Client: Saudi Aramco Neat Khuff Cond. Frac. Project Document No. 308200 - ITP - CI - 014 Rev 01
BI NO./JO :- 3503/35031 DESCRIPTION : Manhole Construction DISCIPLINE : Civil
CONTRACTOR : Snamprogetti S.p.A
SUB CONTRACTOR : Dodsal & Co.
Surveilance/Inspection
Quality Control QC Procedure Acceptance Verifying
Sr.No. Process Description Responsibility Sub Saudi
Activity Ref. Criteria documents Contractor
Contractor Aramco
PP 276706 Rev.A
SAES-Q-
Material approval 005 09-
status for Concrete SAMSS-097
Mix, FEB rebar, Water 09-SAMSS-106 Approved
2 Materials -do- -do- A1 R1 R1
stops, Bituminous S-AE-036083 Materials
paint, site mixed SAES-H-101
grout, manhole cover Manufacturers data
sheet for water
stop
Sticker on
Verifying suitability of Snamprogetti/Sa Snamprogetti/Saud Dodsal Area
equipment and
3 Equipment Inspection equipment to meet udi Aramco HSE i Aramco HSE Engineer and A1 S1 S1
operator's
HSE requirement guideline guideline Safety Officer
certificate
-Suitability of concrete
surface for coating
SAES-H-003
Coating of concrete application -No. of Manufacturers Checklist for
6 Approved Method -do- A1 S1 S1
surface coating layers data sheet Concrete Coating
Statement
-Proper concrete
repair (if any)
SAES-A-114
Dodsal Area
Backfilling Around SAES-M-100 Compaction Test
12 Layer thickness -do- Engineer & Q.C A1 S1 S1
Manholes Method statement Report from Lab.
Inspector
for earthwork