PROJECT TITLE: WORK TITLE:

GROUTING INSPECTION
CHECK LIST

PROJECT OWNER: CONSULTANT: DATE :


LOCATION :
BUILDING :
REMEDIAL TYPE :
CONCESSIONAIRE: CONTRACTOR: MAIN MATERIAL :

START OF INSPECTION :
FINISH OF INSPECTION :
SUBMITTAL
No. DESCRIPTION OK NO REMARKS
1 RFI
2 Shop Drawing
3 Method of Statement
4 Grouting Material Sikagrout 214 or other approved material
5 Coarse Aggregate If needed
PREPARATION
No. DESCRIPTION OK NO REMARKS
1 Roughning (sufficent/ approved) Thick saw and hack out all unsound concrete
2 Cleanliness of Surface Free of dirt, oil, grease, loose material
3 Pre-Treatment Documentation Taken first prior to commence
4 Temperature (as per manufacture spec.) Minimum 10oC - Maximum 40oC
5 Thickness Not Exceeds 100mm Coarse aggregate needed if > 100mm
6 Formwork (size, firmly & water tight) Recommended to apply easy removal agent
7 Calculation Material to be Used To mix materials in sufficient amount
MATERIAL
No. DESCRIPTION OK NO REMARKS
1 Grouting Material (Sikagrout 214) Or other approved material
2 Condition of Material
3 Water Clean water
4 Bonding Agent (if no formwork used) Should be approved material
5 Silicone + Gun Or any approved sealing material
6 Clean Coarse Aggregate 10mm (if needed) Needed for thickness exceeds 100mm
7 Curring Compound/ Goni etc Min. curring 3 days (inclusive of form work)
EQUIPMENT
No. DESCRIPTION OK NO REMARKS
1 Low Speed Drill with Mixing Paddle max. 500 rpm
2 Container Clean and in sufficient size
3 Cube Sampler + bar For sampling with sufficient compaction
4 Camera
5 Shovel/ Trowel/Spatula Note: immediately clean by water after use
APPLICATION (After all stipulated above are OK)
No. DESCRIPTION OK NO REMARKS
1 Damp the Surface of Concrete Saturated surface dry, but no standing water
2 Mixing until Even and Consistent 2-3 minutes
3 Pouring/ application Immediately and no leaking of form work
4 Thickness of Pouring Min. 10 mm, max. 100 mm per pour
RECORDING
No. DESCRIPTION RECORD REMARKS
1 Temperature o
C
2 Batch Number
3 Quantity of Grouting Material kg Sikagrout 214: 25kg/ bag (13.2-13.8ltr mortar)
4 Quantity of Water ltr flowable 4.2ltr/ bag, pourable 3.8ltr/bag
5 Quantity of Coarse Aggregate (if needd) kg Maximum 50%
6 Time of Finished Mixing AM/PM Mixing 2-3 minutes,
7 Time of Finished Application AM/PM
8 Cube Sample nos Sample should be properly marking
9 During and After Treatment Photograph