JNK INDIA PVT. LTD.

Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD ACC


JNKI-046-ATM2B-MC-DG-157
1 Rev.02 3 J-326 CXR-1861 5" X 6.55mm W-82 B-C RC ACC
C-A RUC ACC
A-B NSD ACC
2 JNKI-046-ATM2B-MC-DG-157 4 J-425 CXR-1862 5" X 6.55mm W-60 B-C NSD ACC
Rev.02
C-A RC ACC
A-B RC ACC
JNKI-046-ATM2B-MC-DG-157
3 4 J-426 CXR-1863 5" X 6.55mm W-60 B-C NSD ACC
Rev.02
C-A NSD ACC

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD ACC


JNKI-046-ATM2B-MC-DG-157
1 Rev.02 1 J-125 CXR-1858 5" X 6.55mm W-60 B-C EP ACC
C-A EP ACC
A-B RC,Ti ACC
2 JNKI-046-ATM2B-MC-DG-157 1 J-156 CXR-1859 5" X 6.55mm W-60 B-C NSD,FM ACC
Rev.02
C-A RC ACC
A-B RUC, EP ACC
JNKI-046-ATM2B-MC-DG-157
3 3 J-323 CXR-1769 5" X 6.55mm W-45 B-C EP ACC
Rev.02
C-A RUC ACC
A-B EP ACC
4 JNKI-046-ATM2B-MC-DG-157 3 J-325 CXR-1860 5" X 6.55mm W-60 B-C Ti ACC
Rev.02
C-A EP ACC
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 4 J-401 CXR-1779 5" X 6.55mm W-12 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 4 J-403 CXR-1833 3" X 7.62mm W-60 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 4 J-408 CXR-1856 5" X 6.55mm W-55 B-C
Rev.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 4 J-409 CXR-1857 5" X 6.55mm W-55 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 4 J-401 CXR-1779 5" X 6.55mm W-12 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 4 J-403 CXR-1833 3" X 7.62mm W-60 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 4 J-408 CXR-1856 5" X 6.55mm W-55 B-C
Rev.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 4 J-409 CXR-1857 5" X 6.55mm W-55 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 2 J-214 CXR-1838 5" X 6.55mm W-37 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 3 J-301 CXR-1778 5" X 6.55mm W-12 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 3 J-303 CXR-1832 3" X 7.62mm W-60 B-C
Rev.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 3 J-309 CXR-1855 5" X 6.55mm W-82 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 1 J-101 CXR-1776 5" X 6.55mm W-45 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 1 J-103 CXR-1830 3" X 7.62mm W-60 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 2 J-201 CXR-1777 5" X 6.55mm W-45 B-C
Rev.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 2 J-203 CXR-1831 3" X 7.62mm W-60 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 1 J-108 CXR-1850 5" X 6.55mm W-82 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 1 J-109 CXR-1851 5" X 6.55mm W-82 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 1 J-114 CXR-1834 5" X 6.55mm W-60 B-C
Rev.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 1 J-117 CXR-1835 5" X 6.55mm W-60 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 3 J-303 CXR-1756 3" X 7.62mm W-37 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 3 J-311 CXR-1799 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 3 J-312 CXR-1800 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 4 J-403 CXR-1757 3" X 7.62mm W-37 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 8 J-812 CXR-1810 6" X 7.11mm W-45 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 7 J-711 CXR-1807 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 7 J-712 CXR-1808 6" X 7.11mm W-12 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 8 J-803 CXR-1761 3" X 7.62mm W-37 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 8 J-811 CXR-1809 6" X 7.11mm W-45 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 6 J-603 CXR-1759 3" X 7.62mm W-37 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 6 J-611 CXR-1805 6" X 7.11mm W-45 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 6 J-612 CXR-1806 6" X 7.11mm W-45 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 7 J-703 CXR-1760 3" X 7.62mm W-37 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 5 J-508 CXR-887 6" X 7.11mm W-55 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 5 J-509 CXR-883 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 5 J-511 CXR-1803 6" X 7.11mm W-12 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 5 J-512 CXR-1804 6" X 7.11mm W-12 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 5 J-508 CXR-887 6" X 7.11mm W-55 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 5 J-509 CXR-883 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 5 J-511 CXR-1803 6" X 7.11mm W-12 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 5 J-512 CXR-1804 6" X 7.11mm W-12 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 4 J-410 CXR-1383 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 4 J-411 CXR-1801 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 4 J-412 CXR-1802 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 5 J-503 CXR-1758 3" X 7.62mm W-37 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 3 J-303 CXR-1756 3" X 7.62mm W-37 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 3 J-311 CXR-1799 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 3 J-312 CXR-1800 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 4 J-403 CXR-1757 3" X 7.62mm W-37 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 2 J-210 CXR-1375 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 2 J-211 CXR-1797 6" X 7.11mm W-82 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 2 J-212 CXR-1798 6" X 7.11mm W-82 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 2 J-213 CXR-758 6" X 7.11mm W-33 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 1 J-103 CXR-1754 3" X 7.62mm W-37 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 1 J-111 CXR-1795 6" X 7.11mm W-82 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 1 J-112 CXR-1796 6" X 7.11mm W-82 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 2 J-203 CXR-1755 3" X 7.62mm W-37 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 1 J-130 CXR-1780 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 8 J-823 CXR-1738 6" X 7.11mm W-45 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 8 J-829 CXR-896 6" X 7.11mm W-33 B-C
REV. 04
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 7 J-721 CXR-1785 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 8 J-821 CXR-1786 6" X 7.11mm W-12 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158 J-825
3 8 CXR-752 6" X 7.11mm W-85 B-C
REV. 04 CRW
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 8 J-827 CXR-1787 6" X 7.11mm W-12 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 6 J-622 CXR-1782 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 6 J-623 CXR-1783 6" X 7.11mm W-45 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158 J-632
3 6 CXR-1738 6" X 7.11mm W-33 B-C
REV. 04 CRW
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 6 J-630 CXR-1784 6" X 7.11mm W-45 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 5 J-521 CXR-1315 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 5 J-530 CXR-795 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 5 J-533 CXR-1794 6" X 7.11mm W-33 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 6 J-621 CXR-1781 6" X 7.11mm W-12 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 3 J-330 CXR-794 6" X 7.11mm W-55 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 1 J-121 CXR-844 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 1 J-129 CXR-1056 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 2 J-222 CXR-854 6" X 7.11mm W-33 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 3 J-322 CXR-856 6" X 7.11mm W-33 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 REV.02 4 J-428 CXR-1770 5" X 6.55mm W-45 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 4 J-429 CXR-1771 5" X 6.55mm W-45 B-C
REV.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 REV.02 3 J-328 CXR-1764 5" X 6.55mm W-45 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 3 J-329 CXR-1765 5" X 6.55mm W-45 B-C
REV.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 4 J-422 CXR-1774 5" X 6.55mm W-45 B-C
REV.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 4 J-423 CXR-1775 5" X 6.55mm W-45 B-C
REV.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 REV.02 2 J-222 CXR-1772 5" X 6.55mm W-12 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 2 J-223 CXR-1773 5" X 6.55mm W-12 B-C
REV.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 3 J-322 CXR-1768 5" X 6.55mm W-45 B-C
REV.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 3 J-323 CXR-1769 5" X 6.55mm W-45 B-C
REV.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 REV.02 1 J-122 CXR-1766 5" X 6.55mm W-55 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 1 J-123 CXR-1767 5" X 6.55mm W-55 B-C
REV.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 1 J-128 CXR-1762 5" X 6.55mm W-55 B-C
REV.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 1 J-129 CXR-1763 5" X 6.55mm W-55 B-C
REV.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

JNKI-046-CDU2B-MC-DG-158 A-B
1 8 J-825 CXR-1752 6" X 7.11mm W-82 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
2 8 J-826 CXR-1753 6" X 7.11mm W-82 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
3 8 J-832 CXR-1740 6" X 7.11mm W-55 B-C
Rev-04 C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

JNKI-046-CDU2B-MC-DG-158 A-B
1 6 J-632 CXR-1738 6" X 7.11mm W-55 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
2 7 J-725 CXR-1750 6" X 7.11mm W-55 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
3 7 J-726 CXR-1751 6" X 7.11mm W-55 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
4 7 J-732 CXR-1739 6" X 7.11mm W-55 B-C
Rev-04 C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

JNKI-046-CDU2B-MC-DG-158 A-B
1 5 J-525 CXR-1746 6" X 7.11mm W-12 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
2 5 J-526 CXR-1747 6" X 7.11mm W-12 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
3 6 J-625 CXR-1748 6" X 7.11mm W-45 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
4 6 J-626 CXR-1749 6" X 7.11mm W-45 B-C
Rev-04 C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

JNKI-046-CDU2B-MC-DG-158 A-B
1 3 J-325 CXR-1722 6" X 7.11mm W-82 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
2 3 J-326 CXR-1723 6" X 7.11mm W-82 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
3 4 J-425 CXR-1744 6" X 7.11mm W-82 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
4 4 J-426 CXR-1745 6" X 7.11mm W-82 B-C
Rev-04 C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

JNKI-046-CDU2B-MC-DG-158 A-B
1 1 J-125 CXR-1720 6" X 7.11mm W-55 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
2 1 J-126 CXR-1721 6" X 7.11mm W-55 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
3 2 J-225 CXR-1742 6" X 7.11mm W-55 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
4 2 J-226 CXR-1743 6" X 7.11mm W-55 B-C
Rev-04 C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" & 2.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-158
1 Rev.03 4 J-3A AXR-56 5" X 6.55mm W-39 B-C
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" & 2.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-158
1 Rev.03 2 J-15 AXR-25 2" X 5.54mm W-10 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-158 3 J-3A AXR-55 5" X 6.55mm W-39 B-C
Rev.03
C-A
A-B
JNKI-046-ATM2A-MC-DG-158
3 3 J-5 AXR-30 5" X 6.55mm W-11 B-C
Rev.03
C-A
A-B
4 JNKI-046-ATM2A-MC-DG-158 3 J-13 AXR-37 5" X 6.55mm W-39 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" & 2.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-158
1 Rev.03 1 J-3A AXR-53 5" X 6.55mm W-39 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-158 2 J-16 AXR-13 2" X 5.54mm W-10 B-C
Rev.03
C-A
A-B
JNKI-046-ATM2A-MC-DG-158
3 2 J-3A AXR-54 5" X 6.55mm W-39 B-C
Rev.03
C-A
A-B
4 JNKI-046-ATM2A-MC-DG-158 2 J-13 AXR-24 5" X 6.55mm W-39 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-158
1 Rev.03 3 J-3A AXR-55 5" X 6.55mm W-39 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-158 3 J-8 AXR-33 5" X 6.55mm W-11 B-C
Rev.03
C-A
A-B
JNKI-046-ATM2B-MC-DG-158
3 4 J-3A AXR-56 5" X 6.55mm W-39 B-C
Rev.03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-158 4 J-13 AXR-50 5" X 6.55mm W-39 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" & 2.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-158
1 Rev.03 1 J-3A AXR-53 5" X 6.55mm W-39 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-158 1 J-13 AXR-11 5" X 6.55mm W-39 B-C
Rev.03
C-A
A-B
JNKI-046-ATM2B-MC-DG-158
3 2 J-3A AXR-54 5" X 6.55mm W-39 B-C
Rev.03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-158 2 J-16 AXR-26 2" X 5.54mm W-10 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM D IX 50 Sensitivity 6th Wire
SFD : 5.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156
1 Rev.03 4 J-33 AXR-1A65 5" X 6.55mm W-47 B-C
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM D IX 50 Sensitivity 6th Wire
SFD : 5.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156
1 Rev.03 3 J-50 AXR-1A182 5" X 6.55mm W-50 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 3 J-67 AXR-199 5" X 6.55mm W-86 B-C
Rev.03
C-A
A-B
JNKI-046-ATM2B-MC-DG-156
3 3 J-73 AXR-205 5" X 6.55mm W-75 B-C
Rev.03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 4 J-12 AXR-217 5" X 6.55mm W-47 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM D IX 50 Sensitivity 6th Wire
SFD : 5.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156
1 Rev.03 1 J-36 AXR-1A106 5" X 6.55mm W-42 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 2 J-73 AXR-132 5" X 6.55mm W-75 B-C
Rev.03
C-A
A-B
JNKI-046-ATM2B-MC-DG-156
3 3 J-42 AXR-174 5" X 6.55mm W-85 B-C
Rev.03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 3 W-59 AXR-1A191 5" X 6.55mm W-75 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 Rev.04 2 J-215 CXR-802 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 3 J-307 CXR-1376 6" X 7.11mm W-33 B-C
Rev.04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 3 J-314 CXR-807 6" X 7.11mm W-33 B-C
Rev.04
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 Rev.04 1 J-107 CXR-1371 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 1 J-114 CXR-800 6" X 7.11mm W-55 B-C
Rev.04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 1 J-115 CXR-799 6" X 7.11mm W-55 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 1 J-116 CXR-757 6" X 7.11mm W-55 B-C
Rev.04
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158
1 Rev.03 7 J-708 CXR-732 6" X 7.11mm W-45 B-C
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158
1 Rev.03 1 J-113 CXR-623 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 2 J-210 CXR-625 6" X 7.11mm W-45 B-C
Rev.03
C-A
A-B
JNKI-046-CDU2A-MC-DG-158
3 3 J-307 CXR-627 6" X 7.11mm W-12 B-C
Rev.03
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-158 5 J-509 CXR-721 6" X 7.11mm W-33 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 2 J-228 CXR-1649 5" X 6.55mm W-82 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 2 J-229 CXR-1650 5" X 6.55mm W-82 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 2 J-232 CXR-1647 5" X 6.55mm W-82 B-C
Rev.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 4 W-432 CXR-1648 5" X 6.55mm W-82 B-C
Rev.02
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-159
1 Rev.02 2 J-12 CXR-1664 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-159 3 J-6 CXR-1663 6" X 7.11mm W-33 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-159
3 6 J-9 CXR-1665 6" X 7.11mm W-33 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-159 6 J-10 CXR-1666 6" X 7.11mm W-33 B-C
Rev.02
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 10.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 REV-02 4 J-401 CXR-1610 5" x 6.55mm W-55 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 4 J-414 CXR-1617 5" x 6.55mm W-55 B-C
REV-02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 4 J-428 CXR-1560 5" x 6.55mm W-12 B-C
REV-02
C-A
A-B
4 JNKI-046-ATM2A-MC-DG-157 4 J-429 CXR-1561 5" x 6.55mm W-12 B-C
REV-02
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 10.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 REV-02 4 J-401 CXR-1610 5" x 6.55mm W-55 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 4 J-414 CXR-1617 5" x 6.55mm W-55 B-C
REV-02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 4 J-428 CXR-1560 5" x 6.55mm W-12 B-C
REV-02
C-A
A-B
4 JNKI-046-ATM2A-MC-DG-157 4 J-429 CXR-1561 5" x 6.55mm W-12 B-C
REV-02
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 10.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 REV-02 2 J-229 CXR-1559 5" x 6.55mm W-45 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 3 J-301 CXR-1609 5" x 6.55mm W-55 B-C
REV-02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 3 J-308 CXR-1645 5" x 6.55mm W-12 B-C
REV-02
C-A
A-B
4 JNKI-046-ATM2A-MC-DG-157 3 J-309 CXR-1646 5" x 6.55mm W-12 B-C
REV-02
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 10.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 REV-02 2 J-217 CXR-1616 5" x 6.55mm W-55 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 2 J-222 CXR-1570 5" x 6.55mm W-45 B-C
REV-02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 2 J-223 CXR-1571 5" x 6.55mm W-45 B-C
REV-02
C-A
A-B
4 JNKI-046-ATM2A-MC-DG-157 2 J-228 CXR-1558 5" x 6.55mm W-45 B-C
