You are on page 1of 1

Contract No: 1170032338 RFI #00079

QC Form No

Wax and Used Oil Project at Luberef I (Jeddah) PTJ-C-001 Rev 00

Sheet: 1/1
SURVEYING REPORT NO :
Equipment Name & Serial : TOPCON & CM2238 Reference Points
CALIBRATION DUE DATE: 11-08-2024 Reference Point ID : BM-21 Reference Point ID : BM-20
Equipment Name & Serial : Easting Northing ELEVATION Easting Northing ELEVATION
CALIBRATION DUE DATE: 1290.481 2315.596 N/A 1288.762 2251.445 N/A
Reference Storage tank
Item Description : Storage tank F-9026 stone column No SC-9026-52 JEDDAH-A1-DWG-CIV-004 Area :
Drawing: F-9026
DESIGN CO-ORDINATES ACTUAL CO-ORDINATES DIFFERENCE DESIGN ACTUAL DIFFERENCE
Point ID. Remarks
Easting Northing Easting Northing Easting Northing ELEVATION ELEVATION ELEVATION
SC-9026-52 1295.550 2269.990 1295.549 2269.989 0.001 0.001 N/A N/A

SURVEY(PETROJET) CONTRACTOR (PETROJET) QUALITY (PETROJET) PID Representative


NAME: M.RAMADAN NAME: MAHMOD A HAK NAME: M.KALEEMUDDIN NAME: Mr.MUHAMEED RASHID

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:

1/1