You are on page 1of 131

Contractor Job Code 0-8494-20-0000

Contract No. 5360/B/2020

Employer Name Ministry of Oil, South Refineries Company

Contractor Name JGC Corporation

Basrah Refinery Upgrading Project Project Doc. No. VS215B-101-A-PLN-7001


Revision 05

Vendor Issue Purpose IFC

INSPECTION AND TEST PLAN

Review Result : A
Code: A Approved by : JGC-CMB Y.SASAKI

PO NUMBER 0‐8494‐2‐PS215B‐101‐A

VENDOR NAME THERMAX BABCOCK & WILCOX ENERGY SOLUTIONS LIMITED

VENDOR REFERENCE NO. ITP-PS011-001 R5

EQUIPMENT/SERVICE NAME Steam Boiler Package

ITEM/TAG NO. 30‐W‐001A/B/C

M S
J-04D
-Au g - 2 0 22
PRINT
ED 1 / 131
WHEN
LLED
NCONTRO
Project Doc. No.:

INSPECTION AND TEST PLAN


Basrah Refinery VS215B-101-A-PLN-7001
Upgrading Project

Rev. Date Description Prepared by Checked by Approved by


00 03-11-2021 IFA SVL SRC SRC
01 23-12-2021 IFA SVL SRC SRC
02 05-02-2022 IFC SVL SRC SRC
03 31-03-2022 IFC SVL SRC SRC
04 24-06-2022 IFC SVL SRC SRC
05 12-07-2022 IFC SVL SRC SRC

M S
J-04D
-Au g - 2 0 22
PRINT
ED 2 / 131
WHEN
LLED
NCONTRO
INDEX FOR NON PRESSURE PARTS

Sr. No ITP Description

1 BOILER DRUMS (STEAM DRUM AND WATER DRUM)

2 BOILER FURNACE FRONT AND REAR WALL PANEL ( PANEL WITH HEADER)

3 BOILER SIDE/BAFFLE/FURNACE SIDE/REAR WALLWITHOUT HEADER

4 BOILER TUBES

5 FINNED ECONOMISER ASSEMBLY

6 RISERS,DOWN COMERS,SUPPLY TUBES/PIPES

7 COILS ( Superheater)

8 HEADERS

9 SUPERHEATER ASSEMBLY

10 BOILER BLOCK ASSEMBLY

11 DISHED ENDS FOR BOILER DRUMS

12 BOILER EXTERNAL PIPING ( ASME Sec I & ASME B 31.1)

13 NON BOILER EXTERNAL PIPING ( ASME B31.3)

M S
J-04D
-Au g - 2 0 22
PRINT
ED 3 / 131
WHEN
LLED
NCONTRO
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

1.00 PRE INSPECTION MEETING
RS215B‐101_00 Requisition for  RS215B‐101_00 Requisition for 
1.01 Conduct Pre Inspection Meeting 100% PIM‐MOM H H W OR
Steam Boiler Package Steam Boiler Package
ASME Sec.I, Material Requisition ASME Sec.I, Material Requisition
SS‐000‐15200‐0101 to SS‐000‐15200‐0101 to
SS‐000‐15200‐0110, SS‐000‐15200‐0110,
SS‐000‐13A00‐0001, SS‐000‐13A00‐0001,
SS‐000‐13A00‐0002, SS‐000‐13A00‐0002,
Review of Boiler Data Sheet, PWHT  SS‐000‐135B1‐0001 SS‐000‐135B1‐0001
Procedure, WPS/PQR, Welder List, Hydrotest  VS215B‐101‐A‐PLN‐7302, VS215B‐101‐A‐PLN‐7302,
procedure, PMI Procedure, NDE procedure,  VS215B‐101‐A‐PLN‐7101, VS215B‐101‐A‐PLN‐7101,
1.02 100% Procedures H H ‐ ‐
Hardness Test Procedure,Painting Procedure,  VS215B‐101‐A‐PLN‐7103, VS215B‐101‐A‐PLN‐7103,
Boiler Preservation & Handling Procedure,  VS215B‐101‐A‐PLN‐7401, VS215B‐101‐A‐PLN‐7401,
Air Leak test procedure VS215B‐101‐A‐PLN‐7303, VS215B‐101‐A‐PLN‐7303,
VS215B‐101‐A‐PLN‐7202, VS215B‐101‐A‐PLN‐7202,
VS215B‐101‐A‐PLN‐7304, VS215B‐101‐A‐PLN‐7304,
VS215B‐101‐A‐PLN‐7501, VS215B‐101‐A‐PLN‐7501,
VS215B‐101‐A‐PLN‐7420, VS215B‐101‐A‐PLN‐7420,
VS215B‐101‐A‐PLN‐7417 VS215B‐101‐A‐PLN‐7417
2.00 BOILER DRUMS (STEAM DRUM AND WATER DRUM) LOCATION‐ At TBWES Shop Pune / Savli
ASME Section IX, ASME Section IX,
Review of Welding Procedure Specification 
2.00 A SS‐000‐15200‐0106, SS‐000‐15200‐0106, 100% Procedures H R/W(*) ‐ OR (*) W for New Qualification
(WPS) & Procedure Qualifcation Record(PQR)
VS215B‐101‐A‐PLN‐7101 VS215B‐101‐A‐PLN‐7101
ASME Section IX, ASME Section IX, Procedures/
2.00 B Review of Welder Qualification Records 100% H R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Records
ASME Sec V , ASME Sec I ASME Sec V , ASME Sec I
Procedures/
2.00 C Review of NDT Personnel and Procedures VS215B‐101‐A‐PLN‐7201, VS215B‐101‐A‐PLN‐7201, 100% H R ‐ OR
Records
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
Approved Drawing of Steam and Water  VS215B‐101‐A‐DGN‐0406, VS215B‐101‐A‐DGN‐0406,
2.00 D 100% Drawings H R ‐ OR
Drum  VS215B‐101‐A‐DGN‐0407 VS215B‐101‐A‐DGN‐0407
2.01 MATERIAL IDENTIFICATION
Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl. 
Review & Verification of MTC w.r.t. Drg.BOM  (*) Refer HSS‐000‐13560‐0001  as 
2.02 000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H R/W(*) ‐ OR
& Matl specs applicable ‐ To ensure traceability 
SS‐000‐15200‐0102 SS‐000‐15200‐0102
Dimensional inspection, Verification of UT  of Sampling Test Piece(s), the 
Drawing, ASME 100% (Per 
2.03 testing on Plate, Verification of Transfer Heat  ASME Sec.II, Drawing, Specification MTC H R ‐ OR location of samples shall be 
Sec‐II,Matl. Specs. heat or lot)
number  selected by Contractors Inspector 
MTC,Drawing,Code ASME Sec.II, Drawing, Specification for Plate,Forging,Pipe fittings, Bolt‐
2.04 Correlation of MTC with Material 100% MTC H R ‐ OR Nut, Welding Consumables
VS215B‐101‐A‐PLN‐7301 VS215B‐101‐A‐PLN‐7301
Document review for Dished Ends & 
2.05 MTC,Drawing,Code ASME Sec.II, Drawing, Specification 100% MTC H R ‐ OR
Manhole Rims
Material certification for pressure part and  Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl. 
2.06 attachment to pressure parts as per EN  000‐15200‐0101, Specs.SS‐000‐15200‐0101 100% MTC H R ‐ OR
10204‐3.1 SS‐000‐15200‐0102 ,SS‐000‐15200‐0102
PMI Procedure, PMI Procedure,
2.07
D M S
PMI of Base Metal as applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103 100% PMI report H R R OR

2.10 -
J Aug 22
04-
- 2 0
SETUP OF L‐SEAMS OF SHELL ALONGWITH TEST COUPON
D
VS215B‐101‐A‐PLN‐7303 VS215B‐101‐A‐PLN‐7303

4 / 131
RINTE
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
ASME Sec.I, Drawing, One 
2.11 Verify Production Test Coupon with L‐Seam Drawing 100% Setup Report H R R OR
PTC/Drum
ASME Sec.I, Drawing, Ovality is 1% 
Measurement of ovality, shell length,  of Nominal ID or 5mm max., offset 
2.12 Drawing,ASME Sec.I, 100% Setup Report H R R OR
circumference, offset/mismatch is 10%of Nominal plate thickness or 
3mm max
Drawing, ASME Sec.I, MT 
2.13 Surface Inspection of Welding edges MT Procedure 100% NDE Report H S R OR
Procedure
MT/ PT  Procedure MT/ PT Procedure, ASME SEC I
2.14 Backgouging of L Seam 100% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
2.20 C‐SEAM SETUP
Drawing, ASME Sec.I, MT/PT 
MT/PT Procedure
2.21 Surface Inspection of Welding edges Procedure, 100% NDE Report H S R OR
VS215B‐101‐A‐PLN‐7202
VS215B‐101‐A‐PLN‐7202
ASME Sec.I, Drawing, offset is 10% 
Measurement of orientation, alignment and 
2.22 Drawing of Nominal plate thickness or 3mm  100% Setup Report H R R OR
offset/mismatch
max
MT/ PT  Procedure MT/ PT Procedure, ASME SEC I
2.23 Backgouging of C Seam 100% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
2.40 BUTT JOINT SETUPS OF NOZZLES/PIPES
Measurement of offset/mismatch and other 
2.41 Drawing ASME Sec.I, Drawing 10% Setup Report H R R OR
dimensions
Drawing, ASME Sec.I, 
MT / PT Procedure
2.42 Surface Inspection of Welding edges MT / PT Procedure 100% NDE Report H S R OR
VS215B‐101‐A‐PLN‐7202
VS215B‐101‐A‐PLN‐7202
2.50 SETUP OF NOZZLES, STUBS, MH RIM & OTHER BRANCH CONNECTIONS
2.51 Identification & Orientaion Drawing Drawing 100% Setup Report H R R IR
2.52 Alignment and squareness Drawing Drawing 100% Setup Report H S R IR
Drawing, ASME Sec.I, MT / PT 
MT / PT Procedure
2.54 PT/ MT AFTER CONNECTIONS OPENING  Procedure 100% NDE Report H S R OR
VS215B‐101‐A‐PLN‐7202
VS215B‐101‐A‐PLN‐7202
2.60 WELDING OF NOZZLES, STUBS, MH RIM & OTHER BRANCH CONNECTIONS
Measurement of Weld size and Visual  VT Procedure, Drawing VT Procedure, Drawing Inspection 
2.61 100% H R R OR
inspection of welding VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Report
Weld soundness for WELDING OF MANHOLE  UT Procedure, MT Procedure UT Procedure, MT Procedure Full penetration nozzle and 
2.62 100% NDE Report H R R OR manway welds shall be magnetic 
RIM WITH D'END VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
Full penetration set through nozzle welds &  UT Procedure UT Procedure particle examined at backchipped 
2.63 100% NDE Report H R R OR
Safety valve nozzle VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 surfaces as applicable, for 
MT Procedure MT Procedure inaccessible welds DPT shall be 
2.64 NDE of All Nozzle welds 100% NDE Report H IW R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 carry out 
Weld soundness for Nozzle to Flange butt  RT Procedure RT Procedure
2.65 100% NDE Report H R(*) R OR (*) Review of RT Films
welds VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
2.70 SETUP OF DISHED END TO SHELL
Drawing, ASME Sec.I, PT/MT 
PT/MT Procedure
2.71 Surface Inspection of Welding edges Procedure 100% NDE Report H S R OR
VS215B‐101‐A‐PLN‐7202
VS215B‐101‐A‐PLN‐7202
ASME Sec.I, Drawing, offset is 
2.72
D S
Measurement of orientation, alignment and 
M Drawing 10%of Nominal plate thickness or  100% Setup Report H R R IR

-
J Aug 22
offset/mismatch

04-
- 2 0
D
3mm max
5 / 131
RINTE
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
MT Procedure MT Procedure, ASME SEC I
2.73 Backgouging of C Seam 100% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
2.80 WELDING OF L‐SEAMS & C‐ SEAM OF SHELL, DISHED END TO SHELL
Measurement of Weld reinforcement and  Inspection 
2.81 VT Procedure, Drawing Drawing, Procedure VT 100% H IW R OR
Visual inspection of welding Report
RT Procedure, MT Procedure RT Procedure, MT Procedure IW for MT and (*) Review of RT 
2.82 Weld soundness for butt welds(RT & MT ) 100% NDE Report H IW/R(*) R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Films
2.90 CLEARANCE FOR PWHT

Overall major dimensions and visual 
VT Procedure, Drawing VT Procedure, Drawing Inspection 
2.91 inspections & Cleaning from inside and  100% H W R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Report
outside and compliance to drawing scope
Weld Visual Inspection, Verification of Flange 
Inspection 
2.92 major  dimension and flange face surface  VT Procedure, Drawing VT Procedure, Drawing 100% H W R OR
Report
visual inspection
Review of HT Chart & Testing reports(  Heat treatment procedure, ASME  Heat treatment 
2.93 Heat treatment procedure 100% H R R OR
including impact test as applicable) of PTC Sec.I chart

UT on Lifting Lug with Full Penetration Joint,  UT ,PT,MT Procedure UT Procedure


2.94 100% NDE Report H IW R OR
PT on root run and final weld of Lifting Lug VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202

MT after final weld surface of All attachment 
accessible Welds to drum (including lifting  MT Procedure MT Procedure,
2.95 100% NDE Report H IW R OR
lug)  and MT for  Removal of temporary  VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
attachement welds.
Pneumatic testing of RF pads at 10 Psi (If  Inspection 
2.96 Leak test Procedure Leak test Procedure 100% H IW R OR
Applicable) Report
PMI Procedure, PMI Procedure,
PMI for Alloy Verificaion of Accessible welds  SS‐000‐15200‐0103, SS‐000‐15200‐0103,
2.97 100% PMI report H IW R OR
& Parent Metal ‐ As Applicable VS215B‐101‐A‐PLN‐7303 VS215B‐101‐A‐PLN‐7303

3.00 PWHT 

Review Heat treatment cycle and Review  Heat treatment procedure      Heat treatment procedure      , Heat treatment 


3.01 100% H R R OR
Heat treatment chart VS215B‐101‐A‐PLN‐7302   VS215B‐101‐A‐PLN‐7302  chart
3.10 INSPECTION & NDE AFTER PWHT
Inspection 
3.11 Measurement of Major dimensions Drawing Drawing 100% H W R OR
Report
RT Procedure, RT Procedure,
RT of Accessible area of Lseam welds, C seam 
3.12 SS‐000‐135B1‐0001_01 SS‐000‐135B1‐0001_01 100% NDE Report H R R OR Review of RT Films
welds, Nozzle Butt Weld
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
MT of Accessible are of Lseam welds, Cseam  MT Procedure MT Procedure
3.13 100% NDE Report H IW R OR
welds, Nozzle Welds VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
MT Procedure MT Procedure
3.14 MT of All accessible T‐Joints 100% NDE Report H IW R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
MT of MH rim to D'end welds, accessible  MT Procedure MT Procedure

DM20S
3.15 100% NDE Report H IW R OR
area VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202

J-04-Aug-
22
RINTE
D 6 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
MT of All accessible attachment Welds 
MT Procedure MT Procedure
3.16 (including lifting lug) and Removal of  100% NDE Report H IW R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
temporary attachement welds
3.20 HYDROSTATIC TEST

Hydrotest will be recorded on 
Hydrotest procedure, Drawing,  Hydrotest procedure, Drawing, 
Hydro test , Review water quality Report and  Hydrotest  pressure chart recorder 
3.21 ASME Sec.I, ASME Sec.I,  100% H W W OR
Review Water temperature for Hydrotest Report ,Hydrostatic test pressure shall be 
 VS215B‐101‐A‐PLN‐7401 VS215B‐101‐A‐PLN‐7401
held for a minimum of one hour 
3.30 DRAINING & DRYING AFTER HYDRO TEST
Draining & Drying Procedure Draining & Drying Procedure,
3.31 Inspection of internal cleanliness / dryness 100% Report H R R OR
VS215B‐101‐A‐PLN‐7403 VS215B‐101‐A‐PLN‐7403
3.40 FINAL INSPECTION

Overall major dimensions and compliance to  Inspection  Photographs of every flange 


3.41 Drawing Drawing 100% H W R OR surface prior to the final closure is 
drawing scope Report
required. The photographs shall 
be clearly visible (not over 
exposed), identified and 
Inspection  incorporate with a measuring 
3.42 Drilling Inspection Drawing Drawing 100% H R R OR
Report scale to understand the width of 
flange face

3.50 PAINTING INSPECTION
Painting specification, Drawing,   Painting specification, Drawing,   Check qualification of 
Painting Procedure, Painting Procedure, personnel,Check paint color of 
3.51 Surface prepration  100% Painting Report H R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 temporary material
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501 (shipping jig etc.)
Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
Painting Procedure, Painting Procedure,
3.52 ,Salt contaminants / Conductivity test &  100% Painting Report H R R OR
SS‐000‐13A00‐0001, SS‐000‐13A00‐0001,
check for any steel imperfection,Surface Dust 
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501
Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
3.53 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
3.54 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,   (*) W for Visual Inspection ,DFT  
Inspection of finished coatings,Solvent 
3.55 Painting Procedure, Painting Procedure, Random Painting Report H W(*) R OR for finished paint.IW for WFT, 
Rub(MEK) test for inorganic zink,Adhesion 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 MEK and adhesion test 
test
Painting specification, Drawing,   Painting specification, Drawing,  
3.56 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
3.60 REFRACTORY APPLICATION ( IF APPLICABLE) ‐ Refer VS215B‐101‐A‐PLN‐7407

S
J-0 DM
Refer Separate ITP ‐NO 17 in non pressure 

-2022
parts and refer Refractory Application  R R R OR
-Aug
4Procedure D 7 / 131
RINTE
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

3.70 CLEARANCE FOR ASSEMBLY
Compilation of relevant documents ‐ 
ITPRS,IR's,MTR's, Material Heat chart, NCRs, 
Specification  Specification  Compilation of 
3.71 NDE Reports, HT Records, Drilling Insepction  100% R R R OR
SS‐000‐15200‐0104 SS‐000‐15200‐0104 document
reports, Refractory application  Inspection 
reports
3.80 SPARES ‐ If applicable 

3.81 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R OR


4.00 BOILER FURNACE FRONT AND REAR WALL PANEL ( PANEL WITH HEADER) LOCATION‐ At TBWES Shop Shirwal / Savli 
ASME Section IX, ASME Section IX,
Review of Welding Procedure Specification 
4.00 A SS‐000‐15200‐0106, SS‐000‐15200‐0106, 100% Procedures H R/W(*) ‐ OR (*) W for New Qualification
(WPS) & Procedure Qualifcation Record(PQR)
VS215B‐101‐A‐PLN‐7101 VS215B‐101‐A‐PLN‐7101
ASME Section IX, ASME Section IX, Procedures/
4.00 B Review of Welder Qualification Records 100% H R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Records
ASME Sec V , ASME Sec I ASME Sec V , ASME Sec I
Procedures/
4.00 C Review of NDT Personnel and Procedures VS215B‐101‐A‐PLN‐7201, VS215B‐101‐A‐PLN‐7201, 100% H R R OR
Records
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
Approved Drawing of Boiler Furnace Front  VS215B‐101‐A‐DGN‐0401, VS215B‐101‐A‐DGN‐0401,
4.00 D 100% Drawings H R ‐ OR
and Rear wall panel VS215B‐101‐A‐DGN‐0402 VS215B‐101‐A‐DGN‐0402
4.01 MATERIAL IDENTIFICATION
Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl. 
Review & Verification of MTC w.r.t. Drg.BOM 
4.02 000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H R/W(*) ‐ OR
& Matl specs
SS‐000‐15200‐0102 SS‐000‐15200‐0102
Dimensional inspection‐Verification of  Drawing, ASME
4.03 ASME Sec.II, Drawing, Specification 20% MTC H R ‐ OR
Transfer Heat number Sec‐II,Matl. Specs.
MTC,Drawing,Code MTC,Drawing,Code (*) Refer HSS‐000‐13560‐0001  as 
4.04 Correlation of MTC with Material 100% MTC H R ‐ OR
VS215B‐101‐A‐PLN‐7301 VS215B‐101‐A‐PLN‐7301 applicable ‐ To ensure traceability 
Material certification for pressure part and  Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl.  of Sampling Test Piece(s), the 
4.05 attachment to pressure parts as per EN  000‐15200‐0101, Specs.SS‐000‐15200‐0101 100% MTC H R ‐ OR location of samples shall be 
10204‐3.1 SS‐000‐15200‐0102 ,SS‐000‐15200‐0102 selected by Contracto~s Inspector 
PMI Procedure, PMI Procedure, for Plate,Forging,Pipe fittings, Bolt‐
4.06 PMI of Base Metal as applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103 100% PMI report H R R OR Nut, Welding Consumables
VS215B‐101‐A‐PLN‐7303 VS215B‐101‐A‐PLN‐7303
4.10 SETUP OF BUTT JOINTS
Review inspection report of bend tubes as  Inspection 
4.11 Drawing  Drawing Random  H R R OR
applicable Report
Inspection 
4.12 Orientation, alignment, setup dimensions Drawing Drawing 10% H R R IR
Report
4.20 WELDING OF BUTT WELD JOINTS
RT Procedure, Drawing, 
RT Procedure
4.21 Weld Soundness of butt welds ASME Sec.I 100% NDE Report H R R OR Review of RT Films
VS215B‐101‐A‐PLN‐7202
VS215B‐101‐A‐PLN‐7202
4.30 INSPECTION OF SWAGED TUBE ENDS ‐ IF APPLICABLE

DM20S
Procedure VT, PT/MT Procedure VT, PT/MT Inspection 
4.31 Inspection after swaging 5% H R R IR

J-04-Aug-
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Report
4.32 22
Dimensional Insp ‐Ovality, Thickness, 
Drawing Drawing 10%
Inspection 
H R R OR
Concentricity, Length
ED Report 8 / 131
RINT
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
Hardness 
4.33 Hardness after Normalising Hardness Procedure Hardness Procedure, 2% H R R OR
Report
PT/MT Examination on swaged parts after  Procedure PT/MT Procedure PT/MT Inspection 
4.34 100% H R R OR
Normalization VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Report
4.40 INSPECTION OF PANEL OPENING/LOOSE TUBES AFTER BENDING
Inspection 
4.41 Review of Bending inspection report Drawing Drawing 100% H R R OR
Report
Inspection 
4.42 Orientation, Dimensions Drawing Drawing 5% H R R IR
Report
4.50 SETUP OF PANEL TUBES TO HEADER/S
Inspection 
4.51 Orientation, Set up Dimensions Drawing Drawing 10% H R R IR
Report
4.60 WELDING OF PANEL TUBES TO HEADER/S
NDE after full welding of accessible weld  VT Procedure, MT Procedure,  VT Procedure, MT Procedure, 
4.61 100% NDE Report H R R OR
joints Drawing Drawing
4.70 CLEARANCE FOR PWHT OF PANEL TO HEADER JOINTS

Weld Visual Inspection, Flange  dimension  Inspection 
4.71 VT Procedure, Drawing VT Procedure, Drawing 100% H W R OR
and  face surface visual inspection Report
Review of Report of Swaged tubes as  Inspection 
4.72 Drawing Drawing 100% H R R OR
applicable Report
Inspection 
4.73 Overall Dimensions and visual inspection Drawing, VT Procedure Drawing, VT Procedure 100% H IW R OR
Report
PMI for Alloy Verificaion of Accessible welds  PMI Procedure, PMI Procedure,
4.74 100% PMI report H IW R OR
& Parent Metal‐ If applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103
(5% PT for 
Panel strip to Tube welding (Manual  PT Procedure PT Procedure, Drawing
4.75 manual   NDE Report H R R OR
Welding) VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
weld)
4.80 PWHT OF PANEL TO HEADER JOINTS IF APPLICABLE

Review Heat treatment cycle and Review  Heat treatment procedure Heat treatment procedure, Heat treatment 


4.81 100% H R R OR
Heat treatment chart VS215B‐101‐A‐PLN‐7302 VS215B‐101‐A‐PLN‐7302 chart
4.90 INSPECTION & NDE AFTER PWHT
Inspection 
4.91 Dimension inspection Drawing Drawing 100% H R R OR
Report
MT Procedure, Drawing, ASME 
MT Procedure
4.92 NDE of accesible Header fillet weld joints  Sec.I 100% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202
VS215B‐101‐A‐PLN‐7202
RT Procedure, RT Procedure, Drawing, ASME 
RT of Accessible Header Butt Weld Joint as 
4.93 SS‐000‐135B1‐0001 Sec.I,SS‐000‐135B1‐0001 100% NDE Report H R R OR
applicable
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
5.00 FINAL INSPECTION 

D M S
-
J04-Aug 22
- 2 0
D 9 / 131
RINTE
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

Photographs of every flange 
surface prior to the final closure is 
required. The photographs shall 
Compliance to Drawing for Scope and  Inspection  be clearly visible (not over 
5.01 Drawing Drawing 100% H IW R OR
Dimensions inspection Report exposed), identified and 
incorporate with a measuring 
scale to understand the width of 
flange face
5.10 PAINTING INSPECTION ‐ IF APPLICABLE

Painting specification, Drawing,   Painting specification, Drawing,   Check qualification of 


Painting Procedure, Painting Procedure, personnel,Check paint color of 
5.11 Surface prepration  100% Painting Report H R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 temporary material
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501 (shipping jig etc.)
Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
Painting Procedure, Painting Procedure,
5.12 ,Salt contaminants / Conductivity test &  100% Painting Report H R R OR
SS‐000‐13A00‐0001, SS‐000‐13A00‐0001,
check for any steel imperfection,Surface Dust 
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501
Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
5.13 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
5.14 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent 
5.15 Painting Procedure, Painting Procedure, Random Painting Report H R R OR
Rub(MEK) test for inorganic zink,Adhesion 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test
Painting specification, Drawing,   Painting specification, Drawing,  
5.16 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
5.20 CLEARANCE FOR ASSEMBLY
Compilation of relevant documents ‐ 
Specification  Specification  All Inspection 
5.21 ITPRS,IR's,MTR's, Material Heat chart, NCRs,  100% H R R OR
SS‐000‐15200‐0104 SS‐000‐15200‐0104 report
NDE Reports, HT Records
5.30 SPARES ‐ If applicable 

5.31 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R OR

6.00 BOILER SIDE/BAFFLE/FURNACE SIDE/REAR WALLWITHOUT HEADER LOCATION‐ At TBWES Shop Shirwal / Savli 


ASME Section IX, ASME Section IX,
Review of Welding Procedure Specification 
6.00 A SS‐000‐15200‐0106, SS‐000‐15200‐0106, 100% Procedures H R/W(*) ‐ OR (*) W for New Qualification
(WPS) & Procedure Qualifcation Record(PQR)
VS215B‐101‐A‐PLN‐7101 VS215B‐101‐A‐PLN‐7101
ASME Section IX, ASME Section IX, Procedures/
6.00 B Review of Welder Qualification Records 100% H R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Records

D M S ASME Sec V , ASME Sec I ASME Sec V , ASME Sec I
Procedures/

-
J Au
6.00 C Review of NDT Personnel and Procedures VS215B‐101‐A‐PLN‐7201, VS215B‐101‐A‐PLN‐7201, 100% H R R OR
- 2 0 2 2 Records
g VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
04- RINTE
D 10 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
VS215B‐101‐A‐DGN‐0401, VS215B‐101‐A‐DGN‐0401,
Approved Drawing of Boiler Furnace Front  
6.00 D VS215B‐101‐A‐DGN‐0402, VS215B‐101‐A‐DGN‐0402, 100% Drawings H R ‐ OR
Rear wall panel,Furnace side wall panel
VS215B‐101‐A‐DGN‐0403, VS215B‐101‐A‐DGN‐0403,
6.01 MATERIAL IDENTIFICATION
Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl. 
Review & Verification of MTC w.r.t. Drg.BOM  (*) Refer HSS‐000‐13560‐0001  as 
6.02 000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H R/W(*) R OR
& Matl specs applicable ‐ To ensure traceability 
SS‐000‐15200‐0102 SS‐000‐15200‐0102
of Sampling Test Piece(s), the 
Dimensional inspection‐Verification of  Drawing, ASME
6.03 ASME Sec.II, Drawing, Specification 20% MTC H R R OR location of samples shall be 
Transfer Heat number Sec‐II,Matl. Specs.
selected by Contracto~s Inspector 
for Plate,Forging,Pipe fittings, Bolt‐
MTC,Drawing,Code MTC,Drawing,Code
6.04 Correlation of MTC with Material 100% MTC H R R OR Nut, Welding Consumables
VS215B‐101‐A‐PLN‐7301 VS215B‐101‐A‐PLN‐7301
Material certification for pressure part and  Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl. 
6.05 attachment to pressure parts as per EN  000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H R R OR
10204‐3.1 SS‐000‐15200‐0102 SS‐000‐15200‐0102
PMI Procedure, PMI Procedure,
6.06 PMI of Base Metal as applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103 100% PMI report H R R OR
VS215B‐101‐A‐PLN‐7303 VS215B‐101‐A‐PLN‐7303
6.10 INSPECTION OD SWAGED TUBE ENDS
Procedure VT, PT/MT Procedure VT, PT/MT Inspection 
6.11 Inspection after swaging 5% H R R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Report
Dimensional Insp ‐Ovality, Thickness,  Inspection 
6.12 Drawing Drawing 10% H R R OR
Concentricity, Length Report
Hardness 
6.13 Hardness after Normalising Hardness Procdure Hardness Procdure 2% H R R OR
Report
PT/MT Examination on swaged parts after  Procedure PT/MT Procedure PT/MT Inspection 
6.14 100% H R R OR
Normalization VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Report
6.20 SETUP OF BUTT JOINTS
Review inspection report of bend tubes as  Inspection 
6.21 Drawing  Drawing Random  H R R OR
applicable Report
Inspection 
6.22 Orientation, alignment, setup dimensions Drawing Drawing 10% H R R OR
Report
6.30 WELDING OF BUTT WELD JOINTS

RT Procedure RT Procedure, Drawing, ASME Sec.I
6.31 Weld Soundness of butt welds 100% NDE Report H R R OR Review of RT Films
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
6.40 FINAL INSPECTION
VT Procedure, Drawing, ASME  Inspection 
6.41 Weld Visual Inspection VT Procedure, Drawing, 100% H IW R OR
Section V Report
Compliance to Drawing for Scope and  Inspection 
6.42 Drawing Drawing 100% H IW R OR
Dimensions inspection Report
6.50 PAINTING INSPECTION ‐ IF APPLICABLE
Painting specification, Drawing,   Painting specification, Drawing,   Check qualification of 
Painting Procedure, Painting Procedure, personnel,Check paint color of 
6.51 Surface prepration  100% Painting Report H R R OR

S
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 temporary material

- D M
J04-Aug 22
- 2 0
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501 (shipping jig etc.)

RINTE
D 11 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
Painting Procedure, Painting Procedure,
6.52 ,Salt contaminants / Conductivity test &  100% Painting Report H R R OR
SS‐000‐13A00‐0001, SS‐000‐13A00‐0001,
check for any steel imperfection,Surface Dust 
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501
Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
6.53 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
6.54 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent 
6.55 Painting Procedure, Painting Procedure, Random Painting Report H R R OR
Rub(MEK) test for inorganic zink,Adhesion 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test
Painting specification, Drawing,   Painting specification, Drawing,  
6.56 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
6.70 CLEARANCE FOR ASSEMBLY
Compilation of relevant documents ‐ 
Specification  Specification  All Inspection 
6.71 ITPRS,IR's,MTR's, Material Heat chart, NCRs,  100% H R R OR
SS‐000‐15200‐0104 SS‐000‐15200‐0104 report
NDE Reports, HT Records
6.80 SPARES ‐ If applicable 

6.81 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R OR


7.00 BOILER TUBES LOCATION‐ At TBWES Shop Pune / Savli 
ASME Section IX, ASME Section IX,
Review of Welding Procedure Specification 
7.00 A SS‐000‐15200‐0106, SS‐000‐15200‐0106, 100% Procedures H R/W(*) ‐ OR (*) W for New Qualification
(WPS) & Procedure Qualifcation Record(PQR)
VS215B‐101‐A‐PLN‐7101 VS215B‐101‐A‐PLN‐7101
ASME Section IX, ASME Section IX, Procedures/
7.00 B Review of Welder Qualification Records 100% H R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Records
ASME Sec V , ASME Sec I ASME Sec V , ASME Sec I
Procedures/
7.00 C Review of NDT Personnel and Procedures VS215B‐101‐A‐PLN‐7201, VS215B‐101‐A‐PLN‐7201, 100% H R R OR
Records
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
Approved Drawing of Bank tube,Boiler  VS215B‐101‐A‐DGN‐0404, VS215B‐101‐A‐DGN‐0404,
7.00 D 100% Drawings H R ‐ OR
screen tube VS215B‐101‐A‐DGN‐0405 VS215B‐101‐A‐DGN‐0405
7.01 MATERIAL IDENTIFICATION
Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl.  (*) Refer HSS‐000‐13560‐0001  as 
Review & Verification of MTC w.r.t. Drg.BOM  applicable ‐ To ensure traceability 
7.02 000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H R/W(*) ‐ OR
& Matl specs of Sampling Test Piece(s), the 
SS‐000‐15200‐0102 SS‐000‐15200‐0102
Dimensional inspection‐Verification of  Drawing, ASME location of samples shall be 
7.03 ASME Sec.II, Drawing, Specification 20% MTC H R ‐ OR
Transfer Heat number Sec‐II,Matl. Specs. selected by Contractors Inspector 
MTC,Drawing,Code MTC,Drawing,Code for Plate,Forging,Pipe fittings, Bolt‐
7.04 Correlation of MTC with Material 100% MTC H R ‐ OR
VS215B‐101‐A‐PLN‐7301 VS215B‐101‐A‐PLN‐7301 Nut, Welding Consumables
Material certification for pressure part and  Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl. 
7.05 attachment tp pressure parts as per EN  000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H R ‐ OR

S
10204‐3.1 SS‐000‐15200‐0102 SS‐000‐15200‐0102

J-0 DM
PMI Procedure, PMI Procedure,

-2022
7.06 PMI of Base Metal as applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103 100% PMI report H R R OR
A u g
4- D
RINTE
VS215B‐101‐A‐PLN‐7303 VS215B‐101‐A‐PLN‐7303
12 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

7.10 INSPECTION OF SWAGED TUBE ENDS
Procedure VT, PT/MT Procedure VT, PT/MT Inspection 
7.11 Inspection after swaging 5% H R R IR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Report
Dimensional Insp ‐Ovality, Thickness,  Inspection 
7.12 Drawing Drawing 10% H R R OR
Concentricity, Length‐10% Report
Hardness
7.13 Hardness after Normalising‐2% Hardness Procdure Hardness Procdure 2% H R R OR
Report
PT/MT Examination on swaged parts after  Procedure PT/MT Procedure PT/MT Inspection 
7.14 100% H R R OR
Normalization VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Report
7.20 TUBE BENDING ‐ INPROCESS/FINAL INSPECTION
Inspection 
7.21 Review of sample bend inspection report Drawing Drawing 100% H R R OR
Report
Inspection 
7.22 Dimensions, Ovality, Thinning Drawing Drawing 5% H R R OR
Report
7.30 SETUP OF BUTT JOINTS
Review inspection report of bend tubes as  Inspection 
7.31 Drawing  Drawing 100% H R R OR
applicable‐Random  Report
Inspection 
7.32 Orientation, alignment, setup dimensions Drawing Drawing 10% H R R OR
Report
7.40 WELDING OF BUTT WELD JOINTS
Drg./ 
RT Procedure RT Procedure, Drawing, ASME Sec.I
7.41 Weld Soundness of butt welds Minumum  NDE Report H R R OR Review of RT Films
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
5%
7.50 FINAL INSPECTION
Inspection 
7.51 Weld Visual Inspection VT Procedure, Drawing VT Procedure, Drawing 100% H IW R OR
Report
Compliance to Drawing for Scope and  Inspection 
7.52 Drawing Drawing 100% H IW R OR
Dimensions inspection Report
7.60 PAINTING INSPECTION ‐ IF APPLICABLE
Painting specification, Drawing,   Painting specification, Drawing,   Check qualification of 
Painting Procedure, Painting Procedure, personnel,Check paint color of 
7.61 Surface prepration  100% Painting Report H R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 temporary material
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501 (shipping jig etc.)
Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
Painting Procedure, Painting Procedure,
7.62 , Salt contaminants / Conductivity test &  100% Painting Report H R R OR
SS‐000‐13A00‐0001, SS‐000‐13A00‐0001,
check for any steel imperfection,Surface Dust 
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501
Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
7.63 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
7.64 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent 
7.65 Painting Procedure, Painting Procedure, Random Painting Report H R R OR
Rub(MEK) test for inorganic zink,Adhesion 

S
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

J-DM
test
Painting specification, Drawing,   Painting specification, Drawing,  
22
7.66 ug-20
Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
04-A P R IN TED SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 13 / 131
N HE
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

7.70 Clearance for Assembly
Compilation of relevant documents ‐ 
Specification  Specification  All Inspection 
7.71 ITPRS,IR's,MTR's, Material Heat chart, NCRs,  100% H R R OR
SS‐000‐15200‐0104 SS‐000‐15200‐0104 report
NDE Reports, HT Records
7.80 SPARES ‐ If applicable 

7.81 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R OR


8.00 FINNED ECONOMISER ASSEMBLY LOCATION‐ At TBWES Shop Shirwal / Savli 
Review of Welding Procedure Specification  ASME Section IX, ASME Section IX,
8.00 A 100% Procedures H R/W(*) ‐ OR (*) W for New Qualification
(WPS) & Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106 SS‐000‐15200‐0106
ASME Section IX, ASME Section IX, Procedures/
8.00 B Review of Welder Qualification Records 100% H R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Records
ASME Sec V , ASME Sec I ASME Sec V , ASME Sec I
Procedures/
8.00 C Review of NDT Personnel and Procedures VS215B‐101‐A‐PLN‐7201, VS215B‐101‐A‐PLN‐7201, 100% H R R OR
Records
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
8.00 D Approved Drawing of Economiser VS215B‐101‐A‐DGN‐0408 VS215B‐101‐A‐DGN‐0408 100% Drawings H R ‐ OR
8.01 MATERIAL IDENTIFICATION
Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl.  (*) Refer HSS‐000‐13560‐0001  as 
Review & Verification of MTC w.r.t. Drg.BOM 
8.02 000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H R/W(*) ‐ OR applicable ‐ To ensure traceability 
& Matl specs
SS‐000‐15200‐0102 SS‐000‐15200‐0102 of Sampling Test Piece(s), the 
Dimensional inspection‐Verification of  Drawing, ASME location of samples shall be 
8.03 ASME Sec.II, Drawing, Specification 20% MTC H R ‐ OR
Transfer Heat number Sec‐II,Matl. Specs. selected by Contracto~s Inspector 
for Plate,Forging,Pipe feetings, 
MTC,Drawing,Code MTC,Drawing,Code
8.04 Correlation of MTC with Material 100% MTC H R ‐ OR Bolt‐Nut, Welding Consumables
VS215B‐101‐A‐PLN‐7301 VS215B‐101‐A‐PLN‐7301
Material certification for pressure part and 
MTC,SS‐000‐15200‐0101,
8.05 attachment to pressure parts as per EN  ASME Sec.II, Drawing, Specification 100% MTC H R ‐ OR
SS‐000‐15200‐0102
10204‐3.1
PMI Procedure, PMI Procedure,
8.06 PMI of Base Metal as applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103 100% PMI report H R R OR
VS215B‐101‐A‐PLN‐7303 VS215B‐101‐A‐PLN‐7303
8.10 SETUP OF TUBE BENDS TO FIN TUBES
Inspection 
8.11 Review of sample bend inspection report Drawing Drawing 100% H R R OR
Report
Inspection 
8.12 Dimensions Drawing Drawing 5% H R R OR
Report
8.20 WELDING OF BUTT WELD JOINTS
Inspection 
8.21 Visual inspection after welding  Drawing,  Drawing, ASME Section V 100% H R R OR
Report
RT Procedure RT Procedure, Drawing, ASME Sec.I
8.21a Weld Soundness of butt welds 100% NDE Report H R R OR Review of RT Films
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
8.30 ALIGNMENT OF HEADERS ON STRUCTURE
Inspection 

DM20S
8.31 Identification & Orientaion Drawing Drawing 100% H R R OR
Report
8.32
J-04-Aug-
22
Alignment, Dimensions
RINTED
Drawing Drawing 100%
Inspection 
Report
H R R OR
14 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

8.40 SETUP OF HEADER STUB TO COILS
Inspection 
8.41 Dimensions‐5% Drawing Drawing 5% H R R OR
Report
8.50 WELDING OF BUTT WELD JOINTS
Inspection 
8.51 Visual inspection after welding   Drawing, ASME Section V  Drawing, ASME Section V 100% H W R OR
Report
RT Procedure RT Procedure, Drawing, ASME 
8.52 Weld Soundness of butt welds 100% NDE Report H R(*) R OR (*) Review of RT Films
VS215B‐101‐A‐PLN‐7202 Sec.I,VS215B‐101‐A‐PLN‐7202
8.60 HYDROSTATIC TEST
Hydrotest will be recorded on 
Hydrotest procedure, Drawing,  Hydrotest procedure, Drawing, 
Hydro test , Review water quality Report and  Hydrotest  pressure chart recorder 
8.61 ASME Sec.I. ASME Sec.I, 100% H W W OR
Review Water temperature for Hydrotest Report ,Hydrostatic test pressure shall be 
VS215B‐101‐A‐PLN‐7401 VS215B‐101‐A‐PLN‐7401
held for a minimum of one hour 
8.70 DRAINING & DRYING AFTER HYDRO TEST
Draining & Drying Procedure Draining & Drying Procedure,
8.71 Inspection of internal cleanliness / dryness SS‐000‐13A00‐0002, SS‐000‐13A00‐0002, 100% Report H R R OR
VS215B‐101‐A‐PLN‐7403 VS215B‐101‐A‐PLN‐7403
8.80 FITMENT OF CASING & OTHER ATTACHMENTS
Inspection 
8.81 Identification & Orientation Drawing Drawing 100% H IW R IR
Report
Overall Assembly inspection, Weld  VT Procedure, Drawing, ASME  Inspection 
8.81 VT Procedure 100% H IW R IR
inspection Section V Report
8.90 AIR LEAK TEST
Drawing, Leak test procedure, Drawing, Leak test procedure, Leak test 
8.91 Sealing of Eco.Casing by Air Test 100% H W R OR
VS215B‐101‐A‐PLN‐7407 VS215B‐101‐A‐PLN‐7407 Report
9.00 FINAL INSPECTION

Compliance to Drawing for Scope and  Inspection 
9.01 Drawing Drawing 100% H W R OR
Dimensions inspection,Visual Inspection  Report
9.10 PAINTING INSPECTION

Painting specification, Drawing,   Painting specification, Drawing,   Check qualification of 


Painting Procedure, Painting Procedure, personnel,Check paint color of 
9.11 Surface prepration  100% Painting Report H R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 temporary material
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501 (shipping jig etc.)
Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
Painting Procedure, Painting Procedure,
9.12 , Salt contaminants / Conductivity test &  100% Painting Report H R R OR
SS‐000‐13A00‐0001, SS‐000‐13A00‐0001,
check for any steel imperfection,Surface Dust 
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501
Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
9.13 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
9.14 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R OR

S
‐ Atmospheric Condition 

M
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

- D
J04-Aug 22
- 2 0
D 15 / 131
RINTE
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  (*) W for Visual Inspection ,DFT  
9.15 Painting Procedure, Painting Procedure, Random Painting Report H W(*) R OR
Rub(MEK) test for inorganic zink,Adhesion  for finished paint.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test
Painting specification, Drawing,   Painting specification, Drawing,  
9.16 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
9.20 SPARES ‐ If applicable 
9.21 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R OR

9.31 PACKING/MARKING ‐ REFER  VS215B‐101‐A‐PLN‐7503 & VS215B‐101‐A‐PLN‐7503                                                                                                                                     

Drawing, Specification, Drawing, Specification,
9.31 Rust prevention check 100% H IW R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
9.32 Shipping preparation inspection 100% H IW R IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,
9.33 100% H IW R IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
9.34 Check of cleanliness and dryness 100% H IW R IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification, Inspection 
9.35 100% reports,  H IW R IR Inspection reports, Packing list
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list
Drawing, Specification, Drawing, Specification,
9.36 Check of marking for site installation 100% H IW R IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
9.37 100% H IW R OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
9.38 100% H IW R IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
9.39 Final inspection on all items ( as applicable ) 100% H IW W OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

10.10 INSPECTION RELEASE CERTIFICATE

Drawing, Specification Drawing, Specification
10.11 Final Document Review and Issue of IRC 100% IRC H H R OR IRC
 SS‐000‐15200‐0101  SS‐000‐15200‐0101

10.20 Pre shipping inspection

Approved documents / Project  Approved documents / Project 
10.21 Visual Inspection 100% Verification H H ‐ IR ‐
specification specification
Approved documents / Project  Approved documents / Project 
10.22 Check of Nameplate/Shipping Mark 100% Verification H H ‐ IR ‐
specification specification

D M S Approved documents / Project  Approved documents / Project 

-
10.23 Check of Invoice/Packing List 100% Verification H H ‐ IR Packing list
J Aug 22
-
- 2 0
10.00 04RISERS,DOWN COMERS,SUPPLY PIPES
RINTE
D
specification specification

LOCATION‐ At TBWES Shop Savli  16 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

ASME Section IX, ASME Section IX,
Review of Welding Procedure Specification 
10.00 A SS‐000‐15200‐0106, SS‐000‐15200‐0106, 100% Procedures H R/W(*) ‐ OR (*) W for New Qualification
(WPS) & Procedure Qualifcation Record(PQR)
VS215B‐101‐A‐PLN‐7101 VS215B‐101‐A‐PLN‐7101
ASME Section IX, ASME Section IX, Procedures/
10.00 B Review of Welder Qualification Records 100% H R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Records
ASME Sec V , ASME Sec I ASME Sec V , ASME Sec I
Procedures/
10.00 C Review of NDT Personnel and Procedures VS215B‐101‐A‐PLN‐7201, VS215B‐101‐A‐PLN‐7201, 100% H R R OR
Records
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
VS215B‐101‐A‐DGN‐0409, VS215B‐101‐A‐DGN‐0409,
10.00 D Approved Drawing of Riser, Downcomers 100% Drawings H R OR
VS215B‐101‐A‐DGN‐0412 VS215B‐101‐A‐DGN‐0412
10.01 MATERIAL IDENTIFICATION
Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl. 
Review & Verification of MTC w.r.t. Drg.BOM  (*) Refer HSS‐000‐13560‐0001  as 
10.02 000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H W ‐ OR
& Matl specs applicable ‐ To ensure traceability 
SS‐000‐15200‐0102 SS‐000‐15200‐0102
of Sampling Test Piece(s), the 
Dimensional inspection‐Verification of  Drawing, ASME
10.03 ASME Sec.II, Drawing, Specification 20% MTC H W ‐ OR location of samples shall be 
Transfer Heat number Sec‐II,Matl. Specs.
selected by Contractors Inspector 
MTC,Drawing,Code, MTC,Drawing,Code, for Plate,Forging,Pipe feetings, 
10.04 Correlation of MTC with Material 100% MTC H W ‐ OR Bolt‐Nut, Welding Consumables
VS215B‐101‐A‐PLN‐7301 VS215B‐101‐A‐PLN‐7301
Material certification for pressure part and 
MTC,SS‐000‐15200‐0101,
10.05 attachment to pressure parts as per EN  ASME Sec.II, Drawing, Specification 100% MTC H W ‐ OR
SS‐000‐15200‐0102
10204‐3.1
PMI Procedure, PMI Procedure,
10.06 PMI of Base Metal as applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103 100% PMI report H W R OR
VS215B‐101‐A‐PLN‐7303 VS215B‐101‐A‐PLN‐7303
10.10 INSPECTION OF TUBES/PIPES AFTER BENDING
Inspection 
10.11 Review of Sample bend inspection report Drawing Drawing 100% H R R OR
Report
Ovality within 10%, Dimensions on  Inspection 
10.12 Dimensions, Ovality, Thinning Drawing 5% H SW R OR
layout within 3mm Report
10.20 SETUP OF BUTT JOINTS

Review inspection report of bend tubes as  Inspection 
10.21 Drawing  Drawing 100% H R R OR
applicable‐Random  Report
Orientation, alignment, setup dimensions‐ Inspection 
10.22 Drawing Drawing 10% H SW R OR
10% Report
10.30 WELDING OF BUTT WELD JOINTS
Inspection 
10.31 Visual inspection after welding  Drawing  Drawing,ASME Section V 100% H IW R OR
Report
RT Procedure RT Procedure, Drawing, ASME 
10.32 Weld Soundness of butt welds 100% NDE Report H R R OR Review of RT films
VS215B‐101‐A‐PLN‐7202 Sec.I,VS215B‐101‐A‐PLN‐7202
10.40 SETUP OF BRANCH/FILLET WELD JOINTS
Inspection 
10.41 Setup Dimensions, Alignment, Squareness Drawing Drawing 100% H SW R IR
Report
10.50
D M S
WELDING INSPECTION FOR BRANCH/FILLET WELD JOINTS

10.51 -
J04-Aug 22
- 2 0
Visual inspection after welding 
D
Drawing  Drawing,ASME Section V 100%
Inspection 
Report
H SW R OR
17 / 131
RINTE
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
PT/MT Procedure, Drawing,  PT/MT Procedure, Drawing,  Inspection 
10.52  NDE of accessible welds 100% H SW R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Report
10.60 PWHT (AS APPLICABLE)

Review Heat treatment cycle and review  Heat treatment procedure Heat treatment procedure, Heat treatment 


10.61 100% H R R OR
Heat treatment chart VS215B‐101‐A‐PLN‐7302 VS215B‐101‐A‐PLN‐7302 chart
10.70 INSPECTION & NDE AFTER PWHT
Inspection 
10.71 Dimensions inspection Drawing Drawing 100% H W R OR
Report
RT Procedure, RT Procedure, Drawing, ASME 
10.72 Weld Soundness of accessible butt welds SS‐000‐135B1‐0001 Sec.I,SS‐000‐135B1‐0001 100% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
10.80 FINAL INSPECTION

Compliance to Drawing for Scope and  Inspection 
10.81 Drawing Drawing 100% H SW R OR
Dimensions inspection Report

10.90 PAINTING INSPECTION

Painting specification, Drawing,   Painting specification, Drawing,   Check qualification of 


Painting Procedure, Painting Procedure, personnel,Check paint color of 
10.91 Surface prepration  100% Painting Report H W R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 temporary material
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501 (shipping jig etc.)
Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
Painting Procedure, Painting Procedure,
10.92 ,Salt contaminants / Conductivity test &  100% Painting Report H W R OR
SS‐000‐13A00‐0001, SS‐000‐13A00‐0001,
check for any steel imperfection,Surface Dust 
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501
Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
10.93 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H W R OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
10.94 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H W R OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
The visual shall be checked again 
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,   at TBWES Mundra.
Inspection of finished coatings,Solvent 
10.95 Painting Procedure, Painting Procedure, Random Painting Report H W(*) R OR '(*) W for Visual Inspection ,DFT  
Rub(MEK) test for inorganic zink,Adhesion 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 for finished paint.IW for WFT, 
test
MEK and adhesion test 
Painting specification, Drawing,   Painting specification, Drawing,  
10.96 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H W R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
11.00 Clearance for Assembly

Compilation of relevant documents ‐ 
All Inspection 
11.01 ITPRS,IR's,MTR's, Material Heat chart, NCRs,  Specification Specification 100% H H R OR
report
NDE Reports, HT Records

D M S
-
SPARES ‐ If applicable 
J04-Aug 22
11.02
- 2 0
RINTE
D 18 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

11.03 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H SW R OR

12.00 COILS ( Superheater) LOCATION‐ At TBWES Shop Shirwal / Savli 

Review of Welding Procedure Specification  ASME Section IX, ASME Section IX,


12.00 A 100% Procedures H R/W(*) ‐ OR (*) W for New Qualification
(WPS) & Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106 SS‐000‐15200‐0106

ASME Section IX, ASME Section IX, Procedures/


12.00 B Review of Welder Qualification Records 100% H R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Records

ASME Sec V , ASME Sec I ASME Sec V , ASME Sec I
Procedures/
12.00 C Review of NDT Personnel and Procedures VS215B‐101‐A‐PLN‐7201, VS215B‐101‐A‐PLN‐7201, 100% H R R OR
Records
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202

12.00 D Approved Drawing of Superheater VS215B‐101‐A‐DGN‐0410 VS215B‐101‐A‐DGN‐0410 100% Drawings H R ‐ OR

12.01 MATERIAL IDENTIFICATION
Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl.  (*) Refer HSS‐000‐13560‐0001  as 
Review & Verification of MTC w.r.t. Drg.BOM 
12.02 000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H R/W(*) ‐ OR applicable ‐ To ensure traceability 
& Matl specs
SS‐000‐15200‐0102 SS‐000‐15200‐0102 of Sampling Test Piece(s), the 
Dimensional inspection‐Verification of  Drawing, ASME location of samples shall be 
12.03 ASME Sec.II, Drawing, Specification 20% MTC H R ‐ OR
Transfer Heat number Sec‐II,Matl. Specs. selected by Contractors Inspector 
for Plate,Forging,Pipe feetings, 
MTC,Drawing,Code MTC,Drawing,Code
12.04 Correlation of MTC with Material 100% MTC H R ‐ OR Bolt‐Nut, Welding Consumables
VS215B‐101‐A‐PLN‐7301 VS215B‐101‐A‐PLN‐7301
Material certification for pressure part and 
MTC,SS‐000‐15200‐0101,
12.05 attachment to pressure parts as per EN  ASME Sec.II, Drawing, Specification 100% MTC H R ‐ OR
SS‐000‐15200‐0102
10204‐3.1
PMI Procedure, PMI Procedure,
12.06 PMI of Base Metal as applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103 100% PMI report H R R OR
VS215B‐101‐A‐PLN‐7303 VS215B‐101‐A‐PLN‐7303
12.10 INSPECTION OF TUBES AFTER BENDING
Inspection 
12.11 Review of sample bend inspection report Drawing Drawing 100% H R R IR
Report
Inspection 
12.12 Dimensions, Ovality, Thinning  Drawing Drawing, Ovality 10% Max 5% H R R IR
Report
12.20 SETUP OF BUTT JOINTS
Review inspection report of bend tubes as  Inspection 
12.21 Drawing  Drawing 100% H R R OR
applicable‐Random  Report
Inspection 
12.22 Orientation, alignment, setup dimensions Drawing Drawing 10% H R R IR
Report
12.30 WELDING OF BUTT WELD JOINTS
Inspection 
12.31 Weld Visual inspection  Drawing Drawing 100% H IW R OR
Report
RT Procedure, Drawing,
RT Procedure,

DM20S
12.32 Weld Soundness of butt welds  ASME Sec.I, 100% NDE Report H R(*) R OR (*) Review of RT Films
VS215B‐101‐A‐PLN‐7202

J-04-Aug-
VS215B‐101‐A‐PLN‐7202
22
RINTE
D 19 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

Welds and heat affected zones in 
chrome‐moly steels (1‐1/4 Cr, 1/2 
Hardness Procedure, Hardness Procedure,
Mo and 2‐1/4 Cr, 1 Mo) shall be 
Hardness of accessible Pressure part weld   SS‐000‐15200‐0106 SS‐000‐15200‐0106 One Spot  Hardness 
12.33 H R R IR hardness tested at a frequency of 
joint ‐ If applicable SS‐000‐135B1‐0001_01 SS‐000‐135B1‐0001_01 per Weld Report
one reading per weld.. Hardness 
VS215B‐101‐A‐PLN‐7304 VS215B‐101‐A‐PLN‐7304
shall be carried out after PWHT if 
PWHT is applicable 
12.40  INSPECTION BEFORE PWHT IF APPLICABLE
Inspection 
12.41 Weld Visual inspection  Drawing Drawing 100% H IW R OR
Report
Compliance to Drawing for Scope and  Inspection 
12.42 Drawing Drawing 100% H IW R OR
Dimensions inspection Report
Inspection 
12.43 Orientation, Dimension of attachment Drawing Drawing 100% H IW R OR
Report
PT Procedure, PT Procedure, Drawing, Inspection 
12.44 PT on attachment welds 10% H R R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Report
PMI for Alloy Verification of accessible Welds  PMI Procedure, PMI Procedure,
12.45 100% PMI report H R R OR
& Parent Metal ‐ 100% SS‐000‐15200‐0103 SS‐000‐15200‐0103
12.50 PWHT AS APPLICABLE

Review Heat treatment cycle and review  Heat treatment procedure       Heat treatment procedure       Heat treatment 


12.51 100% H R R OR
Heat treatment chart VS215B‐101‐A‐PLN‐7302 VS215B‐101‐A‐PLN‐7302 chart

12.60 INSPECTION AFTER PWHT AS APPLICABLE
RT Procedure, RT Procedure, Drawing, ASME 
12.61 Accessible Butt Weld RT  SS‐000‐135B1‐0001, Sec.I,SS‐000‐135B1‐0001 100% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
Welds and heat affected zones in 
Hardness Procedure, Hardness Procedure,
chrome‐moly steels (1‐1/4 Cr, 1/2 
Hardness of accessible Pressure part weld   SS‐000‐15200‐0106 SS‐000‐15200‐0106 One Spot  Hardness 
12.62 H R R OR Mo and 2‐1/4 Cr, 1 Mo) shall be 
joint ‐ If applicable SS‐000‐135B1‐0001_01 SS‐000‐135B1‐0001_01, per Weld Report
hardness tested at a frequency of 
VS215B‐101‐A‐PLN‐7304 VS215B‐101‐A‐PLN‐7304
one reading per weld. 
12.70 PAINTING INSPECTION ‐ IF APPLICABLE
Painting specification, Drawing,   Painting specification, Drawing,   Check qualification of 
Painting Procedure, Painting Procedure, personnel,Check paint color of 
12.71 Surface prepration  100% Painting Report H R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 temporary material
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501 (shipping jig etc.)
Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
Painting Procedure, Painting Procedure,
12.72 ,Salt contaminants / Conductivity test &  100% Painting Report H R R OR
SS‐000‐13A00‐0001, SS‐000‐13A00‐0001,
check for any steel imperfection,Surface Dust 
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501
Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
12.73 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R OR

D M S
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

-
J04-Aug 22
- 2 0
D 20 / 131
RINTE
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
12.74 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent 
12.75 Painting Procedure, Painting Procedure, Random Painting Report H R R OR
Rub(MEK) test for inorganic zink,Adhesion 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test
Painting specification, Drawing,   Painting specification, Drawing,  
12.76 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
12.60 CLEARANCE OF ASSEMBLY

Compilation of relevant documents ‐ 
Specification Specification All Inspection 
12.61 ITPRS,IR's,MTR's, Material Heat chart, NCRs,  100% H R R OR
SS‐000‐15200‐0104 SS‐000‐15200‐0104 report
NDE Reports, HT Records
12.70 SPARES ‐ If applicable 

12.01 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R OR

13.00 HEADERS LOCATION‐ At TBWES Shop Shirwal / Savli 

ASME Section IX, ASME Section IX,
Review of Welding Procedure Specification 
13.00 A SS‐000‐15200‐0106, SS‐000‐15200‐0106, 100% Procedures H R/W(*) ‐ OR (*) W for New Qualification
(WPS) & Procedure Qualifcation Record(PQR)
VS215B‐101‐A‐PLN‐7101 VS215B‐101‐A‐PLN‐7101

ASME Section IX, ASME Section IX, Procedures/


13.00 B Review of Welder Qualification Records 100% H R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Records

ASME Sec V , ASME Sec I ASME Sec V , ASME Sec I
Procedures/
13.00 C Review of NDT Personnel and Procedures VS215B‐101‐A‐PLN‐7201, VS215B‐101‐A‐PLN‐7201, 100% H R R OR
Records
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
VS215B‐101‐A‐DGN‐0401, VS215B‐101‐A‐DGN‐0401,
Approved Drawing of Boiler Furnace 
VS215B‐101‐A‐DGN‐0402, VS215B‐101‐A‐DGN‐0402,
13.00 D Front,Rear wall panel ,economiser ,  100% Drawings H R ‐ OR
VS215B‐101‐A‐DGN‐0408, VS215B‐101‐A‐DGN‐0408,
Desuperheater
VS215B‐101‐A‐DGN‐0411 VS215B‐101‐A‐DGN‐0411
13.01 MATERIAL IDENTIFICATION

Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl. 
Review & Verification of MTC w.r.t. Drg.BOM  (*) Refer HSS‐000‐13560‐0001  as 
13.02 000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H R/W(*) R OR
& Matl specs applicable ‐ To ensure traceability 
SS‐000‐15200‐0102 SS‐000‐15200‐0102
of Sampling Test Piece(s), the 
Dimensional inspection‐Verification of  Drawing, ASME
13.03 ASME Sec.II, Drawing, Specification 20% MTC H R R OR location of samples shall be 
Transfer Heat number Sec‐II,Matl. Specs.
selected by Contractors Inspector 
for Plate,Forging,Pipe feetings, 

DM20S
MTC,Drawing,Code MTC,Drawing,Code
13.04 Correlation of MTC with Material 100% MTC H R R OR Bolt‐Nut, Welding Consumables

J-04-Aug-
VS215B‐101‐A‐PLN‐7301 VS215B‐101‐A‐PLN‐7301
22
RINTE
D 21 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
Material certification for pressure part and 
MTC,SS‐000‐15200‐0101,
13.05 attachment to pressure parts as per EN  ASME Sec.II, Drawing, Specification 100% MTC H R R OR
SS‐000‐15200‐0102
10204‐3.1
PMI Procedure, PMI Procedure,
13.06 PMI of Base Metal as applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103 100% PMI report H R R OR
VS215B‐101‐A‐PLN‐7303 VS215B‐101‐A‐PLN‐7303
13.10 SETUP OF BUTT JOINT & WELDING (IF APPLICABLE)
Inspection 
13.11 Setup dimensions Drawing Drawing 100% H R R IR
Report
RT Procedure, RT Procedure, Drawing, ASME 
13.12 RT of Butt welds 100% NDE Report H R R OR Review of RT Films
VS215B‐101‐A‐PLN‐7202 Sec.I,VS215B‐101‐A‐PLN‐7202
13.20 BRANCH SETUP JOINT
Inspection 
13.21 Orientation, alignment, setup dimensions Drawing Drawing 100% M R R OR
Report
13.30 INSPECTION AFTER WELDING
Inspection 
13.31 Weld Visual inspection  Drawing Drawing 100% H R R OR
Report
13.32 Visual Inspection after welding VT Procedure VT Procedure 100% NDE Report M R R OR
PT/MT Procedure, PT/MT Procedure,
13.33 NDE of All Nozzle welds 100% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202

13.40 WELD SETUPS‐HEADER PIPE/STUB TO REDUCER/FLANGE/END COVER; REDUCER TO FLANGE

Inspection 
13.41 Orientation, Setup Dimensions Drawing Drawing 100% M R R IR
Report

13.50 WELDING OF ABOVE

Inspection 
13.51 Visual inspection Drawing Drawing 100% H R R OR
Report
RT Procedure< RT Procedure, Drawing, ASME 
13.52 Butt Weld RT after Final Welding 100% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202 Sec.I,VS215B‐101‐A‐PLN‐7202
Peripheral edges & remaining exposed  MT / PT Procedure, Drawing, ASME 
MT/ PT Procedure,
13.53 surface of weld jt.for end cover as per ASME  Sec.I, 100% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202
Sec I PG 31.i2 VS215B‐101‐A‐PLN‐7202

13.60 INSPECTION BEFORE PWHT AS APPLICABLE

Overall Dimensions and visual inspection,  Photographs of every flange 
Inspection  surface prior to the final closure is 
13.61 Verification of Flange major dimesion and  Drawing Drawing 100% H IW R OR
Report required. The photographs shall 
flange face surface visual inspection
be clearly visible (not over 
exposed), identified and 
PMI Procedure, PMI Procedure, incorporate with a measuring 

DM20S
13.62 PMI for Alloy Verificaion of Accessible welds 100% PMI report H IW R OR
SS‐000‐15200‐0103 SS‐000‐15200‐0103 scale to understand the width of 

J-04-Aug-
flange face
22
RINTE
D 22 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

Welds and heat affected zones in 
chrome‐moly steels (1‐1/4 Cr, 1/2 
Hardness Procedure, Hardness Procedure,
Mo and 2‐1/4 Cr, 1 Mo) shall be 
Hardness of accessible Pressure part weld   SS‐000‐15200‐0106 SS‐000‐15200‐0106 One Spot  Hardness 
13.63 H R R OR hardness tested at a frequency of 
joint ‐ If applicable SS‐000‐135B1‐0001_01 SS‐000‐135B1‐0001_01 per Weld Report
one reading per weld, Hardness 
VS215B‐101‐A‐PLN‐7304 VS215B‐101‐A‐PLN‐7304
shall be carried out after PWHT if 
PWHT is applicable
13.70 PWHT AS APPLICABLE

Review Heat treatment cycle and review  Heat treatment procedure       Heat treatment procedure       Heat treatment 


13.71 100% H R R OR
Heat treatment chart VS215B‐101‐A‐PLN‐7302 VS215B‐101‐A‐PLN‐7302 chart

13.80 INSPECTION AFTER PWHT AS APPLICABLE

PT/MT Procedure, PT/MT Procedure, Drawing, ASME 
13.81 NDE of accesible fillet weld joints 100% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202 Sec.I,VS215B‐101‐A‐PLN‐7202
RT Procedure, RT Procedure, Drawing, ASME 
13.82 Accessible Butt Weld RT  SS‐000‐135B1‐0001, Sec.I,SS‐000‐135B1‐0001 100% NDE Report H R R OR Review of RT Films
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
Welds and heat affected zones in 
Hardness Procedure, Hardness Procedure,
chrome‐moly steels (1‐1/4 Cr, 1/2 
Hardness of accessible Pressure part weld   SS‐000‐15200‐0106 SS‐000‐15200‐0106 One Spot  Hardness 
13.83 H R R OR Mo and 2‐1/4 Cr, 1 Mo) shall be 
joint ‐ If applicable SS‐000‐135B1‐0001_01 SS‐000‐135B1‐0001_01, per Weld Report
hardness tested at a frequency of 
VS215B‐101‐A‐PLN‐7304 VS215B‐101‐A‐PLN‐7304
one reading per weld. 
13.90 CLEARANCE FOR ASSEMBLY
Compilation of relevant documents ‐ 
Specification Specification All Inspection 
13.91 ITPRS,IR's,MTR's, Material Heat chart, NCRs,  100% H R R OR
SS‐000‐15200‐0104 SS‐000‐15200‐0104 report
NDE Reports, HT Records
13.92 SPARES ‐ If applicable 

13.93 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R OR

14.00 SUPERHEATER ASSEMBLY LOCATION‐ At TBWES Shop Shirwal / Savli 

ASME Section IX, ASME Section IX,
Review of Welding Procedure Specification 
14.00 A SS‐000‐15200‐0106, SS‐000‐15200‐0106, 100% Procedures H R/W(*) ‐ OR (*) W for New Qualification
(WPS) & Procedure Qualifcation Record(PQR)
VS215B‐101‐A‐PLN‐7101 VS215B‐101‐A‐PLN‐7101

ASME Section IX, ASME Section IX, Procedures/


14.00 B Review of Welder Qualification Records 100% H R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Records

ASME Sec V , ASME Sec I ASME Sec V , ASME Sec I
Procedures/
14.00 C Review of NDT Personnel and Procedures VS215B‐101‐A‐PLN‐7201, VS215B‐101‐A‐PLN‐7201, 100% H R R OR
Records
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202

D M S
-
J04-Aug 22
14.00 D Approved Drawing of Superheater
- 2 0
D
VS215B‐101‐A‐DGN‐0410 VS215B‐101‐A‐DGN‐0410 100% Drawings H R ‐ OR

23 / 131
RINTE
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

14.01 MATERIAL IDENTIFICATION
Drawing, ASME Sec‐II,Matl. Specs.SS‐ Drawing, ASME Sec‐II,Matl. 
Review & Verification of MTC w.r.t. Drg.BOM  (*) Refer HSS‐000‐13560‐0001  as 
14.02 000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H R/W(*) ‐ OR
& Matl specs applicable ‐ To ensure traceability 
SS‐000‐15200‐0102 SS‐000‐15200‐0102
of Sampling Test Piece(s), the 
Dimensional inspection‐Verification of  Drawing, ASME location of samples shall be 
14.03 ASME Sec.II, Drawing, Specification 20% MTC H R ‐ OR
Transfer Heat number Sec‐II,Matl. Specs. selected by Contractors Inspector 
MTC,Drawing,Code MTC,Drawing,Code for Plate,Forging,Pipe feetings, 
14.04 Correlation of MTC with Material 100% MTC H R ‐ OR
VS215B‐101‐A‐PLN‐7301 VS215B‐101‐A‐PLN‐7301 Bolt‐Nut, Welding Consumables
Material certification for pressure part and 
14.05 attachment to pressure parts as per EN  MTC ASME Sec.II, Drawing, Specification 100% MTC H R ‐ OR
10204‐3.1
PMI Procedure, PMI Procedure,
14.06 PMI of Base Metal as applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103 100% PMI report H R R OR
VS215B‐101‐A‐PLN‐7303 VS215B‐101‐A‐PLN‐7303
14.10 ALIGNMENT OF HEADERS ON STRUCTURE

Inspection 
14.11 Identification & Orientaion Drawing Drawing 100% H R R IR
Report
Inspection 
14.12 Alignment, Dimensions Drawing Drawing 100% H R R IR
Report
14.20 SETUP OF COILS WITH HEADER/S 
Inspection 
14.21 Identification & Orientation  Drawing Drawing 100% H R R OR
Report
Inspection 
14.22 Alignment & Setup Dimensions  Drawing Drawing 10% H R R OR
Report
14.30 WELDING OF COILS WITH HEADER/S
MT Procedure, MT Procedure,
14.31 NDT on accessible weld joints  100% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
14.40 CLEARANCE FOR PWHT AS APPLICABLE
Inspection 
14.41 Weld Visual inspection Drawing, VT Procedure Drawing, VT Procedure 100% H IW R OR
Report
Inspection 
14.42 Overall Dimensions Drawing Drawing 100% H IW R OR
Report
Inspection 
14.43 Orientation, Dimension of attachment Drawing Drawing 100% H IW R OR
Report
PT Procedure, PT Procedure, Drawing, Inspection 
14.44 PT on accessible attachment welds 10% H IW R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Report
PMI for Alloy Verification of accessible Welds  PMI Procedure, PMI Procedure,
14.45 100% PMI report H R R OR
& Parent Metal  SS‐000‐15200‐0103 SS‐000‐15200‐0103
14.50 PWHT AS APPLICABLE

Review Heat treatment cycle and review  Heat treatment procedure, Heat treatment procedure, Heat treatment 


14.51 100% H R R OR
Heat treatment chart VS215B‐101‐A‐PLN‐7302 VS215B‐101‐A‐PLN‐7302 chart

14.60 INSPECTION AFTER PWHT AS APPLICABLE

14.61
D M S
NDE of accesible  fillet weld joints
MT Procedure, MT Procedure, Drawing, ASME 
100% NDE Report H R R OR
-
J Aug 22
04-
- 2 0
D
VS215B‐101‐A‐PLN‐7202 Sec.I,VS215B‐101‐A‐PLN‐7202

24 / 131
RINTE
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
RT Procedure, RT Procedure, Drawing, ASME 
14.62 NDE of accesible header butt weld joint SS‐000‐135B1‐0001, Sec.I,SS‐000‐135B1‐0001, 100% NDE Report H R R OR Review of RT Films
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
Welds and heat affected zones in 
Hardness Procedure, Hardness Procedure, chrome‐moly steels (1‐1/4 Cr, 1/2 
Hardness of accessible Pressure part weld   One Spot  Hardness 
14.63 SS‐000‐15200‐0106, SS‐000‐15200‐0106, H R R OR Mo and 2‐1/4 Cr, 1 Mo) shall be 
joint ‐ If applicable per Weld Report
VS215B‐101‐A‐PLN‐7304 VS215B‐101‐A‐PLN‐7304 hardness tested at a frequency of 
one reading per weld. 
14.70 HYDROSTATIC TEST

Hydrotest will be recorded on 
Hydrotest procedure, Drawing,  Hydrotest procedure, Drawing, 
Hydro test , Review water quality Report and  Hydrotest  pressure chart recorder 
14.71 ASME Sec.I, ASME Sec.I, 100% H W R OR
Review Water temperature for Hydrotest Report ,Hydrostatic test pressure shall be 
VS215B‐101‐A‐PLN‐7401 VS215B‐101‐A‐PLN‐7401
held for a minimum of one hour 
14.80 DRAINING & DRYING AFTER HYDRO TEST
Draining & Drying Procedure Draining & Drying Procedure
14.81 Inspection of internal cleanliness / dryness SS‐000‐13A00‐0002, SS‐000‐13A00‐0002, 100% Report H R R OR
VS215B‐101‐A‐PLN‐7403 VS215B‐101‐A‐PLN‐7403
14.90 PAINTING INSPECTION 
Painting specification, Drawing,   Painting specification, Drawing,   Check qualification of 
Painting Procedure, Painting Procedure, personnel,Check paint color of 
14.91 Surface prepration  100% Painting Report H R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 temporary material
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501 (shipping jig etc.)
Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
Painting Procedure, Painting Procedure,
14.92 ,Salt contaminants / Conductivity test &  100% Painting Report H R R OR
SS‐000‐13A00‐0001, SS‐000‐13A00‐0001,
check for any steel imperfection,Surface Dust 
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501
Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
14.93 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
14.94 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
The visual shall be checked again 
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,   at TBWES Mundra.
Inspection of finished coatings,Solvent 
14.95 Painting Procedure, Painting Procedure, Random Painting Report H W(*) R OR '(*) W for Visual Inspection ,DFT  
Rub(MEK) test for inorganic zink,Adhesion 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 for finished paint.IW for WFT, 
test
MEK and adhesion test 
Painting specification, Drawing,   Painting specification, Drawing,  
14.96 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
15.00 CLEARANCE OF ASSEMBLY
Compilation of relevant documents ‐ 
Drawing, Specification Drawing, Specification All Inspection 
15.01 ITPRS,IR's,MTR's, Material Heat chart, NCRs,  100% H R R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101 report

S
NDE Reports, HT Records
15.10

15.11 - D M
SPARES ‐ If applicable 

J04-Aug 22
- 2 0
Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R OR
PRINTE
D 25 / 131
WHEN
N T R OLLED
ITP for Pressure Parts
NCO
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

16.00 BOILER BLOCK ASSEMBLY LOCATION‐ At TBWES Shop Mundra port


ASME Section IX, ASME Section IX,
Review of Welding Procedure Specification 
16.00 A SS‐000‐15200‐0106, SS‐000‐15200‐0106, 100% Procedures H R/W(*) ‐ OR (*) W for New Qualification
(WPS) & Procedure Qualifcation Record(PQR)
VS215B‐101‐A‐PLN‐7101 VS215B‐101‐A‐PLN‐7101
ASME Section IX, ASME Section IX, Procedures/
16.00 B Review of Welder Qualification Records 100% H R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Records
ASME Sec V , ASME Sec I ASME Sec V , ASME Sec I
Procedures/
16.00 C Review of NDT Personnel and Procedures VS215B‐101‐A‐PLN‐7201, VS215B‐101‐A‐PLN‐7201, 100% H R R OR
Records
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
Approved Drawing of PRESSURE PART 
ARRANGEMENT OF BOILER,ASSEMBLY  VS215B‐101‐A‐DGN‐0301, VS215B‐101‐A‐DGN‐0301,
16.00 D DRAWING OF REFRACTORY FOR STEAM  VS215B‐101‐A‐DGN‐0420, VS215B‐101‐A‐DGN‐0420, 100% Drawings H R ‐ OR
BOILER,ASSEMBLY DRAWING OF INSULATION  VS215B‐101‐A‐DGN‐0421 VS215B‐101‐A‐DGN‐0421
FOR STEAM BOILER
16.01 ASSEMBLY OF BASE FRAME AS APPLICABLE
Inspection 
16.02 Orientation, Setup Dimensions, Alignment Drawing Drawing 100% H IW R OR
Report
16.03 ASSEMBLY OF STRUCTURE AS APPLICABLE
Inspection 
16.04 Orientation, Setup Dimensions, Alignment Drawing Drawing 100% H IW R OR
Report
16.05 DRUM ALIGNMENT ON BASE FRAME
Inspection 
16.06 Orientation, Setup Dimensions, Alignment Drawing Drawing 100% H IW R OR
Report
16.10 TUBE/PANEL INSERTION & EXPANSION IN DRUMS

Identification, orientation, projection in  Drawing, Tube Expansion  Inspection 


16.11 Drawing, Tube Expansion Procedure 100% H IW R OR Refer Tube Expansion Procedure
drums, expansion in drums Procedure Report

Cleanness check before tube insert for Drawing, Tube Expansion  Inspection 


16.12 Drawing, Tube Expansion Procedure 100% H IW R OR
drum holes Procedure Report
Dimensional inspection for Tube
Drawing, Tube Expansion  Inspection 
16.13 OD/ID and tube hole dia. before Drawing, Tube Expansion Procedure 5% H IW R OR
Procedure Report
expanding
Dimensional inspection of Tube ID
Drawing, Tube Expansion  Inspection 
16.14 after expansion for calculating expansion Drawing, Tube Expansion Procedure 5% H IW R OR
Procedure Report
ratio
Check protrusion from inside of drum Drawing, Tube Expansion  Inspection 
16.15 Drawing, Tube Expansion Procedure 5% H IW R OR
(5% tube) Procedure Report

Drawing, Tube Expansion  Inspection 
16.16 Bell Mouthed Diameter as applicable Drawing, Tube Expansion Procedure 5% H IW R OR
Procedure Report
16.20 STRUCTURAL ATTACHMENTS‐ SETUP & WELDING OF TIE BARS, FILLER PLATES & TIE DOWN LUGS

DM20S
Inspection 
16.21 Orientation, Dimension Drawing Drawing 100% H R R OR

J-04-Aug-
Report
22
RINTE
D 26 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

PT of accessible Weld joints, Lifting lug if  PT Procedure, PT Procedure, Drawing, Inspection 


16.22 10% H IW R OR
applicable VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202 Report
16.30 SETUP OF BUTT JOINTS
Review inspection report of bend tubes as  Inspection 
16.31 Drawing  Drawing 100% M R R OR
applicable‐Random  Report
Inspection 
16.32 Orientation, alignment, setup dimensions Drawing Drawing 10% H R R OR
Report
16.40 WELDING OF BUTT WELD JOINTS

RT Procedure, RT Procedure, Drawing, ASME 
16.41 Weld Soundness of butt welds 100% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202 Sec.I,VS215B‐101‐A‐PLN‐7202
PMI Procedure, PMI Procedure,
16.42 PMI for Alloy Verification of accessible Welds 100% PMI report H R R OR
SS‐000‐15200‐0103 SS‐000‐15200‐0103
16.50 OPEN INSPECTION BEFORE HYDRO TEST
Completeness of Expansion, Attachment 
Inspection 
16.51 Welding & NDE, Compliance to Drawing for  Drawing Drawing 100% M W R OR
Report
Scope
Inspection 
16.52 Overall major Dimensions Drawing Drawing 100% H W R OR
Report
PMI of alloy steel welds & Parent Metal as  PMI Procedure, PMI Procedure,
16.53 100% PMI report H IW R OR
applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103
16.60 HYDROSTATIC TEST

Hydrotest will be recorded on 
Hydrotest procedure, Drawing,  Hydrotest procedure, Drawing, 
Hydro test , Review water quality Report and  Hydrotest  pressure chart recorder 
16.61 ASME Sec.I ASME Sec.I, 100% M W W OR
Review Water temperature for Hydrotest Report ,Hydrostatic test pressure shall be 
VS215B‐101‐A‐PLN‐7401 VS215B‐101‐A‐PLN‐7401
held for a minimum of one hour 
16.70 DRAINING & DRYING AFTER HYDRO TEST
Draining & Drying Procedure, Draining & Drying Procedure,
16.71 Inspection of internal cleanliness / dryness SS‐000‐13A00‐0002, SS‐000‐13A00‐0002, 100% Report H R R OR
VS215B‐101‐A‐PLN‐7403 VS215B‐101‐A‐PLN‐7403
16.80 REFRACTORY APPLICATION ‐ REFER VS215B‐101‐A‐PLN‐7407
Refer Separate ITP ‐NO 17 in non pressure 
16.81 parts and refer Refractory Application  OR
Procedure
16.90 INNER CASING ASSEMBLY
Inner Casing Fitment, Draft Gauge 
Connection&S.B/Peep hole 
 Inspection 
16.91 Opening&Insul.Lugs, Fitment of Wash Water  Drawing  Drawing 100% M R R OR
Report
Drain, Dimension Inspection, Weld Visual 
Inspection
PT Procedure, PT Procedure, Drawing,
16.92 NDE of Casing accessible Welds 10% NDE Report H R R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
17.00 FURNACE LEAK TEST

D M S
17.01
-
J04-Aug 22
Soundness of Inner Casing Welds & Furnace  Leak test Procedure,
- 2 0
Tightness
D
VS215B‐101‐A‐PLN‐7407
Leak test Procedure.
VS215B‐101‐A‐PLN‐7407
100%
Leak test 
Report
H W R OR
27 / 131
RINTE
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

17.10 INSULATION & OUTER CASING ‐ REFER VS215B‐101‐A‐PLN‐7408

Insulation location, size and verify with  Specification Specification Inspection 


17.11 100% H IW R OR
specification VS215B‐101‐A‐PLN‐7408 VS215B‐101‐A‐PLN‐7408 Report

Outer Casing Location, Orientation &  Inspection 
17.12 Drawing, VT Procedure Drawing, VT Procedure 100% H IW R OR
Welding Report

Drawing, No Obstruction for Ping  Inspection 
17.13 Tube ID Free from Obstacles Ping pong Ball test 100% H R R OR
Pong Ball Test Report
17.20 FITMENT OF DRUM INTERNALS

Dimensions & Orientation and assembly  Inspection 
17.21 Drawing Drawing 100% H R R OR
inspection after welding Report
17.20A INITIAL INSPECTION FOR E&I AS APPLICABLE
Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved GAD, 
SS‐000‐13702‐0002 / Approved GAD, 
17.21A accordance with Section 4.2 of      IEC60079‐ Data sheets, 100% Dossier review H R R OR
Data sheets.
14  ( as applicable ) HSP‐000‐13800‐010

17.30 PAINTING & FINAL ASSLY INSPECTION ‐ IF APPLICABLE
Overall Construction/ Fitment/ Alignment/ 
Appearance, Burner  Inspection 
17.31 Drawing, Specification Drawing, Specification 100% H W R OR
Identification/Orientation/Alignment, Overall  Report
Dimensions
Painting specification, Drawing,   Painting specification, Drawing,   Check qualification of 
Painting Procedure, Painting Procedure, personnel,Check paint color of 
17.32 Surface prepration  100% Painting Report H IW/S R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 temporary material
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501 (shipping jig etc.)
Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
Painting Procedure, Painting Procedure,
17.33 ,Salt contaminants / Conductivity test &  100% Painting Report H R R OR
SS‐000‐13A00‐0001, SS‐000‐13A00‐0001,
check for any steel imperfection,Surface Dust 
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501
Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
17.34 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
17.35 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  (*) W for Visual Inspection ,DFT  
17.36 Painting Procedure, Painting Procedure, Random Painting Report H W (*) R OR
Rub(MEK) test for inorganic zink,Adhesion  for finished paint.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test

DM20S
Painting specification, Drawing,   Painting specification, Drawing,  

J-04-Aug-
17.37 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R OR
22 SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
RINTE
D 28 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER

17.40 SPARES ‐ If applicable 

17.41 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R OR

17.50 PACKING/MARKING ‐ REFER  VS215B‐101‐A‐PLN‐7503 & VS215B‐101‐A‐PLN‐7503                                                                                                                                     

Drawing, Specification, Drawing, Specification,
17.51 Rust prevention check 100% H IW R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002 Inspection 
reports, 
Drawing, Specification, Drawing, Specification, Packing list
17.52 Shipping preparation inspection 100% H IW R IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,


17.53 100% H IW R IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
17.54 Check of cleanliness and dryness 100% H IW R IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,


17.55 100% H IW R IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001

Inspection 
Drawing, Specification, Drawing, Specification,
17.56 Check of marking for site installation 100% reports,  H IW R IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list

Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,


17.57 100% H IW R OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001

Check of packing conditions as per Drawing, Specification, Drawing, Specification,


17.58 100% H IW R IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
17.59 Final inspection on all items ( as applicable ) 100% H IW W OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

17.60 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
17.61 Final Document Review and Issue of IRC 100% IRC H H R OR IRC
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
17.70 Pre shipping inspection
Approved documents / Project  Approved documents / Project 
17.71 Visual Inspection 100% Verification H H ‐ IR ‐
specification specification
Approved documents / Project  Approved documents / Project 

DM20S
17.72 Check of Nameplate/Shipping Mark 100% Verification H H ‐ IR ‐
specification specification
17.73
J-04-Aug-
22
Check of Invoice/Packing List
RINTE
D
Approved documents / Project 
specification
Approved documents / Project 
specification
100% Verification H H ‐ IR Packing list
29 / 131
HEN P
LED W
ITP for Pressure Parts
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
18.00 DISHED ENDS FOR BOILER DRUMS LOCATION‐ At TBWES Approved Sub Vendor Shop
18.01 MATERIAL IDENTIFICATION
Drawing, ASME Sec‐II,Matl. Specs.SS‐Drawing, ASME Sec‐II,Matl. 
Review & Verification of MTC w.r.t. Drg.BOM  (*) Refer HSS‐000‐13560‐0001  as 
18.02 000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H W R/W(*) ‐ OR
& Matl specs applicable ‐ To ensure traceability 
SS‐000‐15200‐0102 SS‐000‐15200‐0102
Dimensional inspection, Verification of UT  of Sampling Test Piece(s), the 
Drawing, ASME
18.03 testing on Plate, Verification of Transfer Heat  ASME Sec.II, Drawing, Specification 20% MTC H W R ‐ OR location of samples shall be 
Sec‐II,Matl. Specs.
number selected by Contracto~s Inspector 
for Plate,Forging,Pipe feetings, 
MTC,Drawing,Code, MTC,Drawing,Code,
18.04 Correlation of MTC with Material 100% MTC H W R ‐ OR Bolt‐Nut, Welding Consumables
VS215B‐101‐A‐PLN‐7301 VS215B‐101‐A‐PLN‐7301

Material certification for pressure part as per 
18.05 MTC ASME Sec.II, Drawing, Specification 100% MTC H R R ‐ OR
EN 10204‐3.1

Approved Drawing of Steam and Water  VS215B‐101‐A‐DGN‐0406, VS215B‐101‐A‐DGN‐0406,


18.06 100% Drawings H R ‐ OR
Drum  VS215B‐101‐A‐DGN‐0407 VS215B‐101‐A‐DGN‐0407
18.10 INSPECTION OF DISHED ENDS AFTER FORMING
Inspection 
18.11 Visual inspection Drawing Drawing 100% H W R R OR
Report
Inspection 
18.12 Dimension inspection, Profile measurement Drawing, ASME Sec.I Drawing, ASME Sec.I 100% H W R R OR
Report
NDE from Inside,Outside on Knuckle Portion  PT/MT Procedure, PT/MT Procedure,
18.13 100% NDE Report H W R R OR
& On Edge VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
UT Procedure, UT Procedure,
18.14 Lamination check 100% NDE Report H W R R OR
VS215B‐101‐A‐PLN‐7202 VS215B‐101‐A‐PLN‐7202
Review of test reports of PTC as applicable  Heat treatment procedure,  Heat treatment 
18.15 Heat treatment procedure, Drawing 100% H W R R OR
and verify Heat treatment  Drawing chart
Inspection 
18.16 Identification & Stamping on Dished ends Drawing Drawing 100% H W R R OR
Report
19.00 BOILER EXTERNAL PIPING ( ASME Sec I & ASME B 31.1) LOCATION‐ At TBWES Approved Sub Vendor Shop
Review of Welding Procedure Specification 
ASME Section IX, ASME Section IX,
19.00 A (WPS) & Procedure Qualifcation  100% Procedures H R/W(*) R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106
Record(PQR)
ASME Section IX, ASME Section IX, Procedures/
19.00 B Review of Welder Qualification Records 100% H R/W(*) R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Records
Procedures/
19.00 C Review of NDT Personnel and Procedures ASME Sec V , ASME Sec I ASME Sec V , ASME Sec I 100% H R R R OR
Records
Approved Drawing of ARRANGEMENT 
DRAWING OF BOILER PIPING, PIPING  VS215B‐101‐A‐DGN‐0208, VS215B‐101‐A‐DGN‐0208,
19.00 D ISOMETRIC DRAWING FOR LARGE BORE, VS215B‐101‐A‐DGN‐2202, VS215B‐101‐A‐DGN‐2202, 100% Drawings H R ‐ OR
PIPING ISOMETRIC DRAWING FOR SMALL  VS215B‐101‐A‐DGN‐2204 VS215B‐101‐A‐DGN‐2204
BORE
19.01 MATERIAL IDENTIFICATION
Drawing, ASME Sec‐II,Matl. Specs.SS‐Drawing, ASME Sec‐II,Matl.  (*) Refer HSS‐000‐13560‐0001  as 
Review & Verification of MTC w.r.t. Drg.BOM 
19.02 000‐15200‐0101, Specs.SS‐000‐15200‐0101, 100% MTC H R/W(*) R/W(*) ‐ OR applicable ‐ To ensure traceability 
& Matl specs
SS‐000‐15200‐0102 SS‐000‐15200‐0102 of Sampling Test Piece(s), the 

DM20S
Dimensional inspection‐Verification of  Drawing, ASME location of samples shall be 
19.03 ASME Sec.II, Drawing, Specification 20% MTC H SW R ‐ OR

J-
Transfer Heat number Sec‐II,Matl. Specs. selected by Contractors Inspector 
22 g- for Plate,Forging,Pipe feetings, 
-Au
19.0404Correlation of MTC with Material
TED
MTC,Drawing,Code MTC,Drawing,Code
100% MTC H SW R ‐ OR 30 / 131
Bolt‐Nut, Welding Consumables
RIN VS215B‐101‐A‐PLN‐7301 VS215B‐101‐A‐PLN‐7301
WHEN P
OLLED
ITP for Pressure Parts
TR
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
Material certification for pressure part and 
19.05 attachment to pressure parts as per EN  MTC ASME Sec.II, Drawing, Specification 100% MTC H SW R ‐ OR
10204‐3.1
PMI Procedure, PMI Procedure,
19.06 PMI of Base Metal as applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103 100% PMI report H SW R R OR
VS215B‐101‐A‐PLN‐7303 VS215B‐101‐A‐PLN‐7303
19.10 INSPECTION OF TUBES/PIPES AFTER BENDING
Inspection 
19.11 Review of sample bend inspection report Drawing Drawing 100% H R R R OR
Report
Inspection 
19.12 Dimensions, Ovality, Thinning Drawing Drawing 5% H SW R R OR
Report
19.20 SETUP OF BUTT JOINT & WELDING (IF APPLICABLE)
Inspection 
19.21 Setup dimensions Drawing Drawing 100% H SW R R OR
Report

 (**)‐ As per Piping class 
RT Procedure, RT Procedure, Drawing mentioned in PMS/ 
19.22 RT of Butt welds (**) NDE Report H R R R OR
SS‐000‐13606‐0001 SS‐000‐13606‐0001 Drawing/Code/Minimum 5% per 
welder, whichever is stringent

19.30 SETUP OF SOCKET WELDS & OTHER BRANCH WELDS
Inspection 
19.31 Orientation, Setup Dimensions Drawing Drawing 100% H SW R R OR
Report
19.40 WELDING OF ABOVE
Inspection 
19.41 Welding visual inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W R R OR
Report
 (**)‐ As per Piping class 
PT/MT Procedure PT/MT Procedure, Drawing, ASME  mentioned in PMS/ 
19.42 NDE of accesible  fillet weld joints 10%(**) NDE Report H R R R OR
SS‐000‐13606‐0001 Sec.I,SS‐000‐13606‐0001 Drawing/Code/Minimum 10% per 
welder, whichever is stringent
19.50 CLEARANCE FOR PWHT / FINAL (AS APPLICABLE)
Overall major dimensions and compliance to  Photographs of every flange 
drawing scope Inspection  surface prior to the final closure is 
19.51 Drawing Drawing 100% H SW R R OR
Verification of Flange major dimesion and  Report required. The photographs shall 
flange face surface visual inspection be clearly visible (not over 
exposed), identified and 
PMI for Alloy Verification of welds as  PMI Procedure, PMI Procedure, incorporate with a measuring 
19.52 100% PMI report H SW R R OR scale to understand the width of 
applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103
flange face

Welds and heat affected zones in 
chrome‐moly steels (1‐1/4 Cr, 1/2 
Hardness Procedure, Hardness Procedure,
Mo and 2‐1/4 Cr, 1 Mo) shall be 
Hardness of accessible Pressure part weld   SS‐000‐15200‐0106 SS‐000‐15200‐0106 One Spot  Hardness 
19.53 H SW R R OR hardness tested at a frequency of 
joint ‐ If applicable SS‐000‐135B1‐0001_01, SS‐000‐135B1‐0001_01, per Weld Report
one reading per weld. , Hardness 
VS215B‐101‐A‐PLN‐7304 VS215B‐101‐A‐PLN‐7304
shall be carried out after PWHT if 
applicable
19.60 PWHT IF APPLICABLE

D M S
Review Heat treatment cycle and review  Heat treatment procedure, Heat treatment procedure, Heat treatment 

-
J Aug 2
19.61 100% H R R R OR
- 2 0 2
Heat treatment chart VS215B‐101‐A‐PLN‐7302 VS215B‐101‐A‐PLN‐7302 chart

04- RINTE
D 31 / 131
WHEN P
OLLED
ITP for Pressure Parts
TR
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER

19.70 INSPECTION AFTER PWHT

PT/MT Procedure
19.71 NDE of accesible Alloy steel fillet weld joints PT/MT Procedure, Drawing 100% NDE Report H SW R R OR  (**)‐ As per Piping class 
'SS‐000‐135B1‐0001
mentioned in PMS/ 
RT Procedure, RT Procedure, Drawing, ASME  Drawing/Code/Minimum 10% per 
19.72 NDE of accesible header butt weld joint 10%(**) NDE Report H R R R OR welder, whichever is stringent
SS‐000‐135B1‐0001 Sec.I,SS‐000‐135B1‐0001

Welds and heat affected zones in 
Hardness Procedure, Hardness Procedure,
chrome‐moly steels (1‐1/4 Cr, 1/2 
Hardness of accessible Pressure part weld   SS‐000‐15200‐0106 SS‐000‐15200‐0106 One Spot  Hardness 
19.73 H SW R R OR Mo and 2‐1/4 Cr, 1 Mo) shall be 
joint ‐ If applicable SS‐000‐135B1‐0001_01, SS‐000‐135B1‐0001_01, per Weld Report
hardness tested at a frequency of 
VS215B‐101‐A‐PLN‐7304 VS215B‐101‐A‐PLN‐7304
one reading per weld. 

19.80 FINAL INSPECTION

Compliance to Drawing for Scope and 
Inspection 
19.81 Dimensions inspection Drawing Drawing 100% H SW IW R OR
Report
Line check after piping installation

19.90 PAINTING INSPECTION

Painting specification, Drawing,   Painting specification, Drawing,   Check qualification of 


Painting Procedure, Painting Procedure, personnel,Check paint color of 
19.91 Surface prepration  100% Painting Report H SW R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 temporary material
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501 (shipping jig etc.)
Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade
Painting Procedure, Painting Procedure,
19.92 , Salt contaminants / Conductivity test &  100% Painting Report H SW R R OR
SS‐000‐13A00‐0001, SS‐000‐13A00‐0001,
check for any steel imperfection,Surface Dust
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501
Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
19.93 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H W R R OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
19.94 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H W R R OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
The visual shall be checked again 
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,   at TBWES Mundra.
Inspection of finished coatings,Solvent 
19.95 Painting Procedure, Painting Procedure, Random Painting Report H SW W(*) R OR '(*) W for Visual Inspection ,DFT  
Rub(MEK) test for inorganic zink,Adhesion 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 for finished paint.IW for WFT, 
test
MEK and adhesion test 
Painting specification, Drawing,   Painting specification, Drawing,  
19.96 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H SW R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

20.01 SPARES ‐ If applicable 

D M S
-
J04-Aug 22
20.02 Material Conformance to B.O.M.
- 2 0
D
Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H SW R R OR

32 / 131
RINTE
WHEN P
OLLED
ITP for Pressure Parts
TR
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
20.10 PACKING/MARKING ‐ REFER  VS215B‐101‐A‐PLN‐7503 & VS215B‐101‐A‐PLN‐7503                                                                                                                                     
Drawing, Specification, Drawing, Specification,
20.11 Rust prevention check 100% H SW IW R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
20.12 Shipping preparation inspection 100% H SW IW R IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001 Inspection 
Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,
20.13 100% reports,  H SW IW R IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list
Drawing, Specification, Drawing, Specification,
20.14 Check of cleanliness  100% H SW IW R IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,
20.15 100% H SW IW R IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
20.16 Check of marking for site installation 100% H SW IW R IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001 Inspection 
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
20.17 100% reports,  H SW IW R OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
20.18 100% H SW IW R IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
20.19 Final inspection on all items ( as applicable ) 100% H SW W W OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
20.20 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
20.11 Final Document Review and Issue of IRC 100% IRC H H H R OR IRC
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
20.30 Pre shipping inspection
Approved documents / Project  Approved documents / Project 
20.31 Visual Inspection 100% Verification H SW H ‐ IR ‐
specification specification
Approved documents / Project  Approved documents / Project 
20.32 Check of Nameplate/Shipping Mark 100% Verification H SW H ‐ IR ‐
specification specification
Approved documents / Project  Approved documents / Project 
20.33 Check of Invoice/Packing List 100% Verification H SW H ‐ IR Packing list
specification specification
21.00 NON BOILER EXTERNAL PIPING ( ASME B31.3) LOCATION‐ At TBWES Approved Sub Vendor Shop
Review of Welding Procedure Specification 
ASME Section IX, ASME Section IX,
20.00 A (WPS) & Procedure Qualifcation  100% Procedures H R/W(*) R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106
Record(PQR)
ASME Section IX, ASME Section IX, Procedures/
20.00 B Review of Welder Qualification Records 100% H R/W(*) R/W(*) ‐ OR (*) W for New Qualification
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Records
Procedures/
20.00 C Review of NDT Personnel and Procedures ASME Sec V , ASME Sec I ASME Sec V , ASME Sec I 100% H R R R OR
Records
Approved Drawing of ARRANGEMENT 
DRAWING OF BOILER PIPING,PIPING  VS215B‐101‐A‐DGN‐0208, VS215B‐101‐A‐DGN‐0208,
20.00 D ISOMETRIC DRAWING FOR LARGE BORE, VS215B‐101‐A‐DGN‐2202, VS215B‐101‐A‐DGN‐2202, 100% Drawings H R ‐ OR
PIPING ISOMETRIC DRAWING FOR SMALL  VS215B‐101‐A‐DGN‐2204 VS215B‐101‐A‐DGN‐2204
BORE
21.01 MATERIAL IDENTIFICATION
Drawing, ASME Sec‐II,Matl. Specs.SS‐
Drawing, ASME Sec‐II,Matl.  (*) Refer HSS‐000‐13560‐0001  as 
Review & Verification of MTC w.r.t. Drg.BOM  000‐15200‐0101,
21.02 Specs.SS‐000‐15200‐0101, 100% MTC H W R/W(*) ‐ OR applicable ‐ To ensure traceability 
& Matl specs SS‐000‐15200‐0102,
SS‐000‐15200‐0102 of Sampling Test Piece(s), the 
SS‐000‐15200‐0110
location of samples shall be 

DM20S
Dimensional inspection‐Verification of  Drawing, ASME
21.03 ASME Sec.II, Drawing, Specification 20% MTC H W R ‐ OR selected by Contractors Inspector 

J-
Transfer Heat number Sec‐II,Matl. Specs.
for Plate,Forging,Pipe feetings, 
22 g-
-Au
21.0404Correlation of MTC with Material
TED
MTC,Drawing,Code, MTC,Drawing,Code,
100% MTC H W R ‐ OR
Bolt‐Nut, Welding Consumables
33 / 131
EN PRIN VS215B‐101‐A‐PLN‐7301 VS215B‐101‐A‐PLN‐7301
OLL
ITP for Pressure PartsED WH
TR
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
Material certification for pressure part and 
21.05 attachment to pressure parts as per EN  MTC ASME Sec.II, Drawing, Specification 100% MTC H W R ‐ OR
10204‐3.1
PMI Procedure, PMI Procedure,
21.06 PMI of Base Metal as applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103 100% PMI report H W R R OR
VS215B‐101‐A‐PLN‐7303 VS215B‐101‐A‐PLN‐7303
21.10 SETUP OF BUTT JOINT & WELDING (IF APPLICABLE)
Inspection 
21.11 Setup dimensions Drawing Drawing 100% H SW R R OR
Report
 (**) As per Piping class 
RT Procedure, RT Procedure, Drawing, mentioned in PMS/ 
21.12 RT of Butt welds (**) NDE Report H R R R OR
SS‐000‐15200‐0110 SS‐000‐15200‐0110 Drawing/Code/Minimum 5% per 
welder, whichever is stringent

21.20 SETUP OF SOCKET WELDS & OTHER BRANCH WELDS

Inspection 
21.21 Orientation, Setup Dimensions Drawing Drawing 100% H SW R R OR
Report

21.30 WELDING OF ABOVE
Inspection 
21.30 Welding visual inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W R R OR
Report
 (**) As per Piping class 
PT/MT Procedure PT/MT Procedure, Drawing, ASME 
mentioned in PMS/ 
21.31 NDE of accesible  fillet weld joints SS‐000‐13606‐0001, Sec.I,SS‐000‐13606‐0001 10%(**) NDE Report H SW R R OR
Drawing/Code/Minimum 10% per 
SS‐000‐15200‐0110 SS‐000‐15200‐0110
welder, whichever is stringent
21.40 CLEARANCE FOR PWHT / FINAL (AS APPLICABLE)
Overall major dimensions and compliance to  Photographs of every flange 
drawing scope Inspection  surface prior to the final closure is 
21.41 Drawing Drawing 100% H SW R R OR
Verification of Flange major dimension and  Report required. The photographs shall 
flange face surface visual inspection be clearly visible (not over 
exposed), identified and 
PMI for Alloy Verification of welds as  PMI Procedure, PMI Procedure, incorporate with a measuring 
21.42 100% PMI report H SW R R OR scale to understand the width of 
applicable SS‐000‐15200‐0103 SS‐000‐15200‐0103
flange face

Welds and heat affected zones in 
chrome‐moly steels (1‐1/4 Cr, 1/2 
Hardness Procedure, Hardness Procedure,
Mo and 2‐1/4 Cr, 1 Mo) shall be 
Hardness of accessible Pressure part weld   SS‐000‐15200‐0106 SS‐000‐15200‐0106 One Spot  Hardness 
21.43 H SW R R OR hardness tested at a frequency of 
joint ‐ If applicable SS‐000‐135B1‐0001_01, SS‐000‐135B1‐0001_01, per Weld Report
one reading per weld. , Hardness 
VS215B‐101‐A‐PLN‐7304 VS215B‐101‐A‐PLN‐7304
shall be carried out after PWHT if 
applicable
21.50 PWHT IF APPLICABLE
Review Heat treatment cycle and review  Heat treatment procedure, Heat treatment procedure, Heat treatment 

DM20S
21.51 100% H R R R OR
Heat treatment chart VS215B‐101‐A‐PLN‐7302 VS215B‐101‐A‐PLN‐7302 chart

J-04-Au g-22
21.60 INSPECTION AFTER PWHT
RINTE
D 34 / 131
WHEN P
OLLED
ITP for Pressure Parts
TR
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
21.61 NDE of accesible Alloy steel fillet weld joints PT/MT Procedure PT/MT Procedure, Drawing 100% NDE Report H SW R R OR

Welds and heat affected zones in 
Hardness Procedure, Hardness Procedure,
chrome‐moly steels (1‐1/4 Cr, 1/2 
Hardness of accessible Pressure part weld   SS‐000‐15200‐0106 SS‐000‐15200‐0106 One Spot  Hardness 
21.62 H SW R R OR Mo and 2‐1/4 Cr, 1 Mo) shall be 
joint ‐ If applicable SS‐000‐135B1‐0001, SS‐000‐135B1‐0001, per Weld Report
hardness tested at a frequency of 
VS215B‐101‐A‐PLN‐7304 VS215B‐101‐A‐PLN‐7304
one reading per weld. 
Hardness of production weld,hot bend & hot 
Hardness Procedure, Hardness Procedure, Hardness 
21.63 formed piping For P‐Nos 1,3,4,5 materials as  Random H SW R R OR
SS‐000‐15200‐0106 SS‐000‐15200‐0106 Report
applicable 
21.70 FINAL INSPECTION
Compliance to Drawing for Scope and  Inspection 
21.71 Drawing Drawing 100% H SW IW R OR
Dimensions inspection Report

21.80 PAINTING INSPECTION

Painting specification, Drawing,   Painting specification, Drawing,   Check qualification of 


Painting Procedure, Painting Procedure, personnel,Check paint color of 
21.81 Surface prepration  100% Painting Report H SW R R OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 temporary material
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501 (shipping jig etc.)

Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade
Painting Procedure, Painting Procedure,
21.82 ,Salt contaminants / Conductivity test &  100% Painting Report H SW R R OR
SS‐000‐13A00‐0001, SS‐000‐13A00‐0001,
check for any steel imperfection,Surface Dust
VS215B‐101‐A‐PLN‐7501 VS215B‐101‐A‐PLN‐7501
Level

Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  


21.83 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H SW R R OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
21.84 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H SW R R OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,   (*) W for Visual Inspection ,DFT  
Inspection of finished coatings,Solvent 
21.85 Painting Procedure, Painting Procedure, Random Painting Report H SW W(*) R OR for finished paint.IW for WFT, 
Rub(MEK) test for inorganic zink,Adhesion 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 MEK and adhesion test 
test

Painting specification, Drawing,   Painting specification, Drawing,  
The visual shall be checked again 
21.86 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H SW R R OR
at TBWES Mundra.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

21.90 SPARES ‐ If applicable 

21.91

D M S
Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H SW R R OR

-
J Aug 22
-
04-
2 0
D 35 / 131
RINTE
WHEN P
OLLED
ITP for Pressure Parts
TR
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER

22.10 PACKING/MARKING ‐ REFER  VS215B‐101‐A‐PLN‐7503 & VS215B‐101‐A‐PLN‐7503                                                                                                                                     

Drawing, Specification, Drawing, Specification,
22.11 Rust prevention check 100% H SW IW R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
22.12 Shipping preparation inspection 100% H SW IW R IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,
22.13 100% H SW IW R IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
22.14 Check of cleanliness  100% H SW IW R IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001 Inspection 
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification, reports, 
22.15 100% H SW IW R IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001 Packing list
Drawing, Specification, Drawing, Specification,
22.16 Check of marking for site installation 100% H SW IW R IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
22.17 100% H SW IW R OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
22.18 100% H SW IW R IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
22.19 Final inspection on all items ( as applicable ) 100% H SW W W OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
22.20 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
22.11 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
22.30 Pre shipping inspection
Approved documents / Project  Approved documents / Project 
22.31 Visual Inspection 100% Verification H SW H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
22.32 Check of Nameplate/Shipping Mark 100% Verification H SW H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
22.33 Check of Invoice/Packing List 100% Verification H SW H ‐ IR
specification specification
Designation of letters and abbreviations of ITP

H: Hold point 
Vendor is not allowed to proceed with the test/inspection unless a written release is issued by Contractor. Vendor shall submit inspection notification to Contractor 
W: Witness point 
Vendor can proceed with the test/inspection when Contractor’s inspector is not present at the notified time. Vendor shall submit inspection notification to Contractor. 
IW: Initial witness 
Vendor is requested to notify Contractor of the initial inspection date/time. Vendor can proceed with the test/inspection when Contractor’s inspector is not present at the notified time. Subsequent test/inspection will not be witnessed 
unless any deficiencies are found at the initial inspection. 
SW: Spot witness 
Vendor shall notify Contractor of inspection to be spot witnessed. Vendor may proceed with Inspection and testing should Contractor’s inspector not be present at the time notified. 
S: Surveillance 
Vendor is not requested to notify Contractor. Contractor’s inspector will monitor manufacturing conditions, workmanship and test/inspection during his visit or periodical inspection. 
R: Record review 
Vendor shall provide Contractor with certificates, reports and records as applicable for review and confirmation. 

M
<Records> 
S
J-04D
OR: Official record Vendor is requested to provide the official records to submit as the Manufacturing Data Record Book. 
22
- A ug-20
IR: Internal record Vendor is requested to provide the records for Contractor’s inspector to verify the quality.
RINTE
D 36 / 131
WHEN P
OLLED
ITP for Pressure Parts
TR
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
TBWES Thermax Babcock & Wilcox Energy Solutions Ltd 
CONTRACTOR JGC Corporation / Hyundai Engineering & Construction Co., Ltd
EMPLOYER The Ministry of Oil, South Refineries Company (SRC)
Inspection Level
Level 0 Documentation requirements only; no vendor inspection required.
Level 1 Only final inspection is required prior to shipping
Includes pre‐inspection meetings, one or more unspecified “in progress” surveillance visit/s, all witness and hold points, final inspection, and release fo
Level 2
shipment.
Includes pre‐inspection meetings, one or more unspecified “in progress” surveillance visits, all witness and hold points, final inspection, and release fo
Level 3
shipment. Inspections shall be on a regular basis (daily, weekly or bi‐weekly)
Level 4 Resident inspector continually monitoring the work.
Notes

Thermax Babcock & Wilcox Energy Solutions


Contractor
Ltd ( TBWES),Pune
Approved by
Manufacturer/Sub supplier

D M S
-
J04-Aug 22
- 2 0
D 37 / 131
RINTE
WHEN P
OLLED
ITP for Pressure Parts
TR
NCON
INDEX FOR NON PRESSURE PARTS

Sr. No ITP Description

1 DUCT

2 FABRICATED DAMPER

3 FABRICATED EXPANSION JOINTS

4 AIR FLOW MEASURING DEVICE (AEROFOIL)

5 STACK

6 WINDBOX

7 BOILER CASING

8 BOILER STUCTURE INCLUDING PLATFORM & LADDER

9 FOUNDATION BOLTS & PACKER PLATES

10 GRATINGS (GRILLS)

11 DRUM INTERNAL & EXTERNALS

12 BOILER BASE FRAME(FM)

13 MISCELLANEOUS ITEMS

14 STRUCTURE &  CASING FOR MODULAR ECO ASSLY

15 LIFTING BEAM

16 REFRACTORY APPLICATION 

M S
J-04D
-Au g - 2 0 22
PRINT
ED 38 / 131
WHEN
LLED
NCONTRO
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

1.00 DUCT LOCATION‐ At Thermax Approved Sub Vendor Shop


Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1,
1.01 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106
Procedures/
1.01 B Review of Welder Qualification Records WPQ ASME IX/AWS D1.1 100% H R R R OR
Records
Procedures/
1.01 C Review of NDT Personnel and Procedures NDE Procedure NDE Procedure, Drawing 100% H R R R OR
Records
APPROVED ASSEMBLY DRAWING OF AIR & GAS 
1.01 D VS215B‐101‐A‐DGN‐0205 VS215B‐101‐A‐DGN‐0205 100% Drawing H R R R OR
DUCT
1.02 MATERIAL IDENTIFICATION
Review & Verification of MTC/check test  Drawing, Engg. & Material  MTC/Check  In Absence of MTC, Check 
1.03 Drawing, code, MTC 100% H R R R OR
reports w.r.t. Drg.BOM & Matl specs Specification. MTC, test report test to be done
Drawing, Engg. & Material 
1.04 Dimensional inspection Drawing, code, MTC 10% MTC H R R R OR
Specification. MTC,
Drawing, Engg. & Material  MTC/Check 
1.05 Correlation of MTC with Material Drawing, code, MTC 100% H R R R OR
Specification. MTC, test report
Drawing, Engg. & Material  MTC/Check 
1.06 Material certification as per EN 10204‐2.2 MTC/Lab test Report 100% H R R R OR
Specification. MTC, test report
1.10 FINAL INSPECTION BEFORE PAINTING
Inspection 
1.11 Weld Visual inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W W R OR
Report
Dimension inspection, Compliance to 
Inspection 
1.12 Drawing scope,Match Marking, Orientation,  Drawing Drawing 100% H W IW R OR
Report
Distortion / Flatness 
1.13 PT of Filet weld joints PT Procedure PT Procedure PT ‐10% NDE Report H W R R OR
(*) PMI shall be carried 
Alloy Verification ‐PMI of AS , SS accessible Welds 
1.14 PMI Procedure PMI Procedure 10%(*) PMI report H W R R OR out (If applicable ) as per 
& Parent Metal if Applicable
PMI procedure
Drawing/specification Inspection 
1.15 Trial assembly between Ducts by using templates Drawing/specification 100% H W W R OR
Report
1.20 PAINTING INSPECTION

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
1.21 Surface prepration  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Pre‐Blast Check, blotter test & weather 
condition, Cleaning, profile, cleanliness grade  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
1.22 ,Salt contaminants / Conductivity test &  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
check for any steel imperfection,Surface  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Dust Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
1.23 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% H R R R OR
Report
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  

DM20S
Painting  Check‐ 
1.24 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% H W R R IR

J-04-Aug-
Report ‐ Atmospheric Condition 
22 SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

PRINT
ED 39 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  Painting  (*) W for Visual Inspection 
1.25 Painting Procedure, Painting Procedure, Random H W W (*) R OR
Rub(MEK) test for inorganic zink,Adhesion  Report ,DFT for finished paint.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test
Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
1.26 Verify Identification and marking Painting Procedure, Painting Procedure, 100% H W R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
1.30 PACKING INSPECTION
Drawing, Specification, Drawing, Specification,
1.31 Rust prevention check SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR * Site dispach directly
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
1.32 Shipping prepration inspection SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of shipping / lifting bracing as per 
1.33 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
approved drawing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
1.34 Check of cleanliness and dryness SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Flange surface check (with photo record) and 
1.35 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
flange face protection
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
1.36 Check of marking for site installation SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of nameplate with Photo Record or 
1.37 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R OR
Rubbing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of Packing conditions as per approved 
1.38 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
Packing Procedure
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
1.39 Final Inspection on all items SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* W* OR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
1.40 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification IRC for direct despatch to 
1.41 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101 at Site 
1.50 PRE‐SHIPPING INSPECTION
Drawing, Specification Drawing, Specification
1.51 Visual Inspection                             100% Packing list H H H* ‐ IR * Site dispach directly
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
1.52 Check of Nameplates/Shipping Mark 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
1.53 Check of Invoice/Packing List 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
2.00

D M
DAMPERS
S LOCATION‐ At Thermax Approved Sub Vendor Shop
-
J Aug 22
04-
- 2 0
ED 40 / 131
PRINT
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
2.01 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106
Procedures/
2.01 B Review of Welder Qualification Records WPQ ASME IX/AWS D1.1 100% H R R R OR
Records
Procedures/
2.01 C Review of NDT Personnel and Procedures NDE Procedure NDE Procedure, Drawing 100% H R R R OR
Records
APPROVED ASSEMBLY DRAWING OF AIR & GAS 
2.01 D VS215B‐101‐A‐DGN‐0205/3109 VS215B‐101‐A‐DGN‐0205/3109 100% Drawing H R R R OR
DUCT
2.01 MATERIAL IDENTIFICATION
Review & Verification of MTC/check test  Drawing, Engg. & Material  MTC/Check 
2.03 Drawing, code, MTC 100% H R R R OR
reports w.r.t. Drg.BOM & Matl specs Specification. MTC, test report

Drawing, Engg. & Material 
2.04 Dimensional inspection Drawing, code, MTC 10% MTC H R R R OR
Specification. MTC,
Drawing, Engg. & Material  MTC/Check 
2.05 Correlation of MTC with Material Drawing, code, MTC 100% H R R R OR
Specification. MTC, test report
Drawing, Engg. & Material  MTC/Check  In Absence of MTC, Check 
2.06 Material certification as per EN 10204‐2.2 MTC/Lab test Report 100% H R R R OR
Specification. MTC, test report test to be done
2.10 FINAL INSPECTION BEFORE PAINTING
Inspection 
2.11 Weld Visual inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W W R OR
Report
Dimension inspection, Compliance to 
Inspection 
2.12 Drawing scope,Match Marking, Orientation,  Drawing Drawing 100% H W IW R OR
Report
Distortion / Flatness 
2.13 PT of Filet weld joints PT Procedure,  PT Procedure PT ‐10% NDE Report H W R R OR
(*) PMI shall be carried 
Alloy Verification ‐PMI of AS , SS accessible Welds 
2.14 PMI Procedure PMI Procedure 10%(*) PMI report H W R R OR out (If applicable ) as per 
& Parent Metal if Applicable
PMI procedure
Inspection 
2.15 Open/Close Operation  Drawing Drawing 100% H W IW R OR
Report
2.20 PAINTING INSPECTION
Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
2.21 Surface prepration  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Pre‐Blast Check, blotter test & weather 
condition, Cleaning, profile, cleanliness grade  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
2.22 ,Salt contaminants / Conductivity test &  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
check for any steel imperfection,Surface  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Dust Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
2.23 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% H R R R OR
Report

S
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

- D M
J04-Aug 22
- 2 0
PRINT
ED 41 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Painting specification, Drawing,   Painting specification, Drawing,  
Painting  Check‐ 
2.24 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% H W R R IR
Report ‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  Painting  (*) W for Visual Inspection 
2.25 Painting Procedure, Painting Procedure, Random H W W(*) R OR
Rub(MEK) test for inorganic zink,Adhesion  Report ,DFT for finished paint.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
2.26 Verify Identification and marking Painting Procedure, Painting Procedure, 100% H W R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

2.30 PACKING INSPECTION
Drawing, Specification, Drawing, Specification,
2.31 Rust prevention check SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR * Site dispach directly
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
2.32 Shipping prepration inspection SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of shipping / lifting bracing as per 
2.33 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
approved drawing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
2.34 Check of cleanliness and dryness SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Flange surface check (with photo record) and 
2.35 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
flange face protection
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
2.36 Check of marking for site installation SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of nameplate with Photo Record or 
2.37 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R OR
Rubbing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of Packing conditions as per approved 
2.38 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
Packing Procedure
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
2.39 Final Inspection on all items SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* W* OR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
2.40 INSPECTION RELEASE CERTIFICATE

Drawing, Specification Drawing, Specification IRC for direct despatch to 


2.41 Final Document Review and Issue of IRC 100% IRC H H H R IRC
 SS‐000‐15200‐0101  SS‐000‐15200‐0101 at Site 

2.50 PRE‐SHIPPING INSPECTION

D M S
-
J04-Aug 22
Drawing, Specification Drawing, Specification
2.51 Visual Inspection                             100% Packing list H H H* ‐ IR * Site dispach directly
- 2 0  SS‐000‐14500‐0001  SS‐000‐14500‐0001
PRINT
ED 42 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Drawing, Specification Drawing, Specification
2.52 Check of Nameplates/Shipping Mark 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
2.53 Check of Invoice/Packing List 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
3.00 FABRICATED EXPANSION JOINTS LOCATION‐ At Thermax Approved Sub Vendor Shop
Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
3.00 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106
Procedures/
3.00 B Review of Welder Qualification Records WPQ ASME IX/AWS D1.1 100% H R R R OR
Records
Procedures/
3.00 C Review of NDT Personnel and Procedures NDE Procedure NDE Procedure, Drawing 100% H R R R OR
Records
APPROVED ASSEMBLY DRAWING OF EXPANSION 
3.01 D VS215B‐101‐A‐DGN‐0416 VS215B‐101‐A‐DGN‐0416 100% Drawing H R R R OR
JOINT
3.01 MATERIAL IDENTIFICATION
Review & Verification of MTC/check test  Drawing, Engg. & Material  MTC/Check  In Absence of MTC, Check 
3.02 Drawing, code, MTC 100% H W R R OR
reports w.r.t. Drg.BOM & Matl specs Specification. MTC, test report test to be done
Drawing, Engg. & Material 
3.03 Dimensional inspection Drawing, code, MTC 10% MTC H W R R OR
Specification. MTC,
Drawing, Engg. & Material  MTC/Check 
3.04 Correlation of MTC with Material Drawing, code, MTC 100% H W R R OR
Specification. MTC, test report
Drawing, Engg. & Material  MTC/Check 
3.05 Material certification as per EN 10204‐2.2 MTC/Lab test Report 100% H R R R OR
Specification. MTC, test report
3.20 FINAL INSPECTION BEFORE PAINTING
Inspection 
3.21 Weld Visual inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W S R OR
Report
Inspection 
3.22 Compliance to Drawing for Scope Drawing Drawing 100% H W S R OR
Report
3.23 Verify NDE Report NDE Procedure NDE Procedure, Drawing 100% NDE Report H R R R OR
Location & Dimensions of Shear Transfer Pin 
Arrangement, Free Movement of Floating  Inspection 
3.24 Drawing Drawing 100% H W S R OR
Plate,Expansion Provision Dimensions,  Report
Flange mating inspection as applicable
3.30 PAINTING INSPECTION

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
3.31 Surface prepration  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Pre‐Blast Check, blotter test & weather 
condition, Cleaning, profile, cleanliness grade  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
3.32 ,Salt contaminants / Conductivity test &  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
check for any steel imperfection,Surface  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Dust Level

DMS
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 

J-04-Au
3.33 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% H R R R OR
2 Report
g-202
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
PRINT
ED 43 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER
Painting specification, Drawing,   Painting specification, Drawing,  
Painting  Check‐ 
3.34 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% H W R R IR
Report ‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  Painting 
3.35 Painting Procedure, Painting Procedure, Random H W R R OR
Rub(MEK) test for inorganic zink,Adhesion  Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test
Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
3.36 Verify Identification and marking Painting Procedure, Painting Procedure, 100% H W R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
3.40 PACKING INSPECTION
Drawing, Specification, Drawing, Specification,
3.41 Rust prevention check SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR * Site dispach directly
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
3.42 Shipping prepration inspection SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of shipping / lifting bracing as per 
3.43 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
approved drawing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
3.44 Check of cleanliness and dryness SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Flange surface check (with photo record) and 
3.45 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
flange face protection
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
3.46 Check of marking for site installation SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of nameplate with Photo Record or 
3.47 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R OR
Rubbing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of Packing conditions as per approved 
3.48 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
Packing Procedure
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
3.49 Final Inspection on all items SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* W* OR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
3.50 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification IRC for direct despatch to 
3.51 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101 at Site 
3.60 PRE‐SHIPPING INSPECTION
Drawing, Specification Drawing, Specification
3.61 Visual Inspection                             100% Packing list H H H* ‐ IR * Site dispach directly
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification

S
3.62 Check of Nameplates/Shipping Mark 100% Packing list H H H* ‐ IR

M
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
3.63
- D
J04-Aug 22
Check of Invoice/Packing List
- 2 0
D
Drawing, Specification
 SS‐000‐14500‐0001
Drawing, Specification
 SS‐000‐14500‐0001
100% Packing list H H H* ‐ IR
44 / 131
P RINTE
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

4.00 AIR FLOW MEASURING DEVICE (AEROFOIL) LOCATION‐ At Thermax Approved Sub Vendor Shop


Review of Welding Procedure Specification  ASME IX/AWS D1.1
4.01 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
(WPS) & Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106
Procedures/
4.01 B Review of Welder Qualification Records WPQ ASME IX/AWS D1.1 100% H R R R OR
Records
Procedures/
4.01 C Review of NDT Personnel and Procedures NDE Procedure NDE Procedure, Drawing 100% H R R R OR
Records
APPROVED ASSEMBLY DRAWING OF AIR & GAS 
4.01 D VS215B‐101‐A‐DGN‐0205 VS215B‐101‐A‐DGN‐0205 100% Drawing H R R R OR
DUCT
4.02 MATERIAL IDENTIFICATION

Review & Verification of MTC/check test  Drawing, Engg. & Material  MTC/Check  In Absence of MTC, Check 


4.03 Drawing, code, MTC 100% H R R R OR
reports w.r.t. Drg.BOM & Matl specs Specification. MTC, test report test to be done
Drawing, Engg. & Material 
4.04 Dimensional inspection Drawing, code, MTC 10% MTC H R R R OR
Specification. MTC,
Drawing, Engg. & Material  MTC/Check 
4.05 Correlation of MTC with Material Drawing, code, MTC 100% H R R R OR
Specification. MTC, test report

Drawing, Engg. & Material  MTC/Check 
4.06 Material certification as per EN 10204‐2.2 MTC/Lab test Report 100% H R R R OR
Specification. MTC, test report

4.10 FINAL INSPECTION BEFORE PAINTING
Inspection 
4.11 Weld Visual inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W W R OR
Report
Dimension inspection, Compliance to 
Inspection 
4.12 Drawing scope,Match Marking, Orientation,  Drawing Drawing 100% H W R R OR
Report
Distortion / Flatness 
4.13 PT of Filet weld joints PT Procedure,  PT Procedure PT ‐10% NDE Report H W R R OR
(*) PMI shall be carried 
Alloy Verification ‐PMI of AS , SS accessible Welds 
4.14 PMI Procedure PMI Procedure 10%(*) PMI report H W R R OR out (If applicable ) as per 
& Parent Metal if Applicable
PMI procedure
Inspection 
4.15 Throat Size Measurement Drawing Drawing 100% H W R R OR
Report
4.20 PAINTING INSPECTION

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
4.21 Surface prepration  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Pre‐Blast Check, blotter test & weather 
condition, Cleaning, profile, cleanliness grade  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
4.22 ,Salt contaminants / Conductivity test &  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
check for any steel imperfection,Surface  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Dust Level

DMS
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 

J-04-Au
4.23 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% H R R R OR
2 Report
g-202
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
PRINT
ED 45 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Painting specification, Drawing,   Painting specification, Drawing,  
Painting  Check‐ 
4.24 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% H W R R IR
Report ‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  Painting 
4.25 Painting Procedure, Painting Procedure, Random H W R R OR
Rub(MEK) test for inorganic zink,Adhesion  Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test
Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
4.26 Verify Identification and marking Painting Procedure, Painting Procedure, 100% H W R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
4.30 PACKING INSPECTION
Drawing, Specification, Drawing, Specification,
4.31 Rust prevention check SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR * Site dispach directly
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
4.32 Shipping prepration inspection SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of shipping / lifting bracing as per 
4.33 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
approved drawing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
4.34 Check of cleanliness and dryness SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Flange surface check (with photo record) and 
4.35 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
flange face protection
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
4.36 Check of marking for site installation SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of nameplate with Photo Record or 
4.37 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R OR
Rubbing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of Packing conditions as per approved 
4.38 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
Packing Procedure
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
4.39 Final Inspection on all items SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* W* OR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002

4.40 INSPECTION RELEASE CERTIFICATE

Drawing, Specification Drawing, Specification IRC for direct despatch to 


4.41 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101 at Site 

S
4.50 PRE‐SHIPPING INSPECTION

4.51 - D M
J04-Aug 22
- 2 0
Visual Inspection                            
Drawing, Specification
 SS‐000‐14500‐0001
Drawing, Specification
 SS‐000‐14500‐0001
100% Packing list H H H* ‐ IR * Site dispach directly
P RINTE
D 46 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Drawing, Specification Drawing, Specification
4.52 Check of Nameplates/Shipping Mark 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
4.53 Check of Invoice/Packing List 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
5.00 STACK LOCATION‐ At Thermax Approved Sub Vendor Shop
Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
5.01 B WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106
Procedures/
5.01 C Review of Welder Qualification Records WPQ ASME IX/AWS D1.1 100% H R R R OR
Records
Procedures/
5.01 D Review of NDT Personnel and Procedures NDE Procedure NDE Procedure, Drawing 100% H R R R OR
Records
APPROVED ARRANGEMENT,TEMPLATE DRAWING  VS215B‐101‐A‐DGN‐0204, VS215B‐101‐A‐DGN‐0204,
5.01 D 100% Drawing H R R R OR
FOR STACK DRAWING OF STACK  VS215B‐101‐A‐DGN‐0505 VS215B‐101‐A‐DGN‐0505
5.02 MATERIAL IDENTIFICATION

Review & Verification of MTC/check test  Drawing, Engg. & Material  MTC/Check  In Absence of MTC, Check 


5.03 Drawing, code, MTC 100% H W R R OR
reports w.r.t. Drg.BOM & Matl specs Specification. MTC, test report test to be done
Drawing, Engg. & Material 
5.04 Dimensional inspection Drawing, code, MTC 10% MTC H W R R OR
Specification. MTC,

Drawing, Engg. & Material  MTC/Check 
5.05 Correlation of MTC with Material Drawing, code, MTC 100% H W R R OR
Specification. MTC, test report

Drawing, Engg. & Material  MTC/Check 
5.06 Material certification as per EN 10204‐2.2 MTC/Lab test Report 100% H R R R OR
Specification. MTC, test report

5.20 INSP.OF STACK TEMPLATE

Butt Weld Dimensions of Sectors,  Inspection 
5.21 Drawing Drawing 100% H W W/R R OR
Dimensions, No.of Holes, Hole size Report

Weld Inspection, Mating inspection,  Inspection 
5.22 Drawing Drawing 100% H W W/R R OR
Identification/Match marking Report
5.30 INSP.OF BASE RING
Inspection 
5.31 Butt Weld Dimensions Drawing Drawing 100% H R W/R R OR
Report
5.32 Backgauging after first side welding PT Procedure PT Procedure 100% NDE Report H R R R OR
5.33 Weld soundness of Butt joints RT Procedure RT Procedure 100% NDE Report H R R R OR
Inspection 
5.34 Match Drilling of Base Ring with Template Drawing Drawing 100% H W R R OR
Report
Dimensions‐Thickness, ID,OD,PCD, Hole 
Inspection 
5.35 Equispacing, No. of Holes,Hole size & pitch,  Drawing Drawing 100% H W W R OR
Report
weld visual inspection
5.40 SETUP OF L‐SEAMS

S
Dimensions‐OD, Ovality, Circulary &  Inspection 

M
5.41 Drawing Drawing 100% H SW R R OR

D
Mismatch, Height Report
5.42
-
J Aug
04-
- 2 022
Backgauging after first side welding
D
PT Procedure PT Procedure 100% NDE Report H R R R OR
47 / 131
PRINTE
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

5.50 SETUP OF SHELL TO SHELL

Mismatch & Alignment of Shells and setup  Inspection 
5.51 Drawing Drawing 100% H SW R R OR
dimensions Report
5.52 Backgauging after first side welding PT Procedure PT Procedure 100% NDE Report H SW R R OR
5.60 FULL WELDING OF SHELL SEAMS

All T joints‐100%, Lseams‐
10%, A One Radiograph per 
each three shop 
5.61 Weld Inspection, Weld soundness RT Procedure RT Procedure 100% NDE Report H R W R OR circumferential seams on 
stack strucutral shell shall be 
made, preferably at vertical 
weld intersections

PT/MT on root run and final welding of 
5.62 PT/MT Procedure PT/MT Procedure 100% NDE Report H W(*) W(*) R OR (*) for final weld
Lifting Hook/Lug to Structure Weld
UT of shell plate at Lifting Lug Locations (200 
5.63 UT Procedure UT Procedure 100% NDE Report H R W/R R OR
mm from full penetration part)
5.70 ALIGNMENT OF STACK SHELLS (2 ADJACENT SHELLS)
Drawing, 1mm/Meter or 20  Inspection 
5.71 Levelling of Shells Drawing 100% H W W/R R OR
mm max  Report
Inspection 
5.72 Base Ring Squareness with respect to Shell Drawing Drawing, within 5mm 100% H W W/R R OR
Report
Shell to Shell Matching/Mismatch (at 120 
Inspection 
5.73 deg.apart), Overall Length,Continuity of  Drawing Drawing 100% H W W R OR
Report
Monkey Ladder&Wind Breaker
Drawing, 1mm/Mtr, 20mm  Inspection 
5.74 Straightness (at 180 deg. apart) Drawing 100% H W W R OR
Max. Report
Identification & Match Marking and  Inspection 
5.75 Drawing Drawing 100% H W W R OR
completion of welding Report
5.80 MOCKUP ASSEMBLY OF PLATFORM AND LADDER

Verify Assly of Platform & Ladders on Stack  Inspection 
5.81 Drawing Drawing 100% H W W R OR
for bolted construction Report
Verify Assly of Platform&Ladders on ground 
Inspection 
5.82 for welded construction, Weld Visual  Drawing Drawing 100% H W W R OR
Report
Inspection
Inspection 
5.83 Verify Painters Trolly Drawing Drawing 100% H W W R OR
Report
5.90 FINAL INSPECTION BEFORE PAINTING

Anchor Pitch & Orientation‐100%, Anchor  Drawing, In hammer test no  Inspection 


5.91 Drawing, Hammer test 100% H W W R IR
weld soundness‐Random breakages Report

Inspection 

DM20S
5.92 Compliance to Drawing for Scope Drawing Drawing 100% H W W R OR
Report
5.00
J-04-Aug-
22
PAINTING INSPECTION FOR STACK

PRINT
ED 48 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
5.01 Surface prepration  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Pre‐Blast Check, blotter test & weather 
condition, Cleaning, profile, cleanliness grade  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
5.02 ,Salt contaminants / Conductivity test &  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
check for any steel imperfection,Surface  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Dust Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
5.03 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% H R R R OR
Report
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
Painting  Check‐ 
5.04 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% H W R R IR
Report ‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  Painting  (*) W for Visual Inspection 
5.05 Painting Procedure, Painting Procedure, Random H W W (*) R OR
Rub(MEK) test for inorganic zink,Adhesion  Report ,DFT  for finished paint.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test
Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
5.06 Verify Identification and marking Painting Procedure, Painting Procedure, 100% H W R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

5.20 PACKING INSPECTION
Drawing, Specification, Drawing, Specification,
5.21 Rust prevention check SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR * Site dispach directly
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
5.22 Shipping prepration inspection SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of shipping / lifting bracing as per 
5.23 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
approved drawing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
5.24 Check of cleanliness and dryness SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Flange surface check (with photo record) and 
5.25 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
flange face protection
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
5.26 Check of marking for site installation SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of nameplate with Photo Record or 
5.27 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list OR
S
H W W* R
Rubbing

- D M
J04-Aug 22
- 2 0
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002

PRINT
ED 49 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Drawing, Specification, Drawing, Specification,
Check of Packing conditions as per approved 
5.28 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
Packing Procedure
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
5.29 Final Inspection on all items SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* W* OR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
5.30 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification IRC for direct despatch to 
5.31 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101 at Site 
5.40 PRE‐SHIPPING INSPECTION
Drawing, Specification Drawing, Specification
5.41 Visual Inspection                             100% Packing list H H H* ‐ IR * Site dispach directly
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
5.42 Check of Nameplates/Shipping Mark 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
5.43 Check of Invoice/Packing List 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Remarks: Template shall have "Boiler Front","Top,Bottom" marking on it, Shop template shall have only pilot drill of 8mm size & reference of final drill size shall be mentioned on it.This drilling shall be done 
along with base plate. For bolted stack,flanges made from sector,such sector weld shall be 100% RT or UT
6.00 WINDBOX LOCATION‐ At Thermax Approved Sub Vendor Shop
Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
6.00 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106

Procedures/
6.00 B Review of Welder Qualification Records WPQ ASME IX/AWS D1.1 100% H R R R OR
Records

Procedures/
6.00 C Review of NDT Personnel and Procedures NDE Procedure NDE Procedure, Drawing 100% H R R R OR
Records
APPROVED ARRANGEMENT DRAWING OF WIND 
6.01 D VS215B‐101‐A‐DGN‐0206 VS215B‐101‐A‐DGN‐0206 100% Drawing H R R R OR
BOX
6.01 MATERIAL IDENTIFICATION

Review & Verification of MTC/check test  Drawing, Engg. & Material  MTC/Check  In Absence of MTC, Check 


6.02 Drawing, code, MTC 100% H W R R OR
reports w.r.t. Drg.BOM & Matl specs Specification. MTC, test report test to be done
Drawing, Engg. & Material 
6.03 Dimensional inspection Drawing, code, MTC 10% MTC H W R R OR
Specification. MTC,
Drawing, Engg. & Material  MTC/Check 
6.04 Correlation of MTC with Material Drawing, code, MTC 100% H W R R OR
Specification. MTC, test report

Drawing, Engg. & Material  MTC/Check 
6.05 Material certification as per EN 10204‐2.2 MTC/Lab test Report 100% H R R R OR
Specification. MTC, test report
6.20 ASSEMBLY INSPECTION
Orientation, Assembly inspection and  Inspection 
6.21 Drawing Drawing 100% H W R R OR

D M S
completion of welding Report

-
J04-Aug 22
- 2 0
ED 50 / 131
PRINT
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Compliance to Drawing for Scope, Round off  Inspection 
6.22 Drawing Drawing 100% H W S R OR
sharp Corner/edges by 2mm radius Report
6.30 PAINTING INSPECTION

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
6.31 Surface prepration  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Pre‐Blast Check, blotter test & weather 
condition, Cleaning, profile, cleanliness grade  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
6.32 ,Salt contaminants / Conductivity test &  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
check for any steel imperfection,Surface  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Dust Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
6.33 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% H R R R OR
Report
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
Painting  Check‐ 
6.34 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% H W R R IR
Report ‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  Painting  (*) W for Visual Inspection 
6.35 Painting Procedure, Painting Procedure, Random H W W(*) R OR
Rub(MEK) test for inorganic zink,Adhesion  Report ,DFT  for finished paint.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
6.36 Verify Identification and marking Painting Procedure, Painting Procedure, 100% H W R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

7.00 BOILER CASING LOCATION‐ At Thermax Approved Sub Vendor Shop


Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
7.00 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106
Procedures/
7.00 B Review of Welder Qualification Records WPQ ASME IX/AWS D1.1 100% H R R R OR
Records
Procedures/
7.00 C Review of NDT Personnel and Procedures NDE Procedure NDE Procedure, Drawing 100% H R R R OR
Records

7.01 MATERIAL IDENTIFICATION
Review & Verification of MTC/check test  Drawing, Engg. & Material  MTC/Check  In Absence of MTC, Check 
7.02 Drawing, code, MTC 100% H R R R OR
reports w.r.t. Drg.BOM & Matl specs Specification. MTC, test report test to be done
Drawing, Engg. & Material 
7.03 Dimensional inspection Drawing, code, MTC 10% MTC H W R R OR
Specification. MTC,

S
Drawing, Engg. & Material  MTC/Check 

M
7.04 Correlation of MTC with Material Drawing, code, MTC 100% H R R R OR

D
Specification. MTC, test report
-
J Aug 22
-
04-
2 0
ED 51 / 131
PRINT
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Drawing, Engg. & Material  MTC/Check 
7.05 Material certification  as per EN 10204‐2.2 MTC/Lab test Report 100% H R R R OR
Specification. MTC, test report

7.10 FINAL INSPECTION BEFORE PAINTING

Inspection 
7.11 Weld Visual inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W W R OR
Report

Dimension inspection, Compliance to  Inspection 
7.12 Drawing Drawing 100% H W S R OR
Drawing scope  Report
7.20 PAINTING INSPECTION

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
7.21 Surface prepration  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Pre‐Blast Check, blotter test & weather 
condition, Cleaning, profile, cleanliness grade  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
7.22 ,Salt contaminants / Conductivity test &  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
check for any steel imperfection,Surface  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Dust Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
7.23 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% H R R R OR
Report
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
Painting  Check‐ 
7.24 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% H W R R IR
Report ‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  Painting  (*) W for Visual Inspection 
7.25 Painting Procedure, Painting Procedure, Random H W W(*) R OR
Rub(MEK) test for inorganic zink,Adhesion  Report ,DFT  for finished paint.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test
Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
7.26 Verify Identification and marking Painting Procedure, Painting Procedure, 100% H W R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

8.00 BOILER STRUCTURE INCLUDING PLATFORM AND LADDER LOCATION‐ At Thermax Approved Sub Vendor Shop

Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
8.00 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106

Procedures/
8.00 B Review of Welder Qualification Records WPQ ASME IX/AWS D1.1 100% H R R R OR
Records

Procedures/
8.00 C Review of NDT Personnel and Procedures NDE Procedure NDE Procedure, Drawing 100% H R R R OR

D M S Records

-
J04-Aug 22
- 2 0
ED 52 / 131
PRINT
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

APPROVED ASSEMBLY DRAWING OF BUCK 
VS215B‐101‐A‐DGN‐0415, VS215B‐101‐A‐DGN‐0415,
8.01 D STAY,ASSEMBLY DRAWING OF PLATFORM,  100% Drawing H R R R OR
VS215B‐101‐A‐DGN‐0418 VS215B‐101‐A‐DGN‐0418
HANDRAIL, LADDER AND STAIR

8.01 MATERIAL IDENTIFICATION
Review of MTC for main load carrying 
Drawing, Engg. & Material  MTC/Check  In Absence of MTC, Check 
8.02 members, Review of MTC/ Check Test  Drawing, code, MTC 100% H R R R OR
Specification. MTC, test report test to be done
reports for Non load carrying members
Drawing, Engg. & Material 
8.03 Dimensional inspection Drawing, code, MTC 10% MTC H SW R R OR
Specification. MTC,
Drawing, Engg. & Material  MTC/Check 
8.04 Correlation of MTC with Material Drawing, code, MTC 100% H W R R OR
Specification. MTC, test report
Material certification for Beams, Columns, 
Drawing, Engg. & Material  MTC/Check 
8.05 High Strength Bolts ‐ EN 10204 3.1, other  MTC/Lab test Report 100% H R R R OR
Specification. MTC, test report
than above ‐ EN10204 2.2
8.10 BUTT JOINTS IN MAIN LOAD CARRYING MEMBERS FOR LENGTH BUILT‐UP
Inspection 
8.11 Joint Location Review Drawing Drawing 100% H W R R IR
Report
Inspection 
8.12 Setup Dimensions Measurement  Drawing Drawing 100% H W R R IR
Report
Inspection 
8.13 Welding Inspection Visual  Drawing, VT Procedure Drawing, VT Procedure 100% H R W R OR
Report
8.14 Weld Soundness  NDE   Procedure RT/UT  Procedure RT/UT 100% NDE Report H R R R OR
8.20 FINAL INSPECTION OF COLUMN
Drawing, Level marking within 
Box Size, Total Height of Column, Level  Inspection 
8.21 Drawing +/‐ 2mm, 5mm Upto 10mtr &  100% H W IW R OR
Marking Report
8mm max.
Drawing, Location within +/‐  Inspection 
8.22 Orientation and Location of Cleats/Brackets Drawing 100% H W IW R OR
2mm Report
Inspection 
8.23 Squareness of Cleats/Brackets Drawing 1.5 gap in 12" Length 100% H W IW R OR
Report
Inspection 
8.24 Straightness ‐(Camber/Sweep) Drawing 1mm/Mtr, or 10mm Max. 100% H W IW R OR
Report

1.5%of Section Ht/Max.5mm;  Inspection 
8.25 Twist & Levelling Drawing 100% H W IW R OR
Water Level Within 5mm Report
Inspection 
8.26 Weld Inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W IW R OR
Report
8.27 NDE of Splice Joints as applicable  Procedure RT/UT  Procedure RT/UT 100% NDE Report H R R R OR
8.28 NDE of Fillet Welds Joints  PT/MT Procedure PT/MT Procedure 10% Random NDE Report H W IW R OR
PT/MT on root run and final welding of 
8.29 PT/MT Procedure PT/MT Procedure 100% NDE Report H W(*) W(*) R OR (*) for final weld
Lifting Lug welding as applicable
Inspection 

DM20S
8.30 Identification Marking Drawing Drawing 100% H W S R OR
Report

J-04-Aug-
8.30 FINAL INSPECTION OF GIRDER
22
PRINT
ED 53 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Inspection 
8.31 Orientation Drawing Drawing 100% H W IW R OR
Report
Length is '+0/‐3mm upto 12mtr,‐
9mm max., Twist & Levelling is  Inspection 
8.32 Overall dimensions, Length, Twist & Levelling Drawing 100% H W IW R OR
1.5%of Section Ht/Max.5mm;  Report
Water Level Within 5mm
Inspection 
8.33 Straightness ‐(Camber/Sweep) Drawing 1mm/Mtr, or 10mm Max. 100% H W IW R OR
Report
Inspection 
8.34 Cleat locations, orientation, dimensions Drawing Drawing 100% H W IW R OR
Report
Weld Soundness of fillet welds for plate 
8.35 PT/MT Procedure PT/MT Procedure 10% NDE Report H W IW R OR
fabricated girders
Inspection 
8.36 Weld Inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W IW R OR
Report
NDE After removal of temporary 
8.37 MT Procedure MT Procedure 100% NDE Report H W IW R OR
supports,after dress up
PT/MT on root run and final welding of 
8.38 PT/MT Procedure PT/MT Procedure 100% NDE Report H W(*) W(*) R OR (*) for final weld
Lifting Hook/Lug to Structure Weld
ID Marking by Tag Welding (Job 
8.39 Drawing Drawing 100% NDE Report H W IW R OR
no.,Drg.no.,Part no
8.40 FINAL INSPECTION OF  BEAMS/BRACINGS
Inspection 
8.41 Orientation Drawing Drawing 100% H W IW R OR
Report
Length is '+0/‐3mm upto 12mtr,‐
9mm max., Twist & Levelling is  Inspection 
8.42 Overall dimensions, Length, Twist & Levelling Drawing 100% H W IW R OR
1.5%of Section Ht/Max.5mm;  Report
Water Level Within 5mm
Inspection 
8.43 Straightness ‐(Camber/Sweep) Drawing 1mm/Mtr, or 10mm Max. 100% H W IW R OR
Report
Inspection 
8.44 Cleat locations, orientation, dimensions Drawing Drawing 100% H W IW R OR
Report
Inspection 
8.45 Weld Inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W IW R OR
Report
8.46 NDE of Fillet Welds Joints  PT/MT Procedure PT/MT Procedure Random 10% NDE Report H W IW R OR
NDE After removal of temporary 
8.47 MT Procedure MT Procedure 100% NDE Report H W IW R OR
supports,after dress up
PT/MT on root run and final welding of 
8.48 PT/MT Procedure PT/MT Procedure 100% NDE Report H W(*) W(*) R OR (*) for final weld
Lifting Hook/Lug to Structure Weld
ID Marking by Tag Welding (Job 
8.49 Drawing Drawing 100% NDE Report H W IW R OR
no.,Drg.no.,Part no
8.50 FINAL INSPECTION OF BUCKSTAYS
Inspection 
8.51 Orientation, Corner Links ‐ Pin fitment Drawing Drawing 100% H W S R OR
Report

D M S
-
J04-Aug 22
- 2 0
ED 54 / 131
PRINT
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Length is '+0/‐3mm upto 12mtr,‐
9mm max., Twist & Levelling is  Inspection 
8.52 Overall dimensions, Length, Twist & Levelling Drawing 100% H W S R OR
1.5%of Section Ht/Max.5mm;  Report
Water Level Within 5mm
Inspection 
8.53 Straightness ‐(Camber/Sweep) Drawing 1mm/Mtr, or 10mm Max. 100% H W S R OR
Report
Inspection 
8.54 Cleat locations, orientation, dimensions Drawing Drawing 100% H W S R OR
Report
Inspection 
8.55 Weld Inspection Drawing Drawing, VT Procedure 100% H W S R OR
Report
8.56 NDE of Fillet Welds Joints  PT/MT Procedure PT/MT Procedure Random 10% NDE Report H W R R OR
NDE After removal of temporary 
8.57 MT Procedure MT Procedure 100% NDE Report H W S R OR
supports,after dress up
PT/MT on root run and final welding of 
8.58 PT/MT Procedure PT/MT Procedure 100% NDE Report H W(*) W(*) R OR (*) for final weld
Lifting Lug welding as applicable
ID Marking by Tag Welding (Job 
8.59 Drawing Drawing 100% NDE Report H W S R OR
no.,Drg.no.,Part no
8.60 FINAL INSP.OF LADDER,STAIRCASE,HANDRAIL,MONORAIL STR, TEMP.ERECTION& PIPE/PR.PART SUPPORTS
Inspection 
8.61 Overall dimensions, Length Drawing Drawing 100% H W S R OR
Report
Inspection 
8.62 Cleat locations, orientation, dimensions Drawing Drawing 100% H W S R OR
Report
Inspection 
8.63 Weld Inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W S R OR
Report
8.64 NDE of Fillet Welds Joints PT/MT Procedure PT/MT Procedure Random 10% NDE Report H W R R OR
PT/MT on root run and final welding of 
8.65 PT/MT Procedure PT/MT Procedure 100% NDE Report H W(*) W(*) R OR (*) for final weld
Lifting Lug welding as applicable
ID Marking by Tag Welding (Job 
8.66 Drawing Drawing 100% NDE Report H W S R OR
no.,Drg.no.,Part no
8.70 TRIAL ASSEMBLY OF LADDER AND PLATFORM / STRUCTURE IF APPLICABLE

Overall Assembly Inspection & Dimensional 
Inspection 
8.71 check, Alignment, Completion of all Welding,  Drawing Drawing 100% H H W R OR
Report
Match Marking 
8.80 FINAL INSP.OF CANOPY STRUCTURE
Inspection 
8.81 Overall dimensions, Length, Twist & Levelling Drawing, Drawing 100% H W S R OR
Report
Inspection 
8.82 Cleat locations, orientation, dimensions Drawing, Drawing 100% H W S R OR
Report
Inspection 
8.83 Weld Inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W S R OR
Report
8.84 NDE of Splice Joints Procedure RT/ UT  Procedure RT/ UT 100% NDE Report H W R R OR
8.85 NDE of Fillet Welds Joints  PT/MT Procedure PT/MT Procedure Random 10% NDE Report H W R R OR

D M S
-
PT/MT on root run and final welding of 
8.86
J04-Aug -2022
Lifting Lug welding as applicable

PRINT
ED
PT/MT Procedure PT/MT Procedure 100% NDE Report H W(*) W(*) R OR (*) for final weld

55 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

ID Marking by Tag Welding (Job 
8.87 Drawing Drawing 100% NDE Report H W S R OR
no.,Drg.no.,Part no
8.90 FINAL INSP.OF SKID STRUCTURES

Inspection 
8.91 Overall dimensions, Length, Twist & Levelling Drawing, Drawing 100% H W S R OR
Report
Inspection 
8.92 Cleat locations, orientation, dimensions Drawing, Drawing 100% H W S R OR
Report
Inspection 
8.93 Weld Inspection Drawing, VT Procedure Drawing, VT Procedure 100% H W S R OR
Report

8.94 NDE of Fillet Welds Joints PT/MT Procedure PT/MT Procedure Random 10% NDE Report H W R R OR

PT/MT on root run and final welding of 
8.95 PT/MT Procedure PT/MT Procedure 100% NDE Report H W(*) W(*) R OR (*) for final weld
Lifting Lug welding as applicable

ID Marking by Tag Welding (Job 
8.96 Drawing Drawing 100% NDE Report H W S R OR
no.,Drg.no.,Part no

9.00 PAINTING INSPECTION

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
9.01 Surface prepration  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Pre‐Blast Check, blotter test & weather 
condition, Cleaning, profile, cleanliness grade  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
9.02 ,Salt contaminants / Conductivity test &  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
check for any steel imperfection,Surface  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Dust Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
9.03 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% H R R R OR
Report
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
Painting  Check‐ 
9.04 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% H W R R IR
Report ‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  Painting  (*) W for Visual Inspection 
9.05 Painting Procedure, Painting Procedure, Random H W W(*) R OR
Rub(MEK) test for inorganic zink,Adhesion  Report ,DFT  for finished paint.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test
Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
9.06 Verify Identification and marking Painting Procedure, Painting Procedure, 100% H W R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
9.10
S
PACKING INSPECTION

D M
-
J04-Aug 22
- 2 0
ED 56 / 131
PRINT
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Drawing, Specification, Drawing, Specification,
9.11 Rust prevention check SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR * Site dispach directly
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
9.12 Shipping prepration inspection SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of shipping / lifting bracing as per 
9.13 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
approved drawing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
9.14 Check of cleanliness and dryness SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Flange surface check (with photo record) and 
9.15 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
flange face protection
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
9.16 Check of marking for site installation SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of nameplate with Photo Record or 
9.17 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R OR
Rubbing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of Packing conditions as per approved 
9.18 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
Packing Procedure
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
9.19 Final Inspection on all items SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* W* OR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
9.20 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification IRC for direct despatch to 
9.21 Final Document Review and Issue of IRC 100% IRC H H H R IRC
 SS‐000‐15200‐0101  SS‐000‐15200‐0101 at Site 
9.30 PRE‐SHIPPING INSPECTION
Drawing, Specification Drawing, Specification
9.31 Visual Inspection                             100% Packing list H H H* ‐ IR * Site dispach directly
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
9.32 Check of Nameplates/Shipping Mark 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
9.33 Check of Invoice/Packing List 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
10.00 FOUNDATION BOLTS & PACKER PLATES LOCATION‐ At Thermax Approved Sub Vendor Shop
Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
10.00 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106
ASME Section IX/ AWS D1.1 ASME Section IX/ AWS D1.1 Procedures/
10.00 B Review of Welder Qualification Records 100% H R R R OR
Records
Procedures/
10.00 C Review of NDT Personnel and Procedures ASME Section V ASME Section V 100% H R R R OR
Records
APPROVED LOADING DATA & FOUNDATION 
10.01 D VS215B‐101‐A‐DGN‐0503 VS215B‐101‐A‐DGN‐0503 100% Drawing H R R R OR

S
DRAWING FOR AUXILIARY EQUIPMENT

10.02 - D M
10.01 MATERIAL IDENTIFICATION

J04-Aug 22
- 2 0
Review & Verification of MTC/check test 
Drawing, ASME Sec‐II,Matl. Specs.
ASME Sec.II, Drawing, 
100%
MTC/Check 
H R R R OR
In Absence of MTC, Check 
reports w.r.t. Drg.BOM & Matl specs
INTED
PR
Specification test report 57 / 131
test to be done
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

ASME Sec.II, Drawing, 
10.03 Dimensional inspection Drawing, ASME Sec‐II,Matl. Specs. 10% MTC H R R R OR
Specification
ASME Sec.II, Drawing,  MTC/Check 
10.04 Correlation of MTC with Material MTC,Drawing,Code 100% H R R R OR
Specification test report

ASME Sec.II, Drawing,  MTC/Check 
10.05 Material certification  as per EN 10204‐2.2 MTC/Lab test Report 100% H R R R OR
Specification test report

10.10 FINAL INSPECTION (FOUNDATION BOLT)
Bolt Dimensions: Overall Length, Thread  Inspection 
10.11 Drawing  Drawing  100% H SW R R OR
Length Report
Anchor Plate Dimensions: Length X Width x  Inspection 
10.12 Drawing  Drawing  100% H SW R R OR
Thickness Report
Inspection 
10.13 Plain Washers / Taper Washers Drawing  Drawing  100% H SW R R OR
Report
Inspection 
10.14 Bolt thread, finish & Size Drawing  Drawing  100% H SW R R OR
Report
Nut Proof Load in black condition as  Inspection 
10.15 Drawing  Drawing  100% H SW R R OR
applicable Report
Inspection 
10.16 Nut,Locknut fitment with Bolt Threads Drawing  Drawing  100% H SW R R OR
Report
Weld Inspection (Size & Finish) of anchoring  Inspection 
10.17 Drawing  Drawing  100% H SW R R OR
Plates/Rods Report
10.20 FINAL INSPECTION (PACKER PLATES)
Inspection 
10.21 Dimensions: Length x Width x Thickness Drawing  Drawing  100% H W S R OR
Report
Inspection 
10.22 Edge Finish Drawing  Drawing  100% H H R R OR
Report
10.30 PAINTING INSPECTION
Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
10.31 Surface prepration  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Pre‐Blast Check, blotter test & weather 
condition, Cleaning, profile, cleanliness grade  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
10.32 ,Salt contaminants / Conductivity test &  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
check for any steel imperfection,Surface  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Dust Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
10.33 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% H R R R OR
Report
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
Painting  Check‐ 
10.34 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% H W SW R IR
Report ‐ Atmospheric Condition 

D M S SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

-
J04-Aug 22
- 2 0
ED 58 / 131
PRINT
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  Painting  (*) W for Visual Inspection 
10.35 Painting Procedure, Painting Procedure, Random H W W(*) R OR
Rub(MEK) test for inorganic zink,Adhesion  Report ,DFT  for finished paint.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
10.36 Verify Identification and marking Painting Procedure, Painting Procedure, 100% H W R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

10.40 PACKING INSPECTION

Drawing, Specification, Drawing, Specification,
10.41 Rust prevention check SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR * Site dispach directly
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
10.42 Shipping prepration inspection SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of shipping / lifting bracing as per 
10.43 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
approved drawing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
10.44 Check of cleanliness and dryness SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Flange surface check (with photo record) and 
10.45 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
flange face protection
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
10.46 Check of marking for site installation SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of nameplate with Photo Record or 
10.47 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R OR
Rubbing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of Packing conditions as per approved 
10.48 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
Packing Procedure
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
10.49 Final Inspection on all items SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* W* OR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
10.50 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification IRC for direct despatch to 
10.51 Final Document Review and Issue of IRC 100% IRC H H H R IRC
 SS‐000‐15200‐0101  SS‐000‐15200‐0101 at Site 
10.60 PRE‐SHIPPING INSPECTION
Drawing, Specification Drawing, Specification
10.61 Visual Inspection                             100% Packing list H H H* ‐ IR * Site dispach directly
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
10.62 Check of Nameplates/Shipping Mark 100% Packing list H H H* ‐ IR

D M S  SS‐000‐14500‐0001  SS‐000‐14500‐0001

-
Drawing, Specification Drawing, Specification
J04-Aug 2
10.63 Check of Invoice/Packing List
- 2 0 2
PRINT
ED
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
100% Packing list H H H* ‐ IR

59 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

11.00 GRATINGS (GRILLS) LOCATION‐ At Thermax Approved Sub Vendor Shop


Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
11.00 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106
ASME Section IX/ AWS D1.1 ASME Section IX/ AWS D1.1 Procedures/
11.00 B Review of Welder Qualification Records 100% H R R R OR
Records
Procedures/
11.00 C Review of NDT Personnel and Procedures ASME Section V ASME Section V 100% H R R R OR
Records
11.01 MATERIAL IDENTIFICATION
Review & Verification of MTC/check test  ASME Sec.II, Drawing,  MTC/Check 
11.02 Drawing, ASME Sec‐II,Matl. Specs. 100% H R R R OR
reports w.r.t. Drg.BOM & Matl specs Specification test report
ASME Sec.II, Drawing, 
11.03 Dimensional inspection Drawing, ASME Sec‐II,Matl. Specs. 10% MTC H R R R OR
Specification
ASME Sec.II, Drawing,  MTC/Check 
11.04 Correlation of MTC with Material MTC,Drawing,Code 100% H R R R OR
Specification test report
ASME Sec.II, Drawing,  MTC/Check  In Absence of MTC, Check 
11.05 Material certification  as per EN 10204‐2.2 MTC/Lab test Report 100% H R R R OR
Specification test report test to be done
11.10 DIMENSIONAL INSPECTION
Inspection 
11.11 Length & Width Drawing +0/‐5mm 10% H SW R R OR
Report
Inspection 
11.12 Span Orientation Drawing Drawing 10% H SW R R OR
Report
Diagonals, Dimensions & Thickness,  Diagonals‐Within 5mm, 
Inspection 
11.13 Transverse Bow, Logitudinal Bow, Check  Drawing Transverse Bow‐ within 3mm,  10% H SW R R OR
Report
serrated type Longitudinal Bow‐ within 5mm
Inspection 
11.14 Weld Inspection (Size & Finish) Drawing Drawing 10% H SW R R OR
Report
11.30 CHECK TEST FOR GALVANISING     
Inspection / 
11.31 Uniformity in thickness of coating ‐sample                 Painting specification & Procedure Painting specification & Procedure 100% Galvanising  H W R R OR
Report
Inspection / 
11.32 Mass of Zinc coating‐  ‐ sample                                      Painting specification & Procedure Painting specification & Procedure 100% Galvanising  H W R R OR
Report
Inspection / 
11.33 Adherence of Zinc coating ‐  ‐ sample                           Painting specification & Procedure Painting specification & Procedure 100% Galvanising  H W R R OR
Report
Inspection / 
11.34 DFT of Zinc coating‐  ‐ sample                                         Painting specification & Procedure Painting specification & Procedure 100% Galvanising  H W R R OR
Report
11.40 GALVANISING INSPECTION    
Inspection / 
11.41 Compliance to Drawing for Scope                                 Painting specification & Procedure Painting specification & Procedure 100% Galvanising  H SW R R OR
Report
Inspection / 
11.42 Visual Inspection for Galvanised items                         Painting specification & Procedure Painting specification & Procedure 100% Galvanising  H SW R R OR
Report

D M S Inspection / 
11.43
-
J04-Aug 22
DFT of zinc coat for Galvanised items                           Painting specification & Procedure
- 2 0
ED
Painting specification & Procedure 100% Galvanising 
Report
H SW R R OR

60 / 131
PRINT
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Inspection / 
Identification Marking (Grill Size, Job No., Mark 
11.44 Painting specification & Procedure Painting specification & Procedure 100% Galvanising  H SW R R OR
no.)
Report
11.50 PACKING INSPECTION
Drawing, Specification, Drawing, Specification,
11.51 Rust prevention check SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR * Site dispach directly
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
11.52 Shipping prepration inspection SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of shipping / lifting bracing as per 
11.53 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
approved drawing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
11.54 Check of cleanliness and dryness SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Flange surface check (with photo record) and 
11.55 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
flange face protection
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
11.56 Check of marking for site installation SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of nameplate with Photo Record or 
11.57 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R OR
Rubbing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of Packing conditions as per approved 
11.58 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
Packing Procedure
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
11.59 Final Inspection on all items SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* W* OR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
11.60 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification IRC for direct despatch to 
11.61 Final Document Review and Issue of IRC 100% IRC H H H R IRC
 SS‐000‐15200‐0101  SS‐000‐15200‐0101 at Site 
11.70 PRE‐SHIPPING INSPECTION
Drawing, Specification Drawing, Specification
11.71 Visual Inspection                             100% Packing list H H H* ‐ IR * Site dispach directly
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
11.72 Check of Nameplates/Shipping Mark 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
11.73 Check of Invoice/Packing List 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
12.00 DRUM INTERNALS & EXTERNALS LOCATION‐ At Thermax Approved Sub Vendor Shop
Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
12.00 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106

D M S ASME Section IX/ AWS D1.1 ASME Section IX/ AWS D1.1 Procedures/

-
12.00 B Review of Welder Qualification Records 100% H R R R OR
J Aug 22
-
04-
2 0
PRINT
ED
Records

61 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Procedures/
12.00 C Review of NDT Personnel and Procedures ASME Section V ASME Section V 100% H R R R OR
Records
12.01 MATERIAL IDENTIFICATION
Review & Verification of MTC/check test  ASME Sec.II, Drawing,  MTC/Check  In Absence of MTC, Check 
12.02 Drawing, ASME Sec‐II,Matl. Specs. 100% H R R R OR
reports w.r.t. Drg.BOM & Matl specs Specification test report test to be done
ASME Sec.II, Drawing, 
12.03 Dimensional inspection Drawing, ASME Sec‐II,Matl. Specs. 10% MTC H R R R OR
Specification
ASME Sec.II, Drawing,  MTC/Check 
12.04 Correlation of MTC with Material MTC,Drawing,Code 100% H R R R OR
Specification test report
Material certification  as per EN 10204‐2.1/  ASME Sec.II, Drawing,  MTC/Check 
12.05 MTC/Lab test Report 100% H R R R OR
2.2 Specification test report
12.10 INSPECTION OF DRUM INTERNALS
Inspection 
12.11 Orientation of Assembly w.r.to Boiler Front Drawing Drawing 100% H SW R R OR
Report
Inspection 
12.12 Dimension Inspection  Drawing Drawing 100% H SW R R OR
Report
Inspection 
12.13 INTERNAL ATTACHMENTS Drawing Drawing 100% H SW R R OR
Report
Inspection 
12.14 Thread checking of Nut and bolt Drawing Drawing 100% H SW R R OR
Report
12.20 INSPECTION OF DRUM EXTERNALS

Inspection 
12.72 Dimensions  Drawing Drawing 100% H SW R R OR
Report
12.73 NDE of Lifting Lug Drawing , UT Procedure Drawing , UT Procedure 100% NDE Report H SW R R OR
12.30 PANEL ASSEMBLY INSPECTION ( AS APPLICABLE)
Inspection 
12.31 Orientation of Assembly w.r.t. Boiler Front Drawing Drawing 100% H SW R R OR
Report
Bolt Pitch & orientation on angle & Division  Inspection 
12.32 Drawing Drawing 100% H SW R R OR
Plate© Report
On layout Insp. of Division and Closing  Inspection 
12.33 Drawing Drawing 100% H SW R R OR
Division Plate Report
Inspection 
12.34 Rib location and Dimension Inspection Drawing Drawing 100% H SW R R OR
Report
Inspection 
12.35 Dimension of division plate supports Drawing Drawing 100% H SW R R OR
Report
Longitudinal Support Inspection ‐‐Length,  Inspection 
12.36 Drawing Drawing 100% H SW R R OR
Verify slotted holes at ends Report
Width of any panel should be less or equal to  Inspection 
12.37 Drawing Drawing 100% H SW R R OR
400 mm Report
Inspection 
12.38 Orienatation of cut out & Hole Pitch Drawing Drawing 100% H SW R R OR
Report
Inspection 
12.39 Sqaureness of Connection box Drawing Drawing 100% H SW R R OR

S
Report
12.40
12.50
- D M
Gasket & Hardware fitment to its respective 

J04-Aug
parts
- 2 0 22
Drawing
PRIMARY SCRUBBER ASSEMBLY INSPECTION ( AS APPLICABLE)
Drawing 100%
Inspection 
Report
H SW R R OR

PRINT
ED 62 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Inspection 
12.51 Orientation of Assembly w.r.to Boiler Front Drawing Drawing 100% H SW R R OR
Report

Verify quantity of locking plates, lower &  Inspection 
12.52 Drawing Drawing 100% H SW R R OR
Vertical supports Report

Profile check with Template for Scrubber  Inspection 
12.53 Drawing Drawing 100% H SW R R OR
Locking Plate Report
Orientation of both end support plates  Inspection 
12.54 Drawing Drawing 100% H SW R R OR
(Mirror image) Report
12.60 SECONDARY SCRUBBER ASSEMBLY INSPECTION ( AS APPLICABLE)

Inspection 
12.61 Orientation of Assembly w.r.to Boiler Front Drawing Drawing 100% H SW R R OR
Report
Raw Material Dimension Insp.(Perforated 
Inspection 
12.62 sheet‐ with width negative tolerance upto 2‐ Drawing Drawing 100% H SW R R OR
Report
3mm)
Slot & CTC of Secondary Scrubber locking  Inspection 
12.63 Drawing Drawing 100% H SW R R OR
plates Report

Weld and profile check of Secondary  Inspection 
12.64 Drawing Drawing 100% H SW R R OR
Scrubber angle & Gusset Report

12 mm square bar fitment to Secondary  Inspection 
12.65 Drawing Drawing 100% H SW R R OR
Scrubber angles Report
12.70 CYCLON ASSEMBLY INSPECTION ( AS APPLICBLE)

Inspection 
12.71 Orientation of Assembly w.r.to Boiler Front Drawing Drawing 100% H SW R R OR
Report

Matching of Cyclon conn box with cyclon  Inspection 
12.72 Drawing Drawing 100% H SW R R OR
mouth Report

Inspection 
12.73 Matchmarking of each cyclon & conn. Box Drawing Drawing 100% H SW R R OR
Report

Inspection 
12.74 Spout profile matching with cyclon Drawing Drawing 100% H SW R R OR
Report
12.80 PIPING & PIPING SUPOORTS INSPECTION ( AS APPLICABLE)
Inspection 
12.81 Orientation of Assembly w.r.to Boiler Front Drawing Drawing 100% H SW R R OR
Report
Inspection 
12.82 Verify Pipe orientations on fixtures Drawing Drawing 100% H SW R R OR
Report

D M S
12.83 Drain hole ( If applicable) Drawing Drawing 100%
Inspection 
H SW R R OR
-
J Aug 22
04-
- 2 0
ED
Report

63 / 131
PRINT
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Pipe Support Height & Hole Location from  Inspection 
12.84 Drawing Drawing 100% H SW R R OR
top Report
Inspection 
12.85 Pipe support cut out orientation & profile Drawing Drawing 100% H SW R R OR
Report
Inspection 
12.86 Flange Class, thickness & Grade Drawing Drawing 100% H SW R R OR
Report

Inspection 
12.87 Piping Hole orientation Drawing Drawing 100% H SW R R OR
Report

Verification of Shop & Vendor weld joint  Inspection 
12.88 Drawing Drawing 100% H SW R R OR
scope Report
Inspection 
12.89 Holding U & J Clamp size & Threading Length Drawing Drawing 100% H SW R R OR
Report
Inspection 
12.90 Ensure Gaskets for Piping in loose condition Drawing Drawing 100% H SW R R OR
Report
12.90 SADDLE PAD & SADDLE INSPECTION
On layout Insp. of Saddle for Profile, Height  Inspection 
12.91 Drawing Drawing 100% H SW R R OR
check Report
Twist check with cross/diagonal threads of  Inspection 
12.92 Drawing Drawing 100% H SW R R OR
Saddle Pads Report
Base Plate Distortion /flatness after rib  Inspection 
12.93 Drawing Drawing 100% H SW R R OR
welding Report
Orientaion,Size,Visual Insp. of Base Plate  Inspection 
12.94 Drawing Drawing 100% H SW R R OR
Hole/slots Report
Hard Punch Marking of Base Plate Center &  Inspection 
12.95 Drawing Drawing 100% H SW R R OR
Dignonal point before Drilling Report
Prependicularity of base plate with vertical  Inspection 
12.96 Drawing Drawing 100% H SW R R OR
plate Report
Weld Fillet Size / Visual ( If any NDT  Inspection 
12.97 Drawing Drawing 100% H SW R R OR
Applicable) Report
Inspection 
12.98 Rust Prevention oiling to Hardware Drawing Drawing 100% H SW R R OR
Report
12.00 FINAL INSPECTION
Inspection 
12.11 Completion of all Welding Drawing Drawing 100% H SW R R OR
Report
Inspection 
12.12 Weld Inspection Drawing Drawing 100% H SW R R OR
Report

Inspection 
12.13 Compliance to Drawing for Scope Drawing Drawing 100% H SW R R OR
Report

Identification Marking (Job no.,Drg.no.,Part  Inspection 
12.14 Drawing Drawing 100% H SW R R OR
no,Weight*) Report

M S
Round off sharp Corner/edges by 2mm 
D
Inspection 

-
J Aug
12.15 Drawing Drawing 100% H SW R R OR
radius
- 2 0 22 Report
04- PRINT
ED 64 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

13.00 BOILER BASE FRAME(FM) LOCATION‐ At Thermax Approved Sub Vendor Shop


Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
13.00 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106

ASME Section IX/ AWS D1.1 ASME Section IX/ AWS D1.1 Procedures/


13.00 B Review of Welder Qualification Records 100% H R R R OR
Records

Procedures/
13.00 C Review of NDT Personnel and Procedures ASME Section V ASME Section V 100% H R R R OR
Records

13.01 MATERIAL IDENTIFICATION

Review & Verification of MTC/check test  ASME Sec.II, Drawing,  MTC/Check 


13.01 Drawing, ASME Sec‐II,Matl. Specs. 100% H R R R OR
reports w.r.t. Drg.BOM & Matl specs Specification test report
ASME Sec.II, Drawing, 
13.02 Dimensional inspection Drawing, ASME Sec‐II,Matl. Specs. 10% MTC H R R R OR
Specification
ASME Sec.II, Drawing,  MTC/Check 
13.03 Correlation of MTC with Material MTC,Drawing,Code 100% H R R R OR
Specification test report
Material certification for Beams,High 
ASME Sec.II, Drawing,  MTC/Check  In Absence of MTC, Check 
13.04 Strength Bolts ‐ EN 10204 3.1, other than  MTC/Lab test Report 100% H R R R OR
Specification test report test to be done
above ‐ EN10204 2.2
13.10 FINAL INSPECTION
Overall dimensions, Length, Twist &  Inspection 
13.11 Drawing Drawing, Within 5mm 100% H W W R OR
Levelling, Squareness Report
13.12 Weld Visual inspection VT Procedure, Drawing VT Procedure, Drawing 100% NDE Report H W W R OR
13.13 NDE of Fillet Welds Joints PT/MT Procedure PT/MT Procedure 10% Random NDE Report H R W R OR
PT/MT on root run and final welding of 
13.14 PT/MT Procedure PT/MT Procedure 100% NDE Report H W(*) W(*) R OR (*) for final weld
Lifting Lug welding as applicable
13.15 NDE of full penetration Groove Welds Joints UT Procedure, Drawing UT Procedure, Drawing 100% NDE Report H R W R OR
13.20 PAINTING INSPECTION
Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
13.21 Surface prepration  Painting Procedure, Painting Procedure, 100% H SW IW/S R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Pre‐Blast Check, blotter test & weather 
condition, Cleaning, profile, cleanliness grade  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
13.22 ,Salt contaminants / Conductivity test &  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
check for any steel imperfection,Surface  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Dust Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
13.23 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% H R R R OR
Report
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

DMS
Painting specification, Drawing,   Painting specification, Drawing,  
Painting  Check‐ 

J-04-Au
13.24 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% H W W R IR
2 Report ‐ Atmospheric Condition 
g-202 SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
PRINT
ED 65 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  Painting  (*) W for Visual Inspection 
13.25 Painting Procedure, Painting Procedure, Random H W W(*) R OR
Rub(MEK) test for inorganic zink,Adhesion  Report ,DFT  for finished paint.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test
Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
13.26 Verify Identification and marking Painting Procedure, Painting Procedure, 100% H W R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
14.00 MISCELLANEOUS ITEMS LOCATION‐ At Thermax Approved Sub Vendor Shop
Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
14.00 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106

ASME Section IX/ AWS D1.1 ASME Section IX/ AWS D1.1 Procedures/


14.00 B Review of Welder Qualification Records 100% H R R R OR
Records

Procedures/
14.00 C Review of NDT Personnel and Procedures ASME Section V ASME Section V 100% H R R R OR
Records

14.01 MATERIAL IDENTIFICATION

Review & Verification of MTC/check test  ASME Sec.II, Drawing,  MTC/Check  In Absence of MTC, Check 


14.01 Drawing, ASME Sec‐II,Matl. Specs. 100% H R R R OR
reports w.r.t. Drg.BOM & Matl specs Specification test report test to be done

ASME Sec.II, Drawing, 
14.02 Dimensional inspection Drawing, ASME Sec‐II,Matl. Specs. 10% MTC H R R R OR
Specification
ASME Sec.II, Drawing,  MTC/Check 
14.03 Correlation of MTC with Material MTC,Drawing,Code 100% H R R R OR
Specification test report
ASME Sec.II, Drawing,  MTC/Check 
14.04 Material certification  as per EN 10204‐2.2 MTC/Lab test Report 100% H R R R OR
Specification test report
14.10 FABRICATED PARTS / SUB‐ASSEMBLIES

Orientation, Overall Dimensions, Bend 
(*) PMI shall be carry out 
Profiles, If any, Fitment of All Parts, PMI for  Inspection 
14.11 Drawing, Procedure PMI Drawing, Procedure PMI 100%(*) H R R R OR (if applicable) as per PMI 
AS / SS Material, Weld Inspection (Size &  Report
procedure
Finish)
14.20 MACHINED PARTS / SUB‐ASSEMBLIES
Orientation, Dimensions, Concentricity,  (*) PMI shall be carry out 
Inspection 
14.21 Finish of Machined Surface, PMI for AS / SS  Drawing, Procedure PMI Drawing, Procedure PMI 100%(*) H R R R OR (if applicable) as per PMI 
Report
Material procedure
14.30 INSPECTION OF BOUGHT OUT ITEMS

Make,Model,Sr.No., TC Verification, Overall  Drawing, Catalogue,  Inspection 


14.31 Drawing, Catalogue, Specification 100% H R R R OR
Dimensions Specification Report
14.40 INSP.OF PRE‐COATED SHEETS
Dimensions ‐ Profile & thickness, Verification 

D M S
14.41 & Co‐relation w.r.to PO/Catelouges, Colour  Drawing, Catalogue, Specification
Drawing, Catalogue, 
100%
Inspection 
H R R R OR

14.50
-
J Aug
Shade‐1005022
-
4-
2
0NON CRTICAL HARDWARES ( CLASS < OR = 4.6)
ED
Specification Report

66 / 131
PRINT
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Bolt Thread Finish, Nut,Locknut Threads, Bolt  (*) PMI shall be carry out 
Drawing, Plug Guage, Ring Gauge,  Inspection 
14.51 Threads, Nut & Bolt Dimensions, PMI for  Drawing 10%(*) H R R R OR (if applicable) as per PMI 
Specification Report
AS/SS Material procedure
14.60 CRITICAL HARDWARES ( CLASS > 4.6 )
Bolt Thread Finish, Nut,Locknut Threads, Bolt  (*) PMI shall be carry out 
Drawing, Plug Guage, Ring Gauge,  Inspection 
14.61 Threads, Nut & Bolt Dimensions, PMI for  Drawing 10%(*) H SW R R OR (if applicable) as per PMI 
Specification Report
AS/SS Material procedure
Mechanical Testing of Bolts and Nuts from  Destructive 
14.62 Drawing, Specification Drawing, Specification 100% H SW R R OR
Finish Lot‐2 nos per lot per size test Report

14.70 PACKING INSPECTION
Drawing, Specification, Drawing, Specification,
14.71 Rust prevention check SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR * Site dispach directly
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
14.72 Shipping prepration inspection SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of shipping / lifting bracing as per 
14.73 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
approved drawing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
14.74 Check of cleanliness and dryness SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Flange surface check (with photo record) and 
14.75 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
flange face protection
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
14.76 Check of marking for site installation SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of nameplate with Photo Record or 
14.77 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R OR
Rubbing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of Packing conditions as per approved 
14.78 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
Packing Procedure
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
14.79 Final Inspection on all items SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* W* OR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
14.80 INSPECTION RELEASE CERTIFICATE
IRC for direct despatch to at 
14.81 Final Document Review and Issue of IRC Drawing, Specification Drawing, Specification IRC H H H* R IRC
Site 
14.90 PRE‐SHIPPING INSPECTION
Drawing, Specification Drawing, Specification
14.91 Visual Inspection                             100% Packing list H H H* ‐ IR * Site dispach directly
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification

DM20S
14.92 Check of Nameplates/Shipping Mark 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001

J-04-A
ug-
22
14.93 Check of Invoice/Packing List
RINTED
Drawing, Specification
 SS‐000‐14500‐0001
Drawing, Specification
 SS‐000‐14500‐0001
100% Packing list H H H* ‐ IR
67 / 131
ITP FOR NPPROLLED W HEN P
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER
Scope of items under this ITP/QAP:
FABRICATED PARTS/SUB‐ASSEMBLIES :
1. LIGHTENING ARRESTOR
2. CHEQUERED PLATES
3. DRIP PAN, GUTTERS, DOWNTAKE PIPES & 
FITTINGS
4. PEEP HOLE,ACCESS DOOR,MOUNTING 
14.94 BOXES
5. PIPE RACK
6. FABRICATED SUPPORTS FOR PIPING
MACHINED/PRESSED PARTS :
1. COIL/TUBE SUPPORTS/ATTACHMENTS.      
2. FLAT & ROUND STUDS
3. PR./NON PR.PART ATTACHMENTS‐ TO BE 
WELDED AT SHOP/SITE
BOUGHT OUT ITEMS
1. HARDWARES
2. CANOPY ACCESSORIES
3. 'J' BOLTS, 'U' BOLTS
4. NAME PLATES
5. LUBRICANTS
14.95 6. SKY CLIMBER
7. PORTA CABIN iF APPLICABLE
9. HOLDING & CLADING MATERIAL FOR 
REFRACTORY & INSULATION
10. FERRULE
11. PAINT
12. Anchor Bolts
15.00 STRUCTURE & CASING FOR MODULAR ECO.ASSLY LOCATION‐ At Thermax Approved Sub Vendor Shop
Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
15.00 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106
ASME Section IX/ AWS D1.1 ASME Section IX/ AWS D1.1 Procedures/
15.00 B Review of Welder Qualification Records 100% H R R R OR
Records
Procedures/
15.00 C Review of NDT Personnel and Procedures ASME Section V ASME Section V 100% H R R R OR
Records

15.00 D Review of Detailed Assembly Drawing 100% Drawings H R R R OR


15.01 MATERIAL IDENTIFICATION
Review & Verification of MTC/check test  ASME Sec.II, Drawing,  MTC/Check 
15.01 Drawing, ASME Sec‐II,Matl. Specs. 100% H W R R OR
reports w.r.t. Drg.BOM & Matl specs Specification test report
ASME Sec.II, Drawing, 
15.02 Dimensional inspection Drawing, ASME Sec‐II,Matl. Specs. 10% MTC H W R R OR
Specification
ASME Sec.II, Drawing,  MTC/Check 
15.03 Correlation of MTC with Materia MTC,Drawing,Code 100% H W R R OR

S
Specification test report
15.04
D M
Material certification for pressure part as per 
-
J04-Aug - 2022
EN 10204‐2.2
MTC
ASME Sec.II, Drawing, 
Specification
100% MTC H R R R OR
15.10 FINAL INSPECTION BEFORE PAINTING
D
PRINT
E 68 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Inspection 
15.11 Weld Visual inspection Drawing Drawing 100% H W W R OR
Report

15.12 NDE of Fillet Welds Joints PT/MT Procedure PT/MT Procedure Random 30% NDE Report H W W R OR

PT/MT on root run and final welding of 
15.13 PT/MT Procedure PT/MT Procedure 100% NDE Report H W W R OR
Lifting Lug welding as applicable
Dimension inspection, Compliance to  (*) PMI shall be carry out 
Inspection 
15.14 Drawing scope, PMI of AS/SS Welds & Parent  Drawing, PMI Procedure Drawing, PMI Procedure 100%(*) H W R R OR (if applicable) as per PMI 
Report
Metal  procedure
Trial Assembly of Eco Casing & Structure ‐
Overall Assembly Inspection & Dimensional  Inspection 
15.15 Drawing Drawing 100% H W W R OR
check, Alignment, Completion of all Welding,  Report
Match Marking 
15.20 PAINTING INSPECTION

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
15.21 Surface prepration  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Pre‐Blast Check, blotter test & weather 
condition, Cleaning, profile, cleanliness grade  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
15.22 ,Salt contaminants / Conductivity test &  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
check for any steel imperfection,Surface  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Dust Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
15.23 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% H R R R OR
Report
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
Painting  Check‐ 
15.24 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% H W R R IR
Report ‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  Painting  (*) W for Visual Inspection 
15.25 Painting Procedure, Painting Procedure, Random H W W(*) R OR
Rub(MEK) test for inorganic zink,Adhesion  Report ,DFT  for finished paint.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test
Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
15.26 Verify Identification and marking Painting Procedure, Painting Procedure, 100% H W R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
16.00 LIFTING BEAM LOCATION‐ At Thermax Approved Sub Vendor Shop
Review of Welding Procedure Specification (WPS)  ASME IX/AWS D1.1
16.00 A WPS/PQR,SS‐000‐15200‐0106 100% Procedures H R R R OR
& Procedure Qualifcation Record(PQR) SS‐000‐15200‐0106

D M S
-
ASME Section IX/ AWS D1.1 ASME Section IX/ AWS D1.1 Procedures/

J Aug 22
16.00 B Review of Welder Qualification Records 100% H R R R OR
- 2 0 Records
04- PRINT
ED 69 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Procedures/
16.00 C Review of NDT Personnel and Procedures ASME Section V ASME Section V 100% H R R R OR
Records

16.00 D Review of Detailed Assembly Drawing 100% Drawings H R R R OR

16.01 MATERIAL IDENTIFICATION
(*)Refer 
HSS‐000‐13560‐0001 as 
applicable ‐ To ensure 
traceability of Sampling 
Test Piece(s), the location 
Review & Verification of MTC/check test  ASME Sec.II, Drawing,  MTC/Check 
16.01 Drawing, ASME Sec‐II,Matl. Specs. 100% H W R/W* R OR of samples shall be 
reports w.r.t. Drg.BOM & Matl specs Specification test report
selected by Contractor's 
Inspector
for Plate,Forging,Pipe 
fittings, Bolt‐ Nut, Welding 
Consumables
ASME Sec.II, Drawing, 
16.02 Dimensional inspection Drawing, ASME Sec‐II,Matl. Specs. 10% MTC H W R R OR
Specification
Correlation of MTC with Material, Verify UT 
ASME Sec.II, Drawing,  MTC/Check 
16.03 on Plates & Pins and Verify Charpy‐V Impact  MTC,Drawing,Code 100% H W R R OR
Specification test report
test requirements
Material certification for Beam as per EN  ASME Sec.II, Drawing,  MTC/Lab test  In Absence of MTC, Check 
16.04 MTC/Lab test Report 100% H W R R OR
10204‐3.1 and for other 2.2 Specification Report test to be done
16.10 WELD SETUP INSPECTION
16.11 PT on Weld edges of butt jts Drawing, PT Procedure Drawing, PT Procedure 100% NDE Report H W W R OR
Setup configuration & dimensions, Tackweld 
16.12 Drawing, PT Procedure Drawing, PT Procedure 100% NDE Report H W W R OR
Soundness by
16.20 SPLICE JTS.IN STRUCTURAL SECTIONS (IF AAPLICABLE)
Inspection 
16.21 Jt.location approval from TL Engg Drawing Drawing 100% H W R R OR
Report
Inspection 
16.22 Radiography of splice joints Drawing, RT Procedure Drawing, RT Procedure 100% H W R R OR
Report
16.30 WELDING OF ABOVE

16.31 UT/MPT on all critical jts.as indicated on drg UT Procedure, MT Procedure UT Procedure, MT Procedure 100% NDE Report H W W R OR

16.32 PT on all other fillet welds PT Procedure PT Procedure 100% NDE Report H W W R OR

16.33 PT&RT on all butt welds PT Procedure, RT Procedure PT Procedure, RT Procedure 100% NDE Report H W W R OR


16.34 MPI on Welds as indicated in drg MT Procedure MT Procedure 100% NDE Report H W W R OR
16.40 DIMENSIONAL INSPECTION
Overall dimensions, Straightness,Twist &  Inspection 
16.41 Drawing  Drawing 100% H W W R OR
Visual Inspection Report

S
Inspection 

M
16.42 Visual Inspection of welds / Distortion Procedure Drawing 100% H W W R OR

- D
Report
16.50
J Aug 22
04-
- 0
PROOF LOAD TESTING UNDER TPIA WITNESSS
2
PRINT
ED 70 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Inspection 
16.51 Proof load lifting, Review certificate Drawing Drawing, Specification 100% H H R R OR
Report
PT/MT of all accessible weld joints after 
16.52 PT/MT Procedure  PT/MT Procedure 100% NDE Report H H R R OR
proof load testing
16.60 PAINTING INSPECTION

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
16.61 Surface prepration  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Pre‐Blast Check, blotter test & weather 
condition, Cleaning, profile, cleanliness grade  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
16.62 ,Salt contaminants / Conductivity test &  Painting Procedure, Painting Procedure, 100% H SW R R OR
Report
check for any steel imperfection,Surface  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Dust Level
Review Paint TC, Make, Batch no., Expiry  Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
16.63 Date and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% H R R R OR
Report
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
Painting  Check‐ 
16.64 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% H W SW R IR
Report ‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Mesurement of Paint WFT,DFT /  Visual 
Painting specification, Drawing,   Painting specification, Drawing,  
Inspection of finished coatings,Solvent  Painting  (*) W for Visual Inspection 
16.65 Painting Procedure, Painting Procedure, Random H W W(*) R OR
Rub(MEK) test for inorganic zink,Adhesion  Report ,DFT  for finished paint.
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
test

Painting specification, Drawing,   Painting specification, Drawing,  
Painting 
16.66 Verify Identification and marking Painting Procedure, Painting Procedure, 100% H W R R OR
Report
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

16.70 PACKING INSPECTION

Drawing, Specification, Drawing, Specification,
16.71 Rust prevention check SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR * Site dispach directly
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
16.72 Shipping prepration inspection SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of shipping / lifting bracing as per 
16.73 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
approved drawing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
16.74 Check of cleanliness and dryness SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
S
J-04DM
Drawing, Specification, Drawing, Specification,
Flange surface check (with photo record) and 
16.75 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list IR
-2022
H W W* R
flange face protection
- A u g SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
PRINT
ED 71 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Drawing, Specification, Drawing, Specification,
16.76 Check of marking for site installation SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of nameplate with Photo Record or 
16.77 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R OR
Rubbing
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
Check of Packing conditions as per approved 
16.78 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* R IR
Packing Procedure
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
16.79 Final Inspection on all items SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H W W* W* OR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
16.80 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
16.81 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
16.90 PRE‐SHIPPING INSPECTION
Drawing, Specification Drawing, Specification
16.91 Visual Inspection                             100% Packing list H H H* ‐ IR * Site dispach directly
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
16.92 Check of Nameplates/Shipping Mark 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
Drawing, Specification Drawing, Specification
16.93 Check of Invoice/Packing List 100% Packing list H H H* ‐ IR
 SS‐000‐14500‐0001  SS‐000‐14500‐0001
17.00 REFRACTORY APPLICATION ‐ Refer Procedure No. VS215B‐101‐A‐PLN‐7407 and Drawing No.: VS215B‐101‐A‐DGN‐0420 ‐ ASSEMBLY DRAWING OF REFRACTORY FOR STEAM BOILER
17.01 RAW MATERIAL  
Verification of MTC with Material Specs.of 
As per Specification & Data 
17.02 Refractory, including prequalification batch  As per Specification & Data Sheet 100% MTC  / TC H R R R OR
Sheet
test
Review of Material Test Certs‐Chemical  As per Specification & Data 
17.03 As per Specification & Data Sheet 100% MTC  / TC H R R R OR
properties of Ancho & Metal fibers. Sheet

As per Specification & Data 
17.04 Batch No. As per Specification & Data Sheet 100% MTC  / TC H R R R OR
Sheet

As per Specification & Data 
17.05 Validity (Shelf Life) of Refractory Material As per Specification & Data Sheet 100% MTC  / TC H R R R OR
Sheet

Inspection 
17.06 Storage condition of materials Procedure Procedure Random H R R R IR
Report

As per Specification & Data Sheet/  As per Specification & Data  Inspection 


17.07 Dimension of anchor & Metal Fiber Random H R R R OR
Drawing Sheet/ Drawing Report
17.10  PREPARATION PRIOR TO REFRATCRORY APPLICATION

Surface prepration of surfaces in contact with  Inspection 
17.11 Drawing/ Datasheet Drawing/ Datasheet Random H W R R IR
Refractory Report

S
J-04DM
Wrapping of Structural members,nozzle 
Inspection 
-2022
17.12 extensions & other items to prevent bonding  Drawing/ Datasheet Drawing/ Datasheet Random H W R R IR
g Report
- A u
to refractory lining.if applicable
PRINT
ED 72 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Review of Heat Treatment chart of Anchor 
Inspection 
17.13 after forming for Austenitic Stainless Steel  Drawing/ Datasheet Drawing/ Datasheet 100% H R R R OR
Report
material as applicable
Inspection 
17.14 Pre‐qualification batch test Drawing/ Datasheet Drawing/ Datasheet 100% H W W W OR
Report
Inspection 
17.15 Applicators Pre‐qualification test Drawing/ Datasheet Drawing/ Datasheet 100% H W W W IR
Report
17.20 WELDING OF ANCHOR FOR REFRACTORY HOLDING

Inspection 
17.21 No. of Anchors Drawing/ Datasheet Drawing/ Datasheet 100% H SW R R OR
Report

Inspection 
17.22 Anchor Pitch & Orientation Drawing/ Datasheet Drawing/ Datasheet 100% H SW IW R IR
Report

Inspection 
17.23 Visual inspection of Welds Drawing/ Datasheet Drawing/ Datasheet 100% H W W R OR
Report

Drawing/ Datasheet/ Hammer  Drawing/ Datasheet/ Hammer  Inspection 


17.24 Anchor Weld soundness Random H W W R OR
Test Test Report

Verify Expansion Provision by Plastic caps or  Inspection 
17.25 Drawing/ Datasheet Drawing/ Datasheet Random H W W R IR
coating Report

Inspection 
17.26 Welder Identification Drawing/ Datasheet Drawing/ Datasheet 100% H R W R IR
Report
17.30 MIXING & APPLICATION OF REFRACTORY

Prepration of test speciman duiring  Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.31 100% H W W R IR
installation Project Spec Procedure/ Project Spec Report

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.32 Shuttering fixing‐ If applicable Random H SW S R IR
Project Spec Procedure/ Project Spec Report

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.33 Panel size, as required Random H SW R/S R IR
Project Spec Procedure/ Project Spec Report

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.34 Water quality Random H SW R/S R OR
Project Spec Procedure/ Project Spec Report

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.35 Water temperature Random H SW R/S R OR
Project Spec Procedure/ Project Spec Report

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.36 Water Quantity Random H SW R/S R OR
Project Spec Procedure/ Project Spec Report

Mixing of reinforcing fibers in refractory if  Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  3.5% by  Inspection 


17.37 H SW R/S R OR
applicable Project Spec Procedure/ Project Spec weight Report

D M S Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 

-
17.38 Mixing time 100% H SW R/S R IR
J Aug 22
04-
- 2 0
PRINT
ED
Project Spec Procedure/ Project Spec Report

73 / 131
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Verification of surface temprature before to  Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.39 Random H SW R/S R OR
application Project Spec Procedure/ Project Spec Report

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.40 Refractory application Random H SW R/S R IR
Project Spec Procedure/ Project Spec Report

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.41 Shuttering removal‐If applicable Random H SW R/S R IR
Project Spec Procedure/ Project Spec Report
17.50 WET CURING

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection  (*)Inspection after wet 


17.51 Wet Curing for min.24 hrs 100% H W(*) W(*) R OR
Project Spec Procedure/ Project Spec Report curing
17.60 OPEN AIR DRYING

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.61 Drying for min.24 hrs Random H W(*) W(*) R OR (*)Inspection after drying
Project Spec Procedure/ Project Spec Report
17.70 HEAT CURING ( MOISTURE REMOVAL)‐ If applicable

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.71 Heating cycle 100% H R R/S R OR
Project Spec Procedure/ Project Spec Report

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.72 Verify Number of thermocouple 100% H R R/S R OR
Project Spec Procedure/ Project Spec Report
17.80 REPAIRS, IF ANY

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.81 Refractory Repair Procedure 100% H R R/S R OR
Project Spec Procedure/ Project Spec Report

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.82 Repair acc.to procedure 100% H W R/S R OR
Project Spec Procedure/ Project Spec Report
17.90 FINAL INSPECTION

Testing of mockup application sample or  Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection  (*) FOR ONE SAMPLE , 


17.91 Procedure H W(*) W(*) R OR
sample test cubes Project Spec Procedure/ Project Spec Report Rest will be Review 

Review of record for positive identification of 
Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 
17.92 refractory type,batch,palletsampled & Water  Random H R R R IR
Project Spec Procedure/ Project Spec Report
ratio used etc

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.93 Visual inspection Random H W W R OR
Project Spec Procedure/ Project Spec Report

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.94 Verify Thickness of Lining Random H W W R OR
Project Spec Procedure/ Project Spec Report

Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.95 Final dimensions of refractory Random H W W R OR
Project Spec Procedure/ Project Spec Report

S
Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 

M
17.96 Hammer Testing of Linining Random H W W R OR

D
Project Spec Procedure/ Project Spec Report
-
J Aug 22
04-
- 2 0
ED 74 / 131
PRINT
ITP FOR NPPROLLED WHEN
T
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA RECORD Remarks
PLANS DOCUMENTS SUB SUPLLIER TBWES CONTRACROR EMPLOYER

Wrapping of metallic parts by CF Paper Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.97 100% H SW R R IR
(if required on drg) Project Spec Procedure/ Project Spec Report

Visual check of acid proof coating Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.98 100% H W W W IR
application if applicable Project Spec Procedure/ Project Spec Report

Dry film thickness of acid proof coating if  Drawing/ Datasheet/ Procedure/  Drawing/ Datasheet/  Inspection 


17.99 100% H W W W IR
applicable Project Spec Procedure/ Project Spec Report
Letters & abbreviations
H: Hold point 
Vendor is not allowed to proceed with the test/inspection unless a written release is issued by Contractor. Vendor shall submit inspection notification to Contractor 
W: Witness point 
Vendor can proceed with the test/inspection when Contractor’s inspector is not present at the notified time. Vendor shall submit inspection notification to Contractor. 
IW: Initial witness 
Vendor is requested to notify Contractor of the initial inspection date/time. Vendor can proceed with the test/inspection when Contractor’s inspector is not present at the notified time. Subsequent test/inspection will not be 
witnessed unless any deficiencies are found at the initial inspection. 
SW: Spot witness 
Vendor shall notify Contractor of inspection to be spot witnessed. Vendor may proceed with Inspection and testing should Contractor’s inspector not be present at the time notified. 
S: Surveillance 
Vendor is not requested to notify Contractor. Contractor’s inspector will monitor manufacturing conditions, workmanship and test/inspection during his visit or periodical inspection. 
R: Record review 
Vendor shall provide Contractor with certificates, reports and records as applicable for review and confirmation. 
<Records> 
OR: Official record Vendor is requested to provide the official records to submit as the Manufacturing Data Record Book. 
IR: Internal record Vendor is requested to provide the records for Contractor’s inspector to verify the quality.
TBWES Thermax Babcock & Wilcox Energy Solutions Ltd 
CONTRACTOR JGC Corporation / Hyundai Engineering & Construction Co., Ltd
EMPLOYER The Ministry of Oil, South Refineries Company (SRC)
BOM Bill of Material
DRG DRAWING
W.R.T. WITH RESPECT TO
Inspection Level
Level 0 Documentation requirements only; no vendor inspection required.
Level 1 Only final inspection is required prior to shipping
Includes pre‐inspection meetings, one or more unspecified “in progress” surveillance visit/s, all witness and hold points, final inspection, and 
Level 2
release for shipment.
Includes pre‐inspection meetings, one or more unspecified “in progress” surveillance visits, all witness and hold points, final inspection, and release 
Level 3
for shipment. Inspections shall be on a regular basis (daily, weekly or bi‐weekly).
Level 4 Resident inspector continually monitoring the work.
SPECIAL NOTE: 
Thermax Babcock & Wilcox Energy Solutions Ltd ( Contractor
TBWES),Pune Approved by
Manufacturer/Sub supplier

D M S
-
J04-Aug 22
- 2 0
ED 75 / 131
PRINT
ITP FOR NPPROLLED WHEN
T
NCON
INDEX FOR MECHANICAL BOUGHTOUT

Sr. No ITP Description

1 INDUSTRIAL FAN   

2 CONTROl VALVES / ON OFF VALVES
GATE/GLOBE/CHECK VALVE PLUG/ BUTTERFLY/ BALL / NEEDLE / KNIFE GATE VALVES/BLOW DOWN/FIRING VALVE 
3
(MANUAL/MOTORISED)   
4 SAFETY & RELIEF VALVES      

5 STRAINER   

6 STEAM TRAP

7 SPRING HANGERS        

8 FABRIC EXPANSION JOINT  

9 SILENCER  

10 FLOW ELEMENT ( ORIFICE )  

11 FLOW ELEMENT (FLOW NOZZLES & VENTURI)  

12 BURNER   

13 INSPECTION OF MISCELLANEOUS BOUGHT OUT ITEMS          

14 CABLE TRAYS, ACCESSORIES AND SUPPORTS  

15 TURBINE FOR FD FAN 

16 LEVEL GAUGE

17 INSULATION

18 REFRACTORY

19 CERAMIC BLANKET / PAPER / BOARD/ MORTAR/ LOOSE WOOL/ GROUTING MATERIAL   

M S
J-04D
-Au g - 2 0 22
PRINT
ED 76 / 131
WHEN
LLED
NCONTRO
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
1.00 INDUSTRIAL FAN     ( Thermax WBS No ‐ A51, A5A & A5R ) LOCATION‐ As per Project Approved Vendor List
Review of Welding Procedure Specification 
Drawing/ Data Sheet/ ASME 
(WPS) & Procedure Qualifcation Record(PQR),  Drawing/ Data Sheet/ ASME Section IX  (*) W for New 
1.00 A Section IX / AWS D1.1 / SS‐000‐ 100% Procedures H R R/W (*) ‐ ‐
Performance Test, Mechanical run test  / AWS D1.1 / SS‐000‐15200‐0106 Qualification (PQR)
15200‐0106
procedure

SS‐000‐15200‐0106, ASME Section IX /  SS‐000‐15200‐0106, ASME Section  Procedures/


1.00 B Review of Welder Qualification Records 100% H R R ‐ ‐
AWS D1.1 IX /AWS D1.1 Records

Drawing/ Data Sheet / Drawing/ Data Sheet /
Positive material identification procedure, Data 
1.00 C  SS‐000‐15200‐0103  SS‐000‐15200‐0103 100% Procedures H R R ‐ ‐
Sheet / Drawing
VS215B‐101‐A‐DGN‐3102 VS215B‐101‐A‐DGN‐3102
1.01 RAW MATERIAL.FOR CASING, PEDESTAL, IMPELLER PLATES, SHAFT & HUB
*‐ EN 10204, type 3.1 for all 
ASME Sec.II, Approved Drawing,  ASME Sec.II, Approved Drawing,  pressure containing, rotating 
Chemical & Physical properties, 
1.02 Specification, RS215B‐101, SS‐000‐ Specification, RS215B‐101, SS‐000‐ 100% MTC*  / COC H R R ‐ OR and load bearing parts and 
UT of Shaft >= 40 mm type 2.2 for all non‐pressure 
15200‐0102 15200‐0102
parts. 
1.03 NDE REQUIREMENTS
Reference standards ASME Sec. V &  Reference standards ASME Sec. V & 
1.04 LPT for  Accessible welds  100% LPT  Reports H R R ‐ OR
Vendor's internal Procedure Vendor's internal Procedure

Reference standards ASME Sec. V &  Reference standards ASME Sec. V &  100% RT for  impeller back 


1.05 RT for accessible butt welds 10% RT Reports H R R ‐ OR
Vendor's internal Procedure Vendor's internal Procedure plate butt weld joints

Reference standards API 673 &  Reference standards API 673 &  Leak test 


1.06 Pneumatic leak test for casing 10% H R R ‐ OR
Vendor's internal Procedure Vendor's internal Procedure Reports
1.10 ROTOR BALANCING 
Approved Drawing, Data Sheet &  Approved Drawing, Data Sheet &  Run out 
1.11 Shaft Runout Check 100% H R R ‐ OR
Reference Standards Reference Standards Procdure
Approved Drawing, Data Sheet &  Approved Drawing, Data Sheet &  Callibration 
1.12 Calibration Check of Balancing Equipment 100% H R R ‐ OR
Reference Standards Reference Standards Report
Approved Drawing, Data Sheet &  Approved Drawing, Data Sheet &  Balancing 
1.13 Rotor balancing  100% H R R ‐ OR
Reference Standards Reference Standards Report
Approved Drawing, Data Sheet &  Approved Drawing, Data Sheet &  Balancing 
1.14 Residual Balance Check  100% H R R ‐ OR
Reference Standards Reference Standards Report

Approved Drawing, Data Sheet &  Approved Drawing, Data Sheet &  Inspection 


1.15 Visual and Dimensions for Baseplate 100% H R R ‐ OR
Reference Standards Reference Standards Report
1.20 MECHANICAL RUN TEST AT SUPPLIERS SHOP WITH SHOP MOTOR AT NO LOAD FULL SPEED
Approved Drawing, Data Sheet ,  Approved Drawing, Data Sheet, 
1.21 MECHANICAL RUN TEST at Sub‐vendor's shop  Vendor's MRT Procedure, Vendor's MRT Procedure, 100% MRT Report  H W W ‐ OR
VS215B‐101‐A‐PLN‐7411 VS215B‐101‐A‐PLN‐7413

DM20S
1.22 Direction of rotation and Marking Approved Drawing, Approved Drawing, 100% Verify  H W W ‐ IR

J-04-Aug- 22
INTED 77 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
Approved Drawing, Data Sheet ,  Approved Drawing, Data Sheet, 
1.23 Test speed, Bearing Temperature rise 100% MRT Report  H W W ‐ OR
Vendor's MRT Procedure Vendor's MRT Procedure

Vibration, Noise Level only for record and  Approved Drawing, Data Sheet ,  Approved Drawing, Data Sheet, 


1.24 100% MRT Report  H W W ‐ OR
reference. Vendor's MRT Procedure Vendor's MRT Procedure

1.30 PERFORMANCE TEST AT SUPPLIERS SHOP (1 Per Type) AT REDUCED SPEED / RATED SPEED

Approved Drawing, Data Sheet ,  Approved Drawing, Data Sheet , 
PERFORMANCE TEST  at reduced / rated speed  Performance 
1.31 Vendor's PT Procedure, Project  Vendor's PT Procedure, Project  1/Type H W W ‐ OR
at Sub‐vendor's shop  Test Report
Specs.VS215B‐101‐A‐PLN‐7413 Specs.VS215B‐101‐A‐PLN‐7413
Approved Drawing, Data Sheet , 
Efficiency & Power consumption calculation at  Approved Drawing, Data Sheet ,  Performance 
1.32 Vendor's PT Procedure, Project  100% H W W ‐ OR
guarantee point, Vendor's PT Procedure, Project Specs. Test Report
Specs.
Approved Drawing, Data Sheet , 
Record Performance Test Parameter for  Approved Drawing, Data Sheet ,  Performance 
1.33 Vendor's PT Procedure, Project  100% H W W ‐ OR
calculation Vendor's PT Procedure, Project Specs. Test Report
Specs.

