Shop Fabrication : Daily Report

RFSNo: SHELL-SOCM-RFS-179

RFS subject: Pre-SD activities-SSU Phase II Stage 2


Welds status Inspection & Contrôle Reporting
WP N° ITEM Profile Designation Type of weld % Progress
Fit up Welded VI MPI/DPI DI Repair VI MPI/DPI DI Repair % Progress
PT,DI & IV
B5-63/1 PL60*10 Ladder Bolted Connection NA OK NA NA 100% OK OK OK 100%
B5-63/2 L80*8 Ladder FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/3 TUBE-48.3*2.6 Safety Gate FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/4 L60*6 Safety Gate Bolted Connection NA OK NA NA
B5-63/5 TUBE-48.3*2.6 Safety Gate FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/6 TUBE-48.3*2.6 Safety Gate FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/7 PL5*100 Safety Gate FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/8 TUBE-48.3*2.6 Safety Gate FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/9 TUBE-48.3*2.6 Safety Gate FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/10 L80*8 Bridge Bolted Connection NA OK NA NA
B5-63/11 L80*8 Bridge Bolted Connection NA OK NA NA
B5-63/12 L80*8 Bridge Bolted Connection NA OK NA NA
B5-63/13 UPE300 Bridge FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/14 UPE300 Bridge FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/15 PL10*80 Bridge Bolted Connection NA OK NA NA OK OK OK
B5-63 B5-63/16 UPE300 Bridge FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/17 UPE300 Bridge FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/18 L80*8 Bridge FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/19 PL15*200 Bridge Bolted Connection NA OK NA NA
B5-63/20 PL15*100 Bridge Bolted Connection NA OK NA NA
B5-63/21 HEB140 Bridge FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/22 HEB140 Bridge FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/23 HEB140 Bridge FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/24 HEB140 Bridge FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/25 TUBE-48.3*2.6 Gate FW
B5-63/26 HEA160 Support FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/27 HEA160 Support FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/28 PL10*135 Support FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/29 HEA160 Support FW OK OK OK OK OK 100% OK OK OK 100%
B5-63/31 PL10*200 Support Bolted Connection NA OK NA NA
Date :05/12/2017

% Progress
Galvanized Remarks
Final

100%
100%
100%
MRB Checked With comments
100%
100%
100%
100%
100%

100%
100%

OK 100%
100%
100%

100%
100%
100%
100%
The item B5-63/25 was lost after the use of galvanization
100%
100%
100%
100%
Shop Fabrication : Daily Report Date :05

Project: BANKER HOSE SKID FOR MISKAR PLATFORM

Welds status Inspection & Contrôle Reporting


Weld Identification/ % Progress
Designation Type of weld % Progress Painting
Welder Fit up Welded VI UT MPI/DPI DI Repair VI UT MPI/DPI DI Repair % Progress Final
UT,PT,DI & IV
BW1/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW2/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW3/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW4/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW5/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW6/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW7/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW8/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW9/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW10/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW11/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW12/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW13/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW14/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW15/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW16/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW17/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW18/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW19/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW20/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW21/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BANKER
HOSE SKID
BW22/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% OK 50%
BW23/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW24/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW25/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
BW26/W BW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW1/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW2/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW3/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW4/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW5/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW6/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW7/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW8/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW9/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW10/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW11/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW12/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW13/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW14/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW15/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
FW16/W FW OK OK OK OK OK OK 100% OK NA OK OK 0% 50%
Date :05/12/2017

Remarks

MRB checked with comments

All fillet welds were inspected by MT inspection only the inaccessible fillets
welds was inspected by PT inspection.
Shop Fabrication : Daily Report

RFSNo: SHELL-SOCM-RFS-179

RFS subject: Pre-SD activities-SSU Phase II Stage 2


Welds status Inspection & Contrôle Reporting
WP N° ITEM Profile Designation Type of weld % Progress
Fit up Welded VI MPI/DPI DI Repair VI MPI/DPI DI Repair % Progress
PT,DI & IV
B5-55/1 PL70*10 Ladder NA NA NA OK NA OK 100% NA
B5-55/2 PL70*10 Ladder FW OK OK OK OK OK 100% OK
B5-55/3 PL70*10 Ladder FW OK OK OK OK OK 100% OK
B5-55/4 L60*6 Safety Gate BW OK OK OK OK OK 100% OK
B5-55/5 TUBE-48.3*2.6 Safety Gate BW/FW OK OK OK OK OK 100% OK
B5-55/6 TUBE-48.3*2.6 Safety Gate BW/FW OK OK OK OK OK 100% OK
B5-55/7 PL5*100 Safety Gate BW/FW OK OK OK OK OK 100% OK
B5-55/8 TUBE-48.3*2.6 Safety Gate BW/FW OK OK OK OK OK 100% OK
B5-55/9 PL5*100 Safety Gate BW/FW OK OK OK OK OK 100% OK
B5-55/10 PL10*90 Bridge NA NA NA OK NA OK 100% NA
B5-55/11 PL10*80 Bridge NA NA NA OK NA OK 100% NA
B5-55/13 TUBE-48.3*2.6 Gate BW OK OK OK OK 100%
B5-55/14 PL10*200 Support NA NA NA OK NA OK 100% NA
B5-55/15 PL10*100 Support NA NA NA OK NA OK 100% NA
B5-55/16 HEA200 Support FW OK OK OK OK OK 100% OK
B5-55/17 HEA200 Support FW OK OK OK OK OK 100% OK
B5-55/20 PL70*10 Ladder NA NA NA OK NA OK 100% NA
B5-55 B5-55/22 L60*6 Ladder NA NA NA OK NA OK 100% NA
B5-55/23 L60*6 Ladder NA NA NA OK NA OK 100% NA
B5-55/25 UPE220 Bridge FW OK OK OK OK OK 100% OK
B5-55/26 UPE220 Bridge FW OK OK OK OK OK 100% OK
B5-55/27 UPE220 Bridge FW OK OK OK OK OK 100% OK
B5-55/28 UPE220 Bridge FW OK OK OK OK OK 100% OK
B5-55/29 UPE220 Bridge FW OK OK OK OK OK 100% OK
B5-55/31 L80*8 Bridge NA NA NA OK NA OK 100% NA
B5-55/32 L80*8 Bridge FW OK OK OK OK OK 100% OK
B5-55/33 L80*8 Bridge FW OK OK OK OK OK 100% OK
B5-55/34 L80*8 Bridge FW OK OK OK OK OK 100% OK
B5-55/36 L80*8 Bridge FW OK OK OK OK OK 100% OK
B5-55/37 PL15*220 Bridge FW OK OK OK OK OK 100% OK
B5-55/38 PL15*220 Bridge FW OK OK OK OK OK 100% OK
B5-55/39 PL15*220 Bridge FW OK OK OK OK OK 100% OK
B5-55/40 PL15*220 Bridge FW OK OK OK OK OK 100% OK
B5-55/41 PL10*80 Bridge NA NA NA OK NA OK 100% NA
B5-55/43 HEB140 Bridge BW OK OK OK OK OK 100% OK
Date :05/12/2017

% Progress
Galvanized Remarks
Final

IN progress 10% of all welds for structure were perfpormed by PT


IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress
IN progress