1 2
3
4
5
- Approved with comments
- Conditionally approved
- Rejected
- Others (specify)
T lAlSlEI CO,,
SyO&GUPD/SHAYBAH/L-1458/2015
Please find attached Br. C.A.T. International Co. Ltd (CAT) submittal for RE-SUBMITTAL OF
VALVE TESTING PROCEDURE REV. 01; intended for the above mentioned subject project,
for your review and approval.
Should you have any inquiry regarding this matter, please c ersigned at 578-3406.
~
cc: WAK
~(,
Shaybah File
,~(V Q~
Received by: ~ A"!\
Print Name & Sign
TRANSMITTAL
TRANSMITTAL NO. SyO&GUPD/SHAYBAHIT-122612015 DATE: I December 24,2015
~ FOR COpy & ACTION D FOR APPROVAL D FOR YOUR REVIEW & COMMENTS
MP/SHYB/1S/LA-00249
Pl ease find th e attached "V ALVE TESTING I-'ROC EDU RE R EV. 01." for yo ur rev iew &
approv al that we are intend to utili ze for above mentioned contract.
Yours faithfully
Br. C.A.T. International Co. Ltd.
rFa~
Proj ect Manager
RMY/AHB
CC: SSG/RMY
Shaybah QC/Project File
SHAYBAH AREA
5
1 - Approved
2 - Approved with comments
ADDRESS: 3 - Conditionally approved
SAPMT Site Office, Room-01 ,SAB-55 SHAYBAH
4 - Rejected
TEL: 578-3400 5 - Others (specify)
Fax: 578-3402
6 Procedure for Socket Gap Control and Thread Joints 1 Approved without Comments
SI No.l0-00791-3129
SAUDI ARAMCO
1 \ ~
"- ::> A-~'""- '-- L ~ Q
CONTENTS
1.0 PURPOSE
2.0 SCOPE
4.0 RESPONSIBILITIES
5.0 PROCEDURE
10.0 FILLING
12.0 PRESSURIZATION
14.0 ATTACHMENTS
Page 2
Br. C.A.T International Limited VALVE TESTING PROCEDURE
REV. 1 DATED 14.12.2015
1.0 PURPOSE
To establish series of pressure testing required for body and seat at Shop only.
2.0 SCOPE
The scope of this procedure covers the project requirements for field pressure testing
of metallic valves such as gate, globe check, choke, plug and butterfly valve excluded
from this scope are control, safety relief, surge relief, solenoid and other valve classified
as instrumentation valve in accordance with SAES-L-l08 para 4.7.
4.0 RESPONSIBILITIES
Page 3
Br. C.A.T International Limited VALVE TESTING PROCEDURE
REV. 1 DATED 14.12.2015
5.1.1 The valve testing procedure shall be prepared and submitted to SAPMT
and PIS for review and approval to shop testing of all valves 2" and larger.
5.1.2 Recipient of the approved procedure and other users are instructed not to
make copies of any part of the procedure, this is to ensure no out of date
procedures are in circulation that could mistakenly use.
Page 4
Sr. C.A.T International Limited VALVE TESTING PROCEDURE
REV. 1 DATED 14.12.2015
5.1.3 This valves testing is typical and applicable to all permanent valves
required for this project.
5.1.4 All valves shall be subject to visual testing upon receiving.
5.1.5 When a valve is ordered together with an actuator, the valve/actuator
assembly shall be tested together as a unit.
5.1.6 During the test valve shall be placed on elevated platform to have easy
visibility on all part of valve.
5.1.7 All valves shall be subjected to hydrostatic shell test as per API 598 tables
lA & 18.
5.1.8 For she'" high-pressure backseat and high-pressure closure tests, the test
fluid shall be air, inert gas, kerosene, water, or a non-corrective liquid
with a viscosity not higher than that of water. Unless otherwise specified
in the purchase requisition the test fluid temperature shall be within the
range 14°F (SOC) to 122°F (50°C. All test duration shall meet the
requirements of para 3.6 and Table 4 of API 598. SAIC-L-2042 Item C5.
5.1.9 Testing media shall be water complying with para 4 of SA ES-A-007 Testing
intervals (maximum weekly) are established for lest water. Test water
quality shall have a sulfate reducing bacteria (SRB) count of 103 per ml or
less as determined by Rapid check" Method.
Note: Water with higher bacteria count maybe acceptable if treated with
biocide & retested and approved by Supervisor. CTU/ME&CCD/CSD SAIC-L-
2042 Item A7.
5.10 Each valve shall be uniquely identified, tagging or other suitable means
5.11 Relieve valve shall have a calibrated, dated and tagged within one week of
adequate capacity set to relieve at 5% above the hydro test pressure.
