You are on page 1of 4

Internal Correspondence

EHV ENGINEERING & DESIGN


DEPARTMENT LINES ENGINEERING &
DESIGN DIVISION
Jeddah, SEC-HQ

Our Reference #: 12024201 / 2794


##PRMREFERENCE##
- J / 23
Dated :
##PRMDATEG##
07 / 09 / 2023 G
##PRMDATEH##
22 / 02 / 1445 H
To :
EHV Projects Department - WOA
Attention :
Engr. Mahmoud A Al-amri

Contract # :
4400016438
Project Title : 380kV Underground Cables Connection
Relating to Integration of Shoibah PV Power
Plant

Subject : concrete mix design (Supplier-2 OMIX)

Contractor's Ref.#: DTS-031 R01

Dated : 30 / 08 / 2023 G

EHVPD-WOA Ref.# DTS-031 R01

Dated : 30 / 08 / 2023 G

Date Received @ LED: 30 / 08 / 2023 G

STATUS OF THIS SUBMITTAL:

A Acceptable B Acceptable with Comments

X C Acceptable, Except as noted (Resubmit) D Rejected (Resubmit)

E Clarification / For Information X See Attached Comments ( 01 Page )

If you have any questions, please contact Engineer Naif Al-Harbi on Tel. # 012-6537405

Regards,

MOHAMMED ABDULAZIZ AL-SAHAFI


Group Leader - WOA & SOA Lines
NAH Engineering & Design Division
Cc: PD
CEPCO
The given approval does not relieve the Contractor from his contractual responsibility & obligation to meet the requirements of
the project contract scope of work and technical specifications (SOW/PTS).
Attachment to EDD/SEC Letter No.: 12024201 / 2794 - J / 23
Dated: 07 / 09 / 2023 G Submittal Status: C

SL. SEC Comments R0 Contractor Response 01 SEC Response R1 Contractor Response 02


No
The W/C and the content of cement in Noted & complied in the Complied.Please see
revised submittal. Noted for W/C. However
the mix design for Second Revision
MIN. content of cement
1. 17.2 and 20 MPA, is not shall be followed as per
confirming to 70-TMSS-03 R02, table 8A.
table 8A.
Ratio of loss on 100/500 Provided in the Complied.Please see
Not complied.
revolutions for aggregates. Is not revised submittal. Second Revison
2.
confirming to 70-TMSS-03 R02,
table 2.
Contractor to provide sieve analysis Provided in the revised Sieve analysis of combined Complied. Please see
test for combined submittal. coarse aggregate shall Second Revision
3.
coarse aggregates as presented in mix fulfill the requirements of
design. table 1 of 70-TMSS-03-R02.
Contractor to provide chemical test for Provided in the revised
4. Noted.
the fine aggregate. submittal.
Contractor to confirm the source of Noted & confirmed.
materials mentioned in the tests is the Noted.
5.
same source of materials mentioned
in the mix design pages.
After approving the proposed mix Confirmed.
design, contractor shall confirm to Noted.
6.
provide chloride permeability test and
compressive strength test.

NAH 1 OF 1