Professional Documents
Culture Documents
CHECKLIST
Project Name: Project No.:
Subcontractor:
Road Section:
Drawing No. Rev. Page 1 of 3
CHECKING ROADWORKS/PAVING Signature for approved
Asphalt Road, Road class C Asphalt Road, Road class D
Darvari tkIS MOL Comment
Concrete Road
Compaction accepted?
Evd = __________> 50 MN/m² (dynamic load plate test, 1/100m, min. 2/section)
Ev2 = __________> 100 MN/m² (static load plate test, 1/section)
Laboratory test accepted?
Particle size distribution:___________ (1/section)
Survey every 12,5m in cross section done?
Compaction accepted?
Evd = __________> 60 MN/m² (dynamic load plate test, 1/100m, mind. 2/section)
Ev2 = __________> 120 MN/m² (static load plate test, 1/100m, mind. 2/section)
A Compaction accepted?
Evd = __________ > 60 MN/m² (dynamic load plate test, 1/100m, random sample)
S Ev2 = __________> 120 MN/m² (static load plate test, 1/100m, random sample)
P Laboratory test of sandy gravel 0/63 accepted?
H Grain size distribution:____________ (1/1000m³)
Proctor values measured (1/1000m³)
A Organic content: ________ <5% (1/1000m³)
Water content: _________<______% (1/day and section)
L Cement content: _________> 4% (1/day and section)
Compression strength on specimen sample ___________ >
T
Slope accepted?
Slope:_________% (random sample)
Required slope= 2,5% or acc. to road design +/-0,2%
Flatness accepted?
Flatness: ________ < 10mm (random sample with 4m straight edge)
Survey every 12,5m and at visible changes of level in cross section done?
Layer thickness accepted?
Thickness:_________mm (1/100m, min. 2/section)
Required t= 200mm +/-10mm
Free from obvious visual defects?
Survey every 12,5m and at visible changes of level in cross section done?
Slope accepted?
Slope:_________% (random sample)
Required slope= 2,5% or acc. to road design +/-0,2%
Flatness accepted?
Flatness: ________ < 10mm (random sample with 4m straight edge)
Survey every 12,5m and at visible changes of level in cross section done?
Slope accepted?
Slope:_________% (random sample)
Required slope= 2,5% +/-0,2%
Flatness accepted?
Flatness:_________ < 4mm (random sample)
Grip accepted?
Grip:_________% (1/100m)
Required grip= 0,56 µSKM (Tolerance: -0,03)
Asphalt joints accepted?
Hot-cold joint is clean
cold-cold joint is cutted and clean (before sealing)
cold-cold joint is properly sealed (after sealing)
Compaction accepted?
Evd = __________ > 40 MN/m² (dynamic load plate test, 1/100m, random sample)
Ev2 = __________> 80 MN/m² (static load plate test, 1/100m, random sample)
Laboratory test accepted?
Grain size distribution:___________ (1/1000m³)
Proctor values measured (1/1000m³)
Organic content: ________ <5% (1/1000m³)
Execution accepted?