You are on page 1of 1

C-0000A

PRE-COMMISSIONING CHECK SHEET


MECHANICAL
Cylinder
PROJECT
n-BUTYL LITHIUM DILUTION FACILITY PROJECT No. 44 - NC – 2900
DESCRIPTION
SYSTEM
CYLINDER SYSTEM No. 27
DESCRIPTION
SERVICE
TAG No. C-0000
DESCRIPTION

Item Description of check Results


01 Confirm that Nameplate details are correct & in accordance with data sheet

02 Check the empty cylinder weight

03 Confirm that cap is provided to cylinder

04 Check the Product valve and Vent valve and observe physical damaged

05 Check for transit damage to feet

06

07

REMARKS / OBSERVATIONS:

COMPLETED BY CONTRACTOR APPROVED BY JACOBS ACCEPTED BY CHEMETALL


NAME NAME NAME
COMPANY
SIGN & DATE SIGN & DATE SIGN & DATE

You might also like