Point nr.

Axis Measured level [m] Planned level [m] Deviation [mm] + up, - down

1 A 103.975 103.970 0.005


2 A 103.964 103.970 -0.006
4 A 103.962 103.970 -0.008
4 A 103.968 103.970 -0.002
5 I 103.968 103.970 -0.002
6 I 103.964 103.970 -0.006
7 I 103.965 103.970 -0.005
8 I 103.964 103.970 -0.006

Note : you follow PDE-CVS-0845-TB-00001 and Section G (aks 5 ) pls


Comment

Up of platform steel
Up of platform steel
Up of platform steel
Up of platform steel
Up of platform steel
Up of platform steel
Up of platform steel
Up of platform steel
Point nr. Axis Measured level [m] Planned level [m] Deviation [mm] + up, - down

1 A 103.777 103.770 0.007


2 A 103.773 103.770 0.003
4 A 103.768 103.770 -0.002
4 A 103.773 103.770 0.003
5 I 103.827 103.770 0.057
6 I 103.831 103.770 0.061
7 I 103.835 103.770 0.065
8 I 103.825 103.770 0.055
Top of grating [m]
Comment
Calculated Planned
Bottom of platform steel 104.007 104.000
Bottom of platform steel 104.003 104.000
Bottom of platform steel 103.998 104.000
Bottom of platform steel 104.003 104.000
Bottom of platform steel 104.057 104.000
Bottom of platform steel 104.061 104.000
Bottom of platform steel 104.065 104.000
Bottom of platform steel 104.055 104.000