RADIOGRAPHIC EXAMINATION REPORT

USER : PT. PERTAMINA Radiation Source : Ir. 192 SFD 0D Report No. : /SGA/PRI/RT/23
Work Order : Curies 287 Ci Density : 2-4 Sheet No.
Cost Centre : Focal Spot : 3 x 3 mm Penetrameter : ASTM 1A Date of Insp' : 29 OKTOBER 2023
Job Location : SANGA SANGA Kvp :- Sensitivity : 2%
IPAS No. : mA :- Screen - Front : 0.125 mm
Drawing No. : S/N of Camera : D.11223 Screen - Back : 0.125 mm
Procedure No. : PO /AE.MIG-OPS/29.1 S/N Survey Meter 24386 Technique : DWSI
Acceptance Criteria : API 1104 Expire Date : 20 NOVEMBER 2023 Material : Carbon Steel
Material Film Size RESULT
Weld WELD INDICATION
Welder Film 4" x 10 4" x 15"
No. IDENTIFICATION No.or REMARKS
Stamp Dia Thick. Position 14" x 17" ACC REPAIR
Part No. Por CP WH HB IC BT ISI ESI TI IF IP EP UC CR

1 GAS LINE HELIOS J 20 W 4" S 40 0-5 1 ACC


REROUTE SANGA SANGA 5 - 10 1 ACC
10 - 0 1 ACC

INTERPRETER AUTHORIZED INSPECTOR


LEGEND Total Weld 4 Jts
- Por : Porosity - ESI : Elongated Slag Inclusion Total Accepted 4 Jts
- CP : Cluster Porosity - TI : Tungsten Inclusion Total Repair Jts
- WH : Worm Hole - IF : Incomplete Fusion Total Film 4" x 10" 12 Shts Kaco hartono Wayudi
- HB : Hollow Bead - IP : Incomplete Penetration 4" x 15" Shts REVIEWED CLIENT REPRESENTATIVE
- IC : Internal Concavity - EP : Excessive Penetration 14" x 17" Shts
- BT : Burn Through - UC : Undercut PERSONNELS
- ISI : Isolated Slag Inclusion - CR : Crack Rad. Insp. LVL. II (AR) Kaco hartono
Rad. Oprt. LVL. I (OR) Khaerul .z Hadi S Frans E Ginting
FOR/SMR-AE.MIG/009 Rev.00 Tgl. Berlaku : 01/08/2019 Hal . 1 dari 1
RADIOGRAPHIC EXAMINATION REPORT

USER : PT. PERTAMINA Radiation Source : Ir. 192 SFD 0D Report No. : /SGA/PRI/RT/23
Work Order : Curies 287 Ci Density : 2-4 Sheet No.
Cost Centre : Focal Spot : 3 x 3 mm Penetrameter : ASTM 1A Date of Insp' : 29 OKTOBER 2023
Job Location : SANGA SANGA Kvp :- Sensitivity : 2%
IPAS No. : mA :- Screen - Front : 0.125 mm
Drawing No. : S/N of Camera : D.11223 Screen - Back : 0.125 mm
Procedure No. : PO /AE.MIG-OPS/29.1 S/N Survey Meter 24386 Technique : DWSI
Acceptance Criteria : API 1104 Expire Date : 20 NOVEMBER 2023 Material : Carbon Steel
Material Film Size RESULT
Weld WELD INDICATION
Welder Film 4" x 10 4" x 15"
No. IDENTIFICATION No.or REMARKS
Stamp Dia Thick. Position 14" x 17" ACC REPAIR
Part No. Por CP WH HB IC BT ISI ESI TI IF IP EP UC CR

1 GAS LINE HELIOS J 14 W 4" S 40 0-5 1 ACC


REROUTE SANGA SANGA 5 - 10 1 ACC
10 - 0 1 ACC

2 J 16 W 4" S 40 0-5 1 ACC


5 - 10 1 ACC
10 - 0 1 ACC

3 J 18 W 4" S 40 0-5 1 ACC


5 - 10 1 ACC
10 - 0 1 ACC

4 J 19 W 4" S 40 0-5 1 ACC


5 - 10 1 ACC
10 - 0 1 V ACC
INTERPRETER AUTHORIZED INSPECTOR
LEGEND Total Weld 4 Jts
- Por : Porosity - ESI : Elongated Slag Inclusion Total Accepted 4 Jts
- CP : Cluster Porosity - TI : Tungsten Inclusion Total Repair Jts
- WH : Worm Hole - IF : Incomplete Fusion Total Film 4" x 10" 12 Shts Kaco hartono Wayudi
- HB : Hollow Bead - IP : Incomplete Penetration 4" x 15" Shts REVIEWED CLIENT REPRESENTATIVE
- IC : Internal Concavity - EP : Excessive Penetration 14" x 17" Shts
- BT : Burn Through - UC : Undercut PERSONNELS
- ISI : Isolated Slag Inclusion - CR : Crack Rad. Insp. LVL. II (AR) Kaco hartono
Rad. Oprt. LVL. I (OR) Khaerul .z Hadi S Frans E Ginting
FOR/SMR-AE.MIG/009 Rev.00 Tgl. Berlaku : 01/08/2019 Hal . 1 dari 1
RADIOGRAPHIC EXAMINATION REPORT

USER : PT. PERTAMINA Radiation Source : Ir. 192 SFD 0D Report No. : /SGA/PRI/RT/23
Work Order : Curies 287 Ci Density : 2-4 Sheet No.
Cost Centre : Focal Spot : 3 x 3 mm Penetrameter : ASTM 1A Date of Insp' : 29 OKTOBER 2023
Job Location : SANGA SANGA Kvp :- Sensitivity : 2%
IPAS No. : mA :- Screen - Front : 0.125 mm
Drawing No. : S/N of Camera : D.11223 Screen - Back : 0.125 mm
Procedure No. : PO /AE.MIG-OPS/29.1 S/N Survey Meter 24386 Technique : DWSI
Acceptance Criteria : API 1104 Expire Date : 20 NOVEMBER 2023 Material : Carbon Steel
Material Film Size RESULT
Weld WELD INDICATION
Welder Film 4" x 10 4" x 15"
No. IDENTIFICATION No.or REMARKS
Stamp Dia Thick. Position 14" x 17" ACC REPAIR
Part No. Por CP WH HB IC BT ISI ESI TI IF IP EP UC CR

1 GAS LINE HELIOS J 8A W 4" S 40 0-5 1 ACC


REROUTE SANGA SANGA 5 - 10 1 ACC
10 - 0 1 ACC

2 J 10A W 4" S 40 0-5 1 ACC


5 - 10 1 ACC
10 - 0 1 ACC

3 J 11 W 4" S 40 0-5 1 ACC


5 - 10 1 ACC
10 - 0 1 ACC

4 J 13 W 4" S 40 0-5 1 ACC


5 - 10 1 ACC
10 - 0 1 ACC
INTERPRETER AUTHORIZED INSPECTOR
LEGEND Total Weld 4 Jts
- Por : Porosity - ESI : Elongated Slag Inclusion Total Accepted 4 Jts
- CP : Cluster Porosity - TI : Tungsten Inclusion Total Repair Jts
- WH : Worm Hole - IF : Incomplete Fusion Total Film 4" x 10" 12 Shts Kaco hartono Wayudi
- HB : Hollow Bead - IP : Incomplete Penetration 4" x 15" Shts REVIEWED CLIENT REPRESENTATIVE
- IC : Internal Concavity - EP : Excessive Penetration 14" x 17" Shts
- BT : Burn Through - UC : Undercut PERSONNELS
- ISI : Isolated Slag Inclusion - CR : Crack Rad. Insp. LVL. II (AR) Kaco hartono
Rad. Oprt. LVL. I (OR) Khaerul .z Hadi S Frans E Ginting
FOR/SMR-AE.MIG/009 Rev.00 Tgl. Berlaku : 01/08/2019 Hal . 1 dari 1
RADIOGRAPHIC EXAMINATION REPORT

USER : PT. PERTAMINA Radiation Source : Ir. 192 SFD 0D Report No. : /SGA/PRI/RT/23
Work Order : Curies 287 Ci Density : 2-4 Sheet No.
Cost Centre : Focal Spot : 3 x 3 mm Penetrameter : ASTM 1A Date of Insp' : 29 OKTOBER 2023
Job Location : SANGA SANGA Kvp :- Sensitivity : 2%
IPAS No. : mA :- Screen - Front : 0.125 mm
Drawing No. : S/N of Camera : D.11223 Screen - Back : 0.125 mm
Procedure No. : PO /AE.MIG-OPS/29.1 S/N Survey Meter 24386 Technique : DWSI
Acceptance Criteria : API 1104 Expire Date : 20 NOVEMBER 2023 Material : Carbon Steel
Material Film Size RESULT
Weld WELD INDICATION
Welder Film 4" x 10 4" x 15"
No. IDENTIFICATION No.or REMARKS
Stamp Dia Thick. Position 14" x 17" ACC REPAIR
Part No. Por CP WH HB IC BT ISI ESI TI IF IP EP UC CR

1 GAS LINE HELIOS J1 W 4" S 40 0-5 1 ACC


REROUTE SANGA SANGA 5 - 10 1 ACC
10 - 0 1 ACC

2 J2 W 4" S 40 0-5 1 ACC


5 - 10 1 V ACC
10 - 0 1 ACC

3 J 4A W 4" S 40 0-5 1 ACC


5 - 10 1 ACC
10 - 0 1 ACC

4 J 6A W 4" S 40 0-5 1 ACC


5 - 10 1 ACC
10 - 0 1 ACC
INTERPRETER AUTHORIZED INSPECTOR
LEGEND Total Weld 4 Jts
- Por : Porosity - ESI : Elongated Slag Inclusion Total Accepted 4 Jts
- CP : Cluster Porosity - TI : Tungsten Inclusion Total Repair Jts
- WH : Worm Hole - IF : Incomplete Fusion Total Film 4" x 10" 12 Shts Kaco hartono Wayudi
- HB : Hollow Bead - IP : Incomplete Penetration 4" x 15" Shts REVIEWED CLIENT REPRESENTATIVE
- IC : Internal Concavity - EP : Excessive Penetration 14" x 17" Shts
- BT : Burn Through - UC : Undercut PERSONNELS
- ISI : Isolated Slag Inclusion - CR : Crack Rad. Insp. LVL. II (AR) Kaco hartono
Rad. Oprt. LVL. I (OR) Khaerul .z Hadi S Frans E Ginting
FOR/SMR-AE.MIG/009 Rev.00 Tgl. Berlaku : 01/08/2019 Hal . 1 dari 1