You are on page 1of 4

Client:

AL-DUR II IWPP HAYA

RISK ASSESSMENT Country: Bahrain

PAINTING WORK District: Al-Dur


Document Number: Date Issued: 17/03/2020
Before Controls After Controls

Likelihood

Likelihood
Severity

Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating

1.0 PRE-TASK REQUIREMENTS


Attend site HSE induction.

Comply with site HSE and Security instruction and/ or guidelines


Entering/ working in premises without proper Injury to working crew and damage to existing
1.1 2 4 8 2 1 2
information structure/ equipment
Ensure mandatory PPE compliance as per site HSE requirement.

All personnel to undergo PTW Training at site.

Injury to conatct with live equipment/ plant, All site engineers tmust acquire certification as permit receiver.
1.2 Working without valid PTW 2 4 8 2 1 2
loss of property Valid PTW to secure prior to entry in the site start of the activity

Conduct Pre-Task safety instructions prior to start any work, ensure


that everyone understands their task and their roles and own scope
of work.

Communicate to all workers the conditions of the PTW


Ensure all workers have their HSE orientation Sticker on their hard
Pre-task briefing not communicated, lack of hat prior to enter the job site
1.3 Injury, loss of property 2 4 8 2 1 2
follow procedures and safety guidelines
Toolbox meeting shall be conducted before work start to refresh
roles/obligations and scope of work as well as primary hazards,
and hazards controls documented within this RA.

Minimize the communication barrier to convey the message in


different languages.
Preparation for Painting
2.0

Always adopt proper manual handling techniques. Proper


2.2 Muscel cramp/fatigue while handling Paint Injury/fracture to personal 2 2 4 2 1 2
supervision must be needed while handling the cement.

Ensure work is properly coordinated and proper illumination must


be provided at the work place.Always keep access/egrees clear
2.3 Fall of person . Injury to personnel 2 4 8 2 2 4
from materials.

Personnel to use only the allowed means of access/ egress.Proper


2.4 Slips / Trips Injury ,fracture to personnel 2 2 4 housekeeping must be maintained at the work place along with 2 1 2
proper cable management.
PAINTING
3
Fall of person / materials from height Injury to personnel/fracture All working platforms must be inspected /tagged properly.Proper
PPE'S must be used while working at height.Donot overlaod the
platforms with materials.Always keep the access/egrees clear from
materials .
3.1 3 3 9 Properly erected scaffold must be made for working at height and 3 1 3
the inspcetion must be done by competent perosn

Page 1 of 4
Client:
AL-DUR II IWPP HAYA

RISK ASSESSMENT Country: Bahrain

PAINTING WORK District: Al-Dur


Document Number: Date Issued: 17/03/2020
Before Controls After Controls

Likelihood

Likelihood
Severity

Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating

Eye injuries from pneumatic tools Injury to personal All pneumatic tools must be inspected and color coded .Use proper
PPE'S while using the pneumatic tools.Only trained operators are
3.2 3 3 9 allowed to use pneumatic tools. 3 1 3

Fire/Explosion Burns/injury to personal All combustable materials must be cleared from the work
area,proper fire extingushers must be kept at the work place.All
3.3 4 3 12 catridges must be kept secured and empty catridges must be 2 2 4
dispossed properly.

Electrocution from faulty machinery Electrocution/ burns /fatality to personals All machineries must be inspected and color coded .All cables must
be routed properly and ensure that free from joints.Only trained
3.4 4 3 12 operatives are allowed to use the macheneries. 3 1 3

Strains and fatigue LTI , Personal Injury Implement job rotation


Use appropriate mechanical aids and tools
3.5 5 2 10 Conduct training on proper lifting techniques 5 1 5

Contact with paints Skin burn Provide and use chemical resistant gloves
Review and communicate material safety data sheet
3.6 4 3 12 to workers involved in painting works 4 2 8

Inhalation of toxic fumes Health effects with respiratory issues Provide and use suitable respirators
Conduct regular air monitoring
3.7 5 3 15 Cap containers when paints are not in use 5 1 5

Slips / Trips Injury/fracture to personal Always maintain good housekeeping at work place after finishing
the work.All materials must keep properly .Cable management
3.8 2 2 4 must be done properly at the work place. 2 1 2

4 Emergency Procedure

Unaware of emergency procedure.


Loss of life, extension of fire and leads to
4.1
serious injuries or property damage 3 3 9 Emergency response team must be available at site. 3 1 3
Certified First aiders availabe at site.
Emergency contact numbers must be displayed at site.
5 Work in the commisioned area
All personnel must have commissioning induction training
Energized panels & Batteries Electrical shock 6 4 24 Pre task briefing before start of work 6 2 12
Read and Follow warning signs
Equipment to be de energized and provided with LOTO
Page 2 of 4 No Flammable liquid / Gases / Paints to be stored near to
energized equipment
Client:
AL-DUR II IWPP HAYA

RISK ASSESSMENT Country: Bahrain

PAINTING WORK District: Al-Dur


Document Number: Date Issued: 17/03/2020
Before Controls After Controls

Likelihood

Likelihood
Severity

Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
All personnel must have commissioning induction training
Pre task briefing before start of work
Read and Follow warning signs
Equipment to be de energized and provided with LOTO
Fire 6 4 24 No Flammable liquid / Gases / Paints to be stored near to 6 2 12
energized equipment
Continouse supervision & Full safety coverage
Panel to be protected properly from dust & physical damage
Ensure that fire extinguishers are in well maintained and close the
work area
Explosion 6 4 24 Ensure there is minimum clearance of workers from the panel 6 2 12
Ensure batteries are De energized if possible
Batteries to be protected properly from dust & physical damage
Ensure the LOTO procedure is being followed .
No conductive tools must be used
Permit reciver must be available with the crew
Appropriate PPE must be used
Proper care must be taken while handiling the material

Battery acid 6 4 24 6 2 12

6 Risk Matrix

7 EMERGENCY TELEPHONE NUMBERS

First Contact
Name Company Position Telephone
Jose Abrahm SPML HSE

SPML
Ance Construction

Page 3 of 4
Client:
AL-DUR II IWPP HAYA

RISK ASSESSMENT Country: Bahrain

PAINTING WORK District: Al-Dur


Document Number: Date Issued: 17/03/2020
Before Controls After Controls

Likelihood

Likelihood
Severity

Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating

REVIEWED BY APPROVED BY
Name

Position

Date
Signature

Page 4 of 4