Stroke Duration Test of Actuator, Damper  Approved Drawing, Data Sheet ,  Approved Drawing, Data Sheet ,  Inspection 


1.34 100% H W W ‐ OR
operation (If applicable) Project Specs. Project Specs. Report

1.40 FINAL INSPECTION OF FAN ASSEMBLY WITH TURBINE / JOB MOTOR (UNITIZATION) ‐ If Applicable
Dimensional 
Overall Assembly Dimensions along with Job 
1.41 GA Approved Drawing  GA Approved Drawing  100% Inspection  H W W ‐ OR
motor Alignment and coupling check
Report 
BOM 
1.42 Compliance to Approved Drawing for Scope  GA Approved Drawing & BOM GA Approved Drawing & BOM 100% H W R ‐ IR
Verification
PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,
1.43 100% PMI report H W R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103
Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved GAD, Data 
SS‐000‐13702‐0002 / Approved GAD, 
1.44 accordance with Section 4.2 of IEC60079‐14  (  sheets, 100% Dossier review H R R R OR
Data sheets.
as applicable ) HSP‐000‐13800‐010
1.50 PAINTING INSPECTION
Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
1.51 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)

Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
1.52 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level

Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  

DM20S
1.53 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR

J-04-Aug-
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
22
EN PR
INTED 78 / 131
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
1.54 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Mesurement of Paint WFT, DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,   (*) W for Visual Inspection 


1.55 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H W(*) R ‐ OR ,DFT , Adhesion test for 
Rub(MEK) test for inorganic zink,Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 finished paint.

Painting specification, Drawing,   Painting specification, Drawing,  
1.56 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

1.60 SPARES ‐ If applicable 

1.61 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR

1.70 PACKING/MARKING                                                                                                                                                                                         Note : W# ‐ Export packing witness is for direct site supplied items only
Drawing, Specification, Drawing, Specification,
1.71 Rust prevention check 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002

Drawing, Specification, Drawing, Specification,
1.72 Shipping preparation inspection 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,


1.73 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
1.74 Check of cleanliness and dryness 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

Flange surface check (with photo record) Drawing, Specification, Drawing, Specification, Inspection 


1.75 100% reports,  H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list
Drawing, Specification, Drawing, Specification,
1.76 Check of marking for site installation 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,


1.77 100% H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001

Check of packing conditions as per Drawing, Specification, Drawing, Specification,


1.78 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
1.79 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

D M S
-
J04-Aug 22
1.80
- 2 0INSPECTION RELEASE CERTIFICATE

INTED 79 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

Drawing, Specification Drawing, Specification
1.81 Final Document Review and Issue of IRC 100% IRC H H H ‐ IRC
 SS‐000‐15200‐0101  SS‐000‐15200‐0101

1.90 Pre shipping inspection
Approved documents / Project  Approved documents / Project 
1.91 Visual Inspection 100% Verification H H H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
1.92 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
1.93 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification
2.00 CONTROL VALVES  / ON OFF VALVES                          ( Thermax WBS No ‐ I33 ) LOCATION‐ As per Project Approved Vendor List
2.01 RAW MATERIAL ‐ FOR MAJOR COMPONENT

ASME Sec.II, Approved Drawing,  ASME Sec.II, Approved Drawing,  *‐ EN 10204, type 3.1 for all 


pressure containing, rotating 
Specification, RS215B‐101, SS‐000‐ Specification, RS215B‐101, SS‐000‐
2.02 Review of Raw Material Test Certificates 100% MTC  H R R ‐ MTC  and load bearing parts and 
15200‐0102, SS‐000‐15200‐0107, 15200‐0102, SS‐000‐15200‐0107, type 2.2 for all non‐pressure 
VS215B‐101‐A‐DGN‐3203 VS215B‐101‐A‐DGN‐3203 parts. 

2.10 IN PROCESS INSPECTION
Drawing,Datasheet, Vendors VT  Inspection 
2.11 Visual Inspection of Casting Drawing,Datasheet & MSS‐SP‐55 100% H R R ‐ OR
Procedure Report
Inspection 
2.12 Weld visual inspection Vendor`s VT Procedure, Drawings Vendor`s VT Procedure, Drawings 100% H R R ‐ OR
Report
Post Weld Heat Treatment for Castings and test  Drawing,Datasheet, Vendor Heat  Inspection 
2.13 Drawing, Datasheet 100% H R R ‐ OR
bars as applicable treatment procedure Report
Drawing, Vendors heat treatment  Drawing, Vendors heat treatment  Heat treatment 
2.14 Post Weld Heat Treatment (If required)  100% H R R ‐ IR
report report Chart
2.20. FINAL INSPECTION (REFER NOTE)
Drawing,Data sheet, KSY‐0000‐016,  Inspection 
2.21 Overall Dimension,Orientation & Workmanship Drawing,Data sheet 100% H SW R ‐ OR
KSY‐0000‐023 Report
Inspection 
2.22 Verify Flow Direction Marking Drawing, Datasheet,  Drawing,Data sheet 100% H SW R ‐ OR
Report

Drawing,Data sheet, KSY‐0000‐016,  Drawing,Data sheet, Vendors  Inspection 


2.23 Shell/Body Hydro Test 100% H SW R ‐ OR
KSY‐0000‐023 Procedure Report

Drawing,Data sheet, KSY‐0000‐016,  Drawing,Data sheet, Vendors  Inspection 


2.24 Seat Leakage Test ( If applicable) 100% H SW R ‐ OR
KSY‐0000‐023 Procedure Report
Function & Performance Test with Actuator, 
Drawing,Data sheet, KSY‐0000‐016,  Drawing,Data sheet, Vendors  Inspection 
2.25 Stroke check at 0%, 25%, 50%, 75% & 100%/  100% H SW R ‐ OR
KSY‐0000‐023 Procedure Report

S
Stroke Duration Test 

-
2.26D M
J04-Aug 22
- 2 0Open & Close Movement Drawing,Data sheet
Drawing,Data sheet, Vendors 
Procedure
100%
Inspection 
Report
H SW R ‐ OR

EN PRINTE
D 80 / 131
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
Drawing,Data sheet, Vendors  Inspection 
2.27 Operation Time Drawing,Data sheet 100% H SW R ‐ OR
Procedure Report
Inspection 
2.28 Actuator Model no,Sr no  Drawing,Data sheet Drawing,Data sheet 100% H SW R ‐ OR
Report
PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,
2.29 100% PMI report H SW R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103
Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved GAD, Data 
SS‐000‐13702‐0002 / Approved GAD, 
2.30 accordance with Section 4.2 of IEC60079‐14  (  sheets, 100% Dossier review H R R R OR
Data sheets.
as applicable ) HSP‐000‐13800‐010
2.30 PAINTING INSPECTION
Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
2.31 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)
Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
2.32 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level

Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  


2.33 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
2.34 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,   (*) SW for Visual 
2.35 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H SW(*) R ‐ OR Inspection ,DFT , Adhesion 
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 test for finished paint.

Painting specification, Drawing,   Painting specification, Drawing,  
2.36 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
2.40 SPARES ‐ If applicable 

2.41 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR

2.50 PACKING/MARKING                                                                                                                                                                                Note : W# ‐ Export packing witness is for direct site supplied items only
Drawing, Specification, Drawing, Specification,
2.51 Rust prevention check 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Inspection 
Drawing, Specification, Drawing, Specification, reports, 
2.52 Shipping preparation inspection 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001 Packing list

D M SCheck of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,

-
J Aug
2.53
-
04-
2 0 22
approved Drawing

INTED
SS‐000‐14500‐0001 SS‐000‐14500‐0001
100% H W# W# ‐ IR

81 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
Drawing, Specification, Drawing, Specification,
2.54 Check of cleanliness and dryness 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,
2.55 100% H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
2.56 Check of marking for site installation 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification, Inspection 
2.57 100% reports,  H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
2.58 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
2.59 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
2.60 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
2.61 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
2.70 Pre shipping inspection
Approved documents / Project  Approved documents / Project 
2.71 Visual Inspection 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
2.72 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
2.73 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification

Note :‐ 1) Valves SHALL be Tested 100% by the Manufacturer.

GATE/GLOBE/CHECK VALVE PLUG/ BUTTERFLY/ BALL / NEEDLE / KNIFE GATE VALVES/BLOW DOWN/FIRING VALVE 
3.00 LOCATION‐ As per Project Approved Vendor List
(MANUAL/MOTORISED) (Thermax WBS No ‐ Z2K, Z2L, Z2M, Z2N, Z23, Z29)
3.01 RAW MATERIAL ‐ FOR MAJOR COMPONENT
ASME Sec.II, Approved Drawing,  ASME Sec.II, Approved Drawing, 
Specification, RS215B‐101, SS‐000‐ Specification, RS215B‐101, SS‐000‐ *‐ EN 10204, type 3.1 for all 
pressure containing, rotating 
15200‐0102, SS‐000‐15200‐0107. 15200‐0102, SS‐000‐15200‐0107.
3.11 Review of Raw Material Test Certificates 100% MTC H R R ‐ OR and load bearing parts and 
VS215B‐101‐A‐DGN‐3204, VS215B‐101‐A‐DGN‐3204, type 2.2 for all non‐pressure 
VS215B‐101‐A‐DGN‐3205. VS215B‐101‐A‐DGN‐3205. parts. 
VS215B‐101‐A‐DGN‐3206 VS215B‐101‐A‐DGN‐3206
3.20 IN PROCESS INSPECTION 
Drawing,Datasheet, Vendors VT  Inspection 
3.21 Visual inspection of castings Drawing,Datasheet & MSS‐SP‐55 100% H R ‐ ‐ OR
Procedure Report
Inspection 
3.22 Weld visual inspection Vendor`s VT Procedure ,Drawings Vendor`s VT Procedure ,Drawings 100% H R ‐ ‐ OR
Report

DMS
Data 

J-04-Aug-
Radiographic Testing  (RT) of Body , Bonnet  Drawing,Datasheet, Vendors NDT  Drawing,Datasheet, Vendors NDT  sheet / 
3.23 NDT  Report H R ‐ ‐ OR
2022
&Weld (if applicable) Procedure Procedure Code / 
Mfg.std 82 / 131
INTED
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
Data 
MPT / PT (bodies, bonnets, covers, ball & welds)  Drawing,Datasheet, Vendors NDT  Drawing,Datasheet, Vendors NDT  sheet / 
3.24 NDT  Report H R ‐ ‐ OR
‐ If applicable  Procedure Procedure Code / 
Mfg.std
3.30 FINAL INSPECTION (REFER NOTES)

Overall Dimension,Orientation & Workmanship,  Inspection 
3.31 Drawing,Data sheet  Drawing,Data sheet  100% H SW R ‐ OR
Verify Flow Direction Marking Reprot

Hydro Test 
3.32 Shell/Body Hydro Test Drawing,Data sheet  Drawing,Data sheet  100% H SW R ‐ OR
Report

LeakTest 
3.34 Seat Hydro / Pneumatic Test (As Applicable)  Drawing,Data sheet  Drawing,Data sheet  100% H SW R ‐ OR
Report

PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,


3.35 100% PMI report H SW R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103

3.40 FOR MOVs, BLOWDOWN VALVES OPERATION TEST WITH ACTUATOR (AS APPLICABLE)

Inspection 
3.41 Open & Close Movement Drawing, Data sheet  Drawing,Data sheet 100% H SW R ‐ OR
Report
Inspection 
3.42 Operation Time Drawing, Data sheet  Drawing,Data sheet 100% H SW R ‐ OR
Report

Inspection 
3.43 Actuator Model no,Sr no  Drawing,Data sheet Drawing,Data sheet 100% H SW R ‐ OR
Report
Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved GAD, Data 
SS‐000‐13702‐0002 / Approved GAD, 
3.44 accordance with Section 4.2 of IEC60079‐14  (  sheets, 100% Dossier review H R R R OR
Data sheets.
as applicable ) HSP‐000‐13800‐010

3.50 PAINTING INSPECTION

Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
3.51 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)

Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
3.52 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level

Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  


3.53 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  

DM20S
Check‐ 
3.54 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR

J-04-Aug-
‐ Atmospheric Condition 
22 SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

EN PR
INTED 83 / 131
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,   (*) W for Visual Inspection 


3.55 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H W(*) R ‐ OR ,DFT , Adhesion test for 
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 finished paint.

Painting specification, Drawing,   Painting specification, Drawing,  
3.56 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
3.60 SPARES ‐ If applicable 

3.61 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR

3.70 PACKING/MARKING                                                                                                                                                                                Note : W# ‐ Export packing witness is for direct site supplied items only
Drawing, Specification, Drawing, Specification,
3.71 Rust prevention check 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
3.72 Shipping preparation inspection 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,
3.73 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
3.74 Check of cleanliness and dryness 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Inspection 
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,
3.75 100% reports,  H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list
Drawing, Specification, Drawing, Specification,
3.76 Check of marking for site installation 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
3.77 100% H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
3.78 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
3.79 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
3.80 INSPECTION RELEASE CERTIFICATE

Drawing, Specification Drawing, Specification
3.81 Final Document Review and Issue of IRC 100% IRC H H H R IRC
 SS‐000‐15200‐0101  SS‐000‐15200‐0101

3.90 Pre shipping inspection
Approved documents / Project  Approved documents / Project 
3.91 Visual Inspection 100% Verification H H H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
3.92 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
3.93 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification

S
Note :‐ 1) Valves SHALL be Tested 100% by the Manufacturer. NOT (10% per Identical type against offered Qty)

-
4.00
4.01
D M
J04-Aug 22
- 2 0
SAFETY & RELIEF VALVES      ( Thermax WBS No ‐ Z27 & Z2F )        
RAW MATERIAL ‐ FOR MAJOR COMPONENT
LOCATION‐ As per Project Approved Vendor List

EN PR
INTED 84 / 131
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
Drawing , ASME Section II, KSY‐
Drawing,Material Specification, Data  *‐ EN 10204, type 3.1 for all 
0000‐022, RS215B‐101, SS‐000‐
sheet, KSY‐0000‐022, RS215B‐101, SS‐ pressure containing, rotating 
15200‐0102, SS‐000‐15200‐0107, 
4.02 Review of Raw Material Test Certificates  000‐15200‐0102, SS‐000‐15200‐0107, 100% MTC*   H R R ‐ OR and load bearing parts and 
Manufacturer std.. type 2.2 for all non‐pressure 
VS215B‐101‐A‐DGN‐3201,
VS215B‐101‐A‐DGN‐3201, parts. 
VS215B‐101‐A‐DGN‐3202
VS215B‐101‐A‐DGN‐3201
4.10 IN PROCESS INSPECTION 
Inspection 
4.11 Visual inspection of castings As per Specification MSS SP‐55 Vendors VT Procedure 100% H R R ‐ OR
Report
Data 
For all Butt Welding RT & Filllet weld PT/MT as  Vendors RT, PT/MT, Hardness Test  Vendors RT, PT/MT, Hardness Test  sheet / 
4.12 NDT  Report H R R ‐ OR
applicable Procedure, Data sheet, Drawing Procedure Code / 
Mfg.std
Inspection 
4.13 Weld visual inspection Vendor`s VT Procedure, Drawings Vendor`s VT Procedure, Drawings 100% H R R ‐ OR
Report
4.30 FINAL INSPECTION 
Visual ,Overall Major Dimension,Orientation &  Drawing,Data sheet,  Inspection 
4.31 Drawing,Data sheet, 100% H SW R ‐ OR
Workmanship KSY‐0000‐022 Report
Drawing,Data sheet,  Drawing,Data sheet, Vendors  Test
4.32 Popping/Set Pressure Test as applicable 100% H SW R ‐ OR
KSY‐0000‐022 Testing Procedure Report
Drawing,Data sheet,  Drawing,Data sheet, Vendors  Test
4.33 Seat tightness test / Seat Leak test 100% H SW R ‐ OR
KSY‐0000‐022 Testing Procedure Report
Drawing,Data sheet,  Drawing,Data sheet, Vendors  Test
4.34 Hydrostatic / Pneumatic Test  100% H SW R ‐ OR
KSY‐0000‐022 Testing Procedure Report
Verify Flow Marking ,Identification,Tag no ,Item  Drawing,Data sheet,  Inspection 
4.35 Drawing,Data sheet 100% H SW R ‐ OR
no  KSY‐0000‐022 Report
PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,
4.36 100% PMI report H SW R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103
4.40 PAINTING INSPECTION
Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
4.41 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)

Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
4.42 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level

Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  


4.43 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
4.44 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
‐ Atmospheric Condition 

S
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

- D M
J04-Aug 22
- 2 0
EN PR
INTED 85 / 131
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,   (*) SW for Visual 


4.45 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H SW(*) R ‐ OR Inspection ,DFT , Adhesion 
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 test for finished paint.

Painting specification, Drawing,   Painting specification, Drawing,  
4.46 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

4.50 SPARES ‐ If applicable 

4.51 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR

4.60 PACKING/MARKING  (As applicable)                                                                                                                                                       Note : W# ‐ Export packing witness is for direct site supplied items only
Drawing, Specification, Drawing, Specification,
4.61 Rust prevention check 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
4.62 Shipping preparation inspection 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,
4.63 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
4.64 Check of cleanliness and dryness 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001 Inspection 
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,
4.65 100% reports,  H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list
Drawing, Specification, Drawing, Specification,
4.66 Check of marking for site installation 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
4.67 100% H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
4.68 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
4.69 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
4.70 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
4.71 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
4.80 Pre shipping inspection
Approved documents / Project  Approved documents / Project 
4.81 Visual Inspection 100% Verification H H H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
4.82 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification

D M S Approved documents / Project  Approved documents / Project 

-
4.83 Check of Invoice/Packing List 100% Verification H H H ‐ IR
J Aug 22
- 2
04-
0
INTED
specification specification

86 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

5.00 STRAINER                                                                    ( Thermax WBS No ‐ Z23 ) LOCATION‐ As per Project Approved Vendor List

5.10 RAW MATERIAL 
Review of TC for Shell Body ,Flange,  ASME Sec.II, Approved Drawing,  Drawing,Material Specification,  *‐ EN 10204, type 3.1 for all 
5.11 Dishends/End Cap  (Chemical &  Mechanical  Specification, RS215B‐101, SS‐000‐ RS215B‐101, SS‐000‐15200‐0102,  100% Test certificate  H R R ‐ OR pressure containing,  rotating 
properties) 15200‐0102, SS‐000‐15200‐0107 SS‐000‐15200‐0107 and load bearing parts and 
type 2.2 for all non‐pressure 
Compliance  parts. 
5.12 Mesh, Gasket, Hardwares Drawing, Material Specification Drawing, Material Specification 100% H R R ‐ OR
report
5.20 FINAL INSPECTION
Dimensional 
Approved Drawing, Data Sheet / Valve  Approved Drawing, Data Sheet / 
5.21 Overall Dimensions, Orientation & workmanship 100% Inspection  H R R ‐ OR
Schedule Valve Schedule
Report 
Drawing,Vendor's Hydro testing  Hydro Test 
5.22 Shell/Body Hydrotest Drawing 100% H R R ‐ OR
Procedure Report
PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,
5.23 100% PMI report H R R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103
5.30 PAINTING INSPECTION

Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
5.31 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)

Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
5.32 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level
Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  
5.33 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
5.34 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,  


5.35 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H R R ‐ OR
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
5.36 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
5.40 SPARES ‐ If applicable 

5.41

D M S Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR

-
J Aug 22
- 2
04-
0
INTED 87 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

5.50 PACKING/MARKING  (As applicable)                                                                                                                                       Note : W# ‐ Export packing witness is for direct site supplied items only
Drawing, Specification, Drawing, Specification,
5.51 Rust prevention check 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
5.52 Shipping preparation inspection 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,
5.53 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001 Inspection 
Drawing, Specification, Drawing, Specification,
5.54 Check of cleanliness and dryness 100% reports,  H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,
5.55 100% H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
5.56 Check of marking for site installation 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
5.57 100% H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
5.58 100% Inspection  H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001
reports, 
Drawing, Specification, Drawing, Specification,
5.59 Final inspection on all items ( as applicable ) 100% Packing list H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
5.60 INSPECTION RELEASE CERTIFICATE

Drawing, Specification Drawing, Specification
5.61 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
5.70 Pre shipping inspection

Approved documents / Project  Approved documents / Project 
5.71 Visual Inspection 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
5.72 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
5.73 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification

6.00 STEAM TRAP                                      ( Thermax WBS No ‐ Z23 ) LOCATION‐ As per Project Approved Vendor List

6.10 RAW MATERIAL ‐ FOR MAJOR COMPONENT

Drawing,Material Specification,  Drawing,Material Specification,  *‐ EN 10204, type 3.1 for all 


Review of TC for Body ,Cap,Cover (Chemical &   pressure containing, rotating 
RS215B‐101, SS‐000‐15200‐0102, SS‐ RS215B‐101, SS‐000‐15200‐0102, 
6.11 Mechanical properties) 100% Test certificate  H R R ‐ OR and load bearing parts and 
000‐15200‐0107 SS‐000‐15200‐0107, type 2.2 for all non‐pressure 
VS215B‐101‐A‐DGN‐3105 VS215B‐101‐A‐DGN‐3105 parts. 

6.20 FINAL INSPECTION
Dimensional 
Approved Drawing, Data Sheet / Valve  Approved Drawing, Data Sheet / 

DM20S
6.21 Overall Dimensions, Orientation & workmanship 100% Inspection  H R R ‐ OR
Schedule Valve Schedule

J-04-Aug-
Report 
22
EN PR
INTED 88 / 131
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

Approved Drawing, Data Sheet / Valve  Approved Drawing, Data Sheet /  Hydro Test 


6.22 Hydrostatic Test  100% H R R ‐ OR
Schedule Valve Schedule Report

PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,


6.23 100% PMI report H R R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103
6.30 PAINTING INSPECTION
Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
6.31 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)

Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
6.32 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level

Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  


6.33 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
6.34 Painting & Coating prepration & Application , Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,  


6.35 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H R R ‐ OR
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
6.36 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
6.40 SPARES ‐ If applicable 

6.41 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR

6.50 PACKING/MARKING      (As applicable)                                                                                                                                         Note : W# ‐ Export packing witness is for direct site supplied items only

Drawing, Specification, Drawing, Specification,
6.51 Rust prevention check 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002

Inspection 
Drawing, Specification, Drawing, Specification,
6.52 Shipping preparation inspection 100% reports,  H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list

Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,

DM20S
6.53 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001

J-04-Aug- 22
INTED 89 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

Drawing, Specification, Drawing, Specification,
6.54 Check of cleanliness and dryness 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,


6.55 100% H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
6.56 Check of marking for site installation 100% Inspection  H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
reports, 
Packing list
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
6.57 100% H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001

Check of packing conditions as per Drawing, Specification, Drawing, Specification,


6.58 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
6.59 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
6.60 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
6.61 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
6.70 Pre shipping inspection

Approved documents / Project  Approved documents / Project 
6.71 Visual Inspection 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
6.72 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
6.73 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification

7.00 SPRING HANGERS                                               ( Thermax WBS No ‐ Z1B ) LOCATION‐ As per Project Approved Vendor List


7.10 RAW MATERIAL 
*‐ EN 10204, type 3.1 for all 
Drawing, Specification, RS215B‐ pressure containing, rotating 
Review of TC for Hanger Rod,TurnBuckle, Hook  Drawing, Specification, RS215B‐101,
7.11 101, 100% Test certificate  H R R ‐ OR and load bearing parts and 
(Chemical &  Mechanical properties), Spring  VS215B‐101‐A‐DGN‐3301 type 2.2 for all non‐pressure 
VS215B‐101‐A‐DGN‐3301
parts. 

7.20 FINAL INSPECTION
Dimensional 
7.21 Overall Dimensions, Orientation & workmanship Approved Drawing Approved Drawing 100% Inspection  H SW R ‐ OR
Report 

D M S Drg/ Project 

-
J Aug 22
7.22
- 2
04-
0
Overall Assembly‐ Load Travel Test

INTED
Approved Drawing, & Data Sheet Approved Drawing, Data Sheet 100% Specs/
Codes
H SW R ‐ OR

90 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,
7.23 100% PMI report H SW R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103
7.30 PAINTING INSPECTION
Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
7.31 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)

Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
7.32 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level

Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  


7.33 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
7.34 Painting & Coating prepration & Application Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,   (*) SW for Visual 


7.35 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H SW(*) R ‐ OR Inspection ,DFT , Adhesion 
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 test for finished paint.

Painting specification, Drawing,   Painting specification, Drawing,  
7.36 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
7.40 SPARES ‐ If applicable 

7.41 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR

7.50 PACKING/MARKING      (As applicable)                                                                                                                                     Note : W# ‐ Export packing witness is for direct site supplied items only

Drawing, Specification, Drawing, Specification,
7.51 Rust prevention check, 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002

Drawing, Specification, Drawing, Specification,
7.52 Shipping preparation inspection, 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001 Inspection 
reports, 
Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification, Packing list
7.53 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001

DM20S
Drawing, Specification, Drawing, Specification,
7.54 Check of cleanliness and dryness 100% H W# W# ‐ IR

J-04-Aug-
SS‐000‐14500‐0001 SS‐000‐14500‐0001
22
EN PR
INTED 91 / 131
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,


7.55 100% H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
7.56 Check of marking for site installation 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

Inspection 
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
7.57 100% reports,  H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list

Check of packing conditions as per Drawing, Specification, Drawing, Specification,


7.58 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
7.59 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

7.60 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
7.61 Final Document Review and Issue of IRC 100% IRC H H H R IRC
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
7.70 Pre shipping inspection

Approved documents / Project  Approved documents / Project 
7.71 Visual Inspection 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
7.72 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
7.73 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification

8.00 FABRIC EXPANSION JOINT                                                   ( Thermax WBS No ‐ A1J ) LOCATION‐ As per Project Approved Vendor List


8.10 RAW MATERIAL 
*‐ EN 10204, type 3.1 for all 
pressure containing, rotating 
Review of TC for Plates ,Structural Bar (Chemical 
8.11 Drawing, Specification, RS215B‐101 Drawing, Specification, RS215B‐101 100% Test certificate  H R R ‐ OR and load bearing parts and 
&  Mechanical properties) type 2.2 for all non‐pressure 
parts. 

Pin Hole Test, Tensile Strength, Elongation & 
Flexibility Test, Temperature with Stand ability 
8.12 Drawing, Specification Drawing, Specification 100% Test Report W/R R R ‐ OR
Test, 
Air Permiability Test
8.20 FINAL INSPECTION

D M S
-
J04-Aug 22
8.21
- 2 0
Overall Major Dimension,Visual inspection of 
Weld , Orientation & Workmanship
D
Drawing,Vendor`s VT Procedure Drawing,Vendor`s VT Procedure 100%
Inspection 
Report
H R R ‐ OR
92 / 131
EN PRINTE
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

8.22 Verification of Companion Flange details Drawing Drawing 100% Drawing H R R ‐ IR

Verify Flow direction marking & Identification  Inspection 
8.23 Drawing Drawing 100% H R R ‐ OR
Marking‐,Tag no ,Item no  Report
PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,
8.24 100% PMI report H R R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103
8.30 PAINTING INSPECTION
Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
8.31 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)

Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
8.32 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level
Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  
8.33 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check ‐ Atmospheric 
8.34 Painting & Coating prepration & Application Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,   (*) SW for Visual 
8.35 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H SW R ‐ OR Inspection ,DFT , Adhesion 
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 test for finished paint.
Painting specification, Drawing,   Painting specification, Drawing,  
8.36 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
8.40 SPARES ‐ If applicable 

8.41 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR

8.50 PACKING/MARKING    (As applicable)                                                                                                                                    Note : W# ‐ Export packing witness is for direct site supplied items only

Drawing, Specification, Drawing, Specification,
8.51 Rust prevention check, 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002

Inspection 
Drawing, Specification, Drawing, Specification,
8.52 Shipping preparation inspection, 100% reports,  H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list

Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,

DM20S
8.53 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001

J-04-Aug- 22
INTED 93 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

Drawing, Specification, Drawing, Specification,
8.54 Check of cleanliness and dryness 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,


8.55 100% H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification, Inspection 


8.56 Check of marking for site installation 100% reports,  H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
8.57 100% H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001

Check of packing conditions as per Drawing, Specification, Drawing, Specification,


8.58 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
8.59 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
8.60 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
8.61 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
8.70 Pre shipping inspection

Approved documents / Project  Approved documents / Project 
8.71 Visual Inspection 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
8.72 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
8.73 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification

9.00 SILENCER                                                                           (Thermax WBS No ‐ Z1A ) LOCATION‐ As per Project Approved Vendor List


9.10 RAW MATERIAL ‐ FOR MAJOR COMPONENT
*‐ EN 10204, type 3.1 for all 
Drawing,Material Specification,  Material Specification, RS215B‐101,  pressure containing, rotating 
Review of TC for Plate, Pipe, Flanges, Fittings 
9.11 RS215B‐101, SS‐000‐15200‐0102, SS‐000‐15200‐0102, 100% Test certificate  H R R ‐ OR and load bearing parts and 
(Chemical &  Mechanical properties) type 2.2 for all non‐pressure 
VS215B‐101‐A‐DGN‐3107 VS215B‐101‐A‐DGN‐3107
parts. 

Review of TC for Fiber Glass wool / Mineral 
9.12 Drawing, Specification Drawing, Specification 100% Test certificate  H R R ‐ OR
Wool, Cerewool felt
9.20 INPROCESS INSPECTION
Vendor`s PT/MT Procedure, 
9.21 Weld Soundness for lifting Lugs & Butt welds Vendor`s PT/MT Procedure, Drawings 100% NDE Report H R R ‐ OR
Drawings

S
Diffuser Assembly Inspection 

M
9.22 Drawings Drawings 100% H R R ‐ OR

D
Dimension & Visual  Report
-
J Aug 22
- 2
04-
0
INTED 94 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
Inspection 
9.23 Weld visual inspection Vendor`s VT Procedure ,Drawings Vendor`s VT Procedure ,Drawings 100% H R R ‐ OR
Report

Drawings, Vendor`s Leak test  Drawings, Vendor`s Leak test  Hydro test 


9.24 Leak Test (Hydro Test) 100% H R R ‐ OR
procedure procedure Report

9.30 FINAL INSPECTION

Overall Dimensions, Orientation &  Inspection 
9.31 Approved Drawing & Data Sheet Approved Drawing & Data Sheet 100% H SW R ‐ OR
workmanship, Compliance to Drawing for Scope Report

PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,


9.32 100% PMI report H SW R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103

Inspection 
9.33 Flow Marking, Tag No., Name Plate Approved Drawing & Data Sheet Approved Drawing & Data Sheet 100% H SW R ‐ OR
Report
9.40 PAINTING INSPECTION
Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
9.41 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)

Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
9.42 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level

Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  


9.43 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
9.44 Painting & Coating prepration & Application Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,   (*) SW for Visual 


9.45 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H SW(*) R ‐ OR Inspection ,DFT , Adhesion 
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 test for finished paint.

Painting specification, Drawing,   Painting specification, Drawing,  
9.46 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

9.50 SPARES ‐ If applicable 

9.51 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR

D M S
-
J04-Aug 22
- 2 0
INTED 95 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

9.60 PACKING/MARKING                                                                                                                                                                     Note : W# ‐ Export packing witness is for direct site supplied items only

Drawing, Specification, Drawing, Specification,
9.61 Rust prevention check, 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002

Drawing, Specification, Drawing, Specification,
9.62 Shipping preparation inspection, 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,


9.63 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001

Inspection 
Drawing, Specification, Drawing, Specification,
9.64 Check of cleanliness and dryness 100% reports,  H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list

Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,


9.65 100% H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
9.66 Check of marking for site installation 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,


9.67 100% H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001

Check of packing conditions as per Drawing, Specification, Drawing, Specification,


9.68 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001 Inspection 
reports, 
Drawing, Specification, Drawing, Specification,
9.69 Final inspection on all items ( as applicable ) 100% Packing list H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

9.70 INSPECTION RELEASE CERTIFICATE

Drawing, Specification Drawing, Specification
9.71 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101

9.80 Pre shipping inspection

Approved documents / Project  Approved documents / Project 
9.81 Visual Inspection 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
9.82 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
9.83 Check of Invoice/Packing List 100% Verification H H H ‐ IR

S
specification specification

-
10.00
10.01
D M
J04-Aug 22
- 2 0
FLOW ELEMENT ( ORIFICE )                                     ( Thermax WBS No ‐ I34 )
RAW MATERIAL FOR MAJOR COMPONENT
LOCATION‐ As per Project Approved Vendor List

EN PR
INTED 96 / 131
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
*‐ EN 10204, type 3.1 for all 
Review of TC for Orifice plate, Plates,  pressure containing, rotating 
Drawing,Material Specification,  Drawing,Material Specification, 
10.02 Flanges,Fastners (Chemical &  Mechanical  100% Test certificate  H R R ‐ OR and load bearing parts and 
RS215B‐101, SS‐000‐15200‐0102 RS215B‐101, SS‐000‐15200‐0102 type 2.2 for all non‐pressure 
properties)
parts. 

10.10 FINAL INSPECTION
Dimensional 
10.11 Overall Dimensions, Orientation & workmanship Approved Drawing & Data Sheet Approved Drawing & Data Sheet 100% Inspection  H R R ‐ OR
Report 
Dimensional 
10.12 Flow Marking, Tag No ,Name Plate Approved Drawing & Data Sheet Approved Drawing & Data Sheet 100% Inspection  H R R ‐ OR
Report 
PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,
10.13 100% PMI report H R R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103

10.20 PAINTING INSPECTION

Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
10.21 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)

Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
10.22 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level

Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  


10.23 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
10.24 Painting & Coating prepration & Application Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,  


10.25 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H R R ‐ OR
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
10.26 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

10.30 SPARES ‐ If applicable 

D M S
-
10.31 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR
J04-Aug 22
- 2 0
INTED 97 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
10.40 PACKING/MARKING                                                                                                                                                                     Note : W# ‐ Export packing witness is for direct site supplied items only
Drawing, Specification, Drawing, Specification,
10.41 Rust prevention check, 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
10.42 Shipping preparation inspection, 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,
10.43 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
10.44 Check of cleanliness and dryness 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001 Inspection 
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,
10.45 100% reports,  H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list
Drawing, Specification, Drawing, Specification,
10.46 Check of marking for site installation 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
10.47 100% H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
10.48 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
10.49 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
10.50 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
10.51 Final Document Review and Issue of IRC 100% IRC H H H R IRC
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
10.60 Pre shipping inspection
Approved documents / Project  Approved documents / Project 
10.62 Visual Inspection 100% Verification H H H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
10.63 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
10.63 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification
11.00 FLOW ELEMENT ( FLOW NOZZLES & VENTURI)            ( Thermax WBS No ‐ I34 ) LOCATION‐ As per Project Approved Vendor List
11.10 RAW MATERIAL FOR MAJOR COMPONENT
*‐ EN 10204, type 3.1 for all 
pressure containing,  rotating 
Review of TC for Flow Nozzle adaptor,Cap &  Drawing,Material Specification,  Drawing,Material Specification, 
11.11 100% Test certificate  H R R ‐ OR and load bearing parts and 
Nozzle (Chemical &  Mechanical properties) RS215B‐101, SS‐000‐15200‐0102 RS215B‐101, SS‐000‐15200‐0102 type 2.2 for all non‐pressure 
parts. 

11.20 IN PROCESS INSPECTION

11.21 Weld visual inspection Vendor`s VT Procedure, Drawings, Vendor`s VT Procedure, Drawings 100% NDT  Report H R R ‐ OR

Vendor`s RT Procedure, Drawings/ 
11.22 RT of Butt Weld Soundness(**) Drawing, Vendors RT Procedure 100% NDT  Report H R R ‐ OR (**) If PWHT is required NDE 
Data sheet
shall be carried out after 
MPT/PT for Fillet Weld Soundness Drawing, Vendors MPT/PT  PWHT
11.23 Drawing, Vendor`s MPT/PT Procedure 100% NDT  Report H R R ‐ OR
(**) Procedure
MPT/PT for bevel edges / Welds  as applicable  Drawing, Vendors MPT/PT 

DM20S
11.24 Drawing, Vendor`s MPT/PT Procedure 100% NDT  Report H R R ‐ OR
(**) Procedure

J-04-Aug-
11.25 22
Post Weld Heat Treatment (If required) 
RINTE
D
Drawing, Vendor`s heat treatment 
procedure
Drawing, Vendors heat treatment 
report
100% Chart H R R ‐ OR
98 / 131
HEN P
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
11.30 FINAL INSPECTION
Dimensional 
11.31 Overall Dimensions, Orientation & workmanship Approved Drawing & Data Sheet Approved Drawing & Data Sheet 100% Inspection  H SW R ‐ OR
Report 
 Hydro Test 
11.32 Compliance to Drg for Scope & Hydro Test  Approved Drawing & Data Sheet Approved Drawing & Data Sheet 100% H SW R ‐ OR
Report 
Inspection 
11.33 Flow Marking, Tag No ,Name Plate Approved Drawing & Data Sheet Approved Drawing & Data Sheet 100% H SW R ‐ OR
Report 
PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,
11.34 100% PMI report H SW R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103
11.40 PAINTING INSPECTION
Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
11.41 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)

Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
11.42 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level

Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  


11.43 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
11.44 Painting & Coating prepration & Application Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,   (*) SW for Visual 


11.45 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H SW(*) R ‐ OR Inspection ,DFT , Adhesion 
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 test for finished paint.

Painting specification, Drawing,   Painting specification, Drawing,  
11.46 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

11.50 SPARES ‐ If applicable 

11.51 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR

D M S
-
J04-Aug 22
11.60
- 2 0PACKING/MARKING                                                                                                                                                         Note : W# ‐ Export packing witness is for direct site supplied items only

INTED 99 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
Drawing, Specification, Drawing, Specification,
11.61 Rust prevention check, 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
11.62 Shipping preparation inspection, 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,
11.63 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
11.64 Check of cleanliness and dryness 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Inspection 
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,
11.65 100% reports,  H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification, Packing list
11.66 Check of marking for site installation 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
11.67 100% H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
11.68 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
11.69 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
11.70 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
11.71 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
11.80 Pre shipping inspection
Approved documents / Project  Approved documents / Project 
11.81 Visual Inspection 100% Verification H H H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
11.82 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
11.83 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification
12.00 BURNER                                                                                      ( Thermax WBS No ‐ L11 ) LOCATION‐ As per Project Approved Vendor List
12.10 MATERIAL IDENTIFICATION
*‐ EN 10204, type 3.1 for all 
Drawing,Material Specification,  Drawing,Material Specification,  pressure containing, rotating 
Review & Verification of MTC / Test certificate 
12.11 RS215B‐101, SS‐000‐15200‐0102 RS215B‐101, SS‐000‐15200‐0102, 100% Test certificate  H R R ‐ OR and load bearing parts and 
w.r.t. Drg.BOM & Matl specs type 2.2 for all non‐pressure 
VS215B‐101‐A‐DGN‐3101 VS215B‐101‐A‐DGN‐3101
parts. 

12.20 INPROCESS  INSPECTION
Inspection 
report/
12.21 Fit‐Up ‐ Nozzle / Fittings / Castings Drawing Drawing 100% H R R ‐ IR
Compliance 
report
Drawing & Manufacturer Test  Drawing & Manufacturer Test   Test Report
12.22 Pressure Test of Manifolds (as applicable) 100% H R R ‐ OR
procedure procedure
Inspection 
report/
12.23 Fit‐Up ‐ Ignition Torch to Burner (As applicable) Drawing Drawing 100% H R R ‐ OR

S
Compliance 

- D M
J04-Aug 22
- 2 0
report

EN PR
INTED 100 / 131
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
Drawing & Manufacturer Test  Drawing & Manufacturer Test 
12.24 PT ‐ 100% Gas Tips 100% NDE Report H R R ‐ OR
procedure procedure
Radiograph Butt Welds‐gas piping only (As  Drawing & Manufacturer Test  Drawing & Manufacturer Test 
12.25 10% NDE Report H R R ‐ OR
applicable). procedure procedure
Drawing & Manufacturer Test  Drawing & Manufacturer Test   Test Report
12.26 Hydrotest of Oil & Gas Gun 100% H R R ‐ OR
procedure procedure

Flame detector mounting nozzle direction check  
12.27 Drawing  Drawing  100%  Test Report H IW IW ‐ OR
(as applicable)

Functional test for moving components Drawing & Manufacturer Test  Drawing & Manufacturer Test 


12.28 100%  Test Report H IW IW ‐ OR
including register, damper, etc. (As applicable) procedure procedure

(A) Visual and dimensional check (As applicable)
(i) Burner assembly including burner tip Drawing  Drawing 
holes, swirler direction
(ii) Ignitor
12.29 (iii) Weldment of burner gun and manifold 100%  Test Report H W W ‐ OR

(B)Air flow test for burner tip (As applicable). Drawing & Manufacturer Test  Drawing & Manufacturer Test 


(C)Bubble leak test for burner gun, gas procedure procedure
nozzle & manifold (As applicable)

12.30 ASSEMBLY INSPECTION
Orientation, Assembly inspection and  Inspection 
12.31 Drawing Drawing 100% H W W ‐ OR
completion of welding‐ Report
PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,
12.32 100% PMI report H SW R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103
1 no. 
12.30 Igniter test Drawing/ Dat asheet Drawing/ Data sheet Test report H W W ‐ OR
/Type
Compliance to Drawing for Scope, Round off  Inspection 
12.33 Drawing Drawing 100% H W W ‐ OR
sharp Corner/edges  Report
Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved GAD, Data 
SS‐000‐13702‐0002 / Approved GAD, 
12.34 accordance with Section 4.2 of IEC60079‐14  (  sheets, 100% Dossier review H R R R OR
Data sheets.
as applicable ) HSP‐000‐13800‐010
12.40 BURNER TILE

12.41 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR

12.42 Dimensional Inspection Drawing, ASME Sec‐II,Matl. Specs. ASME Sec.II, Drawing, Specification 100% MTC H R R ‐ OR

12.50

D M S
PAINTING INSPECTION

-
J04-Aug 22
- 2 0
INTED 101 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
12.51 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)

Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
12.52 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level

Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  


12.53 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
12.54 Painting & Coating prepration & Application Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001

Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,   (*) SW for Visual 


12.55 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H SW(*) R ‐ OR Inspection ,DFT , Adhesion 
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001 test for finished paint.

Painting specification, Drawing,   Painting specification, Drawing,  
12.56 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
12.60 SPARES ‐ If applicable 
12.61 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR
Inspection 
report/
12.62 Visual & dimensional check (as applicable) Drawing Drawing 100% H R R ‐ OR
Compliance 
report
12.70 PACKING/MARKING                                                                                                                                                                       Note : W# ‐ Export packing witness is for direct site supplied items only
Drawing, Specification, Drawing, Specification,
12.71 Rust prevention check, 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
12.72 Shipping preparation inspection, 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,
12.73 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification, Inspection 


12.74 Check of cleanliness and dryness 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001 reports, 
Packing list
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,
12.75 100% H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001

D M S
-
J04-Aug 22
12.76
- 2 0Check of marking for site installation
D
Drawing, Specification,
SS‐000‐14500‐0001
Drawing, Specification,
SS‐000‐14500‐0001
100% H W# W# ‐ IR
102 / 131
EN PRINTE
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,


12.77 100% H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001

Inspection 
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
12.78 100% reports,  H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list

Drawing, Specification, Drawing, Specification,
12.79 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

12.80 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
12.81 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
12.90 Pre shipping inspection

Approved documents / Project  Approved documents / Project 
12.91 Visual Inspection 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
12.92 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
12.93 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification

13.00 INSPECTION OF MISCELLANEOUS BOUGHT OUT ITEMS  LOCATION‐ As per Project Approved Vendor List

13.01 MATERIAL IDENTIFICATION

Review & Verification of check test reports/COC 
13.02 Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR
Verification w.r.t. Drg.BOM & Matl specs

13.10 FINAL INSPECTION
Make,Model,Sr.No, MODEL, Approved Drawing, PO Specs,  Approved Drawing, PO Specs, 
13.11 100% MTC  / COC H R R ‐ OR
TC / COC Verification Standards & Codes Standards & Codes
Dimensional
Approved Drawing, PO Specs,  Approved Drawing, PO Specs, 
13.12 Overall Dimensions 100% Inspection  H R R ‐ OR
Standards & Codes Standards & Codes
Report
PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,
13.13 100% PMI report H SW R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103
13.20 PAINTING INSPECTION
Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
13.21 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)

D M S
-
J04-Aug 22
- 2 0
INTED 103 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
Pre‐Blast Check, blotter test & weather 
Painting specification, Drawing,   Painting specification, Drawing,  
condition, Cleaning, profile, cleanliness grade 
13.22 Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
for any steel imperfection, Surface Dust Level
Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  
13.23 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
13.24 Painting & Coating prepration & Application Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,  
13.25 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H R R ‐ OR
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
13.26 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
13.30 PACKING/MARKING                                                                                                                                                                        Note : W# ‐ Export packing witness is for direct site supplied items only
Drawing, Specification, Drawing, Specification,
13.31 Rust prevention check, 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
13.32 Shipping preparation inspection, 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification,
13.33 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
13.34 Check of cleanliness and dryness 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Inspection 
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,
13.35 100% reports,  H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list
Drawing, Specification, Drawing, Specification,
13.36 Check of marking for site installation 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
13.37 100% H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
13.38 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
13.39 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
13.40 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
13.41 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101

D M S
-
J04-Aug 22
- 2 0
INTED 104 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

ITEMS IN MISCELLANEOUS BOUGHT OUT CTEGORY  are as listed below 
1. LOOSE ITEMS & SPARES
2. ADDITIONAL ORDERED ITEMS BY CUSTOMER
( LIKE TRADER BUYING ITEMS ADDED AT LAST MOMENT )
3. COMMISSIONING SPARE
13.43
4. PEEP HOLE ASSEMBLY / LOOSE MICA GLASS / ACCESS DOOR
5. DEMISTER PAD
6. AIR LINE / IMPULSE LINE MATERIAL
7. EARTHING MATERIAL
8. Missed out item if any

13.50 Pre shipping inspection
Approved documents / Project  Approved documents / Project 
13.51 Visual Inspection 100% Verification H H H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
13.52 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
13.53 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification
14.00 CABLE TRAYS, ACCESSORIES AND SUPPORTS         ( THERMAX WBS NO ‐ E21, I21 ) LOCATION‐ As per Project Approved Vendor List
14.01 MATERIAL IDENTIFICATION
Review & Verification of check test reports/COC 
Drawing, ASME Sec‐II, Material 
14.02 Verification w.r.t. Drg.BOM & Material  ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR
specification
specification
14.10 FINAL INSPECTION
Approved Drawing, PO Specs, 
Make,Model,Sr.No, MODEL, Approved Drawing, PO Specs, 
14.11 Standards & 100% MTC  / COC H R R ‐ OR
TC / COC Verification Standards & Codes
Codes
Dimensional
Approved Drawing, PO Specs,  Approved Drawing, PO Specs, 
14.12 Overall Dimension,Orientation & Surface finish     100% Inspection  H R R ‐ OR
Standards & Codes Standards & Codes
Report
Approved Drawing, PO Specs,  1 Sample/  Inspection 
14.13 Thickness of Zinc Coating                                        Approved Drawing H R R ‐ OR
Standards & Codes Size Report

Approved Drawing, PO Specs,  1 Sample/  Strip Test 


14.14 Zinc Coating by Weight                                           Approved Drawing H R R ‐ OR
Standards & Codes Size Report 

Approved Drawing, PO Specs,  1 Sample/  Hammer Test 


14.15 Adhesion of Zinc Coating                                         Approved Drawing H R R ‐ OR
Standards & Codes Size Report

Approved Drawing, PO Specs,  1 Sample/  Preece Test 


14.16 Uniformity of Zinc Coating                                       Approved Drawing H R R ‐ OR
Standards & Codes Size Report

Approved Drawing, PO Specs,  1 Sample/  Load Test   


14.17 Deflection Test for 300 & Above                                Approved Drawing H R R ‐ OR
Standards & Codes Size Report

S
Loose items & spare verification, Scope  Approved Drawing, PO Specs,  Inspection 

M
14.18 Approved Drawing 100% H R R ‐ OR

D
Completness              Standards & Codes Report
-
J Aug 22
14.20 - 2
04-
0 SPARES ‐ If applicable 
INTED 105 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
14.21 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR
14.30 PACKING/MARKING    ( as applicable)                                                                                                                                               Note : W# ‐ Export packing witness is for direct site supplied items only
Drawing, Specification, Drawing, Specification,
14.31 Rust prevention check, 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Drawing, Specification, Drawing, Specification,
14.32 Shipping preparation inspection, 100% Inspection  H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
reports, 
Check of shipping / lifting bracing as per Drawing, Specification, Drawing, Specification, Packing list
14.33 100% H W# W# ‐ IR
approved Drawing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
14.34 Check of cleanliness and dryness 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,
14.35 100% H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
14.36 Check of marking for site installation 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification, Inspection 
14.37 100% reports,  H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
14.38 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001

Drawing, Specification, Drawing, Specification,
14.39 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
14.40 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
14.41 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
14.50 Pre shipping inspection

Approved documents / Project  Approved documents / Project 
14.51 Visual Inspection 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
14.52 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
14.53 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification
15.00 TURBINE FOR FD FAN                                        (THEMAX WBS NO ‐ A53)                                                                                                       LOCATION‐ As per Project Approved Vendor List
15.01 REFER VS215B‐101‐A‐PLN‐7004
16.00 LEVEL GAUGE                                          (THEMAX WBS NO ‐ Z28)                                                                                               LOCATION‐ As per Project Approved Vendor List
16.10 RAW MATERIAL ‐ FOR MAJOR COMPONENT

Drawing,Data sheet, Material  Drawing,Data sheet, Material  *‐ EN 10204, type 3.1 for all 

S
pressure containing, rotating 

M
Socket Material/Process Connection Material  Specification, RS215B‐101, SS‐000‐ Specification, RS215B‐101, SS‐000‐

- D
16.11 100% Test certificate  H R R OR and load bearing parts and 

J Aug 22
- 2
04-
0
(Chemical &  Mechanical properties)

INTED
15200‐0102,
VS215B‐101‐A‐DGN‐3108
15200‐0102,
VS215B‐101‐A‐DGN‐3108
type 2.2 for all non‐pressure 
parts. 
106 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER

16.20 FINAL INSPECTION 

Inspection 
16.21 Visual & Dimension  Drawing,Data sheet Drawing,Data sheet 100% H R R OR
Report

Drawing,Data sheet,Vendor's Hydro  Inspection 
16.22 Hydro Test  Drawing,Data sheet 100% H W R OR
testing Procedure Report

PMI for Alloy Verificaion of Accessible welds &  PMI Procedure, PMI Procedure,


16.23 100% PMI report H SW R ‐ OR
Parent Metal SS‐000‐15200‐0103 SS‐000‐15200‐0103
Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved GAD, Data 
SS‐000‐13702‐0002 / Approved GAD, 
16.24 accordance with Section 4.2 of IEC60079‐14  (  sheets, 100% Dossier review H R R R OR
Data sheets.
as applicable ) HSP‐000‐13800‐010
16.30 PAINTING INSPECTION

Check qualification of 
Painting specification, Drawing,   Painting specification, Drawing,  
personnel, Check paint 
16.31 Surface prepration  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
color of temporary 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
material (shipping jig etc.)
Pre‐Blast Check, blotter test & weather  Painting specification, Drawing,   Painting specification, Drawing,  
16.32 condition, Cleaning, profile, cleanliness grade  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
,Salt contaminants / Conductivity test & check  SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Review Paint TC, Make, Batch no., Expiry Date  Painting specification, Drawing,   Painting specification, Drawing,  
16.33 and Review of abrasive Type Analysis (If  Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
Applicable) SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
Check‐ 
16.34 Painting & Coating prepration & Application Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
‐ Atmospheric Condition 
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Mesurement of Paint WFT,DFT /  Visual  Painting specification, Drawing,   Painting specification, Drawing,  
WFT report review by 
16.35 Inspection of finished coatings,Solvent  Painting Procedure, Painting Procedure, Random Painting Report H SW R ‐ OR
TBWES
Rub(MEK) test for inorganic zink, Adhesion test SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
Painting specification, Drawing,   Painting specification, Drawing,  
16.36 Verify Identification and marking Painting Procedure, Painting Procedure, 100% Painting Report H R R ‐ OR
SS‐000‐13A00‐0001 SS‐000‐13A00‐0001
16.40 SPARES ‐ If applicable 
16.41 Material Conformance to B.O.M. Drawing, ASME Sec‐II, Matl. Specs. ASME Sec.II, Drawing, Specification 100% Test certificate  H R R ‐ OR

16.50 PACKING/MARKING    ( as applicable)                                                                                                                                             Note : W# ‐ Export packing witness is for direct site supplied items only

Drawing, Specification, Drawing, Specification,
16.51 Rust prevention check, 100% H W# W# ‐ IR
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Inspection 
Drawing, Specification, Drawing, Specification,

DM20S
16.52 Shipping preparation inspection, 100% reports,  H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Packing list

J-04-Aug-
16.53 22
Check of shipping / lifting bracing as per
approved DrawingD
RINTE
Drawing, Specification,
SS‐000‐14500‐0001
Drawing, Specification,
SS‐000‐14500‐0001
100% H W# W# ‐ IR
107 / 131
HEN P
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
Drawing, Specification, Drawing, Specification,
16.54 Check of cleanliness and dryness 100% H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
Flange surface check (with photo record) Drawing, Specification, Drawing, Specification,
16.55 100% H W# W# ‐ IR
and flange face protection SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
16.56 Check of marking for site installation 100% Inspection  H W# W# ‐ IR
SS‐000‐14500‐0001 SS‐000‐14500‐0001
reports, 
Check of nameplate with Photo Record or  Drawing, Specification, Drawing, Specification,
16.57 100% Packing list H W# W# ‐ OR
Rubbing SS‐000‐14500‐0001 SS‐000‐14500‐0001
Check of packing conditions as per Drawing, Specification, Drawing, Specification,
16.58 100% H W# W# ‐ IR
approved Packing Procedure SS‐000‐14500‐0001 SS‐000‐14500‐0001
Drawing, Specification, Drawing, Specification,
16.59 Final inspection on all items ( as applicable ) 100% H W# W# W# OR
SS‐000‐14500‐0001 SS‐000‐14500‐0001

16.60 INSPECTION RELEASE CERTIFICATE

Drawing, Specification Drawing, Specification
16.61 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101

16.70 Pre shipping inspection

Approved documents / Project  Approved documents / Project 
16.71 Visual Inspection 100% Verification H H H ‐ IR
specification specification

Approved documents / Project  Approved documents / Project 
16.72 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ IR
specification specification
Approved documents / Project  Approved documents / Project 
16.73 Check of Invoice/Packing List 100% Verification H H H ‐ IR
specification specification

17.00 INSULATION                                                                                                                                             LOCATION‐ As per Project Approved Vendor List

17.01 FINAL INSPECTION

As per Specification & Standard, As per Specification & Standard, Review ‐ TC  / 


17.02 Review of test Reports 100% H R R R OR
VS215B‐101‐A‐DGN‐3501 VS215B‐101‐A‐DGN‐3501 COC
As per PO Specification & Data   Inspection 
17.03 Overall Dimensions As per PO Specification & Data Sheet 100% H R R R OR
Sheet Report 
Verification 
17.04 Density & Batch Number As per Specification & Data Sheet As per Specification & Data Sheet 100% H R R R IR
Report
18.10 PACKING/MARKING
For loose materials 
(including spare parts) to 
Drawing, Specification, Drawing, Specification,
Corrosion protection and shipping, Marking,  be delivered to Iraqi 

DM20S
18.11 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H R R ‐ OR
Tagging and Packing inspection construction side, Pre‐

J-04-Aug-
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
22 Shipping Inspection shall 
be carried out
EN PR
INTED 108 / 131
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
18.20 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
18.21 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
19.00 REFRACTORY/CASTABLE                                                                                                                                      LOCATION‐ As per Project Approved Vendor List
19.01 RAW MATERIAL  
As per Specification & Data Sheet, As per Specification & Data Sheet,
19.02 Chemical Composition Mechanical Tests 100% MTC  / COC H R R R OR
VS215B‐101‐A‐DGN‐3401 VS215B‐101‐A‐DGN‐3401
19.10 QUALIFICATION TEST BENCH

As per Specification & Data Sheet, As per Specification & Data Sheet, Inspection 


19.11 Qualification Test ‐ Sampling 100% H R R R OR
VS215B‐101‐A‐DGN‐3401 VS215B‐101‐A‐DGN‐3401 Report

19.20 FINAL INSPECTION

Inspection 
19.21 Physical Verification of Material as per PO As per Specification & Data Sheet As per Specification & Data Sheet 100% H R R R OR
Report
Inspection 
19.22 Batch No & Manufacturing Date As per Specification & Data Sheet As per Specification & Data Sheet 100% H R R R OR
Report
Inspection 
19.23 Self Life verification As per Specification & Data Sheet As per Specification & Data Sheet 100% H R R R OR
Report
Inspection 
19.24 Testing ‐ BD & CCS As per Specification & Data Sheet As per Specification & Data Sheet 100% H R R R OR
Report
19.30 PACKING/MARKING
For loose materials 
(including spare parts) to 
Drawing, Specification, Drawing, Specification,
Corrosion protection and shipping, Marking,  be delivered to Iraqi 
19.31 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H R R ‐ OR
Tagging and Packing inspection construction side, Pre‐
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Shipping Inspection shall 
be carried out
19.40 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
19.41 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
20.00 FIRE, INSULATION BRICKS & TILES                                                                                   LOCATION‐ As per Project Approved Vendor List
20.01 RAW MATERIAL  
As per Specification / Standard / 
As per Specification / Standard / 
20.02 Chemical Composition Mechanical Tests Approved Data Sheet / API  100% MTC  / COC H R R R OR
Approved Data Sheet / API 936/ASTM
936/ASTM

20.10 FINAL INSPECTION

Inpsection 
20.11 Physical Verification of Material as per PO As per Specification & Data Sheet As per Specification & Data Sheet 100% H R R R OR
reports
Inpsection 
20.12 Visual Inspection  & Dimension As per Specification & Data Sheet As per Specification & Data Sheet 100% H R R R OR
reports
20.20 PACKING/MARKING

D M S
-
J04-Aug 22
- 2 0
INTED 109 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
For loose materials 
(including spare parts) to 
Drawing, Specification, Drawing, Specification,
Corrosion protection and shipping, Marking,  be delivered to Iraqi 
20.21 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H R R ‐ OR
Tagging and Packing inspection construction side, Pre‐
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Shipping Inspection shall 
be carried out
20.30 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
20.31 Final Document Review and Issue of IRC 100% IRC H H H R OR
SS‐000‐15200‐0101 SS‐000‐15200‐0101
21.00 CERAMIC BLANKET / PAPER / BOARD/ MORTAR/ LOOSE WOOL/ GROUTING MATERIAL                     LOCATION‐ As per Project Approved Vendor List
21.01 FINAL INSPECTION
21.02 CERAMIC BLANKET, PAPER,  BOARD, MORTAR, LOOSE WOOL, GROUTING MATERIAL
Verification 
21.03 Physical Verification of Material as per PO As per Specification & Data Sheet As per Specification & Data Sheet 100% H R R R IR
Report
 Inspection 
21.04 Visual Inspection   As per Specification & Data Sheet As per Specification & Data Sheet 100% H R R R OR
Report 
21.05 Review of testing reports As per Specification & Data Sheet As per Specification & Data Sheet 100% MTC  / COC H R R R OR

21.06 Mortar Self life Verification As per Specification & Data Sheet As per Specification & Data Sheet 100% MTC  / COC H R R R OR


21.10 PACKING/MARKING
For loose materials 
(including spare parts) to 
Drawing, Specification, Drawing, Specification,
Corrosion protection and shipping, Marking,  be delivered to Iraqi 
21.11 SS‐000‐14500‐0001, SS‐000‐14500‐0001, 100% Packing list H R R R OR
Tagging and Packing inspection construction side, Pre‐
SS‐000‐13A00‐0002 SS‐000‐13A00‐0002
Shipping Inspection shall 
be carried out
21.20 INSPECTION RELEASE CERTIFICATE
Drawing, Specification Drawing, Specification
21.21 Final Document Review and Issue of IRC 100% IRC H H H R OR
 SS‐000‐15200‐0101  SS‐000‐15200‐0101
Designation of letters and abbreviations of ITP

H: Hold point 
Vendor is not allowed to proceed with the test/inspection unless a written release is issued by Contractor. Vendor shall submit inspection notification to Contractor 
W: Witness point 
Vendor can proceed with the test/inspection when Contractor’s inspector is not present at the notified time. Vendor shall submit inspection notification to Contractor. 
IW: Initial witness 
Vendor is requested to notify Contractor of the initial inspection date/time. Vendor can proceed with the test/inspection when Contractor’s inspector is not present at the notified time. Subsequent 
test/inspection will not be witnessed unless any deficiencies are found at the initial inspection. 
SW: Spot witness 
Vendor shall notify Contractor of inspection to be spot witnessed. Vendor may proceed with Inspection and testing should Contractor’s inspector not be present at the time notified. 
S: Surveillance 
Vendor is not requested to notify Contractor. Contractor’s inspector will monitor manufacturing conditions, workmanship and test/inspection during his visit or periodical inspection. 
R: Record review 
Vendor shall provide Contractor with certificates, reports and records as applicable for review and confirmation. 

S
<Records> 

- D M
J04-Aug - 2
OR: Official record Vendor is requested to provide the official records to submit as the Manufacturing Data Record Book. 
022
IR: Internal record Vendor is requested to provide the records for Contractor’s inspector to verify the quality.

EN PR
INTED 110 / 131
H
ITP for MBO LED W
TROL
NCON
1 2 3 4 5 6 7 8
INTERVENTION
SAMPLING  VERIFIED 
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR Employer
SUPLLIER
TBWES Thermax Babcock & Wilcox Energy Solutions Ltd 
CONTRACTOR JGC Corporation / Hyundai Engineering & Construction Co., Ltd
EMPLOYER The Ministry of Oil, South Refineries Company (SRC)
Inspection Level
Level 1  Review shop inspection record only and issue Inspection Release Certificate (IRC)

Level 2 Witness final inspection, review shop inspection record and issue Inspection Release Certificate (IRC). Pre‐inspection Meeting (PIM)  may be held, if necessary.

Conduct Pre‐Inspection Meeting (PIM), witness inspections specified inthe approved Inspection and Test Plan (ITP), in‐process surveillance visits as necessary, review shop inspection 
Level 3
record and issue Inspection Release Certificate (IRC)
Conduct Pre‐Inspection Meeting (PIM), regular inspection visits, perform witness hold points specified in the approved Inspection and 
Level 4 Test Plan (ITP), Resident inspection may be required to continuously monitor the activity in accordance with the approved ITP, review shop inspection record and issue Inspection 
Release Certificate (IRC).
Thermax Babcock & Wilcox Energy Solutions Ltd ( Contractor
TBWES),Pune Approved by
Manufacturer/Sub supplier

D M S
-
J04-Aug 22
- 2 0
INTED 111 / 131
H EN PR
ITP for MBO LED W
TROL
NCON
INDEX FOR E&I

Sr. No ITP Description

1 MOTOR ( MV & LV )

2 POWER CONTROL & EARTHING CABLES

3 PG, TG WITH THERMOWELL

4 RTD, THERMOCOUPLE WITH THERMOWELL

5 INSTRUMENTATION CABLES

6 TRANSMITTERS

7 SWITCHES & INDICATORS
JUNCTION BOXES, LOCAL CONTROL STATION, ELECTRICAL PANEL / DISTRIBUTION BOARD, LOCAL BURNER PANEL, MCC PANEL, 
8
ELECTRIC HEAT TRACING SYSTEM
9 FLOWMETERS

10 ANALYSER, FLAME SCANNER / IGNITOR

11 SWAS PANEL

12 POWER CYLINDER

13 CABLE GLANDS, CABLE LUGS, CABLE TIE, CANOPIES, ILLUMINATION LAMPS, MISCELLANEOUS ITEMS ( E&I )

M S
J-04D
-Au g - 2 0 22
PRINT
ED 112 / 131
WHEN
LLED
NCONTRO
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
1.00 Motors ( MV & LV )
1. 1.01 RAW  MATERIAL
Material test  Material test 
Approved GAD, Data  certificates /  certificates / 
1.1.02 Material certificate review Approved GAD, Data sheets. 100% H R R ‐
sheets. Conformity  Conformity 
certificates certificates
1. 2.01 Production test ( Only for MV induction motors )
SS‐000‐13821‐0001, Rev 0, 
SS‐000‐13821‐0001, Rev 0, 
1. 2.02 In process / Production test ( Rotor Balancing test ) Approved GAD, Data  100% Report H RW R R Report
Approved GAD, Data sheets.
sheets.
1. 3.01 Final Inspection ( Routine test, as applicable )
SS‐000‐13821‐0001, Rev 0 
Visual & Physical, Cable entries, earthing 
SS‐000‐13821‐0001, Rev 0 / /
bolts,terminal boxes, enclosure, name
1. 3.02 SS‐000‐13821‐0002 Rev0,  SS‐000‐13821‐0002 Rev0,  100% Inspection report H W W R Inspection report
plate, lubrication and re‐greasing
Approved GAD, Data sheets Approved GAD, Data 
facilities, Paint shade, Final DFT etc
sheets
Winding resistance(cold),
Calculated resistance at 20 deg.C.,
Locked rotor current,
SS‐000‐13821‐0001, Rev 0 
Locked rotor torque,
SS‐000‐13821‐0001, Rev 0 / /
No load current & no load losses, Test report / test  Test report / test 
1. 3.03 SS‐000‐13821‐0002 Rev0,  SS‐000‐13821‐0002 Rev0,  100% H W W ‐
Vibration severity, certificate certificate
Approved GAD, Data sheets Approved GAD, Data 
Dielectric test on  (motor windings,.anti 
sheets
condensation heaters, built in temperature 
detectors as applicable ),
Verification of spares ( as applicable )
1. 4.01 Final Inspection [ Performance test ( For one motor per same rating & type. )]
Winding resistance ( Hot & cold ), 
Full load heat run test, 
calculated winding temperature rise,
 calculated winding resistance at 20 Deg. C, Bearing 
temperature rise, 
slip & efficiency at ¾ and full load, 
power factor at ¾ and full load,  SS‐000‐13821‐0001, Rev 0 
Locked rotor current, locked rotor torque,  SS‐000‐13821‐0001, Rev 0 / / 1 number per 
Test report / test  Test report / test 
1. 4.02 No load current & no load losses,  SS‐000‐13821‐0002 Rev0,  SS‐000‐13821‐0002 Rev0,  type per rating  H W W ‐
certificate certificate
Vibration severity,  Approved GAD, Data sheets Approved GAD, Data  per frame size
Dielectric test on .motor windings,.anti  sheets
condensation heaters,built in temperature 
detectors ( as applicable ),
shaft voltage at no load, 
noise test,
 Insulation resistance on motor windings before 
heat run and after heat run and dielectric test
1. 5.01 Documentation

SS‐000‐13821‐0001, Rev 0 
Test report / test  Test report / test 
Material test certificates, in process records,  SS‐000‐13821‐0001, Rev 0 / /
certificate/  certificate/ 
1.5.02 Routine test reports, type test reports, ATEX / Area  SS‐000‐13821‐0002 Rev0,  SS‐000‐13821‐0002 Rev0,  100% H R R ‐
prototype test  prototype test 

D M S
classification certification ( as applicable ) Approved GAD, Data sheets Approved GAD, Data 
certificates certificates

-
J04-Aug 22
sheets
- 2 0
E N PRIN
TED 113 / 131
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
SS‐000‐13821‐0001, Rev 0 
/
SS‐000‐13821‐0001, Rev 0 /
Initial Inspection for Verification Dossiers in  SS‐000‐13821‐0002 Rev0, 
SS‐000‐13821‐0002 Rev0, 
1.5.03 accordance with Section 4.2 of IEC60079‐14 ( as  Approved GAD, Data  100% Dossier review H R R R OR
Approved GAD, Data sheets,
applicable ) sheets,
HSP‐000‐13800‐010

1.6.01 Packing  ( as applicable )    Note W# ‐ Export packing witness is for direct site supplied items only
1.6.02 Rust prevention check, 100% H W# W# ‐
1.6.03 Shipping preparation inspection, 100% H W# W# ‐
Check of shipping / lifting bracing as per
1.6.04 100% H W# W# ‐
approved Drawing

1.6.05 Check of cleanliness and dryness, 100% H W# W# ‐ This stage is not applicable


Inspection  Inspection 
Flange surface check (with photo record) Approved documents / Project  Approved documents /  Reports , Packing  Reports , Packing 
1.6.06 100% H W# W# ‐ This stage is not applicable
and flange face protection, specification Project specification checklist,  checklist, Shipping 
1.6.07 Check of marking for site installation, 100% Shipping mark H W# W# ‐ mark
Check of nameplate with Photo Record or
1.6.08  1 Sample  H W# W# ‐
Rubbing,
Check of packing conditions as per
1.6.09 100% H W# W# ‐
approved Packing Procedure,
1.6.10 Final inspection on all items ( as applicable ) 100% H W# W# W#
1.7.01 Inspection Release 
Approved documents / Project  Approved documents / 
1.7.02 Inspection Release Certificate 100% IRC H H H ‐ IRC
specification Project specification
1.8.01 Pre shipping inspection
Approved documents / Project  Approved documents / 
1.8.02 Visual Inspection 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
1.8.03 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
1.8.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification
2.00 Power, Control & Earthing Cables 
2.1.01 RAW  MATERIAL
Material test  Material test 
Approved GAD, Data  certificates /  certificates / 
2.1.02 Material certificate review Approved GAD, Data sheets. 100% H R R ‐
sheets. Conformity  Conformity 
certificates certificates
2. 2.01 Final Inspection ( Routine test / Sample test as applicable )
SS‐000‐13821‐0001, Rev 0 
Cable voltage test (routine test), 
/
Conductor resistance test (routine test), Conductor   SS‐000‐13826‐0001, Rev A  Inspection report  Inspection report 
2.2.02 SS‐000‐13821‐0002 Rev0,  100% H RW RW R
examination (sample test), Approved Data sheets. / test report / test report
Approved GAD, Data 
 Check of dimensions (sample test).
sheets
2.3.01 Final Inspection ( Type test as applicable )

D M S
-
J04-Aug 22
- 2 0
TED 114 / 131
E N PRIN
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
Prototype test certificates / Type test certificates 
(Insulation resistance measurement,  Voltage test 
for 4 hours,
Type test report / 
 Hydrocarbon resistant type test (if any as  SS‐000‐13826‐0001, Rev A  SS‐000‐13826‐0001, Rev A  Test report / test 
2.3.02 100% H R R ‐ Type test 
mentioned in Data sheet), Approved Data sheets. Approved Data sheets. certificate
certificates
  Partial discharge type test,
Marine water solutions resistant type test (if any) ( 
as applicable as mentioned in Data sheet)
2.4.01 Documentation
Test report / test  Test report / test 
Material test certificates, in process records, 
SS‐000‐13826‐0001, Rev A  SS‐000‐13826‐0001, Rev A  certificate/  certificate/ 
2.4.02 Routine test reports, type test reports,( as  100% H R R ‐
Approved Data sheets. Approved Data sheets. prototype test  prototype test 
applicable )
certificates certificates
2.5.01 Packing ( as applicable )     Note W# ‐ Export packing witness is for direct site supplied items only
2.5.02 Rust prevention check, 100% H W# W# ‐ This stage is not applicable
2.5.03 Shipping preparation inspection, 100% H W# W# ‐
Check of shipping / lifting bracing as per
2.5.04 100% H W# W# ‐
approved Drawing
2.5.05 Check of cleanliness and dryness, 100% Inspection  H W# W# ‐ Inspection 
Flange surface check (with photo record) Approved documents / Project  Approved documents /  100% Reports , Packing  Reports , Packing  This stage is not applicable
2.5.06 H W# W# ‐
and flange face protection, specification Project specification checklist,  checklist, Shipping 
2.5.07 Check of marking for site installation, 100% Shipping mark H W# W# ‐ mark
Check of nameplate with Photo Record or
2.5.08  1 Sample  H W# W# ‐ This stage is not applicable
Rubbing,
Check of packing conditions as per
2.5.09 100% H W# W# ‐
approved Packing Procedure,
2.5.10 Final inspection on all items ( as applicable ) 100% H W# W# W#
2.6.01 Inspection Release 
Approved documents / Project  Approved documents / 
2.6.02 Inspection Release Certificate 100% IRC H H H ‐ IRC
specification Project specification
2.7.01 Pre shipping inspection
Approved documents / Project  Approved documents / 
2.7.02 Visual Inspection 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
2.7.03 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
2.7.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification
Additional test if any as mentioned in Data sheets need to be carried out.
3.00 Pressure Gauge, Temperature Gauge with Thermowell
3.1.01 RAW  MATERIAL

D M S
-
J04-Aug 22
- 2 0
TED 115 / 131
E N PRIN
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER

Material test 
certificates,         
Manufacturer 
report( as per EN 
10204 3.1 for 
Material test 
SS‐000‐13702‐0002 /  pressure retaining 
SS‐000‐13702‐0002 / Approved  certificates / 
3.1.02 Material certificate review Approved GAD, Data  100% components) /  H R R ‐
GAD, Data sheets. Conformity 
sheets. Certificate of 
certificates
conformance ( as 
applicable ) for 
non pressure 
retaining 
components

3.2.01 Final Inspection ( Routine test  as applicable )
Dimension Verification,  
 calibration ( 5 point for Pressure gauge & 3 point 
for Temperature gauge ), SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  10% per type  Inspection report  Inspection report 
3.2.02  Accuracy & Hysteresis as applicable , Approved GAD, Data  H RW RW R
GAD, Data sheets. per range  / test report / test report
Tagging & marking by Visual & Mechanical  sheets.
Measurement, Over range protection check,
Assembly check
SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
3.2.03  Review of Hydro test for Thermowell and manifold. Approved GAD, Data  100% H R R
GAD, Data sheets. / test report / test report
sheets.
SS‐000‐13702‐0002 / 
PMI for alloy material ( Pressure retaining  SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
3.2.04 Approved GAD, Data  100% H R R
components / accessible parts only ). GAD, Data sheets. / test report / test report
sheets.
SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
3.2.05 Any other test if mentioned in Data sheets Approved GAD, Data  100% H R R
GAD, Data sheets. / test report / test report
sheets.
3.3.01 Documentation
Test report / test  Test report / test 
Material test certificates, in process records,  SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  certificate/  certificate/ 
3.3.02 Calibration certificates, IP certificates( as applicable  Approved GAD, Data  100% H R R ‐
GAD, Data sheets. prototype test  prototype test 
) sheets.
certificates certificates
3.4.01 Packing ( as applicable )     Note W# ‐ Export packing witness is for direct site supplied items only
3.4.02 Rust prevention check, 100% H W# W# ‐
3.4.03 Shipping preparation inspection, 100% H W# W# ‐
Check of shipping / lifting bracing as per
3.4.04 100% H W# W# ‐
approved Drawing
3.4.05 Check of cleanliness and dryness, 100% H W# W# ‐
One sample of each type 
Flange surface check (with photo record)
3.4.06 100% Inspection  H W# W# ‐ Inspection  will be provided as a typical 
and flange face protection,
Approved documents / Project  Approved documents /  Reports , Packing  Reports , Packing  example.
3.4.07 Check of marking for site installation, specification Project specification 100% checklist,  H W# W# ‐ checklist, Shipping  This stage is not applicable
Shipping mark mark
One sample of each type 
Check of nameplate with Photo Record or
3.4.08  1 Sample  H W# W# ‐ will be provided as a typical 
Rubbing,
example.

D M S
Check of packing conditions as per

-
3.4.09 100% H W# W# ‐

J Aug 22
approved Packing Procedure,
- 2 0
3.4.10
04-Final inspection on all items(as applicable)
PRINT
ED
100% H W# W# W#
116 / 131
HEN
ITP for E and I LED W
TROL
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER

3.5.01 Inspection Release 

Approved documents / Project  Approved documents / 
3.5.02 Inspection Release Certificate 100% IRC H H H ‐ IRC
specification Project specification
3.6.01 Pre shipping inspection
Approved documents / Project  Approved documents / 
3.6.02 Visual Inspection 100% Verification H H H ‐ Visual
specification Project specification

Approved documents / Project  Approved documents / 
3.6.03 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
3.6.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification
Additional test if any as mentioned in Data sheets need to be carried out.
Note : NACE certification compliance for Source service as applicable to be provided depending upon process fluid.
4.00 RTD, THERMOCOUPLE WITH THERMOWELL
4.1.01 RAW  MATERIAL

Material test 
certificates,         
Manufacturer 
report( as per EN 
10204 3.1 for 
Material test 
SS‐000‐13702‐0002 /  pressure retaining 
SS‐000‐13702‐0002 / Approved  certificates / 
4.1.02 Material certificate review Approved GAD, Data  100% components) /  H R R ‐
GAD, Data sheets. Conformity 
sheets. Certificate of 
certificates
conformance ( as 
applicable ) for 
non pressure 
retaining 
components

4.2.01 Final Inspection ( Routine test  as applicable )
Dimension, 
physical Verification, 
SS‐000‐13702‐0002 / 
 calibration, SS‐000‐13702‐0002 / Approved  10% per type  Inspection report  Inspection report 
4.2.02 Approved GAD, Data  H RW RW R
 Accuracy check , GAD, Data sheets. per range  / test report / test report
sheets.
Tagging & marking. 
Insulation resistance test  /Dielectric Strength test     
SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
4.2.03  Review of Hydro test for Thermowell Approved GAD, Data  100% H R R
GAD, Data sheets. / test report / test report
sheets.
SS‐000‐13702‐0002 / 
PMI for alloy material ( Pressure retaining  SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
4.2.04 Approved GAD, Data  100% H R R
components / accessible parts only ). GAD, Data sheets. / test report / test report
sheets.
SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
4.2.05 Sheath integrity test ( as applicable ) Approved GAD, Data  100% H R R
GAD, Data sheets. / test report / test report
sheets.

D M S
-
J04-Aug 22
SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
4.2.06 - 2 0
Any other test if mentioned in Data sheets
GAD, Data sheets.
Approved GAD, Data  100%
/ test report
H R R
/ test report
E N PRIN
TED sheets. 117 / 131
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER

4.3.01 Documentation

Test report / test  Test report / test 
Material test certificates, in process records,  SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  certificate/  certificate/ 
4.3.02 Calibration certificates, IP certificates, Hazardous  Approved GAD, Data  100% H R R ‐
GAD, Data sheets. prototype test  prototype test 
area certificates ( as applicable ) sheets.
certificates certificates
Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved  SS‐000‐13702‐0002 / 
4.3.03 accordance with Section 4.2 of IEC60079‐14 ( as  GAD, Data sheets, Approved GAD, Data  100% Dossier review H R R R OR
applicable ) HSP‐000‐13800‐010 sheets.
4.4.01 Packing ( as applicable )     Note W# ‐ Export packing witness is for direct site supplied items only

4.4.02 Rust prevention check, 100% H W# W# ‐

4.4.03 Shipping preparation inspection, 100% H W# W# ‐


Check of shipping / lifting bracing as per
4.4.04 100% H W# W# ‐
approved Drawing
4.4.05 Check of cleanliness and dryness, 100% H W# W# ‐
One sample of each type 
Flange surface check (with photo record) Inspection  Inspection 
4.4.06 100% H W# W# ‐ will be provided as a typical 
and flange face protection, Approved documents / Project  Approved documents /  Reports , Packing  Reports , Packing 
example.
specification Project specification checklist,  checklist, Shipping 
4.4.07 Check of marking for site installation, 100% Shipping mark H W# W# ‐ mark This stage is not applicable
One sample of each type 
Check of nameplate with Photo Record or
4.4.08  1 Sample  H W# W# ‐ will be provided as a typical 
Rubbing,
example.
Check of packing conditions as per
4.4.09 100% H W# W# ‐
approved Packing Procedure,

4.4.10 Final inspection on all items ( as applicable ) 100% H W# W# W#

4.5.01 Inspection Release 
Approved documents / Project  Approved documents / 
4.5.02 Inspection Release Certificate 100% IRC H H H ‐ IRC
specification Project specification
4.6.01 Pre shipping inspection
Approved documents / Project  Approved documents / 
4.6.02 Visual Inspection 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
4.6.03 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
4.6.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification
Additional test if any as mentioned in Data sheets need to be carried out.
Note : NACE certification compliance for Source service as applicable to be provided depending upon process fluid.
5.00 INSTRUMENTATION Cables 

5.1.01 RAW  MATERIAL
Material test  Material test 
Approved GAD, Data  certificates /  certificates / 
5.1.02 Material certificate review Approved GAD, Data sheets. 100% H R R ‐
sheets. Conformity  Conformity 

D M S certificates certificates

-
J04-Aug 22
5.2.01
- 2
Final Inspection ( Routine test / Sample test as applicable )
0
TED 118 / 131
E N PRIN
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
Conductors continuity, 
Correct marking, 
Correct colours of the outer sheath, 
inner sheath and conductors insulation,
Correct dimensions, 
Insulation test between conductors, 
Insulation test between conductor and screen (if 
SS‐000‐13782‐0001 Rev 
applicable),  SS‐000‐13782‐0001 Rev 01,  Rev  Inspection report  Inspection report 
5.2.02 01,  Rev 1, Approved Data  100% H RW RW R
Insulation test between screens (if applicable), 1, Approved Data sheets. / test report / test report
sheets.
Insulation test between armour and screen (if 
applicable),
Insulation test between conductor and armour (if 
applicable), 
Testing of cables electrical parameters such as 
Inductance, Capacitance, Resistance L/R Ratio (to 
be provide for intrinsically safe cables )
5.3.01 Final Inspection ( Type test as applicable )
Prototype test certificates / Type test certificates 
(Insulation resistance measurement,  Voltage test 
for 4 hours,
Type test report / 
 Hydrocarbon resistant type test (if any as  SS‐000‐13826‐0001, Rev A  SS‐000‐13826‐0001, Rev A  Test report / test 
5.3.02 100% H R R ‐ Type test 
mentioned in data sheet), Approved Data sheets. Approved Data sheets. certificate
certificates
  Partial discharge type test,
Marine water solutions resistant type test (if any) ( 
as applicable as mentioned in data sheet )

5.4.01 Documentation

Test report / test  Test report / test 
Material test certificates, in process records, 
SS‐000‐13826‐0001, Rev A  SS‐000‐13826‐0001, Rev A  certificate/  certificate/ 
5.4.02 Routine test reports, type test reports,( as  100% H R R ‐
Approved Data sheets. Approved Data sheets. prototype test  prototype test 
applicable )
certificates certificates

5.5.01 Packing ( as applicable )     Note W# ‐ Export packing witness is for direct site supplied items only

5.5.02 Rust prevention check, 100% H W# W# ‐ This stage is not applicable


5.5.03 Shipping preparation inspection, 100% H W# W# ‐
Check of shipping / lifting bracing as per
5.5.04 100% H W# W# ‐
approved Drawing
5.5.05 Check of cleanliness and dryness, 100% Inspection  H W# W# ‐ Inspection 
5.5.06 Check of marking for site installation, Approved documents / Project  Approved documents /  100% Reports , Packing  H W# W# ‐ Reports , Packing 
specification Project specification checklist,  checklist, Shipping  One sample of each type 
Check of nameplate with Photo Record or
5.5.07  1 Sample  Shipping mark H W# W# ‐ mark will be provided as a typical 
Rubbing,
example
Check of packing conditions as per
5.5.08 100% H W# W# ‐
approved Packing Procedure,

5.5.09
D M SFinal inspection on all items ( as applicable ) 100% H W# W# W#

-
J Aug 22
5.6.01 -
04-
2 0 Inspection Release 
TED 119 / 131
E N PRIN
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
Approved documents / Project  Approved documents / 
5.6.02 Inspection Release Certificate 100% IRC H H H ‐ IRC
specification Project specification
5.7.01 Pre shipping inspection
Approved documents / Project  Approved documents / 
5.7.02 Visual Inspection 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
5.7.03 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
5.7.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification
Additional test if any as mentioned in Data sheets need to be carried out.
6.00 TRANSMITTERS
6.1.01 RAW  MATERIAL

Material test 
certificates,         
Manufacturer 
report for 
pressure retaining  Material test 
SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  components) /  certificates / 
6.1.02 Material certificate review Approved GAD, Data  100% H R R ‐
GAD, Data sheets. Certificate of  Conformity 
sheets.
conformance ( as  certificates
applicable ) for 
non pressure 
retaining 
components

6.2.01 Final Inspection ( Routine test  as applicable )
Physical check,
Dimensional check,
Verification of make, model number, Serial no,  SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  10% per type  Inspection report  Inspection report 
6.2.02 accessories, tag number. Approved GAD, Data  H RW RW R
GAD, Data sheets. per range  / test report / test report
Calibration check for accuracy, sheets.
electrical / Conduit entry check, 
process connection check
SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
6.2.03  Review of Hydro test for manifold. Approved GAD, Data  100% H R R
GAD, Data sheets. / test report / test report
sheets.
SS‐000‐13702‐0002 / 
PMI for alloy material ( Pressure retaining  SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
6.2.04 Approved GAD, Data  100% H R R
components / accessible parts only ). GAD, Data sheets. / test report / test report
sheets.

SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
6.2.05 Any other test if mentioned in Data sheets Approved GAD, Data  100% H R R
GAD, Data sheets. / test report / test report
sheets.

6.3.01 Documentation
Test report / test  Test report / test 
Material test certificates, in process records,  SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  certificate/  certificate/ 
6.3.02 Calibration certificates, IP certificates, Hazardous  Approved GAD, Data  100% H R R ‐
GAD, Data sheets. prototype test  prototype test 
area certificates ( as applicable ) sheets.

S
certificates certificates

-
6.3.03D M
J04-Aug 22
- 2
Initial Inspection for Verification Dossiers in 
0
accordance with Section 4.2 of IEC60079‐14 ( as 
SS‐000‐13702‐0002 / Approved  SS‐000‐13702‐0002 / 
GAD, Data sheets, Approved GAD, Data  100% Dossier review H R R R OR
applicable ) TED
HSP‐000‐13800‐010 sheets. 120 / 131
E N PRIN
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
6.4.01 Packing ( as applicable )     Note W# ‐ Export packing witness is for direct site supplied items only
6.4.02 Rust prevention check, 100% H W# W# ‐
6.4.03 Shipping preparation inspection, 100% H W# W# ‐
Check of shipping / lifting bracing as per
6.4.04 100% Inspection  H W# W# ‐ Inspection 
approved Drawing
6.4.05 Check of cleanliness and dryness, Approved documents / Project  Approved documents /  100% Reports , Packing  H W# W# ‐ Reports , Packing 
specification Project specification checklist,  checklist, Shipping  One sample of each type 
Flange surface check (with photo record)
6.4.06 100% Shipping mark H W# W# ‐ mark will be provided as a typical 
and flange face protection,
example
6.4.07 Check of marking for site installation, 100% H W# W# ‐ This stage is not applicable
One sample of each type 
Check of nameplate with Photo Record or
6.4.08  1 Sample  H W# W# ‐ will be provided as a typical 
Rubbing, Inspection  Inspection 
example
Approved documents / Project  Approved documents /  Reports , Packing  Reports , Packing 
Check of packing conditions as per
6.4.09 specification Project specification 100% checklist,  H W# W# ‐ checklist, Shipping 
approved Packing Procedure,
Shipping mark mark
6.4.10 Final inspection on all items ( as applicable ) 100% H W# W# W#

6.5.01 Inspection Release 
Approved documents / Project  Approved documents / 
6.5.02 Inspection Release Certificate 100% IRC H H H ‐ IRC
specification Project specification
6.6.01 Pre shipping inspection
Approved documents / Project  Approved documents / 
6.6.02 Visual Inspection 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
6.6.03 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
6.6.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification
Additional test if any as mentioned in Data sheets need to be carried out.
Note : NACE certification compliance for Source service as applicable to be provided depending upon process fluid.
7.00 SWITCHES & INDICATORS

7.1.01 RAW  MATERIAL

Material test 
certificates,         
Manufacturer 
report for 
pressure retaining  Material test 
SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  components) /  certificates / 
7.1.02 Material certificate review Approved GAD, Data  100% H R R ‐
GAD, Data sheets. Certificate of  Conformity 
sheets.
conformance ( as  certificates
applicable ) for 
non pressure 
retaining 
components

7.2.01 Final Inspection ( Routine test  as applicable )

D M S
-
J04-Aug 22
- 2 0
TED 121 / 131
E N PRIN
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
Dimension check, 
Visuals & physical Verification,  SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  10% per type  Inspection report  Inspection report 
7.2.02 calibration / Set point / Functional / Operational  Approved GAD, Data  H RW R ‐
GAD, Data sheets. per range  / test report / test report
check ( as applicable ), sheets.
Tagging & marking verification

SS‐000‐13702‐0002 / 
PMI for alloy material ( Pressure retaining  SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
7.2.03 Approved GAD, Data  100% H R R ‐
components / accessible parts only ). GAD, Data sheets. / test report / test report
sheets.

SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
7.2.04 Any other test if mentioned in Data sheets Approved GAD, Data  100% H R R ‐
GAD, Data sheets. / test report / test report
sheets.

7.3.01 Documentation

Test report / test  Test report / test 
Material test certificates, in process records,  SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  certificate/  certificate/ 
7.3.02 Calibration certificates, IP certificates, Hazardous  Approved GAD, Data  100% H R R ‐
GAD, Data sheets. prototype test  prototype test 
area certificates ( as applicable ) sheets.
certificates certificates

Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved  SS‐000‐13702‐0002 / 


7.3.03 accordance with Section 4.2 of IEC60079‐14 ( as  GAD, Data sheets, Approved GAD, Data  100% Dossier review H R R R OR
applicable ) HSP‐000‐13800‐010 sheets.

7.4.01 Packing ( as applicable )     Note W# ‐ Export packing witness is for direct site supplied items only
7.4.02 Rust prevention check, 100% H W# W# ‐
7.4.03 Shipping preparation inspection, 100% H W# W# ‐
Check of shipping / lifting bracing as per
7.4.04 100% H W# W# ‐
approved Drawing
7.4.05 Check of cleanliness and dryness, 100% H W# W# ‐
One sample of each type 
Flange surface check (with photo record)
7.4.06 100% H W# W# ‐ will be provided as a typical 
and flange face protection, Inspection  Inspection  example
Approved documents / Project  Approved documents /  Reports , Packing  Reports , Packing 
7.4.07 Check of marking for site installation, specification Project specification 100% checklist,  H W# W# ‐ checklist, Shipping  This stage is not applicable
Shipping mark mark
One sample of each type 
Check of nameplate with Photo Record or
7.4.08  1 Sample  H W# W# ‐ will be provided as a typical 
Rubbing,
example
Check of packing conditions as per
7.4.09 100% H W# W# ‐
approved Packing Procedure,

7.4.10 Final inspection on all items ( as applicable ) 100% H W# W# W#

7.5.01 Inspection Release 
Approved documents / Project  Approved documents / 
7.5.02 Inspection Release Certificate 100% IRC H H H ‐ IRC

S
specification Project specification

D
7.6.01

-
7.6.02
M
J04-Aug 22
- 2 0
Pre shipping inspection
Visual Inspection
Approved documents / Project 
specification
Approved documents / 
Project specification
100% Verification H H H ‐ Visual
RINT ED 122 / 131
ITP for E and I ED W HEN P
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
Approved documents / Project  Approved documents / 
7.6.03 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
7.6.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification
Additional test if any as mentioned in Data sheets need to be carried out.
Note : NACE certification compliance for Source service as applicable to be provided depending upon process fluid.
8.00 Junction Boxes, Local control stations, Electrical panels / distribution Boards, Local Burner Panel, MCC Panel, Electric Heat tracing system 
8.1.01 RAW  MATERIAL
Approved GAD, Data 
 Approved GAD, Data sheets, 
sheets, Single line 
Single line diagram, BOM, Certificate of  Certificate of 
8.1.02 Material certificate / Conformity certificate review diagram, BOM, 100% H R R ‐
VS215B‐101‐A‐EIC‐5301, conformance  conformance 
VS215B‐101‐A‐EIC‐5301,
VS215B‐101‐A‐EIC‐5351
VS215B‐101‐A‐EIC‐5351
8.2.01 Final Inspection ( Routine test  as applicable )
Dimension Check, 
Approved GAD, Data 
Physical Verification & Bill of material check. Approved GAD, Data sheets,  Inspection report  Inspection report 
8.2.02 sheets, Single line  100% H RW RW ‐
Tagging & marking check, Single line diagram, BOM / test report / test report
diagram, BOM
Earthing check.
Approved GAD, Data 
Approved GAD, Data sheets,  Inspection report  Inspection report 
8.2.03 Functional / Operational check ( as applicable ) sheets, Single line  100% H RW RW ‐
Single line diagram, BOM / test report / test report
diagram, BOM
Ferrule Check,
Approved GAD, Data 
component identification check, Approved GAD, Data sheets,  Inspection report  Inspection report 
8.2.04 sheets, Single line  100% H RW RW ‐
Alarm, trips, interlocks check ( as applicable ), Single line diagram, BOM / test report / test report
diagram, BOM
Approved GAD, Data 
Approved GAD, Data sheets,  Inspection report  Inspection report 
8.2.05 Final paint shade verification sheets, Single line  100% H RW RW ‐
Single line diagram, BOM / test report / test report
diagram, BOM
Approved GAD, Data 
HV / IR test ( as applicable except for junction box &  Approved GAD, Data sheets,  Inspection report  Inspection report 
8.2.06 sheets, Single line  100% H R R ‐
LCS ) Single line diagram, BOM / test report / test report
diagram, BOM

Approved GAD, Data 
Approved GAD, Data sheets,  Inspection report  Inspection report 
8.2.07 Any other test if mentioned in Data sheets sheets, Single line  100% H R R ‐
Single line diagram, BOM / test report / test report
diagram, BOM

8.3.01 Documentation

Manufacturers  Manufacturers 
Material conformity certificates / Manufacturers  Approved GAD, Data  report /Test  report /Test 
Approved GAD, Data sheets, 
8.3.02 report,  IP certificates, Hazardous area certificates (  sheets, Single line  100% report /   H R R ‐ report /  
Single line diagram, BOM
as applicable ) diagram, BOM prototype test  prototype test 
certificates certificates

Initial Inspection for Verification Dossiers in  Approved GAD, Data sheets,  Approved GAD, Data 


8.3.03 accordance with Section 4.2 of IEC60079‐14 ( as  Single line diagram, BOM, sheets, Single line  100% Dossier review H R R R OR
applicable ) HSP‐000‐13800‐010 diagram, BOM

D M S
-
Packing ( as applicable )     Note W# ‐ Export packing witness is for direct site supplied items only

J04-Aug 22
8.4.01
- 2 0
E N PRIN
TED 123 / 131
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
8.4.02 Rust prevention check, 100% H W# W# ‐ This stage is not applicable
8.4.03 Shipping preparation inspection, 100% H W# W# ‐
Check of shipping / lifting bracing as per
8.4.04 100% H W# W# ‐
approved Drawing
8.4.05 Check of cleanliness and dryness, 100% H W# W# ‐
Inspection  Inspection  One sample of each type 
Flange surface check (with photo record)
8.4.06 Approved documents / Project  Approved documents /  100% Reports , Packing  H W# W# ‐ Reports , Packing  will be provided as a typical 
and flange face protection,
specification Project specification checklist,  checklist, Shipping  example
8.4.07 Check of marking for site installation, 100% Shipping mark H W# W# ‐ mark
One sample of each type 
Check of nameplate with Photo Record or
8.4.08  1 Sample  H W# W# ‐ will be provided as a typical 
Rubbing,
example
Check of packing conditions as per
8.4.09 100% H W# W# ‐
approved Packing Procedure,
8.4.10 Final inspection on all items ( as applicable ) 100% H W# W# W#
8.5.01 Inspection Release 
Approved documents / Project  Approved documents / 
8.5.02 Inspection Release Certificate 100% IRC H H H ‐ IRC
specification Project specification
8.6.01 Pre shipping inspection
Approved documents / Project  Approved documents / 
8.6.02 Visual Inspection 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
8.6.03 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
8.6.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification
9.00 FLOWMETERS
9.1.01 RAW  MATERIAL

Material test 
certificates,         
Manufacturer 
report( as per EN 
10204 3.1 for 
Material test 
SS‐000‐13702‐0002 /  pressure retaining 
SS‐000‐13702‐0002 / Approved  certificates / 
9.1.02 Material certificate review Approved GAD, Data  100% components) /  H R R ‐
GAD, Data sheets. Conformity 
sheets. Certificate of 
certificates
conformance ( as 
applicable ) for 
non pressure 
retaining 
components

9.2.01 Final Inspection ( Routine test  as applicable )
Dimension Verification,  
 calibration range verification,
SS‐000‐13702‐0002 / 
 Tagging & marking verification, SS‐000‐13702‐0002 / Approved  10% per type  Inspection report  Inspection report 
9.2.02 Approved GAD, Data  H RW RW R
Power ON check, GAD, Data sheets. per range  / test report / test report
sheets.
Verification of make, model number, number of 
cable entries,

DM20S
SS‐000‐13702‐0002 / 
 Review of Calibration certificate, SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 

J-04-Aug-
9.2.03 Approved GAD, Data  100% H R R
Review of NDT report ( as applicable ) GAD, Data sheets. / test report / test report
22 sheets.

E N PRIN
TED 124 / 131
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
SS‐000‐13702‐0002 / 
PMI for alloy material ( Pressure retaining  SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
9.2.04 Approved GAD, Data  100% H R R
components / accessible parts only ). GAD, Data sheets. / test report / test report
sheets.

SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
9.2.05 Any other test if mentioned in Data sheets Approved GAD, Data  100% H R R
GAD, Data sheets. / test report / test report
sheets.

9.3.01 Documentation

Test report / test  Test report / test 
Material test certificates,  Calibration certificates, IP  SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  certificate/  certificate/ 
9.3.02 certificates, Hazardous area certificates ( as  Approved GAD, Data  100% H R R ‐
GAD, Data sheets. prototype test  prototype test 
applicable ) sheets.
certificates certificates

Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved  SS‐000‐13702‐0002 / 


9.3.03 accordance with Section 4.2 of IEC60079‐14 ( as  GAD, Data sheets, Approved GAD, Data  100% Dossier review H R R R OR
applicable ) HSP‐000‐13800‐010 sheets.

9.4.01 Packing ( as applicable )     Note W# ‐ Export packing witness is for direct site supplied items only

9.4.02 Rust prevention check, 100% H W# W# ‐


9.4.03 Shipping preparation inspection, 100% H W# W# ‐
Check of shipping / lifting bracing as per
9.4.04 100% H W# W# ‐
approved Drawing
9.4.05 Check of cleanliness and dryness, 100% H W# W# ‐
One sample of each type 
Flange surface check (with photo record) Inspection  Inspection 
9.4.06 100% H W# W# ‐ will be provided as a typical 
and flange face protection, Approved documents / Project  Approved documents /  Reports , Packing  Reports , Packing  example
9.4.07 Check of marking for site installation, specification Project specification 100% checklist,  H W# W# ‐ checklist, Shipping 
Shipping mark mark One sample of each type 
Check of nameplate with Photo Record or
9.4.08  1 Sample  H W# W# ‐ will be provided as a typical 
Rubbing,
example
Check of packing conditions as per
9.4.09 100% H W# W# ‐
approved Packing Procedure,
9.4.10 Final inspection on all items ( as applicable ) 100% H W# W# W#
9.5.01 Inspection Release 
Approved documents / Project  Approved documents / 
9.5.02 Inspection Release Certificate 100% IRC H H H ‐ IRC
specification Project specification
9.6.01 Pre shipping inspection
Approved documents / Project  Approved documents / 
9.6.02 Visual Inspection 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
9.6.03 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
9.6.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification
Note : NACE certification compliance for Source service as applicable to be provided depending upon process fluid.
10.00
D M S
ANALYSER, FLAME SCANNER / IGNITOR

-
J04-Aug
10.1.01
- 2 0 22
RAW  MATERIAL

TED 125 / 131


E N PRIN
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
        
Manufacturer 
report / 
Material test 
SS‐000‐13702‐0002 /  Certificate of 
SS‐000‐13702‐0002 / Approved  certificates / 
10.1.02 Material certificate review Approved GAD, Data  100% conformance ( as  H R R ‐
GAD, Data sheets. Conformity 
sheets. applicable ) for 
certificates
non pressure 
retaining 
components
10.2.01 Final Inspection ( Routine test  as applicable )
Dimension Verification,  
 calibration range verification,
 Tagging & marking verification,
Power ON check, SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
10.2.02 Verification of make, model number, number of  Approved GAD, Data  100% H RW RW R
GAD, Data sheets. / test report / test report
cable entries, sheets.
Functional / operational check ( For Flame scanner / 
Iginiter),
Bill of material verification
SS‐000‐13702‐0002 / 
 Review of Calibration certificate, SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
10.2.03 Approved GAD, Data  100% H R R
Review of NDT report ( as applicable ) GAD, Data sheets. / test report / test report
sheets.
SS‐000‐13702‐0002 / 
PMI for alloy material ( Pressure retaining  SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
10.2.04 Approved GAD, Data  100% H R R
components / accessible parts only ). GAD, Data sheets. / test report / test report
sheets.
SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
10.2.05 Any other test if mentioned in Data sheets Approved GAD, Data  100% H R R
GAD, Data sheets. / test report / test report
sheets.
10.3.01 Documentation
Test report / test  Test report / test 
Material test certificates,  Calibration certificates, IP  SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  certificate/  certificate/ 
10.3.02 certificates, Hazardous area certificates ( as  Approved GAD, Data  100% H R R ‐
GAD, Data sheets. prototype test  prototype test 
applicable ) sheets.
certificates certificates
Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved  SS‐000‐13702‐0002 / 
10.3.03 accordance with Section 4.2 of IEC60079‐14 ( as  GAD, Data sheets, Approved GAD, Data  100% Dossier review H R R R OR
applicable ) HSP‐000‐13800‐010 sheets.

10.4.01 Packing ( as applicable )     Note W# ‐ Export packing witness is for direct site supplied items only

10.4.02 Rust prevention check, 100% H W# W# ‐

10.4.03 Shipping preparation inspection, 100% H W# W# ‐

Check of shipping / lifting bracing as per
10.4.04 100% Inspection  H W# W# ‐ Inspection 
approved Drawing
Approved documents / Project  Approved documents /  Reports , Packing  Reports , Packing 
10.4.05 Check of cleanliness and dryness, specification Project specification 100% checklist,  H W# W# ‐ checklist, Shipping 
Shipping mark mark
One sample of each type 
Flange surface check (with photo record)

S
10.4.06 100% H W# W# ‐ will be provided as a typical 

M
and flange face protection,

- D
example

J04-Aug 22
10.4.07 - 2 0Check of marking for site installation,
RINTED
100% H W# W# ‐
126 / 131
ITP for E and I ED W HEN P
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
One sample of each type 
Check of nameplate with Photo Record or
10.4.08  1 Sample  H W# W# ‐ will be provided as a typical 
Rubbing, Approved  Approved 
example
Check of packing conditions as per Approved documents / Project  Approved documents /  documents /  documents / 
10.4.09 specification Project specification 100% Project  H W# W# ‐ Project 
approved Packing Procedure,
specification specification
10.4.10 Final inspection on all items ( as applicable ) 100% H W# W# W#

10.5.01 Inspection Release 
Approved documents / Project  Approved documents / 
10.5.02 Inspection Release Certificate 100% IRC H H H ‐ IRC
specification Project specification
10.6.01 Pre shipping inspection
Approved documents / Project  Approved documents / 
10.6.02 Visual Inspection 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
10.6.03 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
10.6.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification
Note : NACE certification compliance for Source service as applicable to be provided depending upon process fluid.
11.00 SWAS Panel
11.1.01 RAW  MATERIAL
Manufacturer 
report / 
SS‐000‐13702‐0002 /  Certificate of  Material test 
SS‐000‐13702‐0002 / Approved 
Approved GAD, Data  conformance ( as  certificates / 
11.1.02 Material certificate review GAD, Data sheets. 100% H R R ‐
sheets., applicable ) for  Conformity 
VS215B‐101‐A‐DGN‐3106
VS215B‐101‐A‐DGN‐3106 non pressure  certificates
retaining 
components
11.2.01 Final Inspection ( Routine test  as applicable )
Dimension Verification, 
Visual verification, 
Tagging & marking verification of individual 
components,
SS‐000‐13702‐0002 / 
Verification of make, model number, number of  SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
11.2.02 Approved GAD, Data  100% H RW RW R
cable entries, GAD, Data sheets. / test report / test report
sheets.
Functional / operational check,
Bill of material verification.
Leak test of the system,
SS‐000‐13702‐0002 / 
 Review of Calibration certificate, SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
11.2.03 Approved GAD, Data  100% H R R
Review of NDT report ( as applicable ) GAD, Data sheets. / test report / test report
sheets.
SS‐000‐13702‐0002 / 
PMI for alloy material ( Pressure retaining  SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
11.2.04 Approved GAD, Data  100% H R R
components / accessible parts only ). GAD, Data sheets. / test report / test report
sheets.
SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
11.2.05 Any other test if mentioned in Data sheets Approved GAD, Data  100% H R R
GAD, Data sheets. / test report / test report
sheets.
11.3.01 Documentation

S
Test report / test  Test report / test 

M
Material test certificates,  Calibration certificates, IP  SS‐000‐13702‐0002 / 

D
SS‐000‐13702‐0002 / Approved  certificate/  certificate/ 

-
J04-Au
11.3.02 certificates, Hazardous area certificates ( as 
g-20 2
applicable ) 2
TED
GAD, Data sheets.
Approved GAD, Data 
sheets.
100%
prototype test 
certificates
H R R ‐
prototype test 
certificates
127 / 131
E N PRIN
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved  SS‐000‐13702‐0002 / 
11.3.03 accordance with Section 4.2 of IEC60079‐14 ( as  GAD, Data sheets, Approved GAD, Data  100% Dossier review H R R R OR
applicable ) HSP‐000‐13800‐010 sheets.
11.4.01 Packing ( as applicable )     Note W# ‐ Export packing witness is for direct site supplied items only
11.4.02 Rust prevention check, 100% H W# W# ‐
11.4.03 Shipping preparation inspection, 100% H W# W# ‐
Check of shipping / lifting bracing as per
11.4.04 100% H W# W# ‐
approved Drawing
11.4.05 Check of cleanliness and dryness, 100% H W# W# ‐
Flange surface check (with photo record) Inspection  Inspection 
11.4.06 Approved documents / Project  Approved documents /  100% Reports , Packing  H W# W# ‐ Reports , Packing 
and flange face protection,
11.4.07 Check of marking for site installation, specification Project specification 100% checklist,  H W# W# ‐ checklist, Shipping 
Check of nameplate with Photo Record or Shipping mark mark
11.4.08  1 Sample  H W# W# ‐
Rubbing,
Check of packing conditions as per
11.4.09 100% H W# W# ‐
approved Packing Procedure,
11.4.10 Final inspection on all items ( as applicable ) 100% H W# W# W#

11.5.01 Inspection Release 
Approved documents / Project  Approved documents / 
11.5.02 Inspection Release Certificate 100% IRC H H H ‐ IRC
specification Project specification
11.6.01 Pre shipping inspection
Approved documents / Project  Approved documents / 
11.6.02 Visual Inspection 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
11.6.03 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ Visual
specification Project specification
Approved documents / Project  Approved documents / 
11.6.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification
Note : NACE certification compliance for Source service as applicable to be provided depending upon process fluid.
12.00 POWER CYLINDER
12.1.01 RAW  MATERIAL
        
Manufacturer 
report / 
Material test 
SS‐000‐13702‐0002 /  Certificate of 
SS‐000‐13702‐0002 / Approved  certificates / 
12.1.02 Material certificate review Approved GAD, Data  100% conformance ( as  H R R ‐
GAD, Data sheets. Conformity 
sheets. applicable ) for 
certificates
non pressure 
retaining 
components
12.2.01 Final Inspection ( Routine test  as applicable )
Dimension Verification, 
Visual verification, 
Tagging & marking verification of individual 
components,
Verification of make, model number, number of  SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
12.2.02 cable entries, Approved GAD, Data  100% H RW RW R
GAD, Data sheets. / test report / test report
Functional / operational check/ Calibration check, sheets.
Bill of material verification.

D M S
-
J04-Aug 22
- 2 0
TED 128 / 131
E N PRIN
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
SS‐000‐13702‐0002 / 
PMI for alloy material ( Pressure retaining  SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
12.2.04 Approved GAD, Data  100% H R R
components / accessible parts only ). GAD, Data sheets. / test report / test report
sheets.

Any other test if mentioned in Data sheets, SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
12.2.05 IP certificates, Hazardous area certificates review (  Approved GAD, Data  100% H R R
GAD, Data sheets. / test report / test report
as applicable ) sheets.

Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved  SS‐000‐13702‐0002 / 


12.2.06 accordance with Section 4.2 of IEC60079‐14 ( as  GAD, Data sheets, Approved GAD, Data  100% Dossier review H R R R OR
applicable ) HSP‐000‐13800‐010 sheets.

12.3.01 Packing ( as applicable )     Note W# ‐ Export packing witness is for direct site supplied items only

12.3.02 Rust prevention check, 100% H W# W# ‐


12.3.03 Shipping preparation inspection, 100% H W# W# ‐
Check of shipping / lifting bracing as per
12.3.04 100% H W# W# ‐
approved Drawing
12.3.05 Check of cleanliness and dryness, 100% H W# W# ‐
Inspection  Inspection  One sample of each type 
Flange surface check (with photo record)
12.3.06 Approved documents / Project  Approved documents /  100% Reports , Packing  H W# W# ‐ Reports , Packing  will be provided as a typical 
and flange face protection,
specification Project specification checklist,  checklist, Shipping  example
12.3.07 Check of marking for site installation, 100% Shipping mark H W# W# ‐ mark
One sample of each type 
Check of nameplate with Photo Record or
12.3.08  1 Sample  H W# W# ‐ will be provided as a typical 
Rubbing,
example
Check of packing conditions as per
12.3.09 100% H W# W# ‐
approved Packing Procedure,
12.3.10 Final inspection on all items ( as applicable ) 100% H W# W# W#
12.4.01 Inspection Release 
Approved documents / Project  Approved documents / 
12.4.02 Inspection Release Certificate 100% IRC H H H ‐ IRC
specification Project specification
12.5.01 Pre shipping inspection
Approved documents / Project  Approved documents / 
12.5.02 Visual Inspection 100% Verification H H H ‐ Visual
specification Project specification

Approved documents / Project  Approved documents / 
12.5.03 Check of Nameplate/Shipping Mark 100% Verification H H H ‐ Visual
specification Project specification

Approved documents / Project  Approved documents / 
12.5.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification
13.00 CABLE GLANDS, CABLE LUGS, CABLE TIE, CANOPIES, ILLUMINATION LAMPS, MISCELLANEOUS ITEMS
13.1.01 RAW  MATERIAL

D M S
-
J04-Aug 22
- 2 0
TED 129 / 131
E N PRIN
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER
        
Material test 
SS‐000‐13702‐0002 /  Manufacturer 
SS‐000‐13702‐0002 / Approved  certificates / 
13.1.02 Material certificate / Conformity certificate review Approved Enginering spec,  100% report /  H R R ‐
Enginering spec, PO text. Conformity 
PO text. Certificate of 
certificates
conformance 
13.2.01 Final Inspection ( Routine test  as applicable )
Dimension Verification, 
SS‐000‐13702‐0002 / 
Visual verification,  SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
13.2.02 Approved Enginering spec,  100% H R R ‐
Enginering spec, PO text. / test report / test report
PO text.
SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  Inspection report  Inspection report 
13.2.03 Internal test report / Conformity certificate review Approved Enginering spec,  100% H R R
Enginering spec, PO text. / test report / test report
PO text.
13.3.01 Documentation
material  material 
certificate/  certificate/ 
Material certificate / conformity certificates, IP  SS‐000‐13702‐0002 / 
SS‐000‐13702‐0002 / Approved  conformity  conformity 
13.3.02 certificates , Hazardous area certificates ( as  Approved Enginering spec,  100% H R R ‐
Enginering spec, PO text. certificate,  certificate, 
applicable ) PO text.
prototype test  prototype test 
certificates certificates
Initial Inspection for Verification Dossiers in  SS‐000‐13702‐0002 / Approved  SS‐000‐13702‐0002 / 
13.3.03 accordance with Section 4.2 of IEC60079‐14 ( as  Enginering spec, PO text, Approved Enginering  100% Dossier review H R R R OR
applicable ) HSP‐000‐13800‐010 spec, PO text.
13.4.01 Packing ( as applicable )     Note W# ‐ Export packing witness is for direct site supplied items only

13.4.02 Rust prevention check, 100% H W# W# ‐ This stage is not applicable


13.4.03 Shipping preparation inspection, 100% H W# W# ‐
Check of shipping / lifting bracing as per
13.4.04 100% H W# W# ‐
approved Drawing
13.4.05 Check of cleanliness and dryness, 100% H W# W# ‐
One sample of each type 
Flange surface check (with photo record)
13.4.06 100% Inspection  H W# W# ‐ Inspection  will be provided as a typical 
and flange face protection,
Approved documents / Project  Approved documents /  Reports , Packing  Reports , Packing  example
specification Project specification checklist,  checklist, Shipping 
13.4.07 Check of marking for site installation, 100% Shipping mark H W# W# ‐ mark This stage is not applicable

One sample of each type 
Check of nameplate with Photo Record or
13.4.08  1 Sample  H W# W# ‐ will be provided as a typical 
Rubbing,
example
Check of packing conditions as per
13.4.09 100% H W# W# ‐
approved Packing Procedure,
13.4.10 Final inspection on all items ( as applicable ) 100% H W# W# W#

13.5.01 Inspection Release 
Approved documents / Project  Approved documents / 
13.5.02 Inspection Release Certificate 100% IRC H H H ‐ IRC
specification Project specification
13.6.01 Pre shipping inspection

DM20S
Approved documents / Project  Approved documents / 
13.6.02 Visual Inspection 100% Verification H H H ‐ Visual
specification Project specification

J-04-Aug-
13.6.03 22
Check of Nameplate/Shipping Mark

RINTE
D
Approved documents / Project 
specification
Approved documents / 
Project specification
100% Verification H H H ‐ Visual
130 / 131
E NP
ITP for E and I ED WH
ROLL
T
NCON
1 2 3 4 5 6 7 8
SAMPLING  VERIFIED  INTERVENTION
NO QUALITY VERIFICATION ACTIVITY REFERENCE PROCEDURE ACCEPTANCE CRITERIA SUB  RECORD Remarks
PLANS DOCUMENTS TBWES CONTRACTOR EMPLOYER
SUPLLIER

Approved documents / Project  Approved documents / 
13.6.04 Check of Invoice/Packing List 100% Verification H H H ‐ Packing list
specification Project specification

Letters & abbreviations

Vendor shall submit inspection notification to Purchaser. Vendor is not allowed to proceed with the test/inspection unless a written release is issued by the 
H HOLD POINT
Purchaser.
Vendor shall submit inspection notification to Purchaser. However, Vendor can proceed with the test/inspection when Purchaser’s inspector is not present 
W WITNESS POINT
at the notified time..
Vendor is not requested to notify Purchaser. Purchaser’s inspector will monitor manufacturing conditions, workmanship and test/inspection during his visit 
S SURVEILLIANCE
or periodical inspection.

R RECORD REVIEW Vendor shall provide Purchaser with certificates, reports and records as applicable for review and confirmation.

RW RANDOM WITNESS 10% Random witness by TPI / TL  on first /subsequent single operation/activity of a ITP stage.Vendor is requested to notify Purchaser.

BOM Bill of Material

DRG DRAWING
W.R.T. WITH RESPECT TO
N.D.T Non Destructive Test
Inspection Level
Level 1  Review shop inspection record only and issue Inspection Release Certificate (IRC)

Witness final inspection, review shop inspection record and issue Inspection Release Certificate (IRC). Pre‐inspection Meeting (PIM) may be held, if 
Level 2
necessary.

Conduct Pre‐Inspection Meeting (PIM), witness inspections specified inthe approved Inspection and Test Plan (ITP), in‐process surveillance visits as 
Level 3
necessary, review shop inspection record and issue Inspection Release Certificate (IRC)
Conduct Pre‐Inspection Meeting (PIM), regular inspection visits, perform witness hold points specified in the approved Inspection and 
Level 4 Test Plan (ITP), Resident inspection may be required to continuously monitor the activity in accordance with the approved ITP, review shop inspection 
record and issue Inspection Release Certificate (IRC).
Thermax Babcock & Wilcox Energy Solutions Ltd (
TBWES),Pune Contractor
Manufacturer/Sub supplier Approved by

D M S
-
J04-Aug 22
- 2 0
TED 131 / 131
E N PRIN
ITP for E and I ED WH
ROLL
T
NCON