CHECKLIST FOR LAYING OF UNDER GROUND DRAINAGE & STORMWATER DRAINAGE PIPELINES

PROJECT: MOTIONGATE THEME PARK EXPANSION DUBAI, UAE


CLIENT: DUBAI PARKS AND RESORTS Date:
CONSULTANT: DYNAMIC ENGINEERING CONSULTANTS Location:
CONTRACTOR: NAF CONTRACTING LLC Element:
Sub-Contractor: -- Insp. No.:

Reference Documents:
Specifications:
Drawings: Approved Drawing
Others:
Sl. no. Activity / Item YES NO
1 Inspected all joints visually to ensure no water leakage
2 Site setting, marking and locations as per shop drawing.
2 Ensure that all open ends are properly plugged
Check that minimum one meters head above the crown of the pipe is applied at higher end of the
drain or sewer
3
4 Check and mark the water level on the column
Check the water level in the column after periodic interval of time approximately after one hour and
ensure that no water is leaked from the network
5
6 Check visually again to joint to ensure is no water leakage
Remarks:

Checked by:
MEP WORK
Name: Position: Signature: Date:
CHECKLIST FOR LAYING OFUNDER GROUND & STORMWATER DRAINAGE PIPELINES
PROJECT: MOTIONGATE THEME PARK EXPANSION DUBAI, UAE
CLIENT: DUBAI PARKS AND RESORTS Date:
CONSULTANT: DYNAMIC ENGINEERING CONSULTANTS Location:
CONTRACTOR: NAF CONTRACTING LLC Element:
Sub-Contractor: -- Insp. No.:

Reference Documents:
Specifications:
Drawings: Approved Drawing
Others:
Sl. no. Activity / Item YES NO
7 Ensure that materials and accessories used are as per approved material
8 Ensure all Setting out and Layout as per approved shop drawing
9 Ensure that storm water drainage pipelines are installed & laid as per requirements of specification
and approved Drawings
10 Ensure that Bedding & Backfilling are completed as per specification requirements.
11 Ensure the required accessories are fitted
12 Ensure slops as per approved shop drawings.
13 Ensure warning tapes are installed
14 Ensure Connections and slope to existing manholes as per shop drawing.
15 Ensure that identification Tags as per specification / approved submittals.
Remarks:

Checked by: