You are on page 1of 4

ROYAL COMMISSION

RAS ALKHAIR INDUSTRIAL CITY

REQUEST FOR INSPECTION (RFI)

INSPECTION REQUEST NUMBER:CE-0084 REVISION NO.: DATE: 15-JAN-23

CONTRACTOR NAME:
CONTRACT NO.: 12E-C01
MOFARREH MARZOUQ AL-HARBI & PARTNERS CO. LTD.
LOCATION :- ( 12E-C01 - AREA-F- 9) DATE & TIME OF INSPECTION: 16-JAN-2023,
AROUND OFFICE AND LAY-DOWN AREA

REFERENCE DOCUMENT NO.: RC Spec.Sections: 02310 par3.05,2315 par. 3.05,Section 02310 par. 3.07

DRAWING NO.: (12E-035-20UT-CE-216)

ITP NO. & ACTIVITY NO.: MMAH-CE-002_2.2 & 2.3REV.00

ITEM TO BE INSPECTED: FDT & SURVEY INSPECTION FOR 3RD LAYER BACKFILLING L AT ( 12E-
C01 - AREA-F- 9) AROUND OFFICE AND LAY-DOWN AREA

LOCATION: ( 12E-C01 - AREA-F- 9) AROUND OFFICE AND LAY-DOWN AREA

TYPE OF INSPECTION
(circle applicable) Witness Hold

ADDITIONAL INFORMATION/COMMENTS:

REQUESTOR: QCI. ABDUL HANNAN SIGNATURE: DATE: 15-JAN-23

RECEIVED BY: ENGR.TURKI AL MUTAIRI SIGNATURE: DATE: 15-JAN-23

PAGE 1 OF 1
ROYAL COMMISSION
for Jubail and Yanbu
MOFARREH MARZOUQ AL-HARBI & PARTNERS CO. LTD.

HOLD POINT RELEASE


CONTRACT NO. : 12E-C01
SITE PREPARATION FOR INDUSTRIAL WASTE MANAGEMENT FACILITY IN RIC (IWMF)

HPR NO.: CE-0070 DATE: 16-JAN-23

Work Type : Pay-Item No.: SW-31 23 00-01 Zone No.:

CIVIL WORKS Activity Descriptions :


FDT & SURVEY INSPECTION FOR 3RD LAYER BACKFILLING L AT ( 12E-C01
- AREA-F- 9) AROUND OFFICE AND LAY-DOWN AREA
ELECTRICAL WORKS
MECHANICAL WORKS

OTHERS : _______________ Work Area / Location : ( 12E-C01 - AREA-F- 9) AROUND OFFICE AND LAY-DOWN
AREA

Attachment/s : IFC Drawings Shop Drawings As-Built Drawings Calculations


Drawing Reference No. : ( 12E-035-20UT-CE-216) Revision No. :
Inspection for : Materials / Delivery INSTALLATION HOLD POINT

QUANTITY RECORDS
Measured Qty.
Pay-Item No. Unit B.O.Q. Previous Qty. To Date Under Run Over Run
this Period

SW-31 23 00-01 mᶟ

TOTAL

WORK : MAY PROCEED MAY NOT PROCEED QUALITY : POOR GOOD

FIELD COORDINATION APPROVAL: REMARKS:


CIVIL
ELECTRICAL
MECHANICAL
STRUCTURAL
SPECIALIST

Inspected by MMAH Quality Control Department: Hold Point Released by RC Representative:


Q.C. Engineer QCI. Abdul Hannan Name: ENGR.TURKIAL MUTAIRI
Signature Signature
Q.C. Manager Engr. Najamuddin Ahamed Date:
Signature DATE: 16-JAN-23 Time: DATE: 16-JAN-23
EXCAVATION AND BACKFILLING CHECKLIST
Contract No.: 12E-C01 MMAH-CE-CL-001
Project Name:
SITE PREPARATION FOR INDUSTRIAL WASTE MANAGEMENT FACILITY IN RIC (IWMF)

Project Location: Ras Alkhair Industrial City Date: 16-Jan-23

Drawing No.:
12E-035-20UT-CE-216
Specification No.:
RC Spec.Sections: 02310 par3.05,2315 par. 3.05,Section 02310 par. 3.07

FDT & SURVEY INSPECTION FOR 3RD LAYER BACKFILLING L AT ( 12E-C01 - AREA-F- 9) AROUND OFFICE
Location: AND LAY-DOWN AREA

Item No. Inspection Attributes Accept Reject Not


Applicable

1 Excavation cleared of foreign and loose material

2 Slopes shored or correctly stepped

3 Access are properly provided and identified

4 Fill Material cleans and conforms to requirements

5 Lift thickness and compaction procedures in accordance with specifications

6 Final elevation in accordance to drawings

7 Moisture control acceptable

8 Compaction method and equipment

9 Soil Density Test Reports filed


REMARKS:

Prepared by:QCI. Abdul Hannan Approved by: ENGR.TURKIAL MUTAIRI

Signature & Date: 16-Jan-23 Signature & Date: 16-Jan-23

MMAH QA/QCI RC FIELD ENGINEER


SITE PREPARATION CHECKLIST
Contract No.: 12E-C01 MMAH-CE-CL-002
Project Name:
SITE PREPARATION FOR INDUSTRIAL WASTE MANAGEMENT FACILITY IN RIC (IWMF)

Project Location: Ras Alkhair Industrial City Date: 16-Jan-23

Drawing No.:
12E-035-20UT-CE-216
Specification No.:
RC Spec.Sections: 02310 par3.05,2315 par. 3.05,Section 02310 par. 3.07

FDT & SURVEY INSPECTION FOR 3RD LAYER BACKFILLING L AT ( 12E-C01 - AREA-F- 9) AROUND OFFICE
Location: AND LAY-DOWN AREA

Not
Item No. Inspection Attributes Accept Reject
Applicable

1 All backfilling layer should be as of indicated in the Contract Drawing

2 Select fill is of Client Specification or as approved by the client

3 Do not allow layers to exceed 300mm in thickness before compaction

4 Compact each layers in accordance with Royal Commission for Jubail & Yanbu Standards

5 The bottom of the trench shall be free of sharp or loose rock, debris or foreign matter

6 Cable or pipe shall be laid on a 150mm thick clean sand bed

7 The bed should be compacted uniformly to provide even bearing for pies
REMARKS:

Prepared by: QCI. Abdul Hannan Approved by: ENGR.TURKIAL MUTAIRI

Signature & Date: 16-Jan-23 Signature & Date: 16-Jan-23

MMAH QA/QCI RC FIELD ENGINEER