Professional Documents
Culture Documents
BK91-1310-CPF-000-QAC-ITP-0024
Page 1 of 26
ITP OF WELDING
Document No: BK91-1310-CPF-000-QAC-ITP-0024
minor comments
Re-Issued For
D 23/08/2022 Li Xiaopeng Chen wenliang Huang Jingwei Yang Zhigang
Approval
Re-Issued For
C 03/08/2022 Li Xiaopeng Chen wenliang Huang Jingwei Yang Zhigang
Approval
Re-Issued For
B 06/07/2022 Li Xiaopeng Chen wenliang Huang Jingwei Yang Zhigang
Approval
Issued For
A 29/05/2022 Li Xiaopeng Chen wenliang Huang Jingwei Yang Zhigang
Approval
Page 2 of 26
NOTE: These QAF Form shall be used as the starting point. Entries may be revised, added and deleted and approvals adjusted to reflect the needs of the COMPANY
Inspection Activity and Acceptance Criteria Codes, Standards & Verifying Document Inspection Intervention
No C
Specific Check Point Area Procedures (Inspection Report & Checklist) Contractor PMT/PMC
1 Pre-construction preparation
Technical Document Register Management
1.1 Drawings and Quality documents approval BK91-1101-GEN-999-QAC-SPC-0001 C H R/A
Document Register
Verify the Calibration Status & Validity for the Inspection ITD-GEN-000-QAC-PCD-0002
1.2 QAF-007 & Calibration Certificate C H R/A
& Measuring Equipment BK91-1316-CPF-000-QAC-PCD-0003
2 Material Receiving and Verification
QAF-038
2.1 Receiving Inspection of materials QAF-038B C H H
MR, MTO, Test Report, Batch Certificates
D 2.2 Check the Damage during transportation
QAF-038
C H H
QAF-038B
BK91-1310-CPF-000-CNS-PCD-0059 QAF-038
2.3 Verify the material / Size / Quantity & Physical properties C H H
QAF-038B
QAF-038
2.4 Material protecting from damage C H H
QAF-038B
QAF-038
2.5 Check of material storage condition C H H
QAF-038B
QAF-016A
3.1 Welding Procedure Qualification Record QAF-016C C H R/A
ITD-GEN-000-QAC-PCD-0014
QAF-016B
3.2 Welding Procedure Specification (WPS) ITD-GEN-000-QAC-PCD-0013 QAF-016D C H R/A
BK91-1310-CPF-000-CNS-PCD-0012
3.3 Welder Performance Qualification test BK91-1310-CPF-000-CNS-PCD-0014 QAF-016E C H W
ASME Sec. IX
3.4 Welder Performance Qualification- ID Card QAF-016F C W R/A
Inspection Activity and Acceptance Criteria Codes, Standards & Verifying Document Inspection Intervention
No C
Specific Check Point Area Procedures (Inspection Report & Checklist) Contractor PMT/PMC
4 Welding consumable control
4.1 Welding consumable storgae BK91-1310-CPF-000-CNS-CHK-0001 W S
D ITD-GEN-000-QAC-PCD-0012
4.2 Welding consumable backing and holding BK91-1310-CPF-000-CNS-CHK-0001 W S
BK91-1310-CPF-000-CNS-CHK-0001
4.3 Welding consumable issue record BK91-1310-CPF-000-CNS-CHK-0001 W S
7.2 UT QAF-041 C H W
Contractor: PMC-HQC
Description of Inspection:
(If " Yes ", then the RFI should only be signed once the Inspection Mark-up Drawings have been submitted along with the RFI.)
Yes No
Tick Mark ( √)
Attachments:
The above mentioned activity has been Inspected & Accepted by the Contractor.
PMT/PMC Comments:
Acceptable Yes No
A Work is not ready at the Inspection time. New RFI shall be issued
Comments Code
B Result of Inspection is not acceptable. New RFI shall be issued
QAF-008-Rev-B
Request For Inspection 7 of 26 Date:27.06.2022
Inspection Testing & Measuring Equipment
Calibration Register
Remarks
Name
Signature
Date
Note:
Name
Signature
Date
QAF-038-Rev-B
Material Inspection Report 9 of 26 Date:27.06.2022
Material Inspection Check List
General
1 Verify relevant documents are available as per the approved material requisition ITPs
2 Verify all Inspection & testing carried out & reports/records are signed off by TPI
Verify whether FAT (where applicable) requirements are complied and relevant reports are
3
signed of by TPI
Verify all the documentation relevant to the materials/equipment, including delivery notes, receipt
4
and with appropriate batch / test certificates.
Verify all materials/equipment correspond with the quantities, material type/grade & size and
5
traceability as reflected on the delivery note & MR.
Verify all materials/equipment for any evidence of damage or deterioration, check all items are
6
properly identified and with adequate protection.
Ensure all materials/equipment are stored as per the manufacturer's recommendation and
7
material handling procedure
Note: Non-conforming and/or damaged materials/equipment observed during receipt inspection shall be clearly marked and quarantined. Contractor Store In charge & QC
personnel shall ensure the materials/equipment are not issued for construction until the disposition.
Comments:
Name
Signature
Date
Applicable
Welding Process(es) Type Manual
Code/Standard
PQR Applicable for:
Detail
Joint Design
Backing (Yes/No)
Contractor Witnessed By
Parameter Recorded By Parameter Reviewed By TPI/PMC
Name
Signature
Date
Name
Signature
Date
Diameter (Inch)
F No PWHT
SFA No
Time lapse between completion
Manufacturer's Name of root & Hot Pass
& Trade name
Type & Removal of Line Up Clamp Cleaning Method
Root
Hot
Subsequent
Cap
Note:
Contractor
Contractor Welding Inspector PMC
QA/QC Manager
Name
Signature
Date
QAF-016B
Welding Procedure Specification (WPS) Rev-A
Pipeline 13 of 26 Date: 28.09.2020
Procedure Qualification Record (PQR)
Piping
Applicable
Welding Process(es) Type Manual Semi-Automatic
Code/Standard
Detail
Joints (QW-402:
Joint Design
Backing (Yes/No)
Hot
Subsequent
Cap
Contractor Witnessed By
Parameter Recorded By Parameter Reviewed By TPI/PMC
Name
Signature
Date
QAF-016C
Rev-A
Welding Procedure Qualification Record 14 of 26 Date: 28.09.2020
Non Destructive Test Result
Type of Test Test Result Test Report No Remarks
Visual Inspection
Radiography
Ultrasound
Other
T1
T2
Name
Signature
Date
QAF-016C
Rev-A
Welding Procedure Qualification Record 15 of 26 Date: 28.09.2020
Welding Procedure Specification (WPS)
Piping
Backing (Yes/No)
2.4 + 0.8 1.6±0.8
Unit: mm
Backing Material (Type)
Base Metal (QW-403): PWHT (QW-407):
Filler Metal (QW-404): Root Pass Hot Pass Subsequent Pass Amp (A)
Note:
Hot
Subsequent
Cap
We certify that the statements in this record are correct and that the test coupons were prepared, welded and tested in accordance with the requirements of : ASME-Sec-IX & COMPANY
specification No: BK91-1101-GEN-999-PIP-SPC-0006
Contractor
QA/QC Manager
TPI_BV PMC
Name
Signature
Date
QAF-016D Rev-A
Welding Procedure Specification Pipeline 16 of 26 Date: 28.09.2020
Welder Performance Qualification Certificate
Applicable Code/Standand :
Joint Design
P-No to P-No
Plate Pipe
Test Result
Type of Test Test Result Test Report No Remarks
Visual Inspection
Radiography
Nick Break
Bend Test
Fracture Test (Fillet Weld)
We certify that the statements in this record are correct and that the test coupons were prepared, welded and tested in accordance with the requirements of : ASME SEC IX & COMPANY Specification No: BK91-1101-GEN-999-P-SPC-
00
Name
Signature
Date
QAF-016E Rev-A
Welder Performance Qualification Certificate 17 of 26 Date: 28.09.2020
Welder Performance Qualification Register
Qualified Range
Welding Process (es)
No Name Welder No F Number Qualified Weld Thk (mm) Minimum Test Date Remark
P Number Backing Position
1 2 1 2 1 2 OD (MM)
Name
Signature
Date
QAF-No-016G
Rev -B
Welder Performance Qualification Register 18 of 26 Date: 8.09.2020
Qualification Range
Block9 Surface Facility
Photo Pipe Size (Inch) :
Welder ID Card
Thickness Range (mm) :
Position
Approved By (PMC)
Name/Signature/Date Valid up to: Welder qualification may be revoked, if weld quality found
Code : unsatisfactory at any time
QAF-016F Rev-A
Welder ID card 19 of 26 Date: 28.09.2020
Weld Visual Inspection Report
10
11
12
13
14
15
Note:
Legends : BW : Butt Weld BC: Branch Connection SCW: Socket Weld FW: Fillet Weld
Name
Signature
Date
QAF-039-Rev -C
Weld Visual Inspection Report 20 of 26 Date: 27.06.2022
Radiographic Interpretation Report
Radiographic Data
Name
Signature
Date
QAF-040-Rev -C
Radiographic Interpretation Report 21 of 26 Date: 27.06.2022
Ultrasonic Test Report
Thickness
Job condition Material Size (inch)
(mm)
Frequency
Inspection code UT-Technique Detecting Method
(MHz)
Probe Angle Contact technique
Instrument Type Probe Type
(deg) both side for
Calibration Valid
Calibration block Couplant Instrument Calibration ID
Date
Result
No Joint No. Detection Length Indication Location Indication Type Remark
Accepted / Rejected
Name
Signature
Date
QAF-041-Rev -C
Ultrasonic Test Report 22 of 26 Date: 27.06.2022
Magnetic Particle Test Report
Name
Signature
Date
QAF-042-Rev -C
Magnetic Particle Test Report 23 of 26 Date: 27.06.2022
Penetrant Test Report
Name
Signature
Date
QAF-043-Rev -C
Penetrant Test Report 24 of 26 Date: 27.06.2022
PWHT Report
Name
Signature
Date
QAF-044-Rev -C
PWHT Report 25 of 26 Date: 27.06.2022
Hardness Test Report
Name
Signature
Date
QAF-045-Rev -C
Hardness Test Report 26 of 26 Date: 27.06.2022