Professional Documents
Culture Documents
J3 Program
PROJECT TITLE: RELIANCE JAMNAGAR 3 PROGRAM
VENDOR NAME:
HEURTEY PETROCHEM S.A.
HEURTEY PETROCHEM S. A.
INSPECTION &PLAN
TEST PLAN FOR FIRED HEATER FABRICATION AT SHOP - STABILISER
DOCUMENT TITLE:
INSPECTION ITP
& TEST FOR FIRED
FOR HEATER FIRED
PRE-FABRICATED FAB AT SHOP-MB-AYZ281-F000002
HEATER COMPONENTS AT SHOP - STABILIZER REBOILER
REBOILER (MB-AYZ281-F000002)
HEATER (MB-AYZ281-F000002)
Permission to proceed does not constitute acceptance or approval of Design Detail, Calculations, Analysis, Test Methods or Materials developed OR selected by Vendor,
and does NOT relieve Vendor from FULL compliance with Contractual Obligations
MR Number 4 Z 1 J A Y M B F 0 0 0 1 F W R F R P
4 Z 1 J A Y M B F 0 0 0 1 F W R F R P
DSN 3221
DSN.3221 5150/2003 2
5150/2003 2
1 APPROVAL OF DOCUMENTS
3
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
WELDER PERFORMANCE QUALIFICATION (WPQ) AND CONSUMABLE PMI TEST
Welder
W- for New
Welder Performance Performance
3.1 ASME SEC IX ASME SEC IX H W/R R WPS, R- for
qualification Qualification
Existing WPS
Record
PMI test
3.2.1 Alloy Steel Coil and piping 10080-1-SS-PP-018 ASME SEC IIC H W R
reports
Material
Material Co-relation for
4.1.1 Material Specification & Receipt
Identification & Quantity Approved Drawing H H W/R
Project Specification Inspection
w.r.t MTC /IRN /PO
Report
Material
Verification for Physical
Receipt
4.1.2 Damage and dimensional --- No visual defects H W W
Inspection
check
Report
Material
Review of MTC for
ASME Sec IIC / Project Receipt
4.2.1 correlation of batch no, size, Consumable Test certificate H R W/R
Specification Inspection
class
Report
Material
Verification for Physical
Receipt
4.2.2 Damage and dimensional --- No visual defects H W W
Inspection
check
Report
4.3 FITUP
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
4.3.1a Check rolling as per drg. Approved Drawing Approved Drawing --- H S S
4.3.1b Check cutting as per drg. Approved Drawing Approved Drawing --- H S S
4.3.1c Check drilling as per drg. Approved Drawing Approved Drawing --- H S S
Fit-up /
Check the Fit up to ensure
4.3.2 Approved Drawing Approved Drawing Dimensional H %W S
correctness and cleanliness
Report
4.4 WELDING
WPQ Index /
Check the qualified welders
4.4.2 WPQ Index / Welder Certificate’s ASME Section IX Welder H S S
availability
Certificate
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Weld
Check for preheat, Interpass As per applicable WPS /
4.4.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable PQR
sheet
Fit-up report /
Fit-Up & welding of
Approved Drawing / Applicable Approved Drawing / Weld
4.6.1 instrument Nozzles , Door H S S
WPS Applicable WPS monitoring
Frames, Guide supports
sheet
Weld visual
4.6.2 Visual Inspection of Welds AWS D1.1 AWS D1.1 H W %W
report
Inspection
4.7.2 Anchor Marking / Spacing. Approved Drawing Approved Drawing report H S S
Material
Receipt
10080-1-SS-PP-014
Review MTC of Paint Approved Product Inspection
4.8.2 10080-1-SS-ME-013 H R R
Material / Mastic Coating datasheet Report /
10010-PS-GNR-000-001
Material Test
Certificate
Blasting /
Check the blast surface for
4.8.4 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H %W S
roughness
report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Verification of shipping
marks, shipping protection
4.8.10 --- --- H W W
and completeness of all
items
Compiled
MANUFACTURING DATA
4.9 ITP ---- quality H H H
BOOK records
5.1
INCOMING MATERIAL INSPECTION (Coil piping, Fittings,
Tube Guide Supports, flanges)
Material
Material Co-relation for MTC of
Material Specification & Receipt
5.1.1 Identification & Quantity Approved Drawing H H W/R pressure parts
Project Specification Inspection
w.r.t MTC / IRN / PO as per Type 3.1
Report
Material
Verification for Physical Receipt
5.1.2 --- No visual defects H W W
Damage, if any Inspection
Report
Material
Review of MTC for
ASME Sec IIC / Project Receipt
5.2.1 correlation of batch no, Consumable Test certificate H R W/R
Specification Inspection
size, class
Report
Material
Physical verification for Receipt
5.2.2 --- No visual defects H W W
damage Inspection
Report
5.3 FIT-UP
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Check the dimensional
5.3.1 correctness of Jigs and Approved Drawing Approved Drawing --- H W S
fixtures
Check heat no transfer ,
5.3.2 --- As per MTC --- H S S
wherever required
Fit-up /
Check the Fit up to ensure
5.3.3 Approved Drawing Approved Drawing Dimensional H %W S
correctness and cleanliness
Report
Fit-up /
Dimensional Check of the
5.3.4 Approved Drawing Approved Drawing Dimensional H W S
Coil Assembly
Report
5.4
WELDING (Tube to return bend, bend to half coupling,
T/C Pad, Gusset plate welding )
Review of
5.5.2 RT of butt weld joints Section V B 31.3 RT report H R R Radiography
films
Verification of shipping
marks, shipping Packing
5.6 --- --- H W W
protection and Documents
completeness of all items
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Compiled
MANUFACTURING DATA
5.7 ITP ---- quality H H H
BOOK records
Material
Material Co-relation for
Approved Drawing Material Specification & Receipt
6A.1.1 Identification & Quantity H H W/R
Project Specification Inspection
w.r.t MTC /IRN /PO
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Material
Verification for Physical Receipt
6A.1.2 --- No visual defects H W W
Damage, if any Inspection
Report
6A.1.3 PMI for ITS bolts (10%) 10080-1-SS-PP-018 10080-1-SS-PP-018 PMI report H W R
Material
Review of MTC for
ASME Sec IIC / Project Receipt
6A.2.1 correlation of batch no, size, Consumable Test certificate H R W/R
Specification Inspection
class
Report
Material
Physical verification for Receipt
6A.2.2 --- No visual defects H W W
damage Inspection
Report
Fit-up /
Check the Fit up to ensure
6A.3.2 Approved Drawing Approved Drawing Dimensional H %W S
correctness and cleanliness
Report
6A.4 WELDING
WPQ Index /
Check the qualified welders WPQ Index / Welder
6A.4.2 ASME Section IX Welder H S S
availability Certificate’s
Certificate
Weld
Check for preheat, Interpass As per applicable WPS /
6A.4.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable PQR
sheet
Fit-up report /
Fit-Up / welding of
Approved Drawing / applicable Approved Drawing / weld
6A.6.1 Instruments Nozzles and H S S
WPS applicable WPS monitoring
Frames
sheet
Weld visual
6A.6.2 Visual Inspection of Welds AWS D1.1 AWS D1.1 H W %W
report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Inspection
6A.7.2 Anchor Marking / Spacing Approved Drawing Approved Drawing H S S
report
Weld visual
6A.7.3 Anchor welding As per applicable WPS / PQR AWS D1.1 H S S
report
Inspection
6A.7.4 Bend Hammer Test 10010-PS-GNR-000-001 10010-PS-GNR-000-001 H W %W
report
Blasting /
Check the blast surface for
6A.8.4 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H %W S
roughness
report
6B.1 REFER ITP NO. 2812-FQ-507 R0 FOR CASTABLE and for Ceramic Fibre Blanket ( Applicable for Header Box only )
6C CONVECTION COIL FABRICATION ( Including Cross over and jump over coil )
Material
Material Co-relation for MTC of
Approved Drawing Material Specification & Receipt
6C.1.1 Identification & Quantity H H W/R pressure parts
Project Specification Inspection
w.r.t MTC /IRN /PO as per Type 3.1
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Material
Verification for Physical Receipt
6C.1.2 --- No visual defects H W W
Damage, if any Inspection
Report
Material
Review of MTC for
ASME Sec IIC / Project Receipt
6C.2.1 correlation of batch no, size, Consumable Test certificate H R W/R
Specification Inspection
class
Report
Material
Physical verification for Receipt
6C.2.2 --- No visual defects H W W
damage Inspection
Report
6C.3 FIT-UP
Fit-up and
Check the Fit up to ensure
6C.3.2 Approved Drawing Approved Drawing Dimensional H %W S
correctness and cleanliness
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
6C.4
WELDING (Tube to return bend, supports welding , blank
off nozzles )
Weld
Check preheat, interpass As per applicable WPS /
6C.4.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable. PQR
sheet
Material
Receipt
10080-1-SS-PP-014
Review MTC of Paint Approved product Inspection
6C.6.1 10080-1-SS-ME-013 H R R
Material datasheet Report /
Material Test
Certificate
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Verification of shipping
marks, shipping Packing
6D --- --- H W W
protection and Documents
completeness of all items
Complied
MANUFACTURING DATA
6E ITP -- Quality H H H
BOOK Records
Stage wise Inspection
IRN OF CONVECTION
Approved Drawing / All reports / resolution of
6F MODULE AND DISPATCH IRN H H H
applicable specifications all technical queries ( if
CLEARANCE any )
7A STRUCTURAL FABRICATION
7A.1
INCOMING MATERIAL INSPECTION (Structural Steel,
Nozzle materials , Refractory Anchors)
Material
Material Co-relation for
Material Specification & Receipt
7A.1.1 Identification & Quantity Approved Drawing H H W/R
Project Specification Inspection
w.r.t. MTC /IRN /PO
Report
Material
Verification for Physical Receipt
7A.1.2 --- No visual defects H W W
Damage, if any Inspection
Report
Material
Review of MTC for
ASME Sec IIC / Project Receipt
7A.2.1 correlation of batch no, Consumable Test certificate H R W/R
Specification Inspection
size, class
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Material
Physical verification for Receipt
7A.2.2 --- No visual defects H W W
damage Inspection
Report
7A.3 FIT UP CLEARANCE
Fit-up /
Check the Fit up to ensure
7A.2 Approved Drawing Approved Drawing Dimensional H %W S
correctness and cleanliness
Report
7A.4 WELDING
Type and
extent of NDT
Perform NDE ( see the 10080-1-SS-CS-001
7A.5.3 AWS D1.1 NDE report H W %W shall be as per
remarks ) AWS D1.1
4.5 of 10080-1-
SS-CS-001
Check Final Dimension of Dimensional 100%
7A.5.4 Approved Drawing Approved Drawing H W W
fabricated FG ducts / Stack report
Inspection
7A.7.1 Anchor Marking / Spacing. Approved Drawing Approved Drawing H S S
report
Inspection
7A.7.3 Bend Hammmer Test 10010-PS-GNR-000-001 10010-PS-GNR-000-001 H W W
report
Material
Receipt
10080-1-SS-PP-014
Review MTC of Paint Approved product Inspection
7A.8.2 10080-1-SS-ME-013 H R R
Material datasheet Report /
Material Test
Certificate
Blasting /
Check the blast surface for
7A.8.4 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H %W S
roughness
report
Compiled
MANUFACTURING DATA
7C ITP ---- quality H H H
BOOK records
8.1
INCOMING MATERIAL INSPECTION (Structural Steel, Nozzle
materials , insulation lugs)
Material
Material Co-relation for
Approved Drawing Material Specification & Receipt
8.1.1 Identification & Quantity H H W/R
Project Specification Inspection
w.r.t MTC /IRN /PO
Report
Material
Verification for Physical Receipt
8.1.2 --- No visual defects H W W
Damage, if any Inspection
Report
8.2 INCOMING WELDING CONSUMABLES INSPECTION
Material
Review of MTC for
ASME Sec IIC / Project Receipt
8.2.1 correlation of batch no, Consumable Test certificate H R W/R
Specification Inspection
size, class
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Material
Physical verification for Receipt
8.2.2 --- No visual defects H W W
damage Inspection
Report
8.4 WELDING
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
WPQ Index /
Check the qualified welders
8.4.2 WPQ Index / Welder Certificate’s ASME Section IX Welder H S S
availability
Certificate
Type and
extent of NDT
10080-1-SS-CS-001
8.5.3 Perform NDE ( see remarks ) AWS D1.1 NDE report H W %W shall be as per
AWS D1.1
4.5 of 10080-1-
SS-CS-001
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Fit-up report /
Fit-Up / welding of all Approved Drawing / applicable Approved Drawing / Weld
8.6.1 H S S
Nozzles WPS applicable WPS monitoring
sheet
Weld visual 100%
8.6.2 Visual Inspection of Welds AWS D1.1 AWS D1.1 H W W
report
Material
Receipt
Review MTC of Paint Approved product Inspection
8.8.2 10080-1-SS-PP-014 H R R
Material datasheet Report /
Material Test
Certificate
9 FABRICATION OF OTHER STRUCTURES ( Supporting structure of APH & ducts , Platform, Ladders )
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
9.1
INCOMING MATERIAL INSPECTION (Structural Steel,
fasteners )
Material
Material Co-relation for
Material Specification & Receipt
9.1.1 Identification & Quantity Approved Drawing H H W/R
Project Specification Inspection
w.r.t MTC /IRN /PO
Report
Material
Verification for Physical Receipt
9.1.2 --- No visual defects H W W
Damage, if any Inspection
Report
Material
Review of MTC for
ASME Sec IIC / Project Receipt
9.2.1 correlation of batch no, size, Consumable Test certificate H R W/R
Specification Inspection
class
Report
Material
Physical verification for Receipt
9.2.2 --- No visual defects H W W
damage Inspection
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Fit-up /
Check the Fit up to ensure
9.3.2 Approved Drawing Approved Drawing Dimensional H %W S
correctness and cleanliness
Report
9.4 WELDING
WPQ Index /
Check the qualified welders WPQ Index / Welder
9.4.2 ASME Section IX Welder H S S
availability Certificate’s
Certificate
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Weld
Check for preheat, Interpass As per applicable WPS /
9.4.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable PQR
sheet
9.5 INSPECTION AND NDE
100%
10080-1-SS-CS-001 Weld visual
9.5.2 Carry-out Visual Inspection AWS D1.1 H W W
AWS D1.1 report
Type and
100% extent of NDT
10080-1-SS-CS-001
9.5.3 Perform NDE ( see remarks ) AWS D1.1 NDE report H W W shall be as per
AWS D1.1
4.5 of 10080-1-
SS-CS-001
Material
Receipt
Review MTC of Paint Approved product Inspection
9.6.2 10080-1-SS-PP-014 H R R
Material datasheet Report /
Material Test
Certificate
Compiled
MANUFACTURING DATA
9.7 ITP ---- quality H H H
BOOK records
10 PIPING FABRICATION WITH SUPPORTS ( INCLUDING FUEL SKIDS ) Confirm piping fabrication
includes manifolds
Material
Material Co-relation for
Approved Drawing Material Specification & Receipt
10.1.1 Identification & Quantity H H W/R
Project Specification Inspection
w.r.t MTC / IRN / PO
Report
Material
Verification for Physical Receipt
10.1.2 --- No visual defects H W W
Damage, if any Inspection
Report
Material
Review of MTC for
ASME Sec IIC / Project Receipt
10.2.1 correlation of batch no, Consumable Test certificate H R W/R
Specification Inspection
size, class
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Material
Physical verification for Receipt
10.2.2 --- No visual defects H W W
damage Inspection
Report
10.3 FIT-UP
Transfer of heat nos.
10.3.1 wherever required ( piping --- --- --- H S S
only )
10.4 WELDING
Weld
Check preheat, Interpass As per applicable WPS /
10.4.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable PQR
sheet
Review of
NDE of carbon steel welds (
Radiography
10.5.2 as applicable per piping class ASME Section V B 31.3 NDE report H R R
films ( as
)
applicable )
INSTALLATION OF PIPE
SPOOLS AND SUPPORTS
10.7 --- --- --- --- --- ---
TO FUEL SKIDS
STRUCTURAL FRAME
Installation of piping
10.7.1 spools with supports to As per drg. As per drg. --- H S S
Fuel skid frame
10.7.3 WELDING
Weld
Check preheat, Interpass As per applicable WPS /
10.7.3.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable PQR
sheet
HYDROTEST OF FUEL
10.8
SKIDS
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
General Comments Fuel skid requires FAT, including functional testing, valves tested,
instruments calibrated, wiring insulation/continuity checks, etc. All activities
associated with the fuel skids need to be listed on the ITP.
a) Asbestos shall not be used in any form.
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Calibration records of measuring instruments shall be made available to TPIA for review during inspection. Valid calibrated measuring instrument shall be used during
b) inspection at Fabricator Shop.
LEGENDS :
H : HOLD
W : WITNESS
%W : PERCENTAGE WITNESS
S : SURVEILLANCE
R : REVIEW
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Sl. No. FW/RIL Comments Date : 07-Oct-13 HPC REPLY Date : 14-Oct-13 FW/RIL REPLY Date:
Trail assembly is limited to the extent Trial assembly of entire radiant box is not required.
However, trial assembly of adjacent panels is to be shown
of fabricating / assembling adjacent
Confirm trial assembly of radiant section panels on ITP as an activity.
1 panels together. Entire radiant section
will be carried out and show on ITP as activity
won't be trial assembled at fabrication
shop.