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6608 Tank Farm FS-0701-1D-4" 1/1 FW-426C SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6609 Tank Farm FS-0701-1D-4" 1/1 FW-423A SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

6610 Tank Farm FS-1101-1D-6" 1/1 FW-477 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

6611 Tank Farm FS-1101-1D-6" 1/1 FW-479A SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

6612 Tank Farm FS-1101-1D-6" 1/1 FW-479B SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6613 Tank Farm FS-1101-1D-6" 1/1 FW-479C SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6614 Tank Farm FS-1101-1D-6" 1/1 FW-476A SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

6615 Tank Farm FS-1201-1D-6" 1/1 FW-521A SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

6616 Tank Farm FS-1201-1D-6" 1/1 FW-524A SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

6617 Tank Farm FS-1201-1D-6" 1/1 FW-524B SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6618 Tank Farm FS-1201-1D-6" 1/1 FW-524C SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6619 Tank Farm FS-1301-1D-6" 1/1 FW-566A SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6620 Tank Farm FS-1301-1D-6" 1/1 FW-569C SW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/Gate

6621 Tank Farm DO-0054-1A-14" 1/3 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

6622 Tank Farm DO-0054-1A-14" 1/3 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/45Elbow

6623 Tank Farm DO-0054-1A-14" 1/3 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/45Elbow

6624 Tank Farm DO-0054-1A-14" 1/3 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6625 Tank Farm DO-0054-1A-14" 1/3 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6626 Tank Farm DO-0054-1A-14" 1/3 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6627 Tank Farm DO-0054-1A-14" 1/3 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6628 Tank Farm DO-0054-1A-14" 2/3 FW-17 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6629 Tank Farm DO-0054-1A-14" 2/3 FW-45 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A234 90Elbow/90Elbow

6630 Tank Farm DO-0054-1A-14" 2/3 FW-44 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6631 Tank Farm DO-0054-1A-14" 2/3 FW-45A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6632 Tank Farm DO-0054-1A-14" 2/3 FW-19 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6633 Tank Farm DO-0054-1A-14" 2/3 FW-22 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6634 Tank Farm DO-0054-1A-14" 2/3 FW-29 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6635 Tank Farm DO-0022-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

6636 Tank Farm DO-0022-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

6637 Tank Farm MO-0030-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

6638 Tank Farm MO-0030-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

6639 Tank Farm MO-0027-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

6640 Tank Farm MO-0027-1A-10" 1/1 FW-11 SW WPS-2016-21 GTAW/SMAW 1/2" SCH80 A106/A105 Pipe/scokolet

6641 Tank Farm MO-0024-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6642 Tank Farm MO-0024-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

6643 Tank Farm JF-0041-1A-8” 2/2 FW-35 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

6644 Tank Farm MO-0087-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6645 Tank Farm MO-0087-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6646 Tank Farm MO-0087-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6647 Tank Farm MO-0088-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6648 Tank Farm SA-0013-1B-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

6649 Tank Farm SA-0013-1B-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

6650 Tank Farm SA-0013-1B-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

6651 Tank Farm SA-0013-1B-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

6652 Tank Farm SA-0013-1B-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6653 Tank Farm SA-0013-1B-1" 1/1 FW-1A BW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee

6654 Tank Farm AD-0004-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

6655 Tank Farm AD-0004-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

6656 Tank Farm AD-0004-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

6657 Tank Farm AD-0004-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

6658 Tank Farm AD-0004-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

6659 Tank Farm AD-0004-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

6660 Tank Farm MO-0025-1A-6" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6661 Tank Farm MO-0024-1A-10" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6662 Tank Farm MO-0024-1A-10" 1/1 FW-12 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6663 Tank Farm MO-0024-1A-10" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6664 Tank Farm MO-0024-1A-10" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6665 Tank Farm MO-0024-1A-10" 1/1 FW-10 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

6666 Tank Farm MO-0026-1A-6" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6667 Tank Farm MO-0026-1A-6" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6668 Tank Farm MO-0026-1A-6" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6669 Tank Farm MO-0026-1A-6" 1/1 FW-08 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6670 Tank Farm MO-0026-1A-6" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6671 Tank Farm MO-0026-1A-6" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6672 Tank Farm MO-0026-1A-6" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6673 Tank Farm MO-0026-1A-6" 1/1 FW-18 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6674 Tank Farm MO-0026-1A-6" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6675 Tank Farm MO-0026-1A-6" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6676 Tank Farm MO-0026-1A-6" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6677 Tank Farm MO-0026-1A-6" 1/1 FW-26A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6678 Tank Farm MO-0027-1A-10" 1/1 FW-05 SW WPS-2016-21 GTAW/SMAW 1/2" SCH80 A106/A105 Pipe/scokolet

6679 Tank Farm MO-0027-1A-10" 1/1 FW-06 SW WPS-2016-21 GTAW/SMAW 1/2" SCH80 A106/A105 Pipe/Gate

6680 Tank Farm MO-0027-1A-10" 1/1 FW-12 SW WPS-2016-21 GTAW/SMAW 1/2" SCH80 A106/A105 Pipe/Gate

6681 Tank Farm MO-0029-1A-6" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6682 Tank Farm MO-0029-1A-6" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6683 Tank Farm MO-0029-1A-6" 1/1 FW-08 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6684 Tank Farm MO-0029-1A-6" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6685 Tank Farm MO-0029-1A-6" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6686 Tank Farm MO-0029-1A-6" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6687 Tank Farm MO-0119-1A-12” 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6688 Tank Farm MO-0119-1A-12” 1/2 FW-31 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

6689 Tank Farm JF-0023-1A-6" 1/1 FW-07 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6690 Tank Farm JF-0023-1A-6" 1/1 FW-08 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6691 Tank Farm JF-0023-1A-6" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6692 Tank Farm JF-0023-1A-6" 1/1 FW-11 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6693 Tank Farm JF-0023-1A-6" 1/1 FW-17 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6694 Tank Farm MO-0029-1A-6" 1/1 FW-18 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6695 Tank Farm MO-0119-1A-12” 2/2 FW-46 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6696 Tank Farm MO-0119-1A-12” 2/2 FW-51 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6697 Tank Farm MO-0119-1A-12” 2/2 FW-52 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6698 Tank Farm MO-0119-1A-12” 2/2 FW-53 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6699 Tank Farm MO-0119-1A-12” 2/2 FW-54 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6700 Tank Farm MO-0119-1A-12” 2/2 FW-57 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6701 Tank Farm MO-0119-1A-12” 2/2 FW-52A SW WPS-2016-21 GTAW 1/2" SCH80 A106/A234 Pipe/90Elbow

6702 Tank Farm MO-0119-1A-12” 2/2 FW-52B SW WPS-2016-21 GTAW 1/2" SCH80 A106/A234 Pipe/90Elbow

6703 Tank Farm MO-0032-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A105 Reducer/Flange

6704 Tank Farm MO-0032-1A-6" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6705 Tank Farm MO-0032-1A-6" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6706 Tank Farm MO-0032-1A-6" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6707 Tank Farm MO-0032-1A-6" 1/1 FW-08 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6708 Tank Farm MO-0032-1A-6" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6709 Tank Farm MO-0032-1A-6" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6710 Tank Farm MO-0032-1A-6" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6711 Tank Farm MO-0032-1A-6" 1/1 FW-18 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6712 Tank Farm MO-0032-1A-6" 1/1 FW-23A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6713 Tank Farm MO-0032-1A-6" 1/1 FW-26A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6714 Tank Farm MO-0030-1A-10" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6715 Tank Farm MO-0030-1A-10" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6716 Tank Farm MO-0030-1A-10" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6717 Tank Farm MO-0030-1A-10" 1/1 FW-12 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6718 Tank Farm DO-0022-1A-10" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6719 Tank Farm DO-0022-1A-10" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6720 Tank Farm DO-0022-1A-10" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6721 Tank Farm DO-0022-1A-10" 1/1 FW-12 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6722 Tank Farm DO-0024-1A-8" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6723 Tank Farm DO-0024-1A-8" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6724 Tank Farm DO-0024-1A-8" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6725 Tank Farm DO-0024-1A-8" 1/1 FW-08 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6726 Tank Farm DO-0024-1A-8" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6727 Tank Farm DO-0024-1A-8" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6728 Tank Farm DO-0024-1A-8" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6729 Tank Farm DO-0024-1A-8" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6730 Tank Farm DO-0024-1A-8" 1/1 FW-24A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

6731 Tank Farm DO-0023-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

6732 Tank Farm DO-0054-1A-14" 1/3 FW-03 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

6733 Tank Farm DO-0054-1A-14" 1/3 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6734 Tank Farm DO-0054-1A-14" 1/3 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6735 Tank Farm DO-0054-1A-14" 1/3 FW-15 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

6736 Tank Farm DO-0054-1A-14" 2/3 FW-18 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6737 Tank Farm DO-0054-1A-14" 2/3 FW-20 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6738 Tank Farm DO-0054-1A-14" 2/3 FW-21 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6739 Tank Farm DO-0054-1A-14" 2/3 FW-25 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6740 Tank Farm DO-0054-1A-14" 2/3 FW-26 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6741 Tank Farm DO-0054-1A-14" 2/3 FW-24 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6742 Tank Farm DO-0054-1A-14" 2/3 FW-27 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

6743 Tank Farm DO-0054-1A-14" 2/3 FW-30 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6744 Tank Farm DO-0054-1A-14" 2/3 FW-31 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6745 Tank Farm DO-0054-1A-14" 2/3 FW-33 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6746 Tank Farm DO-0054-1A-14" 2/3 FW-34 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6747 Tank Farm DO-0054-1A-14" 2/3 FW-35 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6748 Tank Farm DO-0054-1A-14" 2/3 FW-36 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6749 Tank Farm DO-0054-1A-14" 2/3 FW-38 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6750 Tank Farm DO-0054-1A-14" 2/3 FW-39 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6751 Tank Farm DO-0054-1A-14" 2/3 FW-40 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6752 Tank Farm DO-0054-1A-14" 2/3 FW-41 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6753 Tank Farm DO-0054-1A-14" 2/3 FW-42 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6754 Tank Farm DO-0054-1A-14" 2/3 FW-43 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6755 Tank Farm DO-0054-1A-14" 2/3 FW-45B BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

6756 Tank Farm DO-0027-1A-8" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6757 Tank Farm DO-0027-1A-8" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6758 Tank Farm DO-0027-1A-8" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6759 Tank Farm DO-0027-1A-8" 1/1 FW-08 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6760 Tank Farm DO-0027-1A-8" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6761 Tank Farm DO-0027-1A-8" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6762 Tank Farm DO-0027-1A-8" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6763 Tank Farm DO-0027-1A-8" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6764 Tank Farm DO-0027-1A-8" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

6765 Tank Farm DO-0027-1A-8" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/45Elbow

6766 Tank Farm DO-0027-1A-8" 1/1 FW-24A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

6767 Tank Farm DO-0025-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

6768 Tank Farm DO-0025-1A-10" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6769 Tank Farm DO-0025-1A-10" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6770 Tank Farm DO-0025-1A-10" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6771 Tank Farm DO-0025-1A-10" 1/1 FW-10 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6772 Tank Farm DO-0025-1A-10" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6773 Tank Farm DO-0025-1A-10" 1/1 FW-12 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6774 Tank Farm DO-0028-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

6775 Tank Farm DO-0028-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

6776 Tank Farm DO-0028-1A-10" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6777 Tank Farm DO-0028-1A-10" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6778 Tank Farm DO-0028-1A-10" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6779 Tank Farm DO-0028-1A-10" 1/1 FW-10 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6780 Tank Farm DO-0028-1A-10" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6781 Tank Farm DO-0028-1A-10" 1/1 FW-12 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6782 Tank Farm DO-0030-1A-8" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6783 Tank Farm DO-0030-1A-8" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6784 Tank Farm DO-0030-1A-8" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6785 Tank Farm DO-0030-1A-8" 1/1 FW-08 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6786 Tank Farm DO-0030-1A-8" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6787 Tank Farm DO-0030-1A-8" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6788 Tank Farm DO-0030-1A-8" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6789 Tank Farm DO-0030-1A-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6790 Tank Farm DO-0030-1A-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

6791 Tank Farm DO-0030-1A-8" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

6792 Tank Farm JF-0041-1A-8” 1/2 FW-17 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6793 Tank Farm JF-0041-1A-8” 1/2 FW-18 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6794 Tank Farm JF-0041-1A-8” 1/2 FW-20 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6795 Tank Farm JF-0041-1A-8” 1/2 FW-21 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6796 Tank Farm JF-0041-1A-8” 1/2 FW-22 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6797 Tank Farm JF-0041-1A-8” 1/2 FW-23 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6798 Tank Farm JF-0041-1A-8” 1/2 FW-24 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6799 Tank Farm JF-0041-1A-8” 1/2 FW-25 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6800 Tank Farm JF-0041-1A-8” 1/2 FW-26 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6801 Tank Farm JF-0041-1A-8” 1/2 FW-27 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6802 Tank Farm JF-0041-1A-8” 1/2 FW-29 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6803 Tank Farm JF-0041-1A-8” 1/2 FW-32 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6804 Tank Farm JF-0041-1A-8” 1/2 FW-33 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6805 Tank Farm JF-0041-1A-8” 1/2 FW-14A BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

6806 Tank Farm JF-0023-1A-6" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6807 Tank Farm JF-0023-1A-6" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6808 Tank Farm JF-0023-1A-6" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6809 Tank Farm JF-0023-1A-6" 1/1 FW-22A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6810 Tank Farm JF-0022-1A-6" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6811 Tank Farm JF-0022-1A-6" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6812 Tank Farm JF-0022-1A-6" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6813 Tank Farm JF-0022-1A-6" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6814 Tank Farm JF-0022-1A-6" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6815 Tank Farm JF-0021-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Reducer

6816 Tank Farm JF-0021-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

6817 Tank Farm JF-0021-1A-8" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6818 Tank Farm JF-0021-1A-8" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6819 Tank Farm JF-0021-1A-8" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6820 Tank Farm JF-0021-1A-8" 1/1 FW-10 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6821 Tank Farm JF-0021-1A-8" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6822 Tank Farm JF-0021-1A-8" 1/1 FW-12 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6823 Tank Farm JF-0024-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

6824 Tank Farm JF-0024-1A-8" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6825 Tank Farm JF-0024-1A-8" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6826 Tank Farm JF-0024-1A-8" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6827 Tank Farm JF-0024-1A-8" 1/1 FW-10 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6828 Tank Farm JF-0024-1A-8" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6829 Tank Farm JF-0024-1A-8" 1/1 FW-12 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6830 Tank Farm JF-0026-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 90Elbow/Flange

6831 Tank Farm JF-0026-1A-6" 1/1 FW-03 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6832 Tank Farm JF-0026-1A-6" 1/1 FW-04 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6833 Tank Farm JF-0026-1A-6" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6834 Tank Farm JF-0026-1A-6" 1/1 FW-07 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6835 Tank Farm JF-0026-1A-6" 1/1 FW-08 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6836 Tank Farm JF-0026-1A-6" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6837 Tank Farm JF-0026-1A-6" 1/1 FW-11 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6838 Tank Farm JF-0026-1A-6" 1/1 FW-17 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6839 Tank Farm JF-0026-1A-6" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6840 Tank Farm JF-0026-1A-6" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6841 Tank Farm JF-0026-1A-6" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6842 Tank Farm JF-0026-1A-6" 1/1 FW-22A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6843 Tank Farm JF-0025-1A-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6844 Tank Farm JF-0025-1A-6" 1/1 FW-1B BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6845 Tank Farm JF-0025-1A-6" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6846 Tank Farm JF-0025-1A-6" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6847 Tank Farm JF-0025-1A-6" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6848 Tank Farm JF-0025-1A-6" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6849 Tank Farm JF-0025-1A-6" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6850 Tank Farm JF-0025-1A-6" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6851 Tank Farm JF-0025-1A-6" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6852 Tank Farm MO-0121-1A-10” 1/2 FW-02 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

6853 Tank Farm MO-0121-1A-10” 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

6854 Tank Farm MO-0121-1A-10” 2/2 FW-32 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6855 Tank Farm MO-0121-1A-10” 2/2 FW-34 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6856 Tank Farm MO-0121-1A-10” 2/2 FW-38 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6857 Tank Farm MO-0121-1A-10” 2/2 FW-39 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6858 Tank Farm MO-0121-1A-10” 2/2 FW-40 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6859 Tank Farm MO-0121-1A-10” 2/2 FW-41 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

6860 Tank Farm MO-0121-1A-10” 2/2 FW-42 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

6861 Tank Farm MO-0121-1A-10” 2/2 FW-43 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6862 Tank Farm MO-0063-1A-10" 2/2 FW-32 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

6863 Tank Farm MO-0121-1A-10” 2/2 FW-48 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6864 Tank Farm MO-0121-1A-10” 2/2 FW-49 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6865 Tank Farm MO-0121-1A-10” 2/2 FW-50 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

6866 Tank Farm MO-0121-1A-10” 2/2 FW-51 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

6867 Tank Farm MO-0121-1A-10” 2/2 FW-53 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6868 Tank Farm MO-0121-1A-10” 2/2 FW-54 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6869 Tank Farm MO-0121-1A-10” 2/2 FW-58 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6870 Tank Farm MO-0121-1A-10” 2/2 FW-59 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6871 Tank Farm MO-0121-1A-10” 2/2 FW-60 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6872 Tank Farm MO-0121-1A-10” 2/2 FW-60A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6873 Tank Farm MO-0121-1A-10” 2/2 FW-60B BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

6874 Tank Farm MO-0065-1A-6" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6875 Tank Farm MO-0065-1A-6" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6876 Tank Farm MO-0065-1A-6" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6877 Tank Farm MO-0065-1A-6" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6878 Tank Farm MO-0065-1A-6" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6879 Tank Farm MO-0065-1A-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6880 Tank Farm MO-0066-1A-6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A105 Reducer/Flange

6881 Tank Farm MO-0066-1A-6" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6882 Tank Farm MO-0066-1A-6" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6883 Tank Farm MO-0066-1A-6" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6884 Tank Farm MO-0066-1A-6" 1/1 FW-08 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6885 Tank Farm MO-0066-1A-6" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6886 Tank Farm MO-0066-1A-6" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6887 Tank Farm MO-0066-1A-6" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6888 Tank Farm MO-0066-1A-6" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6889 Tank Farm MO-0066-1A-6" 1/1 FW-18 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6890 Tank Farm MO-0066-1A-6" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6891 Tank Farm MO-0066-1A-6" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6892 Tank Farm MO-0066-1A-6" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6893 Tank Farm MO-0066-1A-6" 1/1 FW-26A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6894 Tank Farm MO-0064-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6895 Tank Farm MO-0064-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

6896 Tank Farm MO-0064-1A-10" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6897 Tank Farm MO-0064-1A-10" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6898 Tank Farm MO-0064-1A-10" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6899 Tank Farm MO-0064-1A-10" 1/1 FW-10 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6900 Tank Farm MO-0064-1A-10" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6901 Tank Farm MO-0064-1A-10" 1/1 FW-12 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6902 Tank Farm MO-0067-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

6903 Tank Farm MO-0067-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

6904 Tank Farm MO-0067-1A-10" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6905 Tank Farm MO-0067-1A-10" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6906 Tank Farm MO-0067-1A-10" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6907 Tank Farm MO-0067-1A-10" 1/1 FW-10 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6908 Tank Farm MO-0067-1A-10" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6909 Tank Farm MO-0067-1A-10" 1/1 FW-12 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6910 Tank Farm MO-0067-1A-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

6911 Tank Farm MO-0068-1A-6" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6912 Tank Farm MO-0068-1A-6" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6913 Tank Farm MO-0068-1A-6" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6914 Tank Farm MO-0068-1A-6" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6915 Tank Farm MO-0068-1A-6" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6916 Tank Farm MO-0068-1A-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6917 Tank Farm MO-0069-1A-6" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6918 Tank Farm MO-0069-1A-6" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6919 Tank Farm MO-0069-1A-6" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6920 Tank Farm MO-0069-1A-6" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6921 Tank Farm MO-0069-1A-6" 1/1 FW-08 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6922 Tank Farm MO-0069-1A-6" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6923 Tank Farm MO-0069-1A-6" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6924 Tank Farm MO-0069-1A-6" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6925 Tank Farm MO-0069-1A-6" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6926 Tank Farm MO-0069-1A-6" 1/1 FW-18 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6927 Tank Farm MO-0069-1A-6" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6928 Tank Farm MO-0069-1A-6" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6929 Tank Farm MO-0069-1A-6" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6930 Tank Farm MO-0069-1A-6" 1/1 FW-26A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6931 Tank Farm MO-0044-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

6932 Tank Farm MO-0044-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

6933 Tank Farm MO-0044-1A-10" 1/1 FW-03 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6934 Tank Farm MO-0044-1A-10" 1/1 FW-04 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6935 Tank Farm MO-0044-1A-10" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6936 Tank Farm MO-0044-1A-10" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

6937 Tank Farm MO-0044-1A-10" 1/1 FW-09 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6938 Tank Farm MO-0044-1A-10" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6939 Tank Farm MO-0044-1A-10" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6940 Tank Farm MO-0044-1A-10" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

6941 Tank Farm MO-0045-1A--6" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A105 Reducer/Flange

6942 Tank Farm MO-0045-1A--6" 1/1 FW-04 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6943 Tank Farm MO-0045-1A--6" 1/1 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6944 Tank Farm MO-0045-1A--6" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6945 Tank Farm MO-0045-1A--6" 1/1 FW-08 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6946 Tank Farm MO-0045-1A--6" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6947 Tank Farm MO-0045-1A--6" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6948 Tank Farm MO-0045-1A--6" 1/1 FW-12 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6949 Tank Farm MO-0045-1A--6" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6950 Tank Farm MO-0045-1A--6" 1/1 FW-18 BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

6951 Tank Farm MO-0045-1A--6" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6952 Tank Farm MO-0045-1A--6" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6953 Tank Farm MO-0045-1A--6" 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6954 Tank Farm MO-0045-1A--6" 1/1 FW-27A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6955 Tank Farm MO-0046-1A-6" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

6956 Tank Farm MO-0046-1A-6" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6957 Tank Farm MO-0046-1A-6" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

6958 Tank Farm MO-0120-1A-8" 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6959 Tank Farm MO-0120-1A-8" 1/2 FW-35 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

6960 Tank Farm MO-0120-1A-8" 1/2 FW-2A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6961 Tank Farm MO-0120-1A-8" 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6962 Tank Farm MO-0120-1A-8" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6963 Tank Farm MO-0120-1A-8" 1/2 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6964 Tank Farm MO-0120-1A-8" 1/2 FW-36 BW WPS-2016-23 GTAW/SMAW 8" SCH40 A106/A234 Pipe/Reducer

6965 Tank Farm MO-0120-1A-8" 1/2 FW-35A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Reducer

6966 Tank Farm MO-0120a-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

6967 Tank Farm MO-0120a-1A-8" 1/1 FW-23 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Weldolet

6968 Tank Farm MO-0120a-1A-8" 1/1 FW-23A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

6969 Tank Farm MO-0120-1A-8" 1/2 FW-12 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6970 Tank Farm MO-0120-1A-8" 1/2 FW-13 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6971 Tank Farm MO-0120-1A-8" 1/2 FW-14 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6972 Tank Farm MO-0120-1A-8" 1/2 FW-15 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6973 Tank Farm MO-0120a-1A-8" 1/1 FW-23B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

6974 Tank Farm JF-0041a-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

6975 Tank Farm JF-0041a-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

6976 Tank Farm JF-0041a-1A-8" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

6977 Tank Farm JF-0041a-1A-8" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Reducer

6978 Tank Farm MO-0120-1A-8" 1/2 FW-22 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6979 Tank Farm MO-0120-1A-8" 1/2 FW-23 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6980 Tank Farm MO-0120-1A-8" 1/2 FW-24 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

6981 Tank Farm MO-0120-1A-8" 1/2 FW-26 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6982 Tank Farm MO-0120-1A-8" 1/2 FW-27 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6983 Tank Farm MO-0120-1A-8" 1/2 FW-28 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6984 Tank Farm MO-0120-1A-8" 1/2 FW-30 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6985 Tank Farm MO-0120-1A-8" 1/2 FW-31 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

6986 Tank Farm MO-0120-1A-8" 1/2 FW-32 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

6987 Tank Farm JF-0041a-1A-8" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

6988 Tank Farm JF-0041-1A-8” 2/2 FW-59 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

6989 Tank Farm MO-0120-1A-8" 1/2 FW-38 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

6990 Tank Farm MO-0120-1A-8" 2/2 FW-45 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

6991 Tank Farm MO-0120-1A-8" 2/2 FW-46 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6992 Tank Farm MO-0120-1A-8" 2/2 FW-47 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

6993 Tank Farm MO-0120-1A-8" 2/2 FW-48 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
6994 Tank Farm MO-0120-1A-8" 2/2 FW-49 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

6995 Tank Farm MO-0120-1A-8" 2/2 FW-50 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6996 Tank Farm MO-0120-1A-8" 2/2 FW-51 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

6997 Tank Farm MO-0120-1A-8" 2/2 FW-52 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

6998 Tank Farm MO-0024-1A-10" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

6999 Tank Farm MO-0120-1A-8" 2/2 FW-57 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7000 Tank Farm MO-0120-1A-8" 2/2 FW-58 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7001 Tank Farm MO-0120-1A-8" 2/2 FW-59 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7002 Tank Farm MO-0120-1A-8" 2/2 FW-60 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7003 Tank Farm MO-0120-1A-8" 2/2 FW-61 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7004 Tank Farm MO-0120-1A-8" 2/2 FW-62 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7005 Tank Farm MO-0120-1A-8" 2/2 FW-63 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7006 Tank Farm MO-0120-1A-8" 2/2 FW-63A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

7007 Tank Farm MO-0021-1A-16” 1/1 FW-24 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

7008 Tank Farm MO-0021-1A-16” 1/1 FW-22A BW WPS-2016-23 GTAW/SMAW 16” SCH20 A234/A234 Tee/Reducer

7009 Tank Farm MO-0001-1A-12” 5/7 FW-77 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7010 Tank Farm JF-0002-1A-12” 1/2 FW-11 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7011 Tank Farm JF-0002-1A-12” 1/2 FW-18 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7012 Tank Farm JF-0002-1A-12” 1/2 FW-20 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7013 Tank Farm DO-0002-1A-12” 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

7014 Tank Farm DO-0002-1A-12” 1/2 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7015 Tank Farm DO-0002-1A-12” 1/2 FW-11 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7016 Tank Farm MO-0002-1A-12" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7017 Tank Farm MO-0002-1A-12" 1/1 FW-1C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/pipe

7018 Tank Farm MO-0002-1A-12" 1/1 FW-10 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7019 Tank Farm MO-0003-1A-12” 1/1 FW-03 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7020 Tank Farm MO-0003-1A-12” 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7021 Tank Farm MO-0011-1A-12" 1/1 FW-09 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7022 Tank Farm MO-0011-1A-12" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

7023 Tank Farm MO-0011-1A-12" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

7024 Tank Farm MO-0012-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

7025 Tank Farm MO-0014-1A-14" 1/2 FW-16B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

7026 Tank Farm MO-0004-1A-12” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7027 Tank Farm MO-0004-1A-12” 1/1 FW-03 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7028 Tank Farm MO-0122-1A-3" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

7029 Tank Farm MO-0122-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

7030 Tank Farm MO-0122-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

7031 Tank Farm MO-0122-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

7032 Tank Farm MO-0122-1A-3" 1/1 FW-03 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7033 Tank Farm MO-0122-1A-3" 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7034 Tank Farm MO-0123-1A-4" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

7035 Tank Farm MO-0124-1A-3" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

7036 Tank Farm MO-0126-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

7037 Tank Farm MO-0126-1A-3" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7038 Tank Farm MO-0126-1A-3" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

7039 Tank Farm JF-0012-1A-10" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7040 Tank Farm JF-0012-1A-10" 1/1 FW-08 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

7041 Tank Farm DO-0015-1A-14” 1/2 FW-18 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

7042 Tank Farm DO-0015-1A-14” 2/2 FW-31A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

7043 Tank Farm MO-0040-1A-10” 1/1 FW-10 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7044 Tank Farm MO-0040-1A-10” 1/1 FW-13 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7045 Tank Farm MO-0040-1A-10” 1/1 FW-19 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

7046 Tank Farm MO-0040-1A-10” 1/1 FW-3A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

7047 Tank Farm MO-0062-1A-14” 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

7048 Tank Farm MO-0062-1A-14” 1/1 FW-09 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7049 Tank Farm MO-0062-1A-14” 1/1 FW-12 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7050 Tank Farm MO-0062-1A-14” 1/1 FW-16 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7051 Tank Farm MO-0062-1A-14” 1/1 FW-19 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7052 Tank Farm MO-0062-1A-14” 1/1 FW-5A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

7053 Tank Farm MO-0033-1A-12" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7054 Tank Farm MO-0033-1A-12" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7055 Tank Farm MO-0033-1A-12" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7056 Tank Farm MO-0033-1A-12" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

7057 Tank Farm MO-0033-1A-12" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7058 Tank Farm MO-0033-1A-12" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7059 Tank Farm MO-0033-1A-12" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7060 Tank Farm MO-0034-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

7061 Tank Farm MO-0034-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

7062 Tank Farm MO-0034-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

7063 Tank Farm MO-0034-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

7064 Tank Farm MO-0034-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

7065 Tank Farm MO-0034-1A-8" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

7066 Tank Farm MO-0039-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

7067 Tank Farm MO-0039-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

7068 Tank Farm MO-0039-1A-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

7069 Tank Farm MO-0039-1A-10" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

7070 Tank Farm MO-0039-1A-10" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7071 Tank Farm MO-0039-1A-10" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

7072 Tank Farm MO-0039-1A-10" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

7073 Tank Farm MO-0039-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/45Elbow

7074 Tank Farm MO-0039-1A-10" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/45Elbow

7075 Tank Farm MO-0039-1A-10" 1/1 FW-30 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

7076 Tank Farm MO-0039-1A-10" 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

7077 Tank Farm MO-0039-1A-10" 1/1 FW-31A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

7078 Tank Farm PW-5408A-1S2-2" 1/1 FW-01 SOW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

7079 Tank Farm PW-5408A-1S2-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7080 Tank Farm PW-5408A-1S2-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7081 Tank Farm PW-5408A-1S2-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7082 Tank Farm PW-5408A-1S2-2" 1/1 FW-07 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7083 Tank Farm PW-5408A-1S2-2" 1/1 FW-11 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7084 Tank Farm PW-5408A-1S2-2" 1/1 FW-12 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7085 Tank Farm PW-5416-1S1-4" 4/5 FW-41 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7086 Tank Farm PW-5416-1S1-4" 4/5 FW-42 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7087 Tank Farm PW-5416-1S1-4" 4/5 FW-43 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7088 Tank Farm PW-5416-1S1-4" 4/5 FW-44 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7089 Tank Farm PW-5416-1S1-4" 4/5 FW-45 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7090 Tank Farm PW-5416-1S1-4" 4/5 FW-46 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7091 Tank Farm PW-5416-1S1-4" 4/5 FW-47 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7092 Tank Farm PW-5416-1S1-4" 4/5 FW-48 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7093 Tank Farm PW-5416-1S1-4" 4/5 FW-49 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7094 Tank Farm PW-5416-1S1-4" 4/5 FW-50 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7095 Tank Farm PW-5416-1S1-4" 4/5 FW-51 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7096 Tank Farm PW-5416-1S1-4" 4/5 FW-52 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7097 Tank Farm PW-5416-1S1-4" 4/5 FW-53 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7098 Tank Farm PW-5416-1S1-4" 4/5 FW-54 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7099 Tank Farm PW-5416-1S1-4" 4/5 FW-55 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7100 Tank Farm PW-5416-1S1-4" 4/5 FW-56 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7101 Tank Farm PW-5416-1S1-4" 4/5 FW-57 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7102 Tank Farm PW-5428-1S1-2" 1/1 FW-1A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

7103 Tank Farm PW-5425-1S1-2" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7104 Tank Farm PW-5425-1S1-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7105 Tank Farm PW-5425-1S1-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7106 Tank Farm PW-5425-1S1-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7107 Tank Farm PW-5425-1S1-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7108 Tank Farm PW-5425-1S1-2" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7109 Tank Farm PW-5425-1S1-2" 1/1 FW-07 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Gate

7110 Tank Farm PW-5425-1S1-2" 1/1 FW-1A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

7111 Tank Farm PW-5429-1S1-2" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7112 Tank Farm PW-5429-1S1-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7113 Tank Farm PW-5429-1S1-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7114 Tank Farm PW-5429-1S1-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7115 Tank Farm PW-5429-1S1-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7116 Tank Farm PW-5429-1S1-2" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7117 Tank Farm PW-5429-1S1-2" 1/1 FW-07 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Gate

7118 Tank Farm PW-5429-1S1-2" 1/1 FW-1A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

7119 Tank Farm PW-5427-1S1-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7120 Tank Farm PW-5427-1S1-2" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

7121 Tank Farm PW-5427-1S1-2" 1/1 FW-07 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Gate

7122 Tank Farm PW-5427-1S1-2" 1/1 FW-1A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

7123 Tank Farm PW-5424-1S1-2" 1/1 FW-2D BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

7124 Tank Farm PW-5424-1S1-2" 1/1 FW-07 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

7125 Tank Farm PW-5416-1S2-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7126 Tank Farm PW-5416-1S2-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

7127 Tank Farm PW-5416-1S2-2" 1/1 FW-2A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

7128 Tank Farm PW-5416-1S2-2" 1/1 FW-2B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

7129 Tank Farm PW-5416-1S2-2" 1/1 FW-2C BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

7130 Tank Farm PW-5416-1S2-2" 1/1 FW-2D BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

7131 Tank Farm PW-5416-1S2-2" 1/1 FW-1A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Tee

7132 Tank Farm MO-0054-1A-14” 1/2 FW-09 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7133 Tank Farm MO-0054-1A-14” 2/2 FW-40 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7134 Tank Farm MO-0049-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

7135 Tank Farm MO-0049-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

7136 Tank Farm MO-0049-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7137 Tank Farm MO-0058-1A-8” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A105 Reducer/Flange

7138 Tank Farm MO-0056-1A-12” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7139 Tank Farm MO-0056-1A-12” 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7140 Tank Farm MO-0060-1A-12” 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7141 Tank Farm MO-0060-1A-12” 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7142 Tank Farm MO-0060-1A-12” 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7143 Tank Farm MO-0060-1A-12” 1/1 FW-17A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7144 Tank Farm MO-0054-1A-14” 2/2 FW-41 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7145 Tank Farm MO-0054-1A-14” 2/2 FW-41A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7146 Tank Farm MO-0047-1A-12” 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7147 Tank Farm MO-0047-1A-12” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7148 Tank Farm MO-0047-1A-12” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7149 Tank Farm MO-0047-1A-12” 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7150 Tank Farm MO-0054-1A-14” 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

7151 Tank Farm MO-0054-1A-14” 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

7152 Tank Farm MO-0049-1A-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

7153 Tank Farm MO-0049-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

7154 Tank Farm MO-0049-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

7155 Tank Farm MO-0049-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

7156 Tank Farm MO-0049-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

7157 Tank Farm MO-0049-1A-8" 1/1 FW-7A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

7158 Tank Farm JF-0044-1A-2" 1/2 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7159 Tank Farm JF-0044-1A-2" 1/2 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7160 Tank Farm JF-0044-1A-2" 1/2 FW-1B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7161 Tank Farm JF-0044-1A-2" 1/2 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7162 Tank Farm JF-0044-1A-2" 1/2 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7163 Tank Farm JF-0044-1A-2" 1/2 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7164 Tank Farm JF-0004-1A-2" 1/1 FW-13 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7165 Tank Farm JF-0004-1A-2" 1/1 FW-16 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7166 Tank Farm JF-0004-1A-2" 1/1 FW-20 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7167 Tank Farm MO-0008-1A-2" 2/2 FW-33 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7168 Tank Farm MO-0008-1A-2" 2/2 FW-36 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7169 Tank Farm MO-0008-1A-2" 2/2 FW-34 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7170 Tank Farm MO-0008-1A-2" 2/2 FW-35 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7171 Tank Farm MO-0008-1A-2" 2/2 FW-36A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7172 Tank Farm MO-0008-1A-2" 2/2 FW-36B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7173 Tank Farm SA-0001-1B-2" 1/4 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

7174 Tank Farm SA-0001-1B-2" 1/4 FW-3A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

7175 Tank Farm SA-0001-1B-2" 3/4 FW-44 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

7176 Tank Farm SA-0001-1B-2" 1/4 FW-14 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

7177 Tank Farm DO-0004-1A-2" 1/2 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7178 Tank Farm DO-0004-1A-2" 1/2 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7179 Tank Farm DO-0004-1A-2" 1/2 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7180 Tank Farm DO-0004-1A-2" 1/2 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7181 Tank Farm DO-0004-1A-2" 1/2 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7182 Tank Farm DO-0004-1A-2" 1/2 FW-1B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7183 Tank Farm MO-0127-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7184 Tank Farm MO-0127-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7185 Tank Farm MO-0127-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7186 Tank Farm MO-0127-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7187 Tank Farm MO-0127-1A-4" 1/1 FW-5D BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

7188 Tank Farm MO-0126-1A-3" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

7189 Tank Farm MO-0126-1A-3" 1/1 FW-1B BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

7190 Tank Farm MO-0126-1A-3" 1/1 FW-1C BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

7191 Tank Farm SA-0001-1B-2" 1/4 FW-15 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7192 Tank Farm SA-0001-1B-2" 1/4 FW-16 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

7193 Tank Farm JF-0004-1A-2" 1/1 FW-14 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7194 Tank Farm JF-0004-1A-2" 1/1 FW-15 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7195 Tank Farm JF-0004-1A-2" 1/1 FW-17 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7196 Tank Farm JF-0004-1A-2" 1/1 FW-18 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7197 Tank Farm JF-0004-1A-2" 1/1 FW-19 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7198 Tank Farm DO-0054-1A-14" 3/3 FW-60 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

7199 Tank Farm DO-0054-1A-14" 3/3 FW-61 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

7200 Tank Farm DO-0054-1A-14" 3/3 FW-62 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

7201 Tank Farm DO-0054-1A-14" 3/3 FW-63 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

7202 Tank Farm DO-0054-1A-14" 3/3 FW-63A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7203 Tank Farm DO-0054-1A-14" 1/3 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

7204 Tank Farm DO-0054-1A-14" 3/3 FW-47 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

7205 Tank Farm DO-0054-1A-14" 3/3 FW-48 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7206 Tank Farm DO-0054-1A-14" 3/3 FW-52 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7207 Tank Farm DO-0054-1A-14" 3/3 FW-56 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7208 Tank Farm DO-0054a-1A-14” 1/2 FW-1A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

7209 Tank Farm DO-0054a-1A-14” 1/2 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7210 Tank Farm DO-0054a-1A-14” 1/2 FW-29 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7211 Tank Farm DO-0054a-1A-14” 1/2 FW-29A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

7212 Tank Farm DO-0054a-1A-14” 1/2 FW-29B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

7213 Tank Farm PW-5420-1S1-1" 1/1 FW-1A BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7214 Tank Farm PW-5420-1S1-1" 1/1 FW-01 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7215 Tank Farm PW-5420-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7216 Tank Farm PW-5420-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7217 Tank Farm PW-5420-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7218 Tank Farm PW-5420-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7219 Tank Farm PW-5420-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

7220 Tank Farm PW-5420-1S1-1" 1/1 FW-4A BW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/Pipe

7221 Tank Farm PW-5433-1S2-1½" 1/1 FW-1A BW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Tee

7222 Tank Farm PW-5433-1S2-1½" 1/1 FW-01 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

7223 Tank Farm PW-5433-1S2-1½" 1/1 FW-02 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

7224 Tank Farm PW-5433-1S2-1½" 1/1 FW-03 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7225 Tank Farm PW-5433-1S2-1½" 1/1 FW-04 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

7226 Tank Farm PW-5433-1S2-1½" 1/1 FW-05 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

7227 Tank Farm PW-5433-1S2-1½" 1/1 FW-06 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

7228 Tank Farm PW-5433-1S2-1½" 1/1 FW-07 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

7229 Tank Farm PW-5433-1S2-1½" 1/1 FW-08 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

7230 Tank Farm PW-5433-1S2-1½" 1/1 FW-09 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Gate

7231 Tank Farm MO-0058-1A-8” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

7232 Tank Farm MO-0058-1A-8” 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

7233 Tank Farm MO-0058-1A-8” 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 90Elbow/Reducer

7234 Tank Farm MO-0058-1A-8” 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 Tee/Reducer

7235 Tank Farm MO-0003-1A-12” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7236 Tank Farm MO-0002-1A-12" 1/1 FW-32 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7237 Tank Farm MO-0005-1A-12” 1/1 FW-03 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7238 Tank Farm MO-0005-1A-12” 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7239 Tank Farm AD-0004-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7240 Tank Farm AD-0004-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7241 Tank Farm AD-0004-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7242 Tank Farm AD-0004-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7243 Tank Farm AD-0004-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7244 Tank Farm AD-0004-1S1-1" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

7245 Tank Farm AD-0026-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

7246 Tank Farm AD-0026-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7247 Tank Farm AD-0026-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7248 Tank Farm AD-0026-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7249 Tank Farm AD-0026-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7250 Tank Farm AD-0026-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7251 Tank Farm AD-0026-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7252 Tank Farm AD-0026-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7253 Tank Farm AD-0026-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7254 Tank Farm AD-0026-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7255 Tank Farm AD-0026-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7256 Tank Farm AD-0026-1S1-1" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

7257 Tank Farm AD-0031-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7258 Tank Farm AD-0031-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7259 Tank Farm AD-0031-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7260 Tank Farm AD-0031-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7261 Tank Farm AD-0031-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7262 Tank Farm AD-0031-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7263 Tank Farm AD-0031-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7264 Tank Farm AD-0031-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7265 Tank Farm AD-0031-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7266 Tank Farm AD-0031-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7267 Tank Farm AD-0031-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7268 Tank Farm AD-0031-1S1-1" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7269 Tank Farm AD-0024-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

7270 Tank Farm AD-0024-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7271 Tank Farm AD-0024-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7272 Tank Farm AD-0024-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7273 Tank Farm AD-0024-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7274 Tank Farm AD-0024-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7275 Tank Farm AD-0024-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7276 Tank Farm AD-0024-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7277 Tank Farm AD-0024-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7278 Tank Farm AD-0024-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7279 Tank Farm AD-0024-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7280 Tank Farm AD-0024-1S1-1" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

7281 Tank Farm AD-0022-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

7282 Tank Farm AD-0022-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7283 Tank Farm AD-0022-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7284 Tank Farm AD-0022-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7285 Tank Farm AD-0022-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7286 Tank Farm AD-0022-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7287 Tank Farm AD-0022-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7288 Tank Farm AD-0022-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7289 Tank Farm AD-0022-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7290 Tank Farm AD-0022-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7291 Tank Farm AD-0022-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7292 Tank Farm AD-0022-1S1-1" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

7293 Tank Farm AD-0030-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

7294 Tank Farm AD-0030-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7295 Tank Farm AD-0030-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7296 Tank Farm AD-0030-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7297 Tank Farm AD-0030-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7298 Tank Farm AD-0030-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7299 Tank Farm AD-0030-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7300 Tank Farm AD-0030-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7301 Tank Farm AD-0030-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7302 Tank Farm AD-0030-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7303 Tank Farm AD-0030-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7304 Tank Farm AD-0030-1S1-1" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

7305 Tank Farm AD-0018-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

7306 Tank Farm AD-0018-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7307 Tank Farm AD-0018-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7308 Tank Farm AD-0018-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7309 Tank Farm AD-0018-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7310 Tank Farm AD-0018-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7311 Tank Farm AD-0018-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7312 Tank Farm AD-0018-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7313 Tank Farm AD-0018-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7314 Tank Farm AD-0018-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7315 Tank Farm AD-0018-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7316 Tank Farm AD-0018-1S1-1" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

7317 Tank Farm AD-0014-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

7318 Tank Farm AD-0014-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7319 Tank Farm AD-0014-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7320 Tank Farm AD-0014-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7321 Tank Farm AD-0014-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7322 Tank Farm AD-0014-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7323 Tank Farm AD-0014-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7324 Tank Farm AD-0014-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7325 Tank Farm AD-0014-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7326 Tank Farm AD-0014-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7327 Tank Farm AD-0014-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7328 Tank Farm AD-0014-1S1-1" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

7329 Tank Farm AD-0010-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

7330 Tank Farm AD-0010-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7331 Tank Farm AD-0010-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7332 Tank Farm AD-0010-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7333 Tank Farm AD-0010-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7334 Tank Farm AD-0010-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7335 Tank Farm AD-0010-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7336 Tank Farm AD-0010-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7337 Tank Farm AD-0010-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7338 Tank Farm AD-0010-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7339 Tank Farm AD-0010-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7340 Tank Farm AD-0010-1S1-1" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

7341 Tank Farm AD-0008-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

7342 Tank Farm AD-0008-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7343 Tank Farm AD-0008-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7344 Tank Farm AD-0008-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7345 Tank Farm AD-0008-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7346 Tank Farm AD-0008-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7347 SRC DO-0001-1A-12” 1/7 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7348 SRC DO-0001-1A-12” 2/7 FW-21 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7349 SRC DO-0001-1A-12” 2/7 FW-22 SOW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

7350 SRC DO-0001-1A-12” 3/7 FW-31 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7351 SRC DO-0001-1A-12” 3/7 FW-32 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7352 SRC DO-0001-1A-12” 3/7 FW-33 SOW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Flange

7353 SRC DO-0001-1A-12” 3/7 FW-34 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7354 SRC DO-0001-1A-12” 3/7 FW-35 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7355 SRC DO-0001-1A-12” 3/7 FW-36 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7356 SRC DO-0001-1A-12” 3/7 FW-39 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7357 SRC DO-0001-1A-12” 3/7 FW-40 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

7358 SRC DO-0001-1A-12” 3/7 FW-41 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

7359 SRC DO-0001-1A-12” 4/7 FW-57 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7360 SRC DO-0001-1A-12” 4/7 FW-58 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7361 SRC DO-0001-1A-12” 4/7 FW-59 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

7362 SRC DO-0001-1A-12” 4/7 FW-58A SW WPS-2016-21 GTAW 1½" SCH80 A106/A234 Pipe/90Elbow

7363 SRC DO-0001-1A-12” 4/7 FW-58B SW WPS-2016-21 GTAW 1½" SCH80 A106/A234 Pipe/90Elbow

7364 SRC JF-0001-1A-12” 1/7 FW-08 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7365 SRC JF-0001-1A-12” 1/7 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7366 SRC JF-0001-1A-12” 1/7 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7367 SRC JF-0001-1A-12” 2/7 FW-20 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7368 SRC JF-0001-1A-12” 2/7 FW-21 SOW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

7369 SRC JF-0001-1A-12” 3/7 FW-33 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7370 SRC JF-0001-1A-12” 3/7 FW-34 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7371 SRC JF-0001-1A-12” 3/7 FW-35 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7372 SRC JF-0001-1A-12” 3/7 FW-30 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7373 SRC JF-0001-1A-12” 3/7 FW-31 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7374 SRC JF-0001-1A-12” 3/7 FW-32 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Flange

7375 SRC JF-0001-1A-12” 3/7 FW-38 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

7376 SRC JF-0001-1A-12” 4/7 FW-56 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7377 SRC JF-0001-1A-12” 4/7 FW-57 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7378 SRC JF-0001-1A-12” 4/7 FW-58 SOW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7379 SRC MO-0001-1A-12” 1/7 FW-15C BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7380 SRC MO-0001-1A-12” 1/7 FW-15D SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7381 SRC MO-0001-1A-12” 1/7 FW-15E SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7382 SRC MO-0001-1A-12” 2/7 FW-34 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7383 SRC MO-0001-1A-12” 2/7 FW-35 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7384 SRC MO-0001-1A-12” 2/7 FW-36 SOW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

7385 SRC MO-0001-1A-12” 2/7 FW-24 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

7386 SRC MO-0001-1A-12” 2/7 FW-25 SOW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

7387 SRC MO-0001-1A-12” 3/7 FW-42 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Reducer

7388 SRC MO-0001-1A-12” 3/7 FW-37 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7389 SRC MO-0001-1A-12” 3/7 FW-38 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7390 SRC MO-0001-1A-12” 3/7 FW-39 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7391 SRC MO-0001-1A-12” 4/7 FW-61 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7392 SRC MO-0001-1A-12” 4/7 FW-61A SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

7393 SRC MO-0001-1A-12” 4/7 FW-61B SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

7394 SRC MO-0001-1A-12” 4/7 FW-62 SOW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

7395 SRC MO-0001A-1A-12” 1/5 FW-015B SW WPS-2016-23 GTAW/SMAW 1/2" SCH80 A106/A105 Pipe/scokolet

7396 SRC MO-0001A-1A-12” 1/5 FW-015C SW WPS-2016-23 GTAW/SMAW 1/2" SCH80 A106/A105 Pipe/Gate

7397 SRC MO-0001A-1A-12” 1/5 FW-015D SW WPS-2016-23 GTAW/SMAW 1/2" SCH80 A106/A105 Pipe/Gate

7398 SRC MO-0001A-1A-12” 2/5 FW-25A FW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Guesset plate

7399 SRC MO-0001A-1A-12” 2/5 FW-25B FW WPS-2016-21 GTAW 1" SCH80 A106/A105 Guesset plate/Valve

7400 SRC MO-0001A-1A-12” 2/5 FW-25C FW WPS-2016-21 GTAW 1" SCH80 A106/A105 Guesset plate/Valve
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7401 SRC MO-0001A-1A-12” 2/5 FW-25D FW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Guesset plate

7402 SRC MO-0001A-1A-12” 2/5 FW-20D SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7403 SRC MO-0001A-1A-12” 3/5 FW-39A SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

7404 SRC MO-0001A-1A-12” 3/5 FW-39B SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

7405 SRC FW-0015-1C-14" 3/3 FW-46 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

7406 SRC FW-0015-1C-14" 3/3 FW-47 SW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

7407 SRC FW-0015-1C-14" 3/3 FW-45 BRW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Weldolet

7408 SRC MO-0001A-1A-12” 3/5 FW-38A FW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Guesset plate

7409 SRC MO-0001A-1A-12” 3/5 FW-38B FW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Guesset plate

7410 SRC FW-0015-1C-14" 3/3 FW-36A BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7411 SRC FW-0015-1C-14" 3/3 FW-36B SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7412 SRC FW-0015-1C-14" 3/3 FW-36C SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

7413 SRC JF-0048-1A-2" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

7414 SRC JF-0048-1A-2" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7415 SRC JF-0048-1A-2" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7416 SRC JF-0048-1A-2" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7417 SRC JF-0048-1A-2" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7418 SRC JF-0048-1A-2" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7419 SRC JF-0048-1A-2" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7420 SRC JF-0048-1A-2" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7421 SRC JF-0048-1A-2" 1/1 FW-09 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7422 SRC JF-0048-1A-2" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7423 SRC JF-0048-1A-2" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7424 SRC JF-0048-1A-2" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7425 SRC JF-0048-1A-2" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7426 SRC JF-0048-1A-2" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7427 SRC JF-0048-1A-2" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

7428 SRC JF-0048-1A-2" 1/1 FW-16 SOW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7429 SRC JF-0048-1A-2" 1/1 FW-17 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7430 SRC JF-0048-1A-2" 1/1 FW-18 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7431 SRC JF-0048-1A-2" 1/1 FW-19 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7432 SRC JF-0048-1A-2" 1/1 FW-20 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7433 SRC JF-0048-1A-2" 1/1 FW-21 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7434 SRC JF-0048-1A-2" 1/1 FW-22 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7435 SRC JF-0048-1A-2" 1/1 FW-23 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

7436 SRC JF-0048-1A-2" 1/1 FW-24 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

7437 SRC JF-0048-1A-2" 1/1 FW-25 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7438 SRC JF-0048-1A-2" 1/1 FW-26 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Gate

7439 SRC JF-0048-1A-2" 1/1 FW-27 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Gate

7440 SRC JF-0048-1A-2" 1/1 FW-28 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7441 SRC JF-0048-1A-2" 1/1 FW-29 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7442 SRC JF-0048-1A-2" 1/1 FW-30 BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7443 SRC JF-0048-1A-2" 1/1 FW-31 BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7444 SRC JF-0048-1A-2" 1/1 FW-32 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7445 SRC JF-0048-1A-2" 1/1 FW-33 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7446 SRC DO-0058-1A-2" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

7447 SRC DO-0058-1A-2" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7448 SRC DO-0058-1A-2" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7449 SRC DO-0058-1A-2" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7450 SRC DO-0058-1A-2" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7451 SRC DO-0058-1A-2" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7452 SRC DO-0058-1A-2" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7453 SRC DO-0058-1A-2" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7454 SRC DO-0058-1A-2" 1/1 FW-09 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7455 SRC DO-0058-1A-2" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7456 SRC DO-0058-1A-2" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7457 SRC DO-0058-1A-2" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7458 SRC DO-0058-1A-2" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7459 SRC DO-0058-1A-2" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7460 SRC DO-0058-1A-2" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

7461 SRC DO-0058-1A-2" 1/1 FW-16 SW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7462 SRC DO-0058-1A-2" 1/1 FW-17 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7463 SRC DO-0058-1A-2" 1/1 FW-18 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7464 SRC DO-0058-1A-2" 1/1 FW-19 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7465 SRC DO-0058-1A-2" 1/1 FW-20 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A234 Pipe/Tee

7466 SRC DO-0058-1A-2" 1/1 FW-21 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7467 SRC DO-0058-1A-2" 1/1 FW-22 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7468 SRC DO-0058-1A-2" 1/1 FW-23 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

7469 SRC DO-0058-1A-2" 1/1 FW-24 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

7470 SRC DO-0058-1A-2" 1/1 FW-25 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7471 SRC DO-0058-1A-2" 1/1 FW-26 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Gate

7472 SRC DO-0058-1A-2" 1/1 FW-27 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Gate

7473 SRC DO-0058-1A-2" 1/1 FW-28 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7474 SRC DO-0058-1A-2" 1/1 FW-29 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7475 SRC DO-0058-1A-2" 1/1 FW-30 BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7476 SRC DO-0058-1A-2" 1/1 FW-31 BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7477 SRC DO-0058-1A-2" 1/1 FW-32 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7478 SRC DO-0058-1A-2" 1/1 FW-33 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7479 SRC MO-0134-1A-2" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

7480 SRC MO-0134-1A-2" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7481 SRC MO-0134-1A-2" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7482 SRC MO-0134-1A-2" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7483 SRC MO-0134-1A-2" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7484 SRC MO-0134-1A-2" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7485 SRC MO-0134-1A-2" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7486 SRC MO-0134-1A-2" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7487 SRC MO-0134-1A-2" 1/1 FW-09 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7488 SRC MO-0134-1A-2" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7489 SRC MO-0134-1A-2" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

7490 SRC MO-0134-1A-2" 1/1 FW-12 SW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7491 SRC MO-0134-1A-2" 1/1 FW-13 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7492 SRC MO-0134-1A-2" 1/1 FW-14 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7493 SRC MO-0134-1A-2" 1/1 FW-15 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7494 SRC MO-0134-1A-2" 1/1 FW-16 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7495 SRC MO-0134-1A-2" 1/1 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A234 Pipe/Tee

7496 SRC MO-0134-1A-2" 1/1 FW-18 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7497 SRC MO-0134-1A-2" 1/1 FW-19 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7498 SRC MO-0134-1A-2" 1/1 FW-20 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

7499 SRC MO-0134-1A-2" 1/1 FW-21 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7500 SRC MO-0134-1A-2" 1/1 FW-22 SW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Gate

7501 SRC MO-0134-1A-2" 1/1 FW-23 SW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Gate

7502 SRC MO-0134-1A-2" 1/1 FW-24 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/45Elbow

7503 SRC MO-0134-1A-2" 1/1 FW-25 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/45Elbow

7504 SRC MO-0134-1A-2" 1/1 FW-26 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/45Elbow

7505 SRC MO-0134-1A-2" 1/1 FW-27 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/45Elbow

7506 SRC MO-0134-1A-2" 1/1 FW-28 BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7507 SRC MO-0134-1A-2" 1/1 FW-29 BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7508 SRC MO-0134-1A-2" 1/1 FW-30 BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7509 SRC MO-0134-1A-2" 1/1 FW-31 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7510 SRC MO-0134-1A-2" 1/1 FW-32 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7511 SRC OW-8001-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

7512 SRC OW-8001-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

7513 SRC OW-8001-1A-4" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7514 SRC OW-8001-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

7515 SRC OW-8001-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

7516 SRC OW-8001-1A-4" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7517 SRC OW-8001-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

7518 SRC OW-8001-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

7519 SRC OW-8001-1A-4" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7520 SRC OW-8001-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

7521 SRC OW-8001-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7522 SRC OW-8001-1A-4" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7523 SRC OW-8001-1A-4" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7524 SRC OW-8001-1A-4" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7525 SRC OW-8001-1A-4" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7526 SRC OW-8001-1A-4" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7527 SRC OW-8001-1A-4" 1/1 FW-3A BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Reducer

7528 SRC OW-8001-1A-4" 1/1 FW-6A BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Reducer

7529 SRC OW-8001-1A-4" 1/1 FW-9A BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Reducer

7530 SRC MO-0134-1A-2" 1/1 FW-1A BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Weldolet

7531 SRC DO-0058-1A-2" 1/1 FW-1A BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Weldolet

7532 SRC JF-0048-1A-2" 1/1 FW-1A BRW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7533 Tank Farm MO-0121a-1A-10" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7534 Tank Farm MO-0121a-1A-10" 1/1 FW-23 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7535 Tank Farm MO-0121a-1A-10" 1/1 FW-23A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

7536 Tank Farm MO-0119A-1A-12" 1/2 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7537 Tank Farm MO-0119A-1A-12" 1/2 FW-15 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7538 Tank Farm MO-0119A-1A-12" 1/2 FW-15A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

7539 Tank Farm MO-0119A-1A-12" 1/2 FW-20 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7540 Tank Farm MO-0119A-1A-12" 1/2 FW-21 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7541 Tank Farm MO-0119A-1A-12" 1/2 FW-22 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7542 Tank Farm MO-0119A-1A-12" 1/2 FW-23 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Tee/45Elbow

7543 Tank Farm MO-0119A-1A-12" 1/2 FW-28 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A105 Tee/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7544 Tank Farm MO-0121a-1A-10" 1/1 FW-23B BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

7545 Tank Farm MO-0121a-1A-10" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

7546 Tank Farm MO-0121a-1A-10" 1/1 FW-30 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/45Elbow

7547 Tank Farm MO-0120a-1A-8" 1/1 FW-01 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7548 Tank Farm JF-0005-1A-12" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Pipe/90Elbow

7549 Tank Farm JF-0005-1A-12" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Pipe/90Elbow

7550 Tank Farm JF-0005-1A-12" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A234/A234 Pipe/45Elbow

7551 Tank Farm JF-0005-1A-12" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7552 Tank Farm JF-0009-1A-10" 1/1 FW-38A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

7553 Tank Farm JF-0009-1A-10" 1/1 FW-37 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/45Elbow

7554 Tank Farm JF-0009-1A-10" 1/1 FW-38 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7555 Tank Farm JF-0014-1A-12" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7556 Tank Farm JF-0014-1A-12" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7557 Tank Farm JF-0017-1A-10" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/45Elbow

7558 Tank Farm JF-0017-1A-10" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/45Elbow

7559 Tank Farm JF-0017-1A-10" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

7560 Tank Farm JF-0002-1A-12” 1/2 FW-22 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7561 Tank Farm AD-0008-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7562 Tank Farm AD-0008-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7563 Tank Farm AD-0008-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7564 Tank Farm AD-0008-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7565 Tank Farm AD-0008-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7566 Tank Farm AD-0008-1S1-1" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

7567 Tank Farm AD-0006-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

7568 Tank Farm AD-0006-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7569 Tank Farm AD-0006-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7570 Tank Farm AD-0006-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7571 Tank Farm AD-0006-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7572 Tank Farm AD-0006-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7573 Tank Farm AD-0006-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7574 Tank Farm AD-0006-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7575 Tank Farm AD-0006-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7576 Tank Farm AD-0006-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7577 Tank Farm AD-0006-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7578 Tank Farm AD-0006-1S1-1" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

7579 Tank Farm AD-0028-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

7580 Tank Farm AD-0028-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7581 Tank Farm AD-0028-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7582 Tank Farm AD-0028-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7583 Tank Farm AD-0028-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7584 Tank Farm AD-0028-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7585 Tank Farm AD-0028-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7586 Tank Farm AD-0028-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7587 Tank Farm AD-0028-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7588 Tank Farm AD-0028-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7589 Tank Farm AD-0028-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

7590 Tank Farm AD-0028-1S1-1" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

7591 Tank Farm SA-0012-1B-1" 1/1 FW-1A BW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/Tee

7592 Tank Farm SA-0012-1B-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

7593 Tank Farm SA-0012-1B-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

7594 Tank Farm SA-0012-1B-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

7595 Tank Farm SA-0012-1B-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/90Elbow

7596 Tank Farm SA-0012-1B-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

7597 Tank Farm SA-0012-1B-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee

7598 Tank Farm SA-0012-1B-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7599 Tank Farm SA-0012-1B-1" 1/1 FW-08 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

7600 Tank Farm SA-0012-1B-1" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7601 Tank Farm SA-0012-1B-1" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7602 Tank Farm SA-0012-1B-1" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7603 Tank Farm SA-0012-1B-1" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7604 Tank Farm SA-0012-1B-1" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7605 Tank Farm SA-0012-1B-1" 1/1 FW-15 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee

7606 Tank Farm SA-0012-1B-1" 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

7607 Tank Farm SA-0012-1B-1" 1/1 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

7608 Tank Farm SA-0012-1B-1" 1/1 FW-18 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7609 Tank Farm SA-0012-1B-1" 1/1 FW-19 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7610 Tank Farm SA-0013-1B-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee

7611 Tank Farm SA-0013-1B-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

7612 Tank Farm SA-0013-1B-1" 1/1 FW-08 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

7613 Tank Farm SA-0013-1B-1" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7614 Tank Farm SA-0013-1B-1" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7615 Tank Farm SA-0013-1B-1" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7616 Tank Farm SA-0013-1B-1" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7617 Tank Farm SA-0013-1B-1" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7618 Tank Farm SA-0013-1B-1" 1/1 FW-15 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee

7619 Tank Farm SA-0013-1B-1" 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

7620 Tank Farm SA-0013-1B-1" 1/1 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7621 Tank Farm SA-0013-1B-1" 1/1 FW-18 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7622 Tank Farm SA-0013-1B-1" 1/1 FW-19 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7623 Tank Farm MO-0121a-1A-10" 1/1 FW-32A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

7624 Tank Farm MO-0121a-1A-10" 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A234/A234 Tee/45Elbow

7625 Tank Farm MO-0121a-1A-10" 1/1 FW-33 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

7626 Tank Farm MO-0119A-1A-12" 1/2 FW-27 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

7627 Tank Farm MO-0119A-1A-12" 1/2 FW-29 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

7628 Tank Farm MO-0120a-1A-8" 1/1 FW-30 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

7629 Tank Farm MO-0119A-1A-12" 1/2 FW-23A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7630 Tank Farm MO-0119A-1A-12" 1/2 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7631 Tank Farm MO-0119A-1A-12" 1/2 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7632 Tank Farm MO-0119A-1A-12" 1/2 FW-18 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

7633 Tank Farm MO-0119A-1A-12" 1/2 FW-19 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Flange

7634 Tank Farm MO-0121a-1A-10" 1/1 FW-34 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

7635 Tank Farm MO-0120a-1A-8" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

7636 Tank Farm JF-0005-1A-12" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

7637 Tank Farm JF-0009-1A-10" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

7638 Tank Farm JF-0009-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

7639 Tank Farm JF-0009-1A-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

7640 Tank Farm JF-0014-1A-12" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Tee/45Elbow

7641 Tank Farm JF-0014-1A-12" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7642 Tank Farm JF-0017-1A-10" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7643 Tank Farm JF-0017-1A-10" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

7644 Tank Farm JF-0017-1A-10" 1/1 FW-14A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

7645 Tank Farm JF-0002-1A-12” 1/2 FW-2C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

7646 Tank Farm MO-0002-1A-12" 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7647 Tank Farm MO-0002-1A-12" 1/1 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7648 Tank Farm MO-0002-1A-12" 1/1 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7649 Tank Farm MO-0002-1A-12" 1/1 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7650 Tank Farm MO-0002-1A-12" 1/1 FW-15 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7651 Tank Farm MO-0002-1A-12" 1/1 FW-16 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7652 Tank Farm MO-0002-1A-12" 1/1 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7653 Tank Farm MO-0002-1A-12" 1/1 FW-18 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7654 Tank Farm MO-0002-1A-12" 1/1 FW-19 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

7655 Tank Farm MO-0002-1A-12" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

7656 Tank Farm MO-0002-1A-12" 1/1 FW-21 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7657 Tank Farm MO-0002-1A-12" 1/1 FW-22 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7658 Tank Farm MO-0002-1A-12" 1/1 FW-23 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7659 Tank Farm MO-0002-1A-12" 1/1 FW-24 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7660 Tank Farm MO-0002-1A-12" 1/1 FW-25 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7661 Tank Farm MO-0002-1A-12" 1/1 FW-26 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7662 Tank Farm MO-0002-1A-12" 1/1 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7663 Tank Farm MO-0002-1A-12" 1/1 FW-28 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7664 Tank Farm MO-0002-1A-12" 1/1 FW-29 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7665 Tank Farm MO-0002-1A-12" 1/1 FW-30 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7666 Tank Farm MO-0002-1A-12" 1/1 FW-31 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7667 Tank Farm MO-0002-1A-12" 1/1 FW-31A BW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7668 Tank Farm MO-0109-1A-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7669 Tank Farm MO-0109-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7670 Tank Farm MO-0109-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7671 Tank Farm MO-0109-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7672 Tank Farm MO-0109-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7673 Tank Farm MO-0109-1A-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7674 Tank Farm MO-0109-1A-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7675 Tank Farm MO-0109-1A-1" 1/1 FW-7A BW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7676 Tank Farm MO-0004-1A-12” 1/1 FW-20A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7677 Tank Farm MO-0004-1A-12” 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7678 Tank Farm MO-0004-1A-12” 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7679 Tank Farm MO-0004-1A-12” 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7680 Tank Farm MO-0004-1A-12” 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7681 Tank Farm MO-0004-1A-12” 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7682 Tank Farm MO-0004-1A-12” 1/1 FW-09 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7683 Tank Farm MO-0004-1A-12” 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7684 Tank Farm MO-0004-1A-12” 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7685 Tank Farm MO-0004-1A-12” 1/1 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

7686 Tank Farm MO-0004-1A-12” 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7687 Tank Farm MO-0004-1A-12” 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7688 Tank Farm MO-0004-1A-12” 1/1 FW-15 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7689 Tank Farm MO-0004-1A-12” 1/1 FW-16 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7690 Tank Farm MO-0004-1A-12” 1/1 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7691 Tank Farm MO-0004-1A-12” 1/1 FW-18 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7692 Tank Farm MO-0004-1A-12” 1/1 FW-19 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7693 Tank Farm MO-0004-1A-12” 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7694 Tank Farm MO-0003-1A-12” 1/1 FW-20A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7695 Tank Farm MO-0003-1A-12” 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7696 Tank Farm MO-0003-1A-12” 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7697 Tank Farm MO-0003-1A-12” 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7698 Tank Farm MO-0003-1A-12” 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7699 Tank Farm MO-0003-1A-12” 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7700 Tank Farm MO-0003-1A-12” 1/1 FW-09 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7701 Tank Farm MO-0003-1A-12” 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7702 Tank Farm MO-0003-1A-12” 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7703 Tank Farm MO-0003-1A-12” 1/1 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

7704 Tank Farm MO-0003-1A-12” 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

7705 Tank Farm MO-0003-1A-12” 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7706 Tank Farm MO-0003-1A-12” 1/1 FW-15 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7707 Tank Farm MO-0003-1A-12” 1/1 FW-16 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7708 Tank Farm MO-0003-1A-12” 1/1 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7709 Tank Farm MO-0003-1A-12” 1/1 FW-18 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7710 Tank Farm MO-0003-1A-12” 1/1 FW-19 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7711 Tank Farm MO-0003-1A-12” 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7712 Tank Farm MO-0005-1A-12” 1/1 FW-20A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7713 Tank Farm MO-0005-1A-12” 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7714 Tank Farm MO-0005-1A-12” 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7715 Tank Farm MO-0005-1A-12” 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7716 Tank Farm MO-0005-1A-12” 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7717 Tank Farm MO-0005-1A-12” 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7718 Tank Farm MO-0005-1A-12” 1/1 FW-09 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7719 Tank Farm MO-0005-1A-12” 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7720 Tank Farm MO-0005-1A-12” 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7721 Tank Farm MO-0005-1A-12” 1/1 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

7722 Tank Farm MO-0005-1A-12” 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

7723 Tank Farm MO-0005-1A-12” 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7724 Tank Farm MO-0005-1A-12” 1/1 FW-15 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7725 Tank Farm MO-0005-1A-12” 1/1 FW-16 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7726 Tank Farm MO-0005-1A-12” 1/1 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7727 Tank Farm MO-0005-1A-12” 1/1 FW-18 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7728 Tank Farm MO-0005-1A-12” 1/1 FW-19 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7729 Tank Farm MO-0005-1A-12” 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7730 Tank Farm MO-0014-1A-14" 1/2 FW-18 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7731 Tank Farm MO-0014-1A-14" 1/2 FW-19 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7732 Tank Farm MO-0014-1A-14" 1/2 FW-20 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7733 Tank Farm FW-0015-1C-14" 3/3 FW-36D SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

7734 Tank Farm FW-0015-1C-14" 3/3 FW-36E SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7735 Tank Farm MO-0014-1A-14" 1/2 FW-21 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7736 Tank Farm MO-0014-1A-14" 1/2 FW-22 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7737 Tank Farm MO-0014-1A-14" 1/2 FW-23 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7738 Tank Farm MO-0014-1A-14" 1/2 FW-24 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7739 Tank Farm MO-0014-1A-14" 1/2 FW-25 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7740 Tank Farm MO-0014-1A-14" 1/2 FW-26 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

7741 Tank Farm MO-0014-1A-14" 1/2 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7742 Tank Farm MO-0014-1A-14" 1/2 FW-28 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7743 Tank Farm MO-0014-1A-14" 1/2 FW-29 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7744 Tank Farm MO-0014-1A-14" 1/2 FW-30 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7745 Tank Farm MO-0014-1A-14" 1/2 FW-31 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7746 Tank Farm MO-0014-1A-14" 1/2 FW-32 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7747 Tank Farm MO-0014-1A-14" 1/2 FW-33 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7748 Tank Farm MO-0014-1A-14" 1/2 FW-34 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7749 Tank Farm MO-0014-1A-14" 1/2 FW-35 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7750 Tank Farm MO-0014-1A-14" 1/2 FW-36 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7751 Tank Farm MO-0014-1A-14" 1/2 FW-36A SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee

7752 Tank Farm MO-0125-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A105 Reducer/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7753 Tank Farm MO-0125-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Reducer

7754 Tank Farm MO-0123-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Reducer

7755 Tank Farm MO-0013-1A-2" 1/1 FW-5A BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7756 Tank Farm MO-0013-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7757 Tank Farm MO-0013-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7758 Tank Farm MO-0013-1A-2" 1/1 FW-3A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7759 Tank Farm MO-0013-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7760 Tank Farm MO-0013-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7761 Tank Farm MO-0013-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7762 Tank Farm MO-0018-1A-2" 1/1 FW-11A BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7763 Tank Farm MO-0018-1A-2" 1/1 FW-11 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7764 Tank Farm MO-0018-1A-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7765 Tank Farm MO-0018-1A-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7766 Tank Farm MO-0018-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7767 Tank Farm MO-0018-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7768 Tank Farm MO-0018-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7769 Tank Farm MO-0018-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7770 Tank Farm MO-0018-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7771 Tank Farm MO-0018-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7772 Tank Farm MO-0018-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7773 Tank Farm MO-0018-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7774 Tank Farm JF-0006-1A-8" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7775 Tank Farm JF-0006-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

7776 Tank Farm JF-0006-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

7777 Tank Farm JF-0006-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

7778 Tank Farm JF-0017-1A-10" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

7779 Tank Farm JF-0017-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/45Elbow

7780 Tank Farm JF-0017-1A-10" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/45Elbow

7781 Tank Farm JF-0017-1A-10" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

7782 Tank Farm JF-0014-1A-12" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7783 Tank Farm JF-0014-1A-12" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

7784 Tank Farm JF-0009-1A-10" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

7785 Tank Farm JF-0009-1A-10" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7786 Tank Farm JF-0009-1A-10" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A105 Pipe/Flange

7787 Tank Farm JF-0009-1A-10" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/45Elbow

7788 Tank Farm JF-0009-1A-10" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/45Elbow

7789 Tank Farm JF-0009-1A-10" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

7790 Tank Farm JF-0015-1A-8" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

7791 Tank Farm JF-0015-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

7792 Tank Farm JF-0015-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

7793 Tank Farm JF-0015-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

7794 Tank Farm JF-0015-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

7795 Tank Farm MO-0039-1A-10" 1/1 FW-11 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7796 Tank Farm MO-0039-1A-10" 1/1 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7797 Tank Farm MO-0039-1A-10" 1/1 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7798 Tank Farm MO-0039-1A-10" 1/1 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7799 Tank Farm MO-0039-1A-10" 1/1 FW-15 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7800 Tank Farm MO-0039-1A-10" 1/1 FW-16 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7801 Tank Farm MO-0039-1A-10" 1/1 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7802 Tank Farm MO-0039-1A-10" 1/1 FW-18 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7803 Tank Farm MO-0039-1A-10" 1/1 FW-19 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7804 Tank Farm MO-0039-1A-10" 1/1 FW-20 SOW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

7805 Tank Farm MO-0039-1A-10" 1/1 FW-21 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7806 Tank Farm MO-0039-1A-10" 1/1 FW-22 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7807 Tank Farm MO-0039-1A-10" 1/1 FW-23 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7808 Tank Farm MO-0039-1A-10" 1/1 FW-24 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7809 Tank Farm MO-0039-1A-10" 1/1 FW-25 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7810 Tank Farm MO-0039-1A-10" 1/1 FW-26 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7811 Tank Farm MO-0039-1A-10" 1/1 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7812 Tank Farm MO-0039-1A-10" 1/1 FW-28 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7813 Tank Farm MO-0039-1A-10" 1/1 FW-29 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7814 Tank Farm MO-0039-1A-10" 1/1 FW-19A SOW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

7815 Tank Farm MO-0039-1A-10" 1/1 FW-29A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7816 Tank Farm MO-0013-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7817 Tank Farm DO-0005-1A-12” 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7818 Tank Farm DO-0005-1A-12” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7819 Tank Farm DO-0005-1A-12” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7820 Tank Farm DO-0005-1A-12” 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7821 Tank Farm DO-0009-1A-12" 1/1 FW-36A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7822 Tank Farm DO-0009-1A-12" 1/1 FW-36 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7823 Tank Farm MO-0056-1A-12” 1/1 FW-11 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7824 Tank Farm MO-0056-1A-12” 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7825 Tank Farm MO-0056-1A-12” 1/1 FW-13 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7826 Tank Farm MO-0033-1A-12" 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7827 Tank Farm MO-0033-1A-12" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7828 Tank Farm MO-0033-1A-12" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7829 Tank Farm MO-0047-1A-12” 1/1 FW-07 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7830 Tank Farm MO-0047-1A-12” 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7831 Tank Farm MO-0047-1A-12” 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7832 Tank Farm JF-0005-1A-12" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7833 Tank Farm JF-0005-1A-12" 1/1 FW-09 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7834 Tank Farm JF-0005-1A-12" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7835 Tank Farm JF-0014-1A-12" 1/1 FW-08 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7836 Tank Farm JF-0014-1A-12" 1/1 FW-09 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

7837 Tank Farm JF-0014-1A-12" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

7838 Tank Farm MO-0001-1A-12” 7/7 FW-86 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7839 Tank Farm MO-0001-1A-12” 7/7 FW-87 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7840 Tank Farm MO-0001-1A-12” 7/7 FW-88 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7841 Tank Farm MO-0001-1A-12” 7/7 FW-89 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

7842 Tank Farm MO-0001-1A-12” 7/7 FW-90 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7843 Tank Farm MO-0001-1A-12” 7/7 FW-92 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7844 Tank Farm MO-0001-1A-12” 7/7 FW-93 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7845 Tank Farm MO-0001-1A-12” 7/7 FW-94 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

7846 Tank Farm MO-0001-1A-12” 7/7 FW-95 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

7847 Tank Farm MO-0001-1A-12” 7/7 FW-96 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

7848 Tank Farm MO-0001-1A-12” 7/7 FW-99 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7849 Tank Farm DO-0001-1A-12” 7/7 FW-83 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7850 Tank Farm DO-0001-1A-12” 7/7 FW-84 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7851 Tank Farm DO-0001-1A-12” 5/7 FW-71A BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7852 Tank Farm DO-0001-1A-12” 7/7 FW-86 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

7853 Tank Farm DO-0001-1A-12” 7/7 FW-87 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7854 Tank Farm DO-0001-1A-12” 5/7 FW-71B SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7855 Tank Farm DO-0001-1A-12” 7/7 FW-90 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7856 Tank Farm DO-0001-1A-12” 7/7 FW-91 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

7857 Tank Farm DO-0001-1A-12” 7/7 FW-92 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

7858 Tank Farm DO-0001-1A-12” 7/7 FW-93 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

7859 Tank Farm DO-0001-1A-12” 5/7 FW-71C SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

7860 Tank Farm JF-0001-1A-12” 7/7 FW-81 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7861 Tank Farm JF-0001-1A-12” 7/7 FW-82 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

7862 Tank Farm JF-0001-1A-12” 7/7 FW-83 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7863 Tank Farm JF-0001-1A-12” 7/7 FW-84 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

7864 Tank Farm JF-0001-1A-12” 7/7 FW-85 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

7865 Tank Farm JF-0001-1A-12” 7/7 FW-87 BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7866 Tank Farm JF-0001-1A-12” 7/7 FW-88 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

7867 Tank Farm JF-0001-1A-12” 7/7 FW-89 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

7868 Tank Farm JF-0001-1A-12” 7/7 FW-90 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

7869 Tank Farm JF-0001-1A-12” 7/7 FW-91 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

7870 Tank Farm JF-0001-1A-12” 6/7 FW-78 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A53/A234 Pipe/90Elbow

7871 Tank Farm MO-0008A-1A-2" 1/1 FW-28 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7872 Tank Farm MO-0008-1A-2" 2/2 FW-20 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7873 Tank Farm MO-0008A-1A-2" 1/1 FW-27 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7874 Tank Farm MO-0008A-1A-2" 1/1 FW-26 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7875 Tank Farm MO-0008A-1A-2" 1/1 FW-25 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7876 Tank Farm MO-0008A-1A-2" 1/1 FW-24A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7877 Tank Farm MO-0008A-1A-2" 1/1 FW-24 BW WPS-2016-21 GTAW 2" SCH80 A106/A105 Pipe/Tee

7878 Tank Farm MO-0008A-1A-2" 1/1 FW-23 BW WPS-2016-21 GTAW 2" SCH80 A106/A105 Pipe/Flange

7879 Tank Farm MO-0008A-1A-2" 1/1 FW-22 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

7880 Tank Farm MO-0008A-1A-2" 1/1 FW-21 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7881 Tank Farm MO-0008A-1A-2" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7882 Tank Farm MO-0008A-1A-2" 1/1 FW-19 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

7883 Tank Farm MO-0008A-1A-2" 1/1 FW-18 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7884 Tank Farm MO-0008A-1A-2" 1/1 FW-17 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7885 Tank Farm MO-0008A-1A-2" 1/1 FW-16 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7886 Tank Farm MO-0008A-1A-2" 1/1 FW-15 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7887 Tank Farm MO-0008A-1A-2" 1/1 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7888 Tank Farm MO-0008A-1A-2" 1/1 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7889 Tank Farm MO-0008A-1A-2" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7890 Tank Farm MO-0008A-1A-2" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

7891 Tank Farm MO-0008A-1A-2" 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

7892 Tank Farm MO-0008A-1A-2" 1/1 FW-09 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7893 Tank Farm MO-0008A-1A-2" 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

7894 Tank Farm MO-0008A-1A-2" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

7895 Tank Farm MO-0008A-1A-2" 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7896 Tank Farm MO-0008A-1A-2" 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7897 Tank Farm MO-0008A-1A-2" 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7898 Tank Farm MO-0008A-1A-2" 1/1 FW-03 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7899 Tank Farm MO-0008A-1A-2" 1/1 FW-02 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7900 Tank Farm MO-0008A-1A-2" 1/1 FW-01 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7901 Tank Farm MO-0008A-1A-2" 1/1 FW-1A SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7902 Tank Farm DO-0009-1A-12" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7903 Tank Farm DO-0009-1A-12" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

7904 Tank Farm DO-0054a-1A-14” 2/2 FW-34 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7905 Tank Farm DO-0054a-1A-14” 2/2 FW-35 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

7906 Tank Farm DO-0054a-1A-14” 2/2 FW-36 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7907 Tank Farm DO-0031-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

7908 Tank Farm DO-0031-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

7909 Tank Farm DO-0031-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7910 Tank Farm DO-0031-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7911 Tank Farm DO-0031-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

7912 Tank Farm DO-0032-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

7913 Tank Farm DO-0032-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7914 Tank Farm DO-0032-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7915 Tank Farm DO-0032-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7916 Tank Farm DO-0032-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7917 Tank Farm DO-0032-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7918 Tank Farm DO-0033-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

7919 Tank Farm DO-0033-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7920 Tank Farm DO-0033-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7921 Tank Farm DO-0033-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7922 Tank Farm MO-0056-1A-12” 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

7923 Tank Farm DO-0033-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7924 Tank Farm DO-0033-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

7925 Tank Farm DO-0034-1A-3" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Weldolet

7926 Tank Farm DO-0004-1A-2" 1/2 FW-1C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7927 Tank Farm DO-0004A-1A-2" 1/1 FW-27 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7928 Tank Farm DO-0004A-1A-2" 1/1 FW-26 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7929 Tank Farm DO-0004A-1A-2" 1/1 FW-25 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7930 Tank Farm DO-0004A-1A-2" 1/1 FW-24 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7931 Tank Farm DO-0004A-1A-2" 1/1 FW-23A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

7932 Tank Farm DO-0004A-1A-2" 1/1 FW-23 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7933 Tank Farm DO-0004A-1A-2" 1/1 FW-22 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7934 Tank Farm DO-0004A-1A-2" 1/1 FW-21 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7935 Tank Farm DO-0004A-1A-2" 1/1 FW-20 BW WPS-2016-21 GTAW 2" SCH40 A234/A234 90Elbow/Reducer

7936 Tank Farm DO-0004A-1A-2" 1/1 FW-19 BW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Reducer

7937 Tank Farm DO-0004A-1A-2" 1/1 FW-18 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7938 Tank Farm DO-0004A-1A-2" 1/1 FW-17 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7939 Tank Farm DO-0004A-1A-2" 1/1 FW-16 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7940 Tank Farm DO-0004A-1A-2" 1/1 FW-15 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7941 Tank Farm DO-0004A-1A-2" 1/1 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7942 Tank Farm DO-0004A-1A-2" 1/1 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7943 Tank Farm DO-0004A-1A-2" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7944 Tank Farm DO-0004A-1A-2" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

7945 Tank Farm DO-0004A-1A-2" 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

7946 Tank Farm DO-0004A-1A-2" 1/1 FW-09 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7947 Tank Farm DO-0004A-1A-2" 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

7948 Tank Farm DO-0004A-1A-2" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

7949 Tank Farm DO-0004A-1A-2" 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7950 Tank Farm DO-0004A-1A-2" 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7951 Tank Farm DO-0004A-1A-2" 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7952 Tank Farm DO-0004A-1A-2" 1/1 FW-03 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7953 Tank Farm DO-0004A-1A-2" 1/1 FW-02 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7954 Tank Farm DO-0004A-1A-2" 1/1 FW-01 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7955 Tank Farm DO-0004A-1A-2" 1/1 FW-1A SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7956 Tank Farm JF-0004-1A-2" 1/1 FW-21 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7957 Tank Farm JF-0004A-1A-2" 1/1 FW-27 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7958 Tank Farm JF-0004A-1A-2" 1/1 FW-26 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7959 Tank Farm JF-0004A-1A-2" 1/1 FW-25 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7960 Tank Farm JF-0004A-1A-2" 1/1 FW-24 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7961 Tank Farm JF-0004A-1A-2" 1/1 FW-23A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7962 Tank Farm JF-0004A-1A-2" 1/1 FW-23 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7963 Tank Farm JF-0004A-1A-2" 1/1 FW-22 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7964 Tank Farm JF-0004A-1A-2" 1/1 FW-21 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

7965 Tank Farm JF-0004A-1A-2" 1/1 FW-20 BW WPS-2016-21 GTAW 2" SCH40 A234/A234 90Elbow/Reducer

7966 Tank Farm JF-0004A-1A-2" 1/1 FW-19 SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Reducer

7967 Tank Farm JF-0004A-1A-2" 1/1 FW-18 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7968 Tank Farm JF-0004A-1A-2" 1/1 FW-17 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

7969 Tank Farm JF-0004A-1A-2" 1/1 FW-16 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7970 Tank Farm JF-0004A-1A-2" 1/1 FW-15 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7971 Tank Farm JF-0004A-1A-2" 1/1 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7972 Tank Farm JF-0004A-1A-2" 1/1 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7973 Tank Farm JF-0004A-1A-2" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

7974 Tank Farm JF-0004A-1A-2" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

7975 Tank Farm JF-0004A-1A-2" 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

7976 Tank Farm JF-0004A-1A-2" 1/1 FW-09 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7977 Tank Farm JF-0004A-1A-2" 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

7978 Tank Farm JF-0004A-1A-2" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

7979 Tank Farm JF-0004A-1A-2" 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7980 Tank Farm JF-0004A-1A-2" 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7981 Tank Farm JF-0004A-1A-2" 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7982 Tank Farm JF-0004A-1A-2" 1/1 FW-03 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

7983 Tank Farm JF-0004A-1A-2" 1/1 FW-02 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7984 Tank Farm JF-0004A-1A-2" 1/1 FW-01 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

7985 Tank Farm JF-0004A-1A-2" 1/1 FW-1A SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

7986 Tank Farm DO-0034-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

7987 Tank Farm DO-0034-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

7988 Tank Farm DO-0034-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/Flange

7989 Tank Farm DO-0034-1A-3" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

7990 Tank Farm DO-0034-1A-3" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

7991 Tank Farm DO-0036-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7992 Tank Farm DO-0036-1A-4" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7993 Tank Farm DO-0036-1A-4" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

7994 Tank Farm DO-0036-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
7995 Tank Farm DO-0036-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7996 Tank Farm JF-0027-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7997 Tank Farm JF-0027-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7998 Tank Farm JF-0027-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

7999 Tank Farm JF-0028-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8000 Tank Farm JF-0028-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8001 Tank Farm JF-0028-1A-4" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8002 Tank Farm JF-0028-1A-4" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8003 Tank Farm JF-0028-1A-4" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8004 Tank Farm JF-0028-1A-4" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8005 Tank Farm JF-0028-1A-4" 1/1 FW-1A BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8006 Tank Farm JF-0028-1A-4" 1/1 FW-1B SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8007 Tank Farm JF-0028-1A-4" 1/1 FW-1C SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8008 Tank Farm JF-0028-1A-4" 1/1 FW-1D SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8009 Tank Farm MO-0082-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8010 Tank Farm MO-0082-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8011 Tank Farm MO-0082-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8012 Tank Farm MO-0082-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8013 Tank Farm MO-0082-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8014 Tank Farm MO-0083-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8015 Tank Farm MO-0083-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8016 Tank Farm MO-0083-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8017 Tank Farm MO-0083-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8018 Tank Farm MO-0083-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8019 Tank Farm MO-0083-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8020 Tank Farm DO-0039-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8021 Tank Farm DO-0039-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8022 Tank Farm DO-0039-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8023 Tank Farm DO-0039-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8024 Tank Farm MO-0001-1A-12” 5/7 FW-72A BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8025 Tank Farm MO-0001-1A-12” 5/7 FW-72B SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8026 Tank Farm MO-0001-1A-12” 5/7 FW-72C SOW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

8027 Tank Farm MO-0003-1A-12” 1/1 FW-24A BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8028 Tank Farm MO-0003-1A-12” 1/1 FW-24B SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8029 Tank Farm MO-0003-1A-12” 1/1 FW-24C SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8030 Tank Farm MO-0003-1A-12” 1/1 FW-24D SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8031 Tank Farm MO-0004-1A-12” 1/1 FW-26A BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8032 Tank Farm MO-0004-1A-12” 1/1 FW-26B SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8033 Tank Farm MO-0004-1A-12” 1/1 FW-26C SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8034 Tank Farm MO-0004-1A-12” 1/1 FW-26D SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8035 Tank Farm MO-0005-1A-12” 1/1 FW-24A BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8036 Tank Farm MO-0005-1A-12” 1/1 FW-24B SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8037 Tank Farm MO-0005-1A-12” 1/1 FW-24C SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8038 Tank Farm MO-0005-1A-12” 1/1 FW-24D SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8039 Tank Farm MO-0022-1A-8” 2/4 FW-38A BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8040 Tank Farm MO-0022-1A-8” 2/4 FW-38B SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8041 Tank Farm MO-0022-1A-8” 2/4 FW-38C SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

8042 Tank Farm MO-0022-1A-8” 4/4 FW-62A BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8043 Tank Farm MO-0022-1A-8” 4/4 FW-62B SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8044 Tank Farm MO-0022-1A-8” 4/4 FW-62C SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

8045 Tank Farm MO-0052-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8046 Tank Farm MO-0052-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8047 Tank Farm MO-0052-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8048 Tank Farm MO-0052-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8049 Tank Farm MO-0052-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8050 Tank Farm MO-0052-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8051 Tank Farm MO-0052-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8052 Tank Farm MO-0052-1A-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8053 Tank Farm DO-0039-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8054 Tank Farm DO-0040-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8055 Tank Farm DO-0040-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8056 Tank Farm DO-0040-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8057 Tank Farm DO-0040-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8058 Tank Farm DO-0040-1A-4" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A234 90Elbow/90Elbow

8059 Tank Farm DO-0040-1A-4" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8060 Tank Farm DO-0041-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8061 Tank Farm DO-0041-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8062 Tank Farm DO-0041-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8063 Tank Farm DO-0041-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8064 Tank Farm DO-0041-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8065 Tank Farm DO-0042-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8066 Tank Farm DO-0042-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8067 Tank Farm DO-0042-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8068 Tank Farm DO-0042-1A-4" 1/1 FW-8A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

8069 Tank Farm DO-0042-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8070 Tank Farm DO-0042-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A234 90Elbow/90Elbow

8071 Tank Farm DO-0042-1A-4" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8072 Tank Farm DO-0042-1A-4" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8073 Tank Farm MO-0084-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8074 Tank Farm MO-0084-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8075 Tank Farm MO-0084-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8076 Tank Farm MO-0084-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8077 Tank Farm MO-0084-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8078 Tank Farm MO-0085-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8079 Tank Farm MO-0085-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8080 Tank Farm MO-0085-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8081 Tank Farm MO-0085-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8082 Tank Farm MO-0085-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8083 Tank Farm JF-0027-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

8084 Tank Farm MO-0086-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8085 Tank Farm MO-0086-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8086 Tank Farm MO-0086-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8087 Tank Farm MO-0086-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8088 Tank Farm MO-0086-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8089 Tank Farm MO-0086-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8090 Tank Farm MO-0087-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A234 90Elbow/90Elbow

8091 Tank Farm MO-0087-1A-4" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

8092 Tank Farm MO-0087-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8093 Tank Farm MO-0087-1A-4" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8094 Tank Farm MO-0088-1A-4" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8095 Tank Farm MO-0088-1A-4" 1/1 FW-4B BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8096 Tank Farm MO-0088-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8097 Tank Farm MO-0088-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8098 Tank Farm MO-0088-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8099 Tank Farm MO-0088-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8100 Tank Farm MO-0091-1A-4" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

8101 Tank Farm MO-0091-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8102 Tank Farm MO-0091-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8103 Tank Farm MO-0091-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8104 Tank Farm MO-0091-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8105 Tank Farm MO-0091-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8106 Tank Farm MO-0089-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8107 Tank Farm MO-0089-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8108 Tank Farm MO-0089-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8109 Tank Farm MO-0089-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8110 Tank Farm MO-0089-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8111 Tank Farm MO-0090-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8112 Tank Farm MO-0090-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8113 Tank Farm MO-0090-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8114 Tank Farm MO-0090-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8115 Tank Farm MO-0093-1A-4" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8116 Tank Farm MO-0093-1A-4" 1/1 FW-4B BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8117 Tank Farm MO-0093-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8118 Tank Farm MO-0093-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8119 Tank Farm MO-0093-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8120 Tank Farm MO-0093-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8121 Tank Farm MO-0093-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Flange

8122 Tank Farm MO-0037-1A-2" 1/1 FW-9A BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8123 Tank Farm MO-0037-1A-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8124 Tank Farm MO-0037-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8125 Tank Farm MO-0037-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8126 Tank Farm MO-0037-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8127 Tank Farm MO-0037-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8128 Tank Farm MO-0037-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8129 Tank Farm MO-0037-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8130 Tank Farm MO-0037-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8131 Tank Farm MO-0037-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8132 Tank Farm MO-0092-1A-4" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8133 Tank Farm MO-0094-1A-4" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

8134 Tank Farm MO-0092-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8135 Tank Farm MO-0092-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8136 Tank Farm MO-0092-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8137 Tank Farm MO-0092-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8138 Tank Farm MO-0092-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8139 Tank Farm MO-0092-1A-4" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Flange

8140 Tank Farm MO-0095-1A-4" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

8141 Tank Farm MO-0095-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8142 Tank Farm MO-0095-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8143 Tank Farm MO-0095-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8144 Tank Farm MO-0095-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8145 Tank Farm MO-0095-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8146 Tank Farm MO-0094-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8147 Tank Farm MO-0094-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8148 Tank Farm MO-0094-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8149 Tank Farm MO-0094-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8150 Tank Farm MO-0043-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

8151 Tank Farm MO-0043-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8152 Tank Farm MO-0043-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8153 Tank Farm MO-0043-1A-8" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

8154 Tank Farm MO-0043-1A-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

8155 Tank Farm MO-0043-1A-8" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8156 Tank Farm MO-0043-1A-8" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8157 Tank Farm MO-0063-1A-10" 1/2 FW-03 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

8158 Tank Farm MO-0063-1A-10" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee

8159 Tank Farm MO-0063-1A-10" 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8160 Tank Farm MO-0063-1A-10" 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

8161 Tank Farm MO-0063-1A-10" 1/2 FW-09 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

8162 Tank Farm MO-0063-1A-10" 1/2 FW-13 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8163 Tank Farm MO-0063-1A-10" 1/2 FW-20 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

8164 Tank Farm JF-0020-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8165 Tank Farm JF-0020-1A-8" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 Tee/90Elbow

8166 Tank Farm JF-0020-1A-8" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8167 Tank Farm JF-0020-1A-8" 1/1 FW-10A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

8168 Tank Farm JF-0020-1A-8" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8169 Tank Farm JF-0020-1A-8" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8170 Tank Farm JF-0020-1A-8" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8171 Tank Farm JF-0020-1A-8" 1/1 FW-28A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

8172 Tank Farm JF-0020-1A-8" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8173 Tank Farm JF-0020-1A-8" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

8174 Tank Farm JF-0020-1A-8" 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8175 Tank Farm JF-0020-1A-8" 1/1 FW-35 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

8176 Tank Farm JF-0020-1A-8" 1/1 FW-36 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

8177 Tank Farm JF-0045-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8178 Tank Farm JF-0045-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8179 Tank Farm JF-0045-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8180 Tank Farm JF-0045-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8181 Tank Farm JF-0045-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8182 Tank Farm JF-0045-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8183 Tank Farm JF-0045-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8184 Tank Farm JF-0045-1A-2" 1/1 FW-1A BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8185 Tank Farm JF-0013-1A-8” 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

8186 Tank Farm JF-0013-1A-8” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

8187 Tank Farm JF-0013-1A-8” 1/1 FW-17 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8188 Tank Farm JF-0013-1A-8” 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

8189 Tank Farm JF-0009-1A-10" 1/1 FW-13 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8190 Tank Farm JF-0009-1A-10" 1/1 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8191 Tank Farm JF-0009-1A-10" 1/1 FW-15 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8192 Tank Farm JF-0009-1A-10" 1/1 FW-16 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8193 Tank Farm JF-0009-1A-10" 1/1 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8194 Tank Farm JF-0009-1A-10" 1/1 FW-18 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8195 Tank Farm JF-0009-1A-10" 1/1 FW-19 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8196 Tank Farm JF-0009-1A-10" 1/1 FW-20 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8197 Tank Farm JF-0009-1A-10" 1/1 FW-21 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8198 Tank Farm JF-0009-1A-10" 1/1 FW-22 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

8199 Tank Farm JF-0009-1A-10" 1/1 FW-23 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

8200 Tank Farm JF-0009-1A-10" 1/1 FW-24 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8201 Tank Farm JF-0009-1A-10" 1/1 FW-25 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8202 Tank Farm JF-0009-1A-10" 1/1 FW-26 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8203 Tank Farm JF-0009-1A-10" 1/1 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8204 Tank Farm JF-0009-1A-10" 1/1 FW-28 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8205 Tank Farm JF-0009-1A-10" 1/1 FW-29 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8206 Tank Farm JF-0009-1A-10" 1/1 FW-30 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8207 Tank Farm JF-0009-1A-10" 1/1 FW-31 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8208 Tank Farm JF-0009-1A-10" 1/1 FW-32 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8209 Tank Farm JF-0009-1A-10" 1/1 FW-33 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8210 Tank Farm JF-0009-1A-10" 1/1 FW-34 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8211 Tank Farm JF-0009-1A-10" 1/1 FW-35 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8212 Tank Farm JF-0009-1A-10" 1/1 FW-36 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8213 Tank Farm JF-0009-1A-10" 1/1 FW-36A SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee

8214 Tank Farm JF-0012-1A-10" 1/1 FW-12 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8215 Tank Farm JF-0012-1A-10" 1/1 FW-13 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8216 Tank Farm JF-0012-1A-10" 1/1 FW-16 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8217 Tank Farm JF-0012-1A-10" 1/1 FW-19 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8218 Tank Farm JF-0012-1A-10" 1/1 FW-20 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8219 Tank Farm JF-0044-1A-2" 1/2 FW-4B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8220 Tank Farm JF-0044-1A-2" 1/2 FW-4C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8221 Tank Farm JF-0044-1A-2" 1/2 FW-10A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8222 Tank Farm JF-0044-1A-2" 1/2 FW-10B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8223 Tank Farm JF-0044-1A-2" 1/2 FW-10D BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8224 Tank Farm JF-0044-1A-2" 1/2 FW-10I BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8225 Tank Farm JF-0044-1A-2" 1/2 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8226 Tank Farm JF-0044-1A-2" 1/2 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8227 Tank Farm JF-0044-1A-2" 2/2 FW-11 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8228 Tank Farm JF-0044-1A-2" 2/2 FW-16 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8229 Tank Farm JF-0044-1A-2" 2/2 FW-20 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8230 Tank Farm JF-0044-1A-2" 2/2 FW-22 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8231 Tank Farm JF-0044-1A-2" 2/2 FW-23 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8232 Tank Farm JF-0044-1A-2" 2/2 FW-28 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8233 Tank Farm JF-0044-1A-2" 2/2 FW-31 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8234 Tank Farm JF-0041a-1A-8" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Reducer

