CONTRACTOR NAME:
CONTRACT NO.: 12E-C01
MOFARREH MARZOUQ AL-HARBI & PARTNERS CO. LTD.
LOCATION :- 12E C01 ( AREA - F) F-7 DATE & TIME OF INSPECTION: 04-MARCH-2023, Time 10:45 am
BACKFILLING AREA
REFERENCE DOCUMENT NO.: RC Spec.Sections: 02310 par3.05,2315 par. 3.05,Section 02310 par. 3.07
ITEM TO BE INSPECTED: FDT & SURVEY INSPECTION FOR NGL LEVEL SUBGRADE LAYER
BACKFILLING LEVEL AT 12E C01 ( AREA - F) F-7 BACKFILLING AREA
PAGE 1 OF 1
ROYAL COMMISSION
for Jubail and Yanbu
MOFARREH MARZOUQ AL-HARBI & PARTNERS CO. LTD.
OTHERS : _______________ Work Area / Location : 12E C01 ( AREA - F) F-7 BACKFILLING AREA
QUANTITY RECORDS
Measured Qty.
Pay-Item No. Unit B.O.Q. Previous Qty. To Date Under Run Over Run
this Period
TOTAL
Drawing No.:
12E-035-20UT-CE-216
Specification No.:
RC Spec.Sections: 02310 par3.05,2315 par. 3.05,Section 02310 par. 3.07
FDT & SURVEY INSPECTION FOR NGL LEVEL SUBGRADE LAYER BACKFILLING LEVEL AT 12E C01 ( AREA - F)
Location: F-7 BACKFILLING AREA
Drawing No.:
12E-035-20UT-CE-216
Specification No.:
RC Spec.Sections: 02310 par3.05,2315 par. 3.05,Section 02310 par. 3.07
FDT & SURVEY INSPECTION FOR NGL LEVEL SUBGRADE LAYER BACKFILLING LEVEL AT 12E C01 ( AREA - F)
Location: F-7 BACKFILLING AREA
Not
Item No. Inspection Attributes Accept Reject
Applicable
4 Compact each layers in accordance with Royal Commission for Jubail & Yanbu Standards
5 The bottom of the trench shall be free of sharp or loose rock, debris or foreign matter
7 The bed should be compacted uniformly to provide even bearing for pies
REMARKS: