Professional Documents
Culture Documents
ELECTRICAL
Equipment Earthing
PROJECT
DESCRIPTION
n-BUTYL LITHIUM DILUTION FACILITY PROJECT No. 44-NC-2900
SYSTEM
DESCRIPTION
EQUIPMENT EARTHING SYSTEM No. 003
SERVICE
TAG No.
DESCRIPTION
A. INDENT/CONTRACT No:
LOCATION/STATION: SYSTEM / DUTY:
EQUIPMENT TAG No: EQUIPMENT DESCRIPTION:
CABLE SIZE: NO OF EARTHS:
GA DRAWING No: EQUIPMENT WIRING DIAGRAM No:
B. INSPECTION Results
4. Check and ensure that all contacts are clean and greased with jelly
7. Test and record earthing resistance between earth bars and ring ()
10. For IS equipment ensure that a separate insulated earth bar has been installed & is earthed
in accordance with project specifications
C. REMARKS / OBSERVATIONS:
Sheet 1 of 1