8235 Tank Farm JF-0041a-1A-8" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8236 Tank Farm JF-0041a-1A-8" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8237 Tank Farm JF-0041a-1A-8" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8238 Tank Farm JF-0041a-1A-8" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8239 Tank Farm JF-0041a-1A-8" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8240 Tank Farm JF-0041a-1A-8" 1/1 FW-16 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8241 Tank Farm JF-0041a-1A-8" 1/1 FW-17 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8242 Tank Farm JF-0041a-1A-8" 1/1 FW-18 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8243 Tank Farm JF-0041a-1A-8" 1/1 FW-19 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8244 Tank Farm JF-0041a-1A-8" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

8245 Tank Farm JF-0043-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

8246 Tank Farm JF-0043-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8247 Tank Farm JF-0043-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8248 Tank Farm JF-0042-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

8249 Tank Farm JF-0042-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8250 Tank Farm JF-0042-1A-8" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8251 Tank Farm JF-0042-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

8252 Tank Farm JF-0041-1A-8” 2/2 FW-46A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

8253 Tank Farm JF-0002-1A-12” 1/2 FW-19E BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

8254 Tank Farm JF-0002-1A-12” 1/2 FW-17A BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8255 Tank Farm JF-0002-1A-12” 1/2 FW-17B SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8256 Tank Farm JF-0002-1A-12” 1/2 FW-17C SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8257 Tank Farm JF-0002-1A-12” 1/2 FW-17D SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8258 Tank Farm DO-0021-1A-14" 1/2 FW-02 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8259 Tank Farm DO-0021-1A-14" 1/2 FW-04 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

8260 Tank Farm DO-0021-1A-14" 1/2 FW-07 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8261 Tank Farm DO-0021-1A-14" 1/2 FW-08 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8262 Tank Farm DO-0021-1A-14" 1/2 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8263 Tank Farm DO-0021-1A-14" 1/2 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8264 Tank Farm DO-0021-1A-14" 1/2 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8265 Tank Farm DO-0006-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8266 Tank Farm DO-0006-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8267 Tank Farm DO-0006-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8268 Tank Farm DO-0006-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

8269 Tank Farm DO-0006-1A-8" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8270 Tank Farm DO-0010-1A-12" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

8271 Tank Farm DO-0010-1A-12" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

8272 Tank Farm DO-0010-1A-12" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

8273 Tank Farm DO-0010-1A-12" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

8274 Tank Farm DO-0011-1A-8" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8275 Tank Farm DO-0011-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8276 Tank Farm DO-0011-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

8277 Tank Farm DO-0011-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8278 Tank Farm DO-0011-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

8279 Tank Farm DO-0011-1A-8" 1/1 FW-2A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

8280 Tank Farm DO-0011-1A-8" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8281 Tank Farm DO-0015-1A-14” 1/2 FW-04 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8282 Tank Farm DO-0015-1A-14” 1/2 FW-05 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8283 Tank Farm DO-0015-1A-14” 1/2 FW-08 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8284 Tank Farm DO-0015-1A-14” 1/2 FW-09 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

8285 Tank Farm DO-0015-1A-14” 1/2 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8286 Tank Farm DO-0015-1A-14” 1/2 FW-12 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8287 Tank Farm DO-0017-1A-12" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

8288 Tank Farm DO-0017-1A-12" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

8289 Tank Farm DO-0017-1A-12" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/45Elbow

8290 Tank Farm DO-0017-1A-12" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

8291 Tank Farm DO-0018-1A-8" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8292 Tank Farm DO-0018-1A-8" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

8293 Tank Farm DO-0018-1A-8" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8294 Tank Farm DO-0018-1A-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8295 Tank Farm DO-0018-1A-8" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

8296 Tank Farm DO-0016-1A-8” 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

8297 Tank Farm DO-0016-1A-8” 1/1 FW-10B BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

8298 Tank Farm DO-0016-1A-8” 1/1 FW-16C BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

8299 Tank Farm DO-0004-1A-2" 1/2 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

8300 Tank Farm DO-0004-1A-2" 1/2 FW-17B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8301 Tank Farm DO-0004-1A-2" 1/2 FW-4B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8302 Tank Farm DO-0004-1A-2" 1/2 FW-4C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8303 Tank Farm DO-0004-1A-2" 1/2 FW-4D BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8304 Tank Farm DO-0004-1A-2" 2/2 FW-28 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8305 Tank Farm DO-0004-1A-2" 2/2 FW-29 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8306 Tank Farm DO-0004-1A-2" 2/2 FW-30 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8307 Tank Farm DO-0015-1A-14” 2/2 FW-33 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

8308 Tank Farm DO-0020-1A-14" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

8309 Tank Farm DO-0020-1A-14" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

8310 Tank Farm DO-0020-1A-14" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

8311 Tank Farm DO-0020-1A-14" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

8312 Tank Farm DO-0020-1A-14" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

8313 Tank Farm DO-0020-1A-14" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8314 Tank Farm DO-0020-1A-14" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

8315 Tank Farm DO-0020-1A-14" 1/1 FW-11A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

8316 Tank Farm DO-0014-1A-14" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

8317 Tank Farm DO-0014-1A-14" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

8318 Tank Farm DO-0014-1A-14" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

8319 Tank Farm DO-0014-1A-14" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

8320 Tank Farm DO-0014-1A-14" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

8321 Tank Farm DO-0014-1A-14" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

8322 Tank Farm DO-0014-1A-14" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

8323 Tank Farm DO-0014-1A-14" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

8324 Tank Farm DO-0014-1A-14" 1/1 FW-12A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8325 Tank Farm DO-0009-1A-12" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

8326 Tank Farm DO-0009-1A-12" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

8327 Tank Farm DO-0009-1A-12" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

8328 Tank Farm DO-0009-1A-12" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A105 Pipe/Flange

8329 Tank Farm DO-0009-1A-12" 1/1 FW-35 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

8330 Tank Farm DO-0054-1A-14" 2/3 FW-46 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

8331 Tank Farm DO-0054-1A-14" 3/3 FW-49 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8332 Tank Farm DO-0054-1A-14" 3/3 FW-50 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8333 Tank Farm MO-0043-1A-8" 1/1 FW-08 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8334 Tank Farm MO-0043-1A-8" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8335 Tank Farm MO-0043-1A-8" 1/1 FW-10 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8336 Tank Farm MO-0043-1A-8" 1/1 FW-11 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8337 Tank Farm MO-0043-1A-8" 1/1 FW-12 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8338 Tank Farm MO-0023-1A-12" 1/2 FW-08 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

8339 Tank Farm MO-0023-1A-12" 1/2 FW-09 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

8340 Tank Farm MO-0023-1A-12" 1/2 FW-12 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

8341 Tank Farm MO-0023-1A-12" 1/2 FW-13 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8342 Tank Farm MO-0023-1A-12" 1/2 FW-14 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8343 Tank Farm MO-0023-1A-12" 1/2 FW-15 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8344 Tank Farm MO-0023-1A-12" 1/2 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8345 Tank Farm MO-0023-1A-12" 1/2 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8346 Tank Farm MO-0063-1A-10" 1/2 FW-14 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8347 Tank Farm MO-0063-1A-10" 1/2 FW-15 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8348 Tank Farm MO-0063-1A-10" 1/2 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8349 Tank Farm MO-0063-1A-10" 1/2 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8350 Tank Farm MO-0120a-1A-8" 1/1 FW-24 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8351 Tank Farm MO-0120a-1A-8" 1/1 FW-25 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8352 Tank Farm MO-0120a-1A-8" 1/1 FW-26 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8353 Tank Farm MO-0120a-1A-8" 1/1 FW-27 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Flange

8354 Tank Farm MO-0119A-1A-12" 1/2 FW-24 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

8355 Tank Farm MO-0119A-1A-12" 1/2 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8356 Tank Farm MO-0119A-1A-12" 1/2 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Reducer

8357 Tank Farm MO-0119A-1A-12" 1/2 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A234 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8358 Tank Farm MO-0119A-1A-12" 1/2 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8359 Tank Farm MO-0119A-1A-12" 1/2 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8360 Tank Farm MO-0119A-1A-12" 1/2 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8361 Tank Farm MO-0119A-1A-12" 1/2 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8362 Tank Farm MO-0119A-1A-12" 1/2 FW-09 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

8363 Tank Farm MO-0119A-1A-12" 1/2 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

8364 Tank Farm MO-0119A-1A-12" 1/2 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8365 Tank Farm MO-0119A-1A-12" 1/2 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8366 Tank Farm MO-0119A-1A-12" 1/2 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8367 Tank Farm MO-0119A-1A-12" 1/2 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

8368 Tank Farm MO-0121a-1A-10" 1/1 FW-32 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8369 Tank Farm MO-0121a-1A-10" 1/1 FW-24 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8370 Tank Farm MO-0121a-1A-10" 1/1 FW-25 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

8371 Tank Farm MO-0121a-1A-10" 1/1 FW-26 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

8372 Tank Farm MO-0121a-1A-10" 1/1 FW-27 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

8373 Tank Farm MO-0121a-1A-10" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8374 Tank Farm MO-0121a-1A-10" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Reducer

8375 Tank Farm MO-0121a-1A-10" 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A234 Pipe/Reducer

8376 Tank Farm MO-0121a-1A-10" 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8377 Tank Farm MO-0121a-1A-10" 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8378 Tank Farm MO-0121a-1A-10" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8379 Tank Farm MO-0121a-1A-10" 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8380 Tank Farm MO-0121a-1A-10" 1/1 FW-09 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

8381 Tank Farm MO-0121a-1A-10" 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

8382 Tank Farm MO-0121a-1A-10" 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8383 Tank Farm MO-0121a-1A-10" 1/1 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8384 Tank Farm MO-0121a-1A-10" 1/1 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8385 Tank Farm PW-5403-1S2-3" 1/1 FW-21A BW WPS-2016-27 GTAW 3" SCH10S A312/A312 Pipe/Pipe

8386 Tank Farm PW-5403-1S2-3" 1/1 FW-33 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

8387 Tank Farm PW-5403-1S2-3" 1/1 FW-34 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

8388 Tank Farm PW-5403-1S2-3" 1/1 FW-35 BW WPS-2016-27 GTAW 1" SCH40S A182/A182 Pipe/Tee

8389 Tank Farm PW-5403-1S2-3" 1/1 FW-36 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8390 Tank Farm PW-5403-1S2-3" 1/1 FW-37 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8391 Tank Farm PW-5403-1S2-3" 1/1 FW-38 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8392 Tank Farm PW-5403-1S2-3" 1/1 FW-39 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8393 Tank Farm PW-5403-1S2-3" 1/1 FW-40 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8394 Tank Farm PW-5403-1S2-3" 1/1 FW-41 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

8395 Tank Farm PW-5403-1S2-3" 1/1 FW-42 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/90Elbow

8396 Tank Farm PW-5403b-1S2-3" 1/1 FW-01 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/90Elbow

8397 Tank Farm PW-5403b-1S2-3" 1/1 FW-02 BW WPS-2016-27 GTAW 3" SCH10S A312/A312 Pipe/Pipe

8398 Tank Farm PW-5403b-1S2-3" 1/1 FW-03 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

8399 Tank Farm PW-5403b-1S2-3" 1/1 FW-04 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Reducer

8400 Tank Farm PW-5403b-1S2-3" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

8401 Tank Farm PW-5403b-1S2-3" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8402 Tank Farm PW-5403b-1S2-3" 1/1 FW-07 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

8403 Tank Farm PW-5403b-1S2-3" 1/1 FW-08 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

8404 Tank Farm PW-5403b-1S2-3" 1/1 FW-09 SOW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

8405 Tank Farm PW-5403b-1S2-3" 1/1 FW-10 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

8406 Tank Farm PW-5403b-1S2-3" 1/1 FW-11 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

8407 Tank Farm PW-5403b-1S2-3" 1/1 FW-12 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

8408 Tank Farm PW-5403b-1S2-3" 1/1 FW-13 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

8409 Tank Farm PW-5403b-1S2-3" 1/1 FW-14 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8410 Tank Farm PW-5403b-1S2-3" 1/1 FW-15 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8411 Tank Farm PW-5403b-1S2-3" 1/1 FW-16 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8412 Tank Farm PW-5403b-1S2-3" 1/1 FW-17 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8413 Tank Farm PW-5403b-1S2-3" 1/1 FW-18 SOW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

8414 Tank Farm PW-5403b-1S2-3" 1/1 FW-19 BW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/Pipe

8415 Tank Farm PW-5403b-1S2-3" 1/1 FW-20 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8416 Tank Farm PW-5431-1S1-1" 1/1 FW-01 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

8417 Tank Farm PW-5431-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8418 Tank Farm PW-5431-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8419 Tank Farm PW-5431-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8420 Tank Farm PW-5431-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/90Elbow

8421 Tank Farm PW-5431-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/90Elbow

8422 Tank Farm PW-5431-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8423 Tank Farm PW-5431-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8424 Tank Farm PW-5431-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8425 Tank Farm PW-5431-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8426 Tank Farm PW-5431-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8427 Tank Farm PW-5431-1S1-1" 1/1 FW-12 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8428 Tank Farm PW-5431-1S1-1" 1/1 FW-13 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8429 Tank Farm MO-0022-1A-8” 2/4 FW-38D SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

8430 Tank Farm MO-0022-1A-8” 2/4 FW-38E SOW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

8431 Tank Farm MO-0022-1A-8” 4/4 FW-62D SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/90Elbow

8432 Tank Farm MO-0022-1A-8” 4/4 FW-62E SOW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

8433 Tank Farm PW-5408A-1S2-2" 1/1 FW-1L BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

8434 Tank Farm PW-5408A-1S2-2" 1/1 FW-1M BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8435 Tank Farm PW-5408A-1S2-2" 1/1 FW-1N BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

8436 Tank Farm PW-5408A-1S2-2" 1/1 FW-1O BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

8437 Tank Farm PW-5406-1S2-1 ½" FW-1A BW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Tee

8438 Tank Farm PW-5406-1S2-1 ½" FW-01 BW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

8439 Tank Farm PW-5406-1S2-1 ½" FW-02 BW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

8440 Tank Farm PW-5406-1S2-1 ½" FW-03 BW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

8441 Tank Farm PW-5406-1S2-1 ½" FW-04 BW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

8442 Tank Farm PW-5406-1S2-1 ½" FW-05 BW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Gate

8443 Tank Farm PW-5404-1S2-1 ½" FW-1A BW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Tee

8444 Tank Farm PW-5404-1S2-1 ½" FW-01 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

8445 Tank Farm PW-5404-1S2-1 ½" FW-02 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8446 Tank Farm PW-5404-1S2-1 ½" FW-03 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

8447 Tank Farm PW-5404-1S2-1 ½" FW-04 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

8448 Tank Farm PW-5404-1S2-1 ½" FW-05 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Gate

8449 Tank Farm PW-5405-1S2-1 ½" FW-1A BW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Tee

8450 Tank Farm PW-5405-1S2-1 ½" FW-01 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

8451 Tank Farm PW-5405-1S2-1 ½" FW-02 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

8452 Tank Farm PW-5405-1S2-1 ½" FW-03 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

8453 Tank Farm PW-5405-1S2-1 ½" FW-04 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/90Elbow

8454 Tank Farm PW-5405-1S2-1 ½" FW-05 SW WPS-2016-27 GTAW 1½" SCH40S A312/A182 Pipe/Gate

8455 Tank Farm MO-0121a-1A-10" 1/1 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

8456 Tank Farm MO-0120a-1A-8" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8457 Tank Farm MO-0120a-1A-8" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Reducer

8458 Tank Farm MO-0120a-1A-8" 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A234 Pipe/Reducer

8459 Tank Farm MO-0120a-1A-8" 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8460 Tank Farm MO-0120a-1A-8" 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8461 Tank Farm MO-0120a-1A-8" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8462 Tank Farm MO-0120a-1A-8" 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8463 Tank Farm MO-0120a-1A-8" 1/1 FW-09 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

8464 Tank Farm MO-0120a-1A-8" 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

8465 Tank Farm MO-0120a-1A-8" 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8466 Tank Farm MO-0120a-1A-8" 1/1 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8467 Tank Farm MO-0120a-1A-8" 1/1 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8468 Tank Farm MO-0120a-1A-8" 1/1 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

8469 Tank Farm MO-0040-1A-10” 1/1 FW-07 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

8470 Tank Farm MO-0040-1A-10” 1/1 FW-08 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8471 Tank Farm MO-0040-1A-10” 1/1 FW-11 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8472 Tank Farm MO-0040-1A-10” 1/1 FW-12 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Gate

8473 Tank Farm MO-0040-1A-10” 1/1 FW-14 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

8474 Tank Farm MO-0040-1A-10” 1/1 FW-15 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8475 Tank Farm MO-0021-1A-16” 1/1 FW-15 SW WPS-2016-21 GTAW 1/2" SCH40 A106/A105 Pipe/Scokolet

8476 Tank Farm MO-0021-1A-16” 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH40 A106/A105 Pipe/Gate

8477 Tank Farm MO-0021-1A-16” 1/1 FW-17A SW WPS-2016-21 GTAW 1½" SCH40 A106/A105 Pipe/Scokolet

8478 Tank Farm MO-0021-1A-16” 1/1 FW-18 SW WPS-2016-21 GTAW 1½" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8479 Tank Farm MO-0021-1A-16” 1/1 FW-20 SW WPS-2016-21 GTAW 1/2" SCH40 A106/A105 Pipe/Scokolet

8480 Tank Farm MO-0021-1A-16” 1/1 FW-21 SW WPS-2016-21 GTAW 1/2" SCH40 A106/A105 Pipe/Gate

8481 Tank Farm MO-0023-1A-12" 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

8482 Tank Farm MO-0023-1A-12" 1/2 FW-20 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

8483 Tank Farm MO-0023-1A-12" 2/2 FW-26 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

8484 Tank Farm MO-0054-1A-14” 1/2 FW-01 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

8485 Tank Farm MO-0054-1A-14” 1/2 FW-06 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/Tee

8486 Tank Farm MO-0054-1A-14” 1/2 FW-07 BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

8487 Tank Farm MO-0054-1A-14” 2/2 FW-16 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8488 Tank Farm MO-0054-1A-14” 2/2 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8489 Tank Farm MO-0054-1A-14” 2/2 FW-18 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8490 Tank Farm MO-0054-1A-14” 2/2 FW-19 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8491 Tank Farm MO-0054-1A-14” 2/2 FW-20 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8492 Tank Farm MO-0054-1A-14” 2/2 FW-21 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8493 Tank Farm MO-0054-1A-14” 2/2 FW-22 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8494 Tank Farm MO-0054-1A-14” 2/2 FW-23 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8495 Tank Farm MO-0054-1A-14” 2/2 FW-24 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8496 Tank Farm MO-0054-1A-14” 2/2 FW-25 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

8497 Tank Farm MO-0054-1A-14” 2/2 FW-26 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

8498 Tank Farm MO-0054-1A-14” 2/2 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8499 Tank Farm MO-0054-1A-14” 2/2 FW-28 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8500 Tank Farm MO-0054-1A-14” 2/2 FW-29 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8501 Tank Farm MO-0054-1A-14” 2/2 FW-30 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8502 Tank Farm MO-0054-1A-14” 2/2 FW-31 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8503 Tank Farm MO-0054-1A-14” 2/2 FW-32 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8504 Tank Farm MO-0054-1A-14” 2/2 FW-33 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8505 Tank Farm MO-0054-1A-14” 2/2 FW-34 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8506 Tank Farm MO-0054-1A-14” 2/2 FW-35 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8507 Tank Farm MO-0054-1A-14” 2/2 FW-36 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8508 Tank Farm MO-0054-1A-14” 2/2 FW-37 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8509 Tank Farm MO-0054-1A-14” 2/2 FW-38 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8510 Tank Farm MO-0054-1A-14” 2/2 FW-39 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8511 Tank Farm MO-0054-1A-14” 2/2 FW-39A SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8512 Tank Farm MO-0060-1A-12” 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

8513 Tank Farm MO-0060-1A-12” 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

8514 Tank Farm MO-0062-1A-14” 1/1 FW-13 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8515 Tank Farm MO-0062-1A-14” 1/1 FW-14 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8516 Tank Farm MO-0062-1A-14” 1/1 FW-17 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8517 Tank Farm MO-0062-1A-14” 1/1 FW-18 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

8518 Tank Farm MO-0062-1A-14” 1/1 FW-20 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8519 Tank Farm MO-0062-1A-14” 1/1 FW-21 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8520 Tank Farm MO-0121-1A-10” 1/2 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Scokolet

8521 Tank Farm MO-0121-1A-10” 1/2 FW-18 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8522 Tank Farm MO-0121-1A-10” 1/2 FW-21 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8523 Tank Farm MO-0121-1A-10” 1/2 FW-22 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8524 Tank Farm MO-0121-1A-10” 1/2 FW-25 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8525 Tank Farm MO-0121-1A-10” 1/2 FW-26 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8526 Tank Farm MO-0121-1A-10” 1/2 FW-28 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A234 Pipe/90Elbow

8527 Tank Farm JF-0016-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8528 Tank Farm JF-0016-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8529 Tank Farm JF-0016-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8530 Tank Farm JF-0016-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8531 Tank Farm JF-0016-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8532 Tank Farm JF-0016-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8533 Tank Farm JF-0016-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8534 Tank Farm JF-0016-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8535 Tank Farm JF-0016-1A-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8536 Tank Farm JF-0016-1A-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8537 Tank Farm JF-0016-1A-2" 1/1 FW-11 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8538 Tank Farm JF-0016-1A-2" 1/1 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8539 Tank Farm JF-0016-1A-2" 1/1 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8540 Tank Farm JF-0016-1A-2" 1/1 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8541 Tank Farm JF-0016-1A-2" 1/1 FW-15 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8542 Tank Farm JF-0016-1A-2" 1/1 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8543 Tank Farm JF-0004-1A-2" 1/1 FW-12B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8544 Tank Farm JF-0007-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8545 Tank Farm JF-0007-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8546 Tank Farm JF-0007-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8547 Tank Farm JF-0007-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8548 Tank Farm JF-0007-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8549 Tank Farm JF-0007-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8550 Tank Farm JF-0007-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8551 Tank Farm JF-0007-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8552 Tank Farm JF-0007-1A-2" 1/1 FW-09 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8553 Tank Farm JF-0007-1A-2" 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8554 Tank Farm JF-0007-1A-2" 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8555 Tank Farm JF-0007-1A-2" 1/1 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8556 Tank Farm JF-0007-1A-2" 1/1 FW-13 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8557 Tank Farm JF-0004-1A-2" 1/1 FW-8A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8558 Tank Farm JF-0002-1A-12” 1/2 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8559 Tank Farm JF-0002-1A-12” 1/2 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8560 Tank Farm JF-0002-1A-12” 2/2 FW-23 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8561 Tank Farm JF-0002-1A-12” 2/2 FW-24 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8562 Tank Farm JF-0002-1A-12” 2/2 FW-25 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8563 Tank Farm JF-0002-1A-12” 2/2 FW-26 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8564 Tank Farm JF-0002-1A-12” 2/2 FW-27 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8565 Tank Farm JF-0002-1A-12” 2/2 FW-28 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8566 Tank Farm JF-0002-1A-12” 2/2 FW-29 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8567 Tank Farm JF-0002-1A-12” 2/2 FW-30 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

8568 Tank Farm JF-0002-1A-12” 2/2 FW-31 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8569 Tank Farm JF-0002-1A-12” 2/2 FW-32 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8570 Tank Farm JF-0002-1A-12” 2/2 FW-33 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8571 Tank Farm JF-0002-1A-12” 2/2 FW-34 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8572 Tank Farm JF-0002-1A-12” 2/2 FW-35 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8573 Tank Farm JF-0002-1A-12” 2/2 FW-36 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8574 Tank Farm JF-0002-1A-12” 2/2 FW-37 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8575 Tank Farm JF-0002-1A-12” 2/2 FW-38 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8576 Tank Farm JF-0002-1A-12” 2/2 FW-39 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8577 Tank Farm JF-0002-1A-12” 2/2 FW-40 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8578 Tank Farm JF-0002-1A-12” 2/2 FW-41 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8579 Tank Farm JF-0002-1A-12” 2/2 FW-41A SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee

8580 Tank Farm DO-0054-1A-14" 3/3 FW-53 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8581 Tank Farm DO-0054-1A-14" 3/3 FW-54 SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Gate

8582 Tank Farm DO-0054-1A-14" 3/3 FW-57 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8583 Tank Farm DO-0054-1A-14" 3/3 FW-58 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8584 Tank Farm DO-0054a-1A-14” 1/2 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/scokolet

8585 Tank Farm DO-0054a-1A-14” 1/2 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Reducer

8586 Tank Farm DO-0054a-1A-14” 1/2 FW-04 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A234 Pipe/Reducer

8587 Tank Farm DO-0054a-1A-14” 1/2 FW-05 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8588 Tank Farm DO-0054a-1A-14” 1/2 FW-06 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8589 Tank Farm DO-0054a-1A-14” 1/2 FW-07 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8590 Tank Farm DO-0054a-1A-14” 1/2 FW-08 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8591 Tank Farm DO-0054a-1A-14” 1/2 FW-09 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

8592 Tank Farm DO-0054a-1A-14” 1/2 FW-10 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

8593 Tank Farm DO-0054a-1A-14” 1/2 FW-11 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8594 Tank Farm DO-0054a-1A-14” 1/2 FW-12 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8595 Tank Farm DO-0054a-1A-14” 1/2 FW-13 BW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

8596 Tank Farm DO-0054a-1A-14” 1/2 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

8597 Tank Farm DO-0054a-1A-14” 2/2 FW-29 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/scokolet

8598 Tank Farm DO-0054a-1A-14” 2/2 FW-30 SW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/scokolet

8599 Tank Farm DO-0054a-1A-14” 2/2 FW-31 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8600 Tank Farm DO-0054a-1A-14” 2/2 FW-32 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8601 Tank Farm DO-0054a-1A-14” 2/2 FW-33 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8602 Tank Farm DO-0054a-1A-14” 2/2 FW-29A BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

8603 Tank Farm DO-0054a-1A-14” 2/2 FW-29B BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A106 Pipe/Pipe

8604 Tank Farm DO-0054a-1A-14” 2/2 FW-38 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/45Elbow

8605 Tank Farm DO-0054a-1A-14” 2/2 FW-40 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

8606 Tank Farm DO-0054a-1A-14” 2/2 FW-41 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/Tee

8607 Tank Farm DO-0054a-1A-14” 2/2 FW-45 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A105 Pipe/Flange

8608 Tank Farm DO-0054a-1A-14” 2/2 FW-46 BW WPS-2016-23 GTAW/SMAW 14" SCH20 A106/A234 Pipe/90Elbow

8609 Tank Farm JF-0020-1A-8" 1/1 FW-21 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

8610 Tank Farm JF-0020-1A-8" 1/1 FW-22 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8611 Tank Farm JF-0020-1A-8" 1/1 FW-23 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8612 Tank Farm JF-0020-1A-8" 1/1 FW-24 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8613 Tank Farm JF-0020-1A-8" 1/1 FW-25 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8614 Tank Farm MO-0127-1A-4" 1/1 FW-5C BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

8615 Tank Farm MO-0127-1A-4" 1/1 FW-5B BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

8616 Tank Farm MO-0127-1A-4" 1/1 FW-5A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

8617 Tank Farm MO-0127-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8618 Tank Farm MO-0127-1A-4" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8619 Tank Farm MO-0127-1A-4" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8620 Tank Farm MO-0127-1A-4" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8621 Tank Farm MO-0127-1A-4" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8622 Tank Farm MO-0127-1A-4" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8623 Tank Farm MO-0127-1A-4" 1/1 FW-15A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

8624 Tank Farm MO-0008-1A-2" 2/2 FW-19 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8625 Tank Farm MO-0008-1A-2" 2/2 FW-15 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8626 Tank Farm MO-0008-1A-2" 2/2 FW-16 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8627 Tank Farm MO-0009-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8628 Tank Farm MO-0009-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8629 Tank Farm MO-0008-1A-2" 2/2 FW-17 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8630 Tank Farm MO-0008-1A-2" 2/2 FW-18 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8631 Tank Farm MO-0009-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8632 Tank Farm MO-0009-1A-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8633 Tank Farm MO-0009-1A-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8634 Tank Farm MO-0009-1A-2" 1/1 FW-11 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8635 Tank Farm MO-0009-1A-2" 1/1 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8636 Tank Farm MO-0009-1A-2" 1/1 FW-13 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8637 Tank Farm MO-0009-1A-2" 1/1 FW-14 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8638 Tank Farm MO-0009-1A-2" 1/1 FW-15 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

8639 Tank Farm MO-0009-1A-2" 1/1 FW-16 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

8640 Tank Farm MO-0009-1A-2" 1/1 FW-17 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8641 Tank Farm MO-0009-1A-2" 1/1 FW-14A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8642 Tank Farm MO-0009-1A-2" 1/1 FW-14B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

8643 Tank Farm MO-0009-1A-2" 1/1 FW-14C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8644 Tank Farm MO-0043-1A-8" 1/1 FW-3A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

8645 Tank Farm MO-0043-1A-8" 1/1 FW-16C BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A106 Pipe/Pipe

8646 Tank Farm MO-0119-1A-12” 1/2 FW-20 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Scokolet

8647 Tank Farm MO-0119-1A-12” 1/2 FW-21 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8648 Tank Farm MO-0119-1A-12” 1/2 FW-22 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8649 Tank Farm MO-0119-1A-12” 1/2 FW-24 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

8650 Tank Farm MO-0119-1A-12” 1/2 FW-25 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8651 Tank Farm MO-0119-1A-12” 1/2 FW-28 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Scokolet

8652 Tank Farm MO-0119-1A-12” 1/2 FW-29 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8653 Tank Farm MO-0023-1A-12" 1/2 FW-6A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

8654 Tank Farm MO-0023-1A-12" 1/2 FW-8A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8655 Tank Farm MO-0023-1A-12" 1/2 FW-7A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

8656 Tank Farm MO-0023-1A-12" 1/2 FW-7B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

8657 Tank Farm MO-0023-1A-12" 1/2 FW-7C BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

8658 Tank Farm MO-0023-1A-12" 1/2 FW-10A BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

8659 Tank Farm MO-0063-1A-10" 1/2 FW-6A BW WPS-2016-23 GTAW/SMAW 10" SCH20 A106/A106 Pipe/Pipe

8660 Tank Farm MO-0120a-1A-8" 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

8661 Tank Farm MO-0120a-1A-8" 1/1 FW-32 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8662 Tank Farm MO-0120a-1A-8" 1/1 FW-33 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8663 Tank Farm MO-0120a-1A-8" 1/1 FW-34 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A105 Pipe/Flange

8664 Tank Farm MO-0120a-1A-8" 1/1 FW-40 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

8665 Tank Farm MO-0120a-1A-8" 1/1 FW-41 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8666 Tank Farm OW-0001-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8667 Tank Farm OW-0001-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

8668 Tank Farm OW-0001-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8669 Tank Farm OW-0001-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8670 Tank Farm OW-0001-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8671 Tank Farm OW-0001-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8672 Tank Farm OW-0001-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8673 Tank Farm OW-0001-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8674 Tank Farm OW-0005-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8675 Tank Farm OW-0005-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

8676 Tank Farm OW-0005-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8677 Tank Farm OW-0005-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8678 Tank Farm OW-0005-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8679 Tank Farm OW-0005-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8680 Tank Farm OW-0005-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8681 Tank Farm OW-0005-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8682 Tank Farm OW-0007-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8683 Tank Farm OW-0007-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/45Elbow

8684 Tank Farm OW-0007-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/45Elbow

8685 Tank Farm OW-0007-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8686 Tank Farm OW-0007-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8687 Tank Farm OW-0007-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8688 Tank Farm OW-0007-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8689 Tank Farm OW-0007-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8690 Tank Farm OW-0007-1A-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8691 Tank Farm OW-0007-1A-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/90Elbow

8692 Tank Farm OW-0009-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8693 Tank Farm OW-0009-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/45Elbow

8694 Tank Farm OW-0009-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/45Elbow

8695 Tank Farm OW-0009-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8696 Tank Farm OW-0009-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8697 Tank Farm OW-0009-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8698 Tank Farm OW-0009-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8699 Tank Farm OW-0009-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8700 Tank Farm OW-0009-1A-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8701 Tank Farm OW-0009-1A-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/90Elbow

8702 Tank Farm OW-0011-1S1-3" 3/3 FW-42 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

8703 Tank Farm OW-0011-1S1-3" 3/3 FW-43 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

8704 Tank Farm OW-0011-1S1-3" 3/3 FW-44 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

8705 Tank Farm OW-0011-1S1-3" 3/3 FW-45 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Reducer

8706 Tank Farm OW-0011-1S1-3" 3/3 FW-46 BW WPS-2016-27 GTAW 2" SCH10S A182/A403 Tee/Reducer

8707 Tank Farm OW-0011-1S1-3" 3/3 FW-47 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

8708 Tank Farm OW-0011-1S1-3" 3/3 FW-48 SOW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

8709 Tank Farm OW-0011-1S1-3" 3/3 FW-49 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8710 Tank Farm OW-0011-1S1-3" 3/3 FW-50 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

8711 Tank Farm OW-0011-1S1-3" 3/3 FW-51 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

8712 Tank Farm OW-0011-1S1-3" 3/3 FW-52 SOW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

8713 Tank Farm OW-0011-1S1-3" 3/3 FW-53 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

8714 Tank Farm OW-0011-1S1-3" 3/3 FW-54 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

8715 Tank Farm OW-0011-1S1-3" 3/3 FW-55 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

8716 Tank Farm OW-0011-1S1-3" 3/3 FW-56 SOW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

8717 Tank Farm OW-0011-1S1-3" 2/3 FW-41 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

8718 Tank Farm OW-0011-1S1-3" 2/3 FW-40 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

8719 Tank Farm OW-0011-1S1-3" 2/3 FW-39 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

8720 Tank Farm OW-0011-1S1-3" 2/3 FW-38 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8721 Tank Farm OW-0015-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8722 Tank Farm OW-0015-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

8723 Tank Farm OW-0015-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8724 Tank Farm OW-0015-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8725 Tank Farm OW-0015-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8726 Tank Farm OW-0015-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8727 Tank Farm OW-0015-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8728 Tank Farm OW-0015-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8729 Tank Farm OW-0017-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8730 Tank Farm OW-0017-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

8731 Tank Farm OW-0017-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8732 Tank Farm OW-0017-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8733 Tank Farm OW-0017-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8734 Tank Farm OW-0017-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8735 Tank Farm OW-0017-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8736 Tank Farm OW-0017-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8737 Tank Farm OW-0019-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8738 Tank Farm OW-0019-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

8739 Tank Farm OW-0019-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8740 Tank Farm OW-0019-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8741 Tank Farm OW-0019-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8742 Tank Farm OW-0019-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8743 Tank Farm OW-0019-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8744 Tank Farm OW-0019-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8745 Tank Farm OW-1002-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8746 Tank Farm OW-1002-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8747 Tank Farm OW-1002-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

8748 Tank Farm OW-1002-1A-4" 1/1 FW-3A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

8749 Tank Farm OW-1002-1A-4" 1/1 FW-3B BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

8750 Tank Farm OW-1011-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

8751 Tank Farm OW-1011-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

8752 Tank Farm OW-1011-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

8753 Tank Farm OW-1011-1A-4" 1/1 FW-3A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8754 Tank Farm SA-0001-1B-2" 3/4 FW-45 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8755 Tank Farm SA-0001-1B-2" 3/4 FW-46 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8756 Tank Farm SA-0001-1B-2" 3/4 FW-47 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8757 Tank Farm SA-0001-1B-2" 3/4 FW-48 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8758 Tank Farm SA-0001-1B-2" 3/4 FW-49 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8759 Tank Farm SA-0001-1B-2" 3/4 FW-50 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8760 Tank Farm SA-0001-1B-2" 3/4 FW-51 BW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

8761 Tank Farm SA-0001-1B-2" 3/4 FW-52 BW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

8762 Tank Farm SA-0001-1B-2" 3/4 FW-53 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8763 Tank Farm SA-0001-1B-2" 3/4 FW-54 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8764 Tank Farm SA-0001-1B-2" 3/4 FW-55 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8765 Tank Farm SA-0001-1B-2" 3/4 FW-54A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

8766 Tank Farm SA-0001-1B-2" 3/4 FW-58 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8767 Tank Farm SA-0001-1B-2" 3/4 FW-56 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8768 Tank Farm SA-0001-1B-2" 3/4 FW-57 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8769 Tank Farm SA-0001-1B-2" 3/4 FW-48A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

8770 Tank Farm SA-0002-1B-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8771 Tank Farm SA-0002-1B-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

8772 Tank Farm SA-0002-1B-2" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/Tee

8773 Tank Farm SA-0002-1B-2" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8774 Tank Farm SA-0002-1B-2" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8775 Tank Farm SA-0002-1B-2" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8776 Tank Farm SA-0002-1B-2" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8777 Tank Farm SA-0002-1B-2" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8778 Tank Farm SA-0002-1B-2" 1/1 FW-16 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8779 Tank Farm SA-0002-1B-2" 1/1 FW-17 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8780 Tank Farm SA-0002-1B-2" 1/1 FW-18 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8781 Tank Farm SA-0002-1B-2" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8782 Tank Farm SA-0002-1B-2" 1/1 FW-22 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8783 Tank Farm SA-0002-1B-2" 1/1 FW-23 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8784 Tank Farm SA-0002-1B-2" 1/1 FW-24 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8785 Tank Farm SA-0002-1B-2" 1/1 FW-33 SW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Reducer

8786 Tank Farm SA-0002-1B-2" 1/1 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8787 Tank Farm SA-0002-1B-2" 1/1 FW-28 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8788 Tank Farm SA-0002-1B-2" 1/1 FW-29 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8789 Tank Farm SA-0002-1B-2" 1/1 FW-30 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8790 Tank Farm SA-0002-1B-2" 1/1 FW-31 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8791 Tank Farm SA-0003-1B-2" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee

8792 Tank Farm SA-0003-1B-2" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8793 Tank Farm SA-0003-1B-2" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8794 Tank Farm SA-0003-1B-2" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8795 Tank Farm SA-0003-1B-2" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8796 Tank Farm SA-0003-1B-2" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8797 Tank Farm SA-0003-1B-2" 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8798 Tank Farm SA-0003-1B-2" 1/1 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8799 Tank Farm SA-0003-1B-2" 1/1 FW-18 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8800 Tank Farm SA-0003-1B-2" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8801 Tank Farm SA-0003-1B-2" 1/1 FW-22 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8802 Tank Farm SA-0003-1B-2" 1/1 FW-23 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8803 Tank Farm SA-0003-1B-2" 1/1 FW-24 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8804 Tank Farm SA-0003-1B-2" 1/1 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

8805 Tank Farm SA-0003-1B-2" 1/1 FW-28 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8806 Tank Farm SA-0003-1B-2" 1/1 FW-29 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8807 Tank Farm SA-0003-1B-2" 1/1 FW-30 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8808 Tank Farm SA-0003-1B-2" 1/1 FW-31 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8809 Tank Farm SA-0004-1B-2" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee

8810 Tank Farm SA-0004-1B-2" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8811 Tank Farm SA-0004-1B-2" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8812 Tank Farm SA-0004-1B-2" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8813 Tank Farm SA-0004-1B-2" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8814 Tank Farm SA-0004-1B-2" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8815 Tank Farm SA-0004-1B-2" 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee

8816 Tank Farm SA-0004-1B-2" 1/1 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8817 Tank Farm SA-0004-1B-2" 1/1 FW-18 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8818 Tank Farm SA-0004-1B-2" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8819 Tank Farm SA-0004-1B-2" 1/1 FW-22 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8820 Tank Farm SA-0004-1B-2" 1/1 FW-23 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8821 Tank Farm SA-0004-1B-2" 1/1 FW-24 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8822 Tank Farm SA-0004-1B-2" 1/1 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

8823 Tank Farm SA-0004-1B-2" 1/1 FW-28 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8824 Tank Farm SA-0004-1B-2" 1/1 FW-29 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8825 Tank Farm SA-0004-1B-2" 1/1 FW-30 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8826 Tank Farm SA-0004-1B-2" 1/1 FW-31 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8827 Tank Farm SA-0005-1B-2" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee

8828 Tank Farm SA-0005-1B-2" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8829 Tank Farm SA-0005-1B-2" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8830 Tank Farm SA-0005-1B-2" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8831 Tank Farm SA-0005-1B-2" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8832 Tank Farm SA-0005-1B-2" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8833 Tank Farm MO-0023-1A-12" 2/2 FW-35A BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8834 Tank Farm MO-0023-1A-12" 2/2 FW-35B SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8835 Tank Farm MO-0023-1A-12" 2/2 FW-35C SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8836 Tank Farm MO-0023-1A-12" 2/2 FW-35D SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8837 Tank Farm MO-0043-1A-8" 1/1 FW-25A BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8838 Tank Farm MO-0043-1A-8" 1/1 FW-25B SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8839 Tank Farm MO-0043-1A-8" 1/1 FW-25C SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8840 Tank Farm MO-0043-1A-8" 1/1 FW-25D SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8841 Tank Farm MO-0063-1A-10" 2/2 FW-33A BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8842 Tank Farm MO-0063-1A-10" 2/2 FW-33B SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

8843 Tank Farm MO-0063-1A-10" 2/2 FW-33C SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8844 Tank Farm MO-0063-1A-10" 2/2 FW-33D SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

8845 Tank Farm SA-0005-1B-2" 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee

8846 Tank Farm SA-0005-1B-2" 1/1 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8847 Tank Farm SA-0005-1B-2" 1/1 FW-18 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8848 Tank Farm SA-0005-1B-2" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8849 Tank Farm SA-0005-1B-2" 1/1 FW-22 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8850 Tank Farm SA-0005-1B-2" 1/1 FW-23 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8851 Tank Farm SA-0005-1B-2" 1/1 FW-24 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8852 Tank Farm SA-0005-1B-2" 1/1 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8853 Tank Farm SA-0005-1B-2" 1/1 FW-28 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8854 Tank Farm SA-0005-1B-2" 1/1 FW-29 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8855 Tank Farm SA-0005-1B-2" 1/1 FW-30 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8856 Tank Farm SA-0005-1B-2" 1/1 FW-31 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8857 Tank Farm SA-0006-1B-2" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee

8858 Tank Farm SA-0006-1B-2" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8859 Tank Farm SA-0006-1B-2" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8860 Tank Farm SA-0006-1B-2" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8861 Tank Farm SA-0006-1B-2" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8862 Tank Farm SA-0006-1B-2" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8863 Tank Farm SA-0006-1B-2" 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8864 Tank Farm SA-0006-1B-2" 1/1 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8865 Tank Farm SA-0006-1B-2" 1/1 FW-18 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8866 Tank Farm SA-0006-1B-2" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8867 Tank Farm SA-0006-1B-2" 1/1 FW-22 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8868 Tank Farm SA-0006-1B-2" 1/1 FW-23 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8869 Tank Farm SA-0006-1B-2" 1/1 FW-24 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8870 Tank Farm SA-0006-1B-2" 1/1 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

8871 Tank Farm SA-0006-1B-2" 1/1 FW-28 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8872 Tank Farm SA-0006-1B-2" 1/1 FW-29 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8873 Tank Farm SA-0006-1B-2" 1/1 FW-30 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8874 Tank Farm SA-0006-1B-2" 1/1 FW-31 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8875 Tank Farm SA-0006-1B-2" 1/1 FW-33 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Reducer

8876 Tank Farm SA-0006-1B-2" 1/1 FW-33A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Reducer

8877 Tank Farm SA-0007-1B-2" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee

8878 Tank Farm SA-0007-1B-2" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8879 Tank Farm SA-0007-1B-2" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8880 Tank Farm SA-0007-1B-2" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8881 Tank Farm SA-0007-1B-2" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8882 Tank Farm SA-0007-1B-2" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8883 Tank Farm SA-0007-1B-2" 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee

8884 Tank Farm SA-0007-1B-2" 1/1 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8885 Tank Farm SA-0007-1B-2" 1/1 FW-18 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8886 Tank Farm SA-0007-1B-2" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8887 Tank Farm SA-0007-1B-2" 1/1 FW-22 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8888 Tank Farm SA-0007-1B-2" 1/1 FW-23 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8889 Tank Farm SA-0007-1B-2" 1/1 FW-24 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8890 Tank Farm SA-0007-1B-2" 1/1 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

8891 Tank Farm SA-0007-1B-2" 1/1 FW-28 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8892 Tank Farm SA-0007-1B-2" 1/1 FW-29 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/CPLG

8893 Tank Farm SA-0007-1B-2" 1/1 FW-30 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8894 Tank Farm SA-0007-1B-2" 1/1 FW-31 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8895 Tank Farm SA-0007-1B-2" 1/1 FW-21 SW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8896 Tank Farm SA-0007-1B-2" 1/1 FW-26 SOW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8897 Tank Farm SA-0007-1B-2" 1/1 FW-08 SOW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8898 Tank Farm SA-0007-1B-2" 1/1 FW-09 SW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Tee

8899 Tank Farm SA-0001a-1B-2" 2/2 FW-17 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

8900 Tank Farm SA-0011-1B-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8901 Tank Farm SA-0011-1B-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8902 Tank Farm SA-0011-1B-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8903 Tank Farm SA-0011-1B-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

8904 Tank Farm SA-0011-1B-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8905 Tank Farm SA-0011-1B-1" 1/1 FW-1A BW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee

8906 Tank Farm SA-0011-1B-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee

8907 Tank Farm SA-0011-1B-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8908 Tank Farm SA-0011-1B-1" 1/1 FW-08 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8909 Tank Farm SA-0011-1B-1" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8910 Tank Farm SA-0011-1B-1" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8911 Tank Farm SA-0011-1B-1" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8912 Tank Farm SA-0011-1B-1" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

8913 Tank Farm SA-0011-1B-1" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

8914 Tank Farm SA-0011-1B-1" 1/1 FW-15 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee

8915 Tank Farm SA-0011-1B-1" 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8916 Tank Farm SA-0011-1B-1" 1/1 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

8917 Tank Farm SA-0011-1B-1" 1/1 FW-18 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

8918 Tank Farm SA-0011-1B-1" 1/1 FW-19 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8919 Tank Farm SA-0011-1B-1" 1/1 FW-20 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee

8920 Tank Farm SA-0012-1B-1" 1/1 FW-20 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee

8921 Tank Farm SA-0013-1B-1" 1/1 FW-20 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Tee

8922 Tank Farm DO-0008-1A-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8923 Tank Farm DO-0008-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8924 Tank Farm DO-0008-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8925 Tank Farm DO-0008-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8926 Tank Farm DO-0008-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8927 Tank Farm DO-0008-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8928 Tank Farm DO-0008-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8929 Tank Farm DO-0008-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8930 Tank Farm DO-0012-1A-2" 1/1 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8931 Tank Farm DO-0012-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8932 Tank Farm DO-0012-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8933 Tank Farm JF-0001-1A-12” 5/7 FW-69C SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

8934 Tank Farm JF-0001-1A-12” 5/7 FW-69D SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

8935 Tank Farm JF-0001-1A-12” 6/7 FW-77B BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A106 Pipe/Pipe

8936 Tank Farm DO-0012-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8937 Tank Farm DO-0012-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8938 Tank Farm DO-0012-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/45Elbow

8939 Tank Farm DO-0012-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/45Elbow

8940 Tank Farm DO-0012-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8941 Tank Farm DO-0013-1A-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8942 Tank Farm DO-0013-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8943 Tank Farm DO-0013-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8944 Tank Farm DO-0013-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8945 Tank Farm DO-0013-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8946 Tank Farm DO-0013-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8947 Tank Farm DO-0013-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8948 Tank Farm DO-0013-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8949 Tank Farm DO-0019-1A-2" 1/1 FW-7A BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8950 Tank Farm DO-0019-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8951 Tank Farm DO-0019-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8952 Tank Farm DO-0019-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8953 Tank Farm DO-0019-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8954 Tank Farm DO-0019-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8955 Tank Farm DO-0019-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

8956 Tank Farm DO-0019-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

8957 Tank Farm DO-0005-1A-12” 1/1 FW-09 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8958 Tank Farm DO-0005-1A-12” 1/1 FW-10 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8959 Tank Farm DO-0005-1A-12” 1/1 FW-11 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8960 Tank Farm DO-0010-1A-12" 1/1 FW-09 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8961 Tank Farm DO-0010-1A-12" 1/1 FW-10 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8962 Tank Farm DO-0010-1A-12" 1/1 FW-11 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8963 Tank Farm DO-0017-1A-12" 1/1 FW-09 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8964 Tank Farm DO-0017-1A-12" 1/1 FW-10 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8965 Tank Farm DO-0017-1A-12" 1/1 FW-11 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8966 Tank Farm DO-0016-1A-8” 1/1 FW-13 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8967 Tank Farm DO-0016-1A-8” 1/1 FW-14 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8968 Tank Farm DO-0016-1A-8” 1/1 FW-17 BRW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Weldolet

8969 Tank Farm DO-0016-1A-8” 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

8970 Tank Farm SA-0001-1B-2" 1/4 FW-10A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

8971 Tank Farm SA-0001-1B-2" 1/4 FW-10B BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

8972 Tank Farm SA-0001-1B-2" 1/4 FW-11 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

8973 Tank Farm PW-5422-1S1-1" 1/1 FW-1A BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8974 Tank Farm PW-5422-1S1-1" 1/1 FW-01 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8975 Tank Farm PW-5422-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8976 Tank Farm PW-5422-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8977 Tank Farm PW-5422-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8978 Tank Farm PW-5422-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8979 Tank Farm PW-5422-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8980 Tank Farm PW-5422-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8981 Tank Farm PW-5422-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8982 Tank Farm PW-5422-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8983 Tank Farm PW-5422-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8984 Tank Farm PW-5422-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8985 Tank Farm PW-5422-1S1-1" 1/1 FW-12 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

8986 Tank Farm PW-5423-1S1-1" 1/1 FW-1A BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

8987 Tank Farm PW-5423-1S1-1" 1/1 FW-01 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8988 Tank Farm PW-5423-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8989 Tank Farm PW-5423-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8990 Tank Farm PW-5423-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8991 Tank Farm PW-5423-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8992 Tank Farm PW-5423-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8993 Tank Farm PW-5423-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8994 Tank Farm PW-5423-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8995 Tank Farm PW-5423-1S1-1" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
8996 Tank Farm PW-5423-1S1-1" 1/1 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

8997 Tank Farm PW-5423-1S1-1" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

8998 Tank Farm PW-5423-1S1-1" 1/1 FW-12 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

8999 Tank Farm PW-5417-1S1-1" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9000 Tank Farm PW-5421-1S1-1" 1/1 FW-1A BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet

9001 Tank Farm PW-5421-1S1-1" 1/1 FW-01 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9002 Tank Farm PW-5421-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9003 Tank Farm PW-5421-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9004 Tank Farm PW-5421-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9005 Tank Farm PW-5421-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9006 Tank Farm PW-5421-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9007 Tank Farm PW-5418-1S1-1" 1/1 FW-1A BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9008 Tank Farm PW-5418-1S1-1" 1/1 FW-01 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9009 Tank Farm PW-5418-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9010 Tank Farm PW-5418-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9011 Tank Farm PW-5418-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9012 Tank Farm PW-5418-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9013 Tank Farm PW-5418-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9014 Tank Farm PW-5419-1S1-1" 1/1 FW-1A BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9015 Tank Farm PW-5419-1S1-1" 1/1 FW-01 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9016 Tank Farm PW-5419-1S1-1" 1/1 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9017 Tank Farm PW-5419-1S1-1" 1/1 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9018 Tank Farm PW-5419-1S1-1" 1/1 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9019 Tank Farm PW-5419-1S1-1" 1/1 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9020 Tank Farm PW-5419-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9021 Tank Farm PW-5425-1S1-2" 1/1 FW-8A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9022 Tank Farm PW-5425-1S1-2" 1/1 FW-8B BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

9023 Tank Farm PW-5426-1S1-2" 1/1 FW-8A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9024 Tank Farm PW-5426-1S1-2" 1/1 FW-8B BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

9025 Tank Farm PW-5427-1S1-2" 1/1 FW-8A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9026 Tank Farm PW-5427-1S1-2" 1/1 FW-8B BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

9027 Tank Farm PW-5428-1S1-2" 1/1 FW-8A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9028 Tank Farm PW-5428-1S1-2" 1/1 FW-8B BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9029 Tank Farm PW-5429-1S1-2" 1/1 FW-8A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9030 Tank Farm PW-5429-1S1-2" 1/1 FW-8B BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

9031 Tank Farm PW-5430-1S1-2" 1/1 FW-8A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9032 Tank Farm PW-5430-1S1-2" 1/1 FW-8B BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

9033 Tank Farm PW-5416-1S1-4" 4/5 FW-58 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9034 Tank Farm PW-5416-1S1-4" 4/5 FW-59 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9035 Tank Farm PW-5416-1S1-4" 4/5 FW-60 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9036 Tank Farm PW-5416-1S1-4" 5/5 FW-61 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9037 Tank Farm PW-5416-1S1-4" 5/5 FW-62 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9038 Tank Farm PW-5416-1S1-4" 5/5 FW-63 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9039 Tank Farm PW-5416-1S1-4" 5/5 FW-64 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9040 Tank Farm PW-5416-1S1-4" 5/5 FW-65 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9041 Tank Farm PW-5416-1S1-4" 5/5 FW-66 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9042 Tank Farm PW-5416-1S1-4" 5/5 FW-67 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9043 Tank Farm PW-5416-1S1-4" 5/5 FW-68 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9044 Tank Farm PW-5414A-1S1-4" 1/1 FW-1L BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

9045 Tank Farm PW-5414A-1S1-4" 1/1 FW-1M BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

9046 Tank Farm PW-5414A-1S1-4" 1/1 FW-1N BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

9047 Tank Farm PW-5414A-1S1-4" 1/1 FW-1O BW WPS-2016-27 GTAW 4" SCH10S A312/A312 Pipe/Pipe

9048 Tank Farm DO-0002-1A-12” 1/2 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

9049 Tank Farm DO-0002-1A-12” 1/2 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9050 Tank Farm DO-0002-1A-12” 1/2 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9051 Tank Farm DO-0002-1A-12” 1/2 FW-15 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

9052 Tank Farm DO-0002-1A-12” 1/2 FW-16 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

9053 Tank Farm DO-0002-1A-12” 1/2 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9054 Tank Farm DO-0002-1A-12” 1/2 FW-18 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9055 Tank Farm DO-0002-1A-12” 1/2 FW-19 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

9056 Tank Farm DO-0002-1A-12” 1/2 FW-20 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

9057 Tank Farm DO-0002-1A-12” 1/2 FW-21 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

9058 Tank Farm DO-0002-1A-12” 1/2 FW-22 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9059 Tank Farm DO-0002-1A-12” 1/2 FW-23 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

9060 Tank Farm DO-0002-1A-12” 1/2 FW-24 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9061 Tank Farm DO-0002-1A-12” 1/2 FW-25 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9062 Tank Farm DO-0002-1A-12” 1/2 FW-26 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9063 Tank Farm DO-0002-1A-12” 1/2 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9064 Tank Farm DO-0002-1A-12” 1/2 FW-28 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9065 Tank Farm DO-0002-1A-12” 1/2 FW-29 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9066 Tank Farm DO-0002-1A-12” 1/2 FW-30 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9067 Tank Farm DO-0002-1A-12” 1/2 FW-31 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9068 Tank Farm DO-0002-1A-12” 1/2 FW-32 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9069 Tank Farm DO-0002-1A-12” 1/2 FW-32A BW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee

9070 Tank Farm DO-0002-1A-12” 2/2 FW-34A BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

9071 Tank Farm DO-0002-1A-12” 2/2 FW-34B SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

9072 Tank Farm DO-0002-1A-12” 2/2 FW-34C SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9073 Tank Farm DO-0002-1A-12” 2/2 FW-34D SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9074 Tank Farm SA-0001-1B-2" 1/4 FW-12 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

9075 Tank Farm SA-0001-1B-2" 1/4 FW-13 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

9076 Tank Farm SA-0008-1B-1" 1/1 FW-1A BW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/Tee

9077 Tank Farm SA-0008-1B-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9078 Tank Farm SA-0008-1B-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9079 Tank Farm SA-0008-1B-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9080 Tank Farm SA-0008-1B-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9081 Tank Farm SA-0008-1B-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9082 Tank Farm SA-0008-1B-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9083 Tank Farm SA-0008-1B-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9084 Tank Farm SA-0008-1B-1" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9085 Tank Farm SA-0008-1B-1" 1/1 FW-09 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9086 Tank Farm SA-0008-1B-1" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9087 Tank Farm SA-0008-1B-1" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9088 Tank Farm SA-0008-1B-1" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9089 Tank Farm SA-0008-1B-1" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9090 Tank Farm SA-0008-1B-1" 1/1 FW-14 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Tee

9091 Tank Farm SA-0008-1B-1" 1/1 FW-15 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/90Elbow

9092 Tank Farm SA-0008-1B-1" 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/90Elbow

9093 Tank Farm SA-0008-1B-1" 1/1 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9094 Tank Farm SA-0008-1B-1" 1/1 FW-19 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9095 Tank Farm SA-0008-1B-1" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

9096 Tank Farm SA-0008-1B-1" 1/1 FW-21 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

9097 Tank Farm SA-0008-1B-1" 1/1 FW-22 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9098 Tank Farm SA-0008-1B-1" 1/1 FW-23 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Tee

9099 Tank Farm SA-0008-1B-1" 1/1 FW-24 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/90Elbow

9100 Tank Farm SA-0008-1B-1" 1/1 FW-25 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/90Elbow

9101 Tank Farm SA-0008-1B-1" 1/1 FW-26 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9102 Tank Farm SA-0008-1B-1" 1/1 FW-27 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9103 Tank Farm SA-0008-1B-1" 1/1 FW-28 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9104 Tank Farm SA-0009-1B-1" 1/1 FW-1A BW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/Tee

9105 Tank Farm SA-0009-1B-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9106 Tank Farm SA-0009-1B-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9107 Tank Farm SA-0009-1B-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9108 Tank Farm SA-0009-1B-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9109 Tank Farm SA-0009-1B-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9110 Tank Farm SA-0009-1B-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9111 Tank Farm SA-0009-1B-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9112 Tank Farm SA-0009-1B-1" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9113 Tank Farm SA-0009-1B-1" 1/1 FW-09 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9114 Tank Farm SA-0009-1B-1" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9115 Tank Farm SA-0009-1B-1" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9116 Tank Farm SA-0009-1B-1" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9117 Tank Farm SA-0009-1B-1" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9118 Tank Farm SA-0009-1B-1" 1/1 FW-14 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Tee

9119 Tank Farm SA-0009-1B-1" 1/1 FW-15 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/90Elbow

9120 Tank Farm SA-0009-1B-1" 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/90Elbow

9121 Tank Farm SA-0009-1B-1" 1/1 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9122 Tank Farm SA-0009-1B-1" 1/1 FW-19 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9123 Tank Farm SA-0009-1B-1" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

9124 Tank Farm SA-0009-1B-1" 1/1 FW-21 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

9125 Tank Farm SA-0009-1B-1" 1/1 FW-22 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9126 Tank Farm SA-0009-1B-1" 1/1 FW-23 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Tee

9127 Tank Farm SA-0009-1B-1" 1/1 FW-24 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9128 Tank Farm SA-0009-1B-1" 1/1 FW-25 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/90Elbow

9129 Tank Farm SA-0009-1B-1" 1/1 FW-26 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9130 Tank Farm SA-0009-1B-1" 1/1 FW-27 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9131 Tank Farm SA-0009-1B-1" 1/1 FW-28 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9132 Tank Farm SA-0001a-1B-2" 1/2 FW-13A BW WPS-2016-21 GTAW 2" SCH40 A53/A53 Pipe/Pipe

9133 Tank Farm SA-0001-1B-2" 1/4 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

9134 Tank Farm SA-0010-1A-1" 1/1 FW-1A BW WPS-2016-21 GTAW 1" SCH80 A53/A234 Pipe/Tee

9135 Tank Farm SA-0010-1A-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9136 Tank Farm SA-0010-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9137 Tank Farm SA-0010-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9138 Tank Farm SA-0010-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9139 Tank Farm SA-0010-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9140 Tank Farm SA-0010-1A-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Tee

9141 Tank Farm SA-0010-1A-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/90Elbow

9142 Tank Farm SA-0010-1A-1" 1/1 FW-08 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/90Elbow

9143 Tank Farm SA-0010-1A-1" 1/1 FW-09 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9144 Tank Farm SA-0010-1A-1" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9145 Tank Farm SA-0010-1A-1" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

9146 Tank Farm SA-0010-1A-1" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

9147 Tank Farm SA-0010-1A-1" 1/1 FW-14 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9148 Tank Farm SA-0010-1A-1" 1/1 FW-15 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Tee

9149 Tank Farm SA-0010-1A-1" 1/1 FW-16 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9150 Tank Farm SA-0010-1A-1" 1/1 FW-17 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/90Elbow

9151 Tank Farm SA-0010-1A-1" 1/1 FW-18 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9152 Tank Farm SA-0010-1A-1" 1/1 FW-19 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9153 Tank Farm SA-0010-1A-1" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9154 Tank Farm OW-1001-1A-6" 1/1 FW-6B BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9155 Tank Farm OW-1001-1A-6" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9156 Tank Farm OW-1001-1A-6" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Tee/90Elbow

9157 Tank Farm OW-1001-1A-6" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/90Elbow

9158 Tank Farm OW-1001-1A-6" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9159 Tank Farm OW-1001-1A-6" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9160 Tank Farm OW-1001-1A-6" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9161 Tank Farm OW-1001-1A-6" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9162 Tank Farm OW-1001-1A-6" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9163 Tank Farm OW-1001-1A-6" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9164 Tank Farm OW-1001-1A-6" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9165 Tank Farm OW-1001-1A-6" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9166 Tank Farm OW-1001-1A-6" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9167 Tank Farm OW-1001-1A-6" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9168 Tank Farm OW-1001-1A-6" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9169 Tank Farm OW-1001-1A-6" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9170 Tank Farm OW-1001-1A-6" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9171 Tank Farm OW-1001-1A-6" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9172 Tank Farm OW-1001-1A-6" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A234 Pipe/Tee

9173 Tank Farm OW-1001-1A-6" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 Tee/Flange

9174 Tank Farm OW-1001-1A-6" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9175 Tank Farm OW-1001-1A-6" 1/1 FW-11A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9176 Tank Farm OW-1001-1A-6" 1/1 FW-11B BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9177 Tank Farm OW-1001-1A-6" 1/1 FW-11C BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9178 Tank Farm OW-1001-1A-6" 1/1 FW-15A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9179 Tank Farm OW-1001-1A-6" 1/1 FW-15B BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9180 Tank Farm OW-1001-1A-6" 1/1 FW-19A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9181 Tank Farm OW-1001-1A-6" 1/1 FW-19B BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9182 Tank Farm OW-1001-1A-6" 1/1 FW-19C BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9183 Tank Farm OW-1001-1A-6" 1/1 FW-21A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9184 Tank Farm OW-1001-1A-6" 1/1 FW-21B BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9185 Tank Farm OW-1001-1A-6" 1/1 FW-21C BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9186 Tank Farm OW-1001-1A-6" 1/1 FW-23A BW WPS-2016-23 GTAW/SMAW 6" SCH40 A106/A106 Pipe/Pipe

9187 Tank Farm JF-0019-1S1-2" 1/1 FW-01 BW WPS-2016-27 GTAW 3" SCH10S A182/A182 Reducer/Flange

9188 Tank Farm JF-0019-1S1-2" 1/1 FW-1A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9189 Tank Farm JF-0019-1S1-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9190 Tank Farm JF-0019-1S1-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9191 Tank Farm JF-0019-1S1-2" 1/1 FW-04 BRW WPS-2016-27 GTAW 3/4" SCH40S A312/A182 Pipe/scokolet

9192 Tank Farm JF-0019-1S1-2" 1/1 FW-05 SW WPS-2016-27 GTAW 3/4" SCH40S A312/A182 Pipe/scokolet

9193 Tank Farm JF-0019-1S1-2" 1/1 FW-06 SW WPS-2016-27 GTAW 3/4" SCH40S A312/A182 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9194 Tank Farm JF-0019-1S1-2" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9195 Tank Farm JF-0019-1S1-2" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9196 Tank Farm JF-0019-1S1-2" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9197 Tank Farm JF-0019-1S1-2" 1/1 FW-10 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9198 Tank Farm JF-0019-1S1-2" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH10S A312/A182 Pipe/Tee

9199 Tank Farm JF-0019-1S1-2" 1/1 FW-12 SW WPS-2016-27 GTAW 1" SCH10S A312/A182 Pipe/Gate

9200 Tank Farm JF-0019-1S1-2" 1/1 FW-14 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9201 Tank Farm JF-0019-1S1-2" 1/1 FW-15 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9202 Tank Farm JF-0019-1S1-2" 1/1 FW-16 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/45Elbow

9203 Tank Farm JF-0019-1S1-2" 1/1 FW-17 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/45Elbow

9204 Tank Farm JF-0019-1S1-2" 1/1 FW-18 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9205 Tank Farm JF-0019-1S1-2" 1/1 FW-19 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Reducer

9206 Tank Farm JF-0019-1S1-2" 1/1 FW-20 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9207 Tank Farm JF-0019-1S1-2" 1/1 FW-9A SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9208 Tank Farm JF-0011-1S1-2" 1/1 FW-01 BW WPS-2016-27 GTAW 3" SCH10S A182/A182 Reducer/Flange

9209 Tank Farm JF-0011-1S1-2" 1/1 FW-1A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9210 Tank Farm JF-0011-1S1-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9211 Tank Farm JF-0011-1S1-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9212 Tank Farm JF-0011-1S1-2" 1/1 FW-04 BRW WPS-2016-27 GTAW 3/4" SCH40S A312/A182 Pipe/scokolet

9213 Tank Farm JF-0011-1S1-2" 1/1 FW-05 SW WPS-2016-27 GTAW 3/4" SCH40S A312/A182 Pipe/scokolet

9214 Tank Farm JF-0011-1S1-2" 1/1 FW-06 SW WPS-2016-27 GTAW 3/4" SCH40S A312/A182 Pipe/Flange

9215 Tank Farm JF-0011-1S1-2" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9216 Tank Farm JF-0011-1S1-2" 1/1 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9217 Tank Farm JF-0011-1S1-2" 1/1 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9218 Tank Farm JF-0011-1S1-2" 1/1 FW-10 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9219 Tank Farm JF-0011-1S1-2" 1/1 FW-11 SW WPS-2016-27 GTAW 1" SCH10S A312/A182 Pipe/Tee

9220 Tank Farm JF-0011-1S1-2" 1/1 FW-12 SW WPS-2016-27 GTAW 1" SCH10S A312/A182 Pipe/Gate

9221 Tank Farm JF-0011-1S1-2" 1/1 FW-14 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9222 Tank Farm JF-0011-1S1-2" 1/1 FW-15 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9223 Tank Farm JF-0011-1S1-2" 1/1 FW-16 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/45Elbow

9224 Tank Farm JF-0011-1S1-2" 1/1 FW-17 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/45Elbow

9225 Tank Farm JF-0011-1S1-2" 1/1 FW-18 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9226 Tank Farm JF-0011-1S1-2" 1/1 FW-19 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9227 Tank Farm JF-0011-1S1-2" 1/1 FW-20 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9228 Tank Farm JF-0011-1S1-2" 1/1 FW-9A SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9229 Tank Farm JF-0018-1S1-2" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9230 Tank Farm JF-0018-1S1-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9231 Tank Farm JF-0018-1S1-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9232 Tank Farm JF-0018-1S1-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9233 Tank Farm JF-0018-1S1-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9234 Tank Farm JF-0018-1S1-2" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9235 Tank Farm JF-0018-1S1-2" 1/1 FW-07 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9236 Tank Farm JF-0018-1S1-2" 1/1 FW-08 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9237 Tank Farm JF-0018-1S1-2" 1/1 FW-09 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9238 Tank Farm JF-0018-1S1-2" 1/1 FW-10 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9239 Tank Farm JF-0018-1S1-2" 1/1 FW-10A BW WPS-2016-27 GTAW 2" SCH10S A182/A182 Reducer/Flange

9240 Tank Farm JF-0018-1S1-2" 1/1 FW-10B BW WPS-2016-27 GTAW 3" SCH10S A182/A182 Reducer/Flange

9241 Tank Farm JF-0018-1S1-2" 1/1 FW-10C BW WPS-2016-27 GTAW 3" SCH10S A182/A182 Reducer/Flange

9242 Tank Farm JF-0018-1S1-2" 1/1 FW-10D BW WPS-2016-27 GTAW 2" SCH10S A182/A182 Reducer/Flange

9243 Tank Farm JF-0018-1S1-2" 1/1 FW-11 BW WPS-2016-27 GTAW 2" SCH10S A182/A182 Tee/Flange

9244 Tank Farm JF-0018-1S1-2" 1/1 FW-12 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9245 Tank Farm JF-0018-1S1-2" 1/1 FW-12A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9246 Tank Farm JF-0018-1S1-2" 1/1 FW-13 BW WPS-2016-27 GTAW 2½" SCH10S A182/A182 Reducer/Flange

9247 Tank Farm JF-0010-1S1-2" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9248 Tank Farm JF-0010-1S1-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9249 Tank Farm JF-0010-1S1-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9250 Tank Farm JF-0010-1S1-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9251 Tank Farm JF-0010-1S1-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9252 Tank Farm JF-0010-1S1-2" 1/1 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9253 Tank Farm JF-0010-1S1-2" 1/1 FW-07 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9254 Tank Farm JF-0010-1S1-2" 1/1 FW-08 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9255 Tank Farm JF-0010-1S1-2" 1/1 FW-09 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9256 Tank Farm JF-0010-1S1-2" 1/1 FW-10 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9257 Tank Farm JF-0010-1S1-2" 1/1 FW-10A BW WPS-2016-27 GTAW 2" SCH10S A182/A182 Reducer/Flange

9258 Tank Farm JF-0010-1S1-2" 1/1 FW-10B BW WPS-2016-27 GTAW 3" SCH10S A182/A182 Reducer/Flange

9259 Tank Farm JF-0010-1S1-2" 1/1 FW-10C BW WPS-2016-27 GTAW 3" SCH10S A182/A182 Reducer/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9260 Tank Farm JF-0010-1S1-2" 1/1 FW-10D BW WPS-2016-27 GTAW 2" SCH10S A182/A182 Reducer/Flange

9261 Tank Farm JF-0010-1S1-2" 1/1 FW-11 BW WPS-2016-27 GTAW 2" SCH10S A182/A182 Tee/Flange

9262 Tank Farm JF-0010-1S1-2" 1/1 FW-12 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9263 Tank Farm JF-0010-1S1-2" 1/1 FW-12A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9264 Tank Farm JF-0010-1S1-2" 1/1 FW-13 BW WPS-2016-27 GTAW 2½" SCH10S A182/A182 Reducer/Flange

9265 Tank Farm PW-5431-1S1-1" 1/1 FW-14 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9266 Tank Farm PW-5431-1S1-1" 1/1 FW-15 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9267 Tank Farm PW-5431-1S1-1" 1/1 FW-16 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9268 Tank Farm PW-5431-1S1-1" 1/1 FW-17 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9269 Tank Farm PW-5431-1S1-1" 1/1 FW-18 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9270 Tank Farm AD-0001-1S1-2" 1/2 FW-08 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9271 Tank Farm AD-0001-1S1-2" 1/2 FW-09 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9272 Tank Farm AD-0001-1S1-2" 1/2 FW-10 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9273 Tank Farm AD-0001-1S1-2" 1/2 FW-11 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9274 Tank Farm AD-0001-1S1-2" 1/2 FW-12 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9275 Tank Farm AD-0001-1S1-2" 1/2 FW-14 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9276 Tank Farm AD-0001-1S1-2" 1/2 FW-15 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9277 Tank Farm AD-0001-1S1-2" 1/2 FW-16 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9278 Tank Farm AD-0001-1S1-2" 1/2 FW-17 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9279 Tank Farm AD-0001-1S1-2" 1/2 FW-18 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9280 Tank Farm AD-0002-1S1-2" 1/2 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9281 Tank Farm AD-0002-1S1-2" 1/2 FW-11 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9282 Tank Farm AD-0002-1S1-2" 1/2 FW-11A BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

9283 Tank Farm AD-0002-1S1-2" 1/2 FW-11B BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9284 Tank Farm AD-0002-1S1-2" 1/2 FW-11C BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9285 Tank Farm AD-0002-1S1-2" 1/2 FW-11D BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9286 Tank Farm AD-0002-1S1-2" 1/2 FW-12 BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/90Elbow

9287 Tank Farm AD-0002-1S1-2" 1/2 FW-13 BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/90Elbow

9288 Tank Farm AD-0002-1S1-2" 1/2 FW-14 BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/90Elbow

9289 Tank Farm AD-0002-1S1-2" 1/2 FW-15 BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/90Elbow

9290 Tank Farm AD-0002-1S1-2" 1/2 FW-16 BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/90Elbow

9291 Tank Farm AD-0002-1S1-2" 1/2 FW-17 BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/90Elbow

9292 Tank Farm AD-0002-1S1-2" 1/2 FW-18 BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9293 Tank Farm AD-0003-1S1-2" 1/2 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9294 Tank Farm AD-0003-1S1-2" 1/2 FW-5B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

9295 Tank Farm AD-0003-1S1-2" 1/2 FW-07 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9296 Tank Farm AD-0003-1S1-2" 1/2 FW-08 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9297 Tank Farm AD-0003-1S1-2" 1/2 FW-09 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9298 Tank Farm AD-0003-1S1-2" 1/2 FW-10 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9299 Tank Farm AD-0003-1S1-2" 1/2 FW-11 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9300 Tank Farm AD-0003-1S1-2" 1/2 FW-12 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9301 Tank Farm AD-0001-1S1-2" 1/2 FW-19 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9302 Tank Farm AD-0001-1S1-2" 1/2 FW-20 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9303 Tank Farm AD-0001-1S1-2" 1/2 FW-21 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9304 Tank Farm AD-0001-1S1-2" 1/2 FW-22 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9305 Tank Farm AD-0001-1S1-2" 1/2 FW-23 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9306 Tank Farm AD-0001-1S1-2" 1/2 FW-24 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9307 Tank Farm AD-0001-1S1-2" 1/2 FW-25 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9308 Tank Farm AD-0002-1S1-2" 1/2 FW-19 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9309 Tank Farm AD-0002-1S1-2" 1/2 FW-20 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9310 Tank Farm AD-0002-1S1-2" 1/2 FW-21 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9311 Tank Farm AD-0002-1S1-2" 1/2 FW-22 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9312 Tank Farm AD-0002-1S1-2" 1/2 FW-23 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9313 Tank Farm AD-0002-1S1-2" 2/2 FW-24 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9314 Tank Farm AD-0002-1S1-2" 2/2 FW-25 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9315 Tank Farm AD-0002-1S1-2" 2/2 FW-26 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

9316 Tank Farm AD-0002-1S1-2" 2/2 FW-27 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9317 Tank Farm AD-0002-1S1-2" 2/2 FW-28 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9318 Tank Farm AD-0002-1S1-2" 2/2 FW-29 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9319 Tank Farm AD-0002-1S1-2" 2/2 FW-30 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9320 Tank Farm AD-0002-1S1-2" 2/2 FW-31 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9321 Tank Farm AD-0003-1S1-2" 1/2 FW-13 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9322 Tank Farm AD-0003-1S1-2" 1/2 FW-14 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9323 Tank Farm AD-0003-1S1-2" 1/2 FW-15 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9324 Tank Farm AD-0003-1S1-2" 1/2 FW-16 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9325 Tank Farm AD-0003-1S1-2" 1/2 FW-17 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9326 Tank Farm AD-0003-1S1-2" 1/2 FW-17A BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9327 Tank Farm AD-0003-1S1-2" 1/2 FW-17B BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9328 Tank Farm AD-0003-1S1-2" 2/2 FW-18 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9329 Tank Farm JF-0041-1A-8” 2/2 FW-47 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

9330 Tank Farm JF-0041-1A-8” 2/2 FW-48 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

9331 Tank Farm JF-0041-1A-8” 2/2 FW-49 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9332 Tank Farm JF-0041-1A-8” 2/2 FW-50 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9333 Tank Farm JF-0041-1A-8” 2/2 FW-51 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

9334 Tank Farm JF-0041-1A-8” 2/2 FW-52 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

9335 Tank Farm JF-0041-1A-8” 2/2 FW-53 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9336 Tank Farm JF-0041-1A-8” 2/2 FW-54 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9337 Tank Farm JF-0041-1A-8” 2/2 FW-55 BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

9338 Tank Farm JF-0041-1A-8” 2/2 FW-56 SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

9339 Tank Farm JF-0041-1A-8” 2/2 FW-57 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9340 Tank Farm DO-0015-1A-14” 2/2 FW-34 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

9341 Tank Farm DO-0015-1A-14” 2/2 FW-35 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

9342 Tank Farm DO-0015-1A-14” 2/2 FW-36 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9343 Tank Farm DO-0015-1A-14” 2/2 FW-37 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9344 Tank Farm DO-0015-1A-14” 2/2 FW-38 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

9345 Tank Farm DO-0015-1A-14” 2/2 FW-40 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

9346 Tank Farm DO-0015-1A-14” 2/2 FW-41 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9347 Tank Farm DO-0015-1A-14” 2/2 FW-42 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9348 Tank Farm DO-0015-1A-14” 2/2 FW-43 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

9349 Tank Farm DO-0015-1A-14” 2/2 FW-44 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Flange

9350 Tank Farm DO-0015-1A-14” 2/2 FW-45 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

9351 Tank Farm DO-0015-1A-14” 2/2 FW-46 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9352 Tank Farm DO-0015-1A-14” 2/2 FW-47 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9353 Tank Farm DO-0015-1A-14” 2/2 FW-48 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9354 Tank Farm DO-0015-1A-14” 2/2 FW-49 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9355 Tank Farm DO-0015-1A-14” 2/2 FW-50 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9356 Tank Farm DO-0015-1A-14” 2/2 FW-51 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9357 Tank Farm DO-0015-1A-14” 2/2 FW-52 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9358 Tank Farm DO-0015-1A-14” 2/2 FW-53 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9359 Tank Farm DO-0015-1A-14” 2/2 FW-54 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9360 Tank Farm DO-0015-1A-14” 2/2 FW-55 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9361 Tank Farm DO-0015-1A-14” 2/2 FW-56 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9362 Tank Farm DO-0015-1A-14” 2/2 FW-57 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9363 Tank Farm DO-0015-1A-14” 2/2 FW-57A SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Tee

9364 Tank Farm DO-0054a-1A-14” 1/2 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

9365 Tank Farm DO-0054a-1A-14” 1/2 FW-16 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9366 Tank Farm DO-0054a-1A-14” 1/2 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

9367 Tank Farm DO-0054a-1A-14” 1/2 FW-18 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9368 Tank Farm DO-0054a-1A-14” 1/2 FW-19 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9369 Tank Farm DO-0054a-1A-14” 1/2 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9370 Tank Farm DO-0054a-1A-14” 1/2 FW-21 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9371 Tank Farm DO-0054a-1A-14” 1/2 FW-22 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9372 Tank Farm DO-0054a-1A-14” 1/2 FW-23 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9373 Tank Farm DO-0054a-1A-14” 1/2 FW-24 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9374 Tank Farm DO-0054a-1A-14” 1/2 FW-25 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9375 Tank Farm DO-0054a-1A-14” 1/2 FW-26 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9376 Tank Farm DO-0054a-1A-14” 1/2 FW-27 BW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Reducer

9377 Tank Farm DO-0054a-1A-14” 1/2 FW-28 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Reducer

9378 Tank Farm DO-0054a-1A-14” 1/2 FW-28A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

9379 Tank Farm PW-5426-1S1-2" 1/1 FW-08 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Gate

9380 Tank Farm PW-5427-1S1-2" 1/1 FW-08 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9381 Tank Farm PW-5428-1S1-2" 1/1 FW-08 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Gate

9382 Tank Farm PW-5430-1S1-2" 1/1 FW-08 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Gate

9383 Tank Farm PW-5429-1S1-2" 1/1 FW-08 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Gate

9384 Tank Farm PW-5425-1S1-2" 1/1 FW-08 SW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Gate

9385 Tank Farm MO-0119A-1A-12" 2/2 FW-30 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

9386 Tank Farm MO-0119A-1A-12" 2/2 FW-31 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9387 Tank Farm MO-0119A-1A-12" 2/2 FW-32 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

9388 Tank Farm MO-0119A-1A-12" 2/2 FW-33 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9389 Tank Farm MO-0119A-1A-12" 2/2 FW-34 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9390 Tank Farm MO-0119A-1A-12" 2/2 FW-35 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9391 Tank Farm MO-0119A-1A-12" 2/2 FW-36 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9392 Tank Farm MO-0119A-1A-12" 2/2 FW-37 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9393 Tank Farm MO-0119A-1A-12" 2/2 FW-38 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9394 Tank Farm MO-0119A-1A-12" 2/2 FW-39 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9395 Tank Farm MO-0119A-1A-12" 2/2 FW-40 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9396 Tank Farm MO-0119A-1A-12" 2/2 FW-41 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9397 Tank Farm MO-0119A-1A-12" 2/2 FW-42 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9398 Tank Farm MO-0119A-1A-12" 2/2 FW-43 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9399 Tank Farm MO-0119A-1A-12" 2/2 FW-44 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9400 Tank Farm MO-0119A-1A-12" 2/2 FW-45 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9401 Tank Farm MO-0119A-1A-12" 2/2 FW-46 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9402 Tank Farm MO-0119A-1A-12" 2/2 FW-47 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9403 Tank Farm MO-0119A-1A-12" 2/2 FW-48 SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Reducer

9404 Tank Farm MO-0119A-1A-12" 2/2 FW-49 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Reducer

9405 Tank Farm MO-0119A-1A-12" 2/2 FW-49A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

9406 Tank Farm MO-0120a-1A-8" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

9407 Tank Farm MO-0120a-1A-8" 1/1 FW-16 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9408 Tank Farm MO-0120a-1A-8" 1/1 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

9409 Tank Farm MO-0120a-1A-8" 1/1 FW-18 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9410 Tank Farm MO-0120a-1A-8" 1/1 FW-19 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9411 Tank Farm MO-0120a-1A-8" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9412 Tank Farm MO-0120a-1A-8" 1/1 FW-21 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9413 Tank Farm MO-0120a-1A-8" 1/1 FW-22 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9414 Tank Farm MO-0120a-1A-8" 1/1 FW-22A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9415 Tank Farm MO-0121a-1A-10" 1/1 FW-15 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

9416 Tank Farm MO-0121a-1A-10" 1/1 FW-16 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9417 Tank Farm MO-0121a-1A-10" 1/1 FW-17 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

9418 Tank Farm MO-0121a-1A-10" 1/1 FW-18 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9419 Tank Farm MO-0121a-1A-10" 1/1 FW-19 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9420 Tank Farm MO-0121a-1A-10" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9421 Tank Farm MO-0121a-1A-10" 1/1 FW-21 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9422 Tank Farm MO-0121a-1A-10" 1/1 FW-22 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9423 Tank Farm MO-0121a-1A-10" 1/1 FW-22A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9424 Tank Farm JF-0041a-1A-8" 1/1 FW-21 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9425 Tank Farm JF-0041a-1A-8" 1/1 FW-22 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee

9426 Tank Farm JF-0041a-1A-8" 1/1 FW-23 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Tee

9427 Tank Farm JF-0041a-1A-8" 1/1 FW-24 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9428 Tank Farm JF-0041a-1A-8" 1/1 FW-25 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9429 Tank Farm MO-0120-1A-8" 1/2 FW-19A BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

9430 Tank Farm MO-0120-1A-8" 1/2 FW-19B SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

9431 Tank Farm MO-0120-1A-8" 1/2 FW-19C SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

9432 Tank Farm MO-0120-1A-8" 1/2 FW-20A BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

9433 Tank Farm MO-0120-1A-8" 1/2 FW-20B SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

9434 Tank Farm MO-0120-1A-8" 1/2 FW-20C SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

9435 Tank Farm JF-0041a-1A-8" 1/1 FW-26 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9436 Tank Farm JF-0041a-1A-8" 1/1 FW-27 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9437 Tank Farm JF-0041a-1A-8" 1/1 FW-28 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9438 Tank Farm JF-0041a-1A-8" 1/1 FW-29 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9439 Tank Farm JF-0041a-1A-8" 1/1 FW-30 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9440 Tank Farm JF-0041a-1A-8" 1/1 FW-31 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9441 Tank Farm JF-0041a-1A-8" 1/1 FW-32 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9442 Tank Farm JF-0041a-1A-8" 1/1 FW-33 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9443 Tank Farm JF-0041a-1A-8" 1/1 FW-34 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9444 Tank Farm JF-0041a-1A-8" 1/1 FW-35 SW WPS-2016-21 GTAW 1" SCH80 A106/A234 Pipe/Reducer

9445 Tank Farm JF-0041a-1A-8" 1/1 FW-36 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Reducer

9446 Tank Farm JF-0041a-1A-8" 1/1 FW-36A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9447 Tank Farm OW-1003-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

9448 Tank Farm OW-1003-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

9449 Tank Farm OW-1003-1A-4" 1/1 FW-1B BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9450 Tank Farm OW-1004-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

9451 Tank Farm OW-1004-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9452 Tank Farm OW-1004-1A-4" 1/1 FW-1B BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9453 Tank Farm OW-1004-1A-4" 1/1 FW-1C BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9454 Tank Farm OW-1004-1A-4" 1/1 FW-1D BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9455 Tank Farm OW-1004-1A-4" 1/1 FW-1E BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9456 Tank Farm OW-1005-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

9457 Tank Farm OW-1005-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9458 Tank Farm OW-1005-1A-4" 1/1 FW-1B BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9459 Tank Farm OW-1006-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9460 Tank Farm OW-1006-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9461 Tank Farm OW-1006-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9462 Tank Farm OW-1006-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

9463 Tank Farm OW-1006-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

9464 Tank Farm OW-1006-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9465 Tank Farm OW-1006-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A234 90Elbow/Reducer

9466 Tank Farm OW-1007-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A234 90Elbow/Reducer

9467 Tank Farm OW-1007-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9468 Tank Farm OW-1007-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9469 Tank Farm OW-1007-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

9470 Tank Farm OW-1007-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9471 Tank Farm OW-1007-1A-4" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9472 Tank Farm OW-1007-1A-4" 1/1 FW-6A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9473 Tank Farm OW-1008-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

9474 Tank Farm OW-1008-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9475 Tank Farm OW-1009-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

9476 Tank Farm OW-1009-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9477 Tank Farm OW-1010-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

9478 Tank Farm OW-1010-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9479 Tank Farm DO-0021-1A-14" 2/2 FW-31A BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9480 Tank Farm DO-0021-1A-14" 2/2 FW-31B SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

9481 Tank Farm DO-0021-1A-14" 2/2 FW-31C SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9482 Tank Farm DO-0021-1A-14" 2/2 FW-31D SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9483 Tank Farm OW-0011-1S1-3" 2/3 FW-37 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9484 Tank Farm OW-0011-1S1-3" 2/3 FW-36 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9485 Tank Farm OW-0011-1S1-3" 2/3 FW-35 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9486 Tank Farm OW-0011-1S1-3" 2/3 FW-34 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9487 Tank Farm OW-0011-1S1-3" 2/3 FW-33 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9488 Tank Farm OW-0011-1S1-3" 2/3 FW-32 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9489 Tank Farm OW-0011-1S1-3" 2/3 FW-31 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9490 Tank Farm OW-0011-1S1-3" 2/3 FW-30 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9491 Tank Farm OW-0011-1S1-3" 2/3 FW-29 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9492 Tank Farm OW-0011-1S1-3" 2/3 FW-28 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet

9493 Tank Farm OW-0011-1S1-3" 2/3 FW-27 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet

9494 Tank Farm OW-0011-1S1-3" 2/3 FW-26 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9495 Tank Farm OW-0011-1S1-3" 1/3 FW-25 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9496 Tank Farm OW-0011-1S1-3" 1/3 FW-24 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9497 Tank Farm OW-0011-1S1-3" 1/3 FW-23 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9498 Tank Farm OW-0011-1S1-3" 1/3 FW-22 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9499 Tank Farm OW-0011-1S1-3" 1/3 FW-21 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9500 Tank Farm OW-0011-1S1-3" 1/3 FW-20 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/90Elbow

9501 Tank Farm OW-0011-1S1-3" 1/3 FW-19 BW WPS-2016-27 GTAW 3" SCH10S A182/A182 90Elbow/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9502 Tank Farm OW-0011-1S1-3" 1/3 FW-18 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/90Elbow

9503 Tank Farm OW-0011-1S1-3" 1/3 FW-17 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9504 Tank Farm OW-0011-1S1-3" 1/3 FW-16 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9505 Tank Farm OW-0011-1S1-3" 1/3 FW-15 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet

9506 Tank Farm OW-0011-1S1-3" 1/3 FW-14 BRW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet

9507 Tank Farm OW-0011-1S1-3" 1/3 FW-13 BRW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet

9508 Tank Farm OW-0011-1S1-3" 1/3 FW-12 BRW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet

9509 Tank Farm OW-0011-1S1-3" 1/3 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9510 Tank Farm OW-0011-1S1-3" 1/3 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9511 Tank Farm OW-0011-1S1-3" 1/3 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9512 Tank Farm OW-0011-1S1-3" 1/3 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9513 Tank Farm OW-0011-1S1-3" 1/3 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9514 Tank Farm OW-0011-1S1-3" 1/3 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9515 Tank Farm OW-0011-1S1-3" 1/3 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9516 Tank Farm OW-0011-1S1-3" 1/3 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9517 Tank Farm OW-0011-1S1-3" 1/3 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9518 Tank Farm OW-0011-1S1-3" 1/3 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9519 Tank Farm OW-0011-1S1-3" 1/3 FW-01 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9520 Tank Farm OW-0013-1S1-3" 2/3 FW-41 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

9521 Tank Farm OW-0013-1S1-3" 2/3 FW-40 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

9522 Tank Farm OW-0013-1S1-3" 2/3 FW-39 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9523 Tank Farm OW-0013-1S1-3" 2/3 FW-38 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9524 Tank Farm OW-0013-1S1-3" 2/3 FW-37 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9525 Tank Farm OW-0013-1S1-3" 2/3 FW-36 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9526 Tank Farm OW-0013-1S1-3" 2/3 FW-35 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9527 Tank Farm OW-0013-1S1-3" 2/3 FW-34 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9528 Tank Farm OW-0013-1S1-3" 2/3 FW-33 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9529 Tank Farm OW-0013-1S1-3" 2/3 FW-32 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9530 Tank Farm OW-0013-1S1-3" 2/3 FW-31 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9531 Tank Farm OW-0013-1S1-3" 2/3 FW-30 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9532 Tank Farm OW-0013-1S1-3" 2/3 FW-29 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9533 Tank Farm OW-0013-1S1-3" 2/3 FW-28 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet

9534 Tank Farm OW-0013-1S1-3" 2/3 FW-27 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9535 Tank Farm OW-0013-1S1-3" 2/3 FW-26 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9536 Tank Farm OW-0013-1S1-3" 1/3 FW-25 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9537 Tank Farm OW-0013-1S1-3" 1/3 FW-24 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9538 Tank Farm OW-0013-1S1-3" 1/3 FW-23 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9539 Tank Farm OW-0013-1S1-3" 1/3 FW-22 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9540 Tank Farm OW-0013-1S1-3" 1/3 FW-21 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9541 Tank Farm OW-0013-1S1-3" 1/3 FW-20 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/90Elbow

9542 Tank Farm OW-0013-1S1-3" 1/3 FW-19 BW WPS-2016-27 GTAW 3" SCH10S A182/A182 90Elbow/90Elbow

9543 Tank Farm OW-0013-1S1-3" 1/3 FW-18 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/90Elbow

9544 Tank Farm OW-0013-1S1-3" 1/3 FW-17 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9545 Tank Farm OW-0013-1S1-3" 1/3 FW-16 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9546 Tank Farm OW-0013-1S1-3" 1/3 FW-15 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet

9547 Tank Farm OW-0013-1S1-3" 1/3 FW-14 BRW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet

9548 Tank Farm OW-0013-1S1-3" 1/3 FW-13 BRW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet

9549 Tank Farm OW-0013-1S1-3" 1/3 FW-12 BRW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/scokolet

9550 Tank Farm OW-0013-1S1-3" 1/3 FW-11 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9551 Tank Farm OW-0013-1S1-3" 1/3 FW-10 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9552 Tank Farm OW-0013-1S1-3" 1/3 FW-09 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9553 Tank Farm OW-0013-1S1-3" 1/3 FW-08 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9554 Tank Farm OW-0013-1S1-3" 1/3 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9555 Tank Farm OW-0013-1S1-3" 1/3 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9556 Tank Farm OW-0013-1S1-3" 1/3 FW-05 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9557 Tank Farm OW-0013-1S1-3" 1/3 FW-04 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9558 Tank Farm OW-0013-1S1-3" 1/3 FW-03 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9559 Tank Farm OW-0013-1S1-3" 1/3 FW-02 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9560 Tank Farm OW-0013-1S1-3" 1/3 FW-01 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9561 Tank Farm OW-0013-1S1-3" 3/3 FW-42 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

9562 Tank Farm OW-0013-1S1-3" 3/3 FW-43 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Flange

9563 Tank Farm OW-0013-1S1-3" 3/3 FW-44 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Tee

9564 Tank Farm OW-0013-1S1-3" 3/3 FW-45 BW WPS-2016-27 GTAW 3" SCH10S A312/A182 Pipe/Reducer

9565 Tank Farm OW-0013-1S1-3" 3/3 FW-46 BW WPS-2016-27 GTAW 2" SCH10S A182/A403 Tee/Reducer

9566 Tank Farm OW-0013-1S1-3" 3/3 FW-47 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9567 Tank Farm OW-0013-1S1-3" 3/3 FW-48 SOW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9568 Tank Farm OW-0013-1S1-3" 3/3 FW-49 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9569 Tank Farm OW-0013-1S1-3" 3/3 FW-50 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9570 Tank Farm OW-0013-1S1-3" 3/3 FW-51 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9571 Tank Farm OW-0013-1S1-3" 3/3 FW-52 SOW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9572 Tank Farm OW-0013-1S1-3" 3/3 FW-53 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9573 Tank Farm OW-0013-1S1-3" 3/3 FW-54 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9574 Tank Farm OW-0013-1S1-3" 3/3 FW-55 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9575 Tank Farm OW-0013-1S1-3" 3/3 FW-56 SOW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Flange

9576 Tank Farm SA-0001-1B-2" 3/4 FW-59 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

9577 Tank Farm SA-0001-1B-2" 3/4 FW-60 BW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

9578 Tank Farm SA-0001-1B-2" 4/4 FW-61 BW WPS-2016-21 GTAW 2" SCH40 A234/A105 Tee/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9579 Tank Farm SA-0001-1B-2" 4/4 FW-62 BW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/90Elbow

9580 Tank Farm SA-0001-1B-2" 4/4 FW-63 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

9581 Tank Farm SA-0001-1B-2" 4/4 FW-64 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

9582 Tank Farm SA-0001-1B-2" 4/4 FW-65 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

9583 Tank Farm SA-0001-1B-2" 4/4 FW-66 BRW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/scokolet

9584 Tank Farm SA-0001-1B-2" 4/4 FW-67 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/scokolet

9585 Tank Farm SA-0001-1B-2" 4/4 FW-68 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9586 Tank Farm SA-0001-1B-2" 4/4 FW-69 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9587 Tank Farm SA-0001-1B-2" 4/4 FW-70 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

9588 Tank Farm SA-0001-1B-2" 4/4 FW-71 BW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

9589 Tank Farm SA-0001-1B-2" 4/4 FW-72 BW WPS-2016-21 GTAW 2" SCH40 A234/A105 Reducer/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9590 Tank Farm SA-0001-1B-2" 4/4 FW-73 BW WPS-2016-23 GTAW 3" SCH40 A53/A234 Pipe/Reducer

9591 Tank Farm SA-0001-1B-2" 4/4 FW-74 BW WPS-2016-23 GTAW 3" SCH40 A53/A234 Pipe/90Elbow

9592 Tank Farm SA-0001-1B-2" 4/4 FW-75 BW WPS-2016-23 GTAW 3" SCH40 A53/A234 Pipe/90Elbow

9593 Tank Farm SA-0001-1B-2" 4/4 FW-76 BW WPS-2016-23 GTAW 3" SCH40 A53/A234 Pipe/90Elbow

9594 Tank Farm SA-0001-1B-2" 4/4 FW-77 BW WPS-2016-23 GTAW 3" SCH40 A53/A234 Pipe/90Elbow

9595 Tank Farm SA-0001-1B-2" 4/4 FW-78 BW WPS-2016-23 GTAW 3" SCH40 A53/A105 Pipe/Flange

9596 Tank Farm SA-0014-1B-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9597 Tank Farm SA-0014-1B-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9598 Tank Farm SA-0014-1B-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9599 Tank Farm SA-0014-1B-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9600 Tank Farm SA-0014-1B-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9601 Tank Farm SA-0014-1B-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9602 Tank Farm SA-0014-1B-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9603 Tank Farm SA-0014-1B-1" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9604 Tank Farm SA-0014-1B-1" 1/1 FW-09 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9605 Tank Farm SA-0014-1B-1" 1/1 FW-10 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9606 Tank Farm SA-0014-1B-1" 1/1 FW-10A SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

9607 Tank Farm SA-0014-1B-1" 1/1 FW-10B SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

9608 Tank Farm SA-0014-1B-1" 1/1 FW-11 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9609 Tank Farm SA-0014-1B-1" 1/1 FW-12 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/90Elbow

9610 Tank Farm SA-0014-1B-1" 1/1 FW-13 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9611 Tank Farm SA-0014-1B-1" 1/1 FW-14 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9612 Tank Farm SA-0014-1B-1" 1/1 FW-15 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9613 Tank Farm SA-0014-1B-1" 1/1 FW-16 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9614 Tank Farm SA-0014-1B-1" 1/1 FW-17 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

9615 Tank Farm SA-0014-1B-1" 1/1 FW-18 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Gate

9616 Tank Farm SA-0014-1B-1" 1/1 FW-19 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9617 Tank Farm SA-0014-1B-1" 1/1 FW-20 SW WPS-2016-21 GTAW 1" SCH80 A53/A105 Pipe/Tee

9618 Tank Farm SA-0014-1B-1" 1/1 FW-21 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Tee

9619 Tank Farm SA-0014-1B-1" 1/1 FW-22 SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9620 Tank Farm SA-0014-1B-1" 1/1 FW-22A SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9621 Tank Farm SA-0001-1B-2" 3/4 FW-38A BRW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/scokolet

9622 Tank Farm SA-0001-1B-2" 3/4 FW-38B SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9623 Tank Farm SA-0001-1B-2" 3/4 FW-38C SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9624 Tank Farm SA-0001-1B-2" 3/4 FW-38D SW WPS-2016-21 GTAW 1/2" SCH80 A53/A105 Pipe/Gate

9625 Tank Farm SA-0016-1B-3/4" 1/1 FW-01 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Flange

9626 Tank Farm SA-0016-1B-3/4" 1/1 FW-02 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/90Elbow

9627 Tank Farm SA-0016-1B-3/4" 1/1 FW-03 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/90Elbow

9628 Tank Farm SA-0016-1B-3/4" 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/90Elbow

9629 Tank Farm SA-0016-1B-3/4" 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/90Elbow

9630 Tank Farm SA-0016-1B-3/4" 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/90Elbow

9631 Tank Farm SA-0016-1B-3/4" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/90Elbow

9632 Tank Farm SA-0016-1B-3/4" 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate

9633 Tank Farm SA-0016-1B-3/4" 1/1 FW-09 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9634 Tank Farm SA-0016-1B-3/4" 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Flange

9635 Tank Farm SA-0016-1B-3/4" 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/Flange

9636 Tank Farm SA-0016-1B-3/4" 1/1 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/90Elbow

9637 Tank Farm SA-0016-1B-3/4" 1/1 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A53/A105 Pipe/90Elbow

9638 Tank Farm OW-5301-1A-4" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A106 Pipe/Pipe

9639 Tank Farm OW-5301-1A-4" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9640 Tank Farm OW-5301-1A-4" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9641 Tank Farm OW-5301-1A-4" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9642 Tank Farm OW-5301-1A-4" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9643 Tank Farm OW-5301-1A-4" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9644 Tank Farm OW-5301-1A-4" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9645 Tank Farm OW-5301-1A-4" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9646 Tank Farm OW-5301-1A-4" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9647 Tank Farm OW-5301-1A-4" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

9648 Tank Farm OW-5301-1A-4" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9649 Tank Farm OW-5301-1A-4" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9650 Tank Farm OW-5301-1A-4" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9651 Tank Farm OW-5301-1A-4" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9652 Tank Farm OW-5301-1A-4" 1/1 FW-14 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

9653 Tank Farm OW-5301-1A-4" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9654 Tank Farm OW-5301-1A-4" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9655 Tank Farm OW-5301-1A-4" 1/1 FW-17 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9656 Tank Farm OW-5301-1A-4" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9657 Tank Farm OW-5301-1A-4" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9658 Tank Farm OW-5301-1A-4" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9659 Tank Farm OW-5301-1A-4" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9660 Tank Farm OW-5301-1A-4" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9661 Tank Farm OW-5301-1A-4" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9662 Tank Farm OW-5301-1A-4" 1/1 FW-24 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

9663 Tank Farm OW-5301-1A-4" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9664 Tank Farm OW-5301-1A-4" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9665 Tank Farm OW-5301-1A-4" 1/1 FW-27 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

9666 Tank Farm OW-5301-1A-4" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9667 Tank Farm OW-5301-1A-4" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9668 Tank Farm OW-5301-1A-4" 1/1 FW-30 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

9669 Tank Farm OW-5301-1A-4" 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9670 Tank Farm OW-5301-1A-4" 1/1 FW-32 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9671 Tank Farm OW-5301-1A-4" 1/1 FW-33 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

9672 Tank Farm OW-5301-1A-4" 1/1 FW-34 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9673 Tank Farm OW-5301-1A-4" 1/1 FW-35 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9674 Tank Farm OW-5301-1A-4" 1/1 FW-36 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

9675 Tank Farm OW-5301-1A-4" 1/1 FW-37 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

9676 Tank Farm OW-5301-1A-4" 1/1 FW-38 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

9677 Tank Farm SA-0002-1B-2" 1/1 FW-33A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9678 Tank Farm SA-0003-1B-2" 1/1 FW-33 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Reducer

9679 Tank Farm SA-0003-1B-2" 1/1 FW-33A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Reducer

9680 Tank Farm SA-0004-1B-2" 1/1 FW-33 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Reducer

9681 Tank Farm SA-0004-1B-2" 1/1 FW-33A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Reducer

9682 Tank Farm SA-0005-1B-2" 1/1 FW-33 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Reducer

9683 Tank Farm SA-0005-1B-2" 1/1 FW-33A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Reducer

9684 Tank Farm SA-0007-1B-2" 1/1 FW-33 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Reducer

9685 Tank Farm SA-0007-1B-2" 1/1 FW-33A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Reducer

9686 Tank Farm MO-0113-1A-1" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Reducer

9687 Tank Farm MO-0113-1A-1" 1/1 FW-1A BW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Reducer

9688 Tank Farm MO-0113-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9689 Tank Farm MO-0113-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9690 Tank Farm MO-0113-1A-1" 1/1 FW-3A BW WPS-2016-21 GTAW 1" SCH80 A106/A106 Pipe/Pipe

9691 Tank Farm MO-0113-1A-1" 1/1 FW-3B BW WPS-2016-21 GTAW 1" SCH80 A106/A106 Pipe/Pipe

9692 Tank Farm MO-0113-1A-1" 1/1 FW-3C SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9693 Tank Farm MO-0113-1A-1" 1/1 FW-3D SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9694 Tank Farm MO-0113-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9695 Tank Farm MO-0113-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9696 Tank Farm MO-0115-1A-1" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Reducer

9697 Tank Farm MO-0115-1A-1" 1/1 FW-1A BW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Reducer

9698 Tank Farm MO-0115-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9699 Tank Farm MO-0115-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9700 Tank Farm MO-0115-1A-1" 1/1 FW-3A BW WPS-2016-21 GTAW 1" SCH80 A106/A106 Pipe/Pipe

9701 Tank Farm MO-0115-1A-1" 1/1 FW-3B BW WPS-2016-21 GTAW 1" SCH80 A106/A106 Pipe/Pipe

9702 Tank Farm MO-0115-1A-1" 1/1 FW-3C SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9703 Tank Farm MO-0115-1A-1" 1/1 FW-3D SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9704 Tank Farm MO-0115-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9705 Tank Farm MO-0115-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9706 Tank Farm MO-0115-1A-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9707 Tank Farm MO-0115-1A-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9708 Tank Farm MO-0118-1A-1" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Reducer

9709 Tank Farm MO-0118-1A-1" 1/1 FW-1A BW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Reducer

9710 Tank Farm MO-0118-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9711 Tank Farm MO-0118-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9712 Tank Farm MO-0118-1A-1" 1/1 FW-3A BW WPS-2016-21 GTAW 1" SCH80 A106/A106 Pipe/Pipe

9713 Tank Farm MO-0118-1A-1" 1/1 FW-3B BW WPS-2016-21 GTAW 1" SCH80 A106/A106 Pipe/Pipe

9714 Tank Farm MO-0118-1A-1" 1/1 FW-3C SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9715 Tank Farm MO-0118-1A-1" 1/1 FW-3D SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9716 Tank Farm MO-0118-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9717 Tank Farm MO-0118-1A-1" 1/1 FW-4A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9718 Tank Farm MO-0118-1A-1" 1/1 FW-4B SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9719 Tank Farm MO-0118-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9720 Tank Farm DO-0053-1A-1" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Reducer

9721 Tank Farm DO-0053-1A-1" 1/1 FW-1A BW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9722 Tank Farm DO-0053-1A-1" 1/1 FW-02 BW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9723 Tank Farm DO-0053-1A-1" 1/1 FW-03 BW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9724 Tank Farm DO-0053-1A-1" 1/1 FW-3A BW WPS-2016-21 GTAW 1" SCH80 A106/A106 Pipe/Pipe

9725 Tank Farm DO-0053-1A-1" 1/1 FW-3B BW WPS-2016-21 GTAW 1" SCH80 A106/A106 Pipe/Pipe

9726 Tank Farm DO-0053-1A-1" 1/1 FW-3C BW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9727 Tank Farm DO-0053-1A-1" 1/1 FW-3D BW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9728 Tank Farm SA-0001a-1B-2" 1/2 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/90Elbow

9729 Tank Farm DO-0053-1A-1" 1/1 FW-04 BW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9730 Tank Farm DO-0053-1A-1" 1/1 FW-05 BW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9731 Tank Farm AD-0002-1S1-2" 2/2 FW-32 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9732 Tank Farm AD-0002-1S1-2" 2/2 FW-33 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9733 Tank Farm AD-0002-1S1-2" 2/2 FW-34 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9734 Tank Farm AD-0002-1S1-2" 2/2 FW-35 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9735 Tank Farm AD-0002-1S1-2" 2/2 FW-36 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9736 Tank Farm AD-0002-1S1-2" 2/2 FW-37 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9737 Tank Farm AD-0002-1S1-2" 2/2 FW-38 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9738 Tank Farm AD-0002-1S1-2" 2/2 FW-39 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9739 Tank Farm AD-0002-1S1-2" 2/2 FW-40 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9740 Tank Farm AD-0002-1S1-2" 1/2 FW-11E SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9741 Tank Farm AD-0002-1S1-2" 1/2 FW-11F SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9742 Tank Farm AD-0002-1S1-2" 2/2 FW-44A SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9743 Tank Farm AD-0002-1S1-2" 2/2 FW-44 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9744 Tank Farm AD-0002-1S1-2" 2/2 FW-45 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9745 Tank Farm AD-0002-1S1-2" 2/2 FW-46 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9746 Tank Farm AD-0002-1S1-2" 2/2 FW-47 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9747 Tank Farm AD-0002-1S1-2" 2/2 FW-48 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9748 Tank Farm AD-0002-1S1-2" 2/2 FW-49 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9749 Tank Farm AD-0002-1S1-2" 2/2 FW-50 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9750 Tank Farm AD-0002-1S1-2" 2/2 FW-51 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9751 Tank Farm AD-0002-1S1-2" 2/2 FW-52 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9752 Tank Farm AD-0002-1S1-2" 2/2 FW-53 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9753 Tank Farm AD-0002-1S1-2" 2/2 FW-54 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9754 Tank Farm AD-0002-1S1-2" 2/2 FW-55 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9755 Tank Farm AD-0002-1S1-2" 2/2 FW-56 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9756 Tank Farm AD-0002-1S1-2" 2/2 FW-57 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9757 Tank Farm AD-0002-1S1-2" 2/2 FW-58 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9758 Tank Farm AD-0002-1S1-2" 2/2 FW-59 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9759 Tank Farm AD-0002-1S1-2" 2/2 FW-60 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9760 Tank Farm AD-0002-1S1-2" 2/2 FW-61 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9761 Tank Farm AD-0002-1S1-2" 2/2 FW-62 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9762 Tank Farm AD-0002-1S1-2" 2/2 FW-63 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9763 Tank Farm MO-0008-1A-2" 1/2 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9764 Tank Farm MO-0008-1A-2" 1/2 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9765 Tank Farm MO-0008-1A-2" 1/2 FW-2A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9766 Tank Farm MO-0008-1A-2" 2/2 FW-21 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9767 Tank Farm MO-0008-1A-2" 2/2 FW-22 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9768 Tank Farm MO-0008-1A-2" 2/2 FW-23 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9769 Tank Farm MO-0008-1A-2" 2/2 FW-24 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9770 Tank Farm MO-0008-1A-2" 2/2 FW-25 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

9771 Tank Farm MO-0008-1A-2" 2/2 FW-26 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

9772 Tank Farm MO-0008-1A-2" 2/2 FW-32B BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

9773 Tank Farm MO-0008-1A-2" 2/2 FW-36C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

9774 Tank Farm MO-0008-1A-2" 2/2 FW-32D BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

9775 Tank Farm DO-0004-1A-2" 1/2 FW-15 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9776 Tank Farm DO-0004-1A-2" 2/2 FW-20 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9777 Tank Farm DO-0004-1A-2" 2/2 FW-21 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9778 Tank Farm JF-0044-1A-2" 1/2 FW-1C BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

9779 Tank Farm JF-0004-1A-2" 1/1 FW-22 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9780 Tank Farm JF-0004-1A-2" 1/1 FW-23 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9781 Tank Farm JF-0004-1A-2" 1/1 FW-24 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9782 Tank Farm JF-0004-1A-2" 1/1 FW-25 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9783 Tank Farm JF-0004-1A-2" 1/1 FW-26 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9784 Tank Farm JF-0004-1A-2" 1/1 FW-27 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9785 Tank Farm JF-0004-1A-2" 1/1 FW-28 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9786 Tank Farm JF-0004-1A-2" 1/1 FW-28A BW WPS-2016-21 GTAW 2" SCH40 A106/A106 Pipe/Pipe

9787 Tank Farm JF-0004-1A-2" 1/1 FW-28B BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9788 Tank Farm JF-0004-1A-2" 1/1 FW-28C BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9789 Tank Farm JF-0004-1A-2" 1/1 FW-28D BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9790 Tank Farm JF-0004-1A-2" 1/1 FW-28E BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9791 Tank Farm JF-0004-1A-2" 1/1 FW-28F BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9792 Tank Farm JF-0004-1A-2" 1/1 FW-28G BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9793 Tank Farm JF-0004-1A-2" 1/1 FW-29 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

9794 Tank Farm AD-0001-1S1-2" 2/2 FW-26 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9795 Tank Farm AD-0001-1S1-2" 2/2 FW-27 BW WPS-2016-27 GTAW 2" SCH10S A182/A182 90Elbow/Reducer

9796 Tank Farm AD-0001-1S1-2" 2/2 FW-28 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

9797 Tank Farm AD-0001-1S1-2" 2/2 FW-29 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9798 Tank Farm AD-0001-1S1-2" 2/2 FW-30 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9799 Tank Farm AD-0001-1S1-2" 2/2 FW-31 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9800 Tank Farm AD-0001-1S1-2" 2/2 FW-32 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9801 Tank Farm AD-0001-1S1-2" 2/2 FW-33 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9802 Tank Farm AD-0001-1S1-2" 2/2 FW-34 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9803 Tank Farm AD-0001-1S1-2" 2/2 FW-35 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9804 Tank Farm AD-0001-1S1-2" 2/2 FW-36 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9805 Tank Farm AD-0001-1S1-2" 2/2 FW-37 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9806 Tank Farm AD-0001-1S1-2" 2/2 FW-38 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9807 Tank Farm AD-0001-1S1-2" 2/2 FW-39 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9808 Tank Farm AD-0001-1S1-2" 2/2 FW-40 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9809 Tank Farm AD-0001-1S1-2" 2/2 FW-41 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9810 Tank Farm AD-0001-1S1-2" 2/2 FW-42 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9811 Tank Farm AD-0001-1S1-2" 1/2 FW-11B BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

9812 Tank Farm AD-0001-1S1-2" 1/2 FW-11C BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

9813 Tank Farm AD-0001-1S1-2" 1/2 FW-11D BW WPS-2016-27 GTAW 2" SCH10S A312/A312 Pipe/Pipe

9814 Tank Farm AD-0001-1S1-2" 1/2 FW-11E BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9815 Tank Farm AD-0001-1S1-2" 2/2 FW-47 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9816 Tank Farm AD-0001-1S1-2" 2/2 FW-48 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9817 Tank Farm AD-0001-1S1-2" 2/2 FW-49 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9818 Tank Farm AD-0001-1S1-2" 1/2 FW-11F BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9819 Tank Farm AD-0001-1S1-2" 2/2 FW-51 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9820 Tank Farm AD-0001-1S1-2" 2/2 FW-52 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9821 Tank Farm AD-0001-1S1-2" 2/2 FW-53 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9822 Tank Farm AD-0001-1S1-2" 2/2 FW-54 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9823 Tank Farm AD-0001-1S1-2" 2/2 FW-55 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9824 Tank Farm AD-0001-1S1-2" 2/2 FW-56 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9825 Tank Farm AD-0001-1S1-2" 2/2 FW-57 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9826 Tank Farm MO-0120-1A-8" 1/2 FW-19D SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/90Elbow

9827 Tank Farm MO-0120-1A-8" 1/2 FW-19E SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

9828 Tank Farm MO-0120-1A-8" 1/2 FW-20D SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/Gate

9829 Tank Farm AD-0001-1S1-2" 2/2 FW-58 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9830 Tank Farm AD-0001-1S1-2" 2/2 FW-59 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9831 Tank Farm AD-0001-1S1-2" 2/2 FW-60 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9832 Tank Farm AD-0001-1S1-2" 2/2 FW-61 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9833 Tank Farm AD-0001-1S1-2" 2/2 FW-62 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9834 Tank Farm AD-0001-1S1-2" 2/2 FW-63 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9835 Tank Farm AD-0001-1S1-2" 2/2 FW-64 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9836 Tank Farm AD-0001-1S1-2" 2/2 FW-65 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9837 Tank Farm MO-0035-1A-2" 1/1 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

9838 Tank Farm MO-0035-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

9839 Tank Farm MO-0035-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

9840 Tank Farm MO-0035-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/45Elbow

9841 Tank Farm MO-0035-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/45Elbow

9842 Tank Farm MO-0035-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9843 Tank Farm DO-0007-1A-2" 1/1 FW-1A BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/Tee

9844 Tank Farm DO-0007-1A-2" 1/1 FW-01 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9845 Tank Farm DO-0007-1A-2" 1/1 FW-02 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9846 Tank Farm DO-0007-1A-2" 1/1 FW-03 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9847 Tank Farm DO-0007-1A-2" 1/1 FW-04 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9848 Tank Farm DO-0007-1A-2" 1/1 FW-05 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9849 Tank Farm DO-0007-1A-2" 1/1 FW-06 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/90Elbow

9850 Tank Farm DO-0007-1A-2" 1/1 FW-07 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

9851 Tank Farm DO-0007-1A-2" 1/1 FW-08 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

9852 Tank Farm DO-0007-1A-2" 1/1 FW-09 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/45Elbow

9853 Tank Farm DO-0007-1A-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A106/A234 Pipe/45Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9854 Tank Farm DO-0007-1A-2" 1/1 FW-11 BW WPS-2016-21 GTAW 2" SCH40 A106/A105 Pipe/Flange

9855 Tank Farm MO-0126A-1A-3" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

9856 Tank Farm MO-0126A-1A-3" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

9857 Tank Farm MO-0126A-1A-3" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

9858 Tank Farm MO-0126A-1A-3" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

9859 Tank Farm MO-0126A-1A-3" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

9860 Tank Farm MO-0126A-1A-3" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

9861 Tank Farm MO-0126A-1A-3" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

9862 Tank Farm MO-0126A-1A-3" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

9863 Tank Farm MO-0126A-1A-3" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

9864 Tank Farm MO-0126A-1A-3" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9865 Tank Farm MO-0126A-1A-3" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

9866 Tank Farm MO-0127-1A-4" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9867 Tank Farm MO-0127-1A-4" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9868 Tank Farm MO-0127-1A-4" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9869 Tank Farm MO-0127-1A-4" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9870 Tank Farm MO-0127-1A-4" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9871 Tank Farm MO-0127-1A-4" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9872 Tank Farm MO-0127-1A-4" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9873 Tank Farm MO-0127-1A-4" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

9874 Tank Farm AD-0003A-1S1-2" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A182/A182 90Elbow/Flange

9875 Tank Farm AD-0003A-1S1-2" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9876 Tank Farm AD-0003A-1S1-2" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9877 Tank Farm AD-0003A-1S1-2" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9878 Tank Farm AD-0003A-1S1-2" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9879 Tank Farm AD-0003A-1S1-2" 1/1 FW-06 BW WPS-2016-27 GTAW 1" SCH40S A182/A182 Reducer/90Elbow

9880 Tank Farm AD-0003A-1S1-2" 1/1 FW-07 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9881 Tank Farm AD-0003A-1S1-2" 1/1 FW-08 BW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/Pipe

9882 Tank Farm AD-0003-1S1-2" 2/2 FW-19 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9883 Tank Farm AD-0003-1S1-2" 2/2 FW-20 BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

9884 Tank Farm AD-0003-1S1-2" 2/2 FW-21 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9885 Tank Farm AD-0003-1S1-2" 2/2 FW-22 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9886 Tank Farm AD-0003-1S1-2" 2/2 FW-23 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9887 Tank Farm AD-0003-1S1-2" 2/2 FW-24 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9888 Tank Farm AD-0003-1S1-2" 2/2 FW-25 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9889 Tank Farm AD-0003-1S1-2" 2/2 FW-26 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9890 Tank Farm AD-0003-1S1-2" 2/2 FW-27 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9891 Tank Farm AD-0003-1S1-2" 2/2 FW-28 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9892 Tank Farm AD-0003-1S1-2" 2/2 FW-29 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9893 Tank Farm AD-0003-1S1-2" 2/2 FW-30 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9894 Tank Farm AD-0003-1S1-2" 2/2 FW-31 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9895 Tank Farm AD-0003-1S1-2" 2/2 FW-32 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9896 Tank Farm AD-0003-1S1-2" 2/2 FW-33 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9897 Tank Farm AD-0003-1S1-2" 2/2 FW-34 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9898 Tank Farm AD-0003-1S1-2" 2/2 FW-33A SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9899 Tank Farm AD-0003-1S1-2" 2/2 FW-35 SW WPS-2016-27 GTAW 1/2" SCH40S A312/A182 Pipe/Reducer

9900 Tank Farm AD-0003-1S1-2" 2/2 FW-41A SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

9901 Tank Farm AD-0003-1S1-2" 2/2 FW-41B SW WPS-2016-27 GTAW 1/2" SCH40S A312/A182 Pipe/Reducer

9902 Tank Farm AD-0003-1S1-2" 2/2 FW-42A SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

9903 Tank Farm AD-0003-1S1-2" 2/2 FW-42B SW WPS-2016-27 GTAW 1/2" SCH40S A312/A182 Pipe/Reducer

9904 Tank Farm AD-0003-1S1-2" 2/2 FW-44 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Reducer

9905 Tank Farm AD-0003-1S1-2" 2/2 FW-45 SW WPS-2016-27 GTAW 1/2" SCH40S A312/A182 Pipe/Reducer

9906 Tank Farm AD-0003-1S1-2" 2/2 FW-46 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9907 Tank Farm AD-0003-1S1-2" 2/2 FW-47 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9908 Tank Farm AD-0003-1S1-2" 2/2 FW-48 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9909 Tank Farm AD-0003-1S1-2" 2/2 FW-49 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9910 Tank Farm AD-0003-1S1-2" 2/2 FW-50 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9911 Tank Farm AD-0003-1S1-2" 2/2 FW-51 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9912 Tank Farm AD-0003-1S1-2" 2/2 FW-52 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9913 Tank Farm AD-0003-1S1-2" 2/2 FW-53 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9914 Tank Farm AD-0003-1S1-2" 2/2 FW-54 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9915 Tank Farm AD-0003-1S1-2" 2/2 FW-55 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9916 Tank Farm AD-0003-1S1-2" 2/2 FW-56 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9917 Tank Farm AD-0003-1S1-2" 2/2 FW-57 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9918 Tank Farm AD-0003-1S1-2" 2/2 FW-58 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9919 Tank Farm AD-0003-1S1-2" 2/2 FW-59 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9920 Tank Farm AD-0003-1S1-2" 2/2 FW-60 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9921 Tank Farm AD-0001A-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A182/A182 90Elbow/Flange

9922 Tank Farm AD-0001A-1S1-1" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9923 Tank Farm AD-0001A-1S1-1" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9924 Tank Farm AD-0001A-1S1-1" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9925 Tank Farm AD-0001A-1S1-1" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9926 Tank Farm AD-0001A-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A182/A182 Reducer/90Elbow

9927 Tank Farm AD-0001A-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9928 Tank Farm AD-0001A-1S1-1" 1/1 FW-08 BW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/Pipe

9929 Tank Farm AD-0002A-1S1-1" 1/1 FW-01 BW WPS-2016-27 GTAW 2" SCH10S A182/A182 90Elbow/Flange

9930 Tank Farm AD-0002A-1S1-1" 1/1 FW-02 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9931 Tank Farm AD-0002A-1S1-1" 1/1 FW-03 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9932 Tank Farm AD-0002A-1S1-1" 1/1 FW-04 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/90Elbow

9933 Tank Farm AD-0002A-1S1-1" 1/1 FW-05 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Reducer

9934 Tank Farm AD-0002A-1S1-1" 1/1 FW-06 SW WPS-2016-27 GTAW 1" SCH40S A182/A182 Reducer/90Elbow

9935 Tank Farm AD-0002A-1S1-1" 1/1 FW-07 SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/90Elbow

9936 Tank Farm AD-0002A-1S1-1" 1/1 FW-08 BW WPS-2016-27 GTAW 1" SCH40S A312/A312 Pipe/Pipe

9937 Tank Farm AD-0001-1S1-2" 1/2 FW-11G BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9938 Tank Farm AD-0001-1S1-2" 1/2 FW-11H SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9939 Tank Farm AD-0001-1S1-2" 1/2 FW-11I SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9940 Tank Farm AD-0001-1S1-2" 2/2 FW-46A SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Flange

9941 Tank Farm AD-0003-1S1-2" 1/2 FW-5C BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9942 Tank Farm AD-0003-1S1-2" 1/2 FW-5D BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9943 Tank Farm AD-0003-1S1-2" 1/2 FW-5E BW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Tee

9944 Tank Farm AD-0003-1S1-2" 1/2 FW-5F SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9945 Tank Farm AD-0003-1S1-2" 1/2 FW-5G SW WPS-2016-27 GTAW 1" SCH40S A312/A182 Pipe/Gate

9946 Tank Farm MO-0131-1A-3/4" 1/1 FW-1A SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

9947 Tank Farm MO-0131-1A-3/4" 1/1 FW-01 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9948 Tank Farm MO-0131-1A-3/4" 1/1 FW-02 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9949 Tank Farm MO-0131-1A-3/4" 1/1 FW-03 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9950 Tank Farm MO-0131-1A-3/4" 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9951 Tank Farm MO-0131-1A-3/4" 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9952 Tank Farm MO-0131-1A-3/4" 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9953 Tank Farm MO-0131-1A-3/4" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9954 Tank Farm MO-0131-1A-3/4" 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9955 Tank Farm MO-0131-1A-3/4" 1/1 FW-09 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9956 Tank Farm MO-0131-1A-3/4" 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9957 Tank Farm MO-0114-1A-1" 1/1 FW-1A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/scokolet

9958 Tank Farm MO-0114-1A-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

9959 Tank Farm MO-0114-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

9960 Tank Farm MO-0114-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9961 Tank Farm MO-0114-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9962 Tank Farm MO-0114-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9963 Tank Farm MO-0114-1A-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9964 Tank Farm MO-0132-1A-1" 1/1 FW-1A SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

9965 Tank Farm MO-0132-1A-1" 1/1 FW-01 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9966 Tank Farm MO-0132-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9967 Tank Farm MO-0132-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9968 Tank Farm MO-0132-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9969 Tank Farm MO-0132-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9970 Tank Farm MO-0132-1A-1" 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9971 Tank Farm AD-0003-1S1-2" 2/2 FW-41 SW WPS-2016-27 GTAW 1/2" SCH40S A312/A182 Pipe/Gate

9972 Tank Farm AD-0003-1S1-2" 2/2 FW-42 SW WPS-2016-27 GTAW 1/2" SCH40S A312/A182 Pipe/Gate

9973 Tank Farm AD-0001-1S1-2" 1/2 FW-06 BW WPS-2016-27 GTAW 2" SCH10S A312/A182 Pipe/Tee

9974 Tank Farm MO-0132-1A-1" 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9975 Tank Farm MO-0133-1A-1" 1/1 FW-1A SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

9976 Tank Farm MO-0133-1A-1" 1/1 FW-01 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9977 Tank Farm MO-0133-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

9978 Tank Farm MO-0133-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9979 Tank Farm MO-0133-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9980 Tank Farm MO-0133-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9981 Tank Farm MO-0133-1A-1" 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9982 Tank Farm MO-0133-1A-1" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9983 Tank Farm MO-0133-1A-1" 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9984 Tank Farm MO-0133-1A-1" 1/1 FW-09 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

9985 Tank Farm MO-0133-1A-1" 1/1 FW-10 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9986 Tank Farm MO-0097-1A-1" 1/1 FW-1A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

9987 Tank Farm MO-0097-1A-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9988 Tank Farm MO-0097-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9989 Tank Farm MO-0097-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9990 Tank Farm MO-0097-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9991 Tank Farm MO-0097-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9992 Tank Farm MO-0097-1A-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9993 Tank Farm MO-0097-1A-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9994 Tank Farm MO-0097-1A-1" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9995 Tank Farm MO-0105-1A-1" 1/1 FW-1A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

9996 Tank Farm MO-0105-1A-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
9997 Tank Farm MO-0105-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

9998 Tank Farm MO-0105-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

9999 Tank Farm MO-0105-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10000 Tank Farm MO-0105-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10001 Tank Farm MO-0105-1A-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10002 Tank Farm MO-0105-1A-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10003 Tank Farm MO-0105-1A-1" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10004 Tank Farm MO-0107-1A-1" 1/1 FW-1A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

10005 Tank Farm MO-0107-1A-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

10006 Tank Farm MO-0107-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

10007 Tank Farm MO-0107-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10008 Tank Farm MO-0107-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10009 Tank Farm MO-0107-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10010 Tank Farm MO-0107-1A-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10011 Tank Farm MO-0107-1A-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10012 Tank Farm MO-0107-1A-1" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10013 Tank Farm MO-0101-1A-1" 1/1 FW-1A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

10014 Tank Farm MO-0101-1A-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

10015 Tank Farm MO-0101-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

10016 Tank Farm MO-0101-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10017 Tank Farm MO-0101-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10018 Tank Farm MO-0101-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10019 Tank Farm MO-0101-1A-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10020 Tank Farm MO-0101-1A-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10021 Tank Farm MO-0101-1A-1" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10022 Tank Farm MO-0099-1A-1" 1/1 FW-1A SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Flange

10023 Tank Farm MO-0099-1A-1" 1/1 FW-01 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

10024 Tank Farm MO-0099-1A-1" 1/1 FW-02 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/Gate

10025 Tank Farm MO-0099-1A-1" 1/1 FW-03 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10026 Tank Farm MO-0099-1A-1" 1/1 FW-04 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10027 Tank Farm MO-0099-1A-1" 1/1 FW-05 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10028 Tank Farm MO-0099-1A-1" 1/1 FW-06 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10029 Tank Farm MO-0099-1A-1" 1/1 FW-07 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10030 Tank Farm MO-0099-1A-1" 1/1 FW-08 SW WPS-2016-21 GTAW 1" SCH80 A106/A105 Pipe/90Elbow

10031 Tank Farm MO-0132-1A-1" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

10032 Tank Farm MO-0132-1A-1" 1/1 FW-08 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

10033 Tank Farm MO-0122-1A-3" 1/1 FW-05 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

10034 Tank Farm MO-0122-1A-3" 1/1 FW-06 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

10035 Tank Farm MO-0122-1A-3" 1/1 FW-07 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

10036 Tank Farm MO-0122-1A-3" 1/1 FW-13A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10037 Tank Farm MO-0124-1A-3" 1/1 FW-11 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

10038 Tank Farm MO-0124-1A-3" 1/1 FW-12 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/90Elbow

10039 Tank Farm MO-0124-1A-3" 1/1 FW-13 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

10040 Tank Farm MO-0124-1A-3" 1/1 FW-14 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10041 Tank Farm MO-0127-1A-4" 1/1 FW-24 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

10042 Tank Farm MO-0127-1A-4" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

10043 Tank Farm MO-0127-1A-4" 1/1 FW-26 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/45Elbow

10044 Tank Farm MO-0127-1A-4" 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/45Elbow

10045 Tank Farm MO-0127-1A-4" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/45Elbow

10046 Tank Farm MO-0127-1A-4" 1/1 FW-28A BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Flange

10047 Tank Farm MO-0127-1A-4" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

10048 Tank Farm MO-0127-1A-4" 1/1 FW-30 SW WPS-2016-23 GTAW/SMAW 3/4" SCH40 A106/A105 Pipe/scokolet

10049 Tank Farm MO-0127-1A-4" 1/1 FW-31 BRW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/scokolet

10050 Tank Farm MO-0127-1A-4" 1/1 FW-32 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate

10051 Tank Farm MO-0127-1A-4" 1/1 FW-33 SW WPS-2016-21 GTAW 3/4" SCH80 A106/A105 Pipe/Gate
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10052 Tank Farm MO-0127-1A-4" 1/1 FW-34 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

10053 Tank Farm MO-0126A-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10054 Tank Farm MO-0126A-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10055 Tank Farm MO-0126A-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10056 Tank Farm MO-0126A-1A-3" 1/1 FW-9A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10057 Tank Farm MO-0126A-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10058 Tank Farm MO-0126A-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10059 Tank Farm MO-0126A-1A-3" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10060 Tank Farm MO-0126A-1A-3" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10061 Tank Farm MO-0126A-1A-3" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10062 Tank Farm MO-0126A-1A-3" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10063 Tank Farm MO-0126A-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10064 Tank Farm MO-0126A-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10065 Tank Farm MO-0126A-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10066 Tank Farm VL-0001-1A-10" 1/1 FW-15 BRW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

10067 Tank Farm VL-0001-1A-10" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Weldolet

10068 Tank Farm VL-0001-1A-10" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

10069 Tank Farm VL-0001-1A-10" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A234 Reducer/90Elbow

10070 Tank Farm VL-0001-1A-10" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 6" SCH40 A234/A105 Reducer/Flange

10071 Tank Farm VL-0001-1A-10" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Reducer

10072 Tank Farm VL-0001-1A-10" 1/1 FW-22 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A105 Reducer/Flange

10073 Tank Farm VL-0001-1A-10" 1/1 FW-23 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A105 90Elbow/ Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10074 Tank Farm VL-0001-1A-10" 1/1 FW-25 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A234 90Elbow/Tee

10075 Tank Farm VL-0001-1A-10" 1/1 FW-27 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A105 Tee/Flange

10076 Tank Farm VL-0001-1A-10" 1/1 FW-28 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/Tee

10077 Tank Farm VL-0001-1A-10" 1/1 FW-29 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

10078 Tank Farm VL-0001-1A-10" 1/1 FW-30 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

10079 Tank Farm VL-0001-1A-10" 1/1 FW-31 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

10080 Tank Farm VL-0001-1A-10" 1/1 FW-32 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

10081 Tank Farm VL-0001-1A-10" 1/1 FW-33 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

10082 Tank Farm VL-0001-1A-10" 1/1 FW-34 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

10083 Tank Farm VL-0001-1A-10" 1/1 FW-35 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

10084 Tank Farm VL-0001-1A-10" 1/1 FW-36 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10085 Tank Farm VL-0001-1A-10" 1/1 FW-37 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A106/A234 Pipe/90Elbow

10086 Tank Farm VL-0001-1A-10" 1/1 FW-38 BW WPS-2016-23 GTAW/SMAW 8" SCH20 A234/A105 Pipe/Flange

10087 SRC MO-0001-1A-12” 3/7 FW-42A BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

10088 SRC MO-0001-1A-12” 3/7 FW-42B SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

10089 SRC MO-0001-1A-12” 3/7 FW-42C SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

10090 SRC DO-0001-1A-12” 3/7 FW-39A BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

10091 SRC DO-0001-1A-12” 3/7 FW-39B SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

10092 SRC DO-0001-1A-12” 3/7 FW-39C SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange

10093 SRC JF-0001-1A-12” 3/7 FW-38A BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

10094 SRC JF-0001-1A-12” 3/7 FW-38B SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/scokolet

10095 SRC JF-0001-1A-12” 3/7 FW-38C SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10096 Tank Farm MO-0122-1A-3" 1/1 FW-2A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A106 Pipe/Pipe

10097 Tank Farm MO-0127-1A-4" 1/1 FW-35 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

10098 Tank Farm MO-0127-1A-4" 1/1 FW-36 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

10099 Tank Farm MO-0127-1A-4" 1/1 FW-37 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A105 Reducer/Flange

10100 Tank Farm MO-0127-1A-4" 1/1 FW-38 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A105 Reducer/Flange

10101 Tank Farm MO-0127-1A-4" 1/1 FW-39 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/Tee

10102 Tank Farm MO-0127-1A-4" 1/1 FW-40 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

10103 Tank Farm MO-0127-1A-4" 1/1 FW-41 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A234 Pipe/90Elbow

10104 Tank Farm MO-0127-1A-4" 1/1 FW-42 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A106/A105 Pipe/Flange

10105 Tank Farm MO-0127-1A-4" 1/1 FW-43 BW WPS-2016-23 GTAW/SMAW 4" SCH40 A234/A105 Reducer/Flange

10106 Tank Farm MO-0127-1A-4" 1/1 FW-44 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A105 Reducer/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10107 Tank Farm MO-5302-1A-3" 1/1 FW-01 SW WPS-2016-21 GTAW 1½" SCH40 A234/A105 Reducer/Flange

10108 Tank Farm MO-5302-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/Reducer

10109 Tank Farm MO-5302-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10110 Tank Farm MO-5302-1A-3" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10111 Tank Farm MO-5302-1A-3" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10112 Tank Farm MO-5302-1A-3" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10113 Tank Farm MO-5302-1A-3" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10114 Tank Farm MO-5302-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10115 Tank Farm MO-5302-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10116 Tank Farm MO-5302-1A-3" 1/1 FW-10 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/Tee

10117 Tank Farm MO-5302-1A-3" 1/1 FW-11 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/Tee
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10118 Tank Farm MO-5302-1A-3" 1/1 FW-12 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10119 Tank Farm MO-5302-1A-3" 1/1 FW-13 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/Tee

10120 Tank Farm MO-5302-1A-3" 1/1 FW-14 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10121 Tank Farm MO-5302-1A-3" 1/1 FW-15 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10122 Tank Farm MO-5302-1A-3" 1/1 FW-16 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10123 Tank Farm MO-5302-1A-3" 1/1 FW-17 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10124 Tank Farm MO-5302-1A-3" 1/1 FW-18 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10125 Tank Farm MO-5302-1A-3" 1/1 FW-19 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10126 Tank Farm MO-5302-1A-3" 1/1 FW-20 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10127 Tank Farm MO-5302-1A-3" 1/1 FW-21 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/Reducer

10128 Tank Farm MO-5302-1A-3" 1/1 FW-22 SW WPS-2016-21 GTAW 1½" SCH40 A234/A105 Reducer/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10129 Tank Farm MO-5311-1A-3" 1/1 FW-01 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10130 Tank Farm MO-5311-1A-3" 1/1 FW-02 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10131 Tank Farm MO-5311-1A-3" 1/1 FW-03 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A105 Tee/Flange

10132 Tank Farm MO-5311-1A-3" 1/1 FW-04 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A105 Tee/Flange

10133 Tank Farm MO-5311-1A-3" 1/1 FW-05 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/Tee

10134 Tank Farm MO-5311-1A-3" 1/1 FW-06 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10135 Tank Farm MO-5311-1A-3" 1/1 FW-07 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A105 90Elbow/Tee

10136 Tank Farm MO-5311-1A-3" 1/1 FW-08 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10137 Tank Farm MO-5311-1A-3" 1/1 FW-09 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10138 Tank Farm MO-5302-1A-3" 1/1 FW-11A BRW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet

10139 Tank Farm MO-5302-1A-3" 1/1 FW-11B SW WPS-2016-21 GTAW 1/2" SCH80 A106/A105 Pipe/scokolet
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10140 SRC DO-0001-1A-12” 1/7 FW-7D BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A234 Pipe/90Elbow

10141 SRC DO-0001-1A-12” 1/7 FW-7E BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

10142 SRC DO-0001-1A-12” 1/7 FW-7F BRW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Weldolet

10143 SRC DO-0001-1A-12” 1/7 FW-7G SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Weldolet

10144 SRC DO-0001-1A-12” 1/7 FW-7H SW WPS-2016-21 GTAW 1½" SCH80 A106/A105 Pipe/Gate

10145 SRC DO-0001-1A-12” 1/7 FW-7I BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

10146 SRC DO-0001-1A-12” 1/7 FW-7J BW WPS-2016-23 GTAW/SMAW 12" SCH20 A106/A105 Pipe/Flange

10147 Tank Farm FS-0603-1D-3" 1/1 FW-403 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

10148 Tank Farm FS-0603-1D-3" 1/1 FW-404 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

10149 Tank Farm FS-0603-1D-3" 1/1 FW-405 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

10150 Tank Farm FS-0603-1D-3" 1/1 FW-406 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10151 Tank Farm FS-0403-1D-3" 1/1 FW-228A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

10152 Tank Farm FS-0403-1D-3" 1/1 FW-228 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

10153 Tank Farm FS-0403-1D-3" 1/1 FW-243 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

10154 Tank Farm FS-0402-1D-3" 1/1 FW-195A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/Tee

10155 Tank Farm FS-0302-1D-3" 1/1 FW-139 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

10156 Tank Farm FS-0302-1D-3" 1/1 FW-140 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

10157 Tank Farm FS-0302-1D-3" 1/1 FW-141 BW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A234 Pipe/90Elbow

10158 Tank Farm FS-0302-1D-3" 1/1 FW-142 SOW WPS-2016-23 GTAW/SMAW 3" SCH40 A53/A105 Pipe/Flange

10159 Tank Farm FW-0401-1D-6" 1/1 FW-312 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

10160 Tank Farm FW-0401-1D-6" 1/1 FW-313 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

10161 Tank Farm FW-0401-1D-6" 1/1 FW-315 BRW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10162 Tank Farm FW-0401-1D-6" 1/1 FW-316 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

10163 Tank Farm FW-0401-1D-6" 1/1 FW-318 BRW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

10164 Tank Farm FW-0506-1D-2½" 1/1 FW-595 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

10165 Tank Farm FW-0506-1D-2½" 1/1 FW-596 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

10166 Tank Farm FW-0506-1D-2½" 1/1 FW-609 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

10167 Tank Farm FW-0506-1D-2½" 1/1 FW-610 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

10168 Tank Farm FW-0506-1D-2½" 1/1 FW-611 BW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A234 Pipe/90Elbow

10169 Tank Farm FW-0506-1D-2½" 1/1 FW-612 SOW WPS-2016-23 GTAW/SMAW 2½" SCH40 A53/A105 Pipe/Flange

10170 Tank Farm FW-0501-1D-6" 1/1 FW-480 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

10171 Tank Farm FW-0501-1D-6" 1/1 FW-481 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

10172 Tank Farm FW-0501-1D-6" 1/1 FW-483 BRW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10173 Tank Farm FW-0501-1D-6" 1/1 FW-484 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

10174 Tank Farm FW-0501-1D-6" 1/1 FW-486 BRW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

10175 Tank Farm FW-0701-1D-6" 1/1 FW-749 BRW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

10176 Tank Farm FW-0701-1D-6" 1/1 FW-750 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

10177 Tank Farm FW-0701-1D-6" 1/1 FW-752 BRW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

10178 Tank Farm FW-1201-1D-6" 1/1 FW-914 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

10179 Tank Farm FW-1201-1D-6" 1/1 FW-916 BRW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

10180 Tank Farm FW-1201-1D-6" 1/1 FW-917 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

10181 Tank Farm FW-1201-1D-6" 1/1 FW-919 BRW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

10182 Tank Farm FW-0101-1D-6" 1/1 FW-17 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

10183 Tank Farm FW-0101-1D-6" 1/1 FW-18 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10184 Tank Farm FW-0101-1D-6" 1/1 FW-20 BRW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

10185 Tank Farm FW-0101-1D-6" 1/1 FW-21 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

10186 Tank Farm FW-0101-1D-6" 1/1 FW-23 BRW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

10187 Tank Farm FW-0301-1D-6" 1/1 FW-154 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

10188 Tank Farm FW-0301-1D-6" 1/1 FW-157 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

10189 Tank Farm FW-0301-1D-6" 1/1 FW-158 BRW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

10190 Tank Farm FW-0301-1D-6" 1/1 FW-159 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

10191 Tank Farm FW-0301-1D-6" 1/1 FW-160 BRW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG

10192 Tank Farm FW-0201-1D-6" 1/1 FW-89 BRW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/CPLG

10193 Tank Farm FW-0201-1D-6" 1/1 FW-90 SW WPS-2016-21 GTAW 1/2" SCH160 A53/A105 Pipe/Gate

10194 Tank Farm FW-0201-1D-6" 1/1 FW-92 BRW WPS-2016-21 GTAW 1" SCH160 A53/A105 Pipe/CPLG
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10195 Tank Farm FW-3010-1D-2" 1/1 FW-09 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

10196 Tank Farm FW-3010-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

10197 Tank Farm FW-3009-1D-2" 1/1 FW-09 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

10198 Tank Farm FW-3009-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

10199 Tank Farm FW-3008-1D-2" 1/1 FW-09 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

10200 Tank Farm FW-3008-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

10201 Tank Farm FW-3007-1D-2" 1/1 FW-09 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

10202 Tank Farm FW-3007-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

10203 Tank Farm FW-3013-1D-2" 1/1 FW-09 SOW WPS-2016-21 GTAW 2" SCH40 A53/A105 Pipe/Flange

10204 Tank Farm FW-3013-1D-2" 1/1 FW-10 BW WPS-2016-21 GTAW 2" SCH40 A53/A234 Pipe/Tee

10205 Tank Farm FW-0014-1D-10" 2/2 FW-44 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10206 Tank Farm FW-0014-1D-10" 2/2 FW-46 BW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A234 Pipe/90Elbow

10207 Tank Farm FW-0014-1D-10" 2/2 FW-53 SOW WPS-2016-23 GTAW/SMAW 6" SCH40 A53/A105 Pipe/Flange

10208 Tank Farm FW-0014-1D-10" 2/2 FW-54 SOW WPS-2016-23 GTAW/SMAW 10" SCH20 A53/A105 Pipe/Flange

10209 Tank Farm FW-3004-1D-8" 1/1 FW-03 SOW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A105 Pipe/Flange

10210 Tank Farm FW-3004-1D-8" 1/1 FW-1A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

10211 Tank Farm FW-3004-1D-8" 1/1 FW-4A BW WPS-2016-23 GTAW/SMAW 8" SCH20 A53/A234 Pipe/Tee

10212 Tank Farm VL-0002-1A-3" 1/1 FW-13A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10213 Tank Farm VL-0002-1A-3" 1/1 FW-13B BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10214 Tank Farm VL-0002-1A-3" 1/1 FW-13C BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

10215 Tank Farm VL-0003-1A-3" 1/1 FW-13A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10216 Tank Farm VL-0003-1A-3" 1/1 FW-13B BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow
Document No.