REV-02
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158 3" X
1 REV-06 7 J-03 CXR-1581 7.62MM W-12 B-C
"C"
A-B
2 JNKI-046-CDU1A-MC-DG-158 8 J-01 CXR-1585 6" X W-12 B-C
REV-06 7.11MM
C-A
A-B
JNKI-046-CDU1A-MC-DG-158 3" X
3 8 J-03 CXR-1589 W-12 B-C
REV-06 7.62MM
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158 6" X
1 REV-06 6 J-01 CXR-1584 7.11MM W-12 B-C
"C"
A-B
2 JNKI-046-CDU1A-MC-DG-158 6 J-03 CXR-1588 3" X W-12 B-C
REV-06 7.62MM
C-A
A-B
JNKI-046-CDU1A-MC-DG-158 6" X
3 6 J-06 CXR-1531 W-45 B-C
REV-06 7.11MM
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 7 J-01 CXR-1577 6" X W-12 B-C
REV-06 7.11MM
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158 6" X
1 REV-06 4 J-01 CXR-1583 7.11MM W-12 B-C
"C"
A-B
2 JNKI-046-CDU1A-MC-DG-158 4 J-03 CXR-1587 3" X W-12 B-C
REV-06 7.62MM
C-A
A-B
JNKI-046-CDU1A-MC-DG-158 6" X
3 4 J-12 CXR-1504 W-12 B-C
REV-06 7.11MM
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 5 J-03 CXR-1580 6" X W-12 B-C
REV-06 7.11MM
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158 6" X
1 REV-06 1 J-01 CXR-1574 7.11MM W-12 B-C
"C"
A-B
2 JNKI-046-CDU1A-MC-DG-158 2 J-01 CXR-1582 6" X W-12 B-C
REV-06 7.11MM
C-A
A-B
JNKI-046-CDU1A-MC-DG-158 3" X
3 2 J-03 CXR-1586 W-12 B-C
REV-06 7.62MM
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 3 J-01 CXR-1575 6" X W-12 B-C
REV-06 7.11MM
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-159 6" X
1 Rev. 02 7 J-02 CXR-1105 7.11MM W-55 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-159 6" X
1 Rev. 02 5 J-02 CXR-1111 7.11MM W-55 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-159 5 J-08 CXR-1084 6" X W-33 B-C
Rev. 02 7.11MM
C-A
A-B
JNKI-046-CDU2B-MC-DG-159 6" X
3 5 J-10 CXR-1052 W-33 B-C
Rev. 02 7.11MM
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-159 6 J-03 CXR-1085 6" X W-55 B-C
Rev. 02 7.11MM
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-159 6" X
1 Rev. 02 1 J-03 CXR-1082 7.11MM W-55 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-159 1 J-05 CXR-1094 6" X W-55 B-C
Rev. 02 7.11MM
C-A
A-B
JNKI-046-CDU2B-MC-DG-159 6" X
3 3 J-02 CXR-1078 W-55 B-C
Rev. 02 7.11MM
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-159 4 J-03 CXR-1079 6" X W-55 B-C
Rev. 02 7.11MM
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157 6" X
1 Rev. 02 1 J-128 CXR-1507 7.11MM W-45 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 1 J-129 CXR-1508 6" X W-45 B-C
Rev. 02 7.11MM
C-A
A-B
JNKI-046-ATM2A-MC-DG-157 6" X
3 3 J-312 CXR-1301 W-55 B-C
Rev. 02 7.11MM
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-159 6" X
1 Rev. 02 7 J-05 CXR-954 7.11MM W-55 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-159 6" X
1 Rev. 02 1 J-08 CXR-963 7.11MM W-12 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-159 2 J-08 CXR-969 6" X W-55 B-C
Rev. 02 7.11MM
C-A
A-B
JNKI-046-CDU2B-MC-DG-159 6" X
3 3 J-02 CXR-1081 W-55 B-C
Rev. 02 7.11MM
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-159 5 J-09 CXR-1049 6" X W-33 B-C
Rev. 02 7.11MM
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158 6" X
1 Rev. 06 1 J-12 CXR-1475 7.11MM W-33 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-159 6" X
1 Rev. 02 2 J-6 CXR-1590 7.11MM W-55 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156
1 Rev. 03 1 J-62 AXR-53 5" X 6.55mm W-39 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 1 J-64 AXR-55 5" X 6.55mm W-10 B-C
Rev. 03
C-A
A-B
JNKI-046-ATM2B-MC-DG-156
3 2 J-58 AXR-116 5" X 6.55mm W-75 B-C
Rev. 03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 2 J-59 AXR-117 5" X 6.55mm W-75 B-C
Rev. 03
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156
1 Rev. 03 Pass No. - 01 J-45 AXR-40 5" X 6.55mm W-10 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 Pass No. - 01 J-48 AXR-43 5" X 6.55mm W-10 B-C
Rev. 03
C-A
A-B
JNKI-046-ATM2B-MC-DG-156
3 Pass No. - 01 J-53 AXR-46 5" X 6.55mm W-10 B-C
Rev. 03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 Pass No. - 01 J-54 AXR-47 5" X 6.55mm W-39 B-C
Rev. 03
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156
1 Rev. 03 1 J-55 AXR-48 5" X 6.55mm W-39 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 1 J-56 AXR-49 5" X 6.55mm W-10 B-C
Rev. 03
C-A
A-B
JNKI-046-ATM2B-MC-DG-156
3 1 J-61 AXR-52 5" X 6.55mm W-10 B-C
Rev. 03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 1 J-63 AXR-54 5" X 6.55mm W-39 B-C
Rev. 03
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev. 02 Pass No. - 07 J-25 XR-459 6" X 7.11mm W-78 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev. 02 Pass No. - 05 J-5 XR-287 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 05 J-26 XR-308 6" X 7.11mm W-11 B-C
Rev. 02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. - 05 J-73 XR-355 6" X 7.11mm W-47 B-C
Rev. 02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 07 J-18 XR-425 6" X 7.11mm W-11 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -6 J-633 CXR-1579 6" X 7.11mm W-37 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -7 J-733 CXR-1580 6" X 7.11mm W-37 B-C
Rev.04
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -2 J-226 CXR-1535 6" X 7.11mm W-119 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -2 J-233 CXR-1575 6" X 7.11mm W-37 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -3 J-333 CXR-1576 6" X 7.11mm W-37 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -6 J-626 CXR-1533 6" X 7.11mm W-32 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -2 J-226 CXR-1535 6" X 7.11mm W-119 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -2 J-233 CXR-1575 6" X 7.11mm W-37 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -3 J-333 CXR-1576 6" X 7.11mm W-37 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -6 J-626 CXR-1533 6" X 7.11mm W-32 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev.06 Pass No. -8 J-6 CXR-1500 6" X 7.11mm W-12 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev.06 Pass No. -1 J-12 CXR-1475 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass No. -5 J-12 CXR-1479 6" X 7.11mm W-45 B-C
Rev.06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass No. - 6 J-12 CXR-1502 6" X 7.11mm W-12 B-C
Rev.06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass No. 7 J-11 CXR-1480 6" X 7.11mm W-45 B-C
Rev.06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 Rev.02 Pass No. -1 J-107 XR-1463 5" X 6.55mm W-33 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 Pass No. -2 J-233 CXR-1217 5" X 6.55mm W-55 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 Pass No. - 3 J-307 CXR-1465 5" X 6.55mm W-33 B-C
Rev.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25' Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -7 J-71 XR-505 6" X 7.11mm W-11 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25' Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -7 J-10 XR-444 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -7 J-13 XR-447 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -7 J-18 XR-452 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -7 J-21 XR-455 6" X 7.11mm W-11 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25' Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -5 J-45 XR-327 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-68 XR-350 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -5 J-71 XR-353 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -7 J-5 XR-439 6" X 7.11mm W-11 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25' Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -5 J-21 XR-303 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-26 XR-308 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -5 J-29 XR-311 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-34 XR-316 6" X 7.11mm W-11 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25' Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -5 J-5 XR-287 6" X 7.11mm W-11 B-C
C-A

2 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-10 XR-292 6" X 7.11mm W-11


Rev.02

JNKI-046-CDU2B-MC-DG-157
3 Pass No. -5 J-13 XR-295 6" X 7.11mm W-11
Rev.02

4 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-18 XR-300 6" X 7.11mm W-11


Rev.02

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 Pass No. -1 J-115 CXR-1148 5" X 6.55mm W-33 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 Rev.02 Pass No. -3 J-315 CXR-1053 5" X 6.55mm W-45 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 Pass No. -3 J-316 CXR-1326 5"X 6.55mm W-45 B-C
Rev.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-159
1 Rev.02 Pass No. -6 J-6 CXR-771 6" X 6.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-159 Pass No. -6 J-9 CXR-829 6" X 6.11mm W-33 B-C
Rev.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A center
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -6 J-608 CXR-253 6" X 6.11mm W-33

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev.06 Pass No. -3 J-12A CXR-1477 6" X 6.11mm W-33 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -8 J-27 XR-540 6" X 6.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -8 J-62 XR-575 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 3" X
3 Pass No. -8 J-67 XR-580 W-10 B-C
Rev.02 7.682mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -8 J-72 XR-585 3" X 7.62mm W-10 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -8 J-3 XR-516 6" X 6.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -8 J-6 XR-519 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 3" X
3 Pass No. -8 J-11 XR-524 W-10 B-C
Rev.02 7.682mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -8 J-14 XR-527 3" X 7.62mm W-10 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -7 J-60 XR-494 6" X 6.11mm W-42 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -7 J-69 XR-503 6" X 7.11mm W-47 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 3" X
3 Pass No. -7 J-70 XR-504 W-47 B-C
Rev.02 7.682mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -8 F-01A XR-514 3" X 7.62mm W-46 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -6 J-67 XR-428 6" X 6.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -6 J-72 XR-433 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 3" X
3 Pass No. -7 F-01A XR-435 W-47 B-C
Rev.02 7.682mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -7 J-59 XR-493 6" X 7.11mm W-47 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -6 J-46 XR-407 6" X 6.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -6 J-51 XR-412 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -6 J-54 XR-415 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -6 J-62 XR-423 6" X 7.11mm W-10 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -6 F-01A XR-362 3" X 7.62mm W-46 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -6 J-27 XR-388 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -6 J-35 XR-396 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -6 J-38 XR-399 6" X 7.11mm W-10 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -5 J-66 XR-348 6" X 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-69 XR-351 6" X 7.11mm W-47 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -5 J-70 XR-352 6" X 7.11mm W-47 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-73 XR-355 6" X 7.11mm W-47 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -5 J-50 XR-332 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-53 XR-335 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -5 J-58 XR-340 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-61 XR-343 6" X 7.11mm W-11 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -5 F-01A XR-283 3" X 7.62mm W-47 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-37 XR-319 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -5 J-42 XR-324 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-45 XR-327 6" X 7.11mm W-11 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev.06 Pass No. -5 J-1 CXR-1576 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass No. -5 J-3 CXR-1580 3" X 7.62mm W-12 B-C
Rev.06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass No. -7 J-1 CXR-1577 6" X 7.11mm W-12 B-C
Rev.06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass No. -7 J-3 CXR-1581 3" X 7.62mm W-12 B-C
Rev.06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev.06 Pass No. -1 J-1 CXR-1574 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass No. -1 J-3 CXR-1578 3" X 7.62mm W-12 B-C
Rev.06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass No. -3 J-1 CXR-1575 6" X 7.11mm W-12 B-C
Rev.06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass No. -3 J-3 CXR-1579 3" X 7.62mm W-12 B-C
Rev.06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 Rev.02 Pass No. -1 J-112 CXR-1537 5" X 6.55mm W-37 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 Pass No. -4 J-422 CXR-1572 5" X 6.55mm W-12 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 Pass No. -4 J-423 CXR-1573 5" X 6.55mm W-12 B-C
Rev.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 Rev.02 Pass No. -1 J-112 CXR-1537 5" X 6.55mm W-37 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 Pass No. -4 J-422 CXR-1572 5" X 6.55mm W-12 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 Pass No. -4 J-423 CXR-1573 5" X 6.55mm W-12 B-C
Rev.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 Pass No. -1 J-111 CXR-1536 5" X 6.55mm W-37 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 Pass No. -2 J-211 CXR-1516 5" X 6.55mm W-37 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 Pass No. -2 J-212 CXR-1517 5" X 6.55mm W-37 B-C
Rev.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -5 J-533 CXR-1578 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -6 J-633 CXR-1579 6" X 7.11mm W-60 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -7 J-733 CXR-1580 6" X 7.11mm W-45 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -8 J-833 CXR-1581 6" X 7.11mm W-60 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -1 J-133 CXR-1574 6" X 7.11mm W-37 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -2 J-233 CXR-1575 6" X 7.11mm W-37 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -3 J-333 CXR-1576 6" X 7.11mm W-37 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -4 J-433 CXR-1577 6" X 7.11mm W-37 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -7 J-725 CXR-1556 6" X 7.11mm W-119 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -7 J-726 CXR-1557 6" X 7.11mm W-119 B-C
Rev.04
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -5 J-525 CXR-1554 6" X 7.11mm W-119 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -5 J-526 CXR-1555 6" X 7.11mm W-119 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -6 J-625 CXR-1532 6" X 7.11mm W-32 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -6 J-626 CXR-1533 6" X 7.11mm W-32 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -3 J-325 CXR-1552 6" X 7.11mm W-32 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -3 J-326 CXR-1553 6" X 7.11mm W-32 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -4 J-425 CXR-1524 6" X 7.11mm W-32 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -4 J-426 CXR-1525 6" X 7.11mm W-32 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -1 J-125 CXR-1550 6" X 7.11mm W-32 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -1 J-126 CXR-1551 6" X 7.11mm W-32 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -2 J-225 CXR-1534 6" X 7.11mm W-119 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -2 J-226 CXR-1535 6" X 7.11mm W-119 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev. 02 Pass No. 7 J-58 XR-492 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. 7 J-61 XR-495 6" X 7.11mm W-11 B-C
Rev. 02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev. 02 Pass No. 7 J-26 XR-460 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. 7 J-29 XR-463 6" X 7.11mm W-11 B-C
Rev. 02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. 7 J-34 XR-468 6" X 7.11mm W-11 B-C
Rev. 02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. 7 J-37 XR-471 6" X 7.11mm W-11 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 5 J-06 CXR-1482 6" X 7.11mm W-45 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 1 J-12 CXR-1475 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 3 J-12 CXR-1477 6" X 7.11mm W-33 B-C
Rev. 06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass 3 J-5 CXR-1486 6" X 7.11mm W-33 B-C
Rev. 06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass 5 J-5 CXR-1483 6" X 7.11mm W-45 B-C
Rev. 06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-159
1 Rev. 02 Pass 1 J-10 CXR-769 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-159 Pass 2 J-7 CXR-772 6" X 7.11mm W-45 B-C
Rev. 02
C-A
A-B
JNKI-046-CDU2A-MC-DG-159
3 Pass 2 J-9 CXR-774 6" X 7.11mm W-45 B-C
Rev. 02
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-159 Pass 5 J-6 CXR-832 6" X 7.11mm W-45 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev. 03 Pass 3 J-305 CXR-1444 5" X 6.55mm W-33 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 8 J-11 CXR-1490 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 8 J-12 CXR-1491 6" X 7.11mm W-45 B-C
Rev. 06
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 7 J-11 CXR-1480 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 7 J-12 CXR-1481 6" X 7.11mm W-45 B-C
Rev. 06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass 8 J-5 CXR-1499 6" X 7.11mm W-12 B-C
Rev. 06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass 8 J-6 CXR-1500 6" X 7.11mm W-12 B-C
Rev. 06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 6 J-11 CXR-1501 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 6 J-12 CXR-1502 6" X 7.11mm W-12 B-C
Rev. 06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass 7 J-5 CXR-1488 6" X 7.11mm W-45 B-C
Rev. 06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass 7 J-6 CXR-1489 6" X 7.11mm W-45 B-C
Rev. 06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 5 J-11 CXR-1478 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 5 J-12 CXR-1479 6" X 7.11mm W-45 B-C
Rev. 06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass 6 J-5 CXR-1530 6" X 7.11mm W-45 B-C
Rev. 06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass 6 J-6 CXR-1531 6" X 7.11mm W-45 B-C
Rev. 06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 4 J-6 CXR-1529 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 4 J-11 CXR-1503 6" X 7.11mm W-12 B-C
Rev. 06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass 4 J-12 CXR-1504 6" X 7.11mm W-12 B-C
Rev. 06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass 5 J-6 CXR-1482 6" X 7.11mm W-45 B-C
Rev. 06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 2 J-5 CXR-1526 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 2 J-6 CXR-1527 6" X 7.11mm W-12 B-C
Rev. 06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass 3 J-5 CXR-1486 6" X 7.11mm W-33 B-C
Rev. 06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass 4 J-5 CXR-1528 6" X 7.11mm W-12 B-C
Rev. 06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev. 02 Pass 4 J-411 CXR-1548 5" X 6.55mm W-60 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 Pass 4 J-412 CXR-1515 5" X 6.55mm W-60 B-C
Rev. 02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 Pass 4 J-419 CXR-1544 5" X 6.55mm W-60 B-C
Rev. 02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 Pass 4 J-420 CXR-1545 5" X 6.55mm W-60 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev. 02 Pass 3 J-320 CXR-1543 5" X 6.55mm W-60 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 Pass 3 J-324 CXR-1515 5" X 6.55mm W-33 B-C
Rev. 02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 Pass 4 J-405 CXR-1513 5" X 6.55mm W-82 B-C
Rev. 02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 Pass 4 J-406 CXR-1514 5" X 6.55mm W-82 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev. 02 Pass 3 J-305 CXR-1444 5" X 6.55mm W-33 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 Pass 3 J-311 CXR-1540 5" X 6.55mm W-86 B-C
Rev. 02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 Pass 3 J-312 CXR-1541 5" X 6.55mm W-86 B-C
Rev. 02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 Pass 3 J-319 CXR-1542 5" X 6.55mm W-60 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev. 02 Pass 2 J-219 CXR-1546 5" X 6.55mm W-37 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 Pass 2 J-220 CXR-1547 5" X 6.55mm W-37 B-C
Rev. 02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 Pass 2 J-225 CXR-1466 5" X 6.55mm W-33 B-C
Rev. 02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 Pass 2 J-226 CXR-1467 5" X 6.55mm W-33 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev. 02 Pass 1 J-105 CXR-1492 5" X 6.55mm W-33 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 Pass 1 J-106 CXR-1493 5" X 6.55mm W-33 B-C
Rev. 02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 Pass 2 J-105 CXR-1511 5" X 6.55mm W-82 B-C
Rev. 02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 Pass 2 J-206 CXR-1512 5" X 6.55mm W-82 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
1 Rev 03 Pass No. - 02 J-50 AXR-108 6.55 mm W-75 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 Pass No. - 02 J-51 AXR-109 5" Ø X W-75 B-C
Rev 03 6.55 mm
C-A
A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
3 Pass No. - 02 J-66 AXR-125 W-86 B-C
Rev 03 6.55 mm
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 Pass No. - 02 J-67 AXR-126 5" Ø X W-86 B-C
Rev 03 6.55 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
1 Rev 03 Pass No. - 02 J-26 AXR-84 6.55 mm W-75 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 Pass No. - 02 J-27 AXR-85 5" Ø X W-75 B-C
Rev 03 6.55 mm
C-A
A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
3 Pass No. - 02 J-42 AXR-100 W-85 B-C
Rev 03 6.55 mm
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 Pass No. - 02 J-43 AXR-101 5" Ø X W-85 B-C
Rev 03 6.55 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
1 Rev 03 Pass No. - 03 J-66 AXR-198 6.55 mm W-86 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 Pass No. - 03 J-67 AXR-199 5" Ø X W-86 B-C
Rev 03 6.55 mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
1 Rev 03 Pass No. - 01 J-18 AXR-19 6.55 mm W-85 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 Pass No. - 01 J-19 AXR-20 5" Ø X W-85 B-C
Rev 03 6.55 mm
C-A
A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
3 Pass No. - 01 J-50 AXR-44 W-86 B-C
Rev 03 6.55 mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 06 J-35 XR-420 7.11 mm W-47 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-38 XR-423 6" Ø X W-47 B-C
Rev 03 7.11 mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 06 J-19 XR-403 7.11 mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-22 XR-406 6" Ø X W-10 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
3 Pass No. - 06 J-27 XR-412 W-10 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-30 XR-415 6" Ø X W-10 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 06 J-3 XR-387 7.11 mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-6 XR-390 6" Ø X W-10 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
3 Pass No. - 06 J-11 XR-395 W-10 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-14 XR-398 6" Ø X W-10 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 05 J-61 XR-366 7.11 mm W-11 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 05 J-45 XR-350 7.11 mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 05 J-50 XR-355 6" Ø X W-11 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
3 Pass No. - 05 J-53 XR-358 W-11 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-157 Pass No. - 05 J-58 XR-363 6" Ø X W-11 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 05 J-29 XR-334 7.11 mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 05 J-34 XR-339 6" Ø X W-11 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
3 Pass No. - 05 J-37 XR-342 W-11 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-157 Pass No. - 05 J-42 XR-347 6" Ø X W-11 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 07 J-732 CXR-1461 7.11 mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 07 J-832 CXR-1462 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 03 J-332 CXR-1457 7.11 mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 04 J-432 CXR-1458 6" Ø X W-45 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
3 Pass No. - 05 J-532 CXR-1459 W-33 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-158 Pass No. - 06 J-632 CXR-1460 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 01 J-132 CXR-1455 7.11 mm W-45 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 05 J-525 CXR-1451 7.11 mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 05 J-526 CXR-1452 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
3 Pass No. - 07 J-725 CXR-1453 W-33 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-158 Pass No. - 07 J-726 CXR-1454 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 01 J-125 CXR-1447 7.11 mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 01 J-126 CXR-1448 6" Ø X W-45 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
3 Pass No. - 03 J-325 CXR-1449 W-45 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-158 Pass No. - 08 J-326 CXR-1450 6" Ø X W-45 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 04 J-425 CXR-1443 7.11 mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 04 J-426 CXR-1444 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
3 Pass No. - 08 J-825 CXR-1445 W-33 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-158 Pass No. - 08 J-826 CXR-1446 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 06 J-626 CXR-1422 7.11 mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 06 J-625 CXR-1423 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
3 Pass No. - 02 J-226 CXR-1424 W-45 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-158 Pass No. - 02 J-225 CXR-1425 6" Ø X W-45 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 2 to 4
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 07 J-26 XR-484 7.11 mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 07 J-52 XR-510 6" Ø X W-60 B-C
Rev 03 7.11 mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 2 to 4
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 07 J-10 XR-468 7.11 mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 07 J-13 XR-471 6" Ø X W-11 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
3 Pass No. - 07 J-18 XR-476 W-11 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-157 Pass No. - 07 J-21 XR-479 6" Ø X W-11 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 2 to 4
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 06 J-43 XR-428 7.11 mm W-47 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-46 XR-431 6" Ø X W-47 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
3 Pass No. - 06 J-51 XR-436 W-47 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-54 XR-439 6" Ø X W-47 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 2 to 4
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157 5" Ø X
1 Rev 02 Pass No. - 01 J-107 CXR-1463 6.55 mm W-33 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 Pass No. - 02 J-204 CXR-1464 5" Ø X W-33 B-C
Rev 02 6.55 mm
C-A
A-B
JNKI-046-ATM2A-MC-DG-157 5" Ø X
3 Pass No. - 03 J-307 CXR-1465 W-33 B-C
Rev 02 6.55 mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 02 J-58 XR-109A 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-61 XR-112 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 02 J-68 XR-119A W-10 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-71 XR-122A 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 02 J-42 XR-97 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-45 XR-100A 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 02 J-50 XR-103 W-10 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-53 XR-106 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 02 J-26 XR-84A 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-29 XR-87 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 02 J-34 XR-91 W-10 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-37 XR-94 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 02 J-26 XR-84A 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-29 XR-87 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 02 J-34 XR-91 W-10 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-37 XR-94 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 02 J-10 XR-68 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-13 XR-71 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 01 J-18 XR-76 W-10 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-21 XR-79 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 02 J-10 XR-68 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-13 XR-71 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 01 J-18 XR-76 W-10 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-21 XR-79 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 01 J-46 XR-33 7.11mm W-47 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 01 J-51 XR-36 6" Ø x W-47 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 01 J-54 XR-39A W-47 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-05 XR-63 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø x
1 Rev 03 Pass No. - 07 J-722 XR-1409 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 07 J-723 XR-1410 6" Ø x W-33 B-C
Rev 03 7.11mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 3" Ø x
1 Rev 03 Pass No. - 02 J-F-01A XR-059 7.62mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 01 J-19 XR-14 6" Ø x W-47 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 01 J-27 XR-20 W-47 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 01 J-30 XR-12 6" Ø x W-47 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø x
1 Rev 03 Pass No. - 01 J-65 R AXR-143 6.55mm W-11 -
-
-
2 JNKI-046-ATM2B-MC-DG-156 Pass No. - 04 J-44 R AXR-246 5" Ø x W-47 -
Rev 03 6.55mm
C-A
-
JNKI-046-ATM2B-MC-DG-156 5" Ø x
3 Pass No. - 04 J-28 R AXR-1A63 W-47 -
Rev 03 6.55mm
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 Pass No. - 01 J-25 AXR-1A98 5" Ø x W-42 B-C
Rev 03 6.55mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/WQT


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.01.2022
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 3 Min
Source Strength : 11 CU Developing Temp : 5 Min At 20 Deg. C
Film : Kodak MS125 Sensitivity 6th Wire
SFD : 5.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

RUC
JNKI/MUNDRA/WPS-6
1 ARUN KUMAR WQT-95 - - 6" x 7.11mm - NSD
NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM1A-CONV97


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.01.2022
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 3 Min
Source Strength : 11 CU Developing Temp : 5 Min At 20 Deg. C
Film : Kodak MS125 Sensitivity 6th Wire
SFD : 5.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-ATM1A-MC-DG-157 5" X
1 Rev.05 3 J-319 CXR-336 6.55MM W-33 B-C NSD
C-A RUC
A-B NSD

2 JNKI-046-ATM1A-MC-DG-157 3 J-320 CXR-337 5" X W-33 B-C NSD


Rev.05 6.55MM
C-A NSD

A-B NSD
JNKI-046-ATM1A-MC-DG-157 5" X
3 2 J-219 CXR-334 W-33 B-C RUC
Rev.05 6.55MM
C-A NSD

A-B NSD

4 JNKI-046-ATM1A-MC-DG-157 2 J-220 CXR-335 5" X W-33 B-C NSD


Rev.05 6.55MM
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM1A-CONV89


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 03.01.2022
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 3 Min
Source Strength : 11 CU Developing Temp : 5 Min At 20 Deg. C
Film : Kodak MS125 Sensitivity 2%
SFD : 5.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-ATM1A-MC-DG-157 5" X
1 Rev.05 4 J-425 CXR-316 6.55MM W-55 B-C EP
C-A NSD
A-B NSD

2 JNKI-046-ATM1A-MC-DG-157 4 J-426 CXR-317 5" X W-55 B-C NSD


Rev.05 6.55MM
C-A NSD D

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM1A-CONV88


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 03.01.2022
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 3 Min
Source Strength : 11 CU Developing Temp : 5 Min At 20 Deg. C
Film : Kodak MS125 Sensitivity 2%
SFD : 5.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-ATM1A-MC-DG-157 5" X
1 Rev.05 2 J-225 CXR-312 6.55MM W-55 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-ATM1A-MC-DG-157 2 J-226 CXR-313 5" X W-55 B-C NSD


Rev.05 6.55MM
C-A NSD

A-B NSD
JNKI-046-ATM1A-MC-DG-157 5" X
3 3 J-325 CXR-314 W-55 B-C NSD
Rev.05 6.55MM
C-A NSD

A-B NSD

4 JNKI-046-ATM1A-MC-DG-157 3 J-325 CXR-315 5" X W-55 B-C NSD


Rev.05 6.55MM
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM1A-CONV87


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 03.01.2022
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 3 Min
Source Strength : 11 CU Developing Temp : 5 Min At 20 Deg. C
Film : Kodak MS125 Sensitivity 2%
SFD : 5.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-ATM1A-MC-DG-157
1 Rev.05 3 J-324 CXR-300 5" X 6.55mm W-58 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-ATM1A-MC-DG-157 3 J-327 CXR-301 5" X 6.55mm W-55 B-C NSD


Rev.05
C-A NSD

A-B NSD
JNKI-046-ATM1A-MC-DG-157
3 4 J-424 CXR-302 5" X 6.55mm W-55 B-C NSD
Rev.05
C-A NSD

A-B NSD

4 JNKI-046-ATM1A-MC-DG-157 4 J-427 CXR-303 5" X 6.55mm W-55 B-C NSD


Rev.05
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM1A-CONV86


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 03.01.2022
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 3 Min
Source Strength : 11 CU Developing Temp : 5 Min At 20 Deg. C
Film : Kodak MS125 Sensitivity 2%
SFD : 5.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-ATM1A-MC-DG-157
1 Rev.05 1 J-124 CXR-296 5" x 6.55mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-ATM1A-MC-DG-157 1 J-127 CXR-297 5" x 6.55mm W-33 B-C NSD


Rev.05
C-A NSD

A-B NSD
JNKI-046-ATM1A-MC-DG-157
3 2 J-224 CXR-298 5" x 6.55mm W-33 B-C NSD
Rev.05
C-A NSD

A-B NSD

4 JNKI-046-ATM1A-MC-DG-157 2 J-227 CXR-299 5" x 6.55mm W-33 B-C NSD


Rev.05
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/__________________


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : _______/__________/___20_________
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : _________________________
Source Strength : _____ CU Developing Temp : _________________________
Film : _______________________________ Sensitivity 2%
SFD : ______________________ Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity;
SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot; Dep: Depression

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV74


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 29.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD Acc


JNKI-046-CDU1B-MC-DG-158
1 Rev.04 6 J-608 CXR-253 6" X 7.11mm W-33 B-C NSD Acc
C-A NSD Acc
A-B NSD Acc
2 JNKI-046-CDU1B-MC-DG-158 6 J-609 CXR-254 6" X 7.11mm W-33 B-C NSD Acc
Rev.04
C-A NSD Acc

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV73


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 29.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD Acc


JNKI-046-CDU1B-MC-DG-158
1 Rev.04 4 J-408 CXR-249 6" X 7.11mm W-33 B-C NSD Acc
C-A NSD Acc
A-B NSD Acc
2 JNKI-046-CDU1B-MC-DG-158 4 J-409 CXR-250 6" X 7.11mm W-33 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
JNKI-046-CDU1B-MC-DG-158
3 5 J-508 CXR-251 6" X 7.11mm W-33 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
4 JNKI-046-CDU1B-MC-DG-158 5 J-509 CXR-252 6" X 7.11mm W-33 B-C NSD Acc
Rev.04
C-A NSD Acc
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV72


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 29.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD Acc


JNKI-046-CDU1B-MC-DG-158
1 Rev.04 6 J-628 CXR-243 6" X 7.11mm W-55 B-C NSD Acc
C-A NSD Acc
A-B NSD Acc
2 JNKI-046-CDU1B-MC-DG-158 6 J-629 CXR-244 6" X 7.11mm W-55 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
JNKI-046-CDU1B-MC-DG-158
3 8 J-828 CXR-245 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
4 JNKI-046-CDU1B-MC-DG-158 8 J-829 CXR-246 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV71


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 29.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD Acc


JNKI-046-CDU1B-MC-DG-158
1 Rev.04 3 J-328 CXR-239 6" X 7.11mm W-45 B-C NSD Acc
C-A NSD Acc
A-B NSD Acc
2 JNKI-046-CDU1B-MC-DG-158 3 J-329 CXR-240 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
JNKI-046-CDU1B-MC-DG-158
3 5 J-528 CXR-241 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
4 JNKI-046-CDU1B-MC-DG-158 5 J-529 CXR-242 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV70


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 29.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD Acc


JNKI-046-CDU1B-MC-DG-158
1 Rev.04 1 J-128 CXR-235 6" X 7.11mm W-55 B-C NSD Acc
C-A NSD Acc
A-B NSD Acc
2 JNKI-046-CDU1B-MC-DG-158 1 J-129 CXR-236 6" X 7.11mm W-55 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
JNKI-046-CDU1B-MC-DG-158
3 2 J-228 CXR-237 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
4 JNKI-046-CDU1B-MC-DG-158 2 J-229 CXR-238 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV69


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 7 J-716 CXR-234 6" X 7.11mm W-55 B-C NSD
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV68


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 3 J-315 CXR-230 6" X 7.11mm W-55 B-C NSD
C-A NSD
A-B EP/LF

2 JNKI-046-CDU1B-MC-DG-158 Rev 4 J-414 CXR-231 6" X 7.11mm W-33 B-C NSD


04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
3 4 J-415 CXR-232 6" X 7.11mm W-33 B-C NSD
04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 Rev 5 J-513 CXR-233 6" X 7.11mm W-12 B-C NSD


04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV67


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 1 J-109 CXR-226 6" X 7.11mm W-55 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 Rev 2 J-208 CXR-227 6" X 7.11mm W-55 B-C NSD


04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
3 2 J-209 CXR-228 6" X 7.11mm W-55 B-C NSD
04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 Rev 3 J-314 CXR-229 6" X 7.11mm W-55 B-C NSD


04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV66


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 8 J-823 CXR-222 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 Rev 1 J-114 CXR-223 6" X 7.11mm W-33 B-C NSD


04
B-C NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
3 1 J-115 CXR-224 6" X 7.11mm W-33 B-C NSD
04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 Rev 1 J-108 CXR-225 6" X 7.11mm W-55 B-C NSD


04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV65


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 4 J-423 CXR-218 6" X 7.11mm W-55 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 Rev 7 J-722 CXR-219 6" X 7.11mm W-33 B-C NSD


04
B-C NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
3 7 J-723 CXR-220 6" X 7.11mm W-33 B-C NSD
04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 Rev 8 J-822 CXR-221 6" X 7.11mm W-33 B-C NSD


04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV64


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 2 J-215 CXR-214 6" X 7.11mm W-55 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 Rev 3 J-322 CXR-215 6" X 7.11mm W-55 B-C NSD


04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
3 3 J-323 CXR-216 6" X 7.11mm W-55 B-C NSD
04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 Rev 4 J-422 CXR-217 6" X 7.11mm W-55 B-C NSD


04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV63


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 8 J-816 CXR-210 6" X 7.11mm W-55 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Rev 1 J-122 CXR-211 6" X 7.11mm W-33 B-C
04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158 Rev
3 1 J-123 CXR-212 6" X 7.11mm W-33 B-C
04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Rev 2 J-214 CXR-213 6" X 7.11mm W-55 B-C
04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV62


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD ACC


JNKI-046-CDU1B-MC-DG-158 Rev
1 04 7 J-707 CXR-205 6" X 7.11mm W-33 B-C NSD ACC
C-A NSD ACC
A-B LF REP/REJ

2 JNKI-046-CDU1B-MC-DG-158 Rev 7 J-710 CXR-206 6" X 7.11mm W-33 B-C NSD ACC
04
C-A NSD ACC

A-B NSD ACC


JNKI-046-CDU1B-MC-DG-158 Rev
3 7 J-713 CXR-207 6" X 7.11mm W-12 B-C NSD ACC
04
C-A NSD ACC

A-B NSD ACC

4 JNKI-046-CDU1B-MC-DG-158 Rev 8 J-807 CXR-209 6" X 7.11mm W-12 B-C NSD ACC
04
C-A NSD ACC

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV61


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD ACC


JNKI-046-CDU1B-MC-DG-158 Rev
1 04 1 J-104 CXR-199 6" X 7.11mm W-55 B-C NSD ACC
C-A NSD ACC
A-B NSD ACC

2 JNKI-046-CDU1B-MC-DG-158 Rev 6 J-607 CXR-202 6" X 7.11mm W-33 B-C NSD ACC
04
C-A NSD ACC

A-B NSD ACC


JNKI-046-CDU1B-MC-DG-158 Rev
3 6 J-610 CXR-203 6" X 7.11mm W-33 B-C NSD ACC
04
C-A NSD ACC

A-B NSD ACC

4 JNKI-046-CDU1B-MC-DG-158 Rev 6 J-613 CXR-204 6" X 7.11mm W-12 B-C NSD ACC
04
C-A NSD ACC

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV60


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 6 J-622 CXR-197 6" X 7.11mm W-55 B-C NSD
C-A NSD
A-B FM

2 JNKI-046-CDU1B-MC-DG-158 6 J-623 CXR-198 6" X 7.11mm W-55 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV59


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 2 J-222 CXR-193 6" X 7.11mm W-55 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 2 J-223 CXR-194 6" X 7.11mm W-55 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 5 J-522 CXR-195 6" X 7.11mm W-55 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 5 J-523 CXR-196 6" X 7.11mm W-55 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV58


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 8 J-830 CXR-182 6" X 7.11mm W-51 B-C NSD
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV57


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 4 J-416 CXR-182 6" X 7.11mm W-45 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 5 J-530 CXR-183 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 6 J-630 CXR-184 6" X 7.11mm W-52 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 8 J-827 CXR-185 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV56


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 1 J-130 CXR-178 6" X 7.11mm W-52 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 2 J-230 CXR-179 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 3 J-330 CXR-180 6" X 7.11mm W-12 B-C Por
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 4 J-427 CXR-181 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV56


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-178
1 Rev04 1 J-130 CXR-178 6" X 7.11mm W-52 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-178 2 J-230 CXR-179 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-178
3 3 J-330 CXR-180 6" X 7.11mm W-12 B-C Por
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-178 4 J-427 CXR-181 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV55


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev06 7 J-22 CXR-191 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 7 J-23 CXR-192 6" X 7.11mm W-45 B-C
Rev06
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV54


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev06 1 J-28 CXR-187 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 1 J-29 CXR-188 6" X 7.11mm W-33 B-C
Rev06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 6 J-14 CXR-189 6" X 7.11mm W-33 B-C
Rev06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 6 J-15 CXR-190 6" X 7.11mm W-33 B-C
Rev06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV53


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 22.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 3 J-313 CXR-173 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 4 J-413 CXR-174 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 5 J-507 CXR-175 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV52


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 22.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev06 6 J-29 CXR-166 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 9 J-28 CXR-167 6" X 7.11mm W-33 B-C NSD


Rev06
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 8 J-14 CXR-169 6" X 7.11mm W-33 B-C NSD
Rev06
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 8 J-15 CXR-170 6" X 7.11mm W-33 B-C NSD


Rev06
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV51


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 22.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 3 J-307 CXR-171 6" X 7.11mm W-52 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 3 J-310 CXR-172 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 5 J-510 CXR-176 6" X 7.11mm W-12 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 5 J-516 CXR-177 6" X 7.11mm W-45 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV50


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 22.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev06 3 J-28 CXR-163 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 3 J-29 CXR-164 6" X 7.11mm W-33 B-C NSD


Rev06
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 6 J-28 CXR-165 6" X 7.11mm W-33 B-C NSD
Rev06
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 8 J-29 CXR-168 6" X 7.11mm W-33 B-C NSD


Rev06
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV49


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 5 J-14 CXR-154 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 5 J-15 CXR-155 6" X 7.11mm W-33 B-C NSD


Rev04
C-A PM

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 7 J-14 CXR-156 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 7 J-15 CXR-157 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV48


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 3 J-14 CXR-150 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 3 J-15 CXR-151 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B GRS
JNKI-046-CDU1A-MC-DG-158
3 4 J-14 CXR-152 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 4 J-15 CXR-153 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV47


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 1 J-14 CXR-146 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 1 J-15 CXR-147 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 2 J-14 CXR-148 6" X 7.11mm W-33 B-C RT
Rev04
C-A RT

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 2 J-15 CXR-149 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV46


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev02 8 J-821 CXR-162 6" X 7.11mm W-33 B-C NSD
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV44


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev02 1 J-116 CXR-158 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 2 J-216 CXR-159 6" X 7.11mm W-33 B-C NSD


Rev02
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 3 J-316 CXR-160 6" X 7.11mm W-33 B-C NSD
Rev02
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 7 J-721 CXR-161 6" X 7.11mm W-33 B-C NSD


Rev02
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV44


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev02 8 J-824 CXR-143 6" X 7.11mm W-52 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 5 J-524 CXR-144 6" X 7.11mm W-52 B-C NSD


Rev02
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 5 J-527 CXR-145 6" X 7.11mm W-52 B-C NSD
Rev02
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV43


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev02 6 J-624 CXR-139 6" X 7.11mm W-52 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 6 J-627 CXR-140 6" X 7.11mm W-52 B-C NSD


Rev02
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 7 J-724 CXR-141 6" X 7.11mm W-52 B-C NSD
Rev02
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 7 J-727 CXR-142 6" X 7.11mm W-52 B-C NSD


Rev02
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV42


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 7 J-08 CXR-135 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 7 J-09 CXR-136 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 4 J-08 CXR-137 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 4 J-09 CXR-138 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV41


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 8 J-08 CXR-131 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 8 J-09 CXR-132 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 6 J-08 CXR-133 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 6 J-09 CXR-134 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV40


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 3 J-08 CXR-127 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 3 J-09 CXR-128 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 5 J-08 CXR-129 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 5 J-09 CXR-130 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV18


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 1 J-21 CXR-54 6" X 7.11mm W-33 B-C PM, RETAKE
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 1 J-16 CXR-53 6" X 7.11mm W-33 B-C NSD


Rev04
C-A FM

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV17


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 3 J-21 CXR-58 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 3 J-16 CXR-57 6" X 7.11mm W-33 B-C Retake


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 2 J-21 CXR-56 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B CHK SRF

4 JNKI-046-CDU1A-MC-DG-158 2 J-16 CXR-55 6" X 7.11mm W-33 B-C U/C


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV16


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 5 J-21 CXR-62 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 5 J-16 CXR-61 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 4 J-21 CXR-60 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 4 J-16 CXR-59 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV15


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 4 J-10 CXR-34 6" X 7.11mm W-33 -
-
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 7 J-16 CXR-65 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 6 J-21 CXR-64 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B U/C

4 JNKI-046-CDU1A-MC-DG-158 6 J-16 CXR-63 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV14


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 4 J-13 CXR-40 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 4 J-10 CXR-39 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV13


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B Reshoot
JNKI-046-CDU1A-MC-DG-158
1 Rev04 6 J-10 CXR-44 6" X 7.11mm W-33 B-C Repair
C-A Reshoot
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 6 J-07 CXR-43 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 5 J-10 CXR-42 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 5 J-07 CXR-41 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV12


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 7 J-10 CXR-48 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B Por

2 JNKI-046-CDU1A-MC-DG-158 7 J-07 CXR-47 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 5 J-13 CXR-46 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 6 J-13 CXR-45 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV11


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 8 J-13 CXR-52 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 8 J-10 CXR-51 6" X 7.11mm W-33 B-C FM,Por


Rev04
C-A NSD

A-B Retake
JNKI-046-CDU1A-MC-DG-158
3 8 J-07 CXR-50 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 7 J-13 CXR-49 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV10


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 2 J-10 CXR-31 6" X 7.11mm W-33 B-C FM
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 2 J-13 CXR-32 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 3 J-07 CXR-33 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV09


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 1 J-07 CXR-27 6" X 7.11mm W-33 B-C FM
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 1 J-10 CXR-08 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 1 J-13 CXR-29 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 2 J-07 CXR-30 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV08


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 3 J-18 CXR-20 6" X 7.11mm W-33 - -
- -
- -

2 JNKI-046-CDU1A-MC-DG-158 4 J-27 CXR-08 6" X 7.11mm W-45 - -


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 3 J-13 CXR-35 6" X 7.11mm W B-C NSD
Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV07


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 5 J-30 CXR-38 6" X 7.11mm W-12 B-C NSD
C-A RUC
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 2 J-30 XR-37 6" X 7.11mm W-45 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 4 J-07 CXR-36 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

-
4 JNKI-046-CDU1A-MC-DG-158 7 J-18 CXR-23 6" X 7.11mm W-33 B-C NSD
Rev04
-
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV06


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 1 J-18 CXR-25 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 4 J-18 CXR-26 6" X 7.11mm W-33 B-C NSD


R04

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV05


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 5 J-18 CXR-21 6" X 7.11mm W-33 B-C POR
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 6 J-18 CXR-22 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 7 J-18 CXR-23 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 8 J-18 CXR-24 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV04


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 4 J-30 CXR-13 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 7 J-24 CXR-14 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 7 J-27 CXR-15 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 7 J-30 CXR-16 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV03


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 8 J-24 CXR-17 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 8 J-27 CXR-18 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 2 J-18 CXR-19 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 3 J-18 CXR-20 6" X 7.11mm W-33 B-C NSD


R04
C-A FM

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut;
RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV02


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 04.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 2 J-27 CXR-04 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 2 J-24 CXR-03 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 1 J-27 CXR-02 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 1 J-24 CXR-01 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV02


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 04.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 6 J-27 CXR-12 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 6 J-24 CXR-11 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 5 J-27 CXR-10 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 5 J-24 CXR-09 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV01


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 04.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 4 J-27 CXR-08 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 4 J-24 CXR-07 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 3 J-27 CXR-06 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 3 J-24 CXR-05 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV01


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 04.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 4 J-27 CXR-08 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 4 J-24 CXR-07 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 3 J-27 CXR-06 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 3 J-24 CXR-05 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI.R.RT.WQT-V1


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 26.11.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 5 Mins
Source Strength : 3 CU Developing Temp : 5 Mins
Film : AGFA D7 Sensitivity 2%
SFD : 6." (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1B 11 Acceptance Criteria : ASME SEC IX

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD Acc


JNKI/WQT-07 (BR)
1 JNKI/MUNDRA/WPS-06/ GTAW/ - 6" x 7.11mm W-37 B-C NSD Acc
DHARMENDRA KUMAR YADAV
C-A NSD Acc

A-B NSD Acc


JNKI/WQT-08 (BR)
2 JNKI/MUNDRA/WPS-06/ GTAW/ - 6" x 7.11mm W-38 B-C NSD Acc
BRAJAIL SINGH
C-A NSD Acc

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-02


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 25.11.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

AB NSD
JNKI-046-CDU1B-MC-DG-157 6" Ø X
1 Rev2 01 J-34 XR-05 7.11mm W-30 BC NSD
CA NSD
AB POR

2 JNKI-046-CDU1B-MC-DG-157 01 J-39 XR-06 6" Ø X W-30 BC NSD


Rev2 7.11mm
CA NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-01


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.11.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

AB NSD
JNKI-046-CDU1B-MC-DG-157 6" Ø X
1 Rev2 01 J-42 XR-01 7.11mm W-30 BC LF
CA LF
AB NSD

2 JNKI-046-CDU1B-MC-DG-157 01 J-47 XR-02 6" Ø X W-30 BC NSD


Rev2 7.11mm
CA NSD

AB NSD
JNKI-046-CDU1B-MC-DG-157 6" Ø X
3 01 J-50 XR-03 W-30 BC NSD
Rev2 7.11mm
CA NSD

AB LF

4 JNKI-046-CDU1B-MC-DG-157 01 J-55 XR-04 6" Ø X W-30 BC LF


Rev2 7.11mm
CA LF

LEGENDS: ACC: ACCEPTED; NSD: No


Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark;
CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021