0-WD960-CA250-00310
Inspection and Test Plan for Ducting and Insulation Rev. No. B
Page 1 of 4
Inspection Mode
Item Verifying
Activity Reference Documents Acceptance Criteria VPCI AES Frequency Remarks
No. GTC Documents
Site QC
1.0 Preparation
0-WD862-CA731-00347 WP for 100%
1.0a Review of Work Procedure As per Project specification H R R R
Ductworks
1.0b Review of IFC Drawing IFC Drawing As per Project specification H R R R 100%
0-WD-010-MZ731-00110 WP for Note 1
1.1 Material Check As per Project specification H R R R 100%
warehousing and receiving
2.0 Duct Fabrication
Correct duct dimension as per
Confirm Dimension 0-WD862-CA731-00347 WP for
2.1 IFC drawing & Manufacturers H W V V Random - Note 2
Verification Duct Works, Duct Cutting List
cutting list
Check arrangement of Duct by
2.2a Item Marking IFC Drawing & Cutting List H W V V Random - Note 2
cutting list
Visual Inspection of 0-WD862-CA731-00347 WP for
2.2b Approved IFC Drawing H W W V Random - Note 2
workmanship Ductworks
3.0 Installation of Duct
IFC Drawing, Project Standard
Checklist
and Specification, Relevant
Duct Material conforming to IFC Drawing, Project 0-WD960-
3.1 Codes and Standard, H R R R Random
specification Specification, SMACNA CA250-
Manufacturer Installation
00310_F01
Manual
V Surveillance
Masinloc Power Plant Expansion Project Doc. No. 0-WD960-CA250-00310
Inspection and Test Plan for Ducting and Insulation Rev. No. B
Page 2 of 4
Inspection Mode
Item Verifying
Activity Reference Documents Acceptance Criteria VPCI AES Frequency Remarks
No. GTC Documents
Site QC
Approved IFC Drawing, SMACNA Checklist 0-
3.3 Duct Installation Standard, Manufacturer IFC Drawing Latest Revision H SW SW V Random WD960-CA250- Note 2
Instruction Manual 00310_F01
V Surveillance
Masinloc Power Plant Expansion Project Doc. No. 0-WD960-CA250-00310
Inspection and Test Plan for Ducting and Insulation Rev. No. B
Page 3 of 4
Inspection Mode
Item Verifying
Activity Reference Documents Acceptance Criteria VPCI AES Frequency Remarks
No. GTC Documents
Site QC
Checklist
Insulation delivered at site is
Project Specification, 0-WD960-
4.2 free from defects and as per No severe defects H SW SW V Random Note 1
Manufacturer Instruction Manual CA250-
specification
00310_F02
Checklist
Check duct surface for clean & 0-WD862-CA731-00347 WP for No foreign material before 0-WD960-
4.3 H SW SW V per location Note 1.1
dry prior to insulation Duct Works connect preceeding duct CA250-
00310_F02
Checklist
IFC Drawings, 0-WD862-CA731- Fastening clip spacing 400 0-WD960-
4.4 Size of fastening screw H SW SW V per location Note 1.1
00347 WP for ductworks mm CA250-
00310_F02
Checklist
IFC Drawings, 0-WD862-CA731- 0-WD960-
4.5 Insulation plastic band spacing Plastic band spacing 600 mm H SW SW V per location Note 1.1
00347 WP for ductworks CA250-
00310_F02
Checklist
0-WD960-
4.6 Workmanship, check sealant IFC Drawings No damage on sealant H SW SW V per location Note 1.1
CA250-
00310_F02
Checklist
0-WD960-
4.7 Correct flow direction IFC Drawings Correct direction H SW SW V per location Note 1.1
CA250-
00310_F02
Checklist
Visual check all the joints are IFC Drawings, 0-WD862-CA731- 0-WD960-
4.8 No damage on seal H SW SW W per location Note 1.1
sealed properly 00347 WP for ductworks CA250-
00310_F02
Note.1 Material Check should be done with Material controller of VPCI H Hold Point
Note 1.1 Inspection request will be issued for this items together with checklist W Witness Point
LEGEND SW Spot Witness
R Review
LEGEND
V Surveillance
Masinloc Power Plant Expansion Project Doc. No. 0-WD960-CA250-00310
Inspection and Test Plan for Ducting and Insulation Rev. No. B
Page 4 of 4
Inspection Mode
Item Verifying
Activity Reference Documents Acceptance Criteria VPCI AES Frequency Remarks
No. GTC Documents
Site QC
Checklist
Visual inspection of conditions
0-WD960-
4.9 of air outlets & inlets & IFC Drawings Direction check H SW SW V per location Note 1.1
CA250-
direction of grilles
00310_F02
Final visual inspection of
Project specification, relevant Project specifications, Checklist
HVAC System includes
applicable codes and standards, SMACNA, Relevant applicable 0-WD960-
4.10 identification tag for dampers, H SW SW W per location Note 1.1
manufacturer installation codes and standards, CA250-
air flow direction and duct air
manual, Testing procedure Vendor's recommendation 00310_F02
terminal devices
4.11 Painting repair Project specification Galvanized touch-up paint H SW SW V per location Note 1.1
Note.1 Material Check should be done with Material controller of VPCI H Hold Point
Note 1.1 Inspection request will be issued for this items together with checklist W Witness Point
LEGEND SW Spot Witness
R Review
LEGEND
V Surveillance
Masinloc Power Plant Expansion Project Doc. No. 0-WD800-CA250-00302
Inspection and Test Plan for Plumbing Work Rev. No. A
Page 4 of 4
Inspection Mode
Item Verifying
Activity Reference Documents Acceptance Criteria VPCI AES Frequency Remarks
No. GTC Documents
Site QC
7.0 Repair