SAIC-L-2042 Item Bl
5.12 Pressure gauges shall be calibrated before the test. The calibration
interval shall no exceed one month, stickers shall be applied indication the
latest calibration date. SAIC-L-4042 Item Bl
5.13 All pressure gauges shall have a range such thot the test pressure is within
30% to 80% of the full range, a minimum of two pressure gauge are
available for the test system their accuracy is with 5% of one another.
SAIC-L-2042 item B3 & B4 .
....... Page 5
Br. C.A.T International Limited VALVE TESTING PROCEDURE
REV. 1 DATED 14.12.2015
6.1 As soon os the valve arrived at lay down yard they will be
examined by QC inspector for completeness, damage and package
condition. All requirement documentation as per the
procurements plan procedure shall be maintained by the QA/QC
Engineer/Inspector. The QC final disposition reports such as
manufactures certificate shall be submitted to Saudi Aromco.
6.2 If the valve designated for isolation services, perform the tests as per
API 598.
a. Blind shall be installed on both sides of the valve for each body test. It is
recommended to stroke & grease all valves before testing.
b. The pressure gauge shall be calibrated before use and calibration interval shall
not exceed one month prior scheduled test.
e. The pressure gauge shall have a range such that the test pressure with 30% to
80% of the full scale range.
d. Pressure relief valve shall be calibrated before use and the calibration interval
shall not exceed on week prior to schedule test. Pressure relief valve should be
calibrated 5% higher than specified test pressure.
e. A minimum of two pressure gauge is required one on the test pump the
other/son the test system. Bleed valve to be provided for protection as per SAES-
A-004 Para 5.5.2 relief valve and pressure gauges shall be mounted on the
upright position. Gauges shall be visible to the operator. All calibration should be
witness by Saudi Aramco Inspection or performed by an approved laboratory.
Required certificates shall be made available to inspector prior to the
commencement of the test.
/. If the stainless steel valve containing pressure retaining parts made of ANSI 300
and or 400 series should be tested with water that meets requirements of SAES-
A-00l6.1
8.1.1 Manifold intended for use in Hydrostatic test shall be pressure to 1.2% above
maximum test pressure and should have a test certificate. SAIC-L-2042 Item A6
8 .1. 2 An isolation valve, rated for manifold pressure when in close position, shall be
provided between the pressure testing manifold and the system being tested as
per SAES-A-004, para 5.5.3.
Page 6
Br. C.A.T International limited VALVE TESTING PROCEDURE
REV. 1 DATED 14.12.2015
9.1.1 Hydro test pump hoses and fitting intended for pressure testing shall have an
adequate rating to meet the test pressure requirements.
9.1.2 Cleaning
10.0 FILLING
10,,1 The valve asserl1bly shall be fi/led 'vvith portable vvater. Precautionary rneasure shall
be adhered to prevent air entrapment by opening the vent valve until full flow is attained.
11.1 The valve body shall be tested prior seat test. During the shell test the valve must
opened at least 50% after completion of shell test, release the pressure, unbolt one (1) blind
flange and proceed with seat test, repeat the same procedure for other side of the seat
complete the test.
12.0 PRESSURIZATION
12.1 Prior the pressurization a test manifold shall be installed of the blind flange with the
pressure gauges and pressure relief valve.
12.2 After thoroughly cleaning the bare seat and the body, fill the assembly with water the
filling shall be done through the manifold valve with the vent open to eliminate entrapped
air.
12.3 The valve assembly shall be slowly pressurized until it reached the required pressure
(ANSI/API VALVE TEST PRESSURE. The test pressure shall be held as per Table 2 & 3. (SAIC-L-
2042 Item C2 & C3).
12.4 Testing will be required from both sides of seat, for proper inspection. Maximum
allowable leakage as per Table 5 of API 598. (SAIC-L-2042 Item 01)
12.5 Upon satisfactory completion of the 1st seat test, drain the assembly, remove the blind
flange and refit to the opposite side of the valve seat.
Page 7
Br. C.A.T International Limited VALVE TESTING PROCEDURE
REV. 1 DATED 14.12.2015
12.6 Repeat para for the opposite side of the valve seat.
12.7 Leakage in from of drops shall be collected and measured. The allowable leakage rate
shall be in accordance with table 5 API 598 for seat test only. All resilient (soft) seated
isolation valves shall have zero leakage.
