Professional Documents
Culture Documents
Discipline: Civil ITP No: BK91-1310-CPF-000-QAC-ITP-0028 ITP Activity Code & Intervention level: 2.1/2.2.1 H
Description of Inspection:
Visual inspection of incoming pre-cast Piles & Check piling equipment
(If " Yes ", then the RFI should only be signed once the Inspection Mark-up Drawings have been submitted along
Yes No √ with the RFI.)
Tick Mark ( √)
Attachments:
1.BK91-1310-CPF-999-STR-SDD-0014_1_General Notes for Preliminary Piles
2.BK91-1101-GEN-999-CIV-SPC-0013_2 Specification for Concrete Piles and Piling
3.Pre-cast concrete pile certificate
4.Crawler Piling Rig Machine inspection certificate
The above mentioned activity has been Inspected & Accepted by the Contractor.