CONTRACTOR NAME:
CONTRACT NO.: 12E-C01
MOFARREH MARZOUQ AL-HARBI & PARTNERS CO. LTD.
LOCATION :- ( 12E-C01 - AREA-F- 9) DATE & TIME OF INSPECTION: 16-JAN-2023,
AROUND OFFICE AND LAY-DOWN AREA
REFERENCE DOCUMENT NO.: RC Spec.Sections: 02310 par3.05,2315 par. 3.05,Section 02310 par. 3.07
ITEM TO BE INSPECTED: FDT & SURVEY INSPECTION FOR 3RD LAYER BACKFILLING L AT ( 12E-
C01 - AREA-F- 9) AROUND OFFICE AND LAY-DOWN AREA
TYPE OF INSPECTION
(circle applicable) Witness Hold
ADDITIONAL INFORMATION/COMMENTS:
PAGE 1 OF 1
ROYAL COMMISSION
for Jubail and Yanbu
MOFARREH MARZOUQ AL-HARBI & PARTNERS CO. LTD.
OTHERS : _______________ Work Area / Location : ( 12E-C01 - AREA-F- 9) AROUND OFFICE AND LAY-DOWN
AREA
QUANTITY RECORDS
Measured Qty.
Pay-Item No. Unit B.O.Q. Previous Qty. To Date Under Run Over Run
this Period
SW-31 23 00-01 mᶟ
TOTAL
Drawing No.:
12E-035-20UT-CE-216
Specification No.:
RC Spec.Sections: 02310 par3.05,2315 par. 3.05,Section 02310 par. 3.07
FDT & SURVEY INSPECTION FOR 3RD LAYER BACKFILLING L AT ( 12E-C01 - AREA-F- 9) AROUND OFFICE
Location: AND LAY-DOWN AREA
Drawing No.:
12E-035-20UT-CE-216
Specification No.:
RC Spec.Sections: 02310 par3.05,2315 par. 3.05,Section 02310 par. 3.07
FDT & SURVEY INSPECTION FOR 3RD LAYER BACKFILLING L AT ( 12E-C01 - AREA-F- 9) AROUND OFFICE
Location: AND LAY-DOWN AREA
Not
Item No. Inspection Attributes Accept Reject
Applicable
4 Compact each layers in accordance with Royal Commission for Jubail & Yanbu Standards
5 The bottom of the trench shall be free of sharp or loose rock, debris or foreign matter
7 The bed should be compacted uniformly to provide even bearing for pies
REMARKS: