EXTENSTION OF SOUTHERN EXPRESSWAY FROM MATARA TO HAMBANTHOTA
SECTION 1 FROM MATARA TO BELIATTA CH 0+000 TO 30+000 KM
Contract No: RDA/SEEP/CONT-S1 EMPLOYER CONTRACTOR : ROAD DEVELOPMENT AUTHORITY CHINA NATIONAL AERO- ENGINEER TECHNOLOGY INTERNATIONAL ENGINEERING CORPARATION. CHINA RAILWAY FIRST SURVEY & DESIGN INSTITUTE GROUP CO.,LTD CONFIRMATION OF VERBAL INSTRUCTION (CVI) Part A : To be Prepared by Contractor To : Engineer's Rock filling at IC 2 Ramp E 0+150-0+230 Submission Ref. No. : Outgoing Log No. : Drawing Reference: Verbal Instruction received CATIC Verbal Instruction given to: CATIC
We Confirm your verbal instruction given on which was as follows :
Due to the heavy rain, the soil was washed out from Ch.13+200 cutting area. And it caused lots of muddy and sludge accumulated on already filled RUC4 surface at Ramp E 0+150 to 0+230. To expedite the work progress of embankment at the rainy season, both of us inspected the site, and agreed to clean the muddy and filling rock to a certain level to decrease the affection of water, keep stability of the deep excavated slope and guarantee the embankment quality. And also quickly filling the deep excavation area can help us solve the public complain from nearby house owner. Please confirm above mentioned information as for a record.
From : Contractor's representative :
Name : Position Signature Date
Distribution / Remarks :
Part B : To be Completed by Engineer
A - Review & in line with the verbal instruction B - Review & Part different with the verbal instruction (see comments below ) C -Verbal instruction not issued Comments (Enter below for each item separately or insert N/A )