TITLE OF TASK : CHIPPING AND CUTTING OF CONCRETE WORKS SUB-CONTRACTOR : GTC Global, Inc. JESA No. : PERMIT No. :
Date / Time April 19, 2017 Prepared by(Sub-con) : Fatima Abegail Duplon Authorized Environmental Person(VPCI) : Authorized Safety Person(VPCI) :
Safety awareness
regarding heat stroke /
heat stress should be
discuss prior to start the
work
2 Chipping works using chipping gun / Eye injury Barricade and signage Follow the proper Use double eye YES
jackhammer should be put in place to procedure in concrete protection (safety
warn the public chipping works goggles with face shield)
Unauthorized personnel in this particular activity
should not allow to work
on working area
Ensure all electrical
cables and machines are
properly inspected prior
to start the work
Only authorized
personnel should use the
chipping gun /
Wear proper personal
jackhammer
protective equipment
Ensure all electrical
such as, hand gloves,
Accident due to electrocution cables are not lay on the YES
long sleeve, safety shoes,
wet ground
hard hat including safety
In case of bad weather
goggles
condition / heavy rains,
work should be stop
immediately and secure
all electrical machines
Unauthorized personnel
should not allow to work
on working area
Unauthorized personnel
should not allow to work Use dust mask in
Barricade and signage
on working area concrete chipping works
Dust emission should be put in place to YES
Assign personnel to to avoid inhalation of
warn the public
monitor the concrete dust
chipping works
Barricade and signage Unauthorized personnel Use ear defender such as
Noise hazard should be put in place to should not allow to work earplug / ear muffs to YES
warn the public on working area avoid accident
Ensure the area is free
from any obstruction
prior to start the work
All materials should be
Accident due to slip / tripping hazard YES
properly segregated
Maintain good
housekeeping on
working area
Wear proper personal
protective equipment
Unauthorized personnel
such as, hand gloves,
Personal injury (Eye, head, foot, body) should not allow to work YES
long sleeve, safety shoes,
on working area
hard hat including safety
goggles
Follow the proper body
positioning in concrete
chipping works
Accident due to improper body posture YES
Proper man-handling
should be exercised to
prevent ergonomic stress
Accident due to horse play Safety briefing to all YES
personnel prior to start
the work
Assign personnel to
continuous monitoring
on working area
In case of bad weather
condition / heavy rains,
work should be stop
Accident due to bad weather condition immediately YES
Always update / monitor
the weather condition
Standby first aider on
working area for possible
emergency
Provide appropriate
resting shelter and
drinking station intended
Accident due to heat stroke / heat
to the workers involved YES
stress
with the tasks
Safety awareness
regarding heat stroke /
heat stress should be
discuss prior to start the
work
Follow the proper
procedure in cutting of Use double eye
Barricade and signage
concrete using grinder protection (safety
Eye injury should be put in place to YES
Unauthorized personnel goggles with face shield)
warn the public
should not allow to work in this particular activity
on working area
Ensure all electrical
cables and machines are
properly inspected prior
to start the work
Only authorized
personnel should use the
grinder for concrete
Wear proper personal
cutting works
protective equipment
Ensure all electrical
such as, hand gloves,
Accident due to electrocution cables are not lay on the YES
long sleeve, safety shoes,
wet ground
hard hat including safety
3 Cutting of concrete using grinder In case of bad weather
goggles
condition / heavy rains,
work should be stop
immediately and secure
all electrical machines
Unauthorized personnel
should not allow to work
on working area
Barricade and signage
should be put in place to
warn the public
Unauthorized personnel Use dust mask in cutting
Dust emission should not allow to work YES
of concrete using grinder
on working area
Assign personnel to
monitor the activity
Noise hazard Barricade and signage Unauthorized personnel Use ear defender such as YES
should be put in place to should not allow to work earplug / ear muffs to
warn the public on working area avoid accident
Proper guarding’s should
Wear proper personal
be installed on the
Only authorized / protective equipment
machine prior to start
trained personnel should such as, hand gloves,
Caught on the rotating parts the work YES
use the grinder for the long sleeve, safety shoes,
Barricade and signage
cutting of concrete hard hat including safety
should be put in place to
goggles
warn the public
Ensure the area is free
from any obstruction
prior to start the work
All materials should be
Accident due to slip / tripping hazard YES
properly segregated
Maintain good
housekeeping on
working area
Wear proper personal
protective equipment
Unauthorized personnel
such as, hand gloves,
Personal injury (Eye, head, foot, body) should not allow to work YES
long sleeve, safety shoes,
on working area
hard hat including safety
goggles
Follow the proper body
positioning in cutting of
concrete using grinder
Accident due to improper body posture YES
Proper man-handling
should be exercised to
prevent ergonomic stress
Safety briefing to all
personnel prior to start
the work
Accident due to horse play YES
Assign personnel to
continuous monitoring
on working area
In case of bad weather
condition / heavy rains,
work should be stop
Accident due to bad weather condition immediately YES
Always update / monitor
the weather condition
Standby first aider on
working area for possible
emergency
Provide appropriate
resting shelter and
Accident due to heat stroke / heat drinking station intended
YES
stress to the workers involved
with the tasks
Safety awareness
regarding heat stroke /
heat stress should be
discuss prior to start the
work
Tools and Spine board, First aid kit, Spill kit Exact location of Area 2
Equipment Emergency First CCB
needed Aid
STG,STB
GTC Shelter