12.8 For shell testes visually detectable leakage through the pressure boundary walls and
any fixed body joint is not permitted. (SAIC-L-2042 Item Cl)
12.9 valve that failed during testes shall have be tagged and marked and put in quarantine
area until final disposition after that it will be sent to valve repair shop.
12.10 After corrective action has been taken the assembly shall be pressurized again, repeat
para 12.3.
12.11 Any valve rejected by the inspection during the shell/seat test will report to the
initiated engineer/OPO. The necessary repair will be carried out by Saudi Aramco approved
agency.
12.12 All valve testes shall be witnessed by the project inspection department or their
representative.
12.13 Method of water removal, corrosion control measures, preservation is effectively &
consistently applied in accordance with all SA requirements after testing. (SAIC-L-2042 Item D4)
13.1 After the test acceptance, remove the water from the valve, open the blind flanges
sweep and mop as required to ensure that no visible traces of water remain.
13.2 Place the valve 50% open position drain the cavity using the available body cavity drain
lines dry the cavity by blowing dry air using electric hand blower or compressed air, after the
drying activities, the exposed metallic surface protected with rust preventive like W.O. 40 or
equivalents.
13.3 For buried type valve use pressure hose (max 100psi) attachment to one drain, forcing
the water out through the second drain. Again and dry the body cavity to a dew point of 1 C
or less by blowing hot air or dry nitrogen through the drain lines, shut in the system for not
less than 12 hours. Repeat the drying if the dew point has risen above 1 C after hours .
...................... Page 8
Br. C.A.T International Limited VALVE TESTING PROCEDURE
REV. 1 DATED 14.12.2015
13.4 Valves are completely drained of test fluid & thoroughly dried after testing. Machined
surfaces shall be coated with a light film of high viscosity rust inhibiting oil that will not
become fluid & run off at temps below 80 C. SATlP-L-108 item 2.4 SAIC-L-2041 item A1
Clean compressed air & time to below cavities to drain. Verify water removal effectiveness
randomly (next day)
13.5 Corrosion prevention upon completion of drying process, means of corrosion inhibition
(rust preventive like W.O. 40 or equivalents) and lubrication shall be applied as applicable.
13.6 The store area should provide means of protections against severe weather conditions
such as sand encroachment, rains; and other conditions that can affect valves integrity.
Valves should be supported off the ground.
13.7 Flanged valves NPS 6/1 and smaller in class 300 shall be fitted with UV resistant plastic
covers. For other sizes, valve end flanges shall be fitted with plywood covers. The cover
diameter shafl be the same as the outside diameter of the flange and shall be at least 10mm
thick for valves up to NPS 24/1 and 12mm thick for valves NPS 26/1 and larger. The cover shall
be attached by machine bolts with a nut and washer fitted on the side of the flange. There
shall be minimum four (4) bolts on valves up to NP24/1 nominal size and eight (8) bolts on
valves NPS 26 inch and larger. The bolts diameter shall not less than U the size of the flange
bolt hole. The raised face portion of the flange and the ring joint groove shall be covered with
heavy grease. A heavy duty moisture proof disc shall be fitted between the greased flange
face and the cover. The disc shall have diameter equivalent to the inside diameter of the bolt
holes. Sufficient overage shall be ordered to replace loss/damage SA TlP-L-108 item 2.4, SAIC-
2041 item A2.
13.8 The ends of threaded and socket weld end valves shall be protected with tight fittings
plastic caps. SA TlP-L-108 item 2.4- SAIC-L-204 item A3.
13.9 For Long Term Stored Inspections, (Any storage for a period of three months and longer
shall be considered as long term store). At least once every 3 months, the valves shall be
visually inspected to check the integrity of the covers, caps, grease and other visible
conditions. Prior to installation, long term stored valves shall be re-tested per SAEP-35 .
14. 1
TABLE
'"'''''''''''-'''-'''''''''''''-'''''''''''-''''' """""". _". """""._--.-"'-,, """'' ' ' ' -'-",,,,,. -,,''. ,,,,- Page 10 "''-""-"''----''-,,'''"'''''',,'''''''''''''''' ' ' '''--''''' """""""-,,-"'-.. , """ ''''''''''''-''-'" ""'' ' ". "'' '".",,.
Br. C.A.T International Limited VALVE TESTING PROCEDURE
REV. 1 DATED 14.12.2015
Valve Type
Butterfly and
Test Description Gate Globe Plug Check Floating Ball Trunnion- Mounted
Ball
a The backseat test is required for all valves, except for bellows seal valves, that the backseat feature.
b For lubricated plug valves, the high-pressure closure test is mandatory and the low-pressure closure
test is optional.
