REQUEST FOR INSPECTION

Saudi Aramco 6717-ENG (11/98) 726-200 (Inspection Department) Ref:SAEP 1150&1023 RFI No: HENC-INST-

BI: 250002400 JO: 250002400 Phase: CABLE PULLING Title : EPC 14 Jizan Refinery & Marine Terminal Facilities
To: Projects Inspection Unit/ Mr. Mr. Paul Civil Mech. Plumb. Comms. Elect. Inst. Other

Inspection/monitoring is required on (date): 19-Jun-19 at (time): prior to TERMINATION

Visual Inspection of instrument secondry cable pulling/installation from T36-PGJB-


4050 to secondry JB T36-PGJB-4626,T36-PGJB-4627 with Cable Tag # T36-IC-
for the following location/equipment : 4626,T36-IC-4627 & from T36-PGJB-4050 to T36-HS-4571A,T36-HS-4571B,T36-HS-
4572A,T36-HS-4572B,,T36-HS-4574A,T36-HS-4574B,T36-HS-4575A,T36-HS-4575B As
per Highlighted Attached Drawing

Location: Sulfur Stacker (STC02) AREA


Work Permit required: Yes Project Quality Plan: Hold Point Witness Point

SAPMT representative has verified that the work is ready for inspection CONTRACTOR has verified that the work to be inspected is complete
and conforms to the project requirements. and in compliance with the following specifications:

SATIP-J-902-01 (3.05) / SAIC-J-6606/T36-A-JRTP-


SAPMT Name Mr. Hashmi SAES/SAMS/Other # R0011-COMM-C-8013-006,REV-0

Signature Date 18-Jun-19 Contractor/Company Hanwha E&C


Telephone Fax QA/QC Name MD. RASHID
Name: Date 18-Jun-19
QA/QC Signature
This form received by the undersigned Inspection Department employee:

Mr. Paul Signature: __________________ Date 6/19/2019 Time: _________________

NOTE: Inspector's signature is for receiving this request only and not for approval or disapproval of the work or facility inspected.
Distribution: A. Original - Project Management B. 1st Copy - Inspection C. 2nd Copy - Contractor
REQUEST FOR INSPECTION
Saudi Aramco 6717-ENG (11/98) 726-200 (Inspection Department) Ref:SAEP 1150&1023 RFI No: HENC-INST-

BI: 250002400 JO: 250002400 Phase: CABLE PULLING Title : EPC 14 Jizan Refinery & Marine Terminal Facilities
To: Projects Inspection Unit/ Mr. Mr. Santi Civil Mech. Plumb. Comms. Elect. Inst. Other

Inspection/monitoring is required on (date): 24-Jul-19 at (time): prior to TERMINATION

Visual Inspection of Instrument Secondary Cable Pulling and Dressing for the
for the following location/equipment : following Device Tag # T01-SD-9001Y at Berth-1 As per highlighted on attached
drawing.

Location: BERTH-1
Work Permit required: Yes Project Quality Plan: Hold Point Witness Point

SAPMT representative has verified that the work is ready for inspection CONTRACTOR has verified that the work to be inspected is complete
and conforms to the project requirements. and in compliance with the following specifications:

SATIP-J-902-01 (3.05) / SAIC-J-6606/T95-P-VA-


SAPMT Name Mr. Hashmi SAES/SAMS/Other # 373784-004, REV-5

Signature Date 23-Jul-19 Contractor/Company Hanwha E&C


Telephone Fax QA/QC Name MD. RASHID
Name: Date 23-Jul-19
QA/QC Signature
This form received by the undersigned Inspection Department employee:

Mr. Santi Signature: __________________ Date 7/24/2019 Time: _________________

NOTE: Inspector's signature is for receiving this request only and not for approval or disapproval of the work or facility inspected.
Distribution: A. Original - Project Management B. 1st Copy - Inspection C. 2nd Copy - Contractor
REQUEST FOR INSPECTION
Saudi Aramco 6717-ENG (11/98) 726-200 (Inspection Department) Ref:SAEP 1150&1023 RFI No: HENC-INST-

BI: 250002400 JO: 250002400 Phase: CABLE PULLING Title : EPC 14 Jizan Refinery & Marine Terminal Facilities
To: Projects Inspection Unit/ Mr. Mr. Audie Civil Mech. Plumb. Comms. Elect. Inst. Other

Inspection/monitoring is required on (date): 17-Jul-19 at (time): prior to TERMINATION

Visual Inspection of Instrument Secondary Cable Pulling and Dressing for the
for the following location/equipment : following Tag No,T02-XL-2232,T02-XL-2232A,T02-XL-2237,T02-XL-2231A AT BERTH-2 .
As per Highlighted on attached CABLE SCHEDULE.

Location: Berth-2
Work Permit required: Yes Project Quality Plan: Hold Point Witness Point

SAPMT representative has verified that the work is ready for inspection CONTRACTOR has verified that the work to be inspected is complete
and conforms to the project requirements. and in compliance with the following specifications:

SATIP-J-902-01 (3.05) / SAIC-J-6606/T02-J-VD-


SAPMT Name Mr, Hashmi SAES/SAMS/Other # 373932-011, REV-1

Signature Date 16-Jul-19 Contractor/Company Hanwha E&C


Telephone Fax QA/QC Name MD. RASHID
Name: Date 16-Jul-19
QA/QC Signature
This form received by the undersigned Inspection Department employee:

Mr. Audie Signature: __________________ Date 7/17/2019 Time: _________________

NOTE: Inspector's signature is for receiving this request only and not for approval or disapproval of the work or facility inspected.
Distribution: A. Original - Project Management B. 1st Copy - Inspection C. 2nd Copy - Contractor
REQUEST FOR INSPECTION
Saudi Aramco 6717-ENG (11/98) 726-200 (Inspection Department) Ref:SAEP 1150&1023 RFI No: HENC-INST-

BI: 250002400 JO: 250002400 Phase: CABLE PULLING Title : EPC 14 Jizan Refinery & Marine Terminal Facilities
To: Projects Inspection Unit/ Mr. Mr. Audie Civil Mech. Plumb. Comms. Elect. Inst. Other

Inspection/monitoring is required on (date): 27-Jul-19 at (time): prior to TERMINATION

Visual Inspection of Instrument Secondary Cable Pulling and Dressing for the
for the following location/equipment : following Tag No,T02-SD-9001Z, AT BERTH-2. As per Highlighted on attached CABLE
SCHEDULE.

Location: Berth-2
Work Permit required: Yes Project Quality Plan: Hold Point Witness Point

SAPMT representative has verified that the work is ready for inspection CONTRACTOR has verified that the work to be inspected is complete
and conforms to the project requirements. and in compliance with the following specifications:

SATIP-J-902-01 (3.05) / SAIC-J-6606/T95-P-VA-


SAPMT Name Mr, Hashmi SAES/SAMS/Other # 373784-004, REV-3

Signature Date 25-Jul-19 Contractor/Company Hanwha E&C


Telephone Fax QA/QC Name MD. RASHID
Name: Date 25-Jul-19
QA/QC Signature
This form received by the undersigned Inspection Department employee:

Mr. Audie Signature: __________________ Date 7/27/2019 Time: _________________

NOTE: Inspector's signature is for receiving this request only and not for approval or disapproval of the work or facility inspected.
Distribution: A. Original - Project Management B. 1st Copy - Inspection C. 2nd Copy - Contractor
REQUEST FOR INSPECTION
Saudi Aramco 6717-ENG (11/98) 726-200 (Inspection Department) Ref:SAEP 1150&1023 RFI No: HENC-INST-

BI: 250002400 JO: 250002400 Phase: CABLE PULLING Title : EPC 14 Jizan Refinery & Marine Terminal Facilities
To: Projects Inspection Unit/ Mr. Mr. Santi Civil Mech. Plumb. Comms. Elect. Inst. Other

Inspection/monitoring is required on (date): Mr. Audie at (time): prior to TERMINATION

Visual Inspection of FIRE ALARM Cable Pulling and Dressing for the following Tag
No,TAG:T01-CC-7003,T01-IC-7761,T01-CC-7004,T01-CC-7005,T01-IC-7762,T01-CC-
for the following location/equipment : 7006,T01-CC-7007,T01-CC-7008 AT BERTH-1 .As per Highlighted on attached CABLE
SCHEDULE.

Location: BERTH-1
Work Permit required: Yes Project Quality Plan: Hold Point Witness Point

SAPMT representative has verified that the work is ready for inspection CONTRACTOR has verified that the work to be inspected is complete
and conforms to the project requirements. and in compliance with the following specifications:

SATIP-J-902-01 (3.05) / SAIC-J-6606/T95-P-VA-


SAPMT Name Mr, Hashmi SAES/SAMS/Other # 373607-768/769/804, REV-0

Signature Date 12-Sep-19 Contractor/Company Hanwha E&C


Telephone Fax QA/QC Name MD. RASHID
Name: Date 12-Sep-19
QA/QC Signature
This form received by the undersigned Inspection Department employee:

Mr. Audie Signature: __________________ Date 9/14/2019 Time: _________________

NOTE: Inspector's signature is for receiving this request only and not for approval or disapproval of the work or facility inspected.
Distribution: A. Original - Project Management B. 1st Copy - Inspection C. 2nd Copy - Contractor
REQUEST FOR INSPECTION
Saudi Aramco 6717-ENG (11/98) 726-200 (Inspection Department) Ref:SAEP 1150&1023 RFI No: HENC-INST-8205 / 319

BI: 250002400 JO: 250002400 Phase: PreCommisioning Title : EPC 14 Jizan Refinery & Marine Terminal Facilities
To: Projects Inspection Unit/ Mr. Mr. Imtiyaz Civil Mech. Plumb. Comms. Elect. Inst. Other

Inspection/monitoring is required on (date): 27-Apr-20 at (time): prior to N/A

Witness Of on Going Pre-Commissioning Loop Checking (7No's) for The Following


Loop: T04-H-5002,T04-X-5032C,T36-N-4052A,T36-N-4151B,T36-N-4152B,T36-X-
for the following location/equipment : 4052B,T36-X-4958

Location: Main Office


Work Permit required: Yes Project Quality Plan: Hold Point Witness Point

SAPMT representative has verified that the work is ready for inspection and CONTRACTOR has verified that the work to be inspected is complete
conforms to the project requirements. and in compliance with the following specifications:

SAPMT Name Mr. Yahya SAES/SAMS/Other # SATIP-J-900-01 (4.01) / SATR-J-6501

Signature Date 27-Apr-20 Contractor/Company Hanwha E&C


Telephone Fax QA/QC Name SHADHIK
Name: Date 27-Apr-20
QA/QC Signature
This form received by the undersigned Inspection Department employee:

Mr. Imtiyaz Signature: __________________ Date 4/27/2020 Time: _________________

NOTE: Inspector's signature is for receiving this request only and not for approval or disapproval of the work or facility inspected.
Distribution: A. Original - Project Management B. 1st Copy - Inspection C. 2nd Copy - Contractor