REF:WVIR-001 Rev000

NAWARA AND SOUTH TUNISIA GAS DEVELOPMENT


CENTRAL PROCESS FACILITY (CPF), FLOWLINES AND WELLPADS

WELDING VISUAL INSPECTION REPORT

Standard: ASME B31.3 Contractor: MSBI

Drawing No: NAWCPF-MSBI-PF01-000-ME-ISO-10606 Rev:000 Company: OMV

Line N°: NCO-3-ME-4652-01CA3S-0-N-WB Discipline : piping

Procedure N°: NAWCPF-MSBI-NCPF-000-QC-PRO-91548 Report N°: WVIR-ME-001

Fit-up inspection Date welding Visual inspection


Item No Isometric No Weld N° Sizes Welder ID Type of weld WPS N° Result completed Result Remarks

1 NCO-3-ME-4652-01CA3S-0-N-WB SP2248 F19 3" / 7,62mm W298 BW 01.1IP ACC 12/30/2017 ACC

10

11

12

13

14

15

SOCOMENIN WELDING SUPERVISOR SOCOMENIN QA/QC MSBI REPRESENTATIVE OMV REPRESENTATIVE

ZOUHAIR BEN MABROUK HERMASSI BILEL

12/30/2017 12/30/2017

PAGE 1/1
REF:WVIR-001 Rev000

REPLACEMENT OF 48” CRUDE OIL LINE TP-213302T

WELDING VISUAL INSPECTION REPORT


Standard: ASME B31.3 Contractor: VAOS

Drawing No: LD1-6-C2-6015 Rev:A Company: SOC

Line N°: 42''=A1-CR-06004 Discipline : Piping -Pump Station

Project N°: TP-213302T Report N°: WVIR-001

Item No Iso/Line No Weld N° Sizes Welder ID Type of weld WPS N° Fit-up inspection Date welding Visual inspection Remarks
Result completed Result

1 42''-A1-CR-06004 SW02 42" / STD W01 / W02 BW 005 ACC 5-Jun-21 ACC

2 42''-A1-CR-06004 SW03 42" / STD W01 / W02 BW 005 ACC 6-Jun-21 ACC

10

11

12

13

14

15

VAOS WELDING SUPERVISOR SOC- REPRESENTATIVE


Name Name

Sign Sign

Date Date
PAGE 1/1
REF:WVIR-001 Rev000

NAWARA AND SOUTH TUNISIA GAS DEVELOPMENT


CENTRAL PROCESS FACILITY (CPF), FLOWLINES AND WELLPADS

WELDING VISUAL INSPECTION REPORT

Standard: ASME B31.3 Contractor: MSBI

Drawing No: NAWCPF-MSBI-PF01-000-ME-ISO-10370 Rev:000a Company: OMV

Line N°: NCO-2-ME-4617-25CH3M-0-N-WB Discipline : piping

Procedure N°: NAWCPF-MSBI-NCPF-000-QC-PRO-91548 Report N°: WVIR-ME-003

Fit-up inspection Date welding Visual inspection


Item No Isometric No Weld N° Sizes Welder ID Type of weld WPS N° Result completed Result Remarks

1 SP2943 F18 2" / 11,07mm W298 BW 01.1IP ACC 1/5/2018 ACC


NCO-2-ME-4617-25CH3M-0-N-WB
2 SP2944 F19 2" / 11,07mm W298 BW 01.1IP ACC 1/5/2018 ACC

10

11

12

13

14

15

SOCOMENIN WELDING SUPERVISOR SOCOMENIN QA/QC MSBI REPRESENTATIVE OMV REPRESENTATIVE

ZOUHAIR BEN MABROUK NABIL MASMOUDI

1/5/2018 1/5/2018

PAGE 1/1