Professional Documents
Culture Documents
ESSAR P-0220
ENGINEERING SERVICES LTD.
TÍTLE VALE Nº PAGE
SOHAR PELLETIZING PLANT
ET-3173-M-45003 1/15
PELLET SYSTEM - GENERAL
EESL DMS Nº REV.
TECHNICAL SPECIFICATION OF VIBRATING FEEDER
DETAILED ENGINEERING 1027 60 0100 TSP 27 H 002 B
REVISIONS
IT: ISSUE A - PRELIMINARY C - FOR INFORMATION E - FOR CONSTRUCTION G - AS BUILT
TYPE H - CANCELED
B - FOR APPROVAL D - FOR QUOTATION F - AS PURCHASED
CONTENTS
CHAPTER DESCRIPTION PAGE NO.
1 GENERAL INFORMATION 3
2 PROCESS DESCRIPTION 4
3 SCOPE OF SUPPLY 4
4 TECHNICAL SPECIFICATION 5
5 ELECTRICAL & INSTRUMENTATION SPECIFICATION 7
6 EXCLUSIONS 7
7 INSPECTION AND TESTING 7
8 DOCUMENT TO BE SUPPLIED BY THE SELLER 8
9 ENCLOSURE 8
APPENDIX
I. FORMAT OF PRICE SCHEDULE OF ITEMS 9
ANNEXURE
I. FORMAT FOR DEVIATION FROM TENDER DOCUMENT 10
QUESTIONNAIRE TO BE FILLED IN AND SUBMITTED
II. 11
BY SELLER
III SELLER DRAWING AND DATA REQUIREMENT 12
IV INSPECTION TEST AND CLASSIFICATION TABLE 15
PROJECT
ESSAR P-0220
ENGINEERING SERVICES LTD.
TÍTLE VALE Nº PAGE
SOHAR PELLETIZING PLANT
ET-3173-M-45003 3/15
PELLET SYSTEM - GENERAL
EESL DMS Nº REV.
TECHNICAL SPECIFICATION OF VIBRATING FEEDER
DETAILED ENGINEERING 1027 60 0100 TSP 27 H 002 B
1.1 M/s. Vale International SA (also referred to as VALE) is setting up Pellet plant of 9.0
MTPA capacity having 2 (Two) lines of induration process of 4.5 MTPA capacity at
Oman Industrial complex, city of Sohar, Oman. The plant is designed as per Grate-
Kiln technology of Kobe Steel, Ltd. for Iron ore pelletization.
This technical specification together with the reference documents describes the
requirement for manufacture and supply of 1set of Vibrating Feeder.
1.2 The following documents are attached and shall be a part of requirements of
specification:
CP-3100-G-30003_D General Instructions and Information for the Seller.
CP-3100-G-30004_A Engineering Standard- Mechanical.
EG-XXYY-M-402E-Rev.2 Engineering Standard- General Specification for Surface
Treatment and Protective and finished Painting on
Equipment.
CP-3100-G-30007_A Engineering standard- General Procedure for Shop
Inspection and Tests.
CP-3100-G-30008_A Engineering standard-Packing and Marking.
CP-3100-G-30009_A Engineering standard-Drawing and Documents.
CP-3100-G-30010_A Engineering Standard-Instruction for Schedule Control.
CP-3100-G-30012_A Engineering Standard-Shipping Instruction.
EG-0000-E-08028_0 General Specification For Low Voltage Motors.
ABB Document Interface Concept
1.3 If there are conflicts between this specification and other documents described in the
enclosure / attachments, the order of precedence shall be as follows.
(i) This Specification
(ii) Engineering Standard
(iii) Standard Specification.
PROJECT
ESSAR P-0220
ENGINEERING SERVICES LTD.
TÍTLE VALE Nº PAGE
SOHAR PELLETIZING PLANT
ET-3173-M-45003 4/15
PELLET SYSTEM - GENERAL
EESL DMS Nº REV.
TECHNICAL SPECIFICATION OF VIBRATING FEEDER
DETAILED ENGINEERING 1027 60 0100 TSP 27 H 002 B
Vibrating feeder AL-3173-01 with hopper is installed at chunk crushing system ST-
3173-01 to feed the jaw crusher.
It receives raw material from the skip hoist EL-3173-01 and separates the lumps by
means of a scalping grizzly set over the hopper opening.
The vibrating pan of the feeder has also a second grated section that will permit the
passage of the small size material which is not required to go to the crusher and so
increasing the capacity of the whole system.
6.0 EXCLUSION
The following shall be for Seller’s scope,
1) Civil and building works
2) Erection work
3) Support structure for Vibrating feeder’s suspension
a) Inspection & testing of equipment shall be carried out by Seller in witness of Buyer or
an authorized agent of Buyer at the works of supplier during manufacturing and on
final product to ensure conformity of the same with the acceptable criteria of technical
specification, approved drawings, authenticated manufacturing drawings and
reference national / international standards.
b) Buyer reserves the right to verify the quality program and entire product
characteristics during manufacturing to assure the intended and specified quality of
the product.
Refer the enclosed document CP-3100-G-30007_A “Engineering Standard- General
Procedure for Shop Inspection and Tests” and as per Annexure-IV.
PROJECT
ESSAR P-0220
ENGINEERING SERVICES LTD.
TÍTLE VALE Nº PAGE
SOHAR PELLETIZING PLANT
ET-3173-M-45003 8/15
PELLET SYSTEM - GENERAL
EESL DMS Nº REV.
TECHNICAL SPECIFICATION OF VIBRATING FEEDER
DETAILED ENGINEERING 1027 60 0100 TSP 27 H 002 B
9.0 ENCLOSURE
Not Applicable
PROJECT
ESSAR P-0220
ENGINEERING SERVICES LTD.
TÍTLE VALE Nº PAGE
SOHAR PELLETIZING PLANT
ET-3173-M-45003 9/15
PELLET SYSTEM - GENERAL
EESL DMS Nº REV.
TECHNICAL SPECIFICATION OF VIBRATING FEEDER
DETAILED ENGINEERING 1027 60 0100 TSP 27 H 002 B
APPENDIX-1
FORMAT OF PRICE SCHEDULE OF ITEMS
ERECTION &
2 COMMISSIONING SPARES, IF
ANY
SUPERVISION OF ERECTION Man
3 *1
AND COMMISSIONING days
4 SUB TOTAL
SPARES FOR ONE YEAR
5
NORMAL OPERATION
6 GRAND TOTAL
ANNEXURE I
The Seller hereby certifiy that the above mentioned are the only deviations from the
tender documents.
Signature :
Name :
Designation :
Company seal :
PROJECT
ESSAR P-0220
ENGINEERING SERVICES LTD.
TÍTLE VALE Nº PAGE
SOHAR PELLETIZING PLANT
ET-3173-M-45003 11/15
PELLET SYSTEM - GENERAL
EESL DMS Nº REV.
TECHNICAL SPECIFICATION OF VIBRATING FEEDER
DETAILED ENGINEERING 1027 60 0100 TSP 27 H 002 B
ANNEXURE II
ANNEXURE III
SELLER DRAWINGS and DATA REQUIREMENT COMMON
Req'D Req'd after Contract
Ref.
Sr. with
Description of documents Doc. Initial Certified Final
No. Proposal
(*2)
p Time p Time p Time p
1 Proposal 4
2 Seller's Technical Specification of Equipment (*1) 4 2 WO 4 2WA 4 2WB 5
3 Painting Specification List 2 WO 4 2WA 4 2WB 5
4 Arrangement Drawings (*1) 4 3 WO 4 2WA 4 2WB 5
5 Outline drawings of Respective Equipment (*1) 4 3 WO 4 2WA 4 2WB 5
6 Cross Section with Parts Description 3 WO 4 2WA 4 2WB 5
7 Fabrication Drawing for Local Fabrication (*1) WO WA WB
8 Local Fabrication B / o List WO WA WB
9 Foundation Drawing and Loading Data (*1) 2 WO 4 2WA 4 2WB 5
10 Piping Drawings / Flow Diagram 3 WO 4 2WA 4 2WB 5
#1
11 Name Plate Drawing WO WA
12 Detailed Calculations 2 WO 4 2WA 4 2WB 5
13 Utility Data Sheet 4 2 WO 4 2WA 4 2WB 5
14 Lubricant Data sheet 7 WO 4 2WA 4 2WB 5
15 Special Tool list for Erection and Maintenance 10WO 4 2WA 4 2WB 5
16 Consumable List for Erection and commissioning 4 10WO 4 2WA 4 2WB 5
17 Erection and Installation Manual 10WO 4 2WA 4 2WB 5
18 Match Mark Drawing 10WO 4 2WA 4 2WB 5
19 Operation and Maintenance Manual (*4) 10WO 4 2WA 4 2WB 5
20 Spare parts list 4 2 WO 4 2WA 4 WB
21 Proforma Packing List 4 6 WV 4
22 Packing List 3 WV 4 2WV 4
23 Master Packing List #2 3 WV 4 2WV 4
24 Bulky Cargo List 3 WO 4 4WV 4
25 Other Shipping Documents Refer to ES - 09
26 Quality Assurance Organization and Program 5 WO 2WA 4
27 Application for Witnessed Inspection and Test 3 WB
28 Application For Surveyance (Packing Inspection) 3 WB
#3
29 Inspection and Test Manual at shop 10WO 2WA 4
30 Inspection and Test Report 1 WI 2
31 Performance Test Procedure at site 15WO 2WA 4 WB
32 List of Person in Charge #4 2 WO
33 Status (Progress) Report (*3)
34 Manufacturing Schedule (*1) 4 2 WO 2WA 4
35 Sub-order Status Report (*3)
PROJECT
ESSAR P-0220
ENGINEERING SERVICES LTD.
TÍTLE VALE Nº PAGE
SOHAR PELLETIZING PLANT
ET-3173-M-45003 13/15
PELLET SYSTEM - GENERAL
EESL DMS Nº REV.
TECHNICAL SPECIFICATION OF VIBRATING FEEDER
DETAILED ENGINEERING 1027 60 0100 TSP 27 H 002 B
Note
*1 Buyer's approval is required before starting manufacture. And these documents are subjected to Liquidated
:
Damages for Delay of Document Submission
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29.
Non-destructive
Inspection and Test
Examination
Insulation Resistance
Temporary Assembly
Phase-relation Test
Quantity Inspection
Control Circuit Test
Welding Procedure
Painting Inspection
Packing Inspection
Material Inspection
Review of Material
Dielectric Strength
Performance Test
Qualification Test
Magnetic Particle
Visual Inspection
Liquid Penetrant
Hydrostatic Test
Pneumatic Test
Functional Test
Balancing Test
No-Load Test
Radiographic
Examination
Examination
Examination
Examination
Equipment Name
Polarity and
Inspection
Certificate
Load Test
Ultrasonic
Leak Test
(Part or Component)
to be inspected and
Test
Test
Test
Test
tested
Note
Remarks : Marks :
D
S : Seller's own inspection and/or test
B: Inspection and/or test under witness of the Buyer's representative
C
Rev. S/B : Inspection and/or test under spot witness of the Buyer's representative
R : The Seller shall submit the report to the Buyer. (Subseq uently it will be submitted to the Client by the Buyer.)
B
X : The Seller may not submit the report to the Buyer.
A