F-QCD-001 MATERIAL INSPECTION REPORT

CLIENT : SEPL REPORT NO MTR-001

PROJECT/ MAINT :EGS MAINTENANCE -2018 PLACE OF INSPECTION EGS

SPLIT TEE WELDING ON 14" SEA WATER INLET LINE @ K-302


JOB TITLE DATE OF INSPECTION 14/10/2018

ITEM MILL CERTIFICATE DIM VISUAL


NO DESCRIPTION ( SIZE / THK ) MAT'L SPEC. QTY HEAT NO. 5% CHECK REJECT ACCEPT REMARKS
MFR NO DATE
AM BURNS
1 ROLLED PLATE 5/8" A537 CL1 2PCS 811X01320
HARBOR
3371L 14/10/2018 OK OK OK

2 PIPE SIZE14" SCH STD A106B 1 LA1604 USS TUBULAR 2936L 14/10/2018 OK OK OK

3 FLANGE 14" 150# A105/SA 1 15/37685 METALFAR 2639L 14/10/2018 OK OK OK

REMARKS:

Prepared & Inspected By: Inspected & Reviewed By :


Q.C INSPECTOR (R IMC ) INSPECTOR ( SCSL / MEG / EGS )

NAME : SANTHOSH REDDY NAME : __________________


SIGN. : SIGN. :__________________
DATE DATE :__________________