4 S3 PTL25 pH adjustment (pH-2), 80 °C, 2hr 110 614 - 22-09-2023 Assembled. Passed the cross-leak test at 400psi. Under activation
Not taken Mismatch in Active area, Unable to hold the back pressure, cross
5 S3 PTL26 Sintering (pH-1.5), 80 °C, 1hr 255 - for MTS 22-09-2023 leaked at 50psi, MEA is bulged due to this. Need to re-send on
testing coating the same recipe
Passed the cross-leak test at 400psi. observed low performance
running at 5A @2V , ECSA results is good. MPPs burnt due to less
6 S3 PTL27 Sintering (pH-2), 80 °C, 1hr 170 612 - 22-09-2023
contact. Reassembly with new MPPs ensuring sufficient contact in
assembly.