Vendor Document Review Sheet (DECAL)

J3 Program
PROJECT TITLE: RELIANCE JAMNAGAR 3 PROGRAM

VENDOR NAME:
HEURTEY PETROCHEM S.A.
HEURTEY PETROCHEM S. A.

INSPECTION &PLAN
TEST PLAN FOR FIRED HEATER FABRICATION AT SHOP - STABILISER
DOCUMENT TITLE:
INSPECTION ITP
& TEST FOR FIRED
FOR HEATER FIRED
PRE-FABRICATED FAB AT SHOP-MB-AYZ281-F000002
HEATER COMPONENTS AT SHOP - STABILIZER REBOILER
REBOILER (MB-AYZ281-F000002)
HEATER (MB-AYZ281-F000002)

VENDOR DOCUMENT NO: 2812-FQ-303


2812-FQ-303

VENDOR REVISION NO: 01


01

VENDOR DOCUMENT REVIEW FEEDBACK

Permission to proceed does not constitute acceptance or approval of Design Detail, Calculations, Analysis, Test Methods or Materials developed OR selected by Vendor,
and does NOT relieve Vendor from FULL compliance with Contractual Obligations

Work may proceed. 5 Cancelled / Superseded


1
Revise & Resubmit.Work may proceed,
X 2 subject to incorporation of comments Final Certified
F
Revise & Resubmit.Work shall not Proceed
3
For Information Only
4
By: Brian Hay (B5729) Date: 05/Nov/13

Discipline: PACKAGE EQUIPMENT


PACKAGE EQUIPMENT
Equipment No. MB-AYZ281-F000002
MBAYZ281F000002

MR Number 4 Z 1 J A Y M B F 0 0 0 1 F W R F R P
4 Z 1 J A Y M B F 0 0 0 1 F W R F R P

Project No MRP No Unit No(Plant WBS) Cat. No Seq. No. Rev No


-
10010 4 Z 1 J A Y - M B F 0 0 0 1 - F W R - F - 0 0 A Y Z 2 8 1 - A 0 5 - 1 0 2 0 0 1
10010 4 Z 1 J A Y M B F 0 0 0 1 F W R F 0 0 A Y Z 2 8 1 A 0 5 1 0 2 0 0 1

DSN 3221
DSN.3221 5150/2003 2
5150/2003 2

Comments given in ITP of XRC reboiler shall be applicable


ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Applicable Project Specifications and Material Requisition Make reference to


Stabiliser Reboiler
- 4Z1JAY-MBF0001-FWR-F-RP Rev 00 : Fired Process Heater Material Requisition heater Master ITP.

1 APPROVAL OF DOCUMENTS

Project Specification / Material Project Specification /


1.1 ITP for Shop fabrication Approved ITP H H R
Requisition Material Requisition
W- for New
WPS / PQR (Including weld
1.2 ASME SEC IX ASME SEC IX WPS/PQR H W/R R WPS, R- for
repair )
Existing WPS
AWS D1.1 ( for
AWS D1.1 ( for Structural Job ) &
NDT Procedure ( LPT, MPT, Structural Job ) & ASME
1.3 ASME SEC V ( for Piping and Coil Procedure H R R
RT & UT ) B31.3 ( for Piping and
job )
Coil job )
Qualification
Review of Qualifications of
1.4 10080—1-SS-MT-007 10080—1-SS-MT-007 of NDE H R R
NDE operators
operators

1.5 PMI Procedure 10080-1-SS-PP-018 10080-1-SS-PP-018 Procedure H R R


ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Refractory Application 10080-1-SS-ME-013 10080-1-SS-ME-013


1.6 Procedure H R R
Procedure 10010-PS-GNR-000-001 10010-PS-GNR-000-001

Heat treatment and 10080-1-SS-MT-007 10080-1-SS-MT-007


1.7 Procedure H R R
Hardness Procedure ASME B31.3 ASME B31.3

Surface Preparation &


1.8 10080-1-SS-PP-014 10080-1-SS-PP-014 Procedure H R R
Painting

10080-1-SS-PP-006 / ASME 10080-1-SS-PP-006 /


1.9 Hydrotest Procedure Procedure H R R
B31.3 ASME B31.3
Protection, Packing and
1.10 --- --- Procedure H R R
Shipping Procedure

2 PRE-INSPECTION MEETING (PIM)

Pre-Inspection Meeting MR & applicable


2.1 MR & applicable specifications MOM H H H
(PIM) specifications

3
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
WELDER PERFORMANCE QUALIFICATION (WPQ) AND CONSUMABLE PMI TEST

Welder
W- for New
Welder Performance Performance
3.1 ASME SEC IX ASME SEC IX H W/R R WPS, R- for
qualification Qualification
Existing WPS
Record

PMI test of Weld


3.2
Consumables

PMI test
3.2.1 Alloy Steel Coil and piping 10080-1-SS-PP-018 ASME SEC IIC H W R
reports

Stainless Steel / Inconel


PMI test
3.2.2 Consumables for Non 10080-1-SS-PP-018 ASME SEC IIC H W R
reports
pressure parts welding

Confirm trial assembly of radiant


4 RADIANT SECTION FABRICATION section panels will be carried out
and show on ITP as activity.

4.1 INCOMING MATERIAL INSPECTION ( Structural Steel,


Fasteners, Nozzle materials & Refractory Anchors )
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Material
Material Co-relation for
4.1.1 Material Specification & Receipt
Identification & Quantity Approved Drawing H H W/R
Project Specification Inspection
w.r.t MTC /IRN /PO
Report
Material
Verification for Physical
Receipt
4.1.2 Damage and dimensional --- No visual defects H W W
Inspection
check
Report

4.2 INCOMING WELDING CONSUMABLES INSPECTION

Material
Review of MTC for
ASME Sec IIC / Project Receipt
4.2.1 correlation of batch no, size, Consumable Test certificate H R W/R
Specification Inspection
class
Report
Material
Verification for Physical
Receipt
4.2.2 Damage and dimensional --- No visual defects H W W
Inspection
check
Report

4.3 FITUP
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

4.3.1a Check rolling as per drg. Approved Drawing Approved Drawing --- H S S

4.3.1b Check cutting as per drg. Approved Drawing Approved Drawing --- H S S

4.3.1c Check drilling as per drg. Approved Drawing Approved Drawing --- H S S

Fit-up /
Check the Fit up to ensure
4.3.2 Approved Drawing Approved Drawing Dimensional H %W S
correctness and cleanliness
Report

4.4 WELDING

Check proper baking of


Manufacturer Weld baking
4.4.1 electrodes for low Hydrogen Manufacturer recommendation H S S
recommendation register
electrodes

WPQ Index /
Check the qualified welders
4.4.2 WPQ Index / Welder Certificate’s ASME Section IX Welder H S S
availability
Certificate
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Weld
Check for preheat, Interpass As per applicable WPS /
4.4.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable PQR
sheet

4.5 INSPECTION AND NDE

Check the identification


4.5.1 Approved Drawing Approved Drawing --- H S S
marking of fabrication items

10080-1-SS-CS-001 Weld visual 100%


4.5.2 Carry-out Visual Inspection AWS D1.1 H W W
AWS D1.1 report
Type and
extent of NDT
10080-1-SS-CS-001 NDE report
4.5.3 Perform NDE ( see remarks ) AWS D1.1 H W %W shall be as per
AWS D1.1
4.5 of 10080-1-
SS-CS-001

Check final dimension of Dimensional


100%
4.5.4 Approved Drawing Approved Drawing H W W
fabricated items report

4.6 NOZZLES AND FRAME INSTALLATION


ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Fit-up report /
Fit-Up & welding of
Approved Drawing / Applicable Approved Drawing / Weld
4.6.1 instrument Nozzles , Door H S S
WPS Applicable WPS monitoring
Frames, Guide supports
sheet

Weld visual
4.6.2 Visual Inspection of Welds AWS D1.1 AWS D1.1 H W %W
report

4.7 REFRACTORY ANCHOR INSTALLATION

4.7.1 PMI ( 10% ) for SS anchors 10080-1-SS-PP-018 10080-1-SS-PP-018 PMI Report H W W

Inspection
4.7.2 Anchor Marking / Spacing. Approved Drawing Approved Drawing report H S S

As applicable WPS / Weld visual


4.7.3 Anchor welding As per applicable WPS / PQR H S S
AWS D1.1 report
Inspection
4.7.4 Bend Hammer Test 10010-PS-GNR-000-001 10010-PS-GNR-000-001 H W %W
Report

4.8 SURFACE PREPATION AND PAINTING


ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Check the fabrication


Inspection
clearance before blasting
4.8.1 Approved Drawing Approved Drawing clearance H H W
and painting of radiant
report
panels.

Material
Receipt
10080-1-SS-PP-014
Review MTC of Paint Approved Product Inspection
4.8.2 10080-1-SS-ME-013 H R R
Material / Mastic Coating datasheet Report /
10010-PS-GNR-000-001
Material Test
Certificate

Check the surface is free


Blasting /
from Oil, grease, weld
4.8.3 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H S S
Spatters & other
report
contaminates.

Blasting /
Check the blast surface for
4.8.4 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H %W S
roughness
report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Surface preparation from


inside of radiant Panels as Manufacturer data Inspection
4.8.5 Manufacturer data sheet H %W S
per paint manufacturer data sheet report
sheet

Pre-clean the Blast surface


4.8.6 by compressed dry air Prior 10080-1-SS-PP-014 10080-1-SS-PP-014 ---- H S S
to painting.

Verify the primer DFT and


Painting
4.8.7 carryout Visual check 10080-1-SS-PP-014 10080-1-SS-PP-014 H W %W
report
of painted surface

Verify Intermediate / final


coat DFT, Carry-out Painting
4.8.8 10080-1-SS-PP-014 10080-1-SS-PP-014 H W %W
visual check of painted report
surface.
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Mastic coating application


Painting
from Inside of the 10080-1-SS-ME-013 10080-1-SS-ME-013 H W %W
4.8.9 report
radiant panels

Verification of shipping
marks, shipping protection
4.8.10 --- --- H W W
and completeness of all
items

Compiled
MANUFACTURING DATA
4.9 ITP ---- quality H H H
BOOK records

INSPECTION RELEASE Stage wise Inspection


Approved Drawing / All
4.10 NOTE AND DISPATCH report / Resolution of all IRN H H H
applicable specifications
CLEARANCE technical Queries (if any)

5 RADIANT COIL FABRICATION


ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

5.1
INCOMING MATERIAL INSPECTION (Coil piping, Fittings,
Tube Guide Supports, flanges)

Material
Material Co-relation for MTC of
Material Specification & Receipt
5.1.1 Identification & Quantity Approved Drawing H H W/R pressure parts
Project Specification Inspection
w.r.t MTC / IRN / PO as per Type 3.1
Report
Material
Verification for Physical Receipt
5.1.2 --- No visual defects H W W
Damage, if any Inspection
Report

5.2 INCOMING WELDING CONSUMABLES INSPECTION

Material
Review of MTC for
ASME Sec IIC / Project Receipt
5.2.1 correlation of batch no, Consumable Test certificate H R W/R
Specification Inspection
size, class
Report
Material
Physical verification for Receipt
5.2.2 --- No visual defects H W W
damage Inspection
Report

5.3 FIT-UP
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Check the dimensional
5.3.1 correctness of Jigs and Approved Drawing Approved Drawing --- H W S
fixtures
Check heat no transfer ,
5.3.2 --- As per MTC --- H S S
wherever required
Fit-up /
Check the Fit up to ensure
5.3.3 Approved Drawing Approved Drawing Dimensional H %W S
correctness and cleanliness
Report
Fit-up /
Dimensional Check of the
5.3.4 Approved Drawing Approved Drawing Dimensional H W S
Coil Assembly
Report

5.4
WELDING (Tube to return bend, bend to half coupling,
T/C Pad, Gusset plate welding )

Check proper baking of Manufacturer Weld baking


5.4.1 Manufacturer recommended H S S
welding electrodes recommended register

Check the qualified welder’s WPQ Index /


WPQ Index / Welder
5.4.2 availability for Welding / ASME Section IX Welder H S S
Certificate’s
tacking. Certificate
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Weld
Check preheat, Interpass As per applicable WPS /
5.4.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable. PQR
sheet

5.5 INSPECTION AND NDE CLEARANCE Radiant coil hydrotest required.

Carry out Visual Inspection Inspection 100%


5.5.1 ASME Section V ASME B 31.3 H W W
of welds report

Review of
5.5.2 RT of butt weld joints Section V B 31.3 RT report H R R Radiography
films

Carry-out DPT/MPT test on


5.5.3 Section V B 31.3 NDT report H W %W
fillet joints (100% )

Verification of shipping
marks, shipping Packing
5.6 --- --- H W W
protection and Documents
completeness of all items
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Compiled
MANUFACTURING DATA
5.7 ITP ---- quality H H H
BOOK records

INSPECTION RELEASE Stage wise Inspection


Approved Drawing / All
5.8 NOTE AND DISPATCH report / Resolution of IRN H H H
applicable specifications
CLEARANCE technical Queries (if any)

Trial assembly of completed


6 CONVECTION MODULE FABRICATION convection modules to be carried
out and show on ITP as activity.

6A STRUCTURAL FABRICATION INCLUDING HEADER BOX

INCOMING MATERIAL INSPECTION ( Structural Steel,


Fasteners, Nozzle materials , Refractory Anchors, ETS & ITS,
6A.1
ETS alloy steel
Fasteners )

Material
Material Co-relation for
Approved Drawing Material Specification & Receipt
6A.1.1 Identification & Quantity H H W/R
Project Specification Inspection
w.r.t MTC /IRN /PO
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Material
Verification for Physical Receipt
6A.1.2 --- No visual defects H W W
Damage, if any Inspection
Report

6A.1.3 PMI for ITS bolts (10%) 10080-1-SS-PP-018 10080-1-SS-PP-018 PMI report H W R

6A.2 INCOMING WELDING CONSUMABLES INSPECTION

Material
Review of MTC for
ASME Sec IIC / Project Receipt
6A.2.1 correlation of batch no, size, Consumable Test certificate H R W/R
Specification Inspection
class
Report
Material
Physical verification for Receipt
6A.2.2 --- No visual defects H W W
damage Inspection
Report

6A.3 FIT UP CLEARANCE

6A.3.1a Cutting as per drawing Approved Drawing Approved Drawing --- H S S


ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

6A.3.1b Drilling as per drawing Approved Drawing Approved Drawing --- H S S

Fit-up /
Check the Fit up to ensure
6A.3.2 Approved Drawing Approved Drawing Dimensional H %W S
correctness and cleanliness
Report

6A.4 WELDING

Check proper baking of


Manufacturer Weld baking
6A.4.1 electrodes for low Manufacturer recommendation H S S
recommendation register
Hydrogen electrodes

WPQ Index /
Check the qualified welders WPQ Index / Welder
6A.4.2 ASME Section IX Welder H S S
availability Certificate’s
Certificate
Weld
Check for preheat, Interpass As per applicable WPS /
6A.4.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable PQR
sheet

6A.5 INSPECTION AND NDE


ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Check the identification


6A.5.1 Approved Drawing Approved Drawing --- H %W R
marking of fabrication items

10080-1-SS-CS-001 Weld visual 100%


6A.5.2 Carry-out Visual Inspection AWS D1.1 H W W
AWS D1.1 report
Type and
extent of NDT
10080-1-SS-CS-001
6A.5.3 Perform NDE ( see remarks ) AWS D1.1 NDE report H W %W shall be as per
AWS D1.1
4.5 of 10080-1-
SS-CS-001
Check Final Dimension of Dimensional 100%
6A.5.4 Approved Drawing Approved Drawing H W W
fabricated items Report

6A.6 NOZZLES AND FRAME INSTALLATION

Fit-up report /
Fit-Up / welding of
Approved Drawing / applicable Approved Drawing / weld
6A.6.1 Instruments Nozzles and H S S
WPS applicable WPS monitoring
Frames
sheet

Weld visual
6A.6.2 Visual Inspection of Welds AWS D1.1 AWS D1.1 H W %W
report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

6A.7 REFRACTORY ANCHOR INSTALLATION

6A.7.1 PMI (10%) for SS Anchors 10080-1-SS-PP-018 10080-1-SS-PP-018 PMI report H W W

Inspection
6A.7.2 Anchor Marking / Spacing Approved Drawing Approved Drawing H S S
report
Weld visual
6A.7.3 Anchor welding As per applicable WPS / PQR AWS D1.1 H S S
report
Inspection
6A.7.4 Bend Hammer Test 10010-PS-GNR-000-001 10010-PS-GNR-000-001 H W %W
report

6A.8 SURFACE PREPATION AND PAINTING

Check the fabrication


Inspection
clearance before blasting
6A.8.1 Approved Drawing Approved Drawing clearance H H R
and painting of convection
report
panels.
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Material
Receipt
10080-1-SS-PP-014
Review MTC of Paint Approved product Inspection
6A.8.2 10080-1-SS-ME-013 H R R
Material datasheet Report /
Material Test
Certificate

Check the surface is free


Blasting /
from Oil, grease, weld
6A.8.3 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H S S
Spatters & other
report
contaminates.

Blasting /
Check the blast surface for
6A.8.4 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H %W S
roughness
report

Pre-clean the Blast surface


6A.8.5 by compressed dry Air prior 10080-1-SS-PP-014 10080-1-SS-PP-014 ---- H S S
to painting.

Verify the primer DFT and


Painting
6A.8.6 carryout Visual check of 10080-1-SS-PP-014 10080-1-SS-PP-014 H W %W
report
painted surface
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Verify Intermediate / final
coat DFT, Carry-out Painting
6A.8.7 10080-1-SS-PP-014 10080-1-SS-PP-014 H W %W
visual check of painted report
surface.

6B REFRACTORY APPLICATION AND DRY OUT

6B.1 REFER ITP NO. 2812-FQ-507 R0 FOR CASTABLE and for Ceramic Fibre Blanket ( Applicable for Header Box only )

6C CONVECTION COIL FABRICATION ( Including Cross over and jump over coil )

INCOMING MATERIAL INSPECTION (Coil piping, Fittings,


6C.1 Thermocouple attachments, support attachments, blank off
nozzles, Instruments tappings)

Material
Material Co-relation for MTC of
Approved Drawing Material Specification & Receipt
6C.1.1 Identification & Quantity H H W/R pressure parts
Project Specification Inspection
w.r.t MTC /IRN /PO as per Type 3.1
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Material
Verification for Physical Receipt
6C.1.2 --- No visual defects H W W
Damage, if any Inspection
Report

6C.2 INCOMING WELDING CONSUMABLES INSPECTION

Material
Review of MTC for
ASME Sec IIC / Project Receipt
6C.2.1 correlation of batch no, size, Consumable Test certificate H R W/R
Specification Inspection
class
Report
Material
Physical verification for Receipt
6C.2.2 --- No visual defects H W W
damage Inspection
Report

6C.3 FIT-UP

Transfer of heat no. (


6C.3.1 --- --- --- H S S
wherever required )

Fit-up and
Check the Fit up to ensure
6C.3.2 Approved Drawing Approved Drawing Dimensional H %W S
correctness and cleanliness
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

6C.4
WELDING (Tube to return bend, supports welding , blank
off nozzles )

Check proper baking of Manufacturer Weld baking


6C.4.1 Manufacturer recommended H S S
welding electrodes recommended register

Check the qualified welder’s WPQ Index /


WPQ Index / Welder
6C.4.2 availability for welding / ASME Section IX Welder H S S
Certificate’s
tacking. Certificate

Weld
Check preheat, interpass As per applicable WPS /
6C.4.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable. PQR
sheet

6C.5 INSPECTION AND NDE CLEARANCE Convection coil hydrotest required.

Carry out Visual Inspection Weld visual 100%


6C.5.1 ASME Section V ASME B 31.3 H W W
of welds report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Review of
6C.5.2 RT of butt weld joints ASME Section V ASME B 31.3 RT report H R R Radiography
film

Carry-out DPT/MPT test on


6C.5.3 ASME Section V ASME B 31.3 NDT report H W %W
fillet joints (100% )

Final dimensional and Final Final 100%


6C.5.4 Visual Inspection for As per drg. As per drg. dimensional H H W
convection coil report

SURFACE PREPATION AND PAINTING ( Except weld joints


6C.6 ) FOR PORTION OF CROSS OVER AND JUMP OVER
OUTSIDE HEADER BOX

Material
Receipt
10080-1-SS-PP-014
Review MTC of Paint Approved product Inspection
6C.6.1 10080-1-SS-ME-013 H R R
Material datasheet Report /
Material Test
Certificate
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Weld Joints to be protected


6C.6.2 --- --- --- H S S
with suitable Insulation tape

Check the surface is free


Blasting /
from Oil, grease, weld
6C.6.3 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H S S
spatters & other
report
contaminates

Check the blast surface for Blasting /


6C.6.4 roughness & degree of 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H %W S
surface cleanliness report

Pre-clean the Blast surface


6C.6.5 by compressed dry Air prior 10080-1-SS-PP-014 10080-1-SS-PP-014 ---- H S S
to painting.

Verify the primer coat DFT ,


Painting
6C.6.6 visually check the painted 10080-1-SS-PP-014 10080-1-SS-PP-014 H W %W
report
surface .
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Verify the Intermediate Coat


Painting
6C.6.7 and final coat DFT, Visually 10080-1-SS-PP-014 10080-1-SS-PP-014 H W %W
report
check the painted surface.

Verification of shipping
marks, shipping Packing
6D --- --- H W W
protection and Documents
completeness of all items

Complied
MANUFACTURING DATA
6E ITP -- Quality H H H
BOOK Records
Stage wise Inspection
IRN OF CONVECTION
Approved Drawing / All reports / resolution of
6F MODULE AND DISPATCH IRN H H H
applicable specifications all technical queries ( if
CLEARANCE any )

7 FABRICATION OF REFRACTORY LINED STACK AND FLUE GAS DUCT


ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

7A STRUCTURAL FABRICATION

7A.1
INCOMING MATERIAL INSPECTION (Structural Steel,
Nozzle materials , Refractory Anchors)

Material
Material Co-relation for
Material Specification & Receipt
7A.1.1 Identification & Quantity Approved Drawing H H W/R
Project Specification Inspection
w.r.t. MTC /IRN /PO
Report
Material
Verification for Physical Receipt
7A.1.2 --- No visual defects H W W
Damage, if any Inspection
Report

7A.2 INCOMING WELDING CONSUMABLES INSPECTION

Material
Review of MTC for
ASME Sec IIC / Project Receipt
7A.2.1 correlation of batch no, Consumable Test certificate H R W/R
Specification Inspection
size, class
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Material
Physical verification for Receipt
7A.2.2 --- No visual defects H W W
damage Inspection
Report
7A.3 FIT UP CLEARANCE

7A.3.1a Rolling as per drawing Approved Drawing Approved Drawing --- H %W S

7A.3.1b Cutting as per drawing Approved Drawing Approved Drawing --- H %W S

7A.3.1c Drilling as per drawing Approved Drawing Approved Drawing --- H %W S

Fit-up /
Check the Fit up to ensure
7A.2 Approved Drawing Approved Drawing Dimensional H %W S
correctness and cleanliness
Report

7A.4 WELDING

Check proper baking of


Manufacturer Weld baking
7A.4.1 electrodes for low Manufacturer recommendation H S S
recommendation register
Hydrogen electrodes
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
WPQ Index /
Check the qualified welders WPQ Index / Welder
7A.4.2 ASME Section IX Welder H S S
availability Certificate’s
Certificate
Weld
Check for preheat, Interpass As per applicable WPS /
7A.4.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable PQR
sheet
7A.5 INSPECTION AND NDE

Check the identification


7A.5.1 Approved Drawing Approved Drawing --- H %W R
marking of fabrication items

10080-1-SS-CS-001 Weld visual


100%
7A.5.2 Carry-out Visual Inspection AWS D1.1 H W W
AWS D1.1 report

Type and
extent of NDT
Perform NDE ( see the 10080-1-SS-CS-001
7A.5.3 AWS D1.1 NDE report H W %W shall be as per
remarks ) AWS D1.1
4.5 of 10080-1-
SS-CS-001
Check Final Dimension of Dimensional 100%
7A.5.4 Approved Drawing Approved Drawing H W W
fabricated FG ducts / Stack report

7A.6 NOZZLES AND FRAME INSTALLATION


ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Fit-up report /
Fit-Up & welding of all Approved Drawing / applicable Approved Drawing / Weld 100%
7A.6.1 H S W
Nozzles / frames WPS applicable WPS monitoring
sheet
Weld visual
7A.6.2 Visual Inspection of Welds H W W
AWS D1.1 AWS D1.1 report

7A.7 REFRACTORY ANCHOR INSTALLATION ( CS ANCHOR )

Inspection
7A.7.1 Anchor Marking / Spacing. Approved Drawing Approved Drawing H S S
report

Anchor welding / Visual Applicable WPS / AWS Weld visual


7A.7.2 As per applicable WPS / PQR H S S
Inspection D1.1 report

Inspection
7A.7.3 Bend Hammmer Test 10010-PS-GNR-000-001 10010-PS-GNR-000-001 H W W
report

7A.8 SURFACE PREPATION AND PAINTING


ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Check the fabrication Inspection


7A.8.1 clearance before blasting Approved Drawing Approved Drawing clearance H H R
and painting of panels. report

Material
Receipt
10080-1-SS-PP-014
Review MTC of Paint Approved product Inspection
7A.8.2 10080-1-SS-ME-013 H R R
Material datasheet Report /
Material Test
Certificate

Check the surface is free


Blasting /
from Oil, grease, weld
7A.8.3 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H S S
Spatters & other
report
contaminates.

Blasting /
Check the blast surface for
7A.8.4 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H %W S
roughness
report

Pre-clean the Blast surface


7A.8.5 by compressed dry air prior 10080-1-SS-PP-014 10080-1-SS-PP-014 ---- H S S
to painting.
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Verify the primer DFT and


Painting
7A.8.6 carryout Visual check of 10080-1-SS-PP-014 10080-1-SS-PP-014 H W %W
report
painted surface

Verify Intermediate / final


coat DFT, Carry-out Painting
7A.8.7 10080-1-SS-PP-014 10080-1-SS-PP-014 H W %W
visual check of painted report
surface.

7B REFRACTORY APPLICATION AND DRY OUT REFER


ITP NO. 2812-FQ-507 R0 FOR CASTABLE

Compiled
MANUFACTURING DATA
7C ITP ---- quality H H H
BOOK records

Stage wise Inspection


IRN OF STACK MODULE /
Approved drawing / All reports / resolution of
7D FG DUCTS AND IRN H H H
applicable specification all technical queries ( if
DISPATCH CLEARANCE any )
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

8 AIR DUCTS FABRICATION

8.1
INCOMING MATERIAL INSPECTION (Structural Steel, Nozzle
materials , insulation lugs)

Material
Material Co-relation for
Approved Drawing Material Specification & Receipt
8.1.1 Identification & Quantity H H W/R
Project Specification Inspection
w.r.t MTC /IRN /PO
Report
Material
Verification for Physical Receipt
8.1.2 --- No visual defects H W W
Damage, if any Inspection
Report
8.2 INCOMING WELDING CONSUMABLES INSPECTION
Material
Review of MTC for
ASME Sec IIC / Project Receipt
8.2.1 correlation of batch no, Consumable Test certificate H R W/R
Specification Inspection
size, class
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Material
Physical verification for Receipt
8.2.2 --- No visual defects H W W
damage Inspection
Report

8.3 FIT UP CLEARANCE

8.3.1a Rolling as per drawing --- H %W S


Approved Drawing Approved Drawing

8.3.1b cutting as per drawing --- H %W S


Approved Drawing Approved Drawing

8.3.1c Drilling as per drawing --- H %W S


Approved Drawing Approved Drawing

Check the Fit up to ensure Fit-up /


8.3.5 correctness and Approved Drawing Approved Drawing Dimensional H %W S
cleanliness Report

8.4 WELDING
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Check proper baking of


Manufacturer Weld baking
8.4.1 electrodes for low Manufacturer recommendation H S S
recommendation register
Hydrogen electrodes

WPQ Index /
Check the qualified welders
8.4.2 WPQ Index / Welder Certificate’s ASME Section IX Welder H S S
availability
Certificate

8.5 INSPECTION AND NDE

Check the identification


8.5.1 Approved Drawing Approved Drawing --- H %W R
marking of fabrication items

10080-1-SS-CS-001 Weld visual 100%


8.5.2 Carry-out Visual Inspection AWS D1.1 H W W
AWS D1.1 report

Type and
extent of NDT
10080-1-SS-CS-001
8.5.3 Perform NDE ( see remarks ) AWS D1.1 NDE report H W %W shall be as per
AWS D1.1
4.5 of 10080-1-
SS-CS-001
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Check Final Dimension of Dimensional 100%


8.5.4 Approved Drawing Approved Drawing H W W
fabricated ducts report

8.6 NOZZLES AND FRAME INSTALLATION

Fit-up report /
Fit-Up / welding of all Approved Drawing / applicable Approved Drawing / Weld
8.6.1 H S S
Nozzles WPS applicable WPS monitoring
sheet
Weld visual 100%
8.6.2 Visual Inspection of Welds AWS D1.1 AWS D1.1 H W W
report

8.7 INSULATION PIN INSTALLATION

Insulation Pin Marking / Inspection


8.7.1 Approved Drawing Approved Drawing H S S
Spacing. report

Insulation Pin welding and As per applicable WPS / Weld visual


8.7.2 As per applicable WPS H S S
Visual Inspection AWS D1.1 report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

8.8 SURFACE PREPATION AND PAINTING

Check the fabrication Inspection


8.8.1 clearance before blasting Approved Drawing Approved Drawing clearance H H R
and painting of panels. report

Material
Receipt
Review MTC of Paint Approved product Inspection
8.8.2 10080-1-SS-PP-014 H R R
Material datasheet Report /
Material Test
Certificate

Check the surface is free


8.8.3 from Oil, grease, weld Blasting /
10080-1-SS-PP-014 10080-1-SS-PP-014 H S S
spatters & other Painting report
contaminates.

Check the blast surface for


8.8.4 Blasting /
roughness & degree 10080-1-SS-PP-014 10080-1-SS-PP-014 H %W S
Painting report
of surface cleanliness
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Pre-clean the Blast surface


8.8.5
by compressed dry 10080-1-SS-PP-014 10080-1-SS-PP-014 ---- H S S
Air prior to painting.

Verify the primer coat DFT ,


8.8.6 visually check 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting report H W %W
the painted surface .

Verify the Intermediate Coat


8.8.7 and final coat DFT,Visually 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting report H W %W
check the painted surface.

MANUFACTURING DATA Compiled


8.9 ITP ---- H H H
BOOK quality records
Stage wise inspection
IRN OF AIR DUCTS AND Approved Drawing / All reports / Resolution of
8.10 IRN H H H
DISPATCH CLEARANCE applicable specifications all technical queries ( if
any )

9 FABRICATION OF OTHER STRUCTURES ( Supporting structure of APH & ducts , Platform, Ladders )
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

9.1
INCOMING MATERIAL INSPECTION (Structural Steel,
fasteners )

Material
Material Co-relation for
Material Specification & Receipt
9.1.1 Identification & Quantity Approved Drawing H H W/R
Project Specification Inspection
w.r.t MTC /IRN /PO
Report
Material
Verification for Physical Receipt
9.1.2 --- No visual defects H W W
Damage, if any Inspection
Report

9.2 INCOMING WELDING CONSUMABLES INSPECTION

Material
Review of MTC for
ASME Sec IIC / Project Receipt
9.2.1 correlation of batch no, size, Consumable Test certificate H R W/R
Specification Inspection
class
Report
Material
Physical verification for Receipt
9.2.2 --- No visual defects H W W
damage Inspection
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

9.3 FIT UP CLEARANCE

9.3.1a Cutting as per drawing Approved Drawing Approved Drawing --- H %W S

9.3.1b Drilling as per drawing Approved Drawing Approved Drawing --- H %W S

Fit-up /
Check the Fit up to ensure
9.3.2 Approved Drawing Approved Drawing Dimensional H %W S
correctness and cleanliness
Report

9.4 WELDING

Check proper baking of


Manufacturer Weld baking
9.4.1 electrodes for low Manufacturer recommendation H S S
recommendation register
Hydrogen electrodes

WPQ Index /
Check the qualified welders WPQ Index / Welder
9.4.2 ASME Section IX Welder H S S
availability Certificate’s
Certificate
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Weld
Check for preheat, Interpass As per applicable WPS /
9.4.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable PQR
sheet
9.5 INSPECTION AND NDE

Check the identification


9.5.1 Approved Drawing Approved Drawing --- H %W R
marking of fabrication items

100%
10080-1-SS-CS-001 Weld visual
9.5.2 Carry-out Visual Inspection AWS D1.1 H W W
AWS D1.1 report

Type and
100% extent of NDT
10080-1-SS-CS-001
9.5.3 Perform NDE ( see remarks ) AWS D1.1 NDE report H W W shall be as per
AWS D1.1
4.5 of 10080-1-
SS-CS-001

Check Final Dimension of Dimensional 100%


9.5.4 Approved Drawing Approved Drawing H W W
fabricated items report

9.6 SURFACE PREPATION AND PAINTING


ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Check the fabrication Inspection


9.6.1 clearance before blasting Approved Drawing Approved Drawing clearance H H R
and painting of structures report

Material
Receipt
Review MTC of Paint Approved product Inspection
9.6.2 10080-1-SS-PP-014 H R R
Material datasheet Report /
Material Test
Certificate

Check the surface is free


Blasting /
from Oil, grease, weld
9.6.3 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H S S
spatters & other
report
contaminates

Check the blast surface for Blasting /


9.6.4 roughness & degree of 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H %W S
surface cleanliness report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Pre-clean the Blast surface


9.6.5 by compressed dry 10080-1-SS-PP-014 10080-1-SS-PP-014 ---- H S S
Air prior to painting

Verify the primer coat DFT ,


Painting
9.6.6 visually Check the painted 10080-1-SS-PP-014 10080-1-SS-PP-014 H W %W
report
surface .

Verify the Intermediate Coat %W


Painting
9.6.7 and final coat DFT, Visually 10080-1-SS-PP-014 10080-1-SS-PP-014 H W
report
check the painted surface.

Compiled
MANUFACTURING DATA
9.7 ITP ---- quality H H H
BOOK records

Stage wise Inspection


IRN OF STRUCTURES
Approved Drawing / All reports / Resolution of
9.8 AND DISPATCH IRN H H H
applicable specifications all technical queries ( if
CLEARANCE any )
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

10 PIPING FABRICATION WITH SUPPORTS ( INCLUDING FUEL SKIDS ) Confirm piping fabrication
includes manifolds

INCOMING MATERIAL INSPECTION (Piping components –


10.1 Pipe, fittings, flanges Structural Steel ( for support fabrication -
& Fuel Skids ), Fasteners)

Material
Material Co-relation for
Approved Drawing Material Specification & Receipt
10.1.1 Identification & Quantity H H W/R
Project Specification Inspection
w.r.t MTC / IRN / PO
Report
Material
Verification for Physical Receipt
10.1.2 --- No visual defects H W W
Damage, if any Inspection
Report

10.2 INCOMING WELDING CONSUMABLES INSPECTION

Material
Review of MTC for
ASME Sec IIC / Project Receipt
10.2.1 correlation of batch no, Consumable Test certificate H R W/R
Specification Inspection
size, class
Report
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Material
Physical verification for Receipt
10.2.2 --- No visual defects H W W
damage Inspection
Report
10.3 FIT-UP
Transfer of heat nos.
10.3.1 wherever required ( piping --- --- --- H S S
only )

Check the Fit up of the joints Fit-up /


to ensure correctness and Approved Drawing Approved Drawing Dimensional H %W S
10.3.2.
cleanliness Report

Check structural Fit up (for


Fit-up /
10.3.3 piping supports and Fuel
Approved Drawing Approved Drawing Dimensional H S S
skids Frame) to ensure
Report
correctness and cleanliness

Identification marking for


10.3.4 Spools , Fuel Skids frame Approved Drawing Approved Drawing --- H %W R
and fabricated supports
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

10.4 WELDING

Check proper baking of Manufacturer Weld baking


10.4.1 Manufacturer recommendation H S S
welding electrodes recommendation register

Check the qualified welder’s WPQ Index /


10.4.2 availability for WPQ Index / Welder Certificate’s ASME Section IX Welder H S S
Welding / tacking Certificate

Weld
Check preheat, Interpass As per applicable WPS /
10.4.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable PQR
sheet

10.5 INSPECTION AND NDE CLEARANCE

ASME Section V (for piping) / B 31.3 / 10080-1-SS-CS-


Carry out Visual Inspection 10080-1-SS-CS-001 & AWS D1.1 001 & AWS D1.1 (for Weld visual
10.5.1 H W W
of welds (for structural portion of fuel structural portion of fuel report
skids and supports) skids and supports)
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Review of
NDE of carbon steel welds (
Radiography
10.5.2 as applicable per piping class ASME Section V B 31.3 NDE report H R R
films ( as
)
applicable )

Final dimensional check for Fit-up / 100%


10.5.3 the spools, supports & fuel Approved Drawing Approved Drawing Dimensional H W W
skids structural frame report

SURFACE PREPATION AND PAINTING FOR PIPE SPOOLS (


10.6 Except pipe weld joints ) , FUEL SKIDS FRAME ,
SUPPORTS

Fabrication clearance for


Inspection
piping spools, supports, fuel
10.6.1 Approved Drawing Approved Drawing Clearance H H R
skid frame for surface
Report
preparation and painting.
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
Material
Receipt
Review MTC of Paint Approved product Inspection
10.6.2 10080-1-SS-PP-014 H R R
Material datasheet Report /
Material Test
Certificate

Weld Joints to be protected


10.6.3 10080-1-SS-PP-014 10080-1-SS-PP-014 --- H S S
with suitable Insulation tape

Check the surface is free


Blasting /
from Oil, grease, weld
10.6.4 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H S S
spatters & other
report
contaminates

Check the blast surface for Blasting /


10.6.5 roughness & degree of 10080-1-SS-PP-014 10080-1-SS-PP-014 Painting H %W S
surface cleanliness report

Pre-clean the Blast surface


10.6.6 by compressed dry 10080-1-SS-PP-014 10080-1-SS-PP-014 ---- H S S
Air prior to painting.
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Verify the primer coat DFT ,


Painting
10.6.7 visually Check the painted 10080-1-SS-PP-014 10080-1-SS-PP-014 H W %W
report
surface .

Verify the Intermediate Coat


and final coat DFT, Painting
10.6.8 10080-1-SS-PP-014 10080-1-SS-PP-014 H W %W
Visually check the painted report
surface.

Final touch up paint


application / measurement
of DFT on pipe weld joints
Painting
10.6.9 for Fuel skid spools ( To be 10080-1-SS-PP-014 10080-1-SS-PP-014 H W %W
report
applied after Hydrotest of
fuel Skids and before
releasing of Fuel Skid )
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

INSTALLATION OF PIPE
SPOOLS AND SUPPORTS
10.7 --- --- --- --- --- ---
TO FUEL SKIDS
STRUCTURAL FRAME

Installation of piping
10.7.1 spools with supports to As per drg. As per drg. --- H S S
Fuel skid frame

Fitup between pipe spools Fitup /


10.7.2 to pipe spools and pipe As per drg. As per drg. dimensional H %W S
spools to supports report

10.7.3 WELDING

Check proper baking of Manufacturer Weld baking


10.7.3.1 Manufacturer recommendation H S S
welding electrodes recommendation register
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Check the qualified welder’s WPQ Index /


WPQ Index / Welder
10.7.3.2 availability for ASME Section IX Welder H S S
Certificate’s
Welding / tacking Certificate

Weld
Check preheat, Interpass As per applicable WPS /
10.7.3.3 As per applicable WPS / PQR monitoring H S S
temp. as applicable PQR
sheet

10.7.4 INSPECTION AND NDE CLEARANCE

Carry out Visual Inspection Weld visual


10.7.4.1 ASME Section V B 31.3 H W S
of welds report
Review of
NDE of piping welds ( as Radiography
10.7.4.2 ASME Section V B 31.3 NDE report H R R
applicable per piping class ) films ( as
applicable )
Fit-up /
Final dimensional for fuel
10.7.4.3 Approved Drawing Approved Drawing Dimensional H W W
skids
report

HYDROTEST OF FUEL
10.8
SKIDS
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Compilation and verification


of all relevant records in the
10.8.1 --- --- As per this ITP H H H
loop file / test pack and
release for Hydrotest

Check correctness of blinds, Hydrotest


10.8.2 Approved Drawing Approved Drawing H S S
gaskets and pressure gauges report

Approved Drawing / Approved Drawing / Hydrotest


10.8.3 Pressure test witnessing H W W
10080-1-SS-PP-007 10080-1-SS-PP-007 report
Compiled
MANUFACTURING DATA
10.9 ITP ---- quality H H H
BOOK records
IRN OF PIPING SPOOLS Stage wise Inspection
Approved Drawing / All
10.10 AND DISPATCH report / Resolution of IRN H H H
applicable specifications
CLEARANCE technical Queries (if any)

General Comments Fuel skid requires FAT, including functional testing, valves tested,
instruments calibrated, wiring insulation/continuity checks, etc. All activities
associated with the fuel skids need to be listed on the ITP.
a) Asbestos shall not be used in any form.
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

Calibration records of measuring instruments shall be made available to TPIA for review during inspection. Valid calibrated measuring instrument shall be used during
b) inspection at Fabricator Shop.

LEGENDS :
H : HOLD
W : WITNESS
%W : PERCENTAGE WITNESS
S : SURVEILLANCE
R : REVIEW
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks

COMMENTS RESOLUTION SHEET


PROJECT: Reliance J3 Paraxylene Train 4 Project (SEZ Zone) DATE:
CLIENT: Reliance Industries Limited
Category code (as per VDR): A05
DEC: Foster Wheeler Energy Limited, Reading - UK
DOCUMENT REF: ITP for Pre-Fabricated Fired Heater Componenst at Shop ( Stabiliser Reboiler ) REV NO. 1
Doc. Number 2812-FQ-303 R0 Approval code 2
RIL Document
10010-4Z1JAY-MBF0001-FWR-F-00-AYZ281-A05-1020
Number

Sl. No. FW/RIL Comments Date : 07-Oct-13 HPC REPLY Date : 14-Oct-13 FW/RIL REPLY Date:

Trail assembly is limited to the extent Trial assembly of entire radiant box is not required.
However, trial assembly of adjacent panels is to be shown
of fabricating / assembling adjacent
Confirm trial assembly of radiant section panels on ITP as an activity.
1 panels together. Entire radiant section
will be carried out and show on ITP as activity
won't be trial assembled at fabrication
shop.

Hydrotest will be performed for the


entire system ( including Radiant , Project fabrication plan submitted with HPC bid stated
Convection and Cross over ) at field that "radiant coils shall be pre-fabricated in form of
2 Radiant Coil Hydrotest is required banjos, hydro-tested and later inserted in the radiant
after installation. Hydrotest of radiant
section". This was further clarified in clarification
section shall not be performed
TA-HPC-TC-002 where it was agreed a hydrotest of fully
separately at shop. assembled coil would be carried out at site. Hydrotesting
3 Convection Coil Hydrotest required Hydrotest will be performed for the of radiant coil and convection coil in shop is required as
well as a fully assembled test at site. Include shop test in
ITP.
ITP for Pre-Fabricated Fired Heater Components
at Shop
ITP No.: 2812-FQ-303 R1
PROJECT: FIRED HEATER FOR RELIANCE J3 PARAXYLENE
TRAIN-4 PROJECT
Fabricator : --
Inspection
HEATER TAG NO : STABILISER REBOILER ( MB-AYZ-281-F000002 ) BILFINGER NEO
Category: A
STRUCTO PVT. LTD.
Reference Acceptance Type Of
Sr. No. Activities Description
Documents Criteria Record Fabricator HP TPIA RIL Remarks
entire system ( including Radiant ,
Convection and Cross over ) at field
after installation. Hydrotest of
convection and cross over shall not be
Skids are to be provided fully assembled complete with
performed separately at shop. all items listed in item 2.14 of the SoW given in the MR.
Only piping spools will be assembled at Section 1.5 also states that the extent of fabrication and
Fuel skid requires FAT, including functional
shop on the fuel skid structure and preassembly is to be maximised. The general nature of
testing , valve tested , instruments calibrated,
same shall be hydrotested at shop. All a skid means that it is complete and is simply placed in
4 wiring insulation/continuity checks. Etc. All
instruments & control valves shall be position with piping, electrical and C&I interfaces
activties associated with the Fuel skids need to connected to at site. No assembly should be required.
installed at site and all related tests
be listed on the ITP. This same philosophy is followed in project specification
shall be carried out at site thereafter.
The matching components will be 10080-1-SS-MS-001. FAT to be included in ITP.
match drilled and match marked. Each
Trail Assembly of completed convection module is assembled on same Project fabrication plan submitted with HPC bid stated
5
modules to be carried out template. Modules won't be placed on that "In the Convection Modules the trial assembly of
top of each other for trial assembly at two consecutive modules is planned before refractory
shop. lining". Simply match drilling and marking the mating
flanges is not considered adequate as errors during
welding of these mating components on to the modules
could lead to error and misalignment. Trial assembly of
mating modules is required.