You are on page 1of 5

INSPECTION AND TEST PLAN FOR INTERNAL GYPSUM PLASTER

INSPECTION AND TEST


PLAN FOR INTERNAL
GYPSUM PLASTER

OBEROI MAXIMA Project

Prepared By LOKESH Checked BY ANAND SHARMA


KUKADIYA
Designation QA/QC Designation PROJECT
MANAGER
Sign

Date

MAX-DHIPL-FNS-ITP-0001-R0
INSPECTION AND TEST PLAN FOR INTERNAL GYPSUM PLASTER

Frequency
Frequency Format
of In-house Control
Quality Control Responsibility of Third of Tests Remarks
Testing/ Requirements
Approved Party Tests Record
Item / Inspection
Sr.No. Brand/Pro
Description Acceptance Test
duct
Test Criteria Method/R Contract
Test parameter ORL QC
Types Standard / eference or QC
Specification Document
Material Inspection
Third
Every Once before
party
delivery start of work
Sulphur Trioxide Minimum 35 Test H
Perform Review MTC for and every 6  
(SO3) % by mass Min reports/ (Hold)
every lot / month/Chan
MTC/
batch ge of source
MIR
Third
Every Once before
party
2/3 of SO2 delivery start of work
Calcium Oxide Test H
content Perform Review MTC for and every 6  
(CaO) % by mass reports/ (Hold)
Gyproc minimum every lot / month/Chan
MTC/
Elite-100 batch ge of source
Chemical IS 2547 MIR
or
Properties part-1 Third
Equivalen Every Once before
party
t delivery start of work
Magnesium Test H
0.3 Max Perform Review MTC for and every 6  
Oxide (MgO) % reports/ (Hold)
every lot / month/Chan
MTC/
Gypsum batch ge of source
1 MIR
Plaster
Third
Every Once before
party
delivery start of work
Sodium Oxide Test H
0.3 Max Perform Review MTC for and every 6  
( Na2O)% reports/ (Hold)
every lot / month/Chan
MTC/
batch ge of source
MIR
Third
Every Once before
Not greater party
delivery start of work
Loss of Ignition % than 9% and Test H
Perform Review MTC for and every 6  
by mass not less than reports/ (Hold)
every lot / month/Chan
4% MTC/
batch ge of source
MIR
3% Applicable Every Once before Third
for metal delivery start of work party H
Free lime Perform Review  
Lathing MTC for and every 6 Test (Hold)
Plaster. every lot / month/Chan reports/

MAX-DHIPL-FNS-ITP-0001-R0
INSPECTION AND TEST PLAN FOR INTERNAL GYPSUM PLASTER
MTC/
batch ge of source
MIR
Third
Every Once before
party
delivery start of work
Max 770 Test H
Dry Bulk Density Perform Review MTC for and every 6  
Kg/cum reports/ (Hold)
every lot / month/Chan
MTC/
batch ge of source
MIR
Third
Every Once before
party
delivery start of work
Physical Maximum IS 2547 Test H
Dry Set Density Perform Review MTC for and every 6  
Properties 1040 Kg/cum part-2 reports/ (Hold)
every lot / month/Chan
MTC/
batch ge of source
MIR
Third
Every Once before
party
delivery start of work
Compressive Test H
1 N/sq.mm Perform Review MTC for and every 6  
Strength reports/ (Hold)
every lot / month/Chan
MTC/
batch ge of source
MIR
Third
Once before
party
start of work
Minimum 1.4 Test H
Failure test Perform Review MTC per lot and every 6  
Kg/sq.cm reports/ (Hold)
month/Chan
MTC/
ge of source
Bonding Gyproc Chemical ASTM MIR
2
Agent Bond-IT Properties C631 Third
Once before
party
start of work
Greater than Test H
Fracture Perform Review MTC per lot and every 6  
10 Kg/sq.cm reports/ (Hold)
month/Chan
MTC/
ge of source
MIR

Preliminary- Before start of work

Confirming
Method Technical Technical Approve
Statement Specifications/ Specifications/ Once before d copy
H
1 of Internal - Physical Work Order/ Work Order/ - Perform Review starting of - Method  
(Hold)
Gypsum best construction best work Stateme
Plaster practices construction nt
practices
Material Work Order/ Confirming Once before Material H
2 - Physical - Perform Review -  
approval for Relevant IS codes Work Order/ starting of approval (Hold)

MAX-DHIPL-FNS-ITP-0001-R0
INSPECTION AND TEST PLAN FOR INTERNAL GYPSUM PLASTER
Internal work/
Relevant IS
Gypsum change in sheet
codes
Plaster brand
Confirming
Mockup & Technical Technical
Benchmarki Specifications/ Specifications/
Once before Mockup
ng for Work Order/ GFC Work Order/ H
3 - Physical - Perform Review starting of - approval  
Internal Drawings/ GFC (Hold)
work sheet
Gypsum Method Drawings/
Plaster statement Method
statement

Work Inspection

1. Surface shall
be clean and
Surface
Physical As per approved free from dust.
Preparation Every H
1 - Observati Method Loose material - Perform Review - Checklist  
/ MEP construction (Hold)
on Statement and material
Clearance
and mortar
dropping etc.
Check for
Fiber Mesh
Physical As per approved
on joint of Minimum- Every H
2 - Observati Method - Perform Review - Checklist  
RCC and 150mm wide construction (Hold)
on Statement
Block
Masonry
Check for
layout and
vertical Physical As per approved
Every H
3 level strips - Observati Method No deviation - Perform Review - Checklist  
construction (Hold)
at every on Statement
1500mm
distance.
Check for
24 hours prior
application Physical As per approved
to application Every H
4 of Bonding - Observati Method - Perform Review - Checklist  
of Gypsum construction (Hold)
agent on on Statement
plaster.
RCC surface
Check for uniform paste.
Physical
mixing of As per technical Application Every H
5 - Observati - Perform Review - Checklist  
Gypsum specification within 15 mins construction (Hold)
on
Plaster of mixing

MAX-DHIPL-FNS-ITP-0001-R0
INSPECTION AND TEST PLAN FOR INTERNAL GYPSUM PLASTER
a.) 15mm max
Check for Physical As per approved
for Walls Every H
6 thickness of - Observati Method - Perform Review - Checklist  
b.) 8mm max construction (Hold)
Plaster on Statement
for Ceiling
Check for Physical As per approved
Every H
7 Plumb, Line - Observati Method ±3mm in 3mtr - Perform Review - Checklist  
construction (Hold)
and level on Statement
Check for
proper
Physical As per approved
cutting Visual Every H
8 - Observati Method - Perform Review - Checklist  
around the Inspection construction (Hold)
on Statement
MEP
fixtures.
Check for Physical As per approved
Visual Every H
9 smooth - Observati Method - Perform Review - Checklist  
Inspection. construction (Hold)
finish on Statement
Check for
Visual
cleaning of Physical As per approved
Inspection. As Every H
10 surplus - Observati Method - Perform Review - Checklist  
per approved construction (Hold)
dropping of on Statement
mockup
plaster.

H-HOLD POINT- Hold points are predetermined inspection and test points which must be
verified by interested parties as confirming (approved) prior to progressing to the next MIR- Material Inspection Record
stage.
MTC- Manufacturer Test Certificate TPT- Third Party Test

MAX-DHIPL-FNS-ITP-0001-R0