JIMT-CO2-Q-13-20017-182

PROJECT TITLE:
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS AND SERVICES
FOR JURONG ISLAND MARKETING TERMINAL PROJECT, SINGAPORE
CLIENT: SINGAPORE PETROLEUM COMPANY LIMITED
CONSULTANT: SURBANA JURONG INFRASTRUCTURE PTE LTD
VISUAL AND DIMENSIONAL INSPECTION REPORT

Joint Thickness
Sl No Area ISO drawing Joint No. WPS No Process Size(Inch) Material
Type (mm)
10217 Tank Farm VL-0003-1A-3" 1/1 FW-13C BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

10218 Tank Farm VL-0004-1A-3" 1/1 FW-13A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10219 Tank Farm VL-0004-1A-3" 1/1 FW-13B BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10220 Tank Farm VL-0004-1A-3" 1/1 FW-13C BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

10221 Tank Farm VL-0006-1A-3" 1/1 FW-13A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10222 Tank Farm VL-0006-1A-3" 1/1 FW-13B BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10223 Tank Farm VL-0006-1A-3" 1/1 FW-13C BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow

10224 Tank Farm VL-0008-1A-3" 1/1 FW-13A BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A105 Pipe/Flange

10225 Tank Farm VL-0008-1A-3" 1/1 FW-13B BW WPS-2016-23 GTAW/SMAW 3" SCH40 A106/A234 Pipe/90Elbow

10226 Tank Farm VL-0008-1A-3" 1/1 FW-13C BW WPS-2016-23 GTAW/SMAW 3" SCH40 A234/A234 90Elbow/90Elbow
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-005 2-Sep-17 Accept 2-Sep-17 2-Sep-17 Accept 122 2-Sep-17 RT Acc 256 942mm

CIWE-005 2-Sep-17 Accept 2-Sep-17 2-Sep-17 Accept 122 2-Sep-17 RT Acc 256 942mm

CIWE-005 24-Aug-17 Accept 25-Aug-17 2-Sep-17 Accept 122 25-Aug-17 RT Acc 240 942mm

CIWE-005 24-Aug-17 Accept 25-Aug-17 2-Sep-17 Accept 122 25-Aug-17 RT Acc 241 942mm

CIWE-005 24-Aug-17 Accept 25-Aug-17 2-Sep-17 Accept 122 25-Aug-17 RT Acc 241 942mm

CIWE-001 24-Aug-17 Accept 25-Aug-17 2-Sep-17 Accept 122 25-Aug-17 RT Acc 239 942mm

CIWE-001 24-Aug-17 Accept 25-Aug-17 2-Sep-17 Accept 122 25-Aug-17 RT Acc 239 942mm

CIWE-001 24-Aug-17 Accept 25-Aug-17 2-Sep-17 Accept 122 25-Aug-17 RT Acc 241 942mm

CIWE-005 24-Aug-17 Accept 25-Aug-17 2-Sep-17 Accept 122 25-Aug-17 RT Acc 239 942mm

CIWE-005 8-Sep-17 Accept 9-Sep-17 2-Sep-17 Accept 122 18-Sep-17 RT Acc 317 942mm

CIWE-001 8-Sep-17 Accept 9-Sep-17 2-Sep-17 Accept 122 18-Sep-17 RT Acc 318 942mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-005 2-Sep-17 Accept 2-Sep-17 2-Sep-17 Accept 122 2-Sep-17 RT Acc 259 942mm

CIWE-005 8-Sep-17 Accept 9-Sep-17 2-Sep-17 Accept 122 NA MT Acc

CIWE-005 2-Sep-17 Accept 2-Sep-17 2-Sep-17 Accept 122 2-Sep-17 RT Acc 259 942mm

CIWE-001 2-Sep-17 Accept 2-Sep-17 2-Sep-17 Accept 122 2-Sep-17 RT Acc 259 942mm

CIWE-001 2-Sep-17 Accept 2-Sep-17 2-Sep-17 Accept 122 2-Sep-17 RT Acc 258 942mm

CIWE-005 2-Sep-17 Accept 2-Sep-17 2-Sep-17 Accept 122 9-Sep-17 RT Acc-R 294 942mm

CIWE-005 As per site modification deleted 18-Sep-17 RT Acc 318 942mm

CIWE-001 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 18-Sep-17 RT Acc 314 942mm

CIWE-001 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 NA NA NA NA NA

CIWE-001 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 NA NA NA NA NA

CIWE-001 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 2-Nov-17 RT Acc-R 337R 942mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-001 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 NA NA NA NA NA

CIWE-005 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 NA NA NA NA NA

CIWE-005 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 26-Sep-17 RT Acc-R 332 942mm

CIWE-005 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 NA NA NA NA NA

CIWE-025 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 NA NA NA NA NA

CIWE-005 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 18-Sep-17 RT Acc 314 942mm

CIWE-005 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 NA NA NA NA NA

CIWE-001 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 18-Sep-17 RT Acc 315 942mm

CIWE-001 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 NA NA NA NA NA

CIWE-025 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 26-Sep-17 RT Acc 332 942mm

CIWE-025 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 18-Sep-17 RT Acc 315 942mm

CIWE-024 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 18-Sep-17 RT Acc 316 942mm

CIWE-024 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 18-Sep-17 RT Acc 316 942mm

CIWE-024 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 18-Sep-17 RT Acc 316 942mm

CIWE-024 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 NA NA NA NA NA

CIWE-005 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 NA NA NA NA NA

CIWE-025 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 NA NA NA NA NA

CIWE-025 9-Sep-17 Accept 11-Sep-17 12-Sep-17 Accept 124 18-Sep-17 RT Acc 317 942mm

CIWE-025 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-025 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-025 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-025 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 10-Nov-17 RT Acc-R 338R 942mm

CIWE-024 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-024 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-005 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-024 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-024 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-001 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-024 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-024 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-024 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-001 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-001 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-001 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 18-Sep-17 RT Acc 318 942mm

CIWE-024 16-Sep-17 Accept 18-Sep-17 19-Sep-17 Accept 131 NA NA NA NA NA

CIWE-005 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-025 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-025 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 26-Sep-17 RT Acc 333 942mm

CIWE-025 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-025 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-025 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-024 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 26-Sep-17 RT Acc 334 942mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-024 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 26-Sep-17 RT Acc 334 942mm

CIWE-024 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-001 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-001 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 26-Sep-17 RT Acc 333 942mm

CIWE-018 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-025 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-025 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-001 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-001 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA

CIWE-001 18-Sep-17 Accept 20-Sep-17 21-Sep-17 Accept 136 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-029 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-029 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 29-Sep-17 RT Acc 339 942mm

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-029 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 7-Oct-17 RT Acc-R 373 1099mm

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 2-Nov-17 RT Acc-RS 354RS 785mm

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 7-Oct RT Acc 373 1099mm

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-029 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 29-Sep-17 RT Acc 340 785mm

CIWE-029 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-029 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-040 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-007 19-Sep-17 Accept 21-Sep-17 22-Sep-17 Accept 139 NA NA NA NA NA

CIWE-001 22-Sep-17 Accept 24-Sep-17 25-Sep-17 Accept 142 NA NA NA NA NA

CIWE-001 22-Sep-17 Accept 24-Sep-17 25-Sep-17 Accept 142 NA NA NA NA NA

CIWE-025 22-Sep-17 Accept 24-Sep-17 25-Sep-17 Accept 142 NA NA NA NA NA

CIWE-025 22-Sep-17 Accept 24-Sep-17 25-Sep-17 Accept 142 NA NA NA NA NA

CIWE-024 22-Sep-17 Accept 24-Sep-17 25-Sep-17 Accept 142 26-Sep-17 RT Acc 335 942mm

CIWE-024 22-Sep-17 Accept 24-Sep-17 25-Sep-17 Accept 142 26-Sep-17 RT Acc 335 942mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 22-Sep-17 Accept 24-Sep-17 25-Sep-17 Accept 142 26-Sep-17 RT Acc 335 942mm

CIWE-024 22-Sep-17 Accept 24-Sep-17 25-Sep-17 Accept 142 NA NA NA NA NA

CIWE-024 22-Sep-17 Accept 24-Sep-17 25-Sep-17 Accept 142 26-Sep-17 RT Acc 336 942mm

CIWE-025 22-Sep-17 Accept 24-Sep-17 25-Sep-17 Accept 142 NA NA NA NA NA

CIWE-001 22-Sep-17 Accept 24-Sep-17 25-Sep-17 Accept 142 NA NA NA NA NA

CIWE-001 22-Sep-17 Accept 24-Sep-17 25-Sep-17 Accept 142 29-Sep-17 RT Acc 336 942mm

CIWE-037 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 29-Sep-17 RT Acc 341 942mm

CIWE-037 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-037 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-018 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 29-Sep-17 RT Acc-R 374 1256mm

CIWE-018 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-007 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-007 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-029 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-029 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-033 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-029 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-029 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-007 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-007 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-007 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 29-Sep-17 RT Acc 342 942mm

CIWE-037 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 29-Sep-17 RT Acc 342 942mm

CIWE-032 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-032 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 20-Oct-17 RT Acc-RS 352RS 1099mm

CIWE-029 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-033 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-033 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 29-Sep-17 RT Acc-R 353 942mm

CIWE-033 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-037 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-007 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-032 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-007 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-029 23-Sep-17 Accept 25-Sep-17 26-Sep-17 Accept 143 NA NA NA NA NA

CIWE-007 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-007 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-033 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-033 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-037 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-007 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-007 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-029 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-029 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-032 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-032 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-032 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-032 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-037 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-029 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-029 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-007 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-007 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-029 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-033 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-033 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-037 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-032 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-032 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-032 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-033 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-033 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA

CIWE-033 25-Sep-17 Accept 27-Sep-17 28-Sep-17 Accept 148 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-037 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-007 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 7-Oct RT Acc 374 1256mm

CIWE-007 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-029 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-007 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-020 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-032 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-032 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 4-Oct-17 RT Acc 361 785mm

CIWE-032 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-007 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-029 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-037 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 4-Oct-17 RT Acc 362 942mm

CIWE-007 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-007 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 4-Oct-17 RT Acc 363 942mm

CIWE-020 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-020 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-020 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-032 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-029 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-032 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-007 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-033 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-029 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 4-Oct-17 RT Acc 365 628mm

CIWE-029 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-007 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-007 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 4-Oct-17 RT Acc 366 785mm

CIWE-020 28-Sep-17 Accept 30-Sep-17 2-Oct-17 Accept 153 NA NA NA NA NA

CIWE-020 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 4-Oct-17 RT Acc 363 942mm

CIWE-020 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-020 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-037 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-032 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-032 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-032 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 4-Oct-17 RT Acc 366 785mm

CIWE-032 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-033 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-033 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 4-Oct-17 RT Acc 364 942mm

CIWE-033 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-007 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-007 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-029 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-020 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 4-Oct-17 RT Acc 367 942mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-020 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-020 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-007 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-033 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 4-Oct-17 RT Acc 364 942mm

CIWE-033 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-007 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-007 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-032 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-037 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-029 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 4-Oct-17 RT Acc 362 942mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-037 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 4-Oct-17 RT Acc 365 628mm

CIWE-032 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 4-Oct-17 RT Acc 361 785mm

CIWE-032 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-032 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-020 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-020 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-020 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-020 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-029 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-037 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-033 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-007 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-007 30-Sep-17 Accept 2-Oct-17 3-Oct-17 Accept 156 NA NA NA NA NA

CIWE-001 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-018 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-001 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 7-Oct-17 RT Acc 368 942mm

As per site modification deleded NA NA NA NA NA

CIWE-018 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA RT Acc 369 942mm

CIWE-001 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-024 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 7-Oct-17 RT Acc 368 942mm

CIWE-024 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-018 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-024 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-024 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-024 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-018 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-001 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-018 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-001 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-001 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-029 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 159 RT 942mm


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-018 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 159 7-Oct-17 RT Acc 371 942mm

CIWE-018 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-024 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-024 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-018 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-018 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

As per site modification deleded NA NA NA NA NA

CIWE-018 2-Oct-17 Accept 3-Oct-17 4-Oct-17 Accept 159 NA NA NA NA NA

CIWE-007 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-029 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 7-Oct-17 RT Acc 368 942mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-033 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-032 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 7-Oct-17 RT Acc 371 942mm

CIWE-032 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-032 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-032 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-037 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-033 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-007 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-007 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-020 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 7-Oct-17 RT Acc 368 942mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-020 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-033 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-033 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-007 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-029 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-037 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-032 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-033 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-033 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-033 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 7-Oct-17 RT Acc 369 785mm

CIWE-032 As per site modification deleted NA NA NA NA NA

CIWE-032 As per site modification deleted NA NA NA NA NA

CIWE-020 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-020 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-020 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-020 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-020 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-037 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-007 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-032 As per site modification deleted NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-032 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-032 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 7-Oct-17 RT Acc 370 1099mm

CIWE-032 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-032 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 NA NA NA NA NA

CIWE-032 3-Oct-17 Accept 4-Oct-17 5-Oct-17 Accept 161 7-Oct-17 RT Acc 372 1256mm

CIWE-037 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-033 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-033 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-033 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-033 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-032 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-020 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-020 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-020 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-020 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-020 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 9-Oct-17 RT Acc 375 942mm

CIWE-020 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-020 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-037 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-007 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-007 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-037 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 9-Oct-17 RT Acc 379 1099mm

CIWE-007 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-032 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-032 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-033 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-033 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-007 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-037 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-029 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 9-Oct-17 RT Acc 375 942mm

CIWE-033 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-007 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 9-Oct-17 RT Acc 380 628mm

CIWE-007 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-034 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 9-Oct-17 RT Acc 375 942mm

CIWE-034 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-034 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-037 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-037 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-037 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-032 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-032 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-032 5-Oct-17 Accept 6-Oct-17 7-Oct-17 Accept 164 NA NA NA NA NA

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 9-Oct-17 RT Acc 376 942mm

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-020 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 9-Oct-17 RT Acc 376 942mm

CIWE-020 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-029 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 9-Oct-17 RT Acc 377 942mm

CIWE-037 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-037 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-020 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-020 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-007 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-007 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 9-Oct-17 RT Acc 377 942mm

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-037 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-037 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 9-Oct-17 RT Acc 377 942mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-032 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-032 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-032 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-029 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 9-Oct-17 RT Acc 380 628mm

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 9-Oct-17 RT Acc 376 942mm

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-020 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-020 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-037 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-037 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-020 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-032 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 9-Oct-17 RT Acc 378 942mm

CIWE-029 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 166 NA NA NA NA NA

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-046 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-037 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-037 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 10-Oct-17 RT Acc 381 785mm

CIWE-037 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-007 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-007 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-032 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 10-Oct-17 RT Acc 381 785mm

CIWE-032 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-029 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-007 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 10-Oct-17 RT Acc 381 785mm

CIWE-007 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-029 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-032 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-032 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-030 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-037 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-018 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-018 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-018 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 10-Oct-17 RT Acc 385 628mm

CIWE-018 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-018 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-007 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 10-Oct-17 RT Acc 384 628mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-007 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-007 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-033 6-Oct-17 Accept 7-Oct-17 9-Oct-17 Accept 167 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 16-Oct-17 RT Acc 398 785mm

CIWE-020 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-032 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-032 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-032 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-032 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-030 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 10-Oct-17 RT Acc 384 628mm

CIWE-034 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-034 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-034 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-033 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-033 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 10-Oct-17 RT Acc 386 942mm

CIWE-007 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-032 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 10-Oct-17 RT Acc 382 785mm

CIWE-032 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-007 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 10-Oct-17 RT Acc 382 785mm

CIWE-007 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-030 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-034 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-034 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-034 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 10-Oct-17 RT Acc 385 628mm

CIWE-034 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-018 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-018 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-018 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 10-Oct-17 RT Acc 382 785mm

CIWE-029 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-007 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-007 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 10-Oct-17 RT Acc 383 785mm

CIWE-037 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-033 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 10-Oct-17 RT Acc 383 785mm

CIWE-033 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA

CIWE-033 9-Oct-17 Accept 9-Oct-17 10-Oct-17 Accept 170 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-034 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-032 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-032 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-018 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-018 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-018 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-018 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 13-Oct-17 RT Acc 387 471mm

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 13-Oct-17 RT Acc 388 628mm

CIWE-034 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 13-Oct-17 RT Acc 389 785mm

CIWE-030 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 13-Oct-17 RT Acc 390 1099mm

CIWE-033 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-033 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-033 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 13-Oct-17 RT Acc 388 628mm

CIWE-033 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 13-Oct-17 RT Acc 391 942mm

CIWE-034 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-032 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-032 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 13-Oct-17 RT Acc 388 785mm

CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-018 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-029 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-034 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-034 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-033 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 13-Oct-17 RT Acc 392 628mm

CIWE-033 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 173 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-030 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-032 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 13-Oct-17 RT Acc 393 628mm

CIWE-032 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-032 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-029 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-030 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 13-Oct-17 RT Acc 389 785mm

CIWE-018 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-018 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 13-Oct-17 RT Acc 393 628mm

CIWE-034 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 13-Oct-17 RT Acc 392 628mm

CIWE-034 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-032 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-033 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-033 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 13-Oct-17 RT Acc 392 628mm

CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-018 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-018 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 13-Oct-17 RT Acc 393 628mm

CIWE-034 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-034 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-037 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-020 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-033 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-033 9-Oct-17 Accept 10-Oct-17 11-Oct-17 Accept 174 NA NA NA NA NA

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-029 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-030 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 13-Oct-17 RT Acc 394 628mm

CIWE-030 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-018 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-018 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-034 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-032 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-032 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-030 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-018 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-034 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-032 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-032 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 13-Oct-17 RT Acc 394 628mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-030 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-030 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-030 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-030 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-018 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 13-Oct-17 RT Acc 395 1099mm

CIWE-034 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-034 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-034 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 176 NA NA NA NA NA

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-032 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-032 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-032 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-018 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-018 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-034 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-029 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 13-Oct-17 RT Acc 394 628mm

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-018 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-034 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-032 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 13-Oct-17 RT Acc 396 314mm

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-018 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-034 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 13-Oct-17 RT Acc 396 314mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-018 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 17-Oct-17 RT Acc 411 314mm

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-033 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-007 10-Oct-17 Accept 11-Oct-17 12-Oct-17 Accept 178 NA NA NA NA NA

CIWE-007 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-030 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-032 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-032 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-032 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-032 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-018 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-034 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 13-Oct-17 RT Acc 395 1099mm

CIWE-033 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-033 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 13-Oct-17 RT Acc 396 314mm

CIWE-033 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-033 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-007 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-007 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-030 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-030 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-018 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-018 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 13-Oct-17 RT Acc 397 785mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-034 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-034 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-034 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-007 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-007 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-032 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 179 NA NA NA NA NA

CIWE-032 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-018 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-034 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-033 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-033 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-033 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-033 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-033 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-007 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-007 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-020 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-034 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-034 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-034 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-030 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-018 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-018 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-018 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-032 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-032 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-032 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-037 11-Oct-17 Accept 12-Oct-17 13-Oct-17 Accept 180 NA NA NA NA NA

CIWE-037 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-037 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-037 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-033 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-033 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-033 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-033 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-033 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-033 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 17-Oct-17 RT Acc 410 471mm

CIWE-030 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-032 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-032 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 17-Oct-17 RT Acc 410 471mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-032 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-032 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 16-Oct-17 RT Acc 399 471mm

CIWE-032 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-033 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 17-Oct-17 RT Acc 405 785mm

CIWE-030 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 13-Oct-17 14-Oct-17 Accept 182 NA NA NA NA NA

CIWE-020 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-020 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-020 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-020 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-020 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-020 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 16-Oct-17 RT Acc 400 314mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 16-Oct-17 RT Acc 400 314mm

CIWE-037 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-037 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 17-Oct-17 RT Acc 406 471mm

CIWE-030 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-033 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 17-Oct-17 RT Acc 407 785mm

CIWE-033 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 17-Oct-17 RT Acc 408 785mm

CIWE-037 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-037 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-032 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-032 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-029 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-029 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 16-Oct-17 RT Acc 401 785mm

CIWE-037 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-037 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-030 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 17-Oct-17 RT Acc 409 628mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 16-Oct-17 RT Acc 401 785mm

CIWE-007 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-033 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-033 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-033 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-037 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-037 12-Oct-17 Accept 13-Oct-17 16-Oct-17 Accept 184 NA NA NA NA NA

CIWE-030 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-032 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-032 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 17-Oct-17 RT Acc 408 785mm

CIWE-034 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-037 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-037 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-030 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-029 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-029 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 16-Oct-17 RT Acc 402 1099mm

CIWE-020 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-037 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-030 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 16-Oct-17 RT Acc 403 628mm

CIWE-007 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-007 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-030 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 17-Oct-17 RT Acc 409 628mm

CIWE-032 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-032 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-033 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-034 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-018 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 17-Oct-17 RT Acc 406 471mm

CIWE-018 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-032 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-032 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-037 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 16-Oct-17 RT Acc 404 1099mm

CIWE-037 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-037 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-030 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-030 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-030 12-Oct-17 Accept 14-Oct-17 16-Oct-17 Accept 185 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 17-Oct-17 RT Acc 410 471mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-033 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-033 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-033 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-007 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-007 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-029 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-029 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-020 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-032 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 20-Oct-17 RT Acc 417 628mm

CIWE-032 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-030 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-037 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-029 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-032 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-032 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-032 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-033 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-030 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 17-Oct-17 RT Acc 412 628mm

CIWE-030 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-030 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 189 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-037 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-037 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-037 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-029 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-033 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-029 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 17-Oct-17 RT Acc 413 785mm

CIWE-029 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-032 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-032 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-030 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-033 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-030 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-032 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-032 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-029 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-037 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-029 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-030 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-033 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 24-Oct-17 RT Acc-R 415R 1099mm

CIWE-032 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-020 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-020 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 17-Oct-17 RT Acc 413 785mm

CIWE-018 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-034 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-033 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA

CIWE-037 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 17-Oct-17 RT Acc 414 1099mm

CIWE-007 14-Oct-17 Accept 16-Oct-17 17-Oct-17 Accept 190 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-030 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-034 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-030 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-034 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 20-Oct-17 RT Acc 416 942mm

CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-032 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-032 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-032 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 20-Oct-17 RT Acc 417 628mm

CIWE-032 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 20-Oct-17 RT Acc 417 628mm

CIWE-033 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-033 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-020 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-034 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-034 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-037 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-020 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-037 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-037 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-033 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-020 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-034 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 20-Oct-17 RT Acc 416 942mm

CIWE-034 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-034 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-030 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-032 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 193 NA NA NA NA NA

CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-020 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 20-Oct-17 RT Acc 419 785mm

CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 24-Oct-17 RT Acc 422 628mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 20-Oct-17 RT Acc 418 628mm

CIWE-034 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-034 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-034 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-034 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-034 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-020 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-020 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-020 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-037 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-037 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 20-Oct-17 RT Acc 419 785mm

CIWE-033 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-033 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-033 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-020 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-032 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-032 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-032 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 20-Oct-17 RT Acc 419 785mm

CIWE-007 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-037 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 20-Oct-17 RT Acc 421 1099mm

CIWE-033 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-033 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 20-Oct-17 RT Acc 420 785mm

CIWE-033 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-032 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-032 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-032 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-029 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-018 16-Oct-17 Accept 17-Oct-17 19-Oct-17 Accept 194 NA NA NA NA NA

CIWE-018 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-018 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-007 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-007 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-007 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-007 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-034 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-020 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-037 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-037 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-033 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-033 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-033 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-033 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-018 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-018 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-030 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-030 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-030 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-032 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-034 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-034 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-034 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-034 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-034 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-034 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-018 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-018 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-018 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-018 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-018 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-030 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-030 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-032 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-037 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA RT NA NA NA

CIWE-032 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-032 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 196 NA NA NA NA NA

CIWE-001 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 197 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-001 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 197 NA NA NA NA NA

CIWE-001 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 197 NA NA NA NA NA

CIWE-001 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 197 NA NA NA NA NA

CIWE-001 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 197 NA NA NA NA NA

CIWE-001 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 197 NA NA NA NA NA

CIWE-001 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 197 NA NA NA NA NA

CIWE-024 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 197 NA NA NA NA NA

CIWE-025 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 197 NA NA NA NA NA

CIWE-024 17-Oct-17 Accept 19-Oct-17 20-Oct-17 Accept 197 NA NA NA NA NA

CIWE-018 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-018 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-034 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-007 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-007 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-037 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-037 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-034 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-034 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-034 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-018 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-032 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-032 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-030 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-030 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-018 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-007 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-007 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-007 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-034 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-018 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-033 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-033 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-037 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-037 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 24-Oct-17 RT Acc 422 628mm

CIWE-030 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-034 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 24-Oct-17 RT Acc 423 628mm

CIWE-032 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-032 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 24-Oct-17 RT Acc 424 785mm

CIWE-033 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-033 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-034 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-007 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 24-Oct-17 RT Acc 423 628mm

CIWE-007 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-007 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-033 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-034 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-030 19-Oct-17 Accept 20-Oct-17 23-Oct-17 Accept 200 NA NA NA NA NA

CIWE-032 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-032 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 24-Oct-17 RT Acc 422 628mm

CIWE-034 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-033 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-030 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 24-Oct-17 RT Acc 423 628mm

CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-032 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-032 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-034 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-034 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-033 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-032 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-030 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-034 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-030 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-033 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-030 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 24-Oct-17 RT Acc 425 942mm

CIWE-030 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 24-Oct-17 RT Acc 425 942mm

CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 24-Oct-17 RT Acc 426 314mm

CIWE-033 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-034 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-033 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-033 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-033 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-007 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-034 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-034 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 20-Oct-17 Accept 21-Oct-17 23-Oct-17 Accept 203 NA NA NA NA NA

CIWE-034 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-007 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-007 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-007 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-033 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-033 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-033 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-033 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-033 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-033 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-033 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-033 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-030 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-030 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-007 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-007 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-007 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-007 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 26-Oct-17 RT Acc 427 314mm

CIWE-007 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-030 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-030 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-018 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-018 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-018 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-034 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-034 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-034 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-034 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-030 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-030 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-018 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-034 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-034 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 26-Oct-17 RT Acc 428 785mm

CIWE-018 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-018 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-018 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-034 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-034 21-Oct-17 Accept 23-Oct-17 24-Oct-17 Accept 206 NA NA NA NA NA

CIWE-018 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 26-Oct-17 RT Acc 429 1256mm

CIWE-030 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-018 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-018 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-030 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 26-Oct-17 RT Acc 430 942mm

CIWE-030 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-030 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-034 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-034 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-018 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-018 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-030 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-030 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 26-Oct-17 RT Acc 430 942mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 26-Oct-17 RT Acc 430 942mm

CIWE-034 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-034 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-034 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-034 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-018 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-029 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-029 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-029 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-029 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-018 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-034 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-018 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 26-Oct-17 RT Acc 429 1256mm

CIWE-030 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-030 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-030 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-034 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-034 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-034 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-034 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-018 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-029 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 26-Oct-17 RT Acc 431 628mm

CIWE-029 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 2-Nov-17 RT Acc-R 432R 628mm

CIWE-029 23-Oct-17 Accept 24-Oct-17 25-Oct-17 Accept 209 NA NA NA NA NA

CIWE-018 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-029 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 2-Nov-17 RT Acc 433 471mm

CIWE-018 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-029 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-029 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-029 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 2-Nov-17 RT Acc 434 942MM

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 2-Nov-17 RT Acc 434 942MM

CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-029 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 2-Nov-17 RT Acc 435 785mm

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 2-Nov-17 RT Acc 436 1256mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-036 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-036 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-029 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 2-Nov-17 RT Acc 434 942MM

CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-029 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-030 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA

CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 2-Nov-17 RT Acc 437 1089MM

CIWE-034 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 211 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-024 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-024 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-024 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-024 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-001 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-001 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-001 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-024 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-001 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-001 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-001 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-024 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-025 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-024 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-024 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-024 27-Oct-17 Accept 28-Oct-17 30-Oct-17 Accept 212

CIWE-030 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-029 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-029 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-030 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-030 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-029 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-029 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-030 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-030 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-030 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-029 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-030 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-029 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-029 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-029 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215 17-Jan-18 RT Acc 561 628mm

CIWE-030 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215 NA NA NA NA NA

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-029 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-034 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-030 30-Oct-17 Accept 31-Oct-17 1-Nov-17 Accept 215

CIWE-029 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-030 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-030 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-029 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-030 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-029 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-036 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216 10-Nov-17 RT Acc 438 628mm

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-036 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-030 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-030 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216 10-Nov-17 RT Acc 439 942mm

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-036 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-030 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-030 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-029 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-036 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-036 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-029 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-034 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-036 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-036 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-036 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216

CIWE-036 1-Nov-17 Accept 2-Nov-17 3-Nov-17 Accept 216


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-030 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-036 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-036 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217 10-Nov-17 RT Acc 438 628mm

CIWE-036 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-036 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-030 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217 10-Nov-17 RT Acc 439 942mm

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-034 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-034 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-036 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217 10-Nov-17 RT Acc 440 628mm

CIWE-036 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-036 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-034 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-034 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-034 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-030 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-034 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 2-Nov-17 Accept 3-Nov-17 4-Nov-17 Accept 217

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-030 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-030 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-036 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-036 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-036 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-036 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-036 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-030 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218 21-Nov-17 RT Acc 466 628mm

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 218

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-030 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-030 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-020 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-029 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-036 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-036 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-036 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-036 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220 15-Nov-17 RT Acc 458 628mm

CIWE-036 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-034 3-Nov-17 Accept 4-Nov-17 6-Nov-17 Accept 220

CIWE-036 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-036 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-036 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-036 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222 10-Nov-17 RT Acc 440 628mm

CIWE-036 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-036 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-030 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 222 14-Nov-17 RT Acc 453 157mm

CIWE-034 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-030 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223 10-Nov-17 RT Acc 441 628mm

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-034 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-034 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-029 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-034 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-034 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-034 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-034 4-Nov-17 Accept 6-Nov-17 7-Nov-17 Accept 223

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-030 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-030 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224 14-Nov-17 RT Acc-RS 451RS 157mm

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224 11-Nov-17 RT Acc 448 157mm

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 224

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226 14-Nov-17 RT Acc 453 157mm

CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-030 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-030 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-030 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-030 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-030 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-030 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-036 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226 10-Nov-17 RT Acc 442 628mm

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 6-Nov-17 Accept 7-Nov-17 8-Nov-17 Accept 226

CIWE-034 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-034 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-034 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-034 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-034 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-034 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228 10-Nov-17 RT Acc 441 628mm

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-034 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-034 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-034 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 228

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-029 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-036 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-030 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-034 7-Nov-17 Accept 8-Nov-17 9-Nov-17 Accept 229

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230 23-Nov-17 RT Acc-R 474R 628mm

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-030 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-030 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-030 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-030 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-030 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 230

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-029 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-030 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-030 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-030 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231 21-Nov-17 RT Acc-RS 462R 628mm

CIWE-034 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231

CIWE-036 8-Nov-17 Accept 9-Nov-17 10-Nov-17 Accept 231


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-030 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-030 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-030 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-030 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-030 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-030 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233 11-Nov-17 RT Acc 449 157mm

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233 11-Nov-17 RT Acc 449 157mm

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233 15-Nov-17 RT Acc-R 455R 157mm

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233 11-Nov-17 RT Acc 448 157mm

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 233

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234 11-Nov-17 RT Acc 448 157mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234 11-Nov-17 RT Acc 449 157mm

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-036 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234 21-Nov-17 RT Acc-R 464R 785mm

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-030 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-030 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-030 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-030 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-034 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234 14-Nov-17 RT Acc 452 157mm

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234 14-Nov-17 RT Acc 452 157mm

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234 25-Nov-17 RT Acc-RS 454RS 157mm

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234

CIWE-029 9-Nov-17 Accept 10-Nov-17 11-Nov-17 Accept 234 11-Nov-17 RT Acc 448 157mm

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235 15-Nov-17 RT Acc 459 314mm

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 235

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 235

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-036 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-034 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-030 10-Nov-17 Accept 11-Nov-17 13-Nov-17 Accept 237

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-029 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-029 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-029 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-029 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239 15-Nov-17 RT Acc 459 314mm

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239 15-Nov-17 RT Acc 460 785mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 239

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-030 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240 23-Nov-17 RT Acc-R 463R 471mm

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-028 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-028 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-028 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-028 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-028 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-028 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240 25-Nov-17 RT Acc 485 471mm

CIWE-028 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-028 11-Nov-17 Accept 13-Nov-17 14-Nov-17 Accept 240

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 242

CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-030 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-036 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-036 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-036 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-028 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 13-Nov-17 Accept 14-Nov-17 15-Nov-17 Accept 244

CIWE-029 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-029 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245 23-Nov-17 RT Acc 476 471mm

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 245

CIWE-034 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-030 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-028 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-028 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-028 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246 23-Nov-17 RT Acc 479 628mm

CIWE-028 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-028 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-028 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246 21-Nov-17 RT Acc 465 314mm

CIWE-028 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-028 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-028 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246 21-Nov-17 RT Acc 465 314mm

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-036 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-018 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-018 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-018 14-Nov-17 Accept 15-Nov-17 16-Nov-17 Accept 246

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 248


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 15-Nov-17 Accept 16-Nov-17 17-Nov-17 Accept 250

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 253

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-029 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 254

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255 21-Nov-17 RT Acc 465 314mm

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 255

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-036 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-034 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256 23-Nov-17 RT Acc 479 628mm

CIWE-028 17-Nov-17 Accept 18-Nov-17 20-Nov-17 Accept 256

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259 23-Nov-17 RT Acc 479RS 628mm

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-034 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259 RT 484R 314mm

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 259

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-028 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-029 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-036 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260 21-Nov-17 RT Acc 467 471mm

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-018 18-Nov-17 Accept 20-Nov-17 21-Nov-17 Accept 260

CIWE-018 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-018 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-034 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-034 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-034 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-034 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-034 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-034 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-034 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-034 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-034 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-034 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-034 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261 21-Nov-17 RT Acc 470 314mm

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261 25-Nov-17 RT Acc 495 314mm

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 261

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262 25-Nov-17 RT Acc 488 471mm

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262 RT 488RS 471mm

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-029 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-036 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-018 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-018 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-018 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-018 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-028 20-Nov-17 Accept 21-Nov-17 22-Nov-17 Accept 262

CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-028 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-039 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264 21-Nov-17 RT Acc 467 471mm

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 264

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-018 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265 23-Nov-17 RT Acc 476 471mm

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-034 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-036 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-036 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-036 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-036 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265

CIWE-036 21-Nov-17 Accept 22-Nov-17 23-Nov-17 Accept 265


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268 23-Nov-17 RT Acc-R 475R 251.2mm

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268 23-Nov-17 RT Acc 480 251.2mm

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-036 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268

CIWE-029 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268 21-Nov-17 RT Acc 468 471mm

CIWE-029 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 268 21-Nov-17 RT Acc 468 471mm

CIWE-029 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-029 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-029 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-029 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-028 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269 RT 491R 204.1mm

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 22-Nov-17 Accept 23-Nov-17 24-Nov-17 Accept 269

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270 21-Nov-17 RT Acc 469 204.1mm

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270 21-Nov-17 RT Acc 466 628mm

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270 23-Nov-17 RT Acc 482 471mm

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 270

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-029 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271 23-Nov-17 RT Acc 480 251.2mm

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271 25-Nov-17 RT Acc 483 251.2mm

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 271

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-018 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272 23-Nov-17 RT Acc 476 471mm

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-034 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 272

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273 23-Nov-17 RT Acc 481 471mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-036 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-028 24-Nov-17 Accept 25-Nov-17 27-Nov-17 Accept 273

CIWE-028 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-028 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275 25-Nov-17 RT Acc 478R 204.1mm

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275 25-Nov-17 RT Acc 478R 204.1mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 275

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-028 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-028 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-028 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276 25-Nov-17 RT Acc 493 251.2mm

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276 25-Nov-17 RT Acc 494 251.2mm

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 276

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278 25-Nov-17 RT Acc 492 251.2mm

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278 RT 477R 251.2mm

CIWE-034 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 278

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-018 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279 23-Nov-17 RT Acc 481 471mm

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-029 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-036 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-036 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-036 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-036 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-036 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 279

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-036 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 280


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281 25-Nov-17 RT Acc 495 471mm

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-028 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-034 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-039 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-018 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-018 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-018 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-018 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-018 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-018 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-018 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-018 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-018 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-018 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-018 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 281

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282 RT

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282 23-Nov-17 RT Acc 479 251.2mm

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282 25-Nov-17 RT Acc 498 251.2mm

CIWE-028 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-036 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-036 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-036 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-036 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-036 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-036 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282 25-Nov-17 RT Acc 486 471mm

CIWE-036 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-036 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-036 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-036 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 282

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-018 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283 23-Nov-17 RT Acc 481 471mm

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-029 28-Nov-17 Accept 29-Nov-17 30-Nov-17 Accept 283

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284 25-Nov-17 RT Acc 496 471mm

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 284

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-028 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285 25-Nov-17 RT Acc 489 471mm

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-018 29-Nov-17 Accept 30-Nov-17 1-Dec-17 Accept 285

CIWE-040 25-Nov-17 Accept 26-Nov-17 27-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 25-Nov-17 Accept 26-Nov-17 27-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 25-Nov-17 Accept 26-Nov-17 27-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 25-Nov-17 Accept 26-Nov-17 27-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 25-Nov-17 Accept 26-Nov-17 27-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 25-Nov-17 Accept 26-Nov-17 27-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 25-Nov-17 Accept 26-Nov-17 27-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 286 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 26-Nov-17 Accept 27-Nov-17 28-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-040 27-Nov-17 Accept 28-Nov-17 29-Nov-17 Accept 286 NA NA NA NA NA

CIWE-018 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-018 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-034 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-034 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-034 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-034 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-034 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-034 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 30-Nov-17 Accept 1-Dec-17 2-Dec-17 Accept 287

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 289

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 290

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-029 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 291

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 4-Dec-17 Accept 292

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 2-Dec-17 Accept 3-Dec-17 5-Dec-17 Accept 293

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 294

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 295

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-039 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-034 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-034 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296

CIWE-029 3-Dec-17 Accept 4-Dec-17 5-Dec-17 Accept 296


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-029 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-029 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-029 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298 25-Nov-17 RT Acc 487 204.1mm

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298 RT 490R 204.1mm


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 298

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299 25-Nov-17 RT Acc 497 251.2mm

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-034 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-034 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-034 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-034 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-036 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-034 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-018 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-034 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-034 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-034 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 4-Dec-17 Accept 5-Dec-17 6-Dec-17 Accept 299

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-018 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-018 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-028 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-034 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-034 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-034 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-034 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-034 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-034 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 5-Dec-17 Accept 6-Dec-17 8-Dec-17 Accept 302

CIWE-029 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-029 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-030 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-018 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-030 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303 9-Jan RT Acc 557 628mm

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303 9-Jan RT Acc 558 628mm

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-018 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-018 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303 9-Jan RT Acc 557 628mm

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303 9-Jan RT Acc 557 628mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-029 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-029 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-029 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-029 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-028 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-029 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-029 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-029 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-029 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-034 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 6-Dec-17 Accept 7-Dec-17 8-Dec-17 Accept 303

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-028 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-039 7-Dec-17 Accept 8-Dec-17 9-Dec-17 Accept 305

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-039 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-039 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-039 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-039 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-039 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-039 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-039 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-029 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-029 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-029 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-029 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-029 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-029 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-029 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-029 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-029 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-029 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308 15-Dec-17 RT Acc-R 527 785mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-018 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-039 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-028 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 8-Dec-17 Accept 9-Dec-17 11-Dec-17 Accept 308

CIWE-034 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-034 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-034 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-028 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-034 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-028 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310 8-Dec RT Acc 520 785mm

CIWE-034 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-018 9-Dec-17 As per site modification 3" deleted 310

CIWE-018 9-Dec-17 As per site modification 3" deleted 310

CIWE-018 9-Dec-17 As per site modification 3" deleted 310

CIWE-018 9-Dec-17 As per site modification 3" deleted 310

CIWE-046 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310 8-Dec RT Acc 523 157mm

CIWE-046 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-046 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-028 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-028 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-028 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-034 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310 8-Dec RT Acc 524 628mm

CIWE-034 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310 8-Dec RT Acc 524 628mm

CIWE-046 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-046 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-046 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-034 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-034 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-039 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-039 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-039 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-039 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-039 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-039 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310 8-Dec RT Acc 526 157mm

CIWE-028 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-028 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-028 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-028 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-028 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-028 9-Dec-17 Accept 11-Dec-17 12-Dec-17 Accept 310

CIWE-018 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-018 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-018 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-018 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-034 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-034 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-034 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-034 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-034 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-018 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-046 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-046 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-046 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-046 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-028 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-028 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-028 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-028 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-028 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-028 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-018 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-018 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-034 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311 11-Dec RT Acc 533 628mm

CIWE-028 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311 11-Dec RT Acc 533 628mm

CIWE-028 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311 11-Dec RT Acc 533 628mm

CIWE-028 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-046 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311 11-Dec RT Acc 532 157mm

CIWE-046 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311 11-Dec RT Acc 532 157mm

CIWE-018 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-028 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-028 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-039 10-Dec-17 Accept 12-Dec-17 13-Dec-17 Accept 311

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-039 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-018 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-029 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-039 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-039 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-039 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-039 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314 11-Dec RT Acc 534 157mm

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-047 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-018 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314 15-Dec RT Acc 537 785mm

CIWE-047 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-018 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-018 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-047 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314 15-Dec RT Acc 537 785mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-028 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-046 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-047 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-018 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-029 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-029 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314 15-Dec RT Acc 538 785mm

CIWE-034 15-Dec-17 Accept 16-Dec-17 18-Dec-17 Accept 314

CIWE-047 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-047 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-039 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-039 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-039 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-034 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-034 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-029 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-039 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-028 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-034 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-034 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-034 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-029 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-029 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-029 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-018 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-018 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-034 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-018 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-018 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-029 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-029 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-046 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-046 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-046 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-046 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-046 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-046 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-046 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-045 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-045 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-045 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-045 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-045 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-045 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-045 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-045 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 16-Dec-17 Accept 17-Dec-17 19-Dec-17 Accept 315

CIWE-030 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-030 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-030 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-028 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-040 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-040 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-040 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-040 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-028 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-028 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316 3-Jan RT Acc 556 157mm

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316 3-Jan RT Acc 556 157mm

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-028 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-029 18-Dec-17 As per site modification 3" deleted 316

CIWE-047 18-Dec-17 As per site modification 3" deleted 316

CIWE-047 18-Dec-17 As per site modification 3" deleted 316

CIWE-047 18-Dec-17 As per site modification 3" deleted 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-030 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-030 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-029 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-045 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-046 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-029 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-029 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-029 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-047 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-030 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-030 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-029 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316 26-Dec-17 RT Acc 546 785mm

CIWE-029 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-018 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316 26-Dec RT Acc 547 942mm

CIWE-018 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316 9-Jan RT Acc 547R 942mm

CIWE-015 18-Dec-17 Accept 19-Dec-17 21-Dec-17 Accept 316

CIWE-047 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-040 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-040 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-040 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-040 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-040 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-040 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-040 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-040 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-040 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-018 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-018 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-018 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-018 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-015 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-045 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-046 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-046 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-046 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-046 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-046 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-046 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-046 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-046 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-046 19-Dec-17 Accept 20-Dec-17 21-Dec-17 Accept 317

CIWE-030 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-030 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-030 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-040 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-018 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-029 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318 26-Dec RT Acc 545 628mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-030 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-030 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-030 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-030 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-040 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-018 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-018 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-018 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-018 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-040 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318 9-Jan RT Acc 559 157mm

CIWE-040 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-040 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318 9-Jan RT Acc 559 157mm

CIWE-040 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318 9-Jan RT Acc 559 157mm

CIWE-040 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-040 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-028 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-045 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-045 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-045 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-045 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-045 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-045 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-045 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-045 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-045 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318 3-Jan RT Acc 552 157mm

CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-034 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-030 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-030 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-030 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-030 22-Dec-17 Accept 23-Dec-17 26-Dec-17 Accept 318

CIWE-030 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-030 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-030 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-029 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-029 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-029 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-047 23-Dec-17 As per site modification 3" deleted 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-028 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-028 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-047 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-047 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-029 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-029 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-029 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-028 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-028 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-028 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-040 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-040 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-040 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-028 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-034 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-034 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-034 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-034 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-034 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-034 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-030 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-030 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-030 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-030 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-030 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-046 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-046 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-046 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-045 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-045 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-045 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-045 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-045 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-045 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-045 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-045 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319 3-Jan RT Acc 556 157mm

CIWE-045 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-018 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-030 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-030 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-047 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-047 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-047 23-Dec-17 Accept 24-Dec-17 26-Dec-17 Accept 319

CIWE-029 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-029 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-029 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-047 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-047 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-029 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-029 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320 26-Dec RT Acc 545 628mm

CIWE-029 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-028 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-028 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-028 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-028 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-028 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320 17-Jan RT Acc 559R 157mm

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320 9-Jan RT Acc 559 157mm

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320 9-Jan RT Acc 559 157mm

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-028 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-028 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-028 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-028 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-028 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-030 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-029 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-029 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-029 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-029 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-029 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-029 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-028 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-018 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-018 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-018 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320 26-Dec RT Acc 548 251.2mm

CIWE-018 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-018 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-018 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-046 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-046 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-046 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-046 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-046 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-018 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-018 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-018 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-018 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-034 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-034 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320 3-Jan RT Acc 554 785mm

CIWE-034 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320

CIWE-040 26-Dec-17 Accept 27-Dec-17 28-Dec-17 Accept 320


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321 3-Jan RT Acc 553 785mm

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321 3-Jan RT Acc 553 785mm

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321 26-Dec-17 RT Acc 550 314mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321 26-Dec-17 RT Acc 550 314mm

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 As per site modification 3" deleted 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-047 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-047 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-047 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321 9-Jan RT Acc 550R 314mm

CIWE-047 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-028 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-028 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-028 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 As per site modification 3" deleted 321


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 27-Dec-17 As per site modification 3" deleted 321

CIWE-047 27-Dec-17 As per site modification 3" deleted 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-029 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-018 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321 3-Jan RT Acc 555 785mm

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321 3-Jan RT Acc 555 785mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-034 27-Dec-17 Accept 28-Dec-17 29-Dec-17 Accept 321

CIWE-040 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-040 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-040 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-040 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-040 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-034 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323 26-Dec RT Acc 549 628mm

CIWE-034 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323 26-Dec RT Acc 549 628mm

CIWE-034 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-034 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-034 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-034 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-029 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-018 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-040 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-040 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-040 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-040 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-034 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-034 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-034 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 28-Dec-17 Accept 29-Dec-17 30-Dec-17 Accept 323

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-045 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-045 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-045 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-045 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-045 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-045 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-045 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-045 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325 3-Jan RT Acc 556 157mm

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-030 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-034 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 29-Dec-17 Accept 30-Dec-17 2-Jan-18 Accept 325

CIWE-028 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327 26-Dec RT Acc 549 628mm

CIWE-034 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 2-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-030 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-030 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-034 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-028 30-Dec-17 Accept 3-Jan-18 4-Jan-18 Accept 327

CIWE-034 4-Jan-18 Accept 5-Jan-18 8-Jan-18 Accept 330

CIWE-034 4-Jan-18 Accept 5-Jan-18 8-Jan-18 Accept 330

CIWE-034 4-Jan-18 Accept 5-Jan-18 8-Jan-18 Accept 330

CIWE-030 4-Jan-18 Accept 5-Jan-18 8-Jan-18 Accept 330

CIWE-030 4-Jan-18 Accept 5-Jan-18 8-Jan-18 Accept 330


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 4-Jan-18 Accept 5-Jan-18 8-Jan-18 Accept 330

CIWE-034 4-Jan-18 Accept 5-Jan-18 8-Jan-18 Accept 330

CIWE-034 4-Jan-18 Accept 5-Jan-18 8-Jan-18 Accept 330

CIWE-034 4-Jan-18 Accept 5-Jan-18 8-Jan-18 Accept 330

CIWE-028 4-Jan-18 Accept 5-Jan-18 8-Jan-18 Accept 330

CIWE-028 5-Jan-18 Accept 6-Jan-18 8-Jan-18 Accept 330

CIWE-028 5-Jan-18 Accept 6-Jan-18 8-Jan-18 Accept 330

CIWE-028 5-Jan-18 Accept 6-Jan-18 8-Jan-18 Accept 330

CIWE-028 5-Jan-18 Accept 6-Jan-18 8-Jan-18 Accept 330

CIWE-028 5-Jan-18 Accept 6-Jan-18 8-Jan-18 Accept 330

CIWE-028 5-Jan-18 Accept 6-Jan-18 8-Jan-18 Accept 330


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 5-Jan-18 Accept 6-Jan-18 8-Jan-18 Accept 330

CIWE-028 5-Jan-18 Accept 6-Jan-18 8-Jan-18 Accept 330

CIWE-028 5-Jan-18 Accept 6-Jan-18 8-Jan-18 Accept 330

CIWE-028 5-Jan-18 Accept 6-Jan-18 8-Jan-18 Accept 330

CIWE-028 5-Jan-18 Accept 6-Jan-18 8-Jan-18 Accept 330

CIWE-028 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-028 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-028 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-028 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-028 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-030 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-034 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-034 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-034 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-034 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-034 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-034 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-034 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-034 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-028 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-028 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-028 6-Jan-18 Accept 7-Jan-18 8-Jan-18 Accept 330

CIWE-028 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-030 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-030 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-030 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 8-Jan-18 Accept 9-Jan-18 11-Jan-18 Accept 332

CIWE-034 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-034 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-028 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-028 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-028 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-028 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-028 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-028 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-028 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-028 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-028 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-034 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-034 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-034 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-034 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-034 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-034 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-034 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-034 9-Jan-18 Accept 10-Jan-18 11-Jan-18 Accept 332

CIWE-034 10-Jan-18 Accept 11-Jan-18 15-Jan-18 Accept 334

CIWE-034 10-Jan-18 Accept 11-Jan-18 15-Jan-18 Accept 334


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 10-Jan-18 Accept 11-Jan-18 15-Jan-18 Accept 334

CIWE-034 10-Jan-18 Accept 11-Jan-18 15-Jan-18 Accept 334

CIWE-034 10-Jan-18 Accept 11-Jan-18 15-Jan-18 Accept 334

CIWE-034 10-Jan-18 Accept 11-Jan-18 15-Jan-18 Accept 334

CIWE-034 10-Jan-18 Accept 11-Jan-18 15-Jan-18 Accept 334

CIWE-034 10-Jan-18 Accept 11-Jan-18 15-Jan-18 Accept 334

CIWE-034 10-Jan-18 Accept 11-Jan-18 15-Jan-18 Accept 334

CIWE-018 11-Jan-18 Accept 12-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-018 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-034 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-047 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-047 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-047 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-047 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-047 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-047 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-047 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-047 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-047 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-047 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 12-Jan-18 Accept 13-Jan-18 15-Jan-18 Accept 334

CIWE-030 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-034 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-034 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-047 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-047 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-034 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-034 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-030 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-030 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-030 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-030 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-030 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-030 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-030 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-030 13-Jan-18 Accept 14-Jan-18 17-Jan-18 Accept 335

CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-018 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-030 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-030 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-030 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-030 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-030 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-047 14-Jan-18 Accept 15-Jan-18 17-Jan-18 Accept 335

CIWE-047 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-047 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-047 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-047 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-047 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-047 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-040 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-028 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-028 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-028 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-028 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-028 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-028 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-028 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335 17-Jan-18 RT Acc 561 628mm

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335 17-Jan-18 RT Acc 561 628mm
Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-030 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-028 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-028 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-028 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-028 15-Jan-18 Accept 16-Jan-18 17-Jan-18 Accept 335

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-034 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-034 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-030 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-030 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-030 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-030 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-030 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-030 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-030 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-030 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-030 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 16-Jan-18 Accept 17-Jan-18 18-Jan-18 Accept 336

CIWE-028 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-028 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-045 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-045 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-045 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-045 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-047 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-045 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-045 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-045 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-047 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-045 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-047 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-030 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-030 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-030 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-030 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-034 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-034 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-034 17-Jan-18 Accept 18-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-028 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-028 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-028 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-028 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-028 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-028 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-028 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-028 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-028 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-028 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-028 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-030 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-030 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-030 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-034 18-Jan-18 Accept 19-Jan-18 20-Jan-18 Accept 337

CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338

CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338

CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338

CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338

CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338

CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338

CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338

CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338

CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338

CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338

CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338

CIWE-036 19-Jan-18 Accept 20-Jan-18 22-Jan-18 Accept 338

CIWE-047 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-045 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-047 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-047 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-028 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-047 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-047 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-034 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-034 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-047 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-047 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-047 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-047 20-Jan-18 Accept 21-Jan-18 23-Jan-18 Accept 339

CIWE-047 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-047 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-047 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-047 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-030 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-030 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-030 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-030 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-030 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-030 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-030 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-030 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-034 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-047 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-047 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-047 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-047 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-015 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-015 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-015 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-015 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-015 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-015 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-015 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339

CIWE-015 21-Jan-18 Accept 22-Jan-18 23-Jan-18 Accept 339


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-015 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-047 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-045 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-045 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-045 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-045 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-028 22-Jan-18 Accept 23-Jan-18 24-Jan-18 Accept 340

CIWE-030 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-030 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-030 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-030 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-030 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-030 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-030 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-034 23-Jan-18 Accept 24-Jan-18 26-Jan-18 Accept 343

CIWE-028 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-028 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-028 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-028 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-028 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-047 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-028 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-028 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-028 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-028 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-028 26-Jan-18 Accept 27-Jan-18 31-Jan-18 Accept 354

CIWE-028 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-028 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-028 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-028 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-030 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354 1/2/2018 RT Acc 564 785mm

CIWE-030 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-030 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-030 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-030 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 27-Jan-18 Accept 28-Jan-18 31-Jan-18 Accept 354

CIWE-015 28-Jan-18 Accept 29-Jan-18 31-Jan-18 Accept 354

CIWE-015 28-Jan-18 Accept 29-Jan-18 31-Jan-18 Accept 354

CIWE-015 28-Jan-18 Accept 29-Jan-18 31-Jan-18 Accept 354

CIWE-015 28-Jan-18 Accept 29-Jan-18 31-Jan-18 Accept 354


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 28-Jan-18 Accept 29-Jan-18 31-Jan-18 Accept 354

CIWE-015 28-Jan-18 Accept 29-Jan-18 31-Jan-18 Accept 354

CIWE-015 28-Jan-18 Accept 29-Jan-18 31-Jan-18 Accept 354

CIWE-015 28-Jan-18 Accept 29-Jan-18 31-Jan-18 Accept 354

CIWE-015 28-Jan-18 Accept 29-Jan-18 31-Jan-18 Accept 354

CIWE-015 28-Jan-18 Accept 29-Jan-18 31-Jan-18 Accept 354

CIWE-015 28-Jan-18 Accept 29-Jan-18 31-Jan-18 Accept 354

CIWE-015 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-015 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-015 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-015 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-015 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-015 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-015 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-015 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-015 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-015 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-028 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-028 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-028 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-028 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-028 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-028 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-028 29-Jan-18 Accept 30-Jan-18 31-Jan-18 Accept 354

CIWE-028 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-028 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-028 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-028 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-028 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-030 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-030 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-030 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-030 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-030 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-046 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-046 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 30-Jan-18 Accept 31-Jan-18 1-Feb-18 Accept 356

CIWE-015 1-Feb-18 Accept 2-Feb-18 5-Feb-18 Accept 360

CIWE-015 1-Feb-18 Accept 2-Feb-18 5-Feb-18 Accept 360

CIWE-015 1-Feb-18 Accept 2-Feb-18 5-Feb-18 Accept 360


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 1-Feb-18 Accept 2-Feb-18 5-Feb-18 Accept 360

CIWE-039 1-Feb-18 Accept 2-Feb-18 5-Feb-18 Accept 360

CIWE-039 1-Feb-18 Accept 2-Feb-18 5-Feb-18 Accept 360

CIWE-039 1-Feb-18 Accept 2-Feb-18 5-Feb-18 Accept 360

CIWE-047 1-Feb-18 Accept 2-Feb-18 5-Feb-18 Accept 360

CIWE-047 1-Feb-18 Accept 2-Feb-18 5-Feb-18 Accept 360

CIWE-047 1-Feb-18 Accept 2-Feb-18 5-Feb-18 Accept 360

CIWE-047 1-Feb-18 Accept 2-Feb-18 5-Feb-18 Accept 360

CIWE-047 1-Feb-18 Accept 2-Feb-18 5-Feb-18 Accept 360

CIWE-015 2-Feb-18 Accept 3-Feb-18 5-Feb-18 Accept 360

CIWE-015 2-Feb-18 Accept 3-Feb-18 5-Feb-18 Accept 360


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 2-Feb-18 Accept 3-Feb-18 5-Feb-18 Accept 360

CIWE-015 2-Feb-18 Accept 3-Feb-18 5-Feb-18 Accept 360

CIWE-015 2-Feb-18 Accept 3-Feb-18 5-Feb-18 Accept 360

CIWE-015 2-Feb-18 Accept 3-Feb-18 5-Feb-18 Accept 360

CIWE-015 2-Feb-18 Accept 3-Feb-18 5-Feb-18 Accept 360

CIWE-015 2-Feb-18 Accept 3-Feb-18 5-Feb-18 Accept 360

CIWE-015 2-Feb-18 Accept 3-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-034 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-034 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-034 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-034 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-034 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-034 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-046 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-033 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-028 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-033 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-033 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-033 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-036 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-018 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-018 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-018 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-018 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-018 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-018 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-018 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-018 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-036 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-036 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-036 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-036 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360

CIWE-036 3-Feb-18 Accept 4-Feb-18 5-Feb-18 Accept 360


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 2-Feb-18 Accept 3-Feb-18 6-Feb-18 Accept 362

CIWE-025 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-025 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-025 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-025 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-025 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-025 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-015 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-015 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-025 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-024 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-024 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-024 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-024 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-024 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-024 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-024 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-024 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-024 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 3-Feb-18 Accept 4-Feb-18 6-Feb-18 Accept 362

CIWE-024 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-024 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-024 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-024 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-024 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-024 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-036 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-025 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-025 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-025 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-025 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-025 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-025 4-Feb-18 Accept 5-Feb-18 6-Feb-18 Accept 362

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-025 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-036 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-039 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-039 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-040 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-039 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-040 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-040 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-040 4-Feb-18 Accept 5-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-039 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-039 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-039 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-039 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-039 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-036 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-036 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-036 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-036 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-039 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-036 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-040 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-025 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-024 5-Feb-18 Accept 6-Feb-18 7-Feb-18 Accept 364

CIWE-036 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-036 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-046 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-036 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-034 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-047 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-047 6-Feb-18 Accept 7-Feb-18 8-Feb-18 Accept 367

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-036 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-034 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-034 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-015 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-015 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-015 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-015 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-015 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-015 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-015 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-015 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-047 7-Feb-18 Accept 8-Feb-18 9-Feb-18 Accept 369

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-046 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-047 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-047 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-047 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-047 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-047 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-039 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-039 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-039 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-039 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-039 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-036 8-Feb-18 Accept 9-Feb-18 12-Feb-18 Accept 370

CIWE-034 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-015 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-015 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-034 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-015 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-034 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-040 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-040 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-028 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-039 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-039 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-039 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-039 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-030 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-034 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-034 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-034 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-045 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-047 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-047 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-047 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-047 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-047 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-047 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-047 19-Feb-18 Accept 20-Feb-18 21-Feb-18 Accept 376

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

As per site modification deleded

CIWE-036 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-036 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-036 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-036 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-036 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-036 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-024 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-025 19-Feb-18 Accept 20-Feb-18 22-Feb-18 Accept 377

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-036 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-036 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-036 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-036 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-036 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 20-Feb-18 Accept 21-Feb-18 22-Feb-18 Accept 378

CIWE-047 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-047 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-047 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-047 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-047 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-047 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-047 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-047 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-047 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-047 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-049 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-034 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-040 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-040 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-040 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-040 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-036 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-036 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-036 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-036 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-036 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-036 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-036 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-015 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-015 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-015 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-015 22-Feb-18 Accept 23-Feb-18 24-Feb-18 Accept 379

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-015 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-034 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-034 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-034 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-034 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-034 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-034 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-034 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-036 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-036 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-034 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-034 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-034 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-034 23-Feb-18 Accept 24-Feb-18 26-Feb-18 Accept 382

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386

CIWE-034 24-Feb-18 Accept 25-Feb-18 28-Feb-18 Accept 386


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-034 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-039 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386

CIWE-040 25-Feb-18 Accept 26-Feb-18 28-Feb-18 Accept 386


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-034 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-040 26-Feb-18 Accept 27-Feb-18 28-Feb-18 Accept 387

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-039 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 28-Feb-18 Accept 1-Mar-18 2-Mar-18 Accept 392

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-039 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-047 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-047 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-047 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-047 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-047 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-047 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-047 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-034 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-047 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-047 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-047 1-Mar-18 Accept 2-Mar-18 5-Mar-18 Accept 393

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-039 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-039 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-039 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-039 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-039 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-015 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-015 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-015 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-015 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-015 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-015 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-034 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-047 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401

CIWE-034 8-Mar-18 Accept 9-Mar-18 12-Mar-18 Accept 401


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-039 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-045 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 401

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-047 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-034 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-040 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402

CIWE-036 9-Mar-18 Accept 10-Mar-18 12-Mar-18 Accept 402


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-036 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-036 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-036 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-036 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-036 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-036 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-036 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-036 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-039 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-039 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-039 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-039 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-039 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-039 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-039 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-039 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-034 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 10-Mar-18 Accept 11-Mar-18 13-Mar-18 Accept 405

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-047 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-040 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-040 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-045 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 11-Mar-18 Accept 12-Mar-18 13-Mar-18 Accept 406

CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-039 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-045 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-034 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-040 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-015 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-028 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-028 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-028 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-028 12-Mar-18 Accept 13-Mar-18 14-Mar-18 Accept 408

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-028 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-039 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-039 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-039 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-039 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-039 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-039 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-034 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-045 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-047 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-047 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-047 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-047 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-047 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-047 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-047 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-047 13-Mar-18 Accept 14-Mar-18 15-Mar-18 Accept 411

CIWE-047 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-047 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-047 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-047 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-047 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-047 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-040 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-034 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-034 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-034 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-034 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-015 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-015 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-015 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-015 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-015 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-015 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-015 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-015 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-015 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-015 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413

CIWE-015 14-Mar-18 Accept 15-Mar-18 16-Mar-18 Accept 413


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 13-Mar-18 Accept 14-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 14-Mar-18 Accept 15-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 15-Mar-18 Accept 16-Mar-18 17-Mar-18 Accept 415

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-036 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-036 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-036 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-036 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-036 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-024 10-Mar-18 Accept 12-Mar-18 19-Mar-18 Accept 416

CIWE-025 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-025 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-025 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-025 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-025 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-025 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-025 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-025 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-025 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-025 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 11-Mar-18 Accept 13-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-040 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-040 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-040 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-034 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-034 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-034 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-034 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-034 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 12-Mar-18 Accept 14-Mar-18 19-Mar-18 Accept 416

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-034 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-034 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-034 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-034 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-034 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-036 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-036 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-036 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-036 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-036 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-036 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-036 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417

CIWE-024 13-Mar-18 Accept 15-Mar-18 19-Mar-18 Accept 417


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-040 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-040 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-040 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-040 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-040 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-039 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-039 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-039 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-039 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-015 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-034 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-047 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-045 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-040 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 14-Mar-18 Accept 16-Mar-18 20-Mar-18 Accept 419

CIWE-040 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-047 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-047 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-034 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-034 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-034 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-034 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-039 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-039 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-034 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-034 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-039 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-015 15-Mar-18 Accept 17-Mar-18 22-Mar-18 Accept 430

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-039 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-039 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-015 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-034 16-Mar-18 Accept 18-Mar-18 23-Mar-18 Accept 433

CIWE-039 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-040 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-040 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-039 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-040 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-040 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-039 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-040 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-039 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-040 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-040 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-039 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-040 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-040 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-024 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-024 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-024 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-034 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-045 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-015 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-034 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-034 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-034 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-034 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-034 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-034 17-Mar-18 Accept 19-Mar-18 26-Mar-18 Accept 436

CIWE-049 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-049 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-049 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-045 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-040 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-049 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-049 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-049 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-049 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-049 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 22-Mar-18 Accept 23-Mar-18 27-Mar-18 Accept 437

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-024 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-024 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-024 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-039 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-039 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-039 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-039 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-039 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-039 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-039 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 23-Mar-18 Accept 24-Mar-18 28-Mar-18 Accept 438

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-046 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-046 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-046 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-046 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-045 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-045 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-045 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-047 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-047 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-047 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-047 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-047 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-047 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-039 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-039 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-039 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-039 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-039 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-046 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-046 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-046 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-046 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-045 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-045 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-045 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-040 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-040 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-040 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-040 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-045 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-045 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-045 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-045 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-045 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-045 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-046 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 24-Mar-18 Accept 25-Mar-18 29-Mar-18 Accept 440

CIWE-015 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-039 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-015 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-015 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-015 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-015 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-015 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-015 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-015 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-034 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 443

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-045 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-046 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-047 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-015 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-015 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-015 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-015 25-Mar-18 Accept 26-Mar-18 31-Mar-18 Accept 444

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-047 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-047 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-047 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-047 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-047 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-047 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-047 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-047 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-047 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-047 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-047 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-045 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-045 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-045 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-028 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-034 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-034 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-034 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-039 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-034 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-040 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-045 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 26-Mar-18 Accept 27-Mar-18 2-Apr-18 Accept 445

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-015 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-047 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-040 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-047 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-047 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-046 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-046 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-046 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-046 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-046 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-046 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-046 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-046 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-046 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-039 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-039 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-045 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-039 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447

CIWE-039 27-Mar-18 Accept 28-Mar-18 3-Apr-18 Accept 447


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-047 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-040 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-040 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-040 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-040 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-040 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-040 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-040 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-046 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-046 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-046 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-046 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-046 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-047 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-047 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-047 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-047 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-047 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-047 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-047 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-039 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-015 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-034 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-034 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-034 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-034 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-034 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-034 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-034 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-034 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-034 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-034 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 28-Mar-18 Accept 29-Mar-18 4-Apr-18 Accept 448

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-046 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-046 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-046 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-046 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-046 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-046 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-046 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-046 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-046 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-045 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-045 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-045 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-045 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-045 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-045 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-015 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-039 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-034 29-Mar-18 Accept 30-Mar-18 5-Apr-18 Accept 449

CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-034 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-034 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-034 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-034 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-034 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-034 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-034 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-034 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-034 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-034 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-034 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-015 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-047 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-040 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-045 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-045 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-045 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-045 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-045 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-045 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-045 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-045 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-039 2-Apr-18 Accept 3-Apr-18 5-Apr-18 Accept 453

CIWE-024 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-024 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-034 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-039 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-039 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-039 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-039 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-039 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-034 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-034 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-034 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-034 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-034 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-034 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-034 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-034 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-034 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-045 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-034 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-040 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-040 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-040 3-Apr-18 Accept 4-Apr-18 7-Apr-18 Accept 455

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-015 4-Apr-18 Accept 5-Apr-18 9-Apr-18 Accept 460

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-015 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 5-Apr-18 Accept 6-Apr-18 10-Apr-18 Accept 462

CIWE-040 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-040 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-040 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-040 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-040 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-040 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-040 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-040 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-040 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-046 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 6-Apr-18 Accept 7-Apr-18 11-Apr-18 Accept 464

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-015 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-040 7-Apr-18 Accept 8-Apr-18 12-Apr-18 Accept 466

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-039 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-039 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-039 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-039 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-039 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-039 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-039 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-039 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-039 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-015 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-015 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-015 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-015 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-015 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 8-Apr-18 Accept 9-Apr-18 13-Apr-18 Accept 469

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-045 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-046 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-046 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-046 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-046 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-046 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-046 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-046 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-046 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-047 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-047 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-047 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-047 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-047 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-047 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 9-Apr-18 Accept 10-Apr-18 14-Apr-18 Accept 474

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-015 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 10-Apr-18 Accept 11-Apr-18 16-Apr-18 Accept 479

CIWE-046 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-046 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-046 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-046 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-046 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-046 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-046 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-046 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-015 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-015 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-015 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-045 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-040 11-Apr-18 Accept 12-Apr-18 17-Apr-18 Accept 480

CIWE-039 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-039 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 12-Apr-18 Accept 13-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-046 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-046 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-039 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-045 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-045 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-045 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-046 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-046 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-045 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-045 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-045 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-045 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-046 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-045 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 13-Apr-18 Accept 14-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 14-Apr-18 Accept 15-Apr-18 18-Apr-18 Accept 484

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-039 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-039 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-039 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-039 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-039 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-039 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-039 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-039 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-039 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-039 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-045 15-Apr-18 Accept 16-Apr-18 19-Apr-18 Accept 486

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 16-Apr-18 Accept 17-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 17-Apr-18 Accept 18-Apr-18 23-Apr-18 Accept 491

CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491

CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491

CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491

CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491

CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491

CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491

CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491

CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491

CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491

CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491

CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491

CIWE-040 18-Apr-18 Accept 19-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-047 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-045 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-045 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-045 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-045 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-045 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-045 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-045 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-045 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-045 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-045 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-040 19-Apr-18 Accept 20-Apr-18 23-Apr-18 Accept 491

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-047 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-047 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-047 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-047 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-047 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-047 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-047 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-047 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-047 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-015 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-015 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-015 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-015 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-015 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-015 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-015 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-015 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-039 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-045 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-046 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-046 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-046 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-046 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-046 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-046 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-046 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493

CIWE-046 20-Apr-18 Accept 21-Apr-18 24-Apr-18 Accept 493


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-046 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-046 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-046 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-046 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-046 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-046 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-039 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-039 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-039 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-039 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-039 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-015 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-045 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-045 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-045 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-045 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-045 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-045 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-045 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-045 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-045 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-045 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-047 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496

CIWE-024 21-Apr-18 Accept 22-Apr-18 25-Apr-18 Accept 496


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-046 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-046 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-046 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-046 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-046 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-046 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-046 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-039 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-047 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504


Date: 11-May-18

Page No: OF 3

ION REPORT ANNEX A

FitUp Welded Visual & Dimensional Inspection NDT RT


Welder No
Date Result Date Date Result RFI No Date Type Result Rep No Length
CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504

CIWE-045 9-May-18 Accept 10-May-18 11-May-18 Accept 504


RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-239 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-012 CIWE-005 25-Aug ACC 15 4 40


A-1/CIWE/JIMT/RT-239 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-009 CIWE-005 25-Aug ACC 15 4 40
A-1/CIWE/JIMT/RT-239 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-010 CIWE-005 25-Aug ACC 15 4 40
A-1/CIWE/JIMT/RT-240 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-004 CIWE-001 25-Aug ACC 15 4 40
A-1/CIWE/JIMT/RT-241 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-006 CIWE-005 25-Aug ACC 15 4 40
A-1/CIWE/JIMT/RT-241 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-007 CIWE-005 25-Aug ACC 15 4 40
A-1/CIWE/JIMT/RT-241 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-011 CIWE-001 25-Aug ACC 15 4 40

A-1/CIWE/JIMT/RT-256 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-001 CIWE-005 2-Sep ACC 15 4 40

A-1/CIWE/JIMT/RT-256 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-003 CIWE-005 2-Sep ACC 15 4 40

A-1/CIWE/JIMT/RT-257 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-015 CIWE-001 2-Sep ACC 15 4 40

A-1/CIWE/JIMT/RT-257 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-016 CIWE-001 2-Sep ACC 15 4 40

A-1/CIWE/JIMT/RT-257 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-017 CIWE-001 2-Sep ACC 15 4 40

A-1/CIWE/JIMT/RT-258 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-018 CIWE-005 2-Sep ACC 15 4 40

A-1/CIWE/JIMT/RT-258 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-019 CIWE-001 2-Sep ACC 15 4 40

A-1/CIWE/JIMT/RT-267 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-019 CIWE-001 2-Sep REJ 15 4 40

A-1/CIWE/JIMT/RT-267R 20003-M0-0001-1A-12" 20003-M0-0001-1A-12"-W-019R CIWE-001 2-Sep ACC 15 4 40

A-1/CIWE/JIMT/RT-314 M0-0001-1A-12" M0-0001-1A-12"-SW-029 CIWE-001 18-Sep ACC 15 4 40


A-1/CIWE/JIMT/RT-314 M0-0001-1A-12" M0-0001-1A-12"-SW-043 CIWE-005 18-Sep ACC 15 4 40
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-315 D0-0001-1A-12" D0-0001-1A-12"-SW-026 CIWE-001 18-Sep ACC 15 4 40


A-1/CIWE/JIMT/RT-315 JF-0001-1A-12" JF-0001-1A-12"-SW-015 CIWE-024 18-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-316 D0-0001-1A-12" D0-0001-1A-12"-SW-049 CIWE-024 18-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-316 JF-0001-1A-12" JF-0001-1A-12"-SW-048 CIWE-024 18-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-316 M0-0001-1A-12" M0-0001-1A-12"-SW-052 CIWE-024 18-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-317 D0-0001-1A-12" D0-0001-1A-12"-SW-002 CIWE-025 18-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-318 M0-0001-1A-12" M0-0001-1A-12"-SW-013 CIWE-005 18-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-318 M0-0001-1A-12" M0-0001-1A-12"-SW-014 CIWE-001 18-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-318 M0-0001-1A-12" M0-0001-1A-12"-SW-036 CIWE-005 18-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-332 M0-0001-1A-12" M0-0001-1A-12"-SW-047 CIWE-025 26-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-332 JF-0001-1A-12" JF-0001-1A-12"-SW-025 CIWE-025 26-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-333 M0-0001-1A-12" M0-0001-1A-12"-SW-005 CIWE-025 26-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-333 JF-0001-1A-12" JF-0001-1A-12"-SW-099 CIWE-001 26-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-334 M0-0001-1A-12" M0-0001-1A-12"-SW-104 CIWE-024 26-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-334 M0-0001-1A-12" M0-0001-1A-12"-SW-057 CIWE-024 26-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-335 D0-0001-1A-12" D0-0001-1A-12"-SW-064 CIWE-024 26-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-335 D0-0001-1A-12" D0-0001-1A-12"-SW-038 CIWE-024 26-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-335 D0-0001-1A-12" D0-0001-1A-12"-SW-055 CIWE-025 26-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-336 D0-0001-1A-12" D0-0001-1A-12"-SW-101 CIWE-024 26-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-336 D0-0001-1A-12" D0-0001-1A-12"-SW-025 CIWE-001 26-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-337 D0-0001-1A-12" D0-0001-1A-12"-SW-044 CIWE-001 26-Sep REJ 15 4 40
A-1/CIWE/JIMT/RT-337R D0-0001-1A-12" D0-0001-1A-12"-SW-044R CIWE-001 2-Nov ACC 15 4 40
A-1/CIWE/JIMT/RT-338 JF-0001-1A-12" JF-0001-1A-12"-SW-013 CIWE-025 26-Sep REJ 15 4 40
A-1/CIWE/JIMT/RT-338R JF-0001-1A-12" JF-0001-1A-12"-SW-013R CIWE-025 26-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-339 M0-0062-1A-14" M0-0062-1A-14"-FW-003 CIWE-029 29-Sep ACC 15 4 44
A-1/CIWE/JIMT/RT-340 JF-0012-1A-10" JF-0012-1A-10"-FW-002 CIWE-029 29-Sep ACC 15 4 34
A-1/CIWE/JIMT/RT-341 M0-0004-1A-12" M0-0004-1A-12"-FW-027 CIWE-037 29-Sep ACC 15 4 40
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-342 D0-0002-1A-12" D0-0002-1A-12"-FW-036 CIWE-033 29-Sep ACC 15 4 40


A-1/CIWE/JIMT/RT-342 M0-0005-1A-12" M0-0005-1A-12"-FW-025 CIWE-037 29-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-352 M0-0062-1A-14" M0-0062-1A-14"-FW-023 CIWE-032 29-Sep Reshoot 15 4 44
A-1/CIWE/JIMT/RT-352RS M0-0062-1A-14" M0-0062-1A-14"-FW-023 CIWE-032 20-Oct ACC 15 4 44
A-1/CIWE/JIMT/RT-353 M0-0015-1A-12" M0-0015-1A-12"-FW-01A CIWE-033 29-Sep ACC 15 4 40
A-1/CIWE/JIMT/RT-354 JF-0012-1A-10" JF-0012-1A-10"-FW-005 CIWE-007 29-Sep Reshoot 15 4 34
A-1/CIWE/JIMT/RT-354RS JF-0012-1A-10" JF-0012-1A-10"-FW-005RS CIWE-007 2-Nov ACC 15 4 34
A-1/CIWE/JIMT/RT-361 M0-0121-1A-10" M0-0121-1A-10"-FW-029 CIWE-032 4-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-361 M0-0121-1A-10" M0-0121-1A-10"-FW-015 CIWE-032 4-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-362 M0-0003-1A-12" M0-0003-1A-12"-FW-026A CIWE-037 4-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-362 JF-0002-1A-12" JF-0002-1A-12"-FW-19G CIWE-029 4-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-363 M0-0119-1A-12" M0-0119-1A-12"-FW-034 CIWE-007 4-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-363 M0-0015-1A-12" M0-0015-1A-12"-FW-007 CIWE-020 4-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-364 M0-0054-1A-12" M0-0054-1A-12"-FW-013 CIWE-033 4-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-364 M0-0060-1A-12" M0-0060-1A-12"-FW-013 CIWE-033 4-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-365 D0-0016-1A-8" D0-0016-1A-8"-FW-16B CIWE-029 4-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-365 JF-0013-1A-8" JF-0013-1A-8"-FW-014 CIWE-037 4-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-366 M0-0040-1A-10" M0-0040-1A-10"-FW-020 CIWE-007 4-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-366 M0-0040-1A-10" M0-0040-1A-10"-FW-001 CIWE-032 4-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-367 M0-0019-1A-14" M0-0019-1A-14"-FW-011 CIWE-020 4-Oct ACC 15 4 44
A-1/CIWE/JIMT/RT-368 JF-0001-1A-12" JF-0001-1A-12"-SW-018 CIWE-001 7-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-368 M0-0001-1A-12" M0-0001-1A-12"-SW-026 CIWE-024 7-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-368 M0-0047-1A-12" M0-0047-1A-12"-FW-012 CIWE-020 7-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-369 M0-0056-1A-12" M0-0056-1A-12"-FW-016 CIWE-033 7-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-369 D0-0001-1A-12" D0-0001-1A-12"-SW-023(TR1) CIWE-018 7-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-370 JF-0002-1A-14" JF-0002-1A-14"-FW-021 CIWE-029 7-Oct ACC 15 4 44
A-1/CIWE/JIMT/RT-370 D0-0002-1A-12" D0-0002-1A-12"-FW-043 CIWE-029 7-Oct ACC 15 4 40
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-370 JF-0001-1A-12" JF-0001-1A-12"-SW-093(TR2) CIWE-018 7-Oct ACC 15 4 40

A-1/CIWE/JIMT/RT-371 JF-0041-1A-8" JF-0041-1A-8"-FW-042 CIWE-032 7-Oct ACC 15 4 27


A-1/CIWE/JIMT/RT-372 M0-0040-1A-10" M0-0040-1A-10"-FW-005 CIWE-032 7-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-373 M0-0062-1A-14" M0-0062-1A-14"-FW-006 CIWE-007 7-Oct ACC 15 4 44

A-1/CIWE/JIMT/RT-373 D0-0015-1A-14" D0-0015-1A-14"-FW-002(TR2) CIWE-007 7-Oct ACC 15 4 44

A-1/CIWE/JIMT/RT-374 M0-0021-1A-16" M0-0021-1A-16"-FW-029(TR1) CIWE-007 7-Oct ACC 15 4 50


A-1/CIWE/JIMT/RT-374 M0-0021-1A-16" M0-0021-1A-16"-FW-023 CIWE-018 7-Oct ACC 15 4 50
A-1/CIWE/JIMT/RT-375 D0-0017-1A-12" D0-0017-1A-12"-FW-005 CIWE-020 9-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-375 D0-0002-1A-12" D0-0002-1A-12"-FW-042 CIWE-029 9-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-375 M0-0002-1A-12" M0-0002-1A-12"-FW-035 CIWE-034 9-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-376 D0-0005-1A-12" D0-0005-1A-12"-FW-014 CIWE-033 9-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-376 D0-0010-1A-12" D0-0010-1A-12"-FW-014 CIWE-020 9-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-376 JF-0005-1A-12" JF-0005-1A-12"-FW-012 CIWE-033 9-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-377 M0-0002-1A-12" M0-0002-1A-12"-FW-033 CIWE-034 9-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-377 M0-0023-1A-12" M0-0023-1A-12"-FW-023 CIWE-007 9-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-377 M0-0011-1A-12" M0-0011-1A-12"-FW-005 CIWE-037 9-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-378 M0-0119-1A-12" M0-0119-1A-12"-FW-018 CIWE-032 9-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-379 M0-0062-1A-14" M0-0062-1A-14"-FW-05B CIWE-037 9-Oct ACC 15 4 44
A-1/CIWE/JIMT/RT-380 JF-0013-1A-8" JF-0013-1A-8"-FW-004 CIWE-007 9-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-380 M0-0022-1A-8" M0-0022-1A-8"-FW-66A CIWE-029 9-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-381 JF-0017-1A-10" JF-0017-1A-10"-FW-006 CIWE-037 10-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-381 M0-0024-1A-10" M0-0024-1A-10"-FW-003 CIWE-032 10-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-381 M0-0024-1A-10" M0-0024-1A-10"-FW-016 CIWE-007 10-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-382 M0-0030-1A-10" M0-0030-1A-10"-FW-003 CIWE-032 10-Oct ACC 15 4 34
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-382 M0-0027-1A-10" M0-0027-1A-10"-FW-016 CIWE-007 10-Oct ACC 15 4 34


A-1/CIWE/JIMT/RT-382 M0-0063-1A-10" M0-0063-1A-10"-FW-005 CIWE-018 10-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-383 M0-0039-1A-10" M0-0039-1A-10"-FW-008 CIWE-037 10-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-383 JF-0009-1A-10" JF-0009-1A-10"-FW-008 CIWE-033 10-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-384 JF-0041a-1A-8" JF-0041a-1A-8"-FW-002 CIWE-034 10-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-384 D0-0016-1A-8" D0-0016-1A-8"-FW-010A CIWE-030 10-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-385 JF-0041a-1A-8" JF-0041a-1A-8"-FW-004 CIWE-034 10-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-385 M0-0043-1A-8" M0-0043-1A-8"-FW-017 CIWE-018 10-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-386 M0-0033-1A-12" M0-0033-1A-12"-FW-005 CIWE-033 10-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-387 M0-0026-1A-6" M0-0026-1A-6"-FW-021 CIWE-007 13-Oct ACC 10 4 21
A-1/CIWE/JIMT/RT-388 D0-0031-1A-8" D0-0031-1A-8"-FW-005 CIWE-020 13-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-388 D0-0006-1A-8" D0-0006-1A-8"-FW-001 CIWE-033 13-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-388 D0-0023-1A-8" D0-0023-1A-8"-FW-007 CIWE-032 13-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-389 M0-0063-1A-10" M0-0063-1A-10"-FW-007 CIWE-034 13-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-389 JF-0012-1A-10" JF-0012-1A-10"-FW-4G CIWE-030 13-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-390 D0-0015-1A-14" D0-0015-1A-14"-FW-031 CIWE-030 13-Oct ACC 15 4 44
A-1/CIWE/JIMT/RT-391 M0-0023-1A-12" M0-0023-1A-12"-FW-035 CIWE-037 13-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-392 D0-0011-1A-8" D0-0011-1A-8"-FW-006 CIWE-033 13-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-392 JF-0020-1A-8" JF-0020-1A-8"-FW-008 CIWE-034 13-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-392 D0-0024-1A-8" D0-0024-1A-8"-FW-013 CIWE-007 13-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-393 D0-0024-1A-8" D0-0024-1A-8"-FW-019 CIWE-032 13-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-393 JF-0020-1A-8" JF-0020-1A-8"-FW-004 CIWE-018 13-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-393 JF-0020-1A-8" JF-0020-1A-8"-FW-006 CIWE-018 13-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-394 D0-0016-1A-8" D0-0016-1A-8"-FW-011 CIWE-030 13-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-394 D0-0024-1A-8" D0-0024-1A-8"-FW-021 CIWE-032 13-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-394 D0-0024-1A-8" D0-0024-1A-8"-FW-015 CIWE-007 13-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-395 D0-0021-1A-14" D0-0021-1A-14"-FW-013 CIWE-018 13-Oct ACC 15 4 44
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-395 D0-0054a-1A-14" D0-0054a-1A-14"-FW-047 CIWE-034 13-Oct ACC 15 4 44


A-1/CIWE/JIMT/RT-396 D0-0037-1A-4" D0-0037-1A-4"-FW-004 CIWE-020 13-Oct ACC 10 4 14
A-1/CIWE/JIMT/RT-396 D0-0036-1A-4" D0-0036-1A-4"-FW-003 CIWE-020 13-Oct ACC 10 4 14
A-1/CIWE/JIMT/RT-396 M0-0084-1A-4" M0-0084-1A-4"-FW-003 CIWE-033 13-Oct ACC 10 4 14
A-1/CIWE/JIMT/RT-397 M0-0044-1A-10" M0-0044-1A-10"-FW-015 CIWE-018 13-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-398 M0-0063-1A-10" M0-0063-1A-10"-FW-028 CIWE-037 16-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-399 M0-0029-1A-6" M0-0029-1A-6"-FW-015 CIWE-032 16-Oct ACC 10 4 21
A-1/CIWE/JIMT/RT-400 D0-0040-1A-4" D0-0040-1A-4"-FW-006 CIWE-020 16-Oct ACC 10 4 14
A-1/CIWE/JIMT/RT-400 D0-0041-1A-4" D0-0041-1A-4"-FW-006 CIWE-020 16-Oct ACC 10 4 14
A-1/CIWE/JIMT/RT-401 M0-0063-1A-10" M0-0063-1A-10"-FW-023 CIWE-029 16-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-401 D0-0025-1A-10" D0-0025-1A-10"-FW-016 CIWE-007 16-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-402 FW-6024-1B-14" FW-6024-1B-14"-FW-004 CIWE-029 16-Oct ACC 15 4 44
A-1/CIWE/JIMT/RT-403 M0-0022-1A-8" M0-0022-1A-8"-FW-044 CIWE-030 16-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-404 D0-0009-1A-14" D0-0009-1A-14"-FW-007 CIWE-037 16-Oct ACC 15 4 44
A-1/CIWE/JIMT/RT-405 FW-6015-1B-10" FW-6015-1B-10"-FW-002 CIWE-033 17-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-406 M0-0065-1A-6" M0-0065-1A-6"-FW-004 CIWE-018 17-Oct ACC 10 4 21
A-1/CIWE/JIMT/RT-406 M0-0066-1A-6" M0-0066-1A-6"-FW-022 CIWE-018 17-Oct ACC 10 4 21
A-1/CIWE/JIMT/RT-407 FW-6016-1B-10" FW-6016-1B-10"-FW-021 CIWE-033 17-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-408 M0-0044-1B-10" M0-0044-1B-10"-FW-008 CIWE-034 17-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-408 D0-0028-1A-10" D0-0028-1A-10"-FW-008 CIWE-032 17-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-409 JF-0024-1A-8" JF-0024-1A-8"-FW-015 CIWE-034 17-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-409 M0-0022-1A-8" M0-0022-1A-8"-FW-044 CIWE-030 17-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-409 M0-0022-1A-8" M0-0022-1A-8"-FW-034 CIWE-030 17-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-410 M0-0032-1A-6" M0-0032-1A-6"-FW-022 CIWE-007 17-Oct ACC 10 4 21
A-1/CIWE/JIMT/RT-410 M0-0029-1A-6" M0-0029-1A-6"-FW-003 CIWE-032 17-Oct ACC 10 4 21
A-1/CIWE/JIMT/RT-410 M0-0068-1A-6" M0-0068-1A-6"-FW-006 CIWE-034 17-Oct ACC 10 4 21
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-411 D0-0032-1A-6" D0-0032-1A-6"-FW-015 CIWE-018 17-Oct ACC 10 4 21


A-1/CIWE/JIMT/RT-412 M0-0022-1A-8" M0-0022-1A-8"-FW-041 CIWE-030 17-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-413 FW-6010-1B-10" FW-6010-1B-10"-FW-006 CIWE-029 17-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-413 FW-6010-1B-10" FW-6010-1B-10"-FW-001A CIWE-020 17-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-414 FW-6023-1B-14" FW-6023-1B-14"-FW-006 CIWE-037 17-Oct ACC 15 4 44
A-1/CIWE/JIMT/RT-415 FW-6023-1B-14" FW-6023-1B-14"-FW-002 CIWE-033 17-Oct REJ 15 4 44
A-1/CIWE/JIMT/RT-415R FW-6023-1B-14" FW-6023-1B-14"-FW-002R CIWE-033 24-Oct ACC 15 4 44
A-1/CIWE/JIMT/RT-416 FW-6023-1B-12" FW-6023-1B-12"-FW-013 CIWE-034 20-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-416 FW-6002-1B-12" FW-6002-1B-12"-FW-013 CIWE-034 20-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-417 FW-6028-1B-8" FW-6028-1B-8"-FW-03B CIWE-032 20-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-417 FW-6025-1B-8" FW-6025-1B-8"-FW-09A CIWE-032 20-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-417 FW-6027-1B-8" FW-6027-1B-8"-FW-03B CIWE-032 20-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-418 FW-6021-1B-8" FW-6021-1B-8"-FW-005 CIWE-018 20-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-419 FW-6010-1B-10" FW-6010-1B-10"-FW-012 CIWE-020 20-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-419 FW-6012-1B-10" FW-6012-1B-10"-FW-022 CIWE-037 20-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-419 FW-6008-1B-10" FW-6008-1B-10"-FW-010 CIWE-018 20-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-420 FW-6012-1B-10" FW-6012-1B-10"-FW-009 CIWE-033 20-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-421 FW-6023-1B-14" FW-6023-1B-14"-FW-014 CIWE-037 20-Oct ACC 15 4 44
A-1/CIWE/JIMT/RT-422 PW-6001-1B-8" PW-6001-1B-8"-FW-007 CIWE-037 24-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-422 FW-6201-1B-8" FW-6201-1B-8"-FW-009 CIWE-018 24-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-422 PW-6001-1B-8" PW-6001-1B-8"-FW-023A CIWE-032 24-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-423 FW-6009-1B-8" FW-6009-1B-8"-FW-030 CIWE-034 24-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-423 D0-0030-1A-8" D0-0030-1A-8"-FW-015 CIWE-007 24-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-423 D0-0030-1A-8" D0-0030-1A-8"-FW-003 CIWE-007 24-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-424 FW-6026-1B-10" FW-6026-1B-10"-FW-011A CIWE-032 24-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-425 JF-0002-1A-12" JF-0002-1A-12"-FW-003 CIWE-030 24-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-425 D0-0002-1A-12" D0-0002-1A-12"-FW-003 CIWE-030 24-Oct ACC 15 4 40
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-426 M0-0120-1A-8" M0-0120-1A-8"-FW-009 CIWE-007 24-Oct ACC 10 4 14


A-1/CIWE/JIMT/RT-427 M0-0120-1A-8" M0-0120-1A-8"-FW-053 CIWE-007 26-Oct ACC 10 4 14
A-1/CIWE/JIMT/RT-428 FW-6010-1B-10" FW-6010-1B-10"-FW-024 CIWE-034 26-Oct ACC 15 4 34
A-1/CIWE/JIMT/RT-429 FW-6001-1B-16" FW-6001-1B-16"-FW-009 CIWE-018 26-Oct ACC 15 4 50
A-1/CIWE/JIMT/RT-429 FW-6001-1B-16" FW-6001-1B-16"-FW-019 CIWE-018 26-Oct ACC 15 4 50
A-1/CIWE/JIMT/RT-430 M0-0001-1A-12" M0-0001-1A-12"-FW-082A CIWE-030 26-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-430 JF-0001-1A-12" JF-0001-1A-12"-FW-077 CIWE-030 26-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-430 D0-0001-1A-12" D0-0001-1A-12"-FW-079 CIWE-030 26-Oct ACC 15 4 40
A-1/CIWE/JIMT/RT-431 FW-6027-1B-8" FW-6027-1B-8"-FW-006 CIWE-029 26-Oct ACC 15 4 27
A-1/CIWE/JIMT/RT-432 FW-6028-1B-8" FW-6028-1B-8"-FW-005 CIWE-029 26-Oct REJ 15 4 27
A-1/CIWE/JIMT/RT-432R FW-6028-1B-8" FW-6028-1B-8"-FW-005R CIWE-029 2-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-433 M0-0120-1A-8" M0-0120-1A-8"-FW-021(TR1) CIWE-029 2-Nov ACC 10 4 14
A-1/CIWE/JIMT/RT-434 JF-0002-1A-12" JF-0002-1A-12"-FW-002B CIWE-030 2-Nov ACC 15 4 40
A-1/CIWE/JIMT/RT-434 D0-0002-1A-12" D0-0002-1A-12"-FW-002B CIWE-030 2-Nov ACC 15 4 40
A-1/CIWE/JIMT/RT-434 M0-0002-1A-12" M0-0002-1A-12"-FW-001B CIWE-030 2-Nov ACC 15 4 40
A-1/CIWE/JIMT/RT-435 FW-6026-1B-10" FW-6026-1B-10"-FW-003(TR2) CIWE-029 2-Nov ACC 15 4 34
A-1/CIWE/JIMT/RT-436 FW-6001-1B-16" FW-6001-1B-16"-FW-012 CIWE-034 2-Nov ACC 15 4 50
A-1/CIWE/JIMT/RT-437 FW-6024-1B-14" FW-6024-1B-14"-FW-009 CIWE-034 2-Nov ACC 15 4 44
A-1/CIWE/JIMT/RT-438 FS-6207-1D-8" FS-6207-1D-8"-FW-003 CIWE-036 10-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-438 FW-2001A-1D-8" FW-2001A-1D-8"-FW-007 CIWE-034 10-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-438 FS-6207-1D-8" FS-6207-1D-8"-FW-008 CIWE-036 10-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-439 D0-0002-1A-12" D0-0002-1A-12"-FW-036 CIWE-030 10-Nov ACC 15 4 40
A-1/CIWE/JIMT/RT-439 M0-0003-1A-12" M0-0003-1A-12"-FW-023 CIWE-030 10-Nov ACC 15 4 40
A-1/CIWE/JIMT/RT-440 FS-6207-1D-8" FS-6207-1D-8"-FW-014 CIWE-036 10-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-440 FS-6203-1D-8" FS-6203-1D-8"-FW-014 CIWE-034 10-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-440 FS-6206-1D-8" FS-6206-1D-8"-FW-045 CIWE-036 10-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-441 FS-6205-1D-8" FS-6205-1D-8"-FW-002 CIWE-030 10-Nov ACC 15 4 27
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-441 FS-6204-1D-8" FS-6204-1D-8"-FW-006 CIWE-030 10-Nov ACC 15 4 27


A-1/CIWE/JIMT/RT-441 FW-2002-1D-8" FW-2002-1D-8"-FW-001 CIWE-034 10-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-442 FW-2001b-1D-8" FW-2001b-1D-8"-FW-011 CIWE-034 10-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-448 FW-3029-1D-2" FW-3029-1D-2"-FW-007A CIWE-029 11-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-448 FW-3023-1D-2" FW-3023-1D-2"-FW-012 CIWE-029 11-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-448 FW-2011-1D-2" FW-2011-1D-2"-FW-006 2aw 不不 11-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-448 FW-2016-1D-2" FW-2016-1D-2"-FW-006 CIWE-029 11-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-449 FW-2006-1D-2" FW-2006-1D-2"-FW-006 CIWE-029 11-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-449 FW-2004-1D-2" FW-2004-1D-2"-FW-006 CIWE-029 11-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-449 FW-2017-1D-2" FW-2017-1D-2"-FW-006 CIWE-029 11-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-451RS FW-3019-1D-2" FW-3019-1D-2"-FW-012(RS) CIWE-029 14-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-452 FW-3018-1D-2" FW-3018-1D-2"-FW-007A CIWE-029 14-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-452 FW-3021-1D-2" FW-3021-1D-2"-FW-007A CIWE-029 14-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-453 FW-3027-1D-2" FW-3027-1D-2"-FW-012 CIWE-029 14-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-453 FW-3025-1D-2" FW-3025-1D-2"-FW-012 CIWE-029 14-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-454 FW-3024-1D-2" FW-3024-1D-2"-FW-007A CIWE-029 14-Nov Reshoot 10 4 7.5
A-1/CIWE/JIMT/RT-454RS FW-3024-1D-2" FW-3024-1D-2"-FW-007ARS CIWE-029 25-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-455 FW-2010-1D-2" FW-2010-1D-2"-FW-006 CIWE-029 14-Nov REJ 10 4 7.5
A-1/CIWE/JIMT/RT-455R FW-2010-1D-2" FW-2010-1D-2"-FW-006R CIWE-029 15-Nov ACC 10 4 7.5
A-1/CIWE/JIMT/RT-458 FS-6207-1D-8" FS-6207-1D-8"-FW-046 CIWE-036 15-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-459 FS-6205-1D-8" FS-6205-1D-8"-FW-010 CIWE-030 15-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-459 FS-6204-1D-8" FS-6204-1D-8"-FW-030 CIWE-030 15-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-460 FW-0014-1D-10" FW-0014-1D-10"-FW-015 CIWE-034 15-Nov ACC 15 4 34
A-1/CIWE/JIMT/RT-462 FW-2002-1D-8" FW-2002-1D-8"-FW-016 CIWE-034 15-Nov REJ 15 4 27
A-1/CIWE/JIMT/RT-462RS FW-2002-1D-8" FW-2002-1D-8"-FW-016RS CIWE-034 21-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-463 FS-1101-1D-6" FS-1101-1D-6"-FW-468 CIWE-036 15-Nov REJ 10 4 21
A-1/CIWE/JIMT/RT-463R FS-1101-1D-6" FS-1101-1D-6"-FW-468 CIWE-036 23-Nov ACC 10 4 21
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-464 FW-0014-1D-10" FW-0014-1D-10"-FW-028 CIWE-034 15-Nov REJ 15 4 34


A-1/CIWE/JIMT/RT-464R FW-0014-1D-10" FW-0014-1D-10"-FW-028R CIWE-034 21-Nov ACC 15 4 34
A-1/CIWE/JIMT/RT-465 FS-0301-1D-4" FS-0301-1D-4"-FW-091 CIWE-028 21-Nov ACC 10 4 14
A-1/CIWE/JIMT/RT-465 FS-0401-1D-4" FS-0401-1D-4"-FW-176 CIWE-028 21-Nov ACC 10 4 14
A-1/CIWE/JIMT/RT-465 FS-1202-1D-4" FS-1202-1D-4"-FW-528 CIWE-036 21-Nov ACC 10 4 14
A-1/CIWE/JIMT/RT-466 FS-6203-1D-8" FS-6203-1D-8"-FW-002 CIWE-034 21-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-467 FW-0601-1D-6" FW-0601-1D-6"-FW-621 CIWE-018 21-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-467 FW-0701-1D-6" FW-0701-1D-6"-FW-748 CIWE-018 21-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-468 FS-6202-1D-6" FS-6202-1D-6"-FW-019 CIWE-029 21-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-468 FS-6202-1D-6" FS-6202-1D-6"-FW-011 CIWE-029 21-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-469 FW-0706-1D-2 1/2" FW-0706-1D-2 1/2"-FW-811 CIWE-018 21-Nov ACC 10 4 9
A-1/CIWE/JIMT/RT-470 FS-0401-1D-4" FS-0401-1D-4"-FW-189 CIWE-028 21-Nov ACC 10 4 14
WES
A-1/CIWE/JIMT/RT-471 SS316 2" JT1 18619/BV76 21-Nov ACC 10 4 7.5
8
WES
A-1/CIWE/JIMT/RT-471 SS316 2" JT2 18619/BV76 21-Nov ACC 10 4 7.5
8
WES
A-1/CIWE/JIMT/RT-471 SS316 2" JT3 18619/BV76 21-Nov ACC 10 4 7.5
8
WES
A-1/CIWE/JIMT/RT-471 SS316 2" JT4 18619/BV76 21-Nov ACC 10 4 7.5
8
WES
A-1/CIWE/JIMT/RT-472 SS316 2" JT5 18619/BV76 21-Nov ACC 10 4 7.5
8
WES
A-1/CIWE/JIMT/RT-472 SS316 2" JT6 18619/BV76 21-Nov ACC 10 4 7.5
8
WES
A-1/CIWE/JIMT/RT-472 SS316 2" JT7 18619/BV76 21-Nov ACC 10 4 7.5
8
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

WES
A-1/CIWE/JIMT/RT-472 SS316 2" JT8 18619/BV76 21-Nov ACC 10 4 7.5
8
WES
A-1/CIWE/JIMT/RT-473 SS316 2" JT9 18619/BV76 21-Nov ACC 10 4 7.5
8
WES
A-1/CIWE/JIMT/RT-473 SS316 2" JT10 18619/BV76 21-Nov ACC 10 4 7.5
8
WES
A-1/CIWE/JIMT/RT-473 SS316 2" JT11 18619/BV76 21-Nov ACC 10 4 7.5
8
A-1/CIWE/JIMT/RT-474 FW-2002-1D-8" FW-2002-1D-8"-FW-008 CIWE-034 21-Nov REJ 15 4 27
A-1/CIWE/JIMT/RT-474R FW-2002-1D-8" FW-2002-1D-8"-FW-008 CIWE-034 23-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-475 FS-0203-1D-3" FS-0203-1D-3"-FW-084 CIWE-036 21-Nov REJ 10 4 11
A-1/CIWE/JIMT/RT-475R FS-0203-1D-3" FS-0203-1D-3"-FW-084 CIWE-036 23-Nov ACC 10 4 11
A-1/CIWE/JIMT/RT-476 FW-0101-1D-6" FW-0101-1D-6"-FW-019 CIWE-034 23-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-476 FW-0201-1D-6" FW-0201-1D-6"-FW-088 CIWE-034 23-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-476 FS-6201-1D-8" FS-6201-1D-8"-FW-002 CIWE-034 23-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-477 FW-0106-1D-3" FW-0106-1D-3"-FW-065 CIWE-034 23-Nov REJ 10 4 11
A-1/CIWE/JIMT/RT-477R FW-0106-1D-3" FW-0106-1D-3"-FW-065R CIWE-034 28-Nov ACC 10 4 11
A-1/CIWE/JIMT/RT-478 FW-0606-1D-2 1/2" FW-0606-1D-2 1/2"-FW-723 CIWE-018 23-Nov ACC 10 4 9
A-1/CIWE/JIMT/RT-478 FW-0604-1D-2 1/2" FW-0604-1D-2 1/2"-FW-690 CIWE-018 23-Nov REJ 10 4 9
A-1/CIWE/JIMT/RT-478 R1 FW-0604-1D-2 1/2" FW-0604-1D-2 1/2"-FW-690R1 CIWE-018 25-Nov ACC 10 4 9
A-1/CIWE/JIMT/RT-478 FW-0602-1D-2 1/2" FW-0602-1D-2 1/2"-FW-652 CIWE-018 23-Nov REJ 10 4 9
A-1/CIWE/JIMT/RT-478 R1 FW-0602-1D-2 1/2" FW-0602-1D-2 1/2"-FW-652R1 CIWE-018 25-Nov ACC 10 4 9
A-1/CIWE/JIMT/RT-479 FW-3001-1D-8" FW-3001-1D-8"-FW-014 CIWE-028 23-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-479 FW-3001-1D-8" FW-3001-1D-8"-FW-006 CIWE-028 23-Nov Reshoot 15 4 27
A-1/CIWE/JIMT/RT-479RS FW-3001-1D-8" FW-3001-1D-8"-FW-006RS CIWE-028 28-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-479 FW-2001-1D-8" FW-2001-1D-8"-FW-005 CIWE-028 23-Nov ACC 15 4 27
A-1/CIWE/JIMT/RT-480 FS-0503-1D-3" FS-0503-1D-3"-FW-317 CIWE-028 23-Nov ACC 10 4 11
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-480 FS-0102-1D-3" FS-0102-1D-3"-FW-029 CIWE-036 23-Nov ACC 10 4 11


A-1/CIWE/JIMT/RT-480 FS-0202-1D-3" FS-0202-1D-3"-FW-071 CIWE-036 23-Nov ACC 10 4 11
A-1/CIWE/JIMT/RT-481 FW-1301-1D-6" FW-1301-1D-6"-FW-974 CIWE-036 23-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-481 FW-0501-1D-6" FW-0501-1D-6"-FW-473 CIWE-029 23-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-481 FW-0401-1D-6" FW-0401-1D-6"-FW-305 CIWE-029 23-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-482 FW-0301-1D-6" FW-0301-1D-6"-FW-149 CIWE-029 23-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-483 FS-0103-1D-3" FS-0103-1D-3"-FW-039 CIWE-036 25-Nov ACC 10 4 11
A-1/CIWE/JIMT/RT-484 FS-1303-1D-4" FS-1303-1D-4"-FW-590 CIWE-036 25-Nov REJ 10 4 14
A-1/CIWE/JIMT/RT-484R FS-1303-1D-4" FS-1303-1D-4"-FW-590R CIWE-036 28-Nov ACC 10 4 14
A-1/CIWE/JIMT/RT-485 FS-1201-1D-6" FS-1201-1D-6"-FW-515 CIWE-036 25-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-486 FW-1101-1D-6" FW-1101-1D-6"-FW-827 CIWE-036 25-Nov REJ 10 4 21
A-1/CIWE/JIMT/RT-486R FW-1101-1D-6" FW-1101-1D-6"-FW-827R CIWE-036 28-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-487 FW-1303-1D-2 1/2" FW-1303-1D-2 1/2"-FW-1008 CIWE-036 25-Nov ACC 10 4 9
A-1/CIWE/JIMT/RT-488 FS-6202-1D-6" FS-6202-1D-6"-FW-023 CIWE-029 25-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-488 FS-6202-1D-6" FS-6202-1D-6"-FW-042 CIWE-029 25-Nov Reshoot 10 4 21
A-1/CIWE/JIMT/RT-488RS FS-6202-1D-6" FS-6202-1D-6"-FW-042RS CIWE-029 28-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-489 FS-1201-1D-6" FS-1201-1D-6"-FW-909 CIWE-018 25-Nov ACC 10 4 21
A-1/CIWE/JIMT/RT-490 FW-1203-1D-2 1/2" FW-1203-1D-2 1/2"-FW-935 CIWE-018 25-Nov REJ 10 4 9
A-1/CIWE/JIMT/RT-490R FW-1203-1D-2 1/2" FW-1203-1D-2 1/2"-FW-935R CIWE-018 28-Nov ACC 10 4 9
A-1/CIWE/JIMT/RT-491 FW-0702-1D-2 1/2" FW-0702-1D-2 1/2"-FW-759 CIWE-018 25-Nov REJ 10 4 9
A-1/CIWE/JIMT/RT-491R FW-0702-1D-2 1/2" FW-0702-1D-2 1/2"-FW-759R CIWE-018 28-Nov ACC 10 4 9
A-1/CIWE/JIMT/RT-492 FW-0104-1D-3" FW-0104-1D-3"-FW-047 CIWE-034 25-Nov ACC 10 4 11
A-1/CIWE/JIMT/RT-493 FW-0204-1D-3" FW-0204-1D-3"-FW-116 CIWE-034 25-Nov ACC 10 4 11
A-1/CIWE/JIMT/RT-494 FW-0205-1D-3" FW-0205-1D-3"-FW-125 CIWE-034 25-Nov ACC 10 4 11
A-1/CIWE/JIMT/RT-495 FS-0501-1D-4" FS-0501-1D-4"-FW-262 CIWE-028 25-Nov ACC 10 4 14
A-1/CIWE/JIMT/RT-495 FS-0501-1D-4" FS-0501-1D-4"-FW-276 CIWE-028 25-Nov ACC 10 4 14
A-1/CIWE/JIMT/RT-496 FS-0601-1D-4" FS-0601-1D-4"-FW-343 CIWE-028 25-Nov ACC 10 4 14
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-497 FS-0603-1D-3" FS-0603-1D-3"-FW-387 CIWE-028 25-Nov ACC 10 4 11


A-1/CIWE/JIMT/RT-498 FS-0503-1D-3" FS-0503-1D-3"-FW-313 CIWE-028 25-Nov ACC 10 4 11
A-1/CIWE/JIMT/RT-499 FW-0403-1D-2 1/2" FW-0403-1D-2 1/2"-FW-359 CIWE-029 28-Nov ACC 10 4 9
A-1/CIWE/JIMT/RT-499 FW-0503-1D-2 1/2" FW-0503-1D-2 1/2"-FW-523 CIWE-029 28-Nov ACC 10 4 9
A-1/CIWE/JIMT/RT-500 FS-0701-1D-4" FS-0701-1D-4"-FW-408 CIWE-028 28-Nov ACC 10 4 14
A-1/CIWE/JIMT/RT-500 FS-0601-1D-4" FS-0601-1D-4"-FW-355 CIWE-028 28-Nov ACC 10 4 14
A-1/CIWE/JIMT/RT-501 FW-0303-1D-2 1/2" FW-0303-1D-2 1/2"-FW-199 CIWE-029 28-Nov REJ 10 4 9
A-1/CIWE/JIMT/RT-501R FW-0303-1D-2 1/2" FW-0303-1D-2 1/2"-FW-199R CIWE-029 4-Dec ACC 10 4 9
A-1/CIWE/JIMT/RT-501 FW-0302-1D-2 1/2" FW-0302-1D-2 1/2"-FW-172 CIWE-029 28-Nov REJ 10 4 9
A-1/CIWE/JIMT/RT-501R FW-0302-1D-2 1/2" FW-0302-1D-2 1/2"-FW-172R CIWE-029 4-Dec ACC 10 4 9
A-1/CIWE/JIMT/RT-502 FS-0701-1D-4" FS-0701-1D-4"-FW-422 CIWE-028 28-Nov REJ 10 4 14
A-1/CIWE/JIMT/RT-502R FS-0701-1D-4" FS-0701-1D-4"-FW-422R CIWE-028 4-Dec ACC 10 4 14
A-1/CIWE/JIMT/RT-503 FW-0403-1D-2 1/2" FW-0403-1D-2 1/2"-FW-354 CIWE-039 4-Dec ACC 10 4 9
A-1/CIWE/JIMT/RT-503 FW-0406-1D-2 1/2" FW-0406-1D-2 1/2"-FW-446 CIWE-039 4-Dec ACC 10 4 9
A-1/CIWE/JIMT/RT-503 FW-0402-1D-2 1/2" FW-0402-1D-2 1/2"-FW-325 CIWE-039 4-Dec ACC 10 4 9
A-1/CIWE/JIMT/RT-503 FW-0404-1D-2 1/2" FW-0404-1D-2 1/2"-FW-404 CIWE-039 4-Dec ACC 10 4 9
A-1/CIWE/JIMT/RT-504 FW-0505-1D-2 1/2" FW-0505-1D-2 1/2"-FW-574 CIWE-018 4-Dec Reshoot 10 4 9
A-1/CIWE/JIMT/RT-504RS FW-0505-1D-2 1/2" FW-0505-1D-2 1/2"-FW-574 CIWE-018 6-Dec Reshoot 10 4 9
A-1/CIWE/JIMT/RT-504RS1 FW-0505-1D-2 1/2" FW-0505-1D-2 1/2"-FW-574RS CIWE-018 3-Jan ACC 10 4 9
A-1/CIWE/JIMT/RT-505 MO-0063-1A-10" MO-0063-1A-10"-FW-30 CIWE-028 4-Dec ACC 15 4 34
A-1/CIWE/JIMT/RT-506 FW-0504-1D-2 1/2" FW-0504-1D-2 1/2"-FW-543 CIWE-018 4-Dec ACC 10 4 9
A-1/CIWE/JIMT/RT-506 FW-0504-1D-2 1/2" FW-0504-1D-2 1/2"-FW-548 CIWE-018 4-Dec ACC 10 4 9
A-1/CIWE/JIMT/RT-506 FW-0502-1D-2 1/2" FW-0502-1D-2 1/2"-FW-499 CIWE-018 4-Dec ACC 10 4 9
A-1/CIWE/JIMT/RT-506 FW-0404-1D-2 1/2" FW-0404-1D-2 1/2"-FW-388 CIWE-018 4-Dec ACC 10 4 9
A-1/CIWE/JIMT/RT-507 DO-0021-1A-14" DO-0021-1A-14"-FW-020 CIWE-028 4-Dec ACC 15 4 44
A-1/CIWE/JIMT/RT-507 DO-0021-1A-14" DO-0021-1A-14"-FW-022 CIWE-028 4-Dec ACC 15 4 44
A-1/CIWE/JIMT/RT-507 DO-0021-1A-14" DO-0021-1A-14"-FW-026A CIWE-028 4-Dec ACC 15 4 44
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-508 M0-0023-1A-12" M0-0023-1A-12"-FW-030A CIWE-028 4-Dec ACC 15 4 40


A-1/CIWE/JIMT/RT-509 MO-0021-1A-16" MO-0021-1A-16"-FW-022A CIWE-018 6-Dec ACC 15 4 50
A-1/CIWE/JIMT/RT-509 MO-0021-1A-16" MO-0021-1A-16"-FW-025A CIWE-018 6-Dec ACC 15 4 50
A-1/CIWE/JIMT/RT-510 MO-0021-1A-16" MO-0021-1A-16"-FW-027A CIWE-018 6-Dec ACC 15 4 50
A-1/CIWE/JIMT/RT-511 FW-6001-1B-16" FW-6001-1B-16"-FW-003 CIWE-034 6-Dec ACC 15 4 50
A-1/CIWE/JIMT/RT-511 FW-6001-1B-16" FW-6001-1B-16"-FW-016 CIWE-034 6-Dec ACC 15 4 50
A-1/CIWE/JIMT/RT-512 DO-0021-1A-14" DO-0021-1A-14"-FW-015 CIWE-028 6-Dec ACC 15 4 44
A-1/CIWE/JIMT/RT-512 DO-0021-1A-14" DO-0021-1A-14"-FW-018 CIWE-028 6-Dec ACC 15 4 44
A-1/CIWE/JIMT/RT-513 MO-0063-1A-10" MO-0063-1A-10"-FW-026A CIWE-028 6-Dec ACC 15 4 34
A-1/CIWE/JIMT/RT-513 MO-0063-1A-10" MO-0063-1A-10"-FW-029 CIWE-028 6-Dec ACC 15 4 34
A-1/CIWE/JIMT/RT-514 MO-0023-1A-12" MO-0023-1A-12"-FW-026A CIWE-028 6-Dec ACC 15 4 40
A-1/CIWE/JIMT/RT-515 DO-0015-1A-14" DO-0015-1A-14"-FW-025A CIWE-018 6-Dec ACC 15 4 44
A-1/CIWE/JIMT/RT-515 DO-0015-1A-14" DO-0015-1A-14"-FW-014A CIWE-018 6-Dec ACC 15 4 44
A-1/CIWE/JIMT/RT-516 DO-0015-1A-14" DO-0015-1A-14"-FW-001A CIWE-018 6-Dec ACC 15 4 44
A-1/CIWE/JIMT/RT-517 MO-0021-1A-16" MO-0021-1A-16"-FW-005 CIWE-034 6-Dec ACC 15 4 50
A-1/CIWE/JIMT/RT-520 VL-0001-1A-10" VL-0001-1A-10"-FW-003A CIWE-028 8-Dec ACC 15 4 34
A-1/CIWE/JIMT/RT-521 MO-0062-1A-14" MO-0062-1A-14"-FW-007A CIWE-018 8-Dec REJ 15 4 44
A-1/CIWE/JIMT/RT-521RSR1 MO-0062-1A-14" MO-0062-1A-14"-FW-007A CIWE-018 15-Dec ACC 15 4 44
A-1/CIWE/JIMT/RT-522 MO-0127-1A-3" MO-0127-1A-3"-FW-005B CIWE-018 8-Dec ACC 10 4 11
A-1/CIWE/JIMT/RT-522 MO-0127-1A-3" MO-0127-1A-3"-FW-005C CIWE-018 8-Dec ACC 10 4 11
A-1/CIWE/JIMT/RT-523 DO-0004-1A-2" DO-0004-1A-2"-FW-004A CIWE-046 8-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-523 JF-0044-1A-2" JF-0044-1A-2"-FW-004A CIWE-046 8-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-523 MO-0008-1A-2" MO-0008-1A-2"-FW-032C CIWE-046 8-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-523 JF-0004-1A-2" JF-0004-1A-2"-FW-012D CIWE-046 8-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-524 MO-0043-1A-8" MO-0043-1A-8"-FW-023 CIWE-028 8-Dec ACC 15 4 27
A-1/CIWE/JIMT/RT-524 FW-6201-1B-8" FW-6201-1B-8"-FW-012 CIWE-034 8-Dec ACC 15 4 27
A-1/CIWE/JIMT/RT-524 FW-6201-1B-8" FW-6201-1B-8"-FW-001 CIWE-034 8-Dec ACC 15 4 27
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-525 FW-6002-1B-12" FW-6002-1B-12"-FW-002 CIWE-034 8-Dec ACC 15 4 40


A-1/CIWE/JIMT/RT-525 FW-6004-1B-12" FW-6004-1B-12"-FW-002 CIWE-034 8-Dec ACC 15 4 40
A-1/CIWE/JIMT/RT-525 FW-6005-1B-12" FW-6005-1B-12"-FW-002 CIWE-034 8-Dec ACC 15 4 40
A-1/CIWE/JIMT/RT-526 JF-0004-1A-2" JF-0004-1A-2"-FW-002 CIWE-039 8-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-526 DO-0004-1A-2" DO-0004-1A-2"-FW-018 CIWE-039 8-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-527 JF-0012-1A-10" JF-0012-1A-10"-FW-006A CIWE-018 8-Dec REJ 15 4 34
A-1/CIWE/JIMT/RT-527RSR1 JF-0012-1A-10" JF-0012-1A-10"-FW-006A CIWE-018 15-Dec ACC 15 4 34
A-1/CIWE/JIMT/RT-528 MO-0126-1A-3" MO-0126-1A-3"-FW-006 CIWE-046 11-Dec ACC 10 4 11
A-1/CIWE/JIMT/RT-528 MO-0126-1A-3" MO-0126-1A-3"-FW-004A CIWE-046 11-Dec ACC 10 4 11
A-1/CIWE/JIMT/RT-529 FW-6017-1B-8" FW-6017-1B-8"-FW-003 CIWE-034 11-Dec ACC 15 4 27
A-1/CIWE/JIMT/RT-529 FW-6013-1B-8" FW-6013-1B-8"-FW-003 CIWE-034 11-Dec ACC 15 4 27
A-1/CIWE/JIMT/RT-530 MO-0015-1A-14" MO-0015-1A-14"-FW-022B(TR1) CIWE-018 11-Dec ACC 15 4 44
A-1/CIWE/JIMT/RT-531 JF-0012-1A-10" JF-0012-1A-10"-FW-006B(TR2) CIWE-018 11-Dec REJ 15 4 34
A-1/CIWE/JIMT/RT-531RS JF-0012-1A-10" JF-0012-1A-10"-FW-006B(TR2) CIWE-018 15-Dec ACC 15 4 34
A-1/CIWE/JIMT/RT-532 DO-0004-1A-2" DO-0004-1A-2"-FW-023 CIWE-046 11-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-532 DO-0004-1A-2" DO-0004-1A-2"-FW-024 CIWE-046 11-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-532 MO-0002-1A-2" MO-0002-1A-12"-FW-006 CIWE-039 11-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-533 JF-0020-1A-8" JF-0020-1A-8"-FW-034A CIWE-028 11-Dec ACC 15 4 27
A-1/CIWE/JIMT/RT-533 JF-0020-1A-8" JF-0020-1A-8"-FW-033 CIWE-028 11-Dec ACC 15 4 27
A-1/CIWE/JIMT/RT-533 JF-0020-1A-8" JF-0020-1A-8"-FW-036A CIWE-028 11-Dec ACC 15 4 27
A-1/CIWE/JIMT/RT-534 JF-0002-1A-14" JF-0002-1A-14"-FW-008 CIWE-039 11-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-534 DO-0004-1A-2" DO-0004-1A-2"-FW-006 CIWE-046 11-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-534 JF-0004-1A-2" JF-0004-1A-2"-FW-010 CIWE-046 11-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-534 MO-0008-1A-2" MO-0008-1A-2"-FW-026 CIWE-046 11-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-537 VL-0001-1A-10" VL-0001-1A-10"-FW-013A CIWE-028 15-Dec ACC 15 4 34
A-1/CIWE/JIMT/RT-537 VL-0001-1A-10" VL-0001-1A-10"-FW-007 CIWE-028 15-Dec ACC 15 4 34
A-1/CIWE/JIMT/RT-538 FW-6008-1B-10" FW-6008-1B-10"-FW-025 CIWE-034 15-Dec ACC 15 4 34
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-538 FW-6016-1B-10" FW-6016-1B-10"-FW-025 CIWE-034 15-Dec ACC 15 4 34


A-1/CIWE/JIMT/RT-539 FW-6012-1B-10" FW-6012-1B-10"-FW-025 CIWE-034 15-Dec ACC 15 4 34
A-1/CIWE/JIMT/RT-540 MO-0021-1A-16" MO-0021-1A-16"-FW-011 CIWE-029 15-Dec ACC 15 4 50
A-1/CIWE/JIMT/RT-541 MO-0008-1A-2" MO-0008-1A-2"-FW-009 CIWE-046 15-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-541 MO-0008-1A-2" MO-0008-1A-2"-FW-011 CIWE-046 15-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-542 DO-0015-1A-14" DO-0015-1A-14"-FW-029 CIWE-047 15-Dec REJ 15 4 44
A-1/CIWE/JIMT/RT-542RS DO-0015-1A-14" DO-0015-1A-14"-FW-029 CIWE-047 15-Dec ACC 15 4 44
A-1/CIWE/JIMT/RT-543 DO-0054-1A-14" DO-0054-1A-14"-FW-016 CIWE-029 15-Dec ACC 15 4 44
A-1/CIWE/JIMT/RT-544 DO-0004-1A-2" DO-0004-1A-2"-FW-020 CIWE-046 15-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-544 DO-0004-1A-2" DO-0004-1A-2"-FW-013 CIWE-046 15-Dec ACC 10 4 7.5
A-1/CIWE/JIMT/RT-545 JF-0041-1A-8" JF-0041-1A-8"-FW-045 CIWE-029 26-Dec ACC 15 4 27
A-1/CIWE/JIMT/RT-545 DO-0016-1A-8" DO-0016-1A-8"-FW-002 CIWE-029 26-Dec ACC 15 4 27
A-1/CIWE/JIMT/RT-546 JF-0012-1A-10" JF-0012-1A-10"-FW-022A CIWE-029 26-Dec ACC 15 4 34
A-1/CIWE/JIMT/RT-547 DO-0001-1A-12" DO-0001-1A-12"-FW-102 CIWE-018 26-Dec ACC 15 4 40
A-1/CIWE/JIMT/RT-547 JF-0001-1A-12" JF-0001-1A-12"-FW-100 CIWE-018 26-Dec REJ 15 4 40
A-1/CIWE/JIMT/RT-547R1 JF-0001-1A-12" JF-0001-1A-12"-FW-100R1 CIWE-018 9-Jan ACC 15 4 40
A-1/CIWE/JIMT/RT-548 MO-0122-1A-3" MO-0122-1A-3"-FW-011 CIWE-018 26-Dec REJ 10 4 11
A-1/CIWE/JIMT/RT-548R MO-0122-1A-3" MO-0122-1A-3"-FW-011R CIWE-018 3-Jan ACC 10 4 11
A-1/CIWE/JIMT/RT-548 MO-0124-1A-3" MO-0124-1A-3"-FW-017 CIWE-018 26-Dec ACC 10 4 11
A-1/CIWE/JIMT/RT-549 FW-6201-1B-8" FW-6201-1B-8"-FW-016 CIWE-034 26-Dec ACC 15 4 27
A-1/CIWE/JIMT/RT-549 FW-6201-1B-8" FW-6201-1B-8"-FW-021 CIWE-034 26-Dec ACC 15 4 27
A-1/CIWE/JIMT/RT-549 FW-6201-1B-8" FW-6201-1B-8"-FW-025 CIWE-034 26-Dec ACC 15 4 27
A-1/CIWE/JIMT/RT-550 MO-0121-1A-10" MO-0121-1A-10"-FW-056 CIWE-029 26-Dec ACC 15 4 34
A-1/CIWE/JIMT/RT-550 MO-0121-1A-10" MO-0121-1A-10"-FW-047 CIWE-029 26-Dec ACC 15 4 34
A-1/CIWE/JIMT/RT-550 MO-0121-1A-10" MO-0121-1A-10"-FW-057 CIWE-047 26-Dec REJ 15 4 34
A-1/CIWE/JIMT/RT-550R1 MO-0121-1A-10" MO-0121-1A-10"-FW-057R1 CIWE-047 9-Jan ACC 15 4 34
A-1/CIWE/JIMT/RT-551 FW-6007-1B-10" FW-6007-1B-10"-FW-002 CIWE-034 3-Jan ACC 15 4 34
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-552 DO-0004-1A-2" DO-0004-1A-2"-FW-013 CIWE-046 3-Jan ACC 10 4 7.5


A-1/CIWE/JIMT/RT-553 FW-6015-1B-10" FW-6015-1B-10"-FW-006 CIWE-034 3-Jan ACC 15 4 34
A-1/CIWE/JIMT/RT-553 FW-6011-1B-10" FW-6011-1B-10"-FW-006 CIWE-034 3-Jan ACC 15 4 34
A-1/CIWE/JIMT/RT-554 FW-6007-1B-10" FW-6007-1B-10"-FW-006 CIWE-034 3-Jan ACC 15 4 34
A-1/CIWE/JIMT/RT-555 FW-6018-1B-10" FW-6018-1B-10"-FW-011 CIWE-034 3-Jan ACC 15 4 34
A-1/CIWE/JIMT/RT-555 FW-6014-1B-10" FW-6014-1B-10"-FW-011 CIWE-034 3-Jan ACC 15 4 34
A-1/CIWE/JIMT/RT-556 SA-0004-1B-2" SA-0004-1B-2"-FW-006 CIWE-045 3-Jan ACC 10 4 7.5
A-1/CIWE/JIMT/RT-556 SA-0005-1B-2" SA-0005-1B-2"-FW-005 CIWE-045 3-Jan ACC 10 4 7.5
A-1/CIWE/JIMT/RT-556 SA-0006-1B-2" SA-0006-1B-2"-FW-005 CIWE-045 3-Jan ACC 10 4 7.5
A-1/CIWE/JIMT/RT-556 SA-0007-1B-2" SA-0007-1B-2"-FW-007 CIWE-045 3-Jan ACC 10 4 7.5
A-1/CIWE/JIMT/RT-557 PW-6001-1B-8" PW-6001-1B-8"-FW-033 CIWE-028 9-Jan ACC 15 4 27
A-1/CIWE/JIMT/RT-557 PW-6001-1B-8" PW-6001-1B-8"-FW-034 CIWE-028 9-Jan ACC 15 4 27
A-1/CIWE/JIMT/RT-557 PW-6001-1B-8" PW-6001-1B-8"-FW-035 CIWE-028 9-Jan ACC 15 4 27
A-1/CIWE/JIMT/RT-558 PW-6001-1B-8" PW-6001-1B-8"-FW-036 CIWE-028 9-Jan ACC 15 4 27
A-1/CIWE/JIMT/RT-559 PW-5408A-1S2-2" PW-5408A-1S2-2"-FW-001A CIWE-040 9-Jan ACC 10 4 7.5
A-1/CIWE/JIMT/RT-559 PW-5408A-1S2-2" PW-5408A-1S2-2"-FW-001C CIWE-040 9-Jan ACC 10 4 7.5
A-1/CIWE/JIMT/RT-559 PW-5408A-1S2-2" PW-5408A-1S2-2"-FW-001A CIWE-040 9-Jan ACC 10 4 7.5
A-1/CIWE/JIMT/RT-560 PW-5408A-1S2-2" PW-5408A-1S2-2"-FW-001H CIWE-040 9-Jan REJ 10 4 7.5
A-1/CIWE/JIMT/RT-560RS PW-5408A-1S2-2" PW-5408A-1S2-2"-FW-001H CIWE-040 17-Jan ACC 10 4 7.5
A-1/CIWE/JIMT/RT-560 PW-5408A-1S2-2" PW-5408A-1S2-2"-FW-001J CIWE-040 9-Jan ACC 10 4 7.5
A-1/CIWE/JIMT/RT-560 PW-5408A-1S2-2" PW-5408A-1S2-2"-FW-001K CIWE-040 9-Jan ACC 10 4 7.5
A-1/CIWE/JIMT/RT-561 PW-6001-1B-8" PW-6001-1B-8"-FW-030 CIWE-030 17-Jan ACC 15 4 27
A-1/CIWE/JIMT/RT-561 PW-6001-1B-8" PW-6001-1B-8"-FW-001 CIWE-030 17-Jan ACC 15 4 27
A-1/CIWE/JIMT/RT-562 MO-0001A-1A-12" MO-0001A-1A-12"-FW-017 CIWE-040 17-Jan ACC 15 4 40
A-1/CIWE/JIMT/RT-562 MO-0001A-1A-12" MO-0001A-1A-12"-FW-018 CIWE-040 17-Jan ACC 15 4 40
A-1/CIWE/JIMT/RT-564 VL-0001-1A-10" VL-0001-1A-10"-FW-008 CIWE-030 1-Feb ACC 15 4 34
A-1/CIWE/JIMT/RT-565 PW-5416-1S1-2" PW-5416-1S1-2"-FW-002C CIWE-040 1-Feb ACC 10 4 7.5
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-566 SA-0001A-1B-2" SA-0001A-1B-2"-FW-017B CIWE-028 1-Feb ACC 10 4 7.5


A-1/CIWE/JIMT/RT-567 PW-5424-1S1-2" PW-5424-1S1-2"-FW-007 CIWE-028 1-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-567 AD-0001-1S1-2" AD-0001-1S1-2"-FW-002 CIWE-028 1-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-567 AD-0002-1S1-2" AD-0002-1S1-2"-FW-001 CIWE-028 1-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-567 AD-0003-1S1-2" AD-0003-1S1-2"-FW-001 CIWE-028 1-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-568 AD-0001-1S1-2" AD-0001-1S1-2"-FW-013 CIWE-028 1-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-568 AD-0002-1S1-2" AD-0002-1S1-2"-FW-013 CIWE-015 1-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-568 PW-5424-1S1-2" PW-5424-1S1-2"-FW-010 CIWE-040 1-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-569 MO-0026-1A-6" MO-0026-1A-6"-FW-014 CIWE-028 1-Feb ACC 10 4 21
A-1/CIWE/JIMT/RT-570 SA-0001A-1B-2" SA-0001A-1B-2"-FW-019C CIWE-028 1-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-570 SA-0001A-1B-2" SA-0001A-1B-2"-FW-019A CIWE-028 1-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-571 MO-0043-1A-8" MO-0043-1A-8"-FW-021D CIWE-047 1-Feb ACC 15 4 27
A-1/CIWE/JIMT/RT-572 PW-5416-1S1-2" PW-5416-1S1-2"-FW-004C CIWE-040 1-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-572 PW-5424-1S1-2" PW-5424-1S1-2"-FW-016 CIWE-028 1-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-572 SA-0001A-1B-2" SA-0001A-1B-2"-FW-021B CIWE-028 1-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-573 MO-0094-1A-4" MO-0094-1A-4"-FW-005 CIWE-047 1-Feb ACC 10 4 14
A-1/CIWE/JIMT/RT-573 MO-0121-1A-6" MO-0121-1A-6"-FW-001 CIWE-046 1-Feb ACC 10 4 14
A-1/CIWE/JIMT/RT-575 MO-0015-1A-12" MO-0015-1A-12"-FW-010 CIWE-036 5-Feb ACC 15 4 40
A-1/CIWE/JIMT/RT-575 MO-0011-1A-12" MO-0011-1A-12"-FW-002 CIWE-015 5-Feb ACC 15 4 40
A-1/CIWE/JIMT/RT-576 MO-0125-1A-3" MO-0125-1A-3"-FW-004 CIWE-036 5-Feb ACC 10 4 11
A-1/CIWE/JIMT/RT-577 MO-0014-1A-14" MO-0014-1A-14"-FW-010 CIWE-036 5-Feb ACC 15 4 44
A-1/CIWE/JIMT/RT-578 MO-0014-1A-14" MO-0014-1A-14"-FW-006 CIWE-036 5-Feb ACC 10 4 14
A-1/CIWE/JIMT/RT-579 OW-0003-1A-2" OW-0003-1A-2"-FW-008 CIWE-036 5-Feb ACC 10 4 7.5
A-1/CIWE/JIMT/RT-580 DO-0028-1A-10" DO-0028-1A-10"-FW-016 CIWE-028 5-Feb ACC 15 4 34
A-1/CIWE/JIMT/RT-581 JF-0021-1A-8" JF-0021-1A-8"-FW-016 CIWE-028 5-Feb ACC 15 4 27
A-1/CIWE/JIMT/RT-582 DO-0027-1A-8" DO-0027-1A-8"-FW-002 CIWE-046 22-Feb ACC 15 4 27
A-1/CIWE/JIMT/RT-583 DO-0030-1A-8" DO-0030-1A-8"-FW-002 CIWE-046 22-Feb ACC 15 4 27
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-584 JF-0023-1A-6" JF-0023-1A-6"-FW-013 CIWE-047 22-Feb ACC 10 4 21


A-1/CIWE/JIMT/RT-584 JF-0026-1A-6" JF-0026-1A-6"-FW-001A CIWE-047 22-Feb ACC 10 4 21
A-1/CIWE/JIMT/RT-585 OW-1001-1A-6" OW-1001-1A-6"-FW-001A CIWE-036 22-Feb ACC 10 4 21
A-1/CIWE/JIMT/RT-585 OW-1001-1A-6" OW-1001-1A-6"-FW-001B CIWE-036 22-Feb ACC 10 4 21
A-1/CIWE/JIMT/RT-586 MO-0123-1A-4" MO-0123-1A-4"-FW-009 CIWE-015 22-Feb ACC 10 4 14
A-1/CIWE/JIMT/RT-586 MO-0123-1A-4" MO-0123-1A-4"-FW-003 CIWE-046 22-Feb REJ 10 4 14
A-1/CIWE/JIMT/RT-586R1 MO-0123-1A-4" MO-0123-1A-4"-FW-003 CIWE-046 14-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-586 MO-0127-1A-4" MO-0127-1A-4"-FW-001 CIWE-015 22-Feb ACC 10 4 14
A-1/CIWE/JIMT/RT-589 VL-0005-1A-3" VL-0005-1A-3"-FW-009 CIWE-039 2-Mar ACC 10 4 11
A-1/CIWE/JIMT/RT-589 VL-0007-1A-3" VL-0007-1A-3"-FW-010 CIWE-039 2-Mar ACC 10 4 11
A-1/CIWE/JIMT/RT-592 VL-0010-1A-3" VL-0010-1A-3"-FW-010 CIWE-034 2-Mar ACC 10 4 11
A-1/CIWE/JIMT/RT-592 VL-0011-1A-3" VL-0011-1A-3"-FW-010 CIWE-039 2-Mar ACC 10 4 11
A-1/CIWE/JIMT/RT-593 VL-0002-1A-3" VL-0002-1A-3"-FW-009 CIWE-034 3-Mar ACC 10 4 11
A-1/CIWE/JIMT/RT-593 VL-0004-1A-3" VL-0004-1A-3"-FW-010 CIWE-034 3-Mar REJ 10 4 11
A-1/CIWE/JIMT/RT-593 VL-0006-1A-3" VL-0006-1A-3"-FW-008 CIWE-034 3-Mar ACC 10 4 11
A-1/CIWE/JIMT/RT-593RS1 VL-0004-1A-3" VL-0004-1A-3"-FW-010 CIWE-034 6-Mar ACC 10 4 11
A-1/CIWE/JIMT/RT-594 VL-0008-1A-3" VL-0008-1A-3"-FW-009 CIWE-034 3-Mar REJ 10 4 11
A-1/CIWE/JIMT/RT-594 VL-0009-1A-3" VL-0009-1A-3"-FW-012 CIWE-034 3-Mar ACC 10 4 11
A-1/CIWE/JIMT/RT-594RS1 VL-0008-1A-3" VL-0008-1A-3"-FW-009R CIWE-034 6-Mar ACC 10 4 11
A-1/CIWE/JIMT/RT-595 VL-0003-1A-3" VL-0003-1A-3"-FW-010A CIWE-039 3-Mar ACC 10 4 11
A-1/CIWE/JIMT/RT-596 PW-5425-1S1-2" PW-5425-1S1-2"-FW-005 CIWE-028 3-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-596 PW-5426-1S1-2" PW-5426-1S1-2"-FW-005 CIWE-028 3-Mar REJ 10 4 7.5
A-1/CIWE/JIMT/RT-596 PW-5416-1S2-2" PW-5416-1S2-2"-FW-004 CIWE-040 3-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-596 PW-5429-1S1-2" PW-5429-1S1-2"-FW-006 CIWE-036 3-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-596R1 PW-5426-1S1-2" PW-5426-1S1-2"-FW-005 CIWE-028 6-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-597 MO-0119-1A-12" MO-0119-1A-12"-FW-010 CIWE-049 6-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-597 MO-0119-1A-12" MO-0119-1A-12"-FW-038 CIWE-049 6-Mar ACC 10 4 14
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-597 MO-0119-1A-12" MO-0119-1A-12"-FW-039 CIWE-049 6-Mar ACC 10 4 14


A-1/CIWE/JIMT/RT-598 DO-0054-1A-14" DO-0054-1A-14"-FW-007 CIWE-034 6-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-598 DO-0054-1A-14" DO-0054-1A-14"-FW-017 CIWE-034 6-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-598 DO-0054-1A-14" DO-0054-1A-14"-FW-018 CIWE-034 6-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-599 DO-0054-1A-14" DO-0054-1A-14"-FW-022 CIWE-034 6-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-599 DO-0054-1A-14" DO-0054-1A-14"-FW-042 CIWE-034 6-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-599 DO-0041-1A-8" DO-0041-1A-8"-FW-004 CIWE-034 6-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-600 JF-0041-1A-8" JF-0041-1A-8"-FW-009 CIWE-034 6-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-600 MO-0120-1A-8" MO-0120-1A-8"-FW-001 CIWE-040 6-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-600 MO-0120-1A-8" MO-0120-1A-8"-FW-003 CIWE-034 6-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-601 MO-0120-1A-8" MO-0120-1A-8"-FW-005 CIWE-040 6-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-601 MO-0120-1A-8" MO-0120-1A-8"-FW-061 CIWE-040 6-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-601 MO-0120-1A-8" MO-0120-1A-8"-FW-062 CIWE-040 6-Mar REJ 10 4 14
A-1/CIWE/JIMT/RT-601R1 MO-0120-1A-8" MO-0120-1A-8"-FW-062 CIWE-040 14-Mar ACC 10 4 14
A-1/CIWE/JIMT/RT-602 MO-0045-1A-6" MO-0045-1A-6"-FW-014 CIWE-040 6-Mar ACC 10 4 21
A-1/CIWE/JIMT/RT-603 MO-0054-1A-14" MO-0054-1A-14"-FW-040 CIWE-034 14-Mar ACC 15 4 40
A-1/CIWE/JIMT/RT-603 MO-0047-1A-12" MO-0047-1A-12"-FW-001 CIWE-039 14-Mar ACC 15 4 40
A-1/CIWE/JIMT/RT-603 MO-0033-1A-12" MO-0033-1A-12"-FW-001 CIWE-039 14-Mar ACC 15 4 40
A-1/CIWE/JIMT/RT-604 MO-0034-1A-8" MO-0034-1A-8"-FW-004 CIWE-034 14-Mar ACC 15 4 27
A-1/CIWE/JIMT/RT-604 MO-0049-1A-8" MO-0049-1A-8"-FW-001 CIWE-034 14-Mar ACC 15 4 27
A-1/CIWE/JIMT/RT-604 JF-0041a-1A-8" JF-0041a-1A-8"-FW-006 CIWE-040 14-Mar ACC 15 4 27
A-1/CIWE/JIMT/RT-605 MO-0039-1A-10" MO-0039-1A-10"-FW-003 CIWE-034 14-Mar ACC 10 4 21
A-1/CIWE/JIMT/RT-605 MO-0054-1A-14" MO-0054-1A-14"-FW-004 CIWE-039 14-Mar ACC 10 4 21
A-1/CIWE/JIMT/RT-606 MO-0039-1A-10" MO-0039-1A-10"-FW-009 CIWE-034 14-Mar ACC 15 4 34
A-1/CIWE/JIMT/RT-607 MO-0060-1A-12" MO-0060-1A-12"-FW-017 CIWE-034 14-Mar ACC 15 4 40
A-1/CIWE/JIMT/RT-608 DO-0054-1A-14" DO-0054-1A-14"-FW-063B CIWE-047 14-Mar ACC 15 4 44
A-1/CIWE/JIMT/RT-609 MO-0127-1A-4" MO-0127-1A-4"-FW-008 CIWE-045 14-Mar ACC 10 4 14
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-609 MO-0127-1A-4" MO-0127-1A-4"-FW-010 CIWE-045 14-Mar ACC 10 4 14


A-1/CIWE/JIMT/RT-610 MO-0001-1A-12" MO-0001-1A-12"-FW-083(TR) CIWE-025 20-Mar ACC 15 4 40
A-1/CIWE/JIMT/RT-610 DO-0001-1A-12" DO-0001-1A-12"-FW-079(TR) CIWE-025 20-Mar ACC 15 4 40
A-1/CIWE/JIMT/RT-611 DO-0001-1A-12" DO-0001-1A-12"-FW-080(TR) CIWE-025 20-Mar ACC 15 4 40
A-1/CIWE/JIMT/RT-611 JF-0001-1A-12" JF-0001-1A-12"-FW-077(TR) CIWE-001 20-Mar ACC 15 4 40
A-1/CIWE/JIMT/RT-612 JF-0001-1A-12" JF-0001-1A-12"-FW-078(TR) CIWE-001 20-Mar ACC 15 4 40
A-1/CIWE/JIMT/RT-613 JF-0017-1A-10" JF-0017-1A-10"-FW-014 CIWE-034 20-Mar ACC 15 4 34
A-1/CIWE/JIMT/RT-614 JF-0009-1A-10" JF-0009-1A-10"-FW-038 CIWE-034 20-Mar ACC 15 4 34
A-1/CIWE/JIMT/RT-615 JF-0006-1A-8" JF-0006-1A-8"-FW-002 CIWE-034 20-Mar ACC 15 4 27
A-1/CIWE/JIMT/RT-616 MO-0013-1A-2" MO-0013-1A-2"-FW-001 CIWE-015 20-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-617 MO-0013-1A-2" MO-0013-1A-2"-FW-002 CIWE-015 20-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-618 MO-0018-1A-2" MO-0018-1A-2"-FW-001 CIWE-015 20-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-619 MO-0018-1A-2" MO-0018-1A-2"-FW-002 CIWE-015 20-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-620 MO-0037-1A-2" MO-0037-1A-2"-FW-001 CIWE-015 20-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-621 MO-0037-1A-2" MO-0037-1A-2"-FW-004 CIWE-015 20-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-622 MO-0001-1A-12" MO-0001-1A-12"-FW-082(TR) CIWE-025 26-Mar ACC 15 4 40
A-1/CIWE/JIMT/RT-623 DO-0009-1A-14" DO-0009-1A-14"-FW-004 CIWE-034 26-Mar ACC 10 4 21
A-1/CIWE/JIMT/RT-624 DO-0006-1A-8" DO-0006-1A-8"-FW-005 CIWE-034 26-Mar ACC 15 4 27
A-1/CIWE/JIMT/RT-625 DO-0005-1A-12" DO-0005-1A-12"-FW-001A CIWE-034 26-Mar ACC 15 4 40
A-1/CIWE/JIMT/RT-625 DO-0017-1A-12" DO-0017-1A-12"-FW-001 CIWE-034 26-Mar ACC 15 4 40
A-1/CIWE/JIMT/RT-626 DO-0009-1A-14" DO-0009-1A-14"-FW-036 CIWE-034 26-Mar ACC 15 4 44
A-1/CIWE/JIMT/RT-626 DO-0020-1A-14" DO-0020-1A-14"-FW-011A CIWE-034 26-Mar ACC 15 4 44
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-627 MO-0120A-1A-8" MO-0120A-1A-8"-FW-040 CIWE-047 26-Mar ACC 15 4 27


A-1/CIWE/JIMT/RT-628 MO-0008A-1A-2" MO-0008A-1A-2"-FW-028 CIWE-015 26-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-628 DO-0004A-1A-2" DO-0004A-1A-2"-FW-027 CIWE-015 26-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-629 MO-0056-1A-12" MO-0056-1A-12"-FW-012 CIWE-040 26-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-629 MO-0033-1A-12" MO-0033-1A-12"-FW-008 CIWE-040 26-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-629 MO-0047-1A-12" MO-0047-1A-12"-FW-008 CIWE-040 26-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-630 MO-0056-1A-12" MO-0056-1A-12"-FW-013 CIWE-040 26-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-630 MO-0033-1A-12" MO-0033-1A-12"-FW-009 CIWE-040 26-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-630 MO-0047-1A-12" MO-0047-1A-12"-FW-009 CIWE-040 26-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-630 JF-0005-1A-12" JF-0005-1A-12"-FW-010 CIWE-040 26-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-631 JF-0005-1A-12" JF-0005-1A-12"-FW-009 CIWE-040 26-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-631 JF-0014-1A-12" JF-0014-1A-12"-FW-009 CIWE-040 26-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-632 JF-0014-1A-12" JF-0014-1A-12"-FW-010 CIWE-040 26-Mar ACC 10 4 7.5
A-1/CIWE/JIMT/RT-633 JF-0004A-1A-2" JF-0004A-1A-2"-FW-027 CIWE-015 26-Mar Reshoot 10 4 7.5
A-1/CIWE/JIMT/RT-633RS JF-0004A-1A-2" JF-0004A-1A-2"-FW-027 CIWE-015 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-635 SA-0001-1B-2" SA-0001-1B-2"-FW-023 CIWE-015 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-635 SA-0001-1B-2" SA-0001-1B-2"-FW-026 CIWE-015 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-635 SA-0001-1B-2" SA-0001-1B-2"-FW-027 CIWE-015 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-635 SA-0001-1B-2" SA-0001-1B-2"-FW-030 CIWE-015 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-636 SA-0001-1B-2" SA-0001-1B-2"-FW-032 CIWE-015 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-636 SA-0001-1B-2" SA-0001-1B-2"-FW-011 CIWE-015 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-636 SA-0001-1B-2" SA-0001-1B-2"-FW-009 CIWE-015 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-637 MO-0043-1A-8" MO-0043-1A-8"-FW-002 CIWE-047 10-Apr ACC 15 4 27
A-1/CIWE/JIMT/RT-638 JF-0010-1S1-2" JF-0010-1S1-2"-FW-010A CIWE-015 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-638 JF-0010-1S1-2" JF-0010-1S1-2"-FW-010D CIWE-015 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-638 JF-0010-1S1-2" JF-0010-1S1-2"-FW-011 CIWE-015 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-638 JF-0018-1S1-2" JF-0018-1S1-2"-FW-010D CIWE-015 10-Apr ACC 10 4 7.5
RT Master List
Update on: 01-Jun-2018

RT Report No. Tank No. Joint No. Welder No. RT Date Result Film Size RT Length

A-1/CIWE/JIMT/RT-639 JF-0018-1S1-2" JF-0018-1S1-2"-FW-002 CIWE-015 10-Apr ACC 10 4 7.5


A-1/CIWE/JIMT/RT-639 AD-0001-1S1-2" AD-0001-1S1-2"-FW-019 CIWE-040 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-639 AD-0002-1S1-2" AD-0002-1S1-2"-FW-019 CIWE-040 10-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-640 SA-0001-1B-2" SA-0001-1B-2"-FW-002 CIWE-045 24-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-640 SA-0001-1B-2" SA-0001-1B-2"-FW-005 CIWE-045 24-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-640 SA-0001-1B-2" SA-0001-1B-2"-FW-012 CIWE-045 24-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-640 SA-0001-1B-2" SA-0001-1B-2"-FW-064 CIWE-045 24-Apr ACC 10 4 7.5
A-1/CIWE/JIMT/RT-641 JF-0009-1A-10" JF-0009-1A-10"-FW-005 CIWE-039 24-Apr ACC 10 4 21
A-1/CIWE/JIMT/RT-642 JF-0009-1A-10" JF-0009-1A-10"-FW-002 CIWE-046 24-Apr ACC 10 4 21
A-1/CIWE/JIMT/RT-643 JF-0019-1S1-2" JF-0019-1S1-2"-FW-016 CIWE-015 24-Apr ACC 10 4 7.5
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
12 957.072 50 Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe

Pipe

Pipe

Pipe

Pipe

Pipe

Pipe

Pipe

Pipe

Pipe

Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)

Pipe

Pipe
Pipe
Pipe
Pipe

Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe

Pipe

Pipe

Pipe

Pipe

Pipe

Pipe

Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)

Pipe

Pipe

Pipe

Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Repair
Diameter Length
Length Remark
(inch) (mm)
(mm)
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
SRC AND JIMT STATUS ON W
Total No.of joints as per ISO Drawings Total No.of Butt Joints

Location/System As per ISO Drawings /


Done Weld Pending weld Done Weld
With additional joints

SRC Mogas 267 267 0 178

SRC Diesel Oil 155 155 0 97

SRC Jet Fuel 153 153 0 99

SRC Sea Water 83 83 0 71

SRC OW 19 19 0 19

Total 677 677 0 464

Total No.of joints as per ISO Drawings Total No.of Butt Joints
Location/System As per ISO Drawings
Done Weld Pending weld Done Weld
/ With additional joints

1978 (RT) 1337


JIMT Mogas 2011 0
JIMT Mogas 2011 0
33 33

JIMT Diesel Oil 832 832 0 645

JIMT Jet Fuel 733 733 0 529

447 (1C)
0 345
(MT)
JIMT Fire Fighting 3893
3446 (RT)
0 1405
(1D & 1B)

333 (RT) 0 191


JIMT Plant Air 507
174 0 NA

241 (RT) 0 205

JIMT Potable Water 663 159 (PT) 0 32

263 0 NA
JIMT Vapor 138 138 0 126

214 (RT) 0 109

JIMT Additive 382 24 0 NA

144 (PT) 0 0

JIMT Oily Water 303 303 0 247

Total 9462 9462 0 5204


SRC AND JIMT STATUS ON WELD JOINTS & NDT COVERAGE
otal No.of Butt Joints NDT Requirement Need To cover Actual Done

Pending weld RT MT PT RT MT PT RT MT

0 10% NA NA 18 NA NA 31 NA

0 10% NA NA 10 NA NA 14 NA

0 10% NA NA 10 NA NA 11 NA

0 NA 5% NA NA 4 NA 0 11

0 NA NA NA NA NA NA 0 NA

0 38 4 56 11

otal No.of Butt Joints NDT Requirement Need To cover Actual Done

Pending weld RT MT PT RT MT PT RT MT

0 10% NA NA 133 NA NA 133 NA


0 NA NA NA NA NA NA NA NA

0 10% NA NA 64 NA NA 70 NA

0 10% NA NA 52 NA NA 52 NA

0 NA 5% NA NA 18 NA NA 22

0 10% NA NA 140 NA NA 144 NA

0 10% NA NA 19 NA NA 19 NA

0 NA NA NA NA NA NA NA NA

0 10% NA NA 20 NA NA 23 NA

0 NA NA 5% NA NA 8 NA NA

0 NA NA NA NA NA NA NA NA
0 10% NA NA 10 NA NA 14 NA

0 5% NA NA 6 NA NA 7 NA

NA NA NA NA NA NA NA NA NA

0 NA NA 5% NA NA 8 NA NA

0 10% NA NA 24 NA NA 3 NA

0 468 18 16 465 22

UTESCO SS 11
ual Done Pending Reject Repaired

PT RT/MT RT RT

NA 0 1 1

NA 0 1 1

NA 0 2 2

NA 0 NA NA

NA 0 NA NA

0 4 4

ual Done Pending Reject Repaired

PT RT/MT RT RT

NA 0 10 10
NA 0 0 0

NA 0 1 1

NA 0 3 3

NA 0 0 0

NA 0 19 19

NA 0 0 0

NA 0 0 0

NA 0 6 6

9 0 0 0

NA 0 6 6
NA 0 9 9

NA 0 0 0

NA 0 NA NA

28 0 0 0

NA 0 0 0

36 0 54 54