C If agreed to by the purchaser, the valve manufacturer may be use a low pressure closure test instead of
the high- pressure closure test.
d The high-pressure closure test of resilient-seated valves may degrade subsequent seating performance
in low-pressure services.
e For power-operated globe valves, the high-pressure closure test shall be performed at 110 percent of
the design differential pressure used for sizing the power operator.
Valve Type
Butterfly and
Test Description Gate Globe Plug Check Floating Ball Trunnion- Mounted
Ball
Page 11
Sr. C.A. T International Limited VALVE TESTING PROCEDURE
REV. 1 DATED 14.12.2015
a The backseat test is required for all valves, except for bellows seal valves, that have the backseat
feature.
b If agreed to by the purchaser, the valve manufacture may use a low-pressure closure test instead of
the high-pressure closure test.
C The high-pressure closure test of resilient-seated valves may degrade subsequent seating performance
in low-pressure services.
d For power-operated globe valves, the high-pressure closure test shall be performed at 110 percent of
the design differential pressure used for sizing the power operator.
Test Pressured
Test
Pounds per Square Inch Gauge Bar
Valve Except Butter and Check
High-pressure closure and backseat a b
Low-pressure closure and backseata 60-100 4-7
Butterfly Valve
High-pressure closure c
Low-pressure closure 60-100 4-7
Page 12
Br. C.A.T International Limited VALVE TESTING PROCEDURE
REV. 1 DATED 14.12.2015
Check Valve
High-pre ssure closure
Class 1 25 (cast iron)
NPS 2- 12 200 14
NPS 14-48 150 11
Class 250 (cast iron)
NPS 2-12 500 35
NPS 12-24 300 21
Class 150 (ductile iron) 250 17
Class 300 (ductile iron) 640 44
Carbo n , alloy, stainless steel, and special alloys b
Low-p r essure closure (see Tables l-A and I-B) 60-100 4-7
Page 13
Sr. C.A.T International Limited VALVE TESTING PROCEDURE
REV. 1 DATED 14.12.2015
Page 14
~NSPECTION DEPARTMENT
Southern Area Project Inspection Division
ShPIS-SPL-1 & EW- PIU
Tel: 578-3519/3728/8135, Fax: 578-3515/3646
Dr\ 'UMENT:
RE: viEW RESPONSE [6J REQUESTD ID/SAPlD/ShPIS/LOG No. 0904-14
TO STATUS
NAME: AFT AB A. ANSARI, Project Engineer
ADDRESS:
TEL:
SAPMT Office, Room 102, SHAYBAH
578-3518
";
~
~~
1
2
3
4
5
-
-
-
-
-
Approved
Approved with comments
Conditionally approved
Rejected
Others (Specify)
.'. 578-3696
DOCUMENT DESCRIPTION:
VALVE TESTING PROCEDURE REV. 2
COMMENTS:
ShP!S reviewed the above mentioned submittal and was approved with below comment;
- - - bf_
~ ~-%r:i~: L~.
~ - ----Fr·!.. .-.-'-~~
v?/ 90rl
\ I ~
Reviewed by: AW/RA4u.:d/
Ii '.i-
"" ...../ j '
::c5:1
-
lob File
I 1 1 OF 1
SAUDI ARAMCO [D/P[D - 18-MAY-05 - REV 0 (Standards Cutoff -March 2013) Rev 7 31-Mar-13
~~~--------------~----------~------~----:~~~~~----~~~~~~~~~----------
SAUDI ARAMCO INSPECTION CHECKLIST SA[CNUMBER IDATEAPPROVED lOR NUMBER
EQU[PMENT [0 NUMBER(S) [EQU[PMENT DESCR[PT[ON .[ EQPT CODE [SYSTEM [D. lPLANT NO.
LAYOUT DRAW[NG NUMBER REV. NO. [PURCHASE ORDER NUMBER I EC I PMCC I MCC NO.
SCHEDULED [NSPECT[ON DATE & T[ME IACTUAL [NSPECT[ON DATE & T[ME QUANT[TY [NSP. I MH's SPENT I TRAVEL T[ME
[ SAUDI ARAMCO USE ONLY
SAUDI ARAMCO T[P NUMBER SAUDI ARAMCO ACT[V[TY NUMBER WORK PERM[T REQU[RED?
TEST PREPARATION
8
CRITICAL: INSPECTION (INTERNAUEXTERNAL) PRECEDES VALVE TESTING (ATTACHMENT 1)
The relief valve of adequate capacity set to relieve at 5% above the
hydrotest pressure shall be installed. The relief valve(s) shall be tested,
dated, and tagged within one week prior to the hydrotest for new
SAES-A-004,
Para. 5.5.1 I I I
construction projects. Relief Valve current logs exist (M& TE).
Pressure gauges and pressure recorders are calibrated before the tests.
SAES-A-004
82 IThe calibration interval shall not exceed one (1) month. Stickers shall be
Para S.1.5.2
applied indicating the latest calibration date. I
Page 1 of 1
SAUDI ARAMCO ID/PID - 1 8-MAY-05 - REV 0 (Standards Cutoff -March 2013) Rev 7 31·Mar-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST ='-=--~~~-~---1
SAES-L-108,
Para. 4.7.5
C2
API 598 Table 2
Notes b-c
'--
nigh_
SAES-L-108,
C3
me
Para. 4.7.5
KPS
F or Class 800 valves, shell test pressure shall be 1Y, times pressure
SAES-L-108,
rating* at 100°F (38°C), round up to next higher increment of 25 psi.
C4 Para. 4.7.5
NOTE: Check Valve Stamp for pressure rating. For Carbon Steel
API 598 Table 31
Valves, 1,975 psi is the usual pressure rating. Caution!
Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff -March 2013) Rev 7 31-Mar-13
_
. Fif . \ydrostatic Testing of Isolation Valves SAIC-L-2042 I 30-Apr-13 MECH·
r (lTLE WBS / BI/ JO NUMBER _ICONTRACTOR / SUBCONTRACTOR
~~==========================~======~~~====r===T=====~
I~~~ I ACCEPTANCE CRITERIA I REFERENCE I PASS I FAIL I N/A I RE-INSP DATE
D HIGH PRESSURE SEAT CLOSURE TESTS (API 598 Tables) Note: Test Times per Item C5 above
Maximum Allowable Leakage Rates for Closure Tests
I Ml'l;d-s(";!tcu llled; V;llv\;:
All Mt!tU-.scale>.1 Valves.. Except Cb;;.,:k
SAES-L-108,
Vatve Siz:: All R<:'Silit:rll, I Gus T>:;,\ (Gubb!~i-I
Liquid Tt,:al Para. 4.7.5 &
D1 f---=_IN~PS~')_+--S'~"d_~\'_Jl~v,,_'_o tOn,p< p" MintH'1 Pcr Minut,) I Li'pic! TN API 598
52 0 - - - -i:i'-~-T- ---Ob-- -T ---,---- J
Table 5
Notes A-F
g - 12 U ,U I ·jO i
S!:l--- ------c;O'-----i-~--~c~.----iI~--;;-f~~1-i~---:-,---+-~-:r,-~-i
NOTES: Rejected Valves are dispositioned (repaired & retested) per Attachment 1 Requirements. USE SATR-A·2001V.
ATTACHMENTS: Attachment 1 - Valve Testing Facility Approval, Start-Up & Other Quality Requirements Including Repairs
Attachment 2 • Valve Testing Special Considerations
REFERENCE DOCUMENTS:
1- SAES-L-108 (21 March 2010) Selection of Valves
2- SAES-A-004 (14 December 2009) General Requirements for Pressure Testing
3- API 598 Valve Inspection And Testing
Page 2 of 2
SAUDI ARAMCO ID/PIO - 18-MAY-OS - REV 0 (Standa rds Cutoff -March 201 3) Rev 7 31·Mar- 13
SAle NUMBER
SAUDI ARAMCO INSPECTION CH ECKLIST IDATE APPROVE D lOR NUMBER
Page 1 of 1
SAUDI ARAMCO la/PID - 18-MAY-OS - REV a (Standards Cutoff -March 2013) Rev 7
Not.es--:.
0 This tabf-e is- 3 sirnpHfied version .of Table 3 in API 600. It's only purpose is to .oid in
unde:rst:anding the trim number design.-atfons listed -in the Piping t,llateri<3J Classes
-- TriITl selection and acceptable- arter-natives are governed by SAES-L-008 and the
applicable SAf>....'SS
v,"'hen ::31 cOrT"!bir-)ation trim !s shO'Nn (Tri:n--: No.'s 6,7, 8, SAo. 1-!. 12, or -!4). the se::rting
surface rn"ateriafs of the seat and closure cnenober rn.ay be interchanged
Page 1 of 1