You are on page 1of 1

CONSTRUCTION CHECK SHEET E-010A

ELECTRICAL
Equipment Earthing
PROJECT
DESCRIPTION
n-BUTYL LITHIUM DILUTION FACILITY PROJECT No. 44-NC-2900

SYSTEM
DESCRIPTION
EQUIPMENT EARTHING SYSTEM No. 003

SERVICE
TAG No.
DESCRIPTION

A. INDENT/CONTRACT No:
LOCATION/STATION: SYSTEM / DUTY:
EQUIPMENT TAG No: EQUIPMENT DESCRIPTION:
CABLE SIZE: NO OF EARTHS:
GA DRAWING No: EQUIPMENT WIRING DIAGRAM No:

B. INSPECTION Results

1. Inspect earthing cable lugs

2. Inspect earth boss stud diameter

3. Inspect welding of earth boss and protect damaged surface

4. Check and ensure that all contacts are clean and greased with jelly

5. Check earth cable protective measures (kick plates)

6. Test and record earth continuity to ring ()

7. Test and record earthing resistance between earth bars and ring ()

8. Check that all washers are dished shake proof type

9. Ensure test equipment certification is valid

10. For IS equipment ensure that a separate insulated earth bar has been installed & is earthed
in accordance with project specifications

C. REMARKS / OBSERVATIONS:

COMPLETED BY CONTRACTOR APPROVED BY JACOBS ACCEPTED BY CHEMETALL


NAME NAME NAME
COMPANY COMPANY REF. IND.
SIGN & DATE SIGN & DATE SIGN & DATE

Sheet 1 of 1

You might also like