SOUTH BORDER HOUSING PROJECT

CHECK LIST FOR: Form No:


Structured cable for Communication, Installation Rev. No : 0
SUBCONTRACTOR CONTRACTOR Page : 1 of 2

SECTION OF WORK: LOCATION:


LEVEL: WIR No.:
ITEM Checked by Checked by Date
STAGE CONSUL
S/C CONT
TANT

Check Approved Shop drawings/Layouts.


SETTING Check Level as per approved Coordination drawings.
OUT
Check that material as per approved material submittal.
MEP/CIVIL Check for civil clearance.
1. Check installed material is approved.
2. Check the routing as per approved shop drawings.

3. Check hangers and tray supports are adequate.

4. Check size of cable as per approved drawing.


5. Check dressing of cable and properly secure with cable
ties or any other means as per site condition.
Structure Cable System Installation

6. Check equipment’s for damage during installation.


7. Check for feeder numbering and tag numbering of
cable.
8. Check for physical damage and check physical
installation of equipment’s.
9. Check all the installations as per the approved drawing,
manufacturer recommendations, specifications and
local authorities.
10. Check the cable installed not exceeds more than 90
Mtrs. Of manufacturer recommendation.

11. Check the CAT-6A cable to RJ-45 outlets is connected


properly.

For S/C QA/QC: Date: FOR CONTRACTOR Date: For CONS. Rep.: Date:
QA/QC:

Name: Sign: Name: Sign: Name: Sign:


SOUTH BORDER HOUSING PROJECT

CHECK LIST FOR: Form No:


Structured cable for Communication, Installation Rev. No : 0
SUBCONTRACTOR CONTRACTOR Page : 2 of 2

SECTION OF WORK: LOCATION:


LEVEL: WIR No.:
ITEM Checked by Checked by Date
STAGE CONSUL
S/C CONT
TANT

1. Adequate lights are provided in the Work Area prior to


installation.
2. All terminations cables have been checked for any
damage or improper connections.
3. Ensure that barricade & warning boards on the area
are available prior to installation.
4. Ensure all supports have been properly installed &
fixed prior to running the pumps.
SAFETY PRECAUTIONS

5. Ensure no obstacles in the area. Maintain proper


housekeeping.
6. Ensure all personnel performing the installation shall
have proper training & experience.
7. Ensure all electrical tools to be used in the installation
are not damage.
8. Ensure that Scaff tag system shall be implemented.
9. Ensure that a competent team shall be involved to
execute the activities.
10. Ensure that all scaffolding shall conform to the
regulations of ADM
11. Ensure that safe and obstruction free access for
working personnel's shall be maintained all the time
during the execution of all activity.
12. Ensure that power tools operative shall be trained by
manufacturer representative.

For S/C QA/QC: Date: FOR CONTRACTOR Date: For CONS. Rep.: Date:
QA/QC:

Name: Sign: Name: Sign: Name: Sign: