You are on page 1of 1

HAMAD BIN KHALIFA MEDICAL CITY

Hyundai Engineering &


RFI (Request for Inspection) From:
Construction Co., Ltd.
Hamad Bin Khalifa Medical City - Hospital Fit Out
Package No: CP-300B Description:
(Project ID: BA/09/10/C004/G)

To: KEO Attn: Project Manager RFI No: CP300B-RFI-G-LA-1175 Rev No. 01
Subject: Inspection of Lighting Pole Installation for
AP-Type Guard House #3 in Landscape No. of Sheets: 1 + 4(A4) + 2(A3)
Area a Zone-10
Submission: 24-Nov-2015 Discipline: Electrical

We request inspection and / or approval of the following site works and we confirm that works referenced below had been executed
in accordance with the contract specifications and approved drawings.
Specification Reference: Section 16510 – Lighting Fixtures

Section 16130 – Conduit and Conduit Boxes


Drawing No. Work or item details requested for Inspection / Approval

300B-SDS-SHI-LA-EL-LT-004 R1
Inspection of Lighting Pole Installation for AP-Type Guard House #3 in
Landscape Area a Zone-10
Inspection Date: Inspection Time:

KEO remarks and comments

Approval (Circle LETTER) Receive (Please Stamp on the corresponding Square )

A Approved 1. KEO receipt of RFI 2. Contractor receipt of response

B Approved as noted

C Revise & resubmit

D Rejected

Permission to proceed does not constitute acceptance or approval of design details. Calculations, drawings, analysis, test methods or materials
developed or selected by the supplier do not relieve the contractor from full compliance with contractual obligations.
QA/QC Initial: Inspection by:

Contractor PM: Seok Lee KEO RE:

Sign: Sign:

Date: Date: