Liquid Penetrant Exam Report 2018

This document is a liquid penetrant examination report for a construction project in Jakarta. It summarizes the inspection of welds on galvanized material from six parts. The inspection found no discontinuities in any of the welds examined, which included circumferential and longitudinal welds, and the parts received an "ACC" or acceptable result. Photographs are included showing examples of the circumferential and longitudinal welds that were examined.

Uploaded by

Agung Prasetyoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
189 views5 pages

Liquid Penetrant Exam Report 2018

This document is a liquid penetrant examination report for a construction project in Jakarta. It summarizes the inspection of welds on galvanized material from six parts. The inspection found no discontinuities in any of the welds examined, which included circumferential and longitudinal welds, and the parts received an "ACC" or acceptable result. Photographs are included showing examples of the circumferential and longitudinal welds that were examined.

Uploaded by

Agung Prasetyoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

No.

PT : 037-CI/SMU/V/2018
Time Sheet No : -
LIQUID PENETRANT EXAMINATION REPORT
Job/Contract No. : Report No. : 037/V/18
Project : JKT NEW CONSTRUCTION PROJECT Ref. Drawing No. : DWG/CI-TI/045/18

Customer : PT. Sarana Utama Adimandiri Material Examined : Galvanis


Lighting Equipment : Philips 500 watt Ilumination Level : ≥1000 wat
Surface Equipment : As Welded Ground Flush Other ( )

Stage of Examination : After Welding After Excavation Other ( )
Welding Process : SMAW √ GTAW Other ( )
Scope of Examination : Base Material Weldment
√ Other ( )
Penetrant Type : Water Washable ( √ ) Application By
: Solvent Removable ( ) Brushing Spraying Other ( )
: Post Emulsifiable ( ) Dwell Time : ……………………10………………………….. Min
√ √
Penetrant : Flourescent Colors Contrast
Developer Type : Dry Developer Aqueous Dev. Non Aqueous Dev.

Developer Time : ……………………10………………………….. Min Procedure No. :
Cleaner Type : Application Code :
Welder
Part Identification Joint No. Length Examined Type of Result Remark
Code Discontinuity
BS 7 (WD-02) J 13 AGUS SW 3830 mm WD - ACC
AR 6 (WD-02) J 13 AGUS SW 3830 mm WD - ACC
AR 13 (WD-02) J 25 AGUS SW 1915 mm WD - ACC
AR 13 (WD-02) J 24 AGUS SW 3830 mm WD - ACC
BS 10 (WD-02) J 19 AGUS SW 3830 mm WD - ACC
BS 10 (WD-02) J 20 AGUS SW 3830 mm WD - ACC
- ACC

SKETCH

AR 6 AR 13
J 13 J 24 J 25

BS 10 BS 7
J 19 J 20 J 19 J 20

Examined by, Reviewed /Witnessed by Reviewed /Witnessed by Reviewed /Witnessed by


PENETRANT TEST PICTURE

CIRCUMFERENCE WELD - 1 (UPPER)


PENETRANT TEST PICTURE

PROJECT : JKT NEW CONSTRUCTION PROJECT


SERIAL NUMBER : 001
Tag Number :
DATE OF TEST -

CIRCUMFERENCE WELD - 2 (BOTTOM)


PENETRANT TEST PICTURE

PROJECT : JKT NEW CONSTRUCTION PROJECT


SERIAL NUMBER : 001
Tag Number :
DATE OF TEST

LONGITUDINAL WELD
PENETRANT TEST PICTURE

PROJECT : JKT NEW CONSTRUCTION PROJECT


SERIAL NUMBER : 002
Tag Number :
DATE OF TEST

CIRCUMFERENCE WELD - 1 (UPPER)