To: KEO Attn: Project Manager RFI No: CP300B-RFI-G-LA-1175 Rev No. 01
Subject: Inspection of Lighting Pole Installation for
AP-Type Guard House #3 in Landscape No. of Sheets: 1 + 4(A4) + 2(A3)
Area a Zone-10
Submission: 24-Nov-2015 Discipline: Electrical
We request inspection and / or approval of the following site works and we confirm that works referenced below had been executed
in accordance with the contract specifications and approved drawings.
Specification Reference: Section 16510 – Lighting Fixtures
300B-SDS-SHI-LA-EL-LT-004 R1
Inspection of Lighting Pole Installation for AP-Type Guard House #3 in
Landscape Area a Zone-10
Inspection Date: Inspection Time:
B Approved as noted
D Rejected
Permission to proceed does not constitute acceptance or approval of design details. Calculations, drawings, analysis, test methods or materials
developed or selected by the supplier do not relieve the contractor from full compliance with contractual obligations.
QA/QC Initial: Inspection by:
Sign: Sign:
Date: Date: