PRE-COMMISSIONING CHECK SHEET B-0002B

MECHANICAL
Tank
PROJECT
DESCRIPTION
n-Butyl Lithium Dilution facility PROJECT No. 44 – NC - 2900

SYSTEM
DESCRIPTION
HEXANE SYSTEM No. 02

SERVICE
TAG No. B-0002
DESCRIPTION

Item Description of check Results

01 Confirm Construction check list completed and no subsequent damage occurred

02 Confirm Preservation removed

03 Confirm that the Vessel is internally clean and free from obstruction

04 Confirm that Vent and drain valves fitted and have been exercised

05 Confirm that Fittings and connections complete as per vendor drawings & PEFS

06 Confirm earth bonding completed

07 Confirm that Manway(s) closed out with correct gaskets and bolting.& C-007B is completed

08 Confirm that Flame arrester installed if applicable

09 Confirm that all spec blinds are in correct position with correct gaskets

10 Confirm the fitting of & certification of safety relief devices

REMARKS / OBSERVATIONS:

COMPLETED BY CONTRACTOR APPROVED BY JACOBS ACCEPTED BY CHEMETALL


NAME NAME NAME
COMPANY
SIGN & DATE SIGN & DATE SIGN & DATE