Project Name

Project No. : OOOO


GENERAL CABLE PULLING WORKS
INSPECTION REPORT NUMBER INSPECTION DATE & TIME DISCIPLINE SHEET NO

JOB DESCRIPTION AREA DESCRIPTION

ENGINEERING DOCUMENT NUMBER CODES & STANDARDS NUMBER SUBCONTRACTOR/SUPPLIER

Result
No. Area to be inspected Remarks
Accept Reject

1 Correct cable type/size/ installed as per approved drawing

2 No damage of cable has found and maintain insulation resistance

3 Cable route to the designated location and correctly identified

4 Cable installed with sufficient separation and layer

5 Cable installed with sufficient bending radius

6 Cable pulling tension and use proper pulling tools

7 Cable tie, markers, clamps installed properly as per specification

8 Cable Numbering System & Labeling

9 Cable support on raceway installed properly

10 Proper arrangement, dressing of cables, carry out megger test

11 Cable shall be fixed by means of fixing and supporting material

12 Cable protection and sealing

REMARKS:

SUBCONTRACTOR QC CONTRACTOR QC COMPANY


NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE


SIGNATURE SIGNATURE SIGNATURE

DATE DATE DATE

EL-004-F01
Project Name
Project No. : OOOO
UNDERGROUND CABLE PULLING WORKS
INSPECTION REPORT NUMBER INSPECTION DATE & TIME DISCIPLINE SHEET NO

JOB DESCRIPTION AREA DESCRIPTION

ENGINEERING DOCUMENT NUMBER CODES & STANDARDS NUMBER SUBCONTRACTOR/SUPPLIER

Result
No. Area to be inspected Remarks
Accept Reject

1 The size of trench (as per approved drawing)

2 Trench location, route (as per approved drawing)

3 Correct cable type/size/ installed as per approved drawing

4 No damage of cable has found and maintain insulation resistance

5 Cable route, duct to the designated location and correctly identified

6 Cable installed with sufficient bending radius

7 Cable installed with sufficient separation and layer

8 Cable Numbering System & Labeling

9 Cable tie, markers, clamps installed properly as per specification

10 Suitable barrier (between HV and LV cable)

11 Proper arrangement, dressing of cables, carry out megger test

12 Sand for bedding & filling clear, sieved and free of stone

13 Sand backfilling and compaction as per the approved drawing

14 Installation of cable concrete tiles, warning tapes, route markers

15 Cable protection (emerging from floors or soil) and sealing

REMARKS:

SUBCONTRACTOR QC CONTRACTOR QC COMPANY


NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE


SIGNATURE SIGNATURE SIGNATURE

DATE DATE DATE

EL-004-F02
Project Name
Project No. : OOOO
CABLE TEST FOR UNDERGROUND CABLE PULLING WORKS
INSPECTION REPORT NUMBER INSPECTION DATE & TIME DISCIPLINE SHEET NO

JOB DESCRIPTION AREA DESCRIPTION

ENGINEERING DOCUMENT NUMBER CODES & STANDARDS NUMBER SUBCONTRACTOR/SUPPLIER

Continuity Insulation Resistance


Cable
Type Size From To remark
No. Before After Before After
backfill backfill backfill backfill

REMARKS:

SUBCONTRACTOR QC CONTRACTOR QC COMPANY


NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE

DATE DATE DATE


DATE DATE DATE

EL-004-F04
Project Name
Project No. : OOOO
CABLE TEST FOR GENERAL CABLE PULLING WORKS
INSPECTION REPORT NUMBER INSPECTION DATE & TIME DISCIPLINE SHEET NO

JOB DESCRIPTION AREA DESCRIPTION

ENGINEERING DOCUMENT NUMBER CODES & STANDARDS NUMBER SUBCONTRACTOR/SUPPLIER

Cable
Type Size From To Continuity Insulation Resistance remark
No.

REMARKS:

SUBCONTRACTOR QC CONTRACTOR QC COMPANY


NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE


DATE DATE DATE

EL-004-F03