GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

XB100

1574
1

340
MATERIAL LIST FOR ONE ASSEMBLY MK'D No. Required
340 1234
0 Pos. Size Length Qty. Grade Weight

X101 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4


X101 X139 UPN100 1578 1 S275 16.7

X148 L50X50X5 1598 1 S275 6.0

X137 UPN100 193 2 S275 4.1

X137

202
X137 X139
X138 PLT10*45.6 70 2 S355 0.5

X146 PLT10*50 92 2 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4


X148 6 Total 70.4
1788 1754
6 6 6
1301
6 6 1303
10 339 800 439 1755 6 6
6

1139
339

1578
0 10

40 30

X146

36
80
X147
1598 (UC152*152*23 x 1574) 6
1753
6
6 1302
A B C 25 137 80 6
D
C-C

202 116
6 1044
6
1143 6
1084 8.5 X135
B D 6 1046
A C 6
2344 6
6

51
12 332 800 442 12

50
2343 6
X137
1061 6
6 202 6
1292 6
6 1751
6 X138 6
6 6 1045
1060 6
X137
1139
6
36

30

B-B
X146
X147

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION


80

40

REV. DATE MADE BY CHKD. BY DESCRIPTION


6 1752
6 6 6
1294
6
2346
6 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1

1293 6
80 137 25 6
6
1750
6
X138 TITLE BEAM
6 2345
6
1733
DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

6
A-A 6 2374
1734 6 D-D 6
DRAWN A.E DRAWING REV.
6 ECE-W.O.269-F001
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

1574
340
340 1234
XB101 1

0
MATERIAL LIST FOR ONE ASSEMBLY MK'D No. Required
Pos. Size Length Qty. Grade Weight

X102 X102 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4

X144 UPN100 1578 1 S275 16.7

X148 L50X50X5 1598 1 S275 6.0


X137

202
X137 X144 X137 UPN100 193 2 S275 4.1

X138 PLT10*45.6 70 2 S355 0.5

X148 X146 PLT10*50 92 2 S355 0.7


1786
6 160 2 S355
X147 PLT12*144.4 4.4

10 339 800 439 1766 6 Total 70.4


6 6
1313
6

1139

1578
339

6
0 10

1315
1767 6 6
6

40 30

X146

36
80
X147
1598 (UC152*152*23 x 1574) 6
1765
6
6 1314
A B C 25 137 80 6
D
C-C

202 116
6 1038
6
1133 6
1090 8.5 X135
B D 6 1040
A C 6
2352 6
6

51
12 332 800 442 12

50
2351 6
X137
1067 6
6 202 6
1304 6
6 1763
6 X138 6
6 6 1039
1066 6
X137
1129
6
36

30

B-B
X146
X147

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION


80

40

REV. DATE MADE BY CHKD. BY DESCRIPTION


6 1764
6 6 6
1306
6
2354
6 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1

1305 6
80 137 25 6
6
1762
6
X138 TITLE BEAM
6 2353
6
1727
DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

6
A-A 6 2378
1728 6 D-D 6
DRAWN A.E DRAWING REV.
6 ECE-W.O.269-F002
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB102 1 No. Required


Length

1725

1928
Pos. Size Qty. Grade Weight

340
340 1385 203
0

X103 UC152*152*23 1928 1 S275 44.9

X145 UPN100 1930 1 S275 20.5

X146 PLT10*50 92 1 S355 0.4


X103 X147 PLT12*144.4 160 1 S355 2.2

X149 L50X50X5 1940 1 S275 7.2

X135 PLT10*136.8 143 2 S355 2.7

X137 X137

202
X137 UPN100 193 3 S275 6.1
X137 X145
X138 PLT10*45.6 70 3 S355 0.7

Total 84.7
X149 1783
6
1118 6 X137 8.5 1115 6 1108
10 339 693 693 206
6
X135

1031

1724

1930
339
0 10

51
2364 6

50
6
1940 (UC152*152*23 x 1928) D
X138 6 1110
6
A C 6
B 2363
202 116

1112 6 6
6 1109
6 6
1113
6 C-C

C 6 1029
6
1117 6 202 X135 116
B 6 1031
A 6
332 693 693 211
2366 6
D 6
1024

1717

1928
0

332

51
50
2365 6
8.5
X137
6
1322
6 1781 6 1715
6
6 1076 6
1713
6
36

30

X138 6 1030
X146

1075 6 6
2334 6 6
X147

6
B-B
80

40

6 1782
6 00 24-7-2022 A.E A.D ISSUED FOR FABRICATION
1324 6
6
REV. DATE MADE BY CHKD. BY DESCRIPTION
6
80 137 25 6
6
1780 2333 6 X138
1323
6
6 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
1719 6 2368
6
A-A 6 TITLE BEAM
1718 6
6 DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

D-D DRAWN A.E DRAWING REV.


ECE-W.O.269-F003
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB103 2 No. Required


Pos. Size Length Qty. Grade Weight

X104 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

1413 6
6 X136
116
1415 6
6 6 1416
6
6 340 1234
1419
6 6

50 51
0

340

1574
1421
6
6
36

1418
6
1598 (UC152*152*23 x 1574) X135
6
80

6 1417
X147

1414 6
12 1574 12 6
B-B
1420 6
6 40 40 A
A-A A B
X104

A
B A

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F004
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB104 1 No. Required


Pos. Size Length Qty. Grade Weight

X105 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

1574
340
340 1234

46
1623 6
6 X135
6 993
996 6 6
6 6
36

1625 116
6 1598 (UC152*152*23 x 1574) 6
6 995
998 6
6
80

12 1574 12
X147

50 51
1574
340

340 1234
X136
0

40 40
A
6 1624 6
A B 997 6
6 6 994
6
A-A X105
B-B

A
B A
00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F005
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB105 2 No. Required


Pos. Size Length Qty. Grade Weight

X106 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0
6 1431
6

6 1433
6
36
80

X147

6 1390
1387 6 116 6
6
X135
6 1432 340 1234
40 40 6 X136

51
0

340

1574
A-A

50
6 1392
6
1389 6
6
1598 (UC152*152*23 x 1574)
1388 6
6 6 1391
12 1574 12 6
B-B
B A
A
X106

A B A

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F006
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB106 1 No. Required


Pos. Size Length Qty. Grade Weight

X107 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

40 40 6 1665
1667 6
6 6

36
80

X147
340 1234
0

1574
340

1666 6
6
A-A
1598 (UC152*152*23 x 1574)

1533 6
12 1574 12 6 116
6 1536
6
A X135 X136
A B
X107

51
50
6 1538
1535 6 6
6
A 6 1537
B A 1534 6 6
6
B-B

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F007
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB107 1 No. Required


Pos. Size Length Qty. Grade Weight

X108 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

340 1234

1574
0

340

40 40
1598 (UC152*152*23 x 1574)
6 1679
1677 6 6
12 1574 12 6

36
C
A B
X108

80
X147
1678 6
6
A-A
A C
B

40 40 1494 6 116
6
6
6 1692 X135 X136
1694 6
6
51
36

6 00 24-7-2022 A.E A.D ISSUED FOR FABRICATION


50

1497
6 REV. DATE MADE BY CHKD. BY DESCRIPTION
80

X147

6 6 1499
1496 6 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
6
6 1498
6 TITLE BEAM

6 DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


1693
Tekla structures

6
B-B
6 1495
6
DRAWN A.E DRAWING REV.
C-C ECE-W.O.269-F008
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB108 1 No. Required


Pos. Size Length Qty. Grade Weight

1574
340
340 1234 X109 UC152*152*23 1574 1 S275 36.7

0
X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

6 1647
1598 (UC152*152*23 x 1574) 6

12 1574 12
6

36
1649

1574
6
340

340 1234
0

80

X147
B A
A
X109
1648 6 40 40
6
A-A

A B A

116
1575 6 X135 6 1572
6
6
51

X136
50

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

1577 6 REV. DATE MADE BY CHKD. BY DESCRIPTION


6
6 1574 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
6
1576 6 TITLE BEAM
6 6 1573
6 DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

B-B DRAWN A.E DRAWING REV.


ECE-W.O.269-F009
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB109 1 No. Required


Pos. Size Length Qty. Grade Weight

1574
1574 1 S275

340
X110 UC152*152*23 36.7
340 1234

0
X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

1671 6
6 6 1673
6

36
80
X147
1598 (UC152*152*23 x 1574)

12 1574 12
40 40

1574
6
340

340 1234 1672


6
0

A A-A
A B
X110

A B A

116
X135
1523 6
6 6 1520
6
51

X136
6
50

1525
6
00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

6 6 1522
1524 6 6 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
6 1521
6
TITLE BEAM
B-B
DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F010
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB110 1 No. Required


Pos. Size Length Qty. Grade Weight

X111 UC152*152*23 1574 1 S275 36.7

1574
340
340 1234 X135 PLT10*136.8 143 1 S355 1.4

0
X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

1598 (UC152*152*23 x 1574)

12 1574 12
1698 6 40 40
6

1574
340
340 1234
0

36
A B
X111

80

X147
1700 6
6 6 1699
6

A C C-C
B

1683 6
6
6 1685 116
6 6 1507
6 6
1510
6
X135
36
80

X147

51

X136 00 24-7-2022 A.E A.D ISSUED FOR FABRICATION


50

REV. DATE MADE BY CHKD. BY DESCRIPTION


1512 6 6
6 40 40 6 1509
1684 6 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
6
6 TITLE BEAM
A-A 1511 6
6 1508
6 DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

B-B DRAWN A.E DRAWING REV.


ECE-W.O.269-F011
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB111 1 No. Required


Pos. Size Length Qty. Grade Weight

X112 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

340 1234
0

340

1574
1598 (UC152*152*23 x 1574)

12 1574 12

A
A B
X112

A
B A
6 1443 6
1361
6 6
116 6 1364
6

6
X136
36

6
1445 X135
51
80

X147

6 1366
6
50

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION


40 40 6 1444 1363 6
6 6
PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
A-A 6 1365
6 TITLE BEAM
1362 6
6 DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

B-B DRAWN A.E DRAWING REV.


ECE-W.O.269-F012
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB112 1 No. Required


Pos. Size Length Qty. Grade Weight

X113 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

340 1234

1574
0

340

40 40
1598 (UC152*152*23 x 1574) 6
1458
6
12 1574 12

36
C
A B

80
X113

X147
1460 6
6 6 1459
6
C-C
A C
B

1348 6 116 6
6 1351
6 40 40
6 1449
X135 6
X136
51

36

6 1451
6
50

80

X147

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

6 1353
REV. DATE MADE BY CHKD. BY DESCRIPTION
6 6
1350
6 6
PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
1450
6 TITLE BEAM
1349 6 6 1352
6 6 A-A A.E 24.07.2022
DESIGN DATE SHT. No. 1/1
Tekla structures

DRAWN DRAWING
B-B
A.E REV.
ECE-W.O.269-F013
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB113 2 No. Required


Pos. Size Length Qty. Grade Weight

X114 UC152*152*23 1928 1 S275 44.9

X147 PLT12*144.4 160 1 S355 2.2

X135 PLT10*136.8 143 2 S355 2.7

X136 PLT10*63.2 137 2 S355 1.3

Total 51.1
340 1385 203
0

340

1725

1928
1940 (UC152*152*23 x 1928) 40 40 6 1455
6
12 1928

A B C

36
X114

80
X147
6 1457
6

1456 6
A 6
B C
A-A

1335 6
6
1023 6
6 1338 116
6 6
1337 116 6
6
X135 X136
X135 X136
51
51

6
50

1026
50

6 1340 6 1028
6
1025 6 6 00 24-7-2022 A.E A.D ISSUED FOR FABRICATION
6 REV. DATE MADE BY CHKD. BY DESCRIPTION
6 1339 6
6 6 6 1027
1336 1024 6
6 6 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
B-B C-C TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F014
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

1725

1928
340
340 1385 203 MATERIAL LIST FOR ONE ASSEMBLY MK'D XB114 1 No. Required

0
Pos. Size Length Qty. Grade Weight

X115 UC152*152*23 1928 1 S275 44.9

X147 PLT12*144.4 160 1 S355 2.2

X135 PLT10*136.8 143 2 S355 2.7

X136 PLT10*63.2 137 2 S355 1.3

Total 51.1

350 1385 193


0

350

1735

1928
40 40 6 1695
6

1940 (UC152*152*23 x 1928)

A B B

36
X115

51

80
X147
6 1697

50
6

1696 6
A 6
B B
A-A

1484 6
6
116
1486 6 6 1481
6 6

X135
51

X136
50

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION


6 1483
6 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
6 6 1482 TITLE BEAM
1485 6
6
DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

B-B
DRAWN A.E DRAWING REV.
ECE-W.O.269-F015
CHKD. A.D NO. 00
1574
340
ALL HOLES ARE 22 Dia mm UNLESS NOTED
340 1234 GENERAL NOTES:
0
MATERIAL LIST FOR ONE ASSEMBLY MK'D XB115 1 No. Required

X116 Pos. Size Length Qty. Grade Weight

X116 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4

X143 UPN100 1578 1 S275 16.7


X137

202
X137 X143 X148 L50X50X5 1598 1 S275 6.0

X137 UPN100 193 2 S275 4.1

X148 X138 PLT10*45.6 70 2 S355 0.5


1789
6 X146 PLT10*50 92 2 S355 0.7

10 339 800 439 X147 PLT12*144.4 160 2 S355 4.4

6 Total 70.4

1139
339

1578
0 10

1748
6 6
1295
6 6 1297
1749 6 6
6

40 30

X146

36
1598 (UC152*152*23 x 1574)

80
X147
A B C
D 1747 6
6
6 1296
25 137 80 6
C-C

202 116
B D 6
A C 1047
6
1148 6
1081 8.5 X135
6 1049
6
12 332 800 442 12
2340 6
6

51
50
202
40 40 137 6
2339
6 X137
X137
1144
6
1286
6 1745 6
1058 6
6
6
X138 6 1048
36

30

1057 6 6
6
X146

B-B
X147

6
80

2342
40

6
6
6
1746
6
X138 00 24-7-2022 A.E A.D ISSUED FOR FABRICATION
1288 2341
6
6
REV. DATE MADE BY CHKD. BY DESCRIPTION
1736
6
80 137 25 6 1744 6
6
1287
6
6
1737 6 D-D 6
2372 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
6
A-A TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F016
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB116 1 No. Required

1574
Pos. Size Length Qty. Grade Weight

340
340 1234
0
X117 UC152*152*23 1574 1 S275 36.7

X117 X135 PLT10*136.8 143 1 S355 1.4

X140 UPN100 1578 1 S275 16.7

X148 L50X50X5 1598 1 S275 6.0

X137 UPN100 193 2 S275 4.1

X137

202
X137 X140 X138 PLT10*45.6 70 2 S355 0.5

X146 PLT10*50 92 2 S355 0.7

X148
X147 PLT12*144.4 160 2 S355 4.4
1787 Total 70.4
6

10 339 800 439 1760 6


137 40 40 6
6 1307
6

1139

1578
339
0 10

6 1309
6

30

36
X146
40

X147
80
1598 (UC152*152*23 x 1574) 6
1761
D 6
A B C 1759 6 25 137 80
6 6
C-C 1308
6

202 116 6 1041


6
B D 1138 6
1087 8.5 X135
A C 6 1043
6
332 800 442 6
2348
6
1132

1574
0

332

51
12 1574 12 X137

50
2347 6

6 1064 6
1298
6 1757 6 202 6 6 1042
6
X138 6
6
6
X137 1063
36

30

1134
6 B-B
X146
X147
80

40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION


6 1758
6 6 REV. DATE MADE BY CHKD. BY DESCRIPTION
1300
6 6
2350
80 137 25 6 1756
6 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
1299 6
6
6
X138
2349 6 TITLE BEAM
1730 6
A-A 6
DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

6 2376
1731 6 D-D 6
6 DRAWN A.E DRAWING REV.
ECE-W.O.269-F017
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB117 1 No. Required

1574
340
0 340 1234 Pos. Size Length Qty. Grade Weight

X118 UC152*152*23 1574 1 S275 36.7


X118 X135 PLT10*136.8 143 1 S355 1.4

X141 UPN100 1578 1 S275 16.7

X148 L50X50X5 1598 1 S275 6.0

X137

202
X137 UPN100 193 2 S275 4.1
X137 X141
X138 PLT10*45.6 70 2 S355 0.5

X146 PLT10*50 92 2 S355 0.7


X148 X147 PLT12*144.4 160 2 S355 4.4
1785
10 339 800 439 6 Total 70.4

X146

1139

1578
339

6
0 10

1772 6
6 6 1321
1319 6
6 6
1773

30
6

36
40

X147

80
1598 (UC152*152*23 x 1574)

A B C 1771 6
D 6
25 137 80
6 1320
6
C-C

8.5 202 116 6 1035


1093 6
B D
A C 1128 6 X135 6 1037
6
2356 6
12 332 800 442 12 6

51
X137

50
2355 6
202 6
6
1070
6
X138
1310 1769 6
6 6 6 6 1036
X137
1124
1069 6 6
6
36

30

B-B
X146
X147

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION


80

40

REV. DATE MADE BY CHKD. BY DESCRIPTION


6 1770 2358 6
1312 6 6 6
6
X138 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
80 137 25 6 1768 2357 6
1311 6 6
1724 6 TITLE BEAM
6
6
6 2380 DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

A-A 1725 6 D-D 6


6
DRAWN A.E DRAWING REV.
ECE-W.O.269-F018
CHKD. A.D NO. 00
1574
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

340
340 1234
0 MATERIAL LIST FOR ONE ASSEMBLY MK'D XB118 1 No. Required
Pos. Size Length Qty. Weight
X119
Grade

X119 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4

X142 UPN100 1578 1 S275 16.7

X137

202
X137 X142 X148 L50X50X5 1598 1 S275 6.0

X137 UPN100 193 2 S275 4.1

X138 PLT10*45.6 70 2 S355 0.5


X148 1784
6 X146 PLT10*50 92 2 S355 0.7
10 339 800 439 X147 PLT12*144.4 160 2 S355 4.4

1139

1578
339

Total
0 10

70.4
1778 6
6 6
1325
6 6 1327
1779 6 6
6
1598 (UC152*152*23 x 1574)

40 30

X146

36
A B C
D

80
X147
1777 6
6
6 1326
25 137 80 6

B D C-C
A C
12 332 800 442 12 202 116 6 1032
6
1119 6
8.5
1096 X135 6 1034
6
2362 6
6

51
202
X137

50
1316 6 6
6 1775 6
6 6 2361
X137
1123
36

30

1073 6
6
X146

X138 6
X147

6 1033
1072 6
80

6
40

B-B
6 1776 2360 6
1318 6 6 6
6
X138 00 24-7-2022 A.E A.D ISSUED FOR FABRICATION
6
80 137 25 6 1774 2359 6
1317 6 6 REV. DATE MADE BY CHKD. BY DESCRIPTION
6 1721
6
6 2382
A-A 1720 6 D-D 6 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
6
TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F019
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB119 2 No. Required


Pos. Size Length Qty. Grade Weight

X120 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

46
1 * D 12 2 * D 12 1 * D 12

340 1234

1574
0

340

1598 (UC152*152*23 x 1574)

12 1574 12

A
A B 116

X120 X136
36

X135

50 51
80

X147

40 40
B-B
A
A-A B A

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F020
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB120 2 No. Required


Pos. Size Length Qty. Grade Weight

X121 UC152*152*23 1255 1 S275 29.2

X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 1 S355 2.2

Total 33.4

156 156 1099

1255
0

15 719 35 486 12

1011 6 116
6
A X135 X136

X121

51
6

50
1014
6

6 6 1016
1013 6
6
6 1015
A 6
A-A
1012 6
6

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F021
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB121 1 No. Required


Pos. Size Length Qty. Grade Weight

1574
340
340 1234 X122 UC152*152*23 1574 1 S275 36.7

0
X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

350 1224
0

1574
350

40 40
6 1661
1659 6 6
6
1598 (UC152*152*23 x 1574)

36
B
A A
X122

80
X147
1660 6
6
A-A
A A
B

1562 6 X135
6 6 1559
116
6

X136
51
50

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

1564 6
6 6 1561
PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
6
TITLE BEAM
6 1560
6
B-B
1563 6 DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

6
DRAWN A.E DRAWING REV.
ECE-W.O.269-F022
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB122 1 No. Required


Pos. Size Length Qty. Grade Weight

1255
156
156 1099 X123 UC152*152*23 1255 1 S275 29.2

0
X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 1 S355 2.2

Total 33.4

0 166 1089

166

1255
15 719 35 486 12
116 6 999
1002 6 6
6
X135
A

51
X123

50
1004 6
6
6 1001
6
X136
A-A 6 1000
A 1003 6 6
6

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F023
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB123 2 No. Required


Pos. Size Length Qty. Grade Weight

X124 UC152*152*23 1574 1 S275 36.7

X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

340 1234
0

1574
340

40 40
6 1631
1629 6 6
6
1598 (UC152*152*23 x 1574)

36
A B A
X124

80
X147
1630 6
6
A-A
A A
B

6 116
1598
6
X135 X136
51

6
50

1601
6

6 6 1603
00 24-7-2022 A.E A.D ISSUED FOR FABRICATION
1600 6
6 REV. DATE MADE BY CHKD. BY DESCRIPTION
6 1602
6
PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
6
B-B
1599
6 TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F024
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB124 1 No. Required


Pos. Size Length Qty. Grade Weight

1574
340
340 1234 X125 UC152*152*23 1574 1 S275 36.7

0
X135 PLT10*136.8 143 1 S355 1.4

X136 PLT10*63.2 137 1 S355 0.7

X147 PLT12*144.4 160 2 S355 4.4

Total 43.0

350 1224
0

1574
350

40 40
6 1637
1635 6 6
6
1598 (UC152*152*23 x 1574)

36
A B A
X125

80
X147
1636 6
6
A-A
A A
B

116

1614 6 6
6 1611
6

X135
1616 6
6
51
50

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

X136 REV. DATE MADE BY CHKD. BY DESCRIPTION


6 1613
6 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
6 1612
6 TITLE BEAM

6
B-B
DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

1615
6
DRAWN A.E DRAWING REV.
ECE-W.O.269-F025
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

1255
156
156 1099
XB125 1

0
MATERIAL LIST FOR ONE ASSEMBLY MK'D No. Required

X126 Pos. Size Length Qty. Grade Weight

X126 UC152*152*23 1255 1 S275 29.2

X129 UPN100 1257 1 S275 13.3

X130 L50X50X5 1267 1 S275 4.7


X137

202
1790
6 X137 X129 X135 PLT10*136.8 143 1 S355 1.4

X146 PLT10*50 92 1 S355 0.4

X130 X147 PLT12*144.4 160 1 S355 2.2

153 733 372 X137 UPN100 193 2 S275 4.1

X138 PLT10*45.6 70 2 S355 0.5


0

153

886

1257
Total 55.8

1267 (UC152*152*23 x 1255)

1742 6
6 6
1289
B C
6 6 6 1291
D 1743 6
6

40 30

X146

36
80
X147
B D
C 1741 6
6
6 1290
148 730 378 12 25 137 80 6
C-C

202
202 116 6 1050
6 6
X137
1149
6 1078 8.5
1153 6
X135 6
1052
X137
2336 6
6

51
2338 6
6
X138

50
2337 6 00 24-7-2022 A.E A.D ISSUED FOR FABRICATION
1739 6
6 2335 6 REV. DATE MADE BY CHKD. BY DESCRIPTION
1053 6
6 6
2370
6
D-D
6
1740 6
6 1051 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
6 X138 6
1055 TITLE BEAM
6

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

1054 6
6
DRAWN DRAWING
B-B
A.E REV.
ECE-W.O.269-F026
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB126 9 No. Required


Pos. Size Length Qty. Grade Weight

X127 UC152*152*23 903 1 S275 21.0

Total 21.0

UC152*152*23 x 903

X127
51

51
50

50
2 * D 18 2 * D 18

30 843 30
0
30

873
903
00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F027
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XB127 9 No. Required


Pos. Size Length Qty. Grade Weight

X128 UC152*152*23 728 1 S275 17.0

Total 17.0

UC152*152*23 x 728

X128
51

2 * D 18
50

2 * D 18

30 668 30
0
30

698
728
00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE BEAM

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F028
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XC100 36 No. Required


Pos. Size Length Qty. Grade Weight

X100 SHS80*80*5.0 603 1 S275 7.0

X133 PLT10*180 180 1 S355 2.5

X134 PLT10*150 180 1 S355 2.1

X131 PLT6*50 70 2 S355 0.3

X132 PLT6*50 70 2 S355 0.3

Total 12.1

623 (SHS80*80*5.0 x 603)

10 603 10
6 875 6
6
6 772 6 770
6 877 6
A X131 6 B
6 771 X132
6
876 6
6
X100

X133
X134

A-A
B-B
878 6
6
6 773
6 X132
A 6 879 6 B
774
X131 6
533
6
70
0

533

603
00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE COLUMN

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F029
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XP100 3 No. Required


Pos. Size Length Qty. Grade Weight
X153 X153 PL8*1000 1021 1 S355 63.9

1021
X164 SHS30*30*2.5 1000 1 S275 2.1

X168 SHS30*30*2.5 961 1 S275 2.1

X173 X170 SHS30*30*2.5 635 1 S275 1.4

15
X157 SHS30*30*2.5 128 2 S275 0.5
15
X173 SHS30*30*2.5 1021 2 S275 4.4

X178 PLT2*26 26 4 S355 0.0

115
X157 X178
PL.TYP.
Total 74.4
6

X178

50
X164

500
X170

320
TYP.
0
X168
1000

970

320

500
X178

X178
50

CLOSER TYP.
2
X157 00 24-7-2022 A.E A.D ISSUED FOR FABRICATION
115

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


15

TITLE PANNEL
15

X173 DESIGN A.E DATE 24.07.2022 SHT. No.


106 900 15 1/1
Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F030
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XP101 1 No. Required


Pos. Size Length Qty. Grade Weight

X153 X153 PL8*1000 1021 1 S355 63.9

1021
X157 SHS30*30*2.5 128 1 S275 0.3

X162 SHS30*30*2.5 178 1 S275 0.4

X173 X164 SHS30*30*2.5 1000 1 S275 2.1

15
X168 SHS30*30*2.5 961 1 S275 2.1
15
X171 SHS30*30*2.5 585 1 S275 1.2

X173 SHS30*30*2.5 1021 2 S275 4.4

115
X157 X178 X178 PLT2*26 26 4 S355 0.0

Total 74.4
PL.TYP.
6
X178

50
X164

500
X171

320
X168
1000

970

TYP.
0

320
X178

500
X178

X162
CLOSER TYP.
165

2 00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


15

TITLE PANNEL
15

X173 DESIGN A.E DATE 24.07.2022 SHT. No.


106 900 15 1/1
Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F031
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XP102 3 No. Required


Pos. Size Length Qty. Grade Weight

X153 PL8*1000 1021 1 S355 63.9

X160 SHS30*30*2.5 515 1 S275 1.1


1021
X153
X161 SHS30*30*2.5 433 1 S275 0.9

X173 X164 SHS30*30*2.5 1000 1 S275 2.1

15
X169 SHS30*30*2.5 991 1 S275 2.1
15
X178 PLT2*26 26 1 S355 0.0

X173 SHS30*30*2.5 1021 2 S275 4.4

Total 74.5
PL.TYP.
6

X160

500
485
X169
1000

970

65
X178
TYP.
0

CLOSER TYP.
2 X161

500
420
X164

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION


15

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


15

X173
106 900 15 TITLE PANNEL

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F032
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XP103 5 No. Required

X153 Pos. Size Length Qty. Grade Weight

X153 PL8*1000 1021 1 S355 63.9

1021 X164 SHS30*30*2.5 1000 1 S275 2.1

X168 SHS30*30*2.5 961 1 S275 2.1

X173 X174 SHS30*30*2.5 1000 1 S275 2.1

15
X173 SHS30*30*2.5 1021 2 S275 4.4
15
Total 74.6

PL.TYP.
6

500
X174

485
TYP.
0

X168
1000

970

485

500
X164
15

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION


15

X173 REV. DATE MADE BY CHKD. BY DESCRIPTION


106 900 15
PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1
TITLE PANNEL

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F033
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XP104 1 No. Required


Pos. Size Length Qty. Grade Weight

X154 PL8*749 1021 1 S355 47.8

X158 SHS30*30*2.5 390 1 S275 0.8

X159 SHS30*30*2.5 308 1 S275 0.7


X173 X154 X165 SHS30*30*2.5 749 1 S275 1.6

15
X169 SHS30*30*2.5 991 1 S275 2.1

X178 PLT2*26 26 1 S355 0.0

X173 SHS30*30*2.5 1021 2 S275 4.4

Total 57.4
X158

249
234
PL.TYP.
6

X165

X169
TYP.
0

190
719

X178

500
CLOSER TYP.
2
X159

295
15

15
X173
106 900 15

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE PANNEL

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F034
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XP105 3 No. Required


Pos. Size Length Qty. Grade Weight

X155 PL8*1000 1013 1 S355 63.4


X155
X175 1013
X166 SHS30*30*2.5 953 1 S275 2.0

X170 SHS30*30*2.5 635 2 S275 2.7

PL.TYP. X175 SHS30*30*2.5 1013 2 S275 4.3

15
6
X157 SHS30*30*2.5 128 4 S275 1.1

15 X178 PLT2*26 26 8 S355 0.1

Total 73.6

115
X157 X157 X178

X178 X178 X178

50
CLOSER TYP.
2

500
X170
X170

320
X166
1000

970

TYP.
0

320

500
X178

X178 X178 X178


50

X157 00 24-7-2022 A.E A.D ISSUED FOR FABRICATION


115

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


15

TITLE PANNEL
15

X157 X175 A.E 24.07.2022


DESIGN DATE SHT. No. 1/1
Tekla structures

15 983 15 DRAWN A.E DRAWING


ECE-W.O.269-F035
REV.

CHKD. A.D NO. 00


GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

X155 MATERIAL LIST FOR ONE ASSEMBLY MK'D XP106 1 No. Required
Pos. Size Length Qty. Grade Weight

X155 PL8*1000 1013 1 S355 63.4

1013
X166 SHS30*30*2.5 953 1 S275 2.0

X157 SHS30*30*2.5 128 2 S275 0.5

X175 PL.TYP.
X163 SHS30*30*2.5 108 2 S275 0.5

15
6
X172 SHS30*30*2.5 665 2 S275 2.8

15 X175 SHS30*30*2.5 1013 2 S275 4.3

X178 PLT2*26 26 8 S355 0.1

115
X157 X157 X178 Total 73.7

X178 X178 X178

50
CLOSER TYP.

500
2

X172

320
X172

X166
1000

970

TYP.
0

350

X178 500

X178 X178 X178


40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION


X163
REV. DATE MADE BY CHKD. BY DESCRIPTION
95

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


15

TITLE PANNEL
15

X163 X175 DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

15 983 15 DRAWN A.E DRAWING


ECE-W.O.269-F036
REV.

CHKD. A.D NO. 00


GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XP107 3 No. Required


Pos. Size Length Qty. Grade Weight
X155
X155 PL8*1000 1013 1 S355 63.4

X167 SHS30*30*2.5 1013 1 S275 2.2


1013
X160 SHS30*30*2.5 515 2 S275 2.2

X175 X161 SHS30*30*2.5 433 2 S275 1.8

15
X175 SHS30*30*2.5 1013 2 S275 4.3

X178 PLT2*26 26 2 S355 0.0

Total 73.9

PL.TYP.
6
X160

500
485
540

X160

X167
TYP.
0

X178

65
X178
1010

CLOSER TYP.
2

X161

500
420

420

X161

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


15

X175
TITLE PANNEL
15 983 15
DESIGN A.E DATE 24.07.2022 SHT. No. 1/1
Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F037
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

X155 MATERIAL LIST FOR ONE ASSEMBLY MK'D XP108 5 No. Required
Pos. Size Length Qty. Grade Weight

X155 PL8*1000 1013 1 S355 63.4

X166 SHS30*30*2.5 953 1 S275 2.0


1013 X174 SHS30*30*2.5 1000 2 S275 4.3

X175 PL.TYP.
X175 SHS30*30*2.5 1013 2 S275 4.3

15
Total 74.0
6

15

500
X174

485
TYP.

X166
0
1000

970

485

500
X174
15

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION


15

X175 REV. DATE MADE BY CHKD. BY DESCRIPTION

15 983 15 PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE PANNEL

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F038
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XP109 1 No. Required


Pos. Size Length Qty. Grade Weight

X156 PL8*749 1013 1 S355 47.4


1013
X167 SHS30*30*2.5 1013 1 S275 2.2

X156 X158 SHS30*30*2.5 389 2 S275 1.7

X159 SHS30*30*2.5 308 2 S275 1.3

X175 SHS30*30*2.5 1013 2 S275 4.3

26 2 S355
X175
PL.TYP. X178 PLT2*26 0.0
6
Total 56.9

15
X158
359

359
TYP.
0

X158
X167

749
X178
65

65
X178
CLOSER TYP.
2

X159
295

295
X159

15
X175
15 983 15 00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE PANNEL

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F039
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ100 2 No. Required


Pos. Size Length Qty. Grade Weight

X150 PL40*40 2000 1 S275 25.1

X176 PL4*30 51 2 S355 0.1

Total 25.2

1154 1800
6 6
66

66
X176 X176
415 1500 86
415

1915
0

2000
PL40*40 x 2000

X150
36

36
40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F040
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ101 1 No. Required


Pos. Size Length Qty. Grade Weight

X150 PL40*40 2000 1 S275 25.1

X176 PL4*30 51 2 S355 0.1

Total 25.2

1161 1816

2000
6 6

1915
415
415 1500 86
0

26
X176 X176

26
PL40*40 x 2000

X150
40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F041
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ102 1 No. Required


Pos. Size Length Qty. Grade Weight

X150 PL40*40 2000 1 S275 25.1

X177 ROD12 45 2 S275 0.1

Total 25.2
40

X150
40

1214
X177
6 X177
2148
6
415 1500 86

1915
0

415

2000
PL40*40 x 2000

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F042
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ103 2 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X176 PL4*30 51 2 S355 0.1

Total 30.2

1801 1977
6 6

66

66
X176 X176
604 1321 476

1924
0

604

2400
PL40*40 x 2400

X151
36

36
40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F043
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ104 2 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X176 PL4*30 51 2 S355 0.1

Total 30.2

1978 1791
6 6
66

66
X176 X176
214 1705 481

1919
214
0

2400
PL40*40 x 2400

X151
36

36
40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F044
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ105 1 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X176 PL4*30 51 2 S355 0.1

Total 30.2

1845 1951
6 6

66

66
X176 X176
524 1631 246

2154
0

524

2400
PL40*40 x 2400

X151

36
00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F045
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ106 1 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X176 PL4*30 51 2 S355 0.1

Total 30.2

1952 1886
6 66 6

66
X176 X176
464 1680 256

2144
0

464

2400
PL40*40 x 2400

X151

36
00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F046
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ107 1 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X176 PL4*30 51 2 S355 0.1

Total 30.2

1817 1979

2400
6 6

1924
604
604 1321 476
0

26
X176 X176

26
PL40*40 x 2400

X151
40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F047
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ108 1 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X176 PL4*30 51 2 S355 0.1

Total 30.2

1980 1792

2400
6 6

1919
214

214 1705 481


0

26

X176 X176

26
PL40*40 x 2400

X151
40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F048
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ109 1 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X176 PL4*30 51 2 S355 0.1

Total 30.2

1846 1953

2400
6 6

2154
524
524 1631 246
0

26
X176 X176

26
PL40*40 x 2400

X151
40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F049
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ110 1 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X176 PL4*30 51 2 S355 0.1

Total 30.2

1954 1887

2400
6 6

2144
464
464 1680 256
0

26
X176 X176

26
PL40*40 x 2400

X151
40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F050
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ111 1 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X176 PL4*30 51 2 S355 0.1

Total 30.2

2050 2146
6 6

66

66
X176 X176
524 1626 251

2149
0

524

2400
PL40*40 x 2400

X151

36
00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F051
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ112 1 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X176 PL4*30 51 2 S355 0.1

Total 30.2

2147 2105
6 6
66

66
X176 X176
389 1755 256

2144
0

389

2400
PL40*40 x 2400

X151
36

36
40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F052
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ113 1 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X177 ROD12 45 2 S275 0.1

Total 30.2
40

1794 2149
6 6
X151
40

X177 X177
604 1321 476

1924
0

604

2400
PL40*40 x 2400

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F053
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ114 1 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X177 ROD12 45 2 S275 0.1

Total 30.2
40

1796
6
X151
40

X177 X177
214 1705 481
214

1919
0

2400
PL40*40 x 2400

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F054
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ115 1 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X177 ROD12 45 2 S275 0.1

Total 30.2
40

2150 1797
6 6
X151
40

X177 X177
524 1626 251

2149
0

524

2400
PL40*40 x 2400

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F055
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ116 1 No. Required


Pos. Size Length Qty. Grade Weight

X151 PL40*40 2400 1 S275 30.1

X177 ROD12 45 2 S275 0.1

Total 30.2
40

2151 1798
6 6
X151
40

X177
X177

364 1780 256


0

364

2144

2400
PL40*40 x 2400

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F056
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ117 2 No. Required


Pos. Size Length Qty. Grade Weight

X152 PL40*40 1209 1 S275 15.2

X176 PL4*30 51 2 S355 0.1

Total 15.3

1925 1926
6 6

66

66
X176 X176
364 689 155

1054

1209
0

364

PL40*40 x 1209

X152

36
40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F057
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ118 1 No. Required


Pos. Size Length Qty. Grade Weight

X152 PL40*40 1209 1 S275 15.2

X176 PL4*30 51 2 S355 0.1

Total 15.3

1927 1928
6 6

1054

1209
364
364 689 155
0

26
X176 X176

26
PL40*40 x 1209

X152
40

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F058
CHKD. A.D NO. 00
GENERAL NOTES: ALL HOLES ARE 22 Dia mm UNLESS NOTED

MATERIAL LIST FOR ONE ASSEMBLY MK'D XQ119 1 No. Required


Pos. Size Length Qty. Grade Weight

X152 PL40*40 1209 1 S275 15.2

X177 ROD12 45 2 S275 0.1

Total 15.3

40

1799 2152
6 6
X152
40

X177 X177

364 689 155


0

364

1054

1209
PL40*40 x 1209

00 24-7-2022 A.E A.D ISSUED FOR FABRICATION

REV. DATE MADE BY CHKD. BY DESCRIPTION

PROJECT MODIFICATION OF RACK SUPPORTING SYSTEM DETAILS FOR POD-1


TITLE SQ.BAR

DESIGN A.E DATE 24.07.2022 SHT. No. 1/1


Tekla structures

DRAWN A.E DRAWING REV.


ECE-W.O.269-F059
CHKD. A.D NO. 00