You are on page 1of 4

IRR No.

: 000-ISP-MC-001
Date: -ISP-MC-8014
26 January 2023
INSPECTION REPORT
Inspection WO No.:
& Remedial WO/SQ/MOC No.:
RECOMMENDATION SCE: YES V NO
Sheet: 1 of 4

To:

Cc:
Location:
Equipment Desc.: Scrubber Tower Unit:
Vessel/Corr. Circ. No.: Scrubber Tower BD-01
Equipment Name/ Box Up Required: YES V NO
Scrubber Tower
Tag Line No.: Category: Civil
Purpose Assoc. Report / Doc No Assoc. Photo No
Visual Inspection NA NA
SUMMARY OF INSPECTION
Visual inspection of the scrubber tower has been carried out on January 26, 2023. This inspection is only carried out on the outside and does not get
to the inside.
Summary result:

1. Observed stain at body of scrubber Tower (Photo #2)


2. Observed lack of sealant on Nozzle (Photo #3, #4)
3. Observed spot localize corrosion on nozzle (Photo #4)
4. Observed spot localize corrosion on support (Photo #5, #6)
5. Piping damage observed in the scrubber tower pipework (Photo #8 ~ #12)
6. Heavy corrosion was observed on the scrubber tower deck (Photo #13, #17)
7. Heavy corrosion was observed on the bolts and nuts and blower of scrubber tower (Photo #14, #15)
8. Heavy corrosion was observed on the bolts and nuts and ducting of scrubber tower (Photo #16)
9. Heavy corrosion and broken was observed on the cable guard of motor (Photo #18)
10. Heavy corrosion was observed on the cover of motor (Photo #19)
11. Heavy corrosion was observed on the nozzle of scrubber tower (Photo #20)
12. Moderate corrosion was observed on the support of scrubber tower (Photo #21)
13. Generally good condition
For details, refer to attached photos.

PROPOSED REMEDIAL ACTION (Action dated and agree with assignees)


1. For finding no. 1, Clean the stains and repaint according to the painting procedure.
2. For finding no. 2, repair of sealant according to the procedure.
3. For finding no. 3,4,6,7,8,10,11,12, repaint according to the painting procedure.
4. For finding no. 5, replace pipe spool and accessories with a new one.
5. For finding no. 9, replace with a new one.

TARGET FINISH DATE:

RISK ASSESSMENT
Service: Acid
Failure Mode:
Consequences Probability Risk Rank
Safety:
Environment: Justification:

Business:
Remedial Action Categories
No Action (Record Only) X Integrity Repair Order (RO) Permanent Temporary
Further Inspection Fabric Maintenance Order (FMO)
Change of Operating Condition Further Study Through Engineering Site Query (SQ)

PREPARED BY: CHECKED BY: APPROVED BY: APPROVED BY:


Name: Anton IM Civil & Structure Engineer: Pressure System TL: Assigned SPA Lead:
Date: 26 January 2023
Signature: Name: Name: Name:
Date: Date: Date:
Signature: Signature: Signature:
IRR No.: 000-ISP-MC-001
Date: -ISP-MC-8014
26 January 2023
INSPECTION REPORT
Inspection WO No.:
& Remedial WO/SQ/MOC No.:
RECOMMENDATION SCE: YES V NO
Sheet: 2 of 4

To:

Cc:
Location:
Equipment Desc.: Scrubber Tower Unit:
Vessel/Corr. Circ. No.: Scrubber Tower BD-01
Equipment Name/ Box Up Required: YES V NO
Scrubber Tower
Tag Line No.: Category: Civil
Purpose Assoc. Report / Doc No Assoc. Photo No
Visual Inspection NA NA

INSPECTED BY: Others (If Necessary):


Name: Anton IM Specialist:
Date: 26 January 2023
Signature: Name:
Date:
Signature:

PHOTO (If Applicable)

Photo #1. Photo #2. Photo #3.


General view of Scrubber Tower Observed stain at body of scrubber Tower Observed chalky on shell of scrubber tower

Photo #4.
Photo #5. Photo #6.
Observed spot localize corrosion and lack of
Observed spot localize corrosion on support Observed spot localize corrosion on support
sealant on nozzle
IRR No.: 000-ISP-MC-001
Date: -ISP-MC-8014
26 January 2023
INSPECTION REPORT
Inspection WO No.:
& Remedial WO/SQ/MOC No.:
RECOMMENDATION SCE: YES V NO
Sheet: 3 of 4

To:

Cc:
Location:
Equipment Desc.: Scrubber Tower Unit:
Vessel/Corr. Circ. No.: Scrubber Tower BD-01
Equipment Name/ Box Up Required: YES V NO
Scrubber Tower
Tag Line No.: Category: Civil
Purpose Assoc. Report / Doc No Assoc. Photo No
Visual Inspection NA NA

Photo #8. Photo #9.


Photo #7.
Piping damage observed in the scrubber Piping damage observed in the scrubber
General view pipe work of Scrubber Tower
tower pipework. tower pipework.

Photo #10. Photo #11. Photo #12.


Piping damage observed in the scrubber Piping damage observed in the scrubber Pressure gauge and Piping damage observed
tower pipework. tower pipework. in the scrubber tower pipework.

Photo #13. Photo #14. Photo #15.


Heavy corrosion was observed on the Heavy corrosion was observed on the bolts Heavy corrosion was observed on the bolts
scrubber tower deck and nuts and blower of scrubber tower and nuts and blower of scrubber tower
IRR No.: 000-ISP-MC-001
Date: -ISP-MC-8014
26 January 2023
INSPECTION REPORT
Inspection WO No.:
& Remedial WO/SQ/MOC No.:
RECOMMENDATION SCE: YES V NO
Sheet: 4 of 4

To:

Cc:
Location:
Equipment Desc.: Scrubber Tower Unit:
Vessel/Corr. Circ. No.: Scrubber Tower BD-01
Equipment Name/ Box Up Required: YES V NO
Scrubber Tower
Tag Line No.: Category: Civil
Purpose Assoc. Report / Doc No Assoc. Photo No
Visual Inspection NA NA

Photo #16. Photo #17. Photo #18.


Heavy corrosion was observed on the bolts Heavy corrosion was observed on the deck Heavy corrosion and broken was observed on
and nuts and ducting of scrubber tower and blower of scrubber tower the cable guard of motor

Photo #19. Photo #20. Photo #21.


Heavy corrosion was observed on the cover Heavy corrosion was observed on the nozzle Moderate corrosion was observed on the
of motor. of scrubber tower. support of scrubber tower.