JNK INDIA PVT. LTD.

POSITIVE MATERIAL IDENTIFICATION REPORT


Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: ANCHOR Supply - AN1 H=98mm & D=8mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
1 BA-11201A STUD AN1 24.65 0.66 1.87 0.40 19.33 0.85 RAD TAKE OFF
2 BA-11201A STUD AN1 24.72 0.31 1.23 0.01 19.46 0.35 RAD TAKE OFF
3 BA-11201A STUD AN1 24.65 0.78 1.23 0.15 19.12 0.68 RAD TAKE OFF
4 BA-11201A STUD AN1 24.39 0.84 1.58 0.84 19.40 0.23 RAD TAKE OFF
5 BA-11201A STUD AN1 24.52 0.71 1.89 0.66 19.31 0.21 RAD TAKE OFF
6 BA-11201A STUD AN1 24.61 0.06 1.90 0.89 19.39 0.22 RAD TAKE OFF
7 BA-11201A STUD AN1 24.42 0.62 1.18 0.18 19.49 0.81 RAD TAKE OFF
8 BA-11201A STUD AN1 24.97 0.89 1.86 0.63 19.08 0.12 RAD TAKE OFF
9 BA-11201A STUD AN1 24.50 0.57 1.94 0.41 19.40 0.55 RAD TAKE OFF
10 BA-11201A STUD AN1 24.87 0.40 1.29 0.80 19.45 0.97 RAD TAKE OFF
11 BA-11201A STUD AN1 24.44 0.62 1.46 0.95 19.27 0.37 RAD TAKE OFF
12 BA-11201A STUD AN1 24.14 0.83 1.74 0.84 19.14 0.15 RAD TAKE OFF
13 BA-11201A STUD AN1 24.01 0.30 1.11 0.97 19.09 0.19 RAD TAKE OFF
14 BA-11201A STUD AN1 24.54 0.51 1.46 0.25 19.33 0.87 RAD TAKE OFF
15 BA-11201A STUD AN1 24.78 0.97 1.84 0.15 19.16 0.59 RAD TAKE OFF
16 BA-11201A STUD AN1 24.02 0.28 1.15 0.83 19.23 0.60 RAD TAKE OFF
17 BA-11201A STUD AN1 24.65 0.80 1.10 0.43 19.31 0.80 RAD TAKE OFF
18 BA-11201A STUD AN1 24.59 0.70 1.54 0.31 19.18 0.91 RAD TAKE OFF
19 BA-11201A STUD AN1 24.44 0.79 1.38 0.96 19.21 0.38 RAD TAKE OFF
20 BA-11201A STUD AN1 24.96 0.76 1.99 0.73 19.07 0.22 RAD TAKE OFF
21 BA-11201A STUD AN1 24.43 0.22 1.45 0.98 19.37 0.87 RAD TAKE OFF
22 BA-11201A STUD AN1 24.88 0.24 1.68 0.92 19.04 0.84 RAD TAKE OFF
23 BA-11201A STUD AN1 24.57 0.73 1.80 0.80 19.24 0.11 RAD TAKE OFF
24 BA-11201A STUD AN1 24.40 0.78 1.59 0.64 19.19 0.96 RAD TAKE OFF
25 BA-11201A STUD AN1 24.65 0.17 1.54 0.06 19.15 0.52 RAD TAKE OFF
26 BA-11201A STUD AN1 24.27 0.24 1.83 0.23 19.35 0.51 RAD TAKE OFF
27 BA-11201A STUD AN1 24.95 0.08 1.53 1.00 19.43 0.80 RAD TAKE OFF
28 BA-11201A STUD AN1 24.90 0.32 1.32 0.66 19.00 0.51 RAD TAKE OFF
29 BA-11201A STUD AN1 24.66 0.14 1.54 0.97 19.44 0.58 RAD TAKE OFF
30 BA-11201A STUD AN1 24.20 0.76 1.62 0.38 19.15 0.73 RAD TAKE OFF
31 BA-11201A STUD AN1 24.29 0.97 1.45 0.27 19.09 0.20 RAD TAKE OFF
32 BA-11201A STUD AN1 24.15 0.70 1.84 0.06 19.21 0.88 RAD TAKE OFF
33 BA-11201A STUD AN1 24.88 0.02 1.93 0.34 19.44 0.85 RAD TAKE OFF
34 BA-11201A STUD AN1 24.95 0.53 1.54 0.36 19.04 0.88 RAD TAKE OFF
35 BA-11201A STUD AN1 24.20 0.97 1.52 0.84 19.07 0.95 RAD TAKE OFF
36 BA-11201A STUD AN1 24.85 0.96 1.08 0.45 19.46 0.56 RAD TAKE OFF
37 BA-11201A STUD AN1 24.50 0.64 1.25 0.37 19.00 0.18 RAD TAKE OFF
38 BA-11201A STUD AN1 24.51 0.73 1.26 0.72 19.12 0.03 RAD TAKE OFF
39 BA-11201A STUD AN1 24.38 0.04 1.68 0.45 19.16 0.71 RAD TAKE OFF
40 BA-11201A STUD AN1 24.35 0.42 1.96 0.38 19.24 0.42 RAD TAKE OFF
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: ANCHOR Supply - AN1 H=98mm & D=8mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
41 BA-11201A STUD AN1 24.73 0.62 1.74 0.15 19.16 0.18 RAD TAKE OFF
42 BA-11201A STUD AN1 24.69 0.25 1.47 0.09 19.24 0.04 RAD TAKE OFF
43 BA-11201A STUD AN1 24.47 0.85 1.87 0.25 19.26 0.55 RAD TAKE OFF
44 BA-11201A STUD AN1 24.36 0.43 1.17 0.73 19.30 0.52 RAD TAKE OFF
45 BA-11201A STUD AN1 24.61 0.85 1.62 0.66 19.24 0.13 RAD TAKE OFF
46 BA-11201A STUD AN1 24.26 0.42 1.51 0.87 19.10 0.64 RAD TAKE OFF
47 BA-11201A STUD AN1 24.68 1.00 1.12 0.41 19.30 0.71 RAD TAKE OFF
48 BA-11201A STUD AN1 24.76 0.87 1.76 0.08 19.14 0.25 RAD TAKE OFF
49 BA-11201A STUD AN1 24.17 0.04 1.37 0.13 19.37 0.62 RAD TAKE OFF
50 BA-11201A STUD AN1 24.86 0.90 1.72 0.94 19.31 0.07 RAD TAKE OFF
51 BA-11201A STUD AN1 24.20 0.44 1.26 0.89 19.05 0.20 RAD TAKE OFF
52 BA-11201A STUD AN1 24.28 0.05 1.99 0.35 19.12 0.66 RAD TAKE OFF
53 BA-11201A STUD AN1 24.18 0.26 1.36 0.80 19.07 0.23 RAD TAKE OFF
54 BA-11201A STUD AN1 24.78 0.72 1.97 0.71 19.20 0.02 RAD TAKE OFF
55 BA-11201A STUD AN1 24.26 0.93 1.90 0.94 19.10 0.87 RAD TAKE OFF
56 BA-11201A STUD AN1 24.50 0.31 1.39 0.49 19.43 0.40 RAD TAKE OFF
57 BA-11201A STUD AN1 24.01 0.06 1.05 0.89 19.23 0.89 RAD TAKE OFF
58 BA-11201A STUD AN1 24.28 0.03 1.75 0.78 19.47 0.07 RAD TAKE OFF
59 BA-11201A STUD AN1 24.93 0.98 1.43 0.40 19.29 0.30 RAD TAKE OFF
60 BA-11201A STUD AN1 24.54 0.88 1.22 0.22 19.45 0.67 RAD TAKE OFF
61 BA-11201A STUD AN1 24.28 0.11 1.71 0.05 19.47 0.52 RAD TAKE OFF
62 BA-11201A STUD AN1 24.28 0.53 1.30 0.05 19.13 0.02 RAD TAKE OFF
63 BA-11201A STUD AN1 24.93 0.01 1.38 0.45 19.15 0.77 RAD TAKE OFF
64 BA-11201A STUD AN1 24.17 0.35 1.28 0.92 19.36 0.43 RAD TAKE OFF
65 BA-11201A STUD AN1 24.28 0.52 1.46 0.05 19.04 0.52 RAD TAKE OFF
66 BA-11201A STUD AN1 24.39 0.08 1.61 0.26 19.42 0.78 RAD TAKE OFF
67 BA-11201A STUD AN1 24.99 0.49 1.80 0.05 19.34 0.28 RAD TAKE OFF
68 BA-11201A STUD AN1 24.81 0.62 1.61 0.68 19.38 0.25 RAD TAKE OFF
69 BA-11201A STUD AN1 24.26 0.13 1.48 0.96 19.40 0.01 RAD TAKE OFF
70 BA-11201A STUD AN1 24.57 0.90 1.45 0.04 19.27 0.52 RAD TAKE OFF
71 BA-11201A STUD AN1 24.18 0.45 1.97 0.48 19.17 0.94 RAD TAKE OFF
72 BA-11201A STUD AN1 24.99 0.87 1.49 0.44 19.09 0.74 RAD TAKE OFF
73 BA-11201A STUD AN1 24.74 0.30 1.53 0.58 19.12 0.88 RAD TAKE OFF
74 BA-11201A STUD AN1 24.48 0.23 1.12 0.02 19.10 0.94 RAD TAKE OFF
75 BA-11201A STUD AN1 24.02 0.21 1.80 0.67 19.23 0.64 RAD TAKE OFF
76 BA-11201A STUD AN1 24.26 0.49 1.05 0.43 19.30 0.97 RAD TAKE OFF
77 BA-11201A STUD AN1 24.53 0.17 1.38 0.04 19.34 0.65 RAD TAKE OFF
78 BA-11201A STUD AN1 24.53 0.92 1.92 0.08 19.27 0.27 RAD TAKE OFF
79 BA-11201A STUD AN1 24.96 0.32 1.12 0.23 19.02 0.14 RAD TAKE OFF
80 BA-11201A STUD AN1 24.48 0.93 1.15 0.75 19.33 0.05 RAD TAKE OFF
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1 & AN16
Description of Item Tested: ANCHOR Supply - AN1 H=98mm & D=8mm / AN16 H=125/67mm D=6mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
81 BA-11201A STUD AN1 24.47 0.52 1.64 0.35 19.23 0.40 RAD TAKE OFF
82 BA-11201A STUD AN1 24.02 0.20 1.59 0.10 19.29 0.62 RAD TAKE OFF
83 BA-11201A STUD AN1 24.55 0.55 1.53 0.25 19.20 0.25 RAD TAKE OFF
84 BA-11201A STUD AN1 24.95 0.94 1.15 0.56 19.09 0.29 RAD TAKE OFF
85 BA-11201A STUD AN1 24.29 0.57 1.59 0.16 19.28 0.61 RAD TAKE OFF
86 BA-11201A STUD AN1 24.02 0.95 1.60 0.67 19.12 0.89 RAD TAKE OFF
87 BA-11201A STUD AN1 24.74 0.90 1.70 0.30 19.05 0.67 RAD TAKE OFF
88 BA-11201A STUD AN1 24.03 0.61 1.42 0.23 19.49 0.72 RAD TAKE OFF
89 BA-11201A STUD AN1 24.88 0.04 1.92 0.93 19.08 0.99 RAD TAKE OFF
90 BA-11201A STUD AN1 24.36 0.65 1.23 0.83 19.50 0.46 RAD TAKE OFF
91 BA-11201A STUD AN1 24.20 0.47 1.81 0.19 19.18 0.17 RAD TAKE OFF
92 BA-11201A STUD AN1 24.78 0.24 1.64 0.75 19.18 0.62 RAD TAKE OFF
93 BA-11201A STUD AN1 24.07 0.87 1.07 0.57 19.03 0.34 RAD TAKE OFF
94 BA-11201A STUD AN1 24.30 0.97 1.74 0.49 19.45 0.52 RAD TAKE OFF
95 BA-11201A STUD AN1 24.73 0.15 1.88 0.17 19.36 0.65 RAD TAKE OFF
96 BA-11201A STUD AN1 24.39 0.47 1.12 0.56 19.18 0.77 RAD TAKE OFF
97 BA-11201A STUD AN1 24.20 0.13 1.63 0.63 19.22 0.61 RAD TAKE OFF
98 BA-11201A STUD AN1 24.44 0.24 1.76 0.25 19.33 0.96 RAD TAKE OFF
99 BA-11201A STUD AN1 24.24 0.44 1.78 0.97 19.27 0.77 RAD TAKE OFF
100 BA-11201A STUD AN1 24.83 0.29 1.47 0.89 19.01 0.44 RAD TAKE OFF
101 BA-11201A STUD AN1 24.05 0.73 1.11 0.13 19.14 0.35 RAD TAKE OFF
102 BA-11201A STUD AN1 24.45 0.09 1.52 0.33 19.39 0.29 RAD TAKE OFF
103 BA-11201A STUD AN1 24.81 0.52 1.48 0.28 19.08 0.75 RAD TAKE OFF
104 BA-11201A STUD AN1 24.92 0.76 1.68 0.88 19.30 0.80 RAD TAKE OFF
105 BA-11201A STUD AN1 24.97 0.60 1.90 0.74 19.10 0.03 RAD TAKE OFF
106 BA-11201A STUD AN1 24.01 0.18 1.31 0.57 19.44 0.48 RAD TAKE OFF
107 BA-11201A STUD AN1 24.80 0.54 1.57 0.33 19.12 0.94 RAD TAKE OFF
108 BA-11201A STUD AN1 24.54 0.44 1.06 0.97 19.49 0.45 RAD TAKE OFF
109 BA-11201A STUD AN1 24.76 0.94 1.16 0.38 19.31 0.80 RAD TAKE OFF
110 BA-11201A STUD AN1 24.71 0.56 1.21 0.97 19.24 0.04 RAD TAKE OFF
111 BA-11201A STUD AN1 24.04 0.60 1.94 0.77 19.19 0.86 RAD TAKE OFF
112 BA-11201A STUD AN1 24.05 0.54 1.80 0.29 19.33 0.73 RAD TAKE OFF
113 BA-11201A STUD AN1 24.78 0.07 1.14 0.53 19.24 0.50 RAD TAKE OFF
114 BA-11201A STUD AN1 24.09 0.67 1.48 0.88 19.06 0.93 RAD TAKE OFF
115 BA-11201A V-Anchor AN16 24.74 0.56 1.30 0.99 19.29 0.48 RAD SIDE DOOR
116 BA-11201A V-Anchor AN16 24.74 0.56 1.30 0.99 19.29 0.48 RAD SIDE DOOR
117 BA-11201A V-Anchor AN16 24.74 0.56 1.30 0.99 19.29 0.48 RAD SIDE DOOR
118 BA-11201A V-Anchor AN16 24.74 0.56 1.30 0.99 19.29 0.48 RAD SIDE DOOR
119 BA-11201A V-Anchor AN16 24.74 0.56 1.30 0.99 19.29 0.48 RAD SIDE DOOR
120 BA-11201A V-Anchor AN16 24.74 0.56 1.30 0.99 19.29 0.48 RAD SIDE DOOR
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN17 & AN14 & AN1
Description of Item Tested: AN17 H=150/67mm & D=6mm / AN14 H=75mm D=6mm / AN1 H=50mm D=6mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
121 BA-11201A V-Anchor AN17 24.58 0.14 1.94 0.33 19.36 0.28 RAD SIDE DOOR
122 BA-11201A V-Anchor AN17 24.59 0.46 1.98 0.52 19.19 0.52 RAD SIDE DOOR
123 BA-11201A V-Anchor AN14 24.55 0.14 1.66 0.41 19.26 0.74 RAD WALL
124 BA-11201A V-Anchor AN14 24.82 0.05 1.90 0.59 19.49 0.76 RAD WALL
125 BA-11201A V-Anchor AN14 24.85 0.44 1.16 0.94 19.19 1.00 RAD WALL
126 BA-11201A V-Anchor AN14 24.84 0.35 1.72 0.20 19.30 0.98 RAD WALL
127 BA-11201A V-Anchor AN14 24.51 0.52 1.47 0.68 19.37 0.34 RAD WALL
128 BA-11201A V-Anchor AN14 24.75 0.14 1.85 0.94 19.04 0.99 RAD WALL
129 BA-11201A V-Anchor AN14 24.80 0.90 1.82 0.12 19.01 0.46 RAD WALL
130 BA-11201A V-Anchor AN14 24.02 0.87 1.55 0.31 19.35 0.61 RAD WALL
131 BA-11201A V-Anchor AN14 24.79 0.06 1.38 0.32 19.10 0.03 RAD WALL
132 BA-11201A V-Anchor AN14 24.81 0.97 1.33 0.23 19.00 0.49 RAD WALL
133 BA-11201A V-Anchor AN14 24.06 0.21 1.47 0.20 19.20 0.95 RAD WALL
134 BA-11201A V-Anchor + M8 Nut AN1 24.51 0.36 1.26 0.36 19.26 0.16 CONV BARE
135 BA-11201A V-Anchor + M8 Nut AN1 24.63 0.97 1.80 0.46 19.17 0.13 CONV BARE
136 BA-11201A V-Anchor + M8 Nut AN1 24.37 0.99 1.00 0.99 19.20 0.08 CONV BARE
137 BA-11201A V-Anchor + M8 Nut AN1 24.61 0.67 1.63 0.84 19.48 0.57 CONV BARE
138 BA-11201A V-Anchor + M8 Nut AN1 24.60 0.03 1.99 0.65 19.20 0.32 CONV BARE
139 BA-11201A V-Anchor + M8 Nut AN1 24.95 0.45 1.23 0.08 19.27 0.60 CONV BARE
140 BA-11201A V-Anchor + M8 Nut AN1 24.67 0.24 1.84 0.79 19.44 0.74 CONV BARE
141 BA-11201A V-Anchor + M8 Nut AN1 24.73 0.76 1.05 0.97 19.21 0.92 CONV BARE
142 BA-11201A V-Anchor + M8 Nut AN1 24.60 0.02 1.33 0.78 19.32 0.62 CONV BARE
143 BA-11201A V-Anchor + M8 Nut AN1 24.82 0.35 1.78 0.61 19.17 0.54 CONV BARE
144 BA-11201A V-Anchor + M8 Nut AN1 24.92 0.20 1.69 0.01 19.30 0.29 CONV BARE
145 BA-11201A V-Anchor + M8 Nut AN1 24.86 0.40 1.87 0.66 19.39 0.67 CONV BARE
146 BA-11201A V-Anchor + M8 Nut AN1 24.70 0.32 1.30 0.19 19.02 0.13 CONV BARE
147 BA-11201A V-Anchor + M8 Nut AN1 24.44 0.88 1.96 0.92 19.10 0.18 CONV BARE
148 BA-11201A V-Anchor + M8 Nut AN1 24.84 0.00 1.96 0.96 19.49 0.34 CONV BARE
149 BA-11201A V-Anchor + M8 Nut AN1 24.65 0.19 1.62 0.99 19.40 0.18 CONV BARE
150 BA-11201A V-Anchor + M8 Nut AN1 24.70 0.51 1.03 0.51 19.20 0.13 CONV BARE
151 BA-11201A V-Anchor + M8 Nut AN1 24.79 0.46 1.13 0.71 19.14 0.68 CONV BARE
152 BA-11201A V-Anchor + M8 Nut AN1 24.73 0.75 1.50 0.07 19.08 0.54 CONV BARE
153 BA-11201A V-Anchor + M8 Nut AN1 24.69 0.69 1.84 0.74 19.37 0.97 CONV BARE
154 BA-11201A V-Anchor + M8 Nut AN1 24.50 0.03 1.91 0.61 19.47 0.56 CONV BARE
155 BA-11201A V-Anchor + M8 Nut AN1 24.02 0.46 1.13 0.62 19.28 0.13 CONV BARE
156 BA-11201A V-Anchor + M8 Nut AN1 24.99 0.66 1.33 0.67 19.21 0.08 CONV BARE
157 BA-11201A V-Anchor + M8 Nut AN1 24.47 0.59 1.42 0.58 19.40 0.23 CONV BARE
158 BA-11201A V-Anchor + M8 Nut AN1 24.16 0.15 1.33 0.57 19.10 0.72 CONV BARE
159 BA-11201A V-Anchor + M8 Nut AN1 24.15 0.03 1.65 0.29 19.21 0.79 CONV BARE
160 BA-11201A V-Anchor + M8 Nut AN1 24.98 0.55 1.45 0.57 19.19 0.51 CONV BARE
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine Description: X-MET8000
Make
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: AN1 V-ANCHOR H=50mm D=6mm & Stud H=98mm D=8mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
161 BA-11201A V-Anchor + M8 Nut AN1 24.45 0.13 1.95 0.89 19.36 0.35 CONV BARE
162 BA-11201A V-Anchor + M8 Nut AN1 24.41 0.95 1.33 0.99 19.49 0.16 CONV BARE
163 BA-11201A V-Anchor + M8 Nut AN1 24.52 0.36 1.52 0.70 19.18 0.48 CONV BARE
164 BA-11201A V-Anchor + M8 Nut AN1 24.98 0.47 1.03 0.50 19.31 0.95 CONV BARE
165 BA-11201A V-Anchor + M8 Nut AN1 24.97 0.66 1.80 0.55 19.10 0.84 CONV BARE
166 BA-11201A V-Anchor + M8 Nut AN1 24.15 0.19 1.96 0.24 19.02 0.16 CONV BARE
167 BA-11201A V-Anchor + M8 Nut AN1 24.96 0.56 1.66 0.53 19.46 0.45 CONV BARE
168 BA-11201A V-Anchor + M8 Nut AN1 24.45 0.41 1.87 0.30 19.12 0.62 CONV BARE
169 BA-11201A V-Anchor + M8 Nut AN1 24.97 0.59 1.82 0.78 19.48 0.46 CONV BARE
170 BA-11201A V-Anchor + M8 Nut AN1 24.57 0.45 1.06 0.99 19.32 0.52 CONV BARE
171 BA-11201A V-Anchor + M8 Nut AN1 24.80 0.45 1.10 0.35 19.43 0.99 CONV BARE
172 BA-11201A V-Anchor + M8 Nut AN1 24.04 0.53 1.70 0.94 19.12 0.56 CONV BARE
173 BA-11201A V-Anchor + M8 Nut AN1 24.31 0.09 1.36 0.58 19.04 0.52 CONV BARE
174 BA-11201A V-Anchor + M8 Nut AN1 24.39 0.39 1.35 0.93 19.36 0.52 CONV BARE
175 BA-11201A V-Anchor + M8 Nut AN1 24.15 0.73 1.37 0.72 19.38 0.43 CONV BARE
176 BA-11201A V-Anchor + M8 Nut AN1 24.51 0.49 1.51 0.04 19.22 0.03 CONV BARE
177 BA-11201A V-Anchor + M8 Nut AN1 24.28 0.91 1.78 0.19 19.00 0.52 CONV BARE
178 BA-11201A V-Anchor + M8 Nut AN1 24.94 0.68 1.07 0.35 19.36 0.68 CONV BARE
179 BA-11201A V-Anchor + M8 Nut AN1 24.03 0.54 1.42 0.86 19.20 0.54 CONV BARE
180 BA-11201A V-Anchor + M8 Nut AN1 24.86 0.35 1.20 0.60 19.30 0.01 CONV BARE
181 BA-11201A V-Anchor + M8 Nut AN1 24.78 0.53 1.88 0.58 19.21 0.23 CONV BARE
182 BA-11201A V-Anchor + M8 Nut AN1 24.92 0.39 1.40 0.32 19.06 0.10 CONV BARE
183 BA-11201A V-Anchor + M8 Nut AN1 24.64 0.20 1.72 0.13 19.24 0.03 CONV BARE
184 BA-11201A V-Anchor + M8 Nut AN1 24.27 0.80 1.21 0.35 19.37 0.15 CONV BARE
185 BA-11201A V-Anchor + M8 Nut AN1 24.43 0.12 1.16 0.17 19.25 0.90 CONV BARE
186 BA-11201A V-Anchor + M8 Nut AN1 24.43 0.35 1.19 0.46 19.31 0.25 CONV BARE
187 BA-11201A V-Anchor + M8 Nut AN1 24.24 0.55 1.49 0.41 19.34 0.66 CONV BARE
188 BA-11201A V-Anchor + M8 Nut AN1 24.32 0.70 1.00 0.79 19.34 0.89 CONV BARE
189 BA-11201A V-Anchor + M8 Nut AN1 24.19 0.50 1.74 0.96 19.09 0.74 CONV BARE
190 BA-11201A V-Anchor + M8 Nut AN1 24.21 0.87 1.19 0.06 19.10 0.55 CONV BARE
191 BA-11201A V-Anchor + M8 Nut AN1 24.45 0.56 1.43 0.32 19.16 0.71 CONV BARE
192 BA-11201A STUD AN1 24.75 0.58 1.10 0.31 19.29 0.55 CONV BARE
193 BA-11201A STUD AN1 24.13 0.28 1.95 0.06 19.07 0.28 CONV BARE
194 BA-11201A STUD AN1 24.86 0.03 1.50 0.42 19.41 0.28 CONV BARE
195 BA-11201A STUD AN1 24.75 0.54 1.67 0.65 19.06 0.72 CONV BARE
196 BA-11201A STUD AN1 24.49 0.44 1.98 0.69 19.30 0.23 CONV BARE
197 BA-11201A STUD AN1 24.16 0.14 1.20 0.49 19.20 0.10 CONV BARE
198 BA-11201A STUD AN1 24.01 0.95 1.93 0.37 19.02 0.53 CONV BARE
199 BA-11201A STUD AN1 24.38 0.17 1.42 0.01 19.44 0.92 CONV BARE
200 BA-11201A STUD AN1 24.84 0.50 1.45 0.97 19.24 0.04 CONV BARE
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: AN1 Stud H=98mm D=8mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
161 BA-11201A STUD AN1 24.73 0.45 1.02 0.06 19.47 0.67 CONV BARE
162 BA-11201A STUD AN1 24.75 0.90 1.31 0.16 19.17 0.15 CONV BARE
163 BA-11201A STUD AN1 24.43 0.12 1.21 0.03 19.04 0.45 CONV BARE
164 BA-11201A STUD AN1 24.03 0.77 1.21 0.41 19.24 0.90 CONV BARE
165 BA-11201A STUD AN1 24.63 0.52 1.19 0.22 19.41 0.52 CONV BARE
166 BA-11201A STUD AN1 24.76 0.87 1.59 0.75 19.45 0.89 CONV BARE
167 BA-11201A STUD AN1 24.12 0.60 1.88 0.91 19.47 0.17 CONV BARE
168 BA-11201A STUD AN1 24.67 0.21 1.81 0.80 19.41 0.84 CONV BARE
169 BA-11201A STUD AN1 24.81 0.97 1.26 0.58 19.11 0.82 CONV BARE
170 BA-11201A STUD AN1 24.36 0.74 1.85 0.33 19.40 0.59 CONV BARE
171 BA-11201A STUD AN1 24.55 0.54 1.18 0.82 19.47 0.20 CONV BARE
172 BA-11201A STUD AN1 24.10 0.12 1.23 0.51 19.08 0.95 CONV BARE
173 BA-11201A STUD AN1 24.41 0.42 1.72 0.40 19.07 0.78 CONV BARE
174 BA-11201A STUD AN1 24.85 0.29 1.90 0.51 19.37 0.50 CONV BARE
175 BA-11201A STUD AN1 24.14 0.88 1.97 0.27 19.32 0.09 CONV BARE
176 BA-11201A STUD AN1 24.89 0.59 1.83 0.50 19.34 0.04 CONV BARE
177 BA-11201A STUD AN1 24.29 0.45 1.93 0.33 19.20 0.41 CONV BARE
178 BA-11201A STUD AN1 24.95 0.66 1.92 0.76 19.24 0.22 CONV BARE
179 BA-11201A STUD AN1 24.60 0.07 1.13 0.23 19.44 0.76 CONV BARE
180 BA-11201A STUD AN1 24.67 0.47 1.50 0.25 19.23 0.31 CONV BARE
181 BA-11201A STUD AN1 24.09 0.49 1.21 0.81 19.45 0.46 CONV BARE
182 BA-11201A STUD AN1 24.26 0.67 1.12 0.26 19.43 0.07 CONV BARE
183 BA-11201A STUD AN1 24.45 0.20 1.44 0.73 19.07 0.27 CONV BARE
184 BA-11201A STUD AN1 24.13 0.65 1.10 0.72 19.37 0.73 CONV BARE
185 BA-11201A STUD AN1 24.71 0.74 1.00 0.67 19.14 0.85 CONV BARE
186 BA-11201A STUD AN1 24.39 0.13 1.93 0.09 19.41 0.47 CONV BARE
187 BA-11201A STUD AN1 24.93 0.56 1.54 0.03 19.33 0.76 CONV BARE
188 BA-11201A STUD AN1 24.08 0.44 1.92 0.66 19.32 0.07 CONV BARE
189 BA-11201A STUD AN1 24.05 0.17 1.75 0.45 19.13 0.50 CONV BARE
190 BA-11201A STUD AN1 24.67 0.11 1.07 0.02 19.30 0.96 CONV BARE
191 BA-11201A STUD AN1 24.73 0.95 1.37 0.25 19.33 0.25 CONV BARE
192 BA-11201A STUD AN1 24.11 0.16 1.24 0.20 19.50 0.01 CONV BARE
193 BA-11201A STUD AN1 24.50 0.70 1.39 0.70 19.48 0.20 CONV BARE
194 BA-11201A STUD AN1 24.03 0.81 1.78 0.60 19.28 0.88 CONV BARE
195 BA-11201A STUD AN1 24.81 0.38 1.85 0.35 19.16 0.38 CONV BARE
196 BA-11201A STUD AN1 24.55 0.55 1.23 0.56 19.04 0.94 CONV BARE
197 BA-11201A STUD AN1 24.45 0.87 1.86 0.15 19.31 0.08 CONV BARE
198 BA-11201A STUD AN1 24.66 0.90 1.34 0.32 19.40 0.27 CONV BARE
199 BA-11201A STUD AN1 24.78 0.76 1.04 0.85 19.25 0.91 CONV BARE
200 BA-11201A STUD AN1 24.75 0.94 1.30 0.36 19.44 0.17 CONV BARE
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: AN1 Stud H=98mm D=8mm & V-Anchor With Nut H=50mm D=6mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
201 BA-11201A STUD AN1 24.74 0.59 1.02 0.21 19.40 0.57 CONV BARE
202 BA-11201A STUD AN1 24.07 0.13 1.37 0.43 19.50 0.31 CONV BARE
203 BA-11201A STUD AN1 24.39 0.95 1.40 0.36 19.11 0.75 CONV BARE
204 BA-11201A STUD AN1 24.46 0.27 1.18 0.01 19.28 0.70 CONV BARE
205 BA-11201A STUD AN1 24.34 0.59 1.35 0.02 19.21 0.84 CONV BARE
206 BA-11201A STUD AN1 24.34 0.75 1.36 0.47 19.28 0.35 CONV BARE
207 BA-11201A STUD AN1 24.91 0.54 1.99 0.72 19.04 0.38 CONV BARE
208 BA-11201A STUD AN1 24.09 0.85 1.47 0.60 19.34 0.52 CONV BARE
209 BA-11201A STUD AN1 24.77 0.65 1.98 0.69 19.07 0.96 CONV BARE
210 BA-11201A STUD AN1 24.37 0.12 1.22 0.49 19.08 0.38 CONV BARE
211 BA-11201A STUD AN1 24.57 0.04 1.61 0.37 19.20 0.50 CONV BARE
212 BA-11201A STUD AN1 24.02 0.32 1.17 0.43 19.17 0.97 CONV BARE
213 BA-11201A STUD AN1 24.42 0.79 1.38 0.29 19.50 0.95 CONV BARE
214 BA-11201A STUD AN1 24.41 0.04 1.25 0.91 19.13 0.83 CONV BARE
215 BA-11201A STUD AN1 24.08 0.12 1.79 0.78 19.20 0.39 CONV BARE
216 BA-11201A STUD AN1 24.82 0.24 1.89 0.26 19.18 0.89 CONV BARE
217 BA-11201A STUD AN1 24.04 0.40 1.06 0.63 19.46 0.37 CONV BARE
218 BA-11201A STUD AN1 24.17 0.22 1.41 0.47 19.05 0.65 CONV BARE
219 BA-11201A STUD AN1 24.42 0.80 1.91 0.62 19.23 0.09 CONV BARE
220 BA-11201A V-Anchor + Nut AN4 24.34 0.14 1.53 0.46 19.17 0.18 CONV FLOOR
221 BA-11201A V-Anchor + Nut AN4 24.15 0.21 1.66 0.66 19.16 0.97 CONV FLOOR
222 BA-11201A V-Anchor + Nut AN4 24.85 0.75 1.82 0.72 19.35 0.05 CONV FLOOR
223 BA-11201A V-Anchor + Nut AN4 24.33 0.54 1.78 0.53 19.12 0.42 CONV FLOOR
224 BA-11201A V-Anchor + Nut AN4 24.78 0.14 1.45 0.31 19.26 0.26 CONV FLOOR
225 BA-11201A V-Anchor + Nut AN4 24.36 1.00 1.80 0.44 19.16 0.89 CONV FLOOR
226 BA-11201A V-Anchor + Nut AN4 24.48 0.03 1.60 0.28 19.42 0.52 CONV FLOOR
227 BA-11201A V-Anchor + Nut AN4 24.44 0.24 1.53 0.28 19.36 0.99 CONV FLOOR
228 BA-11201A V-Anchor + Nut AN4 24.58 0.55 1.67 0.76 19.11 0.30 CONV FLOOR
229 BA-11201A V-Anchor + Nut AN4 24.57 0.86 1.30 0.03 19.41 0.73 CONV FLOOR
230 BA-11201A V-Anchor + Nut AN4 24.89 0.64 1.50 0.15 19.26 0.03 CONV FLOOR
231 BA-11201A V-Anchor + Nut AN4 24.07 0.05 1.21 0.93 19.42 0.41 CONV FLOOR
232 BA-11201A V-Anchor + Nut AN4 24.74 0.90 1.48 0.52 19.19 0.24 CONV FLOOR
233 BA-11201A V-Anchor + Nut AN4 24.88 0.21 1.81 0.92 19.25 0.91 CONV FLOOR
234 BA-11201A V-Anchor + Nut AN4 24.80 0.69 1.67 0.88 19.06 0.08 CONV FLOOR
235 BA-11201A V-Anchor + Nut AN4 24.81 0.94 1.51 0.12 19.17 0.42 CONV FLOOR
236 BA-11201A V-Anchor + Nut AN4 24.85 0.67 1.65 0.90 19.09 0.27 CONV FLOOR
237 BA-11201A V-Anchor + Nut AN4 24.07 0.88 1.78 0.13 19.18 0.62 CONV FLOOR
238 BA-11201A V-Anchor + Nut AN4 24.94 0.65 1.88 0.85 19.39 0.76 CONV FLOOR
239 BA-11201A V-Anchor + Nut AN4 24.80 0.18 1.46 0.72 19.48 0.05 CONV FLOOR
240 BA-11201A V-Anchor + Nut AN4 24.82 0.02 1.53 0.80 19.12 0.03 CONV FLOOR
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1 & AN4
Description of Item Tested: AN1 Stud H=98mm D=8mm / AN4 V-Anchor H=50mm D=6mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
201 BA-11201A STUD AN1 24.84 0.69 1.12 0.45 19.02 0.87 CONV BARE
202 BA-11201A STUD AN1 24.47 0.49 1.96 0.56 19.44 0.33 CONV BARE
203 BA-11201A STUD AN1 24.24 0.23 1.39 0.90 19.38 0.17 CONV BARE
204 BA-11201A STUD AN1 24.33 0.47 1.83 0.15 19.26 0.94 CONV BARE
205 BA-11201A STUD AN1 24.64 0.48 1.57 0.76 19.24 0.85 CONV BARE
206 BA-11201A STUD AN1 24.41 0.03 1.83 0.52 19.06 0.22 CONV BARE
207 BA-11201A STUD AN1 24.91 0.35 1.09 0.67 19.44 0.37 CONV BARE
208 BA-11201A STUD AN1 24.39 0.30 1.68 0.25 19.48 0.26 CONV BARE
209 BA-11201A STUD AN1 24.28 0.78 1.92 0.93 19.02 0.36 CONV BARE
210 BA-11201A STUD AN1 24.57 0.39 1.35 0.33 19.46 0.55 CONV BARE
211 BA-11201A STUD AN1 24.61 0.00 1.69 0.63 19.44 0.53 CONV BARE
212 BA-11201A STUD AN1 24.26 0.25 1.32 0.17 19.38 0.76 CONV BARE
213 BA-11201A STUD AN1 24.48 0.84 1.62 0.60 19.15 0.45 CONV BARE
214 BA-11201A STUD AN1 24.26 0.22 1.88 0.41 19.09 0.39 CONV BARE
215 BA-11201A STUD AN1 24.68 0.91 1.37 0.73 19.06 0.40 CONV BARE
216 BA-11201A STUD AN1 24.44 0.39 1.93 0.24 19.42 0.88 CONV BARE
217 BA-11201A STUD AN1 24.13 0.00 1.52 0.70 19.27 0.65 CONV BARE
218 BA-11201A STUD AN1 24.43 0.29 1.44 0.54 19.18 0.76 CONV BARE
219 BA-11201A STUD AN1 24.78 0.67 1.07 0.04 19.33 0.73 CONV BARE
220 BA-11201A V-Anchor + Nut AN4 24.90 0.67 1.06 0.45 19.34 0.76 CONV FLOOR
221 BA-11201A V-Anchor + Nut AN4 24.79 0.14 1.78 0.86 19.33 0.73 CONV FLOOR
222 BA-11201A V-Anchor + Nut AN4 24.92 0.99 1.27 0.35 19.03 0.33 CONV FLOOR
223 BA-11201A V-Anchor + Nut AN4 24.15 0.43 1.27 0.96 19.27 0.50 CONV FLOOR
224 BA-11201A V-Anchor + Nut AN4 24.66 0.88 1.21 0.91 19.06 0.16 CONV FLOOR
225 BA-11201A V-Anchor + Nut AN4 24.54 0.78 1.35 0.76 19.07 0.86 CONV FLOOR
226 BA-11201A V-Anchor + Nut AN4 24.86 0.47 1.51 0.87 19.12 0.29 CONV FLOOR
227 BA-11201A V-Anchor + Nut AN4 24.53 0.67 1.88 0.02 19.42 0.83 CONV FLOOR
228 BA-11201A V-Anchor + Nut AN4 24.18 0.34 1.56 0.33 19.01 0.90 CONV FLOOR
229 BA-11201A V-Anchor + Nut AN4 24.58 0.53 1.11 0.50 19.11 0.74 CONV FLOOR
230 BA-11201A V-Anchor + Nut AN4 24.54 0.34 1.49 0.05 19.35 0.98 CONV FLOOR
231 BA-11201A V-Anchor + Nut AN4 24.33 0.76 1.15 0.88 19.38 0.11 CONV FLOOR
232 BA-11201A V-Anchor + Nut AN4 24.05 0.96 1.44 0.98 19.16 0.59 CONV FLOOR
233 BA-11201A V-Anchor + Nut AN4 24.42 0.81 1.42 0.83 19.48 0.20 CONV FLOOR
234 BA-11201A V-Anchor + Nut AN4 24.28 0.02 1.12 0.02 19.42 0.21 CONV FLOOR
235 BA-11201A V-Anchor + Nut AN4 24.16 0.42 1.41 0.87 19.50 0.74 CONV FLOOR
236 BA-11201A V-Anchor + Nut AN4 24.57 0.77 1.91 0.14 19.31 0.75 CONV FLOOR
237 BA-11201A V-Anchor + Nut AN4 24.91 0.69 1.82 0.54 19.37 0.78 CONV FLOOR
238 BA-11201A V-Anchor + Nut AN4 24.75 0.09 1.33 0.84 19.25 0.38 CONV FLOOR
239 BA-11201A V-Anchor + Nut AN4 24.10 0.34 1.68 0.90 19.49 0.13 CONV FLOOR
240 BA-11201A V-Anchor + Nut AN4 24.36 0.52 1.82 0.47 19.39 0.78 CONV FLOOR
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine Description: X-MET8000
Make
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN4 / AN2 / AN9
Description of Item Tested: AN4 & AN2 V-Anchor H=50mm D=6mm / AN9 V-Anchor H=75mm D=6mm
Material as per Drawing: ASTM A 276/479 Gr.310 & 304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
241 BA-11201A V-Anchor + Nut AN4 24.11 0.21 1.55 0.12 19.40 0.24 CONV FLOOR
242 BA-11201A V-Anchor + Nut AN4 24.71 0.83 1.83 0.61 19.25 0.38 CONV FLOOR
243 BA-11201A V-Anchor + Nut AN2 24.47 0.83 1.34 0.49 19.17 0.22 CONV BARE
244 BA-11201A V-Anchor + Nut AN2 24.60 0.10 1.21 0.48 19.47 0.06 CONV BARE
245 BA-11201A V-Anchor + Nut AN2 24.54 0.95 1.72 0.84 19.38 0.27 CONV BARE
246 BA-11201A V-Anchor + Nut AN2 24.92 0.08 1.26 0.83 19.25 0.58 CONV BARE
247 BA-11201A V-Anchor + Nut AN2 24.07 0.78 1.08 0.89 19.39 0.42 CONV BARE
248 BA-11201A V-Anchor + Nut AN2 24.61 0.75 1.34 0.71 19.39 0.38 CONV BARE
249 BA-11201A V-Anchor + Nut AN2 24.45 0.49 1.32 0.82 19.20 0.85 CONV BARE
250 BA-11201A V-Anchor + Nut AN2 24.35 0.88 1.12 0.09 19.34 0.91 CONV BARE
251 BA-11201A V-Anchor + Nut AN2 24.63 0.55 1.94 0.62 19.30 0.23 CONV BARE
252 BA-11201A V-Anchor + Nut AN2 24.21 0.97 1.81 0.50 19.19 0.20 CONV BARE
253 BA-11201A V-Anchor + Nut AN2 24.08 0.52 1.04 0.84 19.17 0.19 CONV BARE
254 BA-11201A V-Anchor AN9 18.64 0.90 1.03 0.88 8.31 0.64 RAD HB
255 BA-11201A V-Anchor AN9 18.05 0.60 1.55 0.05 8.41 0.39 RAD HB
256 BA-11201A V-Anchor AN9 18.46 0.74 1.95 0.61 8.99 0.61 RAD HB
257 BA-11201A V-Anchor AN9 18.38 0.49 1.40 0.06 8.62 0.86 RAD HB
258 BA-11201A V-Anchor AN9 18.67 0.98 1.00 0.87 8.36 0.55 RAD HB
259 BA-11201A V-Anchor AN9 18.74 0.09 1.38 0.65 8.35 0.98 RAD HB
260 BA-11201A V-Anchor AN9 18.68 0.55 1.12 0.70 8.55 0.18 RAD HB
261 BA-11201A V-Anchor AN9 18.02 0.11 1.29 0.61 8.81 0.04 RAD HB
262 BA-11201A V-Anchor AN9 18.04 0.59 1.63 0.60 8.15 0.59 RAD HB
263 BA-11201A V-Anchor AN9 18.59 0.30 1.30 0.17 8.72 0.75 RAD HB
264 BA-11201A V-Anchor AN9 18.29 0.69 1.88 0.18 8.09 0.60 RAD HB
265 BA-11201A V-Anchor AN9 18.28 0.78 1.83 0.28 8.33 0.40 RAD HB
266 BA-11201A V-Anchor AN9 18.80 0.87 1.16 0.43 8.63 0.52 RAD HB
267 BA-11201A V-Anchor AN9 18.59 0.16 1.76 0.90 8.03 0.84 RAD HB
268 BA-11201A V-Anchor AN9 18.01 0.02 1.31 0.96 8.66 0.17 RAD HB
269 BA-11201A V-Anchor AN9 18.06 0.91 1.78 0.60 8.45 0.36 RAD HB
270 BA-11201A V-Anchor AN9 18.41 0.21 1.47 0.53 8.12 0.36 RAD HB
271 BA-11201A V-Anchor AN9 18.97 0.34 1.18 0.60 8.89 0.18 RAD HB
272 BA-11201A V-Anchor AN9 18.25 0.62 1.22 0.42 8.34 0.65 RAD HB
273 BA-11201A V-Anchor AN9 18.76 0.23 1.72 0.14 8.74 0.65 RAD HB
274 BA-11201A V-Anchor AN9 18.29 0.39 1.79 0.11 8.29 0.09 RAD HB
275 BA-11201A V-Anchor AN9 18.83 0.00 1.73 0.43 8.56 0.72 RAD HB
276 BA-11201A V-Anchor AN9 18.36 0.95 1.68 0.27 8.00 0.21 RAD HB
277 BA-11201A V-Anchor AN9 18.27 0.78 1.33 0.61 8.86 0.74 RAD HB
278 BA-11201A V-Anchor AN9 18.60 0.78 1.06 0.69 8.63 0.82 RAD HB
279 BA-11201A V-Anchor AN9 18.64 0.66 1.77 0.07 8.59 0.75 RAD HB
280 BA-11201A V-Anchor AN9 18.14 0.37 1.98 0.98 8.39 0.08 RAD HB
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN9
Description of Item Tested: AN9 V-Anchor H=75mm D=6mm
Material as per Drawing: ASTM A 276/479 Gr.304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
281 BA-11201A V-Anchor AN9 18.21 0.56 1.20 0.48 8.06 0.64 RAD HB
282 BA-11201A V-Anchor AN9 18.92 0.39 1.09 0.98 8.76 0.48 RAD HB
283 BA-11201A V-Anchor AN9 18.01 0.10 1.64 0.74 8.47 0.68 RAD HB
284 BA-11201A V-Anchor AN9 18.52 0.44 1.70 0.95 8.71 0.42 RAD HB
285 BA-11201A V-Anchor AN9 18.35 0.88 1.49 0.13 8.98 0.63 RAD HB
286 BA-11201A V-Anchor AN9 18.52 0.86 1.57 0.93 8.20 0.21 RAD HB
287 BA-11201A V-Anchor AN9 18.21 0.54 1.23 0.41 8.67 0.26 RAD HB
288 BA-11201A V-Anchor AN9 18.52 0.64 1.44 0.76 8.83 0.87 RAD HB
289 BA-11201A V-Anchor AN9 18.34 0.72 1.40 0.56 8.01 0.20 RAD HB
290 BA-11201A V-Anchor AN9 18.85 0.61 1.25 0.91 8.00 0.33 RAD HB
291 BA-11201A V-Anchor AN9 18.81 0.51 1.70 0.40 8.37 0.50 RAD HB
292 BA-11201A V-Anchor AN9 18.23 0.38 1.74 0.91 8.60 0.58 RAD HB
293 BA-11201A V-Anchor AN9 18.12 0.64 1.76 0.36 8.14 0.81 RAD HB
294 BA-11201A V-Anchor AN9 18.03 0.53 1.12 0.06 8.03 0.81 RAD HB
295 BA-11201A V-Anchor AN9 18.37 0.58 1.82 0.03 8.82 0.13 RAD HB
296 BA-11201A V-Anchor AN9 18.17 0.18 1.85 0.37 8.45 0.41 RAD HB
297 BA-11201A V-Anchor AN9 18.24 0.91 1.25 0.54 8.14 0.57 RAD HB
298 BA-11201A V-Anchor AN9 18.44 0.43 1.20 0.36 8.22 0.41 RAD HB
299 BA-11201A V-Anchor AN9 18.71 0.28 1.37 0.51 8.74 0.26 RAD HB
300 BA-11201A V-Anchor AN9 18.29 0.52 1.84 0.60 8.51 0.11 RAD HB
301 BA-11201A V-Anchor AN9 18.56 0.25 1.76 0.71 8.36 0.45 RAD HB
302 BA-11201A V-Anchor AN9 18.62 0.19 1.23 0.89 8.82 0.91 RAD HB
303 BA-11201A V-Anchor AN9 18.97 0.33 1.30 0.68 8.03 0.54 RAD HB
304 BA-11201A V-Anchor AN9 18.51 0.90 1.52 0.32 8.45 0.07 RAD HB
305 BA-11201A V-Anchor AN9 18.05 0.15 1.50 0.95 8.96 0.32 RAD HB
306 BA-11201A V-Anchor AN9 18.21 0.60 1.52 0.34 8.05 0.31 RAD HB
307 BA-11201A V-Anchor AN9 18.13 0.34 1.01 0.55 8.48 0.59 RAD HB
308 BA-11201A V-Anchor AN9 18.24 0.47 1.69 0.90 8.38 0.00 RAD HB
309 BA-11201A V-Anchor AN9 18.84 0.88 1.76 0.21 8.69 0.40 RAD HB
310 BA-11201A V-Anchor AN9 18.72 0.21 1.90 0.58 8.88 0.13 RAD HB
311 BA-11201A V-Anchor AN9 18.94 0.28 1.27 0.65 8.98 0.62 RAD HB
312 BA-11201A V-Anchor AN9 18.82 0.44 1.21 0.41 8.88 0.84 RAD HB
313 BA-11201A V-Anchor AN9 18.34 1.00 1.31 0.00 8.09 0.32 RAD HB
314 BA-11201A V-Anchor AN9 18.29 0.89 1.90 0.03 8.63 0.77 RAD HB
315 BA-11201A V-Anchor AN9 18.81 0.42 1.98 0.09 8.99 0.16 RAD HB
316 BA-11201A V-Anchor AN9 18.53 0.20 1.63 0.53 8.86 0.27 RAD HB
317 BA-11201A V-Anchor AN9 18.38 0.54 1.87 0.46 8.31 0.64 RAD HB
318 BA-11201A V-Anchor AN9 18.42 0.39 1.91 0.98 8.62 0.18 RAD HB
319 BA-11201A V-Anchor AN9 18.30 0.22 1.10 0.59 8.55 0.19 RAD HB
320 BA-11201A V-Anchor AN9 18.91 0.96 1.26 0.50 8.22 0.70 RAD HB
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN9
Description of Item Tested: AN9 V-Anchor H=75mm D=6mm
Material as per Drawing: ASTM A 276/479 Gr.304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
321 BA-11201A V-Anchor AN9 18.93 0.49 1.69 0.49 8.36 0.59 RAD HB
322 BA-11201A V-Anchor AN9 18.40 0.86 1.63 0.87 8.55 0.88 RAD HB
323 BA-11201A V-Anchor AN9 18.91 0.01 1.96 0.96 8.44 0.92 RAD HB
324 BA-11201A V-Anchor AN9 18.93 0.59 1.23 0.02 8.37 0.30 RAD HB
325 BA-11201A V-Anchor AN9 18.72 0.26 1.22 0.54 8.61 0.78 RAD HB
326 BA-11201A V-Anchor AN9 18.08 0.11 1.25 0.43 8.68 0.06 RAD HB
327 BA-11201A V-Anchor AN9 18.53 0.74 1.36 0.81 8.72 0.38 RAD HB
328 BA-11201A V-Anchor AN9 18.40 0.44 1.88 0.60 8.05 0.51 RAD HB
329 BA-11201A V-Anchor AN9 18.39 0.69 1.03 0.87 8.54 0.27 RAD HB
330 BA-11201A V-Anchor AN9 18.97 0.42 1.64 0.34 8.57 0.85 RAD HB
331 BA-11201A V-Anchor AN9 18.83 0.86 1.77 0.01 8.60 0.54 RAD HB
332 BA-11201A V-Anchor AN9 18.83 0.17 1.17 0.49 8.90 0.28 RAD HB
333 BA-11201A V-Anchor AN9 18.60 0.72 1.42 0.71 8.41 0.27 RAD HB
334 BA-11201A V-Anchor AN9 18.96 0.52 1.15 0.31 8.76 0.08 RAD HB
335 BA-11201A V-Anchor AN9 18.10 0.73 1.77 0.47 8.35 0.71 RAD HB
336 BA-11201A V-Anchor AN9 18.50 0.02 1.11 0.95 8.80 0.96 RAD HB
337 BA-11201A V-Anchor AN9 18.76 0.28 1.64 0.55 8.27 0.25 RAD HB
338 BA-11201A V-Anchor AN9 18.03 0.68 1.65 0.79 8.77 0.18 RAD HB
339 BA-11201A V-Anchor AN9 18.00 0.01 1.22 0.33 8.29 0.03 RAD HB
340 BA-11201A V-Anchor AN9 18.25 0.44 1.57 0.52 8.03 0.63 RAD HB
341 BA-11201A V-Anchor AN9 18.88 0.94 1.52 0.44 8.34 0.37 RAD HB
342 BA-11201A V-Anchor AN9 18.65 1.00 1.98 0.54 8.68 0.60 RAD HB
343 BA-11201A V-Anchor AN9 18.11 0.65 1.03 0.92 8.33 0.10 RAD HB
344 BA-11201A V-Anchor AN9 18.26 0.28 1.67 0.07 8.34 0.97 RAD HB
345 BA-11201A V-Anchor AN9 18.16 0.54 1.23 0.48 8.74 0.56 RAD HB
346 BA-11201A V-Anchor AN9 18.45 0.12 1.12 0.73 8.02 0.35 RAD HB
347 BA-11201A V-Anchor AN9 18.38 0.45 2.00 0.54 8.55 0.48 RAD HB
348 BA-11201A V-Anchor AN9 18.49 0.19 1.09 0.38 8.78 0.15 RAD HB
349 BA-11201A V-Anchor AN9 18.58 0.12 1.18 0.82 8.40 0.11 RAD HB
350 BA-11201A V-Anchor AN9 18.66 0.12 1.80 0.87 8.27 0.16 RAD HB
351 BA-11201A V-Anchor AN9 18.37 0.93 1.66 0.52 8.91 0.56 RAD HB
352 BA-11201A V-Anchor AN9 18.21 0.89 1.51 0.88 8.12 0.10 RAD HB
353 BA-11201A V-Anchor AN9 18.46 0.76 1.73 0.01 8.65 0.89 RAD HB
354 BA-11201A V-Anchor AN9 18.59 0.86 1.36 0.72 8.70 0.47 RAD HB
355 BA-11201A V-Anchor AN9 18.24 0.96 1.94 0.70 8.76 0.99 RAD HB
356 BA-11201A V-Anchor AN9 18.56 0.11 1.79 0.94 8.55 0.78 RAD HB
357 BA-11201A V-Anchor AN9 18.12 0.21 1.40 0.01 8.82 0.94 RAD HB
358 BA-11201A V-Anchor AN9 18.55 0.54 1.58 0.58 8.12 0.91 RAD HB
359 BA-11201A V-Anchor AN9 18.74 0.93 1.36 1.00 8.78 0.90 RAD HB
360 BA-11201A V-Anchor AN9 18.68 0.10 1.70 0.52 8.58 0.92 RAD HB
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine Description: X-MET8000
Make
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN10
Description of Item Tested: AN10 V-Anchor H=50mm D=6mm
Material as per Drawing: ASTM A 276/479 Gr.304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
361 BA-11201A V-Anchor AN10 18.73 0.88 1.29 0.01 8.43 0.39 CONV BREECH
362 BA-11201A V-Anchor AN10 18.69 0.22 1.06 0.93 8.73 0.07 CONV BREECH
363 BA-11201A V-Anchor AN10 18.89 0.12 1.09 0.62 8.90 0.48 CONV BREECH
364 BA-11201A V-Anchor AN10 18.10 0.04 1.39 0.53 8.70 0.45 CONV BREECH
365 BA-11201A V-Anchor AN10 18.36 0.78 1.37 0.16 8.50 0.71 CONV BREECH
366 BA-11201A V-Anchor AN10 18.48 0.52 1.97 0.01 8.98 0.49 CONV BREECH
367 BA-11201A V-Anchor AN10 18.55 0.74 1.52 0.03 8.14 0.52 CONV BREECH
368 BA-11201A V-Anchor AN10 18.69 0.72 1.19 0.71 8.68 0.44 CONV BREECH
369 BA-11201A V-Anchor AN10 18.09 0.12 1.37 0.61 8.14 0.51 CONV BREECH
370 BA-11201A V-Anchor AN10 18.16 0.85 1.47 0.17 8.41 0.78 CONV BREECH
371 BA-11201A V-Anchor AN10 18.28 0.29 1.99 0.56 8.82 0.83 CONV BREECH
372 BA-11201A V-Anchor AN10 18.45 0.89 1.75 0.52 8.62 0.41 CONV BREECH
373 BA-11201A V-Anchor AN10 18.27 0.67 1.88 0.30 8.74 0.45 CONV BREECH
374 BA-11201A V-Anchor AN10 18.31 0.10 1.86 0.97 8.99 0.22 CONV BREECH
375 BA-11201A V-Anchor AN10 18.19 0.26 1.87 0.58 8.83 0.05 CONV BREECH
376 BA-11201A V-Anchor AN10 18.99 0.81 1.87 0.72 8.58 0.28 CONV BREECH
377 BA-11201A V-Anchor AN10 18.53 0.58 1.22 0.36 8.51 0.43 CONV BREECH
378 BA-11201A V-Anchor AN10 18.23 0.60 1.14 0.45 8.24 0.64 CONV BREECH
379 BA-11201A V-Anchor AN10 18.65 0.44 1.65 0.97 8.30 0.35 CONV BREECH
380 BA-11201A V-Anchor AN10 18.48 0.49 1.55 0.27 8.08 0.19 CONV BREECH
381 BA-11201A V-Anchor AN10 18.61 0.43 1.66 0.45 8.57 0.24 CONV BREECH
382 BA-11201A V-Anchor AN10 18.51 0.78 1.77 0.48 8.17 0.61 CONV BREECH
383 BA-11201A V-Anchor AN10 18.75 0.34 1.90 0.57 8.59 0.21 CONV BREECH
384 BA-11201A V-Anchor AN10 18.13 0.31 1.31 0.24 8.41 0.22 CONV BREECH
385 BA-11201A V-Anchor AN10 18.18 0.26 1.05 0.80 8.66 0.31 CONV BREECH
386 BA-11201A V-Anchor AN10 18.92 0.10 1.24 0.45 8.11 0.96 CONV BREECH
387 BA-11201A V-Anchor AN10 18.81 0.65 1.48 0.23 8.01 0.89 CONV BREECH
388 BA-11201A V-Anchor AN10 18.62 0.77 1.33 0.33 8.97 0.26 CONV BREECH
389 BA-11201A V-Anchor AN10 18.54 0.62 1.58 0.87 8.16 0.39 CONV BREECH
390 BA-11201A V-Anchor AN10 18.94 0.15 1.64 0.62 8.57 0.02 CONV BREECH
391 BA-11201A V-Anchor AN10 18.27 0.13 1.96 0.23 8.62 0.66 CONV BREECH
392 BA-11201A V-Anchor AN10 18.71 0.10 1.75 0.54 8.03 0.71 CONV BREECH
393 BA-11201A V-Anchor AN10 18.08 0.64 1.86 0.31 8.26 0.76 CONV BREECH
394 BA-11201A V-Anchor AN10 18.46 0.94 1.92 0.52 8.80 0.66 CONV BREECH
395 BA-11201A V-Anchor AN10 18.45 0.43 1.35 0.27 8.09 0.25 CONV BREECH
396 BA-11201A V-Anchor AN10 18.40 0.55 1.91 0.56 8.01 0.98 CONV BREECH
397 BA-11201A V-Anchor AN10 18.65 0.71 1.63 0.48 8.57 0.02 CONV BREECH
398 BA-11201A V-Anchor AN10 18.97 0.12 1.93 0.31 8.24 0.90 CONV BREECH
399 BA-11201A V-Anchor AN10 18.03 0.77 1.62 0.93 8.46 0.51 CONV BREECH
400 BA-11201A V-Anchor AN10 18.42 0.81 1.34 0.26 8.05 0.62 CONV BREECH
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN10 / AN1
Description of Item Tested: AN10 V-Anchor H=50mm D=6mm / AN1 V-Anchor H=50mm D=6mm
Material as per Drawing: ASTM A 276/479 Gr.304 / 310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
401 BA-11201A V-Anchor AN10 18.85 0.11 1.33 0.32 8.14 0.60 CONV BREECH
402 BA-11201A V-Anchor AN10 18.05 0.32 1.59 0.55 8.04 1.00 CONV BREECH
403 BA-11201A V-Anchor AN10 18.92 0.05 1.55 0.11 8.03 0.02 CONV BREECH
404 BA-11201A V-Anchor AN10 18.90 0.65 1.17 0.32 8.30 0.45 CONV BREECH
405 BA-11201A V-Anchor AN10 18.54 0.29 1.05 0.12 8.75 0.31 CONV BREECH
406 BA-11201A V-Anchor AN10 18.26 0.74 1.44 0.52 8.63 0.87 CONV BREECH
407 BA-11201A V-Anchor AN10 18.52 0.60 1.89 0.49 8.56 0.74 CONV BREECH
408 BA-11201A V-Anchor AN10 18.25 0.17 1.57 0.87 8.20 0.47 CONV BREECH
409 BA-11201A V-Anchor AN10 18.27 0.32 1.80 0.34 8.60 0.65 CONV BREECH
410 BA-11201A V-Anchor AN10 18.58 0.61 1.60 0.98 8.64 0.37 CONV BREECH
411 BA-11201A V-Anchor AN10 18.69 0.36 1.04 0.98 8.97 0.62 CONV BREECH
412 BA-11201A V-Anchor AN10 18.68 0.98 1.47 0.17 8.12 0.66 CONV BREECH
413 BA-11201A V-Anchor AN10 18.87 0.97 1.68 0.80 8.60 0.68 CONV BREECH
414 BA-11201A V-Anchor AN10 18.87 0.29 1.71 0.81 8.44 0.23 CONV BREECH
415 BA-11201A V-Anchor AN10 18.24 0.20 1.01 0.59 8.59 0.19 CONV BREECH
416 BA-11201A V-Anchor AN10 18.71 0.25 1.84 0.89 8.08 0.70 CONV BREECH
417 BA-11201A V-Anchor AN10 18.81 0.73 1.94 0.82 8.70 0.93 CONV BREECH
418 BA-11201A V-Anchor AN10 18.95 0.77 1.16 0.77 8.81 0.63 CONV BREECH
419 BA-11201A V-Anchor AN10 18.90 0.61 1.67 0.62 8.10 0.17 CONV BREECH
420 BA-11201A V-Anchor AN10 18.49 0.15 1.02 0.36 8.58 0.21 CONV BREECH
421 BA-11201A V-Anchor AN10 18.15 0.97 1.58 0.35 8.52 0.95 CONV BREECH
422 BA-11202A V-Anchor + Nut AN1 24.89 0.48 1.63 0.82 19.41 0.34 RAD ARCH
423 BA-11202A V-Anchor + Nut AN1 24.80 0.49 1.46 0.40 19.28 0.00 RAD ARCH
424 BA-11202A V-Anchor + Nut AN1 24.15 0.01 1.32 0.27 19.28 0.06 RAD ARCH
425 BA-11202A V-Anchor + Nut AN1 24.68 0.51 1.07 0.10 19.34 0.65 RAD ARCH
426 BA-11202A V-Anchor + Nut AN1 24.34 0.87 1.66 0.35 19.41 0.02 RAD ARCH
427 BA-11202A V-Anchor + Nut AN1 24.41 0.66 1.62 0.48 19.38 0.66 RAD ARCH
428 BA-11202A V-Anchor + Nut AN1 24.71 0.12 1.30 0.83 19.30 0.92 RAD ARCH
429 BA-11202A V-Anchor + Nut AN1 24.85 0.35 1.15 0.13 19.06 0.65 RAD ARCH
430 BA-11202A V-Anchor + Nut AN1 24.04 0.08 1.91 0.02 19.41 0.16 RAD ARCH
431 BA-11202A V-Anchor + Nut AN1 24.09 0.34 1.28 0.23 19.00 0.39 RAD ARCH
432 BA-11202A V-Anchor + Nut AN1 24.97 0.52 1.53 0.11 19.07 0.86 RAD ARCH
433 BA-11202A V-Anchor + Nut AN1 24.79 0.85 1.62 0.91 19.16 0.89 RAD ARCH
434 BA-11202A V-Anchor + Nut AN1 24.13 0.63 1.78 0.42 19.24 0.71 RAD ARCH
435 BA-11202A V-Anchor + Nut AN1 24.46 0.75 1.05 0.06 19.48 0.84 RAD ARCH
436 BA-11202A V-Anchor + Nut AN1 24.03 0.25 1.39 0.14 19.49 0.93 RAD ARCH
437 BA-11202A V-Anchor + Nut AN1 24.30 0.04 1.83 0.53 19.07 0.22 RAD ARCH
438 BA-11202A V-Anchor + Nut AN1 24.58 0.07 1.93 0.27 19.29 0.13 RAD ARCH
439 BA-11202A V-Anchor + Nut AN1 24.76 0.51 1.34 0.04 19.27 0.08 RAD ARCH
440 BA-11202A V-Anchor + Nut AN1 24.03 0.49 1.52 0.94 19.08 0.76 RAD ARCH
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: AN1 V-Anchor H=50mm D=6mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
401 BA-11202A V-Anchor + Nut AN1 24.83 0.75 1.77 0.31 19.27 0.10 RAD ARCH
402 BA-11202A V-Anchor + Nut AN1 24.70 0.59 1.82 0.96 19.10 0.18 RAD ARCH
403 BA-11202A V-Anchor + Nut AN1 24.12 0.22 1.09 0.76 19.04 0.14 RAD ARCH
404 BA-11202A V-Anchor + Nut AN1 24.35 0.34 1.55 0.13 19.24 0.14 RAD ARCH
405 BA-11202A V-Anchor + Nut AN1 24.46 0.69 1.92 0.61 19.05 0.38 RAD ARCH
406 BA-11202A V-Anchor + Nut AN1 24.75 0.77 1.83 0.37 19.40 0.70 RAD ARCH
407 BA-11202A V-Anchor + Nut AN1 24.67 0.76 1.62 0.99 19.16 0.36 RAD ARCH
408 BA-11202A V-Anchor + Nut AN1 24.27 0.52 1.07 0.01 19.30 0.99 RAD ARCH
409 BA-11202A V-Anchor + Nut AN1 24.84 0.14 1.66 0.36 19.12 0.32 RAD ARCH
410 BA-11202A V-Anchor + Nut AN1 24.64 0.88 1.49 0.25 19.13 0.49 RAD ARCH
411 BA-11202A V-Anchor + Nut AN1 24.14 0.97 1.64 0.49 19.08 0.09 RAD ARCH
412 BA-11202A V-Anchor + Nut AN1 24.60 0.89 1.44 0.53 19.48 0.39 RAD ARCH
413 BA-11202A V-Anchor + Nut AN1 24.17 0.58 1.25 0.76 19.04 0.61 RAD ARCH
414 BA-11202A V-Anchor + Nut AN1 24.55 0.48 1.79 0.40 19.26 0.32 RAD ARCH
415 BA-11202A V-Anchor + Nut AN1 24.18 0.28 1.85 0.40 19.50 0.07 RAD ARCH
416 BA-11202A V-Anchor + Nut AN1 24.65 0.13 1.00 0.41 19.29 0.46 RAD ARCH
417 BA-11202A V-Anchor + Nut AN1 24.27 0.14 1.32 0.14 19.35 0.09 RAD ARCH
418 BA-11202A V-Anchor + Nut AN1 24.98 0.51 1.22 0.55 19.37 0.79 RAD ARCH
419 BA-11202A V-Anchor + Nut AN1 24.87 0.61 1.47 0.68 19.17 0.91 RAD ARCH
420 BA-11202A V-Anchor + Nut AN1 24.56 0.37 1.89 0.61 19.13 0.66 RAD ARCH
421 BA-11202A V-Anchor + Nut AN1 24.49 0.38 1.39 0.13 19.44 0.14 RAD ARCH
422 BA-11202A V-Anchor + Nut AN1 24.46 0.93 1.70 0.33 19.06 0.72 RAD ARCH
423 BA-11202A V-Anchor + Nut AN1 24.25 0.18 1.57 0.79 19.42 0.43 RAD ARCH
424 BA-11202A V-Anchor + Nut AN1 24.08 0.82 1.21 0.48 19.21 0.20 RAD ARCH
425 BA-11202A V-Anchor + Nut AN1 24.54 0.54 1.23 0.50 19.27 0.75 RAD ARCH
426 BA-11202A V-Anchor + Nut AN1 24.97 0.58 1.57 0.32 19.16 0.73 RAD ARCH
427 BA-11202A V-Anchor + Nut AN1 24.44 0.13 1.11 0.20 19.12 0.37 RAD ARCH
428 BA-11202A V-Anchor + Nut AN1 24.75 0.02 1.69 0.92 19.43 0.16 RAD ARCH
429 BA-11202A V-Anchor + Nut AN1 24.28 0.92 1.71 0.44 19.04 0.01 RAD TAKE OFF
430 BA-11202A V-Anchor + Nut AN1 24.14 0.26 1.72 0.19 19.39 0.55 RAD TAKE OFF
431 BA-11202A V-Anchor + Nut AN1 24.79 0.24 1.34 0.99 19.34 0.62 RAD TAKE OFF
432 BA-11202A V-Anchor + Nut AN1 24.93 0.52 1.61 0.01 19.37 0.25 RAD TAKE OFF
433 BA-11202A V-Anchor + Nut AN1 24.36 0.40 1.10 0.17 19.10 0.90 RAD TAKE OFF
434 BA-11202A V-Anchor + Nut AN1 24.50 0.48 1.02 0.04 19.25 0.96 RAD TAKE OFF
435 BA-11202A V-Anchor + Nut AN1 24.41 0.94 1.08 0.65 19.37 0.49 RAD TAKE OFF
436 BA-11202A V-Anchor + Nut AN1 24.57 0.40 1.27 0.09 19.17 0.13 RAD TAKE OFF
437 BA-11202A V-Anchor + Nut AN1 24.45 0.11 1.73 0.06 19.43 0.12 RAD TAKE OFF
438 BA-11202A V-Anchor + Nut AN1 24.59 0.54 1.07 0.73 19.41 0.69 RAD TAKE OFF
439 BA-11202A V-Anchor + Nut AN1 24.68 0.75 1.91 0.06 19.08 0.32 RAD TAKE OFF
440 BA-11202A V-Anchor + Nut AN1 24.14 0.09 1.61 0.35 19.30 0.18 RAD TAKE OFF
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine Description: X-MET8000
Make
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN12 / AN1 / AN10
Description of Item Tested: AN12 V-Anchor H=125/67mm D=6mm / AN1 V-Anchor H=50mm D=6mm
Material as per Drawing: ASTM A 276/479 Gr.304 / 310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
441 BA-11202A V-Anchor + Nut AN1 24.02 0.05 1.00 0.49 19.12 0.63 RAD TAKE OFF
442 BA-11202A V-Anchor + Nut AN1 24.03 0.49 1.03 0.52 19.21 0.70 RAD TAKE OFF
443 BA-11202A V-Anchor + Nut AN1 24.79 0.15 1.49 0.97 19.14 0.91 RAD TAKE OFF
444 BA-11202A V-Anchor + Nut AN1 24.71 0.37 1.52 0.78 19.14 0.92 RAD TAKE OFF
445 BA-11202A V-Anchor + Nut AN1 24.02 0.59 1.19 0.76 19.18 0.42 RAD TAKE OFF
446 BA-11202A V-Anchor + Nut AN1 24.36 0.04 1.28 0.02 19.49 0.87 RAD TAKE OFF
447 BA-11202A V-Anchor + Nut AN1 24.39 0.27 1.10 0.85 19.14 0.02 RAD TAKE OFF
448 BA-11202A V-Anchor + Nut AN1 24.75 0.97 1.37 0.60 19.25 0.86 RAD TAKE OFF
449 BA-11202A V-Anchor + Nut AN1 24.15 0.86 1.05 0.04 19.38 0.80 RAD TAKE OFF
450 BA-11202A V-Anchor + Nut AN1 24.76 0.25 1.21 0.29 19.22 0.43 RAD TAKE OFF
451 BA-11202A V-Anchor + Nut AN1 24.07 0.15 1.51 0.21 19.04 0.59 RAD TAKE OFF
452 BA-11202A V-Anchor + Nut AN1 24.40 0.14 1.94 0.86 19.14 0.03 RAD TAKE OFF
453 BA-11202A V-Anchor + Nut AN1 24.34 0.78 1.95 0.79 19.25 0.00 RAD TAKE OFF
454 BA-11202A V-Anchor + Nut AN1 24.88 0.91 1.27 0.95 19.20 0.67 RAD TAKE OFF
455 BA-11202A V-Anchor + Nut AN1 24.42 0.23 1.36 0.42 19.49 0.19 RAD TAKE OFF
456 BA-11202A V-Anchor + Nut AN1 24.84 0.88 1.94 0.41 19.18 0.38 RAD TAKE OFF
457 BA-11202A V-Anchor + Nut AN1 24.46 0.02 1.11 0.43 19.10 0.59 RAD TAKE OFF
458 BA-11202A V-Anchor + Nut AN1 24.51 0.90 1.90 0.49 19.49 0.00 RAD TAKE OFF
459 BA-11202A V-Anchor + Nut AN1 24.11 0.56 1.57 0.56 19.11 0.80 RAD TAKE OFF
460 BA-11202A V-Anchor + Nut AN1 24.19 0.09 1.27 0.61 19.27 0.32 RAD TAKE OFF
461 BA-11202A V-Anchor + Nut AN1 24.39 0.30 1.44 0.33 19.38 0.96 RAD TAKE OFF
462 BA-11202A V-Anchor + Nut AN1 24.18 0.57 1.56 0.06 19.38 0.25 RAD TAKE OFF
463 BA-11202A V-Anchor AN12 24.18 0.14 1.88 0.83 19.08 0.40 RAD SIDE DOOR
464 BA-11202A V-Anchor AN12 24.92 0.39 1.51 0.97 19.25 0.91 RAD SIDE DOOR
465 BA-11202A V-Anchor AN12 24.28 0.54 1.92 0.08 19.33 0.58 RAD SIDE DOOR
466 BA-11202A V-Anchor AN12 24.30 0.93 1.24 0.65 19.27 0.61 RAD SIDE DOOR
467 BA-11202A V-Anchor AN10 24.24 0.39 1.86 0.06 19.25 0.36 RAD ARCH/WAL
468 BA-11202A V-Anchor AN10 24.05 0.70 1.84 0.14 19.48 0.74 RAD ARCH/WAL
469 BA-11202A V-Anchor AN10 24.92 0.08 1.01 0.69 19.08 0.33 RAD ARCH/WAL
470 BA-11202A V-Anchor AN10 24.26 0.60 1.66 0.18 19.05 0.01 RAD ARCH/WAL
471 BA-11202A V-Anchor AN10 24.60 0.56 1.40 0.56 19.30 0.76 RAD ARCH/WAL
472 BA-11202A V-Anchor AN10 24.56 0.02 1.79 0.00 19.17 0.27 RAD ARCH/WAL
473 BA-11202A V-Anchor AN10 24.57 0.78 1.24 0.18 19.14 0.81 RAD ARCH/WAL
474 BA-11202A V-Anchor AN10 24.14 0.93 1.17 0.93 19.23 0.03 RAD ARCH/WAL
475 BA-11202A V-Anchor AN10 24.55 0.37 1.92 0.79 19.43 0.57 RAD ARCH/WAL
476 BA-11202A V-Anchor AN10 24.13 0.10 1.18 0.69 19.35 0.51 RAD ARCH/WAL
477 BA-11202A V-Anchor AN10 24.51 0.38 1.75 0.02 19.02 0.80 RAD ARCH/WAL
478 BA-11202A V-Anchor AN10 24.36 0.51 1.82 0.47 19.28 0.55 RAD ARCH/WAL
479 BA-11202A V-Anchor AN10 24.89 0.81 1.81 0.98 19.40 0.70 RAD ARCH/WAL
480 BA-11202A V-Anchor AN10 24.29 0.16 1.31 0.37 19.13 0.98 RAD ARCH/WAL
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.46
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: AN1 V-Anchor H=50mm D=6mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
481 BA-11202A V-Anchor + Nut AN1 24.64 0.05 1.15 0.09 19.49 0.82 CONV BARE
482 BA-11202A V-Anchor + Nut AN1 24.10 0.04 1.49 0.31 19.06 0.72 CONV BARE
483 BA-11202A V-Anchor + Nut AN1 24.05 0.55 1.70 0.85 19.37 0.24 CONV BARE
484 BA-11202A V-Anchor + Nut AN1 24.22 0.52 1.11 0.02 19.19 0.55 CONV BARE
485 BA-11202A V-Anchor + Nut AN1 24.56 0.07 1.67 0.03 19.13 0.39 CONV BARE
486 BA-11202A V-Anchor + Nut AN1 24.27 0.80 1.62 0.42 19.25 0.09 CONV BARE
487 BA-11202A V-Anchor + Nut AN1 24.30 0.08 1.62 0.16 19.47 0.81 CONV BARE
488 BA-11202A V-Anchor + Nut AN1 24.54 0.72 1.64 0.34 19.31 0.46 CONV BARE
489 BA-11202A V-Anchor + Nut AN1 24.25 0.46 1.45 0.38 19.20 0.14 CONV BARE
490 BA-11202A V-Anchor + Nut AN1 24.13 0.92 1.77 0.32 19.24 0.13 CONV BARE
491 BA-11202A V-Anchor + Nut AN1 24.70 0.87 1.85 0.31 19.05 0.90 CONV BARE
492 BA-11202A V-Anchor + Nut AN1 24.35 0.16 1.71 0.29 19.15 0.39 CONV BARE
493 BA-11202A V-Anchor + Nut AN1 24.24 0.83 1.32 0.73 19.22 0.41 CONV BARE
494 BA-11202A V-Anchor + Nut AN1 24.04 0.24 1.12 0.81 19.19 0.12 CONV BARE
495 BA-11202A V-Anchor + Nut AN1 24.28 0.84 1.43 0.26 19.06 0.68 CONV BARE
496 BA-11202A V-Anchor + Nut AN1 24.47 0.88 1.29 0.38 19.49 0.21 CONV BARE
497 BA-11202A V-Anchor + Nut AN1 24.17 0.86 1.91 0.48 19.34 0.34 CONV BARE
498 BA-11202A V-Anchor + Nut AN1 24.18 0.56 1.02 0.47 19.37 0.23 CONV BARE
499 BA-11202A V-Anchor + Nut AN1 24.47 0.42 1.77 0.23 19.16 0.16 CONV BARE
500 BA-11202A V-Anchor + Nut AN1 24.53 0.90 1.46 0.69 19.08 0.25 CONV BARE
501 BA-11202A V-Anchor + Nut AN1 24.11 0.12 1.35 0.15 19.09 0.28 CONV BARE
502 BA-11202A V-Anchor + Nut AN1 24.58 0.59 1.34 0.05 19.34 0.95 CONV BARE
503 BA-11202A V-Anchor + Nut AN1 24.56 0.30 1.25 0.09 19.21 0.06 CONV BARE
504 BA-11202A V-Anchor + Nut AN1 24.88 0.01 1.46 0.41 19.39 0.59 CONV BARE
505 BA-11202A V-Anchor + Nut AN1 24.20 0.56 1.19 0.41 19.22 0.32 CONV BARE
506 BA-11202A V-Anchor AN5 24.40 0.29 1.43 0.83 19.06 0.79 RAD HB
507 BA-11202A V-Anchor AN5 24.10 0.31 1.54 0.17 19.35 0.91 RAD HB
508 BA-11202A V-Anchor AN5 24.85 0.33 1.72 0.05 19.26 0.63 RAD HB
509 BA-11202A V-Anchor AN5 24.86 0.65 1.34 0.69 19.32 0.99 RAD HB
510 BA-11202A V-Anchor AN5 24.45 0.31 1.98 0.79 19.19 0.64 RAD HB
511 BA-11202A V-Anchor AN5 24.70 0.40 1.06 0.81 19.22 0.92 RAD HB
512 BA-11202A V-Anchor AN5 24.72 0.27 1.98 0.82 19.22 0.62 RAD HB
513 BA-11202A V-Anchor AN5 24.26 0.49 1.42 0.12 19.35 0.99 RAD HB
514 BA-11202A V-Anchor AN5 24.32 0.40 1.43 0.27 19.16 0.92 RAD HB
515 BA-11202A V-Anchor AN5 24.44 0.35 1.16 0.41 19.21 0.94 RAD HB
516 BA-11202A V-Anchor AN5 24.95 0.11 1.30 0.12 19.02 0.25 RAD HB
517 BA-11202A V-Anchor AN5 24.21 0.23 1.25 0.63 19.23 0.57 RAD HB
518 BA-11202A V-Anchor AN5 24.49 0.53 1.06 0.04 19.08 0.58 RAD HB
519 BA-11202A V-Anchor AN5 24.57 0.57 1.14 0.61 19.43 0.88 RAD HB
520 BA-11202A V-Anchor AN5 24.23 0.97 1.64 0.10 19.21 0.08 RAD HB
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.45
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: ANCHOR Supply - AN1 H=98mm & D=8mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
1 BA-11201A Stud AN1 24.32 0.35 1.23 0.69 19.44 0.06 Rad Arch
2 BA-11201A Stud AN1 24.25 0.44 1.41 0.97 19.16 0.58 Rad Arch
3 BA-11201A Stud AN1 24.77 0.62 1.56 0.24 19.04 0.96 Rad Arch
4 BA-11201A Stud AN1 24.29 0.44 1.15 0.83 19.04 0.96 Rad Arch
5 BA-11201A Stud AN1 24.16 1.00 1.88 0.18 19.21 0.79 Rad Arch
6 BA-11201A Stud AN1 24.94 0.44 1.88 0.02 19.32 0.94 Rad Arch
7 BA-11201A Stud AN1 24.13 0.22 1.44 0.05 19.36 0.07 Rad Arch
8 BA-11201A Stud AN1 24.85 0.47 1.33 0.03 19.06 0.79 Rad Arch
9 BA-11201A Stud AN1 24.59 0.86 1.11 0.11 19.11 0.63 Rad Arch
10 BA-11201A Stud AN1 24.73 0.63 1.25 0.32 19.25 0.06 Rad Arch
11 BA-11201A Stud AN1 24.47 0.37 1.97 0.08 19.25 0.60 Rad Arch
12 BA-11201A Stud AN1 24.39 0.39 1.74 0.02 19.33 0.28 Rad Arch
13 BA-11201A Stud AN1 24.18 0.90 2.00 0.63 19.36 0.58 Rad Arch
14 BA-11201A Stud AN1 24.05 0.25 1.26 0.94 19.03 0.71 Rad Arch
15 BA-11201A Stud AN1 24.22 0.59 1.19 0.76 19.06 0.37 Rad Arch
16 BA-11201A Stud AN1 24.65 0.07 1.36 0.82 19.08 0.13 Rad Arch
17 BA-11201A Stud AN1 24.54 0.59 1.76 0.25 19.14 0.19 Rad Arch
18 BA-11201A Stud AN1 24.91 0.32 1.89 0.04 19.49 0.36 Rad Arch
19 BA-11201A Stud AN1 24.57 0.58 1.19 0.74 19.23 0.65 Rad Arch
20 BA-11201A Stud AN1 24.00 0.46 1.63 0.04 19.22 0.96 Rad Arch
21 BA-11201A Stud AN1 24.36 0.15 1.45 0.60 19.09 0.99 Rad Arch
22 BA-11201A Stud AN1 24.90 0.72 1.42 0.59 19.13 0.19 Rad Arch
23 BA-11201A Stud AN1 24.89 0.14 1.33 0.67 19.26 0.80 Rad Arch
24 BA-11201A Stud AN1 24.09 0.97 1.69 0.84 19.35 0.61 Rad Arch
25 BA-11201A Stud AN1 24.72 0.08 1.83 0.50 19.11 0.48 Rad Arch
26 BA-11201A Stud AN1 24.61 0.51 1.23 0.47 19.20 0.50 Rad Arch
27 BA-11201A Stud AN1 24.25 0.94 1.72 0.59 19.38 0.78 Rad Arch
28 BA-11201A Stud AN1 24.94 0.64 1.32 0.19 19.17 1.00 Rad Arch
29 BA-11201A Stud AN1 24.27 0.08 1.38 0.33 19.23 0.53 Rad Arch
30 BA-11201A Stud AN1 24.39 0.37 1.41 0.85 19.49 0.27 Rad Arch
31 BA-11201A Stud AN1 24.68 0.98 1.90 0.99 19.31 0.84 Rad Arch
32 BA-11201A Stud AN1 24.74 0.03 1.16 0.32 19.40 0.51 Rad Arch
33 BA-11201A Stud AN1 24.04 0.14 1.46 0.07 19.33 0.62 Rad Arch
34 BA-11201A Stud AN1 24.56 0.45 1.45 0.00 19.27 0.56 Rad Arch
35 BA-11201A Stud AN1 24.77 0.95 1.85 0.22 19.12 0.88 Rad Arch
36 BA-11201A Stud AN1 24.83 0.75 1.32 0.27 19.34 0.06 Rad Arch
37 BA-11201A Stud AN1 24.34 0.26 1.89 0.29 19.05 0.47 Rad Take Off
38 BA-11201A Stud AN1 24.51 0.71 1.76 0.21 19.40 0.93 Rad Take Off
39 BA-11201A Stud AN1 24.79 0.04 1.38 0.99 19.03 0.74 Rad Take Off
40 BA-11201A Stud AN1 24.52 0.63 1.43 0.44 19.23 0.41 Rad Take Off
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.45
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: ANCHOR Supply - AN1 H=98mm & D=8mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
41 BA-11201A Stud AN1 24.12 0.59 1.43 0.32 19.22 0.13 Rad Take Off
42 BA-11201A Stud AN1 24.50 0.42 1.27 0.39 19.49 0.65 Rad Take Off
43 BA-11201A Stud AN1 24.43 0.03 1.93 0.77 19.48 0.25 Rad Take Off
44 BA-11201A Stud AN1 24.54 0.26 1.68 0.85 19.27 0.81 Rad Take Off
45 BA-11201A Stud AN1 24.19 0.59 1.04 0.23 19.27 0.18 Rad Take Off
46 BA-11201A Stud AN1 24.26 0.34 1.70 0.88 19.32 0.34 Rad Take Off
47 BA-11201A Stud AN1 24.73 0.44 1.39 0.14 19.38 0.50 Rad Take Off
48 BA-11201A Stud AN1 24.82 0.35 1.56 0.85 19.15 0.98 Rad Take Off
49 BA-11201A Stud AN1 24.25 0.97 1.77 0.36 19.23 0.05 Rad Take Off
50 BA-11201A Stud AN1 24.27 0.66 1.26 0.29 19.16 0.09 Rad Take Off
51 BA-11201A Stud AN1 24.41 0.53 1.56 0.16 19.04 0.94 Rad Take Off
52 BA-11201A Stud AN1 24.50 0.53 1.45 0.55 19.42 0.20 Rad Take Off
53 BA-11201A Stud AN1 24.14 0.56 1.30 0.58 19.15 0.59 Rad Take Off
54 BA-11201A Stud AN1 24.36 0.84 1.25 0.68 19.08 0.48 Rad Take Off
55 BA-11201A Stud AN1 24.83 0.01 1.62 0.87 19.09 0.47 Rad Take Off
56 BA-11201A Stud AN1 24.46 0.50 1.76 0.63 19.29 0.31 Rad Take Off
57 BA-11201A Stud AN1 24.14 0.95 1.84 0.59 19.11 0.22 Rad Take Off
58 BA-11201A Stud AN1 24.91 0.88 1.01 0.27 19.22 0.14 Rad Take Off
59 BA-11201A Stud AN1 24.12 0.05 1.35 0.97 19.14 0.17 Rad Take Off
60 BA-11201A Stud AN1 24.57 0.43 1.41 0.65 19.08 0.07 Rad Take Off
61 BA-11201A Stud AN1 24.06 0.92 1.78 0.29 19.15 0.34 Rad Take Off
62 BA-11201A Stud AN1 24.34 0.71 1.77 0.16 19.29 0.17 Rad Take Off
63 BA-11201A Stud AN1 24.55 0.41 1.42 0.69 19.38 0.21 Rad Take Off
64 BA-11201A Stud AN1 24.19 0.61 1.01 0.89 19.28 0.68 Rad Take Off
65 BA-11201A Stud AN1 24.75 0.58 1.94 0.53 19.16 0.16 Rad Take Off
66 BA-11201A Stud AN1 24.33 0.38 1.42 0.24 19.24 0.93 Rad Take Off
67 BA-11201A Stud AN1 24.51 0.98 1.73 1.00 19.25 0.73 Rad Take Off
68 BA-11201A Stud AN1 24.28 0.12 1.08 0.87 19.49 0.44 Rad Take Off
69 BA-11201A Stud AN1 24.97 0.89 1.54 0.27 19.48 0.45 Rad Take Off
70 BA-11201A Stud AN1 24.64 0.18 1.51 0.22 19.33 0.61 Rad Take Off
71 BA-11201A Stud AN1 24.29 0.83 1.17 0.91 19.22 0.34 Rad Take Off
72 BA-11201A Stud AN1 24.39 0.14 1.82 0.87 19.22 0.37 Rad Take Off
73 BA-11201A Stud AN1 24.15 0.00 1.54 0.95 19.11 0.94 Rad Take Off
74 BA-11201A Stud AN1 24.15 0.27 1.94 0.19 19.26 0.18 Rad Take Off
75 BA-11201A Stud AN1 24.07 0.42 1.75 0.94 19.12 0.30 Rad Take Off
76 BA-11201A Stud AN1 24.72 0.46 1.86 0.38 19.15 0.72 Rad Take Off
77 BA-11201A Stud AN1 24.47 0.85 1.76 0.75 19.22 0.10 Rad Take Off
78 BA-11201A Stud AN1 24.65 0.85 1.44 0.83 19.01 0.86 Rad Take Off
79 BA-11201A Stud AN1 24.68 0.85 1.56 0.08 19.08 0.67 Rad Take Off
80 BA-11201A Stud AN1 24.41 0.99 1.30 0.58 19.32 0.89 Rad Take Off
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.45
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: ANCHOR Supply - AN1 H=98mm & D=8mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
81 BA-11201A Stud AN1 24.91 0.11 1.39 0.88 19.45 0.15 Rad Take Off
82 BA-11201A Stud AN1 24.83 0.94 1.41 0.88 19.43 0.74 Rad Take Off
83 BA-11201A Stud AN1 24.89 0.04 1.20 0.27 19.47 0.30 Rad Take Off
84 BA-11201A Stud AN1 24.46 0.92 1.70 0.89 19.39 0.72 Rad Take Off
85 BA-11201A Stud AN1 24.13 0.12 1.19 0.31 19.35 0.89 Rad Take Off
86 BA-11201A Stud AN1 24.11 0.54 1.08 0.12 19.38 0.95 Rad Take Off
87 BA-11201A Stud AN1 24.64 0.26 1.48 0.12 19.40 0.16 Rad Take Off
88 BA-11201A Stud AN1 24.16 0.15 1.83 0.95 19.45 0.39 Rad Take Off
89 BA-11201A Stud AN1 24.48 0.08 1.84 0.92 19.06 0.27 Rad Take Off
90 BA-11201A Stud AN1 24.74 0.28 1.33 0.47 19.22 0.07 Rad Take Off
91 BA-11201A Stud AN1 24.99 0.87 1.55 0.39 19.48 0.93 Rad Take Off
92 BA-11201A Stud AN1 24.55 0.49 1.17 0.20 19.24 0.71 Rad Take Off
93 BA-11201A Stud AN1 24.50 0.84 1.21 0.70 19.48 0.45 Rad Take Off
94 BA-11201A Stud AN1 24.02 0.72 1.88 0.71 19.46 0.91 Rad Take Off
95 BA-11201A Stud AN1 24.39 0.26 1.42 0.49 19.27 0.89 Rad Take Off
96 BA-11201A Stud AN1 24.72 0.22 1.18 0.16 19.49 0.56 Rad Take Off
97 BA-11201A Stud AN1 24.91 0.10 1.12 0.07 19.06 0.78 Rad Take Off
98 BA-11201A Stud AN1 24.70 0.32 1.70 0.71 19.14 0.93 Rad Take Off
99 BA-11201A Stud AN1 24.62 0.23 1.65 0.54 19.15 0.31 Rad Take Off
100 BA-11201A Stud AN1 24.70 0.88 1.69 0.99 19.22 0.90 Rad Take Off
101 BA-11201A Stud AN1 24.77 0.15 1.09 0.17 19.24 0.62 Rad Take Off
102 BA-11201A Stud AN1 24.28 0.22 1.22 0.11 19.19 0.12 Rad Take Off
103 BA-11201A Stud AN1 24.03 0.92 1.48 0.14 19.21 0.82 Rad Take Off
104 BA-11201A Stud AN1 24.88 0.87 1.70 0.20 19.11 0.09 Rad Take Off
105 BA-11201A Stud AN1 24.67 0.34 1.93 0.96 19.23 0.88 Rad Take Off
106 BA-11201A Stud AN1 24.96 0.77 1.24 0.67 19.35 0.25 Rad Take Off
107 BA-11201A Stud AN1 24.09 0.61 1.62 0.19 19.50 0.75 Rad Take Off
108 BA-11201A Stud AN1 24.29 0.47 1.40 0.54 19.24 0.21 Rad Take Off
109 BA-11201A Stud AN1 24.87 0.59 1.72 0.19 19.38 0.35 Rad Take Off
110 BA-11201A Stud AN1 24.86 0.32 1.55 0.97 19.37 0.78 Rad Take Off
111 BA-11201A Stud AN1 24.56 0.17 1.83 0.97 19.30 0.53 Rad Take Off
112 BA-11201A Stud AN1 24.07 0.55 1.90 0.19 19.10 0.88 Rad Take Off
113 BA-11201A Stud AN1 24.30 0.03 1.23 0.74 19.23 0.99 Rad Take Off
114 BA-11201A Stud AN1 24.27 0.21 1.23 0.12 19.28 0.64 Rad Take Off
115 BA-11201A Stud AN1 24.75 0.02 1.53 0.54 19.22 0.22 Rad Take Off
116 BA-11201A Stud AN1 24.54 0.99 1.56 0.97 19.20 0.02 Rad Take Off
117 BA-11201A Stud AN1 24.06 0.93 1.46 0.97 19.15 0.34 Rad Take Off
118 BA-11201A Stud AN1 24.19 0.71 1.98 0.25 19.14 0.73 Rad Take Off
119 BA-11201A Stud AN1 24.12 0.09 1.96 0.69 19.25 0.19 Rad Take Off
120 BA-11201A Stud AN1 24.49 0.13 1.49 0.61 19.37 0.49 Rad Take Off
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.45
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: ANCHOR Supply - AN1 H=98mm & D=8mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
121 BA-11201A Stud AN1 24.31 0.56 1.05 0.92 19.42 0.85 Rad Take Off
122 BA-11201A Stud AN1 24.60 0.52 1.58 0.63 19.48 0.09 Rad Take Off
123 BA-11201A Stud AN1 24.29 0.78 1.29 0.14 19.31 0.21 Rad Take Off
124 BA-11201A Stud AN1 24.97 0.27 1.20 0.63 19.27 0.60 Rad Take Off
125 BA-11201A Stud AN1 24.20 0.42 1.51 0.66 19.35 0.76 Rad Take Off
126 BA-11201A Stud AN1 24.01 0.62 1.52 0.77 19.47 0.21 Rad Take Off
127 BA-11201A Stud AN1 24.31 0.46 1.21 0.65 19.26 0.84 Rad Take Off
128 BA-11201A Stud AN1 24.74 0.50 1.28 0.89 19.47 0.03 Rad Take Off
129 BA-11201A Stud AN1 24.03 0.16 1.54 0.92 19.48 0.95 Rad Take Off
130 BA-11201A Stud AN1 24.43 0.55 1.29 0.28 19.03 0.59 Rad Take Off
131 BA-11201A Stud AN1 24.24 0.04 1.18 0.18 19.31 0.48 Rad Take Off
132 BA-11201A Stud AN1 24.10 0.86 1.10 0.45 19.02 0.18 Rad Take Off
133 BA-11201A Stud AN1 24.60 0.65 1.24 0.17 19.16 0.13 Rad Take Off
134 BA-11201A Stud AN1 24.74 0.91 1.42 0.58 19.38 0.09 Rad Take Off
135 BA-11201A Stud AN1 24.87 0.82 1.89 0.19 19.36 0.94 Rad Take Off
136 BA-11201A Stud AN1 24.03 0.55 1.20 0.01 19.05 0.50 Rad Take Off
137 BA-11201A Stud AN1 24.76 0.85 1.90 0.83 19.27 0.26 Rad Take Off
138 BA-11201A Stud AN1 24.28 0.74 1.92 0.33 19.07 1.00 Rad Take Off
139 BA-11201A Stud AN1 24.35 0.26 1.59 0.46 19.19 0.38 Rad Take Off
140 BA-11201A Stud AN1 24.08 0.82 1.89 0.92 19.24 0.50 Rad Take Off
141 BA-11201A Stud AN1 24.67 0.66 1.84 0.78 19.34 0.38 Rad Take Off
142 BA-11201A Stud AN1 24.47 0.98 1.19 0.57 19.47 0.24 Rad Take Off
143 BA-11201A Stud AN1 24.95 0.98 1.87 0.93 19.46 0.75 Rad Take Off
144 BA-11201A Stud AN1 24.88 0.67 1.10 0.51 19.26 0.20 Rad Take Off
145 BA-11201A Stud AN1 24.82 0.06 1.92 0.53 19.46 0.45 Rad Take Off
146 BA-11201A Stud AN1 24.27 0.83 1.17 0.05 19.48 0.75 Rad Take Off
147 BA-11201A Stud AN1 24.67 0.98 1.91 0.61 19.02 0.51 Rad Take Off
148 BA-11201A Stud AN1 24.17 0.46 1.13 0.96 19.31 0.75 Rad Take Off
149 BA-11201A Stud AN1 24.98 0.65 1.34 0.15 19.46 0.85 Rad Take Off
150 BA-11201A Stud AN1 24.11 0.53 1.91 0.60 19.35 0.37 Rad Take Off
151 BA-11201A Stud AN1 24.85 0.72 1.23 1.00 19.26 0.08 Rad Take Off
152 BA-11201A Stud AN1 24.01 0.43 1.13 0.44 19.12 0.05 Rad Take Off
153 BA-11201A Stud AN1 24.82 0.70 1.92 0.44 19.45 0.55 Rad Take Off
154 BA-11201A Stud AN1 24.07 0.68 1.29 0.56 19.24 1.00 Rad Take Off
155 BA-11201A Stud AN1 24.22 0.73 1.08 0.14 19.29 0.69 Rad Take Off
156 BA-11201A Stud AN1 24.75 0.35 1.45 0.68 19.21 0.11 Rad Take Off
157 BA-11201A Stud AN1 24.43 0.93 1.97 0.47 19.24 0.47 Rad Take Off
158 BA-11201A Stud AN1 24.48 0.72 1.47 0.47 19.47 0.41 Rad Take Off
159 BA-11201A Stud AN1 24.28 0.33 1.61 0.21 19.21 0.30 Rad Take Off
160 BA-11201A Stud AN1 24.41 0.58 1.63 0.48 19.09 0.31 Rad Take Off
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.45
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine Description: X-MET8000
Make
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: ANCHOR Supply - AN1 H=98mm & D=8mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
161 BA-11201A Stud AN1 24.09 0.77 1.35 0.68 19.22 0.72 Rad Take Off
162 BA-11201A Stud AN1 24.61 0.82 1.54 0.60 19.02 0.42 Rad Take Off
163 BA-11201A Stud AN1 24.02 0.78 1.19 0.33 19.23 0.49 Rad Take Off
164 BA-11201A Stud AN1 24.04 0.53 1.59 0.85 19.42 0.27 Rad Take Off
165 BA-11201A Stud AN1 24.37 0.78 1.78 0.59 19.15 0.62 Rad Take Off
166 BA-11201A Stud AN1 24.72 0.84 1.76 0.17 19.42 0.39 Rad Take Off
167 BA-11201A Stud AN1 24.10 0.07 1.22 0.58 19.42 0.86 Rad Take Off
168 BA-11201A Stud AN1 24.25 0.87 1.06 0.34 19.10 0.34 Rad Take Off
169 BA-11201A Stud AN1 24.85 0.96 1.21 0.44 19.19 0.17 Rad Take Off
170 BA-11201A Stud AN1 24.08 0.08 1.67 0.81 19.12 0.59 Rad Take Off
171 BA-11201A Stud AN1 24.22 0.88 1.42 0.74 19.03 0.86 Rad Take Off
172 BA-11201A Stud AN1 24.55 0.49 1.96 0.95 19.31 0.90 Rad Take Off
173 BA-11201A Stud AN1 24.71 0.68 1.55 0.44 19.45 0.07 Rad Take Off
174 BA-11201A Stud AN1 24.63 0.08 1.08 0.63 19.22 0.12 Conv.Bare
175 BA-11201A Stud AN1 24.51 0.86 1.19 0.85 19.25 0.09 Conv.Bare
176 BA-11201A Stud AN1 24.90 0.57 1.95 0.11 19.14 0.27 Conv.Bare
177 BA-11201A Stud AN1 24.02 0.57 1.46 0.61 19.28 0.30 Conv.Bare
178 BA-11201A Stud AN1 24.48 0.65 1.06 0.82 19.45 0.02 Conv.Bare
179 BA-11201A Stud AN1 24.96 0.04 1.36 0.82 19.22 0.90 Conv.Bare
180 BA-11201A Stud AN1 24.90 0.16 1.41 0.58 19.44 0.63 Conv.Bare
181 BA-11201A Stud AN1 24.01 0.02 1.45 0.14 19.11 0.19 Conv.Bare
182 BA-11201A Stud AN1 24.64 0.32 1.17 0.13 19.17 0.35 Conv.Bare
183 BA-11201A Stud AN1 24.22 0.42 1.77 0.19 19.08 0.65 Conv.Bare
184 BA-11201A Stud AN1 24.93 0.13 1.92 0.48 19.11 0.96 Conv.Bare
185 BA-11201A Stud AN1 24.55 0.77 1.94 0.62 19.02 0.93 Conv.Bare
186 BA-11201A Stud AN1 24.26 0.01 1.94 0.97 19.33 0.86 Conv.Bare
187 BA-11201A Stud AN1 24.06 0.52 1.95 0.41 19.07 0.56 Conv.Bare
188 BA-11201A Stud AN1 24.65 0.75 1.32 0.40 19.37 0.67 Conv.Bare
189 BA-11201A Stud AN1 24.40 0.20 1.57 0.56 19.04 0.44 Conv.Bare
190 BA-11201A Stud AN1 24.70 0.63 1.62 0.72 19.34 0.82 Conv.Bare
191 BA-11201A Stud AN1 24.59 0.04 1.40 0.27 19.26 0.27 Conv.Bare
192 BA-11201A Stud AN1 24.02 0.45 1.62 0.95 19.22 0.26 Conv.Bare
193 BA-11201A Stud AN1 24.15 0.54 1.41 0.19 19.25 0.25 Conv.Bare
194 BA-11201A Stud AN1 24.97 0.34 1.10 0.39 19.27 0.65 Conv.Bare
195 BA-11201A Stud AN1 24.52 0.80 1.15 0.31 19.32 0.83 Conv.Bare
196 BA-11201A Stud AN1 24.03 0.14 1.19 0.02 19.23 0.79 Conv.Bare
197 BA-11201A Stud AN1 24.43 0.01 1.55 0.32 19.36 0.60 Conv.Bare
198 BA-11201A Stud AN1 24.80 0.49 1.07 0.59 19.37 0.52 Conv.Bare
199 BA-11201A Stud AN1 24.09 0.52 1.06 0.89 19.09 0.14 Conv.Bare
200 BA-11201A Stud AN1 24.78 0.20 1.83 0.39 19.10 0.25 Conv.Bare
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.45
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: ANCHOR Supply - AN1 H=98mm & D=8mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
201 BA-11201A Stud AN1 24.41 0.90 1.62 0.42 19.28 0.23 Conv.Bare
202 BA-11201A Stud AN1 24.32 0.24 1.21 0.38 19.12 0.87 Conv.Bare
203 BA-11201A Stud AN1 24.53 0.88 1.98 0.61 19.02 0.42 Conv.Bare
204 BA-11201A Stud AN1 24.05 0.00 1.15 0.82 19.09 0.67 Conv.Bare
205 BA-11201A Stud AN1 24.25 0.29 1.48 0.21 19.30 0.28 Conv.Bare
206 BA-11201A Stud AN1 24.95 0.89 1.88 0.11 19.06 0.39 Conv.Bare
207 BA-11201A Stud AN1 24.42 0.05 1.35 0.52 19.12 0.52 Conv.Bare
208 BA-11201A Stud AN1 24.76 0.25 1.43 0.39 19.45 0.13 Conv.Bare
209 BA-11201A Stud AN1 24.82 0.48 1.24 0.54 19.18 0.43 Conv.Bare
210 BA-11201A Stud AN1 24.36 0.43 1.52 0.63 19.16 0.33 Conv.Bare
211 BA-11201A Stud AN1 24.13 0.33 1.26 0.37 19.35 0.31 Conv.Bare
212 BA-11201A Stud AN1 24.68 0.83 1.40 0.11 19.15 0.14 Conv.Bare
213 BA-11201A Stud AN1 24.84 0.59 1.07 0.12 19.19 0.30 Conv.Bare
214 BA-11201A Stud AN1 24.37 0.18 1.45 0.35 19.12 0.89 Conv.Bare
215 BA-11201A Stud AN1 24.09 0.20 1.07 0.97 19.22 0.27 Conv.Bare
216 BA-11201A Stud AN1 24.68 0.86 1.67 0.48 19.45 0.19 Conv.Bare
217 BA-11201A Stud AN1 24.35 0.82 1.89 0.35 19.14 0.61 Conv.Bare
218 BA-11201A Stud AN1 24.07 0.68 1.67 0.32 19.26 0.08 Conv.Bare
219 BA-11201A Stud AN1 24.06 0.03 1.19 0.57 19.17 0.31 Conv.Bare
220 BA-11201A Stud AN1 24.13 0.67 1.19 0.63 19.15 0.35 Conv.Bare
221 BA-11201A Stud AN1 24.41 0.64 1.00 0.34 19.39 0.01 Conv.Bare
222 BA-11201A Stud AN1 24.49 0.65 1.30 0.87 19.39 0.60 Conv.Bare
223 BA-11201A Stud AN1 24.92 0.82 1.53 0.65 19.11 0.28 Conv.Bare
224 BA-11201A Stud AN1 24.89 0.40 1.75 0.91 19.35 0.16 Conv.Bare
225 BA-11201A Stud AN1 24.13 0.33 1.32 0.41 19.38 0.93 Conv.Bare
226 BA-11201A Stud AN1 24.48 0.89 1.23 0.26 19.33 0.66 Conv.Bare
227 BA-11201A Stud AN1 24.56 0.87 1.35 0.71 19.41 0.71 Conv.Bare
228 BA-11201A Stud AN1 24.83 0.71 1.31 0.14 19.26 0.62 Conv.Bare
229 BA-11201A Stud AN1 24.80 0.77 1.15 0.70 19.04 0.66 Conv.Bare
230 BA-11201A Stud AN1 24.54 0.40 1.76 0.64 19.23 0.78 Conv.Bare
231 BA-11201A Stud AN1 24.49 0.33 1.55 0.18 19.42 0.82 Conv.Bare
232 BA-11201A Stud AN1 24.82 0.88 1.83 0.40 19.08 0.44 Conv.Bare
233 BA-11201A Stud AN1 24.76 0.71 1.95 0.12 19.07 0.09 Conv.Bare
234 BA-11201A Stud AN1 24.21 0.58 1.98 0.39 19.37 0.41 Conv.Bare
235 BA-11201A Stud AN1 24.40 0.03 1.69 0.34 19.28 0.23 Conv.Bare
236 BA-11201A Stud AN1 24.50 0.81 1.96 0.72 19.38 0.57 Conv.Bare
237 BA-11201A Stud AN1 24.70 0.45 1.00 0.24 19.37 0.46 Conv.Bare
238 BA-11201A Stud AN1 24.07 0.64 1.95 0.13 19.45 0.74 Conv.Bare
239 BA-11201A Stud AN1 24.28 0.78 1.54 0.33 19.37 0.03 Conv.Bare
240 BA-11201A Stud AN1 24.46 0.95 1.69 0.81 19.38 0.47 Conv.Bare
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.45
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: ANCHOR Supply - AN1 H=50mm & D=6mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
241 BA-11201A V-Anchor + Nut AN1 24.15 0.12 1.93 0.01 19.29 0.71 Conv.Bare
242 BA-11201A V-Anchor + Nut AN1 24.14 0.60 1.65 0.07 19.30 0.87 Conv.Bare
243 BA-11201A V-Anchor + Nut AN1 24.93 0.85 1.84 0.93 19.30 0.25 Conv.Bare
244 BA-11201A V-Anchor + Nut AN1 24.60 0.26 1.10 0.85 19.46 0.25 Conv.Bare
245 BA-11201A V-Anchor + Nut AN1 24.28 0.26 1.33 0.73 19.05 0.73 Conv.Bare
246 BA-11201A V-Anchor + Nut AN1 24.95 0.06 1.96 0.10 19.29 0.37 Conv.Bare
247 BA-11201A V-Anchor + Nut AN1 24.65 0.88 1.00 0.45 19.17 0.41 Conv.Bare
248 BA-11201A V-Anchor + Nut AN1 24.61 0.75 1.67 0.44 19.12 0.05 Conv.Bare
249 BA-11201A V-Anchor + Nut AN1 24.65 0.30 1.56 0.17 19.18 0.66 Conv.Bare
250 BA-11201A V-Anchor + Nut AN1 24.03 0.15 1.55 0.58 19.45 0.32 Conv.Bare
251 BA-11201A V-Anchor + Nut AN1 24.64 0.84 2.00 0.07 19.16 0.86 Conv.Bare
252 BA-11201A V-Anchor + Nut AN1 24.22 0.00 1.84 0.77 19.20 0.63 Conv.Bare
253 BA-11201A V-Anchor + Nut AN1 24.18 0.43 1.91 0.96 19.15 0.79 Conv.Bare
254 BA-11201A V-Anchor + Nut AN1 24.68 0.26 1.54 0.55 19.29 0.49 Conv.Bare
255 BA-11201A V-Anchor + Nut AN1 24.25 0.32 1.34 0.53 19.25 0.74 Conv.Bare
256 BA-11201A V-Anchor + Nut AN1 24.80 0.70 1.67 0.87 19.21 0.18 Conv.Bare
257 BA-11201A V-Anchor + Nut AN1 24.53 0.86 1.40 0.97 19.40 0.19 Conv.Bare
258 BA-11201A V-Anchor + Nut AN1 24.11 0.49 1.27 0.88 19.31 0.45 Conv.Bare
259 BA-11201A V-Anchor + Nut AN1 24.85 0.54 1.78 0.21 19.42 0.92 Conv.Bare
260 BA-11201A V-Anchor + Nut AN1 24.23 0.59 1.46 0.69 19.44 0.23 Conv.Bare
261 BA-11201A V-Anchor + Nut AN1 24.34 0.46 1.58 0.76 19.49 0.88 Conv.Bare
262 BA-11201A V-Anchor + Nut AN1 24.17 0.93 1.42 0.97 19.32 0.18 Conv.Bare
263 BA-11201A V-Anchor + Nut AN1 24.61 0.92 1.45 0.84 19.40 0.11 Conv.Bare
264 BA-11201A V-Anchor + Nut AN1 24.06 0.82 1.30 0.49 19.17 0.25 Conv.Bare
265 BA-11201A V-Anchor + Nut AN1 24.60 0.32 1.80 0.38 19.15 0.53 Conv.Bare
266 BA-11201A V-Anchor + Nut AN1 24.44 0.63 1.14 0.13 19.48 0.05 Conv.Bare
267 BA-11201A V-Anchor + Nut AN1 24.36 0.01 1.24 0.60 19.17 0.50 Conv.Bare
268 BA-11201A V-Anchor + Nut AN1 24.43 1.00 1.84 0.54 19.49 0.24 Conv.Bare
269 BA-11201A V-Anchor + Nut AN1 24.02 0.20 1.38 0.53 19.03 0.16 Conv.Bare
270 BA-11201A V-Anchor + Nut AN1 24.18 0.81 1.40 0.53 19.22 0.38 Conv.Bare
271 BA-11201A V-Anchor + Nut AN1 24.88 0.03 1.47 0.56 19.18 0.77 Conv.Bare
272 BA-11201A V-Anchor + Nut AN1 24.29 0.89 1.29 0.69 19.25 0.87 Conv.Bare
273 BA-11201A V-Anchor + Nut AN1 24.13 0.76 1.39 0.32 19.33 0.45 Conv.Bare
274 BA-11201A V-Anchor + Nut AN1 24.38 0.81 1.98 0.01 19.07 0.72 Conv.Bare
275 BA-11201A V-Anchor + Nut AN1 24.96 0.36 1.42 0.30 19.27 0.91 Conv.Bare
276 BA-11201A V-Anchor + Nut AN1 24.90 0.32 1.34 0.28 19.43 0.07 Conv.Bare
277 BA-11201A V-Anchor + Nut AN1 24.55 0.44 1.28 0.17 19.32 0.06 Conv.Bare
278 BA-11201A V-Anchor + Nut AN1 24.16 0.84 1.89 0.03 19.41 0.22 Conv.Bare
279 BA-11201A V-Anchor + Nut AN1 24.20 0.72 1.85 0.35 19.19 0.31 Conv.Bare
280 BA-11201A V-Anchor + Nut AN1 24.48 0.17 1.98 0.17 19.30 0.56 Conv.Bare
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.45
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 01.09.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN1
Description of Item Tested: ANCHOR Supply - AN1 H=50mm & D=6mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
281 BA-11201A V-Anchor + Nut AN1 24.03 0.31 2.00 0.33 19.41 0.66 Conv.Bare
282 BA-11201A V-Anchor + Nut AN1 24.92 0.74 1.51 0.38 19.15 0.06 Conv.Bare
283 BA-11201A V-Anchor + Nut AN1 24.32 0.16 1.33 0.10 19.14 0.27 Conv.Bare
284 BA-11201A V-Anchor + Nut AN1 24.76 0.37 1.19 0.23 19.20 0.87 Conv.Bare
285 BA-11201A V-Anchor + Nut AN1 24.07 0.15 1.07 0.33 19.06 0.02 Conv.Bare
286 BA-11201A V-Anchor + Nut AN1 24.80 0.68 1.71 0.50 19.33 0.21 Conv.Bare
287 BA-11201A V-Anchor + Nut AN1 24.16 0.90 1.21 0.33 19.47 0.87 Conv.Bare
288 BA-11201A V-Anchor + Nut AN1 24.64 0.27 1.85 0.05 19.07 0.73 Conv.Bare
289 BA-11201A V-Anchor + Nut AN1 24.63 0.70 1.08 0.33 19.06 0.18 Conv.Bare
290 BA-11201A V-Anchor + Nut AN1 24.83 0.89 1.16 0.71 19.22 0.23 Conv.Bare
291 BA-11201A V-Anchor + Nut AN1 24.38 0.52 1.26 0.77 19.43 0.21 Conv.Bare
292 BA-11201A V-Anchor + Nut AN1 24.07 0.93 1.58 0.82 19.11 0.77 Conv.Bare
293 BA-11201A V-Anchor + Nut AN1 24.04 0.13 1.38 0.63 19.10 0.36 Conv.Bare
294 BA-11201A V-Anchor + Nut AN1 24.25 0.18 1.53 0.88 19.11 0.15 Conv.Bare
295 BA-11201A V-Anchor + Nut AN1 24.81 0.70 1.79 0.75 19.35 0.03 Conv.Bare
296 BA-11201A V-Anchor + Nut AN1 24.69 0.24 1.46 0.67 19.22 0.17 Conv.Bare
297 BA-11201A V-Anchor + Nut AN1 24.12 0.17 1.80 0.84 19.49 0.60 Conv.Bare
298 BA-11201A V-Anchor + Nut AN1 24.17 0.21 1.48 0.82 19.16 0.58 Conv.Bare
299 BA-11201A V-Anchor + Nut AN1 24.46 0.97 1.15 0.09 19.40 0.23 Conv.Bare
300 BA-11101A V-Anchor + Nut AN15 24.50 0.93 1.41 0.76 19.06 0.76 Access Door
301 BA-11101A V-Anchor + Nut AN15 24.64 0.07 1.10 0.27 19.24 0.87 Access Door
302 BA-11101A V-Anchor + Nut AN15 24.80 0.27 1.18 0.66 19.38 0.02 Access Door
303 BA-11101A V-Anchor + Nut AN18 24.88 0.40 1.76 0.98 19.32 0.22 Insp Door
304 BA-11101A V-Anchor + Nut AN18 24.97 0.95 1.24 0.54 19.20 0.44 Insp Door
305 BA-11101A V-Anchor + Nut AN18 24.55 0.17 1.35 0.11 19.15 0.80 Insp Door
306 BA-11102A Stud AN13 24.02 0.94 1.78 0.01 19.37 0.44 Insp Door
307 BA-11102A Stud AN13 24.27 0.38 1.86 0.59 19.47 0.04 Insp Door
308 BA-11102A Stud AN13 24.83 0.76 1.69 0.10 19.12 0.58 Insp Door
309
310
311
312
313
314
315
316
317
318
319
320
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.110
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 26.08.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN14
Description of Item Tested: ANCHOR Supply - AN14 H=75mm & D=6mm
Material as per Drawing: ASTM A 276/479 Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
1 BA-11101A V-Anchor AN14 24.94 0.30 1.40 0.46 19.20 0.24 Rad Floor
2 BA-11101A V-Anchor AN14 24.36 0.44 1.08 0.92 19.41 0.29 Rad Floor
3 BA-11101A V-Anchor AN14 24.15 0.37 1.04 0.37 19.06 0.30 Rad Floor
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.363
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 11.11.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN4
Description of Item Tested: ANCHOR Supply - AN4 H=123mm & D=8mm
Material as per Drawing: ASTM A 276 Gr.310S
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
1 BA-11101A Stud AN4 24.92 0.46 1.75 0.33 19.26 0.96 Conv Floor
2 BA-11101A Stud AN4 24.89 0.56 1.42 0.80 19.21 0.75 Conv Floor
3 BA-11101A Stud AN4 24.12 0.50 1.45 0.86 19.43 0.69 Conv Floor
4 BA-11101A Stud AN4 24.26 0.65 1.00 0.85 19.35 0.86 Conv Floor
5 BA-11101A Stud AN4 24.38 0.45 1.43 0.85 19.40 0.28 Conv Floor
6 BA-11101A Stud AN4 24.82 0.88 1.77 0.78 19.25 0.81 Conv Floor
7 BA-11101A Stud AN4 24.85 0.84 1.70 0.29 19.02 0.34 Conv Floor
8 BA-11101A Stud AN4 24.30 0.73 1.17 0.36 19.41 0.85 Conv Floor
9 BA-11101A Stud AN4 24.71 0.10 1.44 0.69 19.17 0.90 Conv Floor
10 BA-11101A Stud AN4 24.15 0.78 1.66 0.32 19.28 0.13 Conv Floor
11 BA-11101A Stud AN4 24.30 0.14 1.16 0.70 19.06 0.07 Conv Floor
12 BA-11101A Stud AN4 24.21 0.33 1.20 0.48 19.44 0.11 Conv Floor
13 BA-11101A Stud AN4 24.73 0.91 1.49 0.27 19.38 0.01 Conv Floor
14 BA-11101A Stud AN4 24.93 0.67 1.48 0.43 19.40 0.41 Conv Floor
15 BA-11101A Stud AN4 24.07 0.91 1.56 0.37 19.05 0.23 Conv Floor
16 BA-11101A Stud AN4 24.39 0.76 1.64 0.03 19.15 0.86 Conv Floor
17 BA-11101A Stud AN4 24.01 0.48 1.78 0.82 19.17 0.06 Conv Floor
18 BA-11101A Stud AN4 24.77 0.26 1.08 0.19 19.44 0.72 Conv Floor
19 BA-11101A Stud AN4 24.83 0.41 1.45 0.13 19.10 0.07 Conv Floor
20 BA-11101A Stud AN4 24.34 0.36 1.81 0.57 19.16 0.04 Conv Floor
21 BA-11101A Stud AN4 24.76 0.04 1.76 0.80 19.15 0.21 Conv Floor
22 BA-11101A Stud AN4 24.82 0.41 1.41 0.49 19.12 0.10 Conv Floor
23 BA-11101A Stud AN4 24.27 0.63 1.16 0.00 19.17 0.31 Conv Floor
24 BA-11101A Stud AN4 24.19 0.65 1.16 0.24 19.16 0.76 Conv Floor
25 BA-11201A Stud AN4 24.33 0.73 1.73 0.43 19.19 0.52 Conv Floor
26 BA-11201A Stud AN4 24.25 0.41 1.45 0.36 19.46 0.58 Conv Floor
27 BA-11201A Stud AN4 24.50 0.38 1.61 0.44 19.07 0.11 Conv Floor
28 BA-11201A Stud AN4 24.36 0.34 1.89 0.20 19.11 0.13 Conv Floor
29 BA-11201A Stud AN4 24.14 0.79 1.49 0.51 19.18 0.97 Conv Floor
30 BA-11201A Stud AN4 24.75 0.09 1.15 0.88 19.04 0.94 Conv Floor
31 BA-11201A Stud AN4 24.83 0.78 1.03 0.38 19.41 0.65 Conv Floor
32 BA-11201A Stud AN4 24.25 0.83 1.21 0.02 19.00 0.50 Conv Floor
33 BA-11201A Stud AN4 24.11 0.33 1.01 0.18 19.31 0.48 Conv Floor
34 BA-11201A Stud AN4 24.88 0.48 1.66 0.01 19.35 0.98 Conv Floor
35 BA-11201A Stud AN4 24.80 0.51 1.25 0.83 19.02 0.17 Conv Floor
36 BA-11201A Stud AN4 24.17 0.11 1.14 0.98 19.47 0.83 Conv Floor
37 BA-11201A Stud AN4 24.97 0.91 1.32 0.32 19.43 0.31 Conv Floor
38 BA-11201A Stud AN4 24.67 0.04 1.67 0.55 19.30 0.42 Conv Floor
39 BA-11201A Stud AN4 24.81 0.29 1.99 0.96 19.07 0.60 Conv Floor
40 BA-11201A Stud AN4 24.60 0.66 1.63 0.21 19.17 0.33 Conv Floor
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.363
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 11.11.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN4 / AN7 / AN8
Description of Item Tested: ANCHOR Supply - AN4 H=123mm & D=8mm / AN7 & AN8 H=75mm 25mm X 3mm
Material as per Drawing: ASTM A 276 Gr.310S / A 240M Gr. 310 & 304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
41 BA-11201A Stud AN4 24.88 0.40 1.02 0.65 19.03 0.61 Conv Floor
42 BA-11201A Stud AN4 24.00 0.31 1.09 0.22 19.46 0.95 Conv Floor
43 BA-11201A Stud AN4 24.26 0.91 1.61 0.56 19.14 0.26 Conv Floor
44 BA-11201A Stud AN4 24.81 0.80 1.84 0.76 19.20 0.57 Conv Floor
45 BA-11201A Stud AN4 24.72 0.66 1.66 0.70 19.47 0.91 Conv Floor
46 BA-11201A Stud AN4 24.72 0.59 1.50 0.90 19.30 0.16 Conv Floor
47 BA-11201A Stud AN4 24.59 0.03 1.59 0.26 19.25 0.21 Conv Floor
48 BA-11101A Strip Anchor AN7 24.43 0.67 1.49 0.39 19.07 0.54 Conv ETS
49 BA-11101A Strip Anchor AN7 24.50 0.62 1.52 0.19 19.30 0.26 Conv ETS
50 BA-11101A Strip Anchor AN7 24.96 0.36 1.19 0.71 19.49 0.43 Conv ETS
51 BA-11101A Strip Anchor AN7 24.01 0.54 1.08 0.09 19.12 0.14 Conv ETS
52 BA-11201A Strip Anchor AN7 24.90 0.32 1.89 0.77 19.32 0.35 Conv ETS
53 BA-11201A Strip Anchor AN7 24.67 0.49 1.98 0.93 19.25 0.26 Conv ETS
54 BA-11201A Strip Anchor AN7 24.65 0.57 1.34 0.95 19.03 0.43 Conv ETS
55 BA-11201A Strip Anchor AN7 24.26 0.25 1.67 0.81 19.12 0.40 Conv ETS
56 BA-11101A Strip Anchor AN8 18.02 0.18 1.18 0.48 8.54 0.36 Conv ETS
57 BA-11101A Strip Anchor AN8 18.58 0.94 1.24 0.47 8.95 0.19 Conv ETS
58 BA-11101A Strip Anchor AN8 18.41 0.78 1.49 0.10 8.61 0.27 Conv ETS
59 BA-11101A Strip Anchor AN8 18.90 0.73 1.21 0.41 8.71 0.85 Conv ETS
60 BA-11101A Strip Anchor AN8 18.58 0.92 1.49 0.16 8.16 0.93 Conv ETS
61 BA-11101A Strip Anchor AN8 18.26 0.81 1.86 0.95 8.30 0.14 Conv ETS
62 BA-11101A Strip Anchor AN8 18.81 0.11 1.40 0.46 8.33 0.80 Conv ETS
63 BA-11101A Strip Anchor AN8 18.60 0.76 1.94 0.17 8.73 0.42 Conv ETS
64 BA-11101A Strip Anchor AN8 18.09 0.74 1.28 0.62 8.78 0.54 Conv ETS
65 BA-11101A Strip Anchor AN8 18.60 0.62 1.18 0.31 8.78 0.07 Conv ETS
66 BA-11101A Strip Anchor AN8 18.13 0.53 1.19 0.66 8.95 0.87 Conv ETS
67 BA-11101A Strip Anchor AN8 18.66 0.68 1.50 0.15 8.96 0.66 Conv ETS
68 BA-11101A Strip Anchor AN8 18.49 0.58 1.87 0.93 8.37 0.04 Conv ETS
69 BA-11101A Strip Anchor AN8 18.77 0.74 1.00 0.36 8.87 0.76 Conv ETS
70 BA-11101A Strip Anchor AN8 18.79 0.30 1.19 0.03 8.87 0.02 Conv ETS
71 BA-11201A Strip Anchor AN8 18.87 0.56 1.79 0.64 8.92 0.79 Conv ETS
72 BA-11201A Strip Anchor AN8 18.04 0.10 1.84 0.06 8.05 0.66 Conv ETS
73 BA-11201A Strip Anchor AN8 18.05 0.03 1.61 0.37 8.68 0.96 Conv ETS
74 BA-11201A Strip Anchor AN8 18.71 0.53 1.51 0.18 8.62 0.00 Conv ETS
75 BA-11201A Strip Anchor AN8 18.89 0.13 1.17 0.87 8.63 0.43 Conv ETS
76 BA-11201A Strip Anchor AN8 18.79 0.89 1.13 0.69 8.07 0.31 Conv ETS
77 BA-11201A Strip Anchor AN8 18.98 0.73 1.59 0.15 8.95 0.62 Conv ETS
78 BA-11201A Strip Anchor AN8 18.79 0.20 1.48 0.53 8.54 0.90 Conv ETS
79 BA-11201A Strip Anchor AN8 18.05 0.96 1.46 0.66 8.08 0.29 Conv ETS
80 BA-11201A Strip Anchor AN8 18.05 0.41 1.71 0.67 8.25 0.29 Conv ETS
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.363
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 11.11.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN8 / AN6/ AN5
Description of Item Tested: ANCHOR Supply - AN8 H=75mm 25mm X 3mm / AN6 & AN5 H=202mm D=6mm
Material as per Drawing: ASTM A 276 Gr.304 & 310S / A 240M Gr.304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
81 BA-11201A Strip Anchor AN8 18.77 0.90 1.30 0.74 8.24 0.14 Conv ETS
82 BA-11201A Strip Anchor AN8 18.41 0.75 1.84 0.29 8.94 0.68 Conv ETS
83 BA-11201A Strip Anchor AN8 18.96 0.48 1.38 0.72 8.91 0.70 Conv ETS
84 BA-11201A Strip Anchor AN8 18.46 0.45 1.19 0.55 8.20 0.67 Conv ETS
85 BA-11201A Strip Anchor AN8 18.39 0.39 1.55 0.80 8.56 0.88 Conv ETS
86 BA-11101A Corbel AN6 18.74 0.87 1.76 0.57 8.00 0.39 Conv Wall
87 BA-11101A Corbel AN6 18.95 0.74 1.87 0.54 8.69 0.20 Conv Wall
88 BA-11101A Corbel AN6 18.86 0.05 1.12 0.47 8.05 0.97 Conv Wall
89 BA-11101A Corbel AN6 18.74 0.31 1.57 0.13 8.69 0.48 Conv Wall
90 BA-11101A Corbel AN6 18.37 0.27 1.29 0.14 8.24 0.42 Conv Wall
91 BA-11101A Corbel AN6 18.37 0.88 1.27 0.32 8.51 0.83 Conv Wall
92 BA-11101A Corbel AN6 18.37 0.13 1.94 0.65 8.41 0.86 Conv Wall
93 BA-11101A Corbel AN6 18.80 0.60 1.92 0.95 8.49 0.37 Conv Wall
94 BA-11101A Corbel AN6 18.01 0.49 1.26 0.56 8.15 0.82 Conv Wall
95 BA-11101A Corbel AN6 18.23 0.16 1.24 0.26 8.79 0.91 Conv Wall
96 BA-11101A Corbel AN6 18.76 0.15 1.74 0.51 8.80 0.48 Conv Wall
97 BA-11101A Corbel AN6 18.62 0.01 1.82 0.22 8.95 0.14 Conv Wall
98 BA-11101A Corbel AN6 18.95 0.26 1.85 0.74 8.10 0.27 Conv Wall
99 BA-11101A Corbel AN6 18.63 0.57 1.48 0.46 8.01 0.48 Conv Wall
100 BA-11101A Corbel AN6 18.56 0.30 1.62 0.89 8.96 0.11 Conv Wall
101 BA-11101A Corbel AN6 18.53 0.84 1.98 0.09 8.26 0.15 Conv Wall
102 BA-11101A Corbel AN6 18.23 0.23 1.12 0.02 8.62 0.97 Conv Wall
103 BA-11101A Corbel AN6 18.17 0.97 1.90 0.04 8.36 0.11 Conv Wall
104 BA-11101A Corbel AN6 18.74 0.73 1.24 0.70 8.97 0.04 Conv Wall
105 BA-11101A Corbel AN5 24.56 0.48 1.86 0.32 19.27 0.22 Conv Wall
106 BA-11101A Corbel AN5 24.81 0.50 1.27 0.02 19.45 0.68 Conv Wall
107 BA-11101A Corbel AN5 24.61 0.81 1.13 0.71 19.07 0.23 Conv Wall
108 BA-11101A Corbel AN5 24.64 0.66 1.71 0.22 19.19 0.93 Conv Wall
109 BA-11101A Corbel AN5 24.31 0.46 1.69 0.06 19.18 0.65 Conv Wall
110 BA-11202A V-Anchor + M8 Nut AN1 24.77 0.07 1.61 0.30 19.40 0.22 Conv Wall
111 BA-11202A V-Anchor + M8 Nut AN1 24.73 0.67 1.30 0.05 19.30 0.82 Conv Wall
112 BA-11202A V-Anchor + M8 Nut AN1 24.07 0.43 1.67 0.19 19.04 1.00 Conv Wall
113 BA-11202A V-Anchor + M8 Nut AN1 24.17 0.91 1.05 0.32 19.35 0.63 Conv Wall
114 BA-11202A V-Anchor + M8 Nut AN1 24.71 0.87 1.66 1.00 19.02 0.40 Conv Wall
115 BA-11202A V-Anchor + M8 Nut AN1 24.27 0.77 1.37 0.72 19.34 0.12 Conv Wall
116 BA-11202A V-Anchor + M8 Nut AN1 24.38 0.69 1.15 0.53 19.32 0.46 Conv Wall
117 BA-11202A V-Anchor + M8 Nut AN1 24.14 0.68 1.30 0.99 19.40 0.12 Conv Wall
118 BA-11202A V-Anchor + M8 Nut AN1 24.69 0.23 1.23 0.77 19.07 0.55 Conv Wall
119 BA-11202A V-Anchor + M8 Nut AN1 24.55 0.21 1.33 0.95 19.28 0.30 Conv Wall
120 BA-11202A V-Anchor + M8 Nut AN1 24.14 0.15 1.53 0.60 19.36 0.98 Conv Wall
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.363
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 11.11.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN2
Description of Item Tested: ANCHOR Supply - AN2 H=50mm D=6mm
Material as per Drawing: ASTM A 276 Gr.304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
121 BA-11202A V-Anchor + M8 Nut AN2 18.71 0.52 1.88 0.87 8.48 0.97 Conv Wall
122 BA-11202A V-Anchor + M8 Nut AN2 18.53 0.11 1.05 0.20 8.69 0.71 Conv Wall
123 BA-11202A V-Anchor + M8 Nut AN2 18.60 0.77 1.30 0.57 8.96 0.63 Conv Wall
124 BA-11202A V-Anchor + M8 Nut AN2 18.32 0.29 1.20 0.77 8.57 0.93 Conv Wall
125 BA-11202A V-Anchor + M8 Nut AN2 18.37 0.53 1.91 0.82 8.16 0.95 Conv Wall
126 BA-11202A V-Anchor + M8 Nut AN2 18.78 0.33 1.68 0.29 8.79 0.70 Conv Wall
127 BA-11202A V-Anchor + M8 Nut AN2 18.13 0.77 1.55 0.20 8.77 0.67 Conv Wall
128 BA-11202A V-Anchor + M8 Nut AN2 18.80 0.31 1.64 0.46 8.36 0.04 Conv Wall
129 BA-11202A V-Anchor + M8 Nut AN2 18.86 0.80 1.09 0.86 8.74 0.86 Conv Wall
130 BA-11202A V-Anchor + M8 Nut AN2 18.38 0.15 1.44 0.78 8.17 0.22 Conv Wall
131 BA-11202A V-Anchor + M8 Nut AN2 18.68 0.31 1.77 0.27 8.08 0.71 Conv Wall
132 BA-11202A V-Anchor + M8 Nut AN2 18.30 0.22 1.50 0.70 8.69 0.18 Conv Wall
133 BA-11202A V-Anchor + M8 Nut AN2 18.28 0.94 1.35 0.87 8.86 0.17 Conv Wall
134 BA-11202A V-Anchor + M8 Nut AN2 18.97 0.65 1.69 0.97 8.50 0.49 Conv Wall
135 BA-11202A V-Anchor + M8 Nut AN2 18.73 0.40 1.39 0.42 8.28 0.68 Conv Wall
136 BA-11202A V-Anchor + M8 Nut AN2 18.19 0.42 1.98 0.69 8.41 0.53 Conv Wall
137 BA-11202A V-Anchor + M8 Nut AN2 18.13 0.50 1.41 0.68 8.23 0.33 Conv Wall
138 BA-11202A V-Anchor + M8 Nut AN2 18.90 0.46 1.71 0.14 8.55 0.44 Conv Wall
139 BA-11202A V-Anchor + M8 Nut AN2 18.83 0.59 1.30 0.71 8.74 0.89 Conv Wall
140 BA-11202A V-Anchor + M8 Nut AN2 18.42 0.77 1.78 0.40 8.87 0.81 Conv Wall
141 BA-11202A V-Anchor + M8 Nut AN2 18.64 0.64 1.97 0.75 8.75 0.23 Conv Wall
142 BA-11202A V-Anchor + M8 Nut AN2 18.43 0.66 1.41 0.68 8.83 0.65 Conv Wall
143 BA-11202A V-Anchor + M8 Nut AN2 18.99 0.70 1.64 0.11 8.36 0.92 Conv Wall
144 BA-11202A V-Anchor + M8 Nut AN2 18.29 0.98 1.93 0.79 8.52 0.18 Conv Wall
145 BA-11202A V-Anchor + M8 Nut AN2 18.27 0.42 1.76 0.18 8.79 0.52 Conv Wall
146 BA-11202A V-Anchor + M8 Nut AN2 18.98 0.70 1.17 0.89 8.88 0.79 Conv Wall
147 BA-11202A V-Anchor + M8 Nut AN2 18.00 0.41 1.64 0.27 8.27 0.83 Conv Wall
148 BA-11202A V-Anchor + M8 Nut AN2 18.97 0.41 1.78 0.56 8.98 0.75 Conv Wall
149 BA-11202A V-Anchor + M8 Nut AN2 18.67 0.80 1.35 0.34 8.56 0.14 Conv Wall
150 BA-11202A V-Anchor + M8 Nut AN2 18.96 0.10 1.88 0.72 8.67 0.44 Conv Wall
151 BA-11202A V-Anchor + M8 Nut AN2 18.50 0.17 1.71 0.33 8.02 0.95 Conv Wall
152 BA-11202A V-Anchor + M8 Nut AN2 18.99 0.10 1.68 0.40 8.20 0.91 Conv Wall
153 BA-11202A V-Anchor + M8 Nut AN2 18.68 0.64 1.10 0.02 8.23 0.95 Conv Wall
154 BA-11202A V-Anchor + M8 Nut AN2 18.76 0.89 1.31 0.90 8.78 0.10 Conv Wall
155 BA-11202A V-Anchor + M8 Nut AN2 18.19 0.99 1.22 0.66 8.39 0.74 Conv Wall
156 BA-11202A V-Anchor + M8 Nut AN2 18.79 0.41 1.02 0.82 8.52 0.29 Conv Wall
157 BA-11202A V-Anchor + M8 Nut AN2 18.50 0.71 1.18 0.11 8.31 0.44 Conv Wall
158 BA-11202A V-Anchor + M8 Nut AN2 18.50 0.62 1.64 0.73 8.75 0.89 Conv Wall
159 BA-11202A V-Anchor + M8 Nut AN2 18.95 0.03 1.64 0.78 8.59 0.45 Conv Wall
160 BA-11202A V-Anchor + M8 Nut AN2 18.76 0.50 1.54 0.48 8.90 0.03 Conv Wall
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.363
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 11.11.2021
Machine Description: X-MET8000
Make
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN2 / AN7/ AN8/ AN3/ AN4
Description of Item Tested:AN2 H=50mmD=6mm / AN7 & AN8 H=75mm 25X3mm / AN3 & AN4 H=177mm D=6mm
Material as per Drawing: ASTM A 276 Gr.304 / A 240M Gr.310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
161 BA-11202A V-Anchor + M8 Nut AN2 18.05 0.43 1.97 0.09 8.89 0.96 Conv Wall
162 BA-11202A V-Anchor + M8 Nut AN2 18.56 0.81 1.06 0.00 8.81 0.55 Conv Wall
163 BA-11202A V-Anchor + M8 Nut AN2 18.82 0.53 1.14 0.19 8.16 0.12 Conv Wall
164 BA-11202A V-Anchor + M8 Nut AN2 18.37 0.53 1.09 0.82 8.09 0.77 Conv Wall
165 BA-11202A V-Anchor + M8 Nut AN2 18.54 0.73 1.90 0.35 8.60 0.76 Conv Wall
166 BA-11202A V-Anchor + M8 Nut AN2 18.64 0.13 1.12 0.11 8.33 0.30 Conv Wall
167 BA-11202A V-Anchor + M8 Nut AN2 18.33 0.55 1.51 0.81 8.86 0.17 Conv Wall
168 BA-11202A V-Anchor + M8 Nut AN2 18.81 0.17 1.04 0.75 8.29 0.13 Conv Wall
169 BA-111201A Strip Anchor AN7 24.10 0.42 1.16 0.65 19.15 0.11 Conv ETS
170 BA-111201A Strip Anchor AN7 24.35 0.44 1.37 0.78 19.27 0.72 Conv ETS
171 BA-111202A Strip Anchor AN7 24.12 0.91 1.78 0.95 19.18 0.00 Conv ETS
172 BA-111202A Strip Anchor AN7 24.69 1.00 1.37 0.49 19.06 0.51 Conv ETS
173 BA-111201A Strip Anchor AN8 18.99 0.71 1.47 0.37 8.21 0.77 Conv ETS
174 BA-111201A Strip Anchor AN8 18.71 0.85 1.52 0.07 8.14 0.95 Conv ETS
175 BA-111201A Strip Anchor AN8 18.21 0.68 1.63 0.97 8.46 0.86 Conv ETS
176 BA-111201A Strip Anchor AN8 18.88 0.79 1.83 0.40 8.30 0.92 Conv ETS
177 BA-111201A Strip Anchor AN8 18.05 0.35 1.26 0.13 8.90 0.56 Conv ETS
178 BA-111201A Strip Anchor AN8 18.87 0.35 1.56 0.64 8.01 0.89 Conv ETS
179 BA-111201A Strip Anchor AN8 18.72 0.00 1.74 0.61 8.55 0.85 Conv ETS
180 BA-111202A Strip Anchor AN8 18.79 0.61 1.58 0.89 8.10 0.41 Conv ETS
181 BA-111202A Strip Anchor AN8 18.61 0.60 1.76 0.57 8.17 0.63 Conv ETS
182 BA-111202A Strip Anchor AN8 18.53 0.84 1.04 0.47 8.73 0.60 Conv ETS
183 BA-111202A Strip Anchor AN8 18.01 0.26 1.28 0.08 8.90 0.32 Conv ETS
184 BA-111202A Strip Anchor AN8 18.82 0.51 1.87 0.60 8.87 0.98 Conv ETS
185 BA-111202A Strip Anchor AN8 18.63 0.81 1.31 0.45 8.78 0.00 Conv ETS
186 BA-11102A Corbels AN3 24.52 0.07 1.19 0.37 19.05 0.21 Conv Wall
187 BA-11102A Corbels AN3 24.23 0.07 1.91 0.51 19.09 0.84 Conv Wall
188 BA-11102A Corbels AN3 24.05 0.60 1.29 0.79 19.09 0.58 Conv Wall
189 BA-11102A Corbels AN3 24.13 0.18 1.96 0.76 19.08 0.99 Conv Wall
190 BA-11202A Corbels AN3 24.38 0.47 1.73 0.69 19.02 0.58 Conv Wall
191 BA-11202A Corbels AN3 24.10 0.58 1.20 0.03 19.44 0.93 Conv Wall
192 BA-11202A Corbels AN3 24.12 0.80 1.68 0.52 19.37 0.21 Conv Wall
193 BA-11202A Corbels AN3 24.79 0.55 1.08 0.97 19.02 0.44 Conv Wall
194 BA-11102A Corbels AN4 18.95 0.63 1.72 0.07 8.91 0.16 Conv Wall
195 BA-11102A Corbels AN4 18.47 0.46 1.09 0.26 8.01 0.12 Conv Wall
196 BA-11102A Corbels AN4 18.31 0.84 1.29 0.51 8.21 0.81 Conv Wall
197 BA-11102A Corbels AN4 18.64 0.30 1.45 0.88 8.59 0.83 Conv Wall
198 BA-11102A Corbels AN4 18.92 0.44 1.33 0.33 8.28 0.24 Conv Wall
199 BA-11102A Corbels AN4 18.40 0.69 1.50 0.31 8.77 0.25 Conv Wall
200 BA-11102A Corbels AN4 18.07 0.83 1.86 0.92 8.39 0.57 Conv Wall
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.363
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 11.11.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN4
Description of Item Tested:AN4 H=177mm D=6mm
Material as per Drawing: ASTM A 276 Gr.304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
161 BA-11102A Corbels AN4 18.97 0.12 1.27 0.03 8.02 0.99 Conv Wall
162 BA-11102A Corbels AN4 18.97 0.54 1.57 0.61 8.98 0.28 Conv Wall
163 BA-11102A Corbels AN4 18.42 0.93 1.09 0.43 8.97 0.41 Conv Wall
164 BA-11102A Corbels AN4 18.37 0.35 1.97 0.04 8.07 0.91 Conv Wall
165 BA-11202A Corbels AN4 18.17 0.76 1.47 0.25 8.86 0.80 Conv Wall
166 BA-11202A Corbels AN4 18.90 0.58 1.17 0.66 8.49 0.74 Conv Wall
167 BA-11202A Corbels AN4 18.18 0.18 1.37 0.44 8.51 0.33 Conv Wall
168 BA-11202A Corbels AN4 18.92 0.14 1.27 0.61 8.63 0.47 Conv Wall
169 BA-11202A Corbels AN4 18.20 0.29 1.51 0.35 8.68 0.08 Conv Wall
170 BA-11202A Corbels AN4 18.49 0.78 1.58 0.13 8.49 0.35 Conv Wall
171 BA-11202A Corbels AN4 18.73 0.28 1.78 0.46 8.16 0.58 Conv Wall
172 BA-11202A Corbels AN4 18.45 0.69 1.84 0.58 8.76 1.00 Conv Wall
173 BA-11202A Corbels AN4 18.86 0.42 1.98 0.30 8.89 0.91 Conv Wall
174 BA-11202A Corbels AN4 18.13 0.65 1.32 0.36 8.59 0.86 Conv Wall
175 BA-11102A Stud AN4 18.14 0.54 1.72 0.71 8.69 0.82 Conv Wall
176 BA-11102A Stud AN4 18.02 0.12 1.88 0.60 8.65 0.02 Conv Wall
177 BA-11102A Stud AN4 18.41 0.68 1.20 0.18 8.63 0.06 Conv Wall
178 BA-11102A Stud AN4 18.06 0.01 1.40 0.43 8.32 0.96 Conv Wall
179 BA-11102A Stud AN4 18.09 0.19 1.98 0.98 8.57 0.11 Conv Wall
180 BA-11102A Stud AN4 18.12 0.43 1.73 0.15 8.86 0.20 Conv Wall
181 BA-11102A Stud AN4 18.45 0.35 1.80 0.80 8.92 0.03 Conv Wall
182 BA-11102A Stud AN4 18.10 0.85 1.55 0.69 8.29 0.41 Conv Wall
183 BA-11102A Stud AN4 18.50 0.98 1.86 0.23 8.58 0.34 Conv Wall
184 BA-11102A Stud AN4 18.34 0.97 1.85 0.37 8.09 0.95 Conv Wall
185 BA-11102A Stud AN4 18.73 0.95 1.35 0.02 8.36 0.51 Conv Wall
186 BA-11202A Stud AN4 18.56 0.23 1.82 0.86 8.37 0.62 Conv Wall
187 BA-11202A Stud AN4 18.68 0.51 1.08 0.11 8.18 0.13 Conv Wall
188 BA-11202A Stud AN4 18.74 0.05 1.18 0.65 8.32 0.17 Conv Wall
189 BA-11202A Stud AN4 18.22 0.81 1.98 0.44 8.75 0.94 Conv Wall
190 BA-11202A Stud AN4 18.91 0.26 1.01 0.67 8.67 0.65 Conv Wall
191 BA-11202A Stud AN4 18.75 0.77 1.89 0.52 8.48 0.41 Conv Wall
192 BA-11202A Stud AN4 18.42 0.69 1.41 0.49 8.59 0.31 Conv Wall
193 BA-11202A Stud AN4 18.80 0.59 1.17 0.76 8.46 0.74 Conv Wall
194 BA-11202A Stud AN4 18.09 0.30 1.55 0.72 8.92 0.71 Conv Wall
195 BA-11202A Stud AN4 18.37 0.75 1.96 0.51 8.52 0.05 Conv Wall
196 BA-11202A Stud AN4 18.48 0.94 1.49 0.52 8.30 0.77 Conv Wall
197
198
199
200
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.118a
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 27.08.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN2
Description of Item Tested: ANCHOR Supply - AN2 H=73mm & D=8mm
Material as per Drawing: ASTM A 276 Gr.310S
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
1 BA-11101A Stud AN2 24.43 0.59 1.34 0.71 19.50 0.52 Shielded Wall
2 BA-11101A Stud AN2 24.82 0.57 1.25 0.05 19.37 0.71 Shielded Wall
3 BA-11101A Stud AN2 24.68 0.00 1.38 0.82 19.45 0.80 Shielded Wall
4 BA-11101A Stud AN2 24.67 0.11 1.87 0.85 19.11 0.17 Shielded Wall
5 BA-11101A Stud AN2 24.49 0.00 1.53 0.56 19.34 0.12 Shielded Wall
6 BA-11101A Stud AN2 24.77 0.23 1.50 0.08 19.10 0.59 Shielded Wall
7 BA-11101A Stud AN2 24.80 0.81 1.63 0.49 19.46 0.21 Shielded Wall
8 BA-11101A Stud AN2 24.35 0.85 1.17 0.18 19.38 0.20 Shielded Wall
9 BA-11101A Stud AN2 24.48 0.23 1.95 0.19 19.12 0.04 Shielded Wall
10 BA-11101A Stud AN2 24.56 0.76 1.92 0.91 19.41 0.60 Shielded Wall
11 BA-11101A Stud AN2 24.21 0.95 1.06 0.39 19.39 0.38 Shielded Wall
12 BA-11101A Stud AN2 24.38 0.89 1.54 0.50 19.24 0.48 Shielded Wall
13 BA-11101A Stud AN2 24.17 0.15 1.36 0.59 19.40 0.46 Shielded Wall
14 BA-11101A Stud AN2 24.50 0.18 1.82 0.33 19.02 0.90 Shielded Wall
15 BA-11101A Stud AN2 24.29 0.86 1.90 0.42 19.12 0.84 Shielded Wall
16 BA-11101A Stud AN2 24.76 0.72 1.24 0.38 19.29 0.93 Shielded Wall
17 BA-11101A Stud AN2 24.25 0.66 1.77 0.60 19.25 0.46 Shielded Wall
18 BA-11101A Stud AN2 24.45 0.25 1.73 0.78 19.31 0.66 Shielded Wall
19 BA-11101A Stud AN2 24.29 0.94 1.40 0.31 19.21 0.98 Shielded Wall
20 BA-11101A Stud AN2 24.88 0.91 1.24 0.02 19.41 0.94 Shielded Wall
21 BA-11101A Stud AN2 24.68 0.65 1.18 0.21 19.22 0.97 Shielded Wall
22 BA-11101A Stud AN2 24.53 0.82 1.03 0.51 19.45 0.85 Shielded Wall
23 BA-11101A Stud AN2 24.02 0.53 1.36 0.27 19.39 0.81 Shielded Wall
24 BA-11101A Stud AN2 24.40 0.53 1.34 0.02 19.17 0.85 Shielded Wall
25 BA-11101A Stud AN2 24.48 0.81 1.90 0.53 19.49 0.05 Shielded Wall
26 BA-11101A Stud AN2 24.50 0.02 1.68 0.88 19.15 0.51 Shielded Wall
27 BA-11101A Stud AN2 24.51 0.09 1.64 0.79 19.27 0.65 Shielded Wall
28 BA-11101A Stud AN2 24.12 0.05 1.59 0.99 19.11 0.07 Shielded Wall
29 BA-11101A Stud AN2 24.12 0.71 1.12 0.54 19.20 0.20 Shielded Wall
30 BA-11101A Stud AN2 24.60 0.30 1.25 0.67 19.05 0.13 Shielded Wall
31 BA-11101A Stud AN2 24.10 0.08 1.34 0.85 19.46 0.94 Shielded Wall
32 BA-11101A Stud AN2 24.98 0.88 1.58 0.64 19.23 0.62 Shielded Wall
33 BA-11101A Stud AN2 24.15 0.82 1.57 0.72 19.15 0.31 Shielded Wall
34 BA-11101A Stud AN2 24.96 0.20 1.07 0.17 19.14 0.90 Shielded Wall
35 BA-11101A Stud AN2 24.16 0.23 1.38 0.17 19.47 0.42 Shielded Wall
36 BA-11101A Stud AN2 24.93 0.74 1.31 0.58 19.44 0.89 Shielded Wall
37 BA-11101A Stud AN2 24.99 0.75 1.56 0.87 19.21 0.51 Shielded Wall
38 BA-11101A Stud AN2 24.07 0.68 1.60 0.36 19.46 0.47 Shielded Wall
39 BA-11101A Stud AN2 24.98 0.02 1.92 0.11 19.23 0.15 Shielded Wall
40 BA-11101A Stud AN2 24.25 0.43 1.79 0.30 19.34 0.85 Shielded Wall
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.118a
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 27.08.2022
Sr. No:814659
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN2 & AN1
Description of Item Tested: ANCHOR Supply - AN2 & AN1 H=73mm & D=8mm
Material as per Drawing: ASTM A 276 Gr.310S
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
41 BA-11101A Stud AN2 24.70 0.90 1.79 0.45 19.29 0.29 Shielded Wall
42 BA-11101A Stud AN2 24.15 0.16 1.12 0.21 19.37 0.08 Shielded Wall
43 BA-11101A Stud AN2 24.88 0.68 1.78 0.92 19.11 0.35 Shielded Wall
44 BA-11102A Stud AN1 24.95 0.20 1.69 0.25 19.38 0.11 Radiant Wall
45 BA-11102A Stud AN1 24.24 0.92 1.49 0.52 19.10 0.08 Radiant Wall
46 BA-11102A Stud AN1 24.55 0.96 1.74 0.70 19.24 0.84 Radiant Wall
47 BA-11102A Stud AN1 24.75 0.26 1.93 0.82 19.40 0.70 Radiant Wall
48 BA-11102A Stud AN1 24.14 0.43 1.23 0.14 19.02 0.99 Radiant Wall
49 BA-11102A Stud AN1 24.80 0.20 1.54 0.05 19.30 0.64 Radiant Wall
50 BA-11102A Stud AN1 24.25 0.08 1.24 0.69 19.37 0.37 Radiant Wall
51 BA-11102A Stud AN1 24.24 0.85 1.28 0.70 19.36 1.00 Radiant Wall
52 BA-11102A Stud AN1 24.69 0.10 1.60 0.54 19.14 0.55 Radiant Wall
53 BA-11102A Stud AN1 24.37 0.41 1.95 0.29 19.41 0.73 Radiant Wall
54 BA-11102A Stud AN1 24.41 0.90 1.09 0.21 19.39 0.29 Radiant Wall
55 BA-11102A Stud AN1 24.17 0.34 1.81 0.46 19.28 0.04 Radiant Wall
56 BA-11102A Stud AN1 24.24 0.06 1.95 0.13 19.20 0.88 Radiant Wall
57 BA-11102A Stud AN1 24.55 0.99 1.08 0.54 19.44 0.82 Radiant Wall
58 BA-11102A Stud AN1 24.26 0.73 1.36 0.49 19.15 0.83 Radiant Wall
59 BA-11102A Stud AN1 24.70 0.34 1.08 0.05 19.45 0.55 Radiant Wall
60 BA-11102A Stud AN1 24.13 0.88 1.86 0.58 19.34 0.87 Radiant Wall
61 BA-11102A Stud AN1 24.87 0.42 1.46 0.62 19.23 0.97 Radiant Wall
62 BA-11102A Stud AN1 24.89 0.08 1.40 0.82 19.46 0.63 Radiant Wall
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.118
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 26.08.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN2
Description of Item Tested: ANCHOR Supply - AN2 H=73mm & D=8mm
Material as per Drawing: ASTM A 276 Gr.310S
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
1 BA-11101A Stud AN2 24.91 0.83 1.81 0.16 19.16 0.46 Shielded Wall
2 BA-11101A Stud AN2 24.95 0.17 1.19 0.20 19.31 0.38 Shielded Wall
3 BA-11101A Stud AN2 24.47 0.37 1.59 0.21 19.16 0.23 Shielded Wall
4 BA-11101A Stud AN2 24.78 0.34 1.09 0.91 19.30 0.42 Shielded Wall
5 BA-11101A Stud AN2 24.73 0.78 1.71 0.01 19.41 0.50 Shielded Wall
6 BA-11101A Stud AN2 24.33 0.26 1.60 0.02 19.01 0.37 Shielded Wall
7 BA-11101A Stud AN2 24.93 0.60 1.18 0.93 19.12 0.51 Shielded Wall
8 BA-11101A Stud AN2 24.10 0.63 1.01 0.81 19.39 0.05 Shielded Wall
9 BA-11101A Stud AN2 24.53 0.33 1.36 0.50 19.46 0.81 Shielded Wall
10 BA-11101A Stud AN2 24.98 0.30 1.90 0.03 19.24 0.78 Shielded Wall
11 BA-11101A Stud AN2 24.21 0.11 1.17 0.33 19.28 0.26 Shielded Wall
12 BA-11101A Stud AN2 24.73 0.93 1.58 0.81 19.07 0.43 Shielded Wall
13 BA-11101A Stud AN2 24.64 0.29 1.07 0.28 19.24 0.56 Shielded Wall
14 BA-11101A Stud AN2 24.92 0.33 1.81 0.08 19.31 0.10 Shielded Wall
15 BA-11101A Stud AN2 24.22 0.07 1.27 0.24 19.42 0.66 Shielded Wall
16 BA-11101A Stud AN2 24.99 0.72 1.66 0.97 19.06 0.08 Shielded Wall
17 BA-11101A Stud AN2 24.71 0.05 1.89 0.19 19.30 0.31 Shielded Wall
18 BA-11101A Stud AN2 24.59 0.37 1.36 0.55 19.33 0.66 Shielded Wall
19 BA-11101A Stud AN2 24.98 0.75 1.51 0.64 19.14 0.20 Shielded Wall
20 BA-11101A Stud AN2 24.09 0.54 1.26 0.83 19.32 0.79 Shielded Wall
21 BA-11101A Stud AN2 24.67 0.79 1.84 0.42 19.18 0.88 Shielded Wall
22 BA-11101A Stud AN2 24.81 0.03 1.48 0.32 19.36 0.99 Shielded Wall
23 BA-11101A Stud AN2 24.26 0.47 1.23 0.46 19.43 0.79 Shielded Wall
24 BA-11101A Stud AN2 24.82 0.81 1.96 0.76 19.06 0.37 Shielded Wall
25 BA-11101A Stud AN2 24.02 0.69 1.62 0.64 19.05 0.37 Shielded Wall
26 BA-11101A Stud AN2 24.07 0.17 1.63 0.31 19.09 0.76 Shielded Wall
27 BA-11101A Stud AN2 24.68 0.12 1.74 0.67 19.02 0.13 Shielded Wall
28 BA-11101A Stud AN2 24.18 1.00 1.18 0.97 19.41 0.88 Shielded Wall
29 BA-11101A Stud AN2 24.28 0.28 1.92 0.11 19.35 0.17 Shielded Wall
30 BA-11101A Stud AN2 24.01 0.61 1.65 0.69 19.21 0.18 Shielded Wall
31 BA-11101A Stud AN2 24.31 0.20 1.63 0.47 19.12 0.78 Shielded Wall
32 BA-11101A Stud AN2 24.12 0.31 1.99 0.83 19.14 0.39 Shielded Wall
33 BA-11101A Stud AN2 24.07 0.65 1.38 0.97 19.30 0.78 Shielded Wall
34 BA-11101A Stud AN2 24.13 0.15 1.93 0.93 19.11 0.41 Shielded Wall
35 BA-11101A Stud AN2 24.21 0.25 1.37 0.46 19.18 0.26 Shielded Wall
36 BA-11101A Stud AN2 24.64 0.04 1.38 0.17 19.33 0.69 Shielded Wall
37 BA-11101A Stud AN2 24.07 0.09 1.78 0.70 19.01 0.26 Shielded Wall
38 BA-11101A Stud AN2 24.53 0.12 1.81 0.12 19.10 0.34 Shielded Wall
39 BA-11101A Stud AN2 24.41 0.00 1.61 0.89 19.16 0.34 Shielded Wall
40 BA-11101A Stud AN2 24.18 0.22 1.38 0.47 19.43 0.86 Shielded Wall
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.118
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 26.08.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN2
Description of Item Tested: ANCHOR Supply - AN2 H=73mm & D=8mm
Material as per Drawing: ASTM A 276 Gr.310S
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
41 BA-11101A Stud AN2 24.31 0.11 1.46 0.35 19.39 0.75 Shielded Wall
42 BA-11101A Stud AN2 24.18 0.62 1.62 0.34 19.02 0.25 Shielded Wall
43 BA-11101A Stud AN2 24.76 0.89 1.05 0.21 19.05 0.31 Shielded Wall
44 BA-11101A Stud AN2 24.23 0.38 1.95 0.50 19.42 0.36 Shielded Wall
45 BA-11101A Stud AN2 24.72 0.23 1.18 0.67 19.49 0.26 Shielded Wall
46 BA-11101A Stud AN2 24.41 0.26 1.05 0.87 19.15 0.88 Shielded Wall
47 BA-11101A Stud AN2 24.83 0.47 1.26 0.66 19.09 0.67 Shielded Wall
48 BA-11101A Stud AN2 24.50 0.78 1.34 0.12 19.03 0.15 Shielded Wall
49 BA-11101A Stud AN2 24.62 0.96 1.97 0.72 19.31 0.04 Shielded Wall
50 BA-11101A Stud AN2 24.34 0.16 1.02 0.69 19.41 0.71 Shielded Wall
51 BA-11101A Stud AN2 24.21 0.76 1.38 0.55 19.02 0.82 Shielded Wall
52 BA-11101A Stud AN2 24.08 0.28 1.77 0.59 19.04 0.62 Shielded Wall
53 BA-11101A Stud AN2 24.42 0.81 1.14 0.03 19.10 0.32 Shielded Wall
54 BA-11101A Stud AN2 24.13 0.39 1.34 0.77 19.12 0.21 Shielded Wall
55 BA-11101A Stud AN2 24.01 0.55 1.46 0.38 19.11 0.44 Shielded Wall
56 BA-11101A Stud AN2 24.53 0.82 1.75 0.57 19.32 0.44 Shielded Wall
57 BA-11101A Stud AN2 24.08 0.77 1.92 0.31 19.40 0.74 Shielded Wall
58 BA-11101A Stud AN2 24.50 0.65 1.09 0.11 19.42 0.17 Shielded Wall
59 BA-11101A Stud AN2 24.66 0.86 1.42 0.17 19.38 0.63 Shielded Wall
60 BA-11101A Stud AN2 24.07 0.42 1.68 0.67 19.00 0.86 Shielded Wall
61 BA-11101A Stud AN2 24.61 0.75 1.06 0.42 19.18 0.91 Shielded Wall
62 BA-11101A Stud AN2 24.82 0.14 1.69 0.73 19.03 0.88 Shielded Wall
63 BA-11101A Stud AN2 24.93 0.42 1.61 0.90 19.08 0.07 Shielded Wall
64 BA-11101A Stud AN2 24.54 0.79 1.53 0.72 19.31 0.03 Shielded Wall
65 BA-11101A Stud AN2 24.13 0.48 1.33 0.73 19.34 0.27 Shielded Wall
66 BA-11101A Stud AN2 24.51 0.33 1.49 0.48 19.41 0.22 Shielded Wall
67 BA-11101A Stud AN2 24.80 0.16 1.84 0.30 19.12 0.98 Shielded Wall
68 BA-11101A Stud AN2 24.51 0.29 1.27 0.71 19.32 0.32 Shielded Wall
69 BA-11101A Stud AN2 24.92 0.75 1.86 0.46 19.02 0.21 Shielded Wall
70 BA-11101A Stud AN2 24.27 0.65 1.04 0.22 19.31 0.76 Shielded Wall
71 BA-11101A Stud AN2 24.93 0.65 1.54 0.71 19.19 0.06 Shielded Wall
72 BA-11101A Stud AN2 24.88 0.80 1.61 0.96 19.36 0.36 Shielded Wall
73 BA-11101A Stud AN2 24.77 0.52 1.28 0.20 19.16 0.84 Shielded Wall
74 BA-11101A Stud AN2 24.22 0.79 1.51 0.98 19.14 0.97 Shielded Wall
75 BA-11101A Stud AN2 24.27 0.24 1.60 0.67 19.20 0.22 Shielded Wall
76 BA-11101A Stud AN2 24.38 0.82 1.33 0.22 19.36 0.31 Shielded Wall
77 BA-11101A Stud AN2 24.04 0.51 1.90 0.36 19.30 0.24 Shielded Wall
78 BA-11101A Stud AN2 24.62 0.44 1.50 0.38 19.12 0.28 Shielded Wall
79 BA-11101A Stud AN2 24.99 0.30 1.37 0.35 19.17 0.58 Shielded Wall
80 BA-11101A Stud AN2 24.42 0.05 1.59 0.06 19.46 0.45 Shielded Wall
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.118
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 26.08.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN2 & AN9
Description of Item Tested: ANCHOR Supply - AN2 H=73mm & D=8mm & AN9 H=75mm & D=6mm
Material as per Drawing: ASTM A 276 Gr.310S & 304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
81 BA-11101A Stud AN2 24.69 0.64 1.83 0.99 19.08 0.37 Shielded Wall
82 BA-11101A Stud AN2 24.50 0.24 1.58 0.94 19.40 0.19 Shielded Wall
83 BA-11101A Stud AN2 24.72 0.62 1.22 0.43 19.32 0.31 Shielded Wall
84 BA-11101A Stud AN2 24.95 0.54 1.78 0.09 19.44 0.18 Shielded Wall
85 BA-11101A Stud AN2 24.45 0.79 1.18 0.33 19.11 0.26 Shielded Wall
86 BA-11101A Stud AN2 24.04 0.89 1.07 0.56 19.34 0.75 Shielded Wall
87 BA-11101A Stud AN2 24.14 0.98 1.72 0.37 19.36 0.47 Shielded Wall
88 BA-11101A Stud AN2 24.63 0.95 1.48 0.16 19.31 0.70 Shielded Wall
89 BA-11101A Stud AN2 24.97 0.43 1.24 0.06 19.06 0.41 Shielded Wall
90 BA-11101A Stud AN2 24.89 0.46 1.39 0.48 19.40 0.67 Shielded Wall
91 BA-11101A Stud AN2 24.83 0.05 1.22 0.61 19.23 0.61 Shielded Wall
92 BA-11101A Stud AN2 24.32 0.99 1.63 0.46 19.04 0.93 Shielded Wall
93 BA-11101A Stud AN2 24.17 0.67 1.06 0.63 19.45 0.64 Shielded Wall
94 BA-11101A Stud AN2 24.03 0.85 1.99 0.30 19.27 0.42 Shielded Wall
95 BA-11101A Stud AN2 24.84 0.56 1.16 0.69 19.31 0.78 Shielded Wall
96 BA-11101A Stud AN2 24.94 0.58 1.49 0.40 19.31 0.18 Shielded Wall
97 BA-11101A Stud AN2 24.63 0.42 1.63 0.73 19.40 0.63 Shielded Wall
98 BA-11101A Stud AN2 24.82 0.35 1.10 0.88 19.33 0.85 Shielded Wall
99 BA-11101A Stud AN2 24.98 0.16 1.94 0.85 19.06 0.64 Shielded Wall
100 BA-11101A Stud AN2 24.92 0.21 1.03 0.88 19.49 0.12 Shielded Wall
101 BA-11101A Stud AN2 24.42 0.45 1.21 0.59 19.11 0.65 Shielded Wall
102 BA-11101A Stud AN2 24.70 0.79 1.49 0.92 19.10 0.89 Shielded Wall
103 BA-11101A Stud AN2 24.39 0.74 1.06 0.82 19.29 0.89 Shielded Wall
104 BA-11101A V-Anchor AN9 18.06 0.26 1.08 0.22 8.02 0.61 Header Box
105 BA-11101A V-Anchor AN9 18.88 0.31 1.66 0.05 8.08 0.29 Header Box
106 BA-11101A V-Anchor AN9 18.77 0.61 1.04 0.60 8.24 0.15 Header Box
107 BA-11101A V-Anchor AN9 18.92 0.17 1.89 0.99 8.68 0.64 Header Box
108 BA-11101A V-Anchor AN9 18.42 0.98 1.52 0.43 9.43 0.89 Header Box
109 BA-11101A V-Anchor AN9 18.09 0.09 1.16 0.74 8.32 0.26 Header Box
110 BA-11101A V-Anchor AN9 18.16 0.38 1.64 0.30 8.79 0.62 Header Box
111 BA-11101A V-Anchor AN9 18.54 0.56 1.23 0.47 8.71 0.00 Header Box
112 BA-11101A V-Anchor AN9 18.61 0.95 1.91 0.46 8.86 0.23 Header Box
113 BA-11101A V-Anchor AN9 18.69 0.66 1.77 0.02 8.67 0.43 Header Box
114 BA-11101A V-Anchor AN9 18.38 0.41 1.17 0.12 8.39 0.92 Header Box
115 BA-11101A V-Anchor AN9 18.75 0.15 1.28 0.79 8.34 0.26 Header Box
116 BA-11101A V-Anchor AN9 18.87 0.88 1.85 0.16 8.99 0.86 Header Box
117 BA-11101A V-Anchor AN9 18.19 0.83 1.37 0.30 8.10 0.08 Header Box
118 BA-11101A V-Anchor AN9 18.93 0.58 1.29 0.50 9.18 0.76 Header Box
119 BA-11101A V-Anchor AN9 18.79 0.31 1.27 0.17 8.31 0.76 Header Box
120 BA-111101A V-Anchor AN9 18.81 0.14 1.78 0.41 9.13 0.36 Header Box
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.118
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 26.08.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN9
Description of Item Tested: ANCHOR Supply - AN9 H=75mm & D=6mm
Material as per Drawing: ASTM A 276 Gr.304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
121 BA-11101A V-Anchor AN9 18.26 0.17 1.45 0.80 9.42 0.33 Header Box
122 BA-11101A V-Anchor AN9 18.02 0.64 1.56 0.56 9.41 0.20 Header Box
123 BA-11101A V-Anchor AN9 18.42 0.20 1.65 0.70 8.86 0.27 Header Box
124 BA-11101A V-Anchor AN9 18.39 0.17 1.79 0.54 8.78 0.54 Header Box
125 BA-11101A V-Anchor AN9 18.93 0.05 1.09 0.21 8.48 0.02 Header Box
126 BA-11101A V-Anchor AN9 18.72 0.74 1.78 0.62 9.35 0.83 Header Box
127 BA-11101A V-Anchor AN9 18.66 0.22 1.35 0.87 9.23 0.41 Header Box
128 BA-11101A V-Anchor AN9 18.96 0.47 1.34 0.70 9.43 0.04 Header Box
129 BA-11101A V-Anchor AN9 18.23 0.69 1.30 0.49 8.02 1.00 Header Box
130 BA-11101A V-Anchor AN9 18.03 0.93 1.37 0.31 9.05 0.41 Header Box
131 BA-11101A V-Anchor AN9 18.25 0.07 1.57 0.14 8.88 0.84 Header Box
132 BA-11101A V-Anchor AN9 18.16 0.53 1.80 0.14 9.36 0.08 Header Box
133 BA-11101A V-Anchor AN9 18.02 0.40 1.03 0.51 8.89 0.39 Header Box
134 BA-11101A V-Anchor AN9 18.36 0.36 1.31 0.44 8.10 0.03 Header Box
135 BA-11101A V-Anchor AN9 18.95 0.13 1.43 0.01 9.10 0.77 Header Box
136 BA-11101A V-Anchor AN9 18.86 0.37 1.48 0.48 8.44 0.44 Header Box
137 BA-11101A V-Anchor AN9 18.29 0.22 1.27 0.80 9.01 0.67 Header Box
138 BA-11101A V-Anchor AN9 18.76 0.42 1.58 0.34 8.73 0.01 Header Box
139 BA-11101A V-Anchor AN9 18.38 0.13 1.79 0.45 8.84 0.62 Header Box
140 BA-11101A V-Anchor AN9 18.57 0.17 1.68 0.15 8.57 0.61 Header Box
141 BA-11101A V-Anchor AN9 18.51 0.31 1.58 0.35 8.46 0.79 Header Box
142 BA-11101A V-Anchor AN9 18.57 0.07 1.29 0.28 8.12 0.89 Header Box
143 BA-11101A V-Anchor AN9 18.63 0.69 1.90 0.91 8.04 0.63 Header Box
144 BA-11101A V-Anchor AN9 18.07 0.31 1.25 0.41 8.17 0.82 Header Box
145 BA-11101A V-Anchor AN9 18.38 0.15 1.05 0.77 8.50 0.79 Header Box
146 BA-11101A V-Anchor AN9 18.22 0.28 1.64 0.52 9.20 0.80 Header Box
147 BA-11101A V-Anchor AN9 18.82 0.84 1.90 0.35 8.25 0.70 Header Box
148 BA-11101A V-Anchor AN9 18.18 0.19 1.97 0.17 8.15 0.61 Header Box
149 BA-11101A V-Anchor AN9 18.52 0.18 1.90 0.35 9.05 0.66 Header Box
150 BA-11101A V-Anchor AN9 18.37 0.27 1.39 0.39 9.25 0.44 Header Box
151 BA-11101A V-Anchor AN9 18.76 0.70 1.98 0.01 8.33 0.44 Header Box
152 BA-11101A V-Anchor AN9 18.89 0.81 1.64 0.53 8.52 0.99 Header Box
153 BA-11101A V-Anchor AN9 18.23 0.70 1.41 0.85 8.51 0.44 Header Box
154 BA-11101A V-Anchor AN9 18.23 0.22 1.96 0.11 9.36 0.56 Header Box
155 BA-11101A V-Anchor AN9 18.36 0.37 1.78 0.66 8.65 0.77 Header Box
156 BA-11101A V-Anchor AN9 18.38 0.53 1.25 0.91 8.21 0.33 Header Box
157 BA-11101A V-Anchor AN9 18.98 0.16 1.14 0.31 8.75 0.80 Header Box
158 BA-11101A V-Anchor AN9 18.73 0.32 1.11 0.62 9.47 0.11 Header Box
159 BA-11101A V-Anchor AN9 18.79 0.91 1.38 0.28 8.96 0.04 Header Box
160 BA-111101A V-Anchor AN9 18.91 0.84 1.33 0.42 8.40 0.43 Header Box
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.118
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 26.08.2022
Machine Description: X-MET8000
Make
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN9 & AN5
Description of Item Tested: ANCHOR Supply - AN9 H=75mm & D=6mm & AN5 H=75mm & D=6mm
Material as per Drawing: ASTM A 276 Gr.304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
161 BA-11101A V-Anchor AN9 18.04 0.33 1.11 0.15 9.20 0.37 Header Box
162 BA-11101A V-Anchor AN9 18.69 0.22 1.84 0.78 8.63 0.57 Header Box
163 BA-11101A V-Anchor AN9 18.91 0.48 1.80 0.15 9.07 0.46 Header Box
164 BA-11101A V-Anchor AN9 18.46 0.89 1.44 0.63 8.13 0.09 Header Box
165 BA-11101A V-Anchor AN9 18.12 0.08 1.62 0.80 8.35 0.97 Header Box
166 BA-11101A V-Anchor AN9 18.69 0.47 1.10 0.65 9.40 0.79 Header Box
167 BA-11101A V-Anchor AN9 18.47 0.97 1.04 0.89 8.17 0.79 Header Box
168 BA-11101A V-Anchor AN9 18.70 0.44 1.28 0.46 8.48 0.83 Header Box
169 BA-11101A V-Anchor AN9 18.95 0.78 1.19 0.67 8.54 0.81 Header Box
170 BA-11101A V-Anchor AN9 18.13 0.66 1.15 0.38 8.60 0.92 Header Box
171 BA-11101A V-Anchor AN9 18.92 0.61 1.64 0.60 9.18 0.60 Header Box
172 BA-11101A V-Anchor AN9 18.21 0.60 1.98 0.38 8.09 0.88 Header Box
173 BA-11101A V-Anchor AN9 18.14 0.47 1.96 0.12 9.03 0.97 Header Box
174 BA-11101A V-Anchor AN9 18.49 0.40 1.70 0.29 9.11 0.53 Header Box
175 BA-11101A V-Anchor AN9 18.51 0.81 1.10 0.98 8.86 0.96 Header Box
176 BA-11101A V-Anchor AN9 18.14 0.94 1.37 0.88 8.89 0.82 Header Box
177 BA-11101A V-Anchor AN9 18.85 0.94 1.45 0.65 9.39 0.65 Header Box
178 BA-11101A V-Anchor AN9 18.51 0.03 1.77 0.02 8.12 0.83 Header Box
179 BA-11102A V-Anchor AN5 18.30 0.05 1.57 0.08 8.82 0.48 Header Box
180 BA-11102A V-Anchor AN5 18.31 0.64 1.89 0.78 8.49 0.09 Header Box
181 BA-11102A V-Anchor AN5 18.78 0.28 1.70 0.66 9.17 0.77 Header Box
182 BA-11102A V-Anchor AN5 18.94 0.88 1.51 0.06 8.25 0.99 Header Box
183 BA-11102A V-Anchor AN5 18.70 0.82 1.81 0.89 9.22 0.26 Header Box
184 BA-11102A V-Anchor AN5 18.04 0.01 1.91 0.15 8.66 0.54 Header Box
185 BA-11102A V-Anchor AN5 18.54 0.33 1.91 0.98 8.56 0.20 Header Box
186 BA-11102A V-Anchor AN5 18.85 0.05 1.40 0.54 8.07 0.47 Header Box
187 BA-11102A V-Anchor AN5 18.70 0.08 1.14 0.32 8.93 0.50 Header Box
188 BA-11102A V-Anchor AN5 18.26 0.83 1.07 0.54 9.36 0.31 Header Box
189 BA-11102A V-Anchor AN5 18.98 0.32 1.81 0.51 9.10 0.48 Header Box
190 BA-11102A V-Anchor AN5 18.71 0.87 1.93 0.30 9.10 0.88 Header Box
191 BA-11102A V-Anchor AN5 18.66 0.37 1.05 0.36 8.52 0.72 Header Box
192 BA-11102A V-Anchor AN5 18.64 0.33 1.99 0.25 9.07 0.33 Header Box
193 BA-11102A V-Anchor AN5 18.39 0.84 1.83 0.07 8.53 0.98 Header Box
194 BA-11102A V-Anchor AN5 18.74 0.29 1.36 0.45 9.30 0.10 Header Box
195 BA-11102A V-Anchor AN5 18.25 0.44 1.36 0.56 8.17 0.97 Header Box
196 BA-11102A V-Anchor AN5 18.18 0.39 1.61 0.58 8.49 0.62 Header Box
197 BA-11102A V-Anchor AN5 18.67 0.78 1.31 0.90 9.21 0.13 Header Box
198 BA-11102A V-Anchor AN5 18.05 0.98 1.30 0.21 8.72 0.62 Header Box
199 BA-11102A V-Anchor AN5 18.19 0.02 1.87 0.47 8.74 0.97 Header Box
200 BA-11102A V-Anchor AN5 18.31 0.40 1.42 0.25 8.98 0.03 Header Box
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.118
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 26.08.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN5
Description of Item Tested: ANCHOR Supply - AN5 H=75mm & D=6mm
Material as per Drawing: ASTM A 276 Gr.304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
201 BA-11102A V-Anchor AN5 18.68 0.32 1.77 0.57 9.37 0.85 Header Box
202 BA-11102A V-Anchor AN5 18.27 0.08 1.81 0.25 9.44 0.01 Header Box
203 BA-11102A V-Anchor AN5 18.34 0.28 1.21 0.34 9.13 0.67 Header Box
204 BA-11102A V-Anchor AN5 18.18 0.80 1.79 0.70 8.27 0.68 Header Box
205 BA-11102A V-Anchor AN5 18.86 0.94 1.98 0.25 8.11 0.66 Header Box
206 BA-11102A V-Anchor AN5 18.46 0.51 1.07 0.59 8.72 0.43 Header Box
207 BA-11102A V-Anchor AN5 18.22 0.08 1.52 0.76 8.63 0.14 Header Box
208 BA-11102A V-Anchor AN5 18.23 0.84 1.51 0.89 8.32 0.54 Header Box
209 BA-11102A V-Anchor AN5 18.52 0.38 1.58 0.94 9.12 0.51 Header Box
210 BA-11102A V-Anchor AN5 18.72 0.79 1.50 0.48 8.37 0.63 Header Box
211 BA-11102A V-Anchor AN5 18.85 0.77 1.73 0.39 8.84 0.32 Header Box
212 BA-11102A V-Anchor AN5 18.10 0.30 1.86 0.26 9.40 0.57 Header Box
213 BA-11102A V-Anchor AN5 18.28 0.88 1.83 0.81 9.04 0.68 Header Box
214 BA-11102A V-Anchor AN5 18.67 0.56 1.07 0.66 8.91 0.55 Header Box
215 BA-11102A V-Anchor AN5 18.61 0.57 1.11 0.53 9.17 0.97 Header Box
216 BA-11102A V-Anchor AN5 18.00 0.24 1.75 0.81 8.61 0.99 Header Box
217 BA-11102A V-Anchor AN5 18.30 0.44 1.69 0.28 8.83 0.28 Header Box
218 BA-11102A V-Anchor AN5 18.89 0.52 1.75 0.99 9.27 0.95 Header Box
219 BA-11102A V-Anchor AN5 18.08 0.95 1.09 0.51 8.30 0.34 Header Box
220 BA-11102A V-Anchor AN5 18.62 0.44 1.57 0.21 9.07 0.89 Header Box
221 BA-11102A V-Anchor AN5 18.72 0.66 1.26 0.81 8.16 0.82 Header Box
222 BA-11102A V-Anchor AN5 18.06 0.63 1.99 0.85 8.68 0.91 Header Box
223 BA-11102A V-Anchor AN5 18.46 0.35 1.60 0.86 8.29 0.08 Header Box
224 BA-11102A V-Anchor AN5 18.40 0.16 1.17 0.01 9.33 0.61 Header Box
225 BA-11102A V-Anchor AN5 18.76 0.25 1.44 0.67 8.58 0.61 Header Box
226 BA-11102A V-Anchor AN5 18.46 0.17 1.15 0.95 8.40 0.61 Header Box
227 BA-11102A V-Anchor AN5 18.15 0.11 1.96 0.65 8.79 0.73 Header Box
228 BA-11102A V-Anchor AN5 18.88 0.40 1.53 0.35 8.90 0.89 Header Box
229 BA-11102A V-Anchor AN5 18.22 0.63 1.34 0.68 8.94 0.57 Header Box
230 BA-11102A V-Anchor AN5 18.36 0.83 1.29 0.99 9.16 0.45 Header Box
231 BA-11102A V-Anchor AN5 18.80 0.58 1.76 0.73 9.37 0.93 Header Box
232 BA-11102A V-Anchor AN5 18.94 0.19 1.73 0.90 8.55 0.27 Header Box
233 BA-11102A V-Anchor AN5 18.64 0.18 1.80 0.87 8.15 0.91 Header Box
234 BA-11102A V-Anchor AN5 18.93 0.02 1.32 0.69 8.69 0.10 Header Box
235 BA-11102A V-Anchor AN5 18.97 0.33 1.41 0.28 8.29 0.95 Header Box
236 BA-11102A V-Anchor AN5 18.99 0.67 1.25 0.19 8.47 0.71 Header Box
237 BA-11102A V-Anchor AN5 18.57 0.68 1.69 0.27 8.35 0.43 Header Box
238 BA-11102A V-Anchor AN5 18.73 0.64 1.27 0.46 9.45 0.74 Header Box
239 BA-11102A V-Anchor AN5 18.07 0.32 1.67 0.07 9.46 0.82 Header Box
240 BA-11102A V-Anchor AN5 18.71 0.80 1.90 0.94 8.96 0.88 Header Box
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021

JNK INDIA PVT. LTD.


POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.IMIR.118
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 26.08.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : AN5
Description of Item Tested: ANCHOR Supply - AN5 H=75mm & D=6mm
Material as per Drawing: ASTM A 276 Gr.304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mn +/- Ni +/- Remarks
241 BA-11102A V-Anchor AN5 18.39 0.29 1.35 0.89 8.67 0.63 Header Box
242 BA-11102A V-Anchor AN5 18.65 0.36 1.25 0.40 8.84 0.24 Header Box
243 BA-11102A V-Anchor AN5 18.73 0.47 1.75 0.92 8.27 0.11 Header Box
244 BA-11102A V-Anchor AN5 18.66 0.18 1.00 0.02 9.26 0.79 Header Box
245 BA-11102A V-Anchor AN5 18.46 0.01 1.49 0.87 9.47 0.73 Header Box
246 BA-11102A V-Anchor AN5 18.64 0.14 1.19 0.43 8.46 0.21 Header Box
247 BA-11102A V-Anchor AN5 18.11 0.49 1.68 0.65 8.68 0.45 Header Box
248 BA-11102A V-Anchor AN5 18.10 0.03 1.49 0.74 9.39 0.16 Header Box
249 BA-11102A V-Anchor AN5 18.07 0.56 1.89 0.45 9.36 0.77 Header Box
250 BA-11102A V-Anchor AN5 18.58 0.42 1.75 0.19 9.28 0.10 Header Box
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.ATM1A-ANC.005
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCDate: 27.01.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : ATM1A Anchors for CM-2
Description of Item Tested: AN1 (Stud + V-Anchoe with Nuts) & AN7 (Split Y)
Material as per Drawing: ASTM A276 SS310S
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-MC-DG-281 (R1) AN1-Stud 24.90 0.14 19.94 0.30
2 JNKI-046-MC-DG-281 (R1) AN1-V-Anchor 24.41 0.52 19.63 0.32
3 JNKI-046-MC-DG-281 (R1) AN7 24.59 0.52 19.67 0.45
4
5
6
7
8
9
10
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
M.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B.con.
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 20.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Convection Coil (CM-3)
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Convection Coil - PASS #7
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-158 J-101 18.88 0.01 3.05 0.24 13.92 0.14
2 JNKI-046-CDU2B-MC-DG-158 J-102 19.41 0.52 3.05 0.87 13.28 0.48
3 JNKI-046-CDU2B-MC-DG-158 J-103 19.22 0.52 3.14 0.84 13.00 0.31
4 JNKI-046-CDU2B-MC-DG-158 J-105 19.28 0.52 3.76 0.90 13.20 0.66
5 JNKI-046-CDU2B-MC-DG-158 18.53 0.52 3.22 0.52 12.17 0.17
6 JNKI-046-CDU2B-MC-DG-158 J-106 18.93 0.52 3.63 0.53 13.26 0.28
7 JNKI-046-CDU2B-MC-DG-158 J-108 19.07 0.52 3.40 1.00 13.63 0.27
8 JNKI-046-CDU2B-MC-DG-158 J-109 18.80 0.52 3.07 0.77 13.08 0.50
9 JNKI-046-CDU2B-MC-DG-158 J-111 18.51 0.52 3.37 0.42 13.12 0.68
10 JNKI-046-CDU2B-MC-DG-158 18.96 0.52 3.34 0.38 11.88 0.02
11 JNKI-046-CDU2B-MC-DG-158 J-112 18.97 0.52 3.86 0.52 13.97 0.38
12 JNKI-046-CDU2B-MC-DG-158 J-114 18.99 0.52 3.30 0.81 13.22 0.45
13 JNKI-046-CDU2B-MC-DG-158 J-115 19.02 0.52 3.66 0.74 13.89 0.29
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B.con.
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 20.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Convection Coil (CM-3)
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Convection Coil - PASS #5
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-158 J-101 18.59 0.83 3.74 0.92 13.02 0.33
2 JNKI-046-CDU2B-MC-DG-158 J-102 19.46 0.52 3.77 0.75 13.90 0.14
3 JNKI-046-CDU2B-MC-DG-158 J-103 18.55 0.52 3.77 0.34 13.71 0.94
4 JNKI-046-CDU2B-MC-DG-158 J-105 19.30 0.52 3.94 0.07 13.17 0.91
5 JNKI-046-CDU2B-MC-DG-158 18.71 0.52 3.21 0.76 12.68 0.94
6 JNKI-046-CDU2B-MC-DG-158 J-106 18.70 0.52 3.67 0.32 13.01 0.73
7 JNKI-046-CDU2B-MC-DG-158 J-108 18.97 0.52 3.70 0.41 13.80 0.28
8 JNKI-046-CDU2B-MC-DG-158 J-109 19.23 0.52 3.35 0.76 13.81 0.95
9 JNKI-046-CDU2B-MC-DG-158 J-111 19.18 0.52 3.04 0.21 13.55 0.15
10 JNKI-046-CDU2B-MC-DG-158 18.93 0.52 3.51 0.07 12.10 0.26
11 JNKI-046-CDU2B-MC-DG-158 J-112 18.88 0.52 3.05 0.32 13.01 0.82
12 JNKI-046-CDU2B-MC-DG-158 J-114 18.71 0.52 3.99 0.24 13.74 0.21
13 JNKI-046-CDU2B-MC-DG-158 J-115 19.32 0.52 3.79 0.98 13.48 0.05
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B.con.
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 20.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Convection Coil (CM-3)
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Convection Coil - PASS #4
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-158 J-101 19.17 0.88 3.57 0.56 13.76 0.39
2 JNKI-046-CDU2B-MC-DG-158 J-102 19.21 0.52 3.31 0.94 13.69 0.20
3 JNKI-046-CDU2B-MC-DG-158 J-103 19.15 0.52 3.44 0.73 13.35 0.52
4 JNKI-046-CDU2B-MC-DG-158 J-105 18.88 0.52 3.97 0.85 13.68 0.51
5 JNKI-046-CDU2B-MC-DG-158 18.67 0.52 3.33 0.16 12.80 0.02
6 JNKI-046-CDU2B-MC-DG-158 J-106 18.90 0.52 3.61 0.10 13.22 0.46
7 JNKI-046-CDU2B-MC-DG-158 J-108 18.81 0.52 3.65 0.81 13.70 0.73
8 JNKI-046-CDU2B-MC-DG-158 J-109 19.34 0.52 3.05 0.36 13.47 0.07
9 JNKI-046-CDU2B-MC-DG-158 J-111 18.65 0.52 3.95 0.09 13.02 0.31
10 JNKI-046-CDU2B-MC-DG-158 19.31 0.52 3.07 0.90 12.42 0.96
11 JNKI-046-CDU2B-MC-DG-158 J-112 18.87 0.52 3.73 0.01 13.58 0.10
12 JNKI-046-CDU2B-MC-DG-158 J-114 19.45 0.52 3.01 0.31 13.75 0.09
13 JNKI-046-CDU2B-MC-DG-158 J-115 19.34 0.52 3.94 0.55 13.80 0.01
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B.con.
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 20.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Convection Coil (CM-3)
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Convection Coil - PASS #3
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-158 J-101 19.29 0.51 3.01 0.85 13.90 0.84
2 JNKI-046-CDU2B-MC-DG-158 J-102 18.73 0.52 3.84 0.30 13.13 0.93
3 JNKI-046-CDU2B-MC-DG-158 J-103 18.70 0.52 3.38 0.31 13.12 0.12
4 JNKI-046-CDU2B-MC-DG-158 J-105 18.83 0.52 3.05 0.55 13.96 0.13
5 JNKI-046-CDU2B-MC-DG-158 19.09 0.52 3.77 0.96 12.95 0.92
6 JNKI-046-CDU2B-MC-DG-158 J-106 18.70 0.52 3.27 0.59 13.59 0.70
7 JNKI-046-CDU2B-MC-DG-158 J-108 19.47 0.52 3.16 0.32 13.81 0.48
8 JNKI-046-CDU2B-MC-DG-158 J-109 18.58 0.52 3.31 0.50 13.28 0.86
9 JNKI-046-CDU2B-MC-DG-158 J-111 18.58 0.52 3.10 0.75 13.21 0.79
10 JNKI-046-CDU2B-MC-DG-158 19.43 0.52 3.97 0.15 11.44 0.77
11 JNKI-046-CDU2B-MC-DG-158 J-112 18.61 0.52 3.89 0.14 13.57 0.47
12 JNKI-046-CDU2B-MC-DG-158 J-114 19.03 0.52 3.52 0.44 13.15 0.14
13 JNKI-046-CDU2B-MC-DG-158 J-115 18.79 0.52 3.03 0.64 13.85 0.20
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B.con.
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 20.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Convection Coil (CM-3)
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Convection Coil - PASS #2
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-158 J-101 19.38 0.70 3.60 0.74 13.89 0.77
2 JNKI-046-CDU2B-MC-DG-158 J-102 19.49 0.52 3.10 0.52 13.02 0.20
3 JNKI-046-CDU2B-MC-DG-158 J-103 18.53 0.52 3.41 0.15 13.01 0.49
4 JNKI-046-CDU2B-MC-DG-158 J-105 18.57 0.52 3.42 0.86 13.99 0.41
5 JNKI-046-CDU2B-MC-DG-158 19.28 0.52 3.62 0.73 11.27 0.21
6 JNKI-046-CDU2B-MC-DG-158 J-106 19.30 0.52 3.76 0.90 13.26 0.09
7 JNKI-046-CDU2B-MC-DG-158 J-108 18.95 0.52 3.53 0.46 13.13 0.19
8 JNKI-046-CDU2B-MC-DG-158 J-109 18.75 0.52 3.43 0.61 13.15 0.65
9 JNKI-046-CDU2B-MC-DG-158 J-111 19.40 0.52 3.94 0.43 13.01 0.57
10 JNKI-046-CDU2B-MC-DG-158 18.67 0.52 3.19 0.36 11.45 0.70
11 JNKI-046-CDU2B-MC-DG-158 J-112 18.51 0.52 3.87 0.15 13.42 0.18
12 JNKI-046-CDU2B-MC-DG-158 J-114 18.60 0.52 3.76 0.59 13.44 0.98
13 JNKI-046-CDU2B-MC-DG-158 J-115 18.55 0.52 3.44 0.54 13.30 0.29
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B.con.
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 20.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Convection Coil (CM-3)
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Convection Coil - PASS #1
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-158 J-101 19.06 0.64 3.81 0.71 13.84 0.24
2 JNKI-046-CDU2B-MC-DG-158 J-102 19.20 0.52 3.11 0.77 13.77 0.37
3 JNKI-046-CDU2B-MC-DG-158 J-103 19.44 0.52 3.95 0.17 13.24 0.27
4 JNKI-046-CDU2B-MC-DG-158 J-105 18.61 0.52 3.48 0.39 13.22 0.71
5 JNKI-046-CDU2B-MC-DG-158 19.47 0.52 3.46 0.60 11.91 0.63
6 JNKI-046-CDU2B-MC-DG-158 J-106 18.83 0.52 3.55 0.50 13.89 0.48
7 JNKI-046-CDU2B-MC-DG-158 J-108 18.79 0.52 3.59 0.40 13.89 0.88
8 JNKI-046-CDU2B-MC-DG-158 J-109 19.23 0.52 3.40 0.10 13.48 0.10
9 JNKI-046-CDU2B-MC-DG-158 J-111 19.48 0.52 3.98 0.07 13.20 0.89
10 JNKI-046-CDU2B-MC-DG-158 18.81 0.52 3.42 0.29 12.30 0.55
11 JNKI-046-CDU2B-MC-DG-158 J-112 18.87 0.52 3.47 0.34 13.87 0.53
12 JNKI-046-CDU2B-MC-DG-158 J-114 19.15 0.52 3.30 0.19 13.89 0.65
13 JNKI-046-CDU2B-MC-DG-158 J-115 18.79 0.52 3.85 0.47 13.63 0.52
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 07.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #8 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-157 F-01A 18.95 0.29 3.16 0.79 13.31 0.70
2 JNKI-046-CDU2B-MC-DG-157 J-01 18.53 0.52 3.39 0.57 13.04 0.25
3 JNKI-046-CDU2B-MC-DG-157 F-01 19.31 0.52 3.18 0.54 13.53 0.63
4 JNKI-046-CDU2B-MC-DG-157 J-02 18.90 0.52 3.58 0.37 13.78 0.31
5 JNKI-046-CDU2B-MC-DG-157 18.93 0.52 3.77 0.16 12.27 0.49
6 JNKI-046-CDU2B-MC-DG-157 J-71 18.51 0.52 3.30 0.15 13.39 0.87
7 JNKI-046-CDU2B-MC-DG-157 J-70 19.14 0.52 3.35 0.60 13.84 0.75
8 JNKI-046-CDU2B-MC-DG-157 J-69 19.45 0.52 3.20 0.09 13.08 0.14
9 JNKI-046-CDU2B-MC-DG-157 J-68 18.73 0.52 3.66 0.62 13.75 0.84
10 JNKI-046-CDU2B-MC-DG-157 18.75 0.52 3.42 0.66 12.91 0.20
11 JNKI-046-CDU2B-MC-DG-157 J-66 19.48 0.52 3.46 0.18 13.83 0.21
12 JNKI-046-CDU2B-MC-DG-157 J-65 18.67 0.52 3.40 0.05 13.68 0.37
13 JNKI-046-CDU2B-MC-DG-157 J-64 19.32 0.52 3.98 0.18 13.56 0.13
14 JNKI-046-CDU2B-MC-DG-157 J-63 18.92 0.52 3.83 0.47 13.84 0.39
15 JNKI-046-CDU2B-MC-DG-157 18.97 0.52 3.74 0.01 12.69 0.41
16 JNKI-046-CDU2B-MC-DG-157 J-61 18.70 0.52 3.96 0.15 13.40 0.37
17 JNKI-046-CDU2B-MC-DG-157 J-60 19.44 0.52 3.30 0.24 13.41 0.11
18 JNKI-046-CDU2B-MC-DG-157 J-59 19.15 0.52 3.43 0.34 13.93 0.95
19 JNKI-046-CDU2B-MC-DG-157 J-58 18.61 0.52 3.89 0.62 13.39 0.76
20 JNKI-046-CDU2B-MC-DG-157 19.17 0.52 3.24 0.93 12.42 0.75
21 JNKI-046-CDU2B-MC-DG-157 J-56 19.32 0.52 3.20 0.02 14.00 0.75
22 JNKI-046-CDU2B-MC-DG-157 J-55 19.08 0.52 3.60 0.95 13.87 0.05
23 JNKI-046-CDU2B-MC-DG-157 J-54 18.79 0.52 3.76 1.00 13.62 0.99
24 JNKI-046-CDU2B-MC-DG-157 J-53 19.22 0.52 3.67 0.49 13.25 0.02
25 JNKI-046-CDU2B-MC-DG-157 J-52 18.50 0.52 3.27 0.44 13.73 0.04
26 JNKI-046-CDU2B-MC-DG-157 J-51 19.23 0.52 3.37 0.06 13.81 0.89
27 JNKI-046-CDU2B-MC-DG-157 J-50 18.71 0.52 3.37 0.68 13.60 0.15
28 JNKI-046-CDU2B-MC-DG-157 19.00 0.52 3.61 0.96 11.20 0.52
29 JNKI-046-CDU2B-MC-DG-157 J-48 18.86 0.52 3.18 0.97 13.17 0.51
30 JNKI-046-CDU2B-MC-DG-157 J-47 19.30 0.52 3.80 0.13 13.97 0.46
31 JNKI-046-CDU2B-MC-DG-157 J-45 19.28 0.52 3.49 0.19 13.21 0.20
32 JNKI-046-CDU2B-MC-DG-157 J-44 18.61 0.52 3.22 0.87 13.76 0.47
33 JNKI-046-CDU2B-MC-DG-157 J-43 19.29 0.52 3.54 0.95 13.90 0.14
34 JNKI-046-CDU2B-MC-DG-157 J-42 19.37 0.52 3.86 0.85 13.89 0.69
35 JNKI-046-CDU2B-MC-DG-157 J-04 18.96 0.52 3.18 0.33 13.74 0.69
36 JNKI-046-CDU2B-MC-DG-157 J-03 18.94 0.52 3.35 0.02 13.14 0.54
37 JNKI-046-CDU2B-MC-DG-157 18.64 0.52 3.10 0.29 12.17 0.05
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 07.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #8 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
38 JNKI-046-CDU2B-MC-DG-157 J-42 19.49 0.25 3.45 0.27 13.92 0.28
39 JNKI-046-CDU2B-MC-DG-157 18.52 0.52 3.35 0.64 13.33 0.48
40 JNKI-046-CDU2B-MC-DG-157 J-40 19.43 0.52 3.73 0.83 13.26 0.52
41 JNKI-046-CDU2B-MC-DG-157 J-39 18.71 0.52 3.88 0.24 13.91 0.63
42 JNKI-046-CDU2B-MC-DG-157 J-37 19.20 0.52 3.70 0.16 12.92 0.75
43 JNKI-046-CDU2B-MC-DG-157 J-36 18.65 0.52 3.14 0.53 13.35 0.18
44 JNKI-046-CDU2B-MC-DG-157 J-35 19.19 0.52 3.30 0.79 13.55 0.75
45 JNKI-046-CDU2B-MC-DG-157 J-34 19.22 0.52 3.74 0.92 13.43 0.57
46 JNKI-046-CDU2B-MC-DG-157 19.34 0.52 3.45 0.18 13.49 0.30
47 JNKI-046-CDU2B-MC-DG-157 J-32 19.19 0.52 3.99 0.70 12.52 0.54
48 JNKI-046-CDU2B-MC-DG-157 J-31 18.78 0.52 3.05 0.28 13.31 0.96
49 JNKI-046-CDU2B-MC-DG-157 J-29 19.42 0.52 3.51 0.75 13.69 0.12
50 JNKI-046-CDU2B-MC-DG-157 J-28 19.09 0.52 3.83 0.23 13.97 0.35
51 JNKI-046-CDU2B-MC-DG-157 J-27 18.61 0.52 3.38 0.67 13.73 0.47
52 JNKI-046-CDU2B-MC-DG-157 J-26 19.31 0.52 3.61 0.82 13.88 0.10
53 JNKI-046-CDU2B-MC-DG-157 18.51 0.52 3.35 0.94 12.55 0.87
54 JNKI-046-CDU2B-MC-DG-157 J-24 18.78 0.52 3.94 0.57 13.48 0.04
55 JNKI-046-CDU2B-MC-DG-157 J-23 19.04 0.52 3.88 0.22 13.84 0.96
56 JNKI-046-CDU2B-MC-DG-157 18.52 0.52 3.56 0.52 11.96 0.25
57 JNKI-046-CDU2B-MC-DG-157 J-21 19.15 0.52 3.65 0.97 11.55 0.57
58 JNKI-046-CDU2B-MC-DG-157 J-20 19.28 0.52 3.01 0.92 13.11 0.50
59 JNKI-046-CDU2B-MC-DG-157 J-19 18.63 0.52 3.26 0.24 13.69 0.62
60 JNKI-046-CDU2B-MC-DG-157 J-18 19.01 0.52 3.92 0.75 13.72 0.69
61 JNKI-046-CDU2B-MC-DG-157 J-16 18.77 0.52 3.02 0.19 13.18 0.08
62 JNKI-046-CDU2B-MC-DG-157 J-15 19.09 0.52 3.94 0.29 13.30 0.95
63 JNKI-046-CDU2B-MC-DG-157 19.47 0.52 3.95 0.55 12.63 0.06
64 JNKI-046-CDU2B-MC-DG-157 J-13 19.11 0.52 3.58 0.80 13.67 0.75
65 JNKI-046-CDU2B-MC-DG-157 J-12 19.14 0.52 3.60 0.35 12.85 0.43
66 JNKI-046-CDU2B-MC-DG-157 J-11 18.56 0.52 3.55 0.56 13.81 0.55
67 JNKI-046-CDU2B-MC-DG-157 J-10 19.42 0.52 3.09 0.65 13.07 0.67
68 JNKI-046-CDU2B-MC-DG-157 18.84 0.52 3.31 0.15 11.47 0.24
69 JNKI-046-CDU2B-MC-DG-157 J-08 19.12 0.52 3.53 0.77 13.29 0.81
70 JNKI-046-CDU2B-MC-DG-157 F-03 19.43 0.52 3.13 0.89 13.89 0.28
71 JNKI-046-CDU2B-MC-DG-157 J-05 19.05 0.52 3.26 0.91 13.82 0.72
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 07.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #6 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-157 F-01A 18.79 0.63 3.56 0.41 13.27 0.92
2 JNKI-046-CDU2B-MC-DG-157 J-01 18.71 0.52 3.92 0.11 13.99 0.19
3 JNKI-046-CDU2B-MC-DG-157 F-01 19.22 0.52 3.32 0.17 13.77 0.33
4 JNKI-046-CDU2B-MC-DG-157 J-02 19.14 0.52 3.30 0.55 13.20 0.43
5 JNKI-046-CDU2B-MC-DG-157 18.74 0.52 3.41 0.12 12.29 0.76
6 JNKI-046-CDU2B-MC-DG-157 J-71 18.69 0.52 3.05 0.25 13.51 0.04
7 JNKI-046-CDU2B-MC-DG-157 J-70 18.69 0.52 3.72 0.85 13.35 0.24
8 JNKI-046-CDU2B-MC-DG-157 J-69 18.60 0.52 3.96 0.05 13.95 1.00
9 JNKI-046-CDU2B-MC-DG-157 J-68 19.27 0.52 3.38 0.99 13.87 0.38
10 JNKI-046-CDU2B-MC-DG-157 19.13 0.52 3.69 0.62 11.10 0.58
11 JNKI-046-CDU2B-MC-DG-157 J-66 18.68 0.52 3.04 0.42 13.46 0.72
12 JNKI-046-CDU2B-MC-DG-157 J-65 19.03 0.52 3.61 0.91 13.18 0.73
13 JNKI-046-CDU2B-MC-DG-157 J-64 18.64 0.52 3.76 0.79 13.76 0.51
14 JNKI-046-CDU2B-MC-DG-157 J-63 19.29 0.52 3.22 0.87 13.59 0.56
15 JNKI-046-CDU2B-MC-DG-157 18.83 0.52 3.77 0.49 11.43 0.84
16 JNKI-046-CDU2B-MC-DG-157 J-61 19.33 0.52 3.94 0.61 13.43 0.26
17 JNKI-046-CDU2B-MC-DG-157 J-60 18.60 0.52 3.04 0.55 13.28 0.11
18 JNKI-046-CDU2B-MC-DG-157 J-59 18.87 0.52 3.01 0.54 13.77 0.58
19 JNKI-046-CDU2B-MC-DG-157 J-58 18.79 0.52 3.87 0.63 13.11 0.47
20 JNKI-046-CDU2B-MC-DG-157 19.06 0.52 3.10 0.65 12.75 0.80
21 JNKI-046-CDU2B-MC-DG-157 J-56 19.00 0.52 3.10 0.19 13.73 0.89
22 JNKI-046-CDU2B-MC-DG-157 J-55 18.86 0.52 3.73 0.44 13.05 0.09
23 JNKI-046-CDU2B-MC-DG-157 J-54 19.16 0.52 3.41 0.34 13.97 0.72
24 JNKI-046-CDU2B-MC-DG-157 J-53 19.06 0.52 3.33 0.51 13.04 0.44
25 JNKI-046-CDU2B-MC-DG-157 J-52 18.96 0.52 3.48 0.62 13.60 0.46
26 JNKI-046-CDU2B-MC-DG-157 J-51 19.27 0.52 3.37 0.23 13.73 0.77
27 JNKI-046-CDU2B-MC-DG-157 J-50 19.33 0.52 3.48 0.39 13.72 0.22
28 JNKI-046-CDU2B-MC-DG-157 18.71 0.52 3.82 0.25 11.49 0.49
29 JNKI-046-CDU2B-MC-DG-157 J-48 19.29 0.52 3.26 0.68 13.89 0.71
30 JNKI-046-CDU2B-MC-DG-157 J-47 19.23 0.52 3.38 0.92 13.11 0.95
31 JNKI-046-CDU2B-MC-DG-157 J-45 18.79 0.52 3.72 0.87 13.74 0.06
32 JNKI-046-CDU2B-MC-DG-157 J-44 18.85 0.52 3.30 0.79 13.07 0.81
33 JNKI-046-CDU2B-MC-DG-157 J-43 19.07 0.52 3.80 0.06 13.55 0.53
34 JNKI-046-CDU2B-MC-DG-157 J-42 19.33 0.52 3.41 0.64 13.45 0.14
35 JNKI-046-CDU2B-MC-DG-157 J-04 19.32 0.52 3.58 0.27 13.45 0.75
36 JNKI-046-CDU2B-MC-DG-157 J-03 18.62 0.52 3.51 0.70 13.29 0.60
37 JNKI-046-CDU2B-MC-DG-157 18.63 0.52 3.17 0.83 12.25 0.26
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 07.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #6 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
38 JNKI-046-CDU2B-MC-DG-157 J-42 19.40 0.11 3.56 0.90 13.39 0.71
39 JNKI-046-CDU2B-MC-DG-157 18.99 0.52 3.80 0.77 13.01 0.03
40 JNKI-046-CDU2B-MC-DG-157 J-40 19.00 0.52 3.82 0.12 13.44 0.56
41 JNKI-046-CDU2B-MC-DG-157 J-39 18.80 0.52 3.46 0.69 13.20 0.95
42 JNKI-046-CDU2B-MC-DG-157 J-37 18.66 0.52 3.56 0.56 12.23 0.79
43 JNKI-046-CDU2B-MC-DG-157 J-36 18.77 0.52 3.99 0.77 13.20 0.11
44 JNKI-046-CDU2B-MC-DG-157 J-35 19.44 0.52 3.37 0.21 13.87 0.10
45 JNKI-046-CDU2B-MC-DG-157 J-34 18.99 0.52 3.38 0.03 13.08 0.13
46 JNKI-046-CDU2B-MC-DG-157 18.56 0.52 3.58 0.00 13.71 0.51
47 JNKI-046-CDU2B-MC-DG-157 J-32 19.35 0.52 3.90 0.06 12.68 0.44
48 JNKI-046-CDU2B-MC-DG-157 J-31 18.74 0.52 3.42 0.52 13.80 0.72
49 JNKI-046-CDU2B-MC-DG-157 J-29 19.25 0.52 3.78 0.51 13.91 0.83
50 JNKI-046-CDU2B-MC-DG-157 J-28 18.56 0.52 3.28 0.90 13.46 0.97
51 JNKI-046-CDU2B-MC-DG-157 J-27 18.99 0.52 3.42 0.20 13.33 0.42
52 JNKI-046-CDU2B-MC-DG-157 J-26 18.78 0.52 3.04 0.86 13.40 0.30
53 JNKI-046-CDU2B-MC-DG-157 18.53 0.52 3.67 0.63 12.14 0.59
54 JNKI-046-CDU2B-MC-DG-157 J-24 18.84 0.52 3.29 0.18 13.17 0.93
55 JNKI-046-CDU2B-MC-DG-157 J-23 19.14 0.52 3.29 0.44 13.67 0.99
56 JNKI-046-CDU2B-MC-DG-157 19.00 0.52 3.73 0.25 12.09 0.39
57 JNKI-046-CDU2B-MC-DG-157 J-21 18.55 0.52 3.43 0.66 12.23 0.41
58 JNKI-046-CDU2B-MC-DG-157 J-20 18.87 0.52 3.55 0.84 13.07 0.84
59 JNKI-046-CDU2B-MC-DG-157 J-19 19.25 0.52 3.65 0.82 13.39 0.69
60 JNKI-046-CDU2B-MC-DG-157 J-18 18.93 0.52 3.42 0.15 13.92 0.48
61 JNKI-046-CDU2B-MC-DG-157 J-16 18.56 0.52 3.62 0.19 13.43 0.63
62 JNKI-046-CDU2B-MC-DG-157 J-15 18.87 0.52 3.73 0.47 13.39 0.61
63 JNKI-046-CDU2B-MC-DG-157 19.43 0.52 3.52 0.07 11.21 0.42
64 JNKI-046-CDU2B-MC-DG-157 J-13 19.37 0.52 3.99 0.59 13.72 0.13
65 JNKI-046-CDU2B-MC-DG-157 J-12 18.53 0.52 3.82 0.90 11.27 0.67
66 JNKI-046-CDU2B-MC-DG-157 J-11 18.80 0.52 3.36 0.47 13.49 0.02
67 JNKI-046-CDU2B-MC-DG-157 J-10 19.43 0.52 3.36 0.19 13.00 0.83
68 JNKI-046-CDU2B-MC-DG-157 18.85 0.52 3.78 0.02 11.33 0.70
69 JNKI-046-CDU2B-MC-DG-157 J-08 19.22 0.52 3.04 0.36 13.74 0.80
70 JNKI-046-CDU2B-MC-DG-157 F-03 18.62 0.52 3.10 0.20 13.65 0.15
71 JNKI-046-CDU2B-MC-DG-157 J-05 18.59 0.52 3.79 0.82 13.11 0.78
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 07.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #7 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-157 J-76 18.71 0.01 3.30 0.64 13.07 0.41
2 JNKI-046-CDU2B-MC-DG-157 J-75 18.86 0.52 3.33 0.80 13.17 0.07
3 JNKI-046-CDU2B-MC-DG-157 J-74 19.34 0.52 3.74 0.36 13.62 0.08
4 JNKI-046-CDU2B-MC-DG-157 J-73 18.76 0.52 3.74 0.66 13.58 0.46
5 JNKI-046-CDU2B-MC-DG-157 19.33 0.52 3.93 0.63 11.69 0.21
6 JNKI-046-CDU2B-MC-DG-157 J-71 18.60 0.52 3.86 0.06 13.81 0.52
7 JNKI-046-CDU2B-MC-DG-157 J-70 19.27 0.52 3.24 0.98 13.73 0.00
8 JNKI-046-CDU2B-MC-DG-157 J-69 19.43 0.52 3.39 0.59 13.77 0.98
9 JNKI-046-CDU2B-MC-DG-157 J-68 18.90 0.52 3.92 0.59 13.95 0.12
10 JNKI-046-CDU2B-MC-DG-157 18.87 0.52 3.97 0.13 12.82 0.85
11 JNKI-046-CDU2B-MC-DG-157 J-66 18.63 0.52 3.92 0.43 13.99 0.80
12 JNKI-046-CDU2B-MC-DG-157 J-65 18.61 0.52 3.36 0.95 13.99 0.62
13 JNKI-046-CDU2B-MC-DG-157 J-64 19.07 0.52 3.10 0.49 13.91 0.60
14 JNKI-046-CDU2B-MC-DG-157 J-63 19.17 0.52 3.88 0.96 13.61 0.89
15 JNKI-046-CDU2B-MC-DG-157 19.37 0.52 3.07 0.16 11.60 0.94
16 JNKI-046-CDU2B-MC-DG-157 J-61 19.10 0.52 3.69 0.27 13.79 0.44
17 JNKI-046-CDU2B-MC-DG-157 J-60 18.66 0.52 3.55 0.00 13.62 0.89
18 JNKI-046-CDU2B-MC-DG-157 J-59 18.60 0.52 3.00 1.00 13.50 0.86
19 JNKI-046-CDU2B-MC-DG-157 J-58 19.18 0.52 3.36 0.51 13.80 0.67
20 JNKI-046-CDU2B-MC-DG-157 19.50 0.52 3.02 0.52 11.68 0.14
21 JNKI-046-CDU2B-MC-DG-157 J-56 18.91 0.52 3.02 0.08 13.95 0.38
22 JNKI-046-CDU2B-MC-DG-157 J-55 18.74 0.52 3.67 0.74 13.29 0.91
23 JNKI-046-CDU2B-MC-DG-157 J-54 18.85 0.52 3.09 0.40 13.99 0.16
24 JNKI-046-CDU2B-MC-DG-157 J-53 18.55 0.52 3.17 0.58 13.53 0.03
25 JNKI-046-CDU2B-MC-DG-157 J-52 19.13 0.52 3.53 0.94 13.08 0.53
26 JNKI-046-CDU2B-MC-DG-157 J-51 19.02 0.52 3.48 0.63 13.07 0.62
27 JNKI-046-CDU2B-MC-DG-157 J-50 19.42 0.52 3.80 0.79 13.70 0.29
28 JNKI-046-CDU2B-MC-DG-157 18.86 0.52 3.32 0.28 12.48 0.80
29 JNKI-046-CDU2B-MC-DG-157 J-48 18.96 0.52 3.69 0.11 13.60 0.78
30 JNKI-046-CDU2B-MC-DG-157 J-47 18.86 0.52 3.91 0.35 13.11 0.72
31 JNKI-046-CDU2B-MC-DG-157 J-45 19.15 0.52 3.40 0.01 13.44 0.83
32 JNKI-046-CDU2B-MC-DG-157 J-44 18.84 0.52 3.67 0.44 13.95 0.30
33 JNKI-046-CDU2B-MC-DG-157 J-43 18.64 0.52 3.32 0.51 13.36 0.40
34 JNKI-046-CDU2B-MC-DG-157 J-42 18.52 0.52 3.96 0.33 13.46 0.98
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 07.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #7 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
35 JNKI-046-CDU2B-MC-DG-157 J-42 18.56 0.70 3.81 0.04 13.47 0.70
36 JNKI-046-CDU2B-MC-DG-157 18.66 0.52 3.91 0.38 13.06 0.01
37 JNKI-046-CDU2B-MC-DG-157 J-40 19.21 0.52 3.22 0.03 13.99 0.16
38 JNKI-046-CDU2B-MC-DG-157 J-39 18.74 0.52 3.77 0.46 13.66 0.88
39 JNKI-046-CDU2B-MC-DG-157 J-37 19.23 0.52 3.27 0.59 11.75 0.34
40 JNKI-046-CDU2B-MC-DG-157 J-36 18.52 0.52 3.74 0.24 13.71 0.34
41 JNKI-046-CDU2B-MC-DG-157 J-35 18.64 0.52 3.61 0.87 13.01 0.05
42 JNKI-046-CDU2B-MC-DG-157 J-34 18.86 0.52 3.43 0.56 13.08 0.94
43 JNKI-046-CDU2B-MC-DG-157 19.23 0.52 3.67 0.74 13.46 0.30
44 JNKI-046-CDU2B-MC-DG-157 J-32 19.05 0.52 3.07 0.78 12.49 0.16
45 JNKI-046-CDU2B-MC-DG-157 J-31 18.91 0.52 3.27 0.85 13.19 0.14
46 JNKI-046-CDU2B-MC-DG-157 J-29 19.18 0.52 3.47 0.77 13.93 0.77
47 JNKI-046-CDU2B-MC-DG-157 J-28 19.29 0.52 3.81 0.03 13.56 0.20
48 JNKI-046-CDU2B-MC-DG-157 J-27 18.80 0.52 3.40 0.35 13.53 0.18
49 JNKI-046-CDU2B-MC-DG-157 J-26 19.40 0.52 3.68 0.68 13.92 0.48
50 JNKI-046-CDU2B-MC-DG-157 19.30 0.52 3.77 0.41 11.18 0.03
51 JNKI-046-CDU2B-MC-DG-157 J-24 19.33 0.52 3.05 0.02 13.31 0.24
52 JNKI-046-CDU2B-MC-DG-157 J-23 18.83 0.52 3.68 0.97 13.79 0.28
53 JNKI-046-CDU2B-MC-DG-157 19.17 0.52 3.21 0.58 12.44 0.32
54 JNKI-046-CDU2B-MC-DG-157 J-21 19.06 0.52 3.13 0.42 11.80 0.95
55 JNKI-046-CDU2B-MC-DG-157 J-20 18.60 0.52 3.13 0.88 13.03 0.73
56 JNKI-046-CDU2B-MC-DG-157 J-19 18.78 0.52 3.19 0.16 13.86 0.88
57 JNKI-046-CDU2B-MC-DG-157 J-18 18.58 0.52 3.99 0.94 13.16 0.71
58 JNKI-046-CDU2B-MC-DG-157 J-16 18.69 0.52 3.35 0.85 13.31 0.22
59 JNKI-046-CDU2B-MC-DG-157 J-15 18.76 0.52 3.40 0.58 13.73 0.42
60 JNKI-046-CDU2B-MC-DG-157 18.92 0.52 3.26 0.61 12.81 0.87
61 JNKI-046-CDU2B-MC-DG-157 J-13 18.95 0.52 3.32 0.55 13.15 0.82
62 JNKI-046-CDU2B-MC-DG-157 J-12 19.25 0.52 3.57 0.58 12.02 0.42
63 JNKI-046-CDU2B-MC-DG-157 J-11 18.83 0.52 3.13 0.19 13.89 0.05
64 JNKI-046-CDU2B-MC-DG-157 J-10 18.92 0.52 3.46 0.45 13.51 0.88
65 JNKI-046-CDU2B-MC-DG-157 18.80 0.52 3.72 0.29 12.51 0.04
66 JNKI-046-CDU2B-MC-DG-157 J-08 19.50 0.52 3.59 0.22 13.87 0.65
67 JNKI-046-CDU2B-MC-DG-157 F-03 18.67 0.52 3.07 0.30 13.10 0.42
68 JNKI-046-CDU2B-MC-DG-157 J-05 18.86 0.52 3.76 0.99 13.48 0.49
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 07.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #7 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
69 JNKI-046-CDU2B-MC-DG-157 J-04 19.10 0.08 3.55 0.78 13.76 0.61
70 JNKI-046-CDU2B-MC-DG-157 J-03 18.94 0.52 3.72 0.64 13.85 0.61
71 JNKI-046-CDU2B-MC-DG-157 J-02 19.45 0.52 3.85 0.00 13.74 0.53
72 JNKI-046-CDU2B-MC-DG-157 F-01 19.33 0.52 3.88 0.70 13.67 0.85
73 JNKI-046-CDU2B-MC-DG-157 19.21 0.52 3.15 0.05 11.47 0.38
74 JNKI-046-CDU2B-MC-DG-157 F-01A 18.86 0.52 3.33 0.04 13.84 0.54
75 JNKI-046-CDU2B-MC-DG-157 J-01 19.02 0.52 3.13 0.87 13.29 0.05
76 JNKI-046-CDU2B-MC-DG-157 J-77 19.37 0.52 3.91 0.81 13.77 0.24
77 JNKI-046-CDU2B-MC-DG-157 J-78 18.59 0.52 3.93 0.42 13.01 0.71

Prepared by JNKI TPIA


SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 07.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #5 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-157 J-76 19.26 0.37 3.02 0.65 13.10 0.50
2 JNKI-046-CDU2B-MC-DG-157 J-75 19.20 0.52 3.75 0.44 13.67 0.68
3 JNKI-046-CDU2B-MC-DG-157 J-74 19.46 0.52 3.58 0.32 13.04 0.41
4 JNKI-046-CDU2B-MC-DG-157 J-73 19.05 0.52 3.68 0.88 13.91 0.51
5 JNKI-046-CDU2B-MC-DG-157 19.22 0.52 3.70 0.59 12.95 0.25
6 JNKI-046-CDU2B-MC-DG-157 J-71 18.71 0.52 3.83 0.55 13.73 0.14
7 JNKI-046-CDU2B-MC-DG-157 J-70 19.14 0.52 3.82 0.25 13.97 0.30
8 JNKI-046-CDU2B-MC-DG-157 J-69 18.98 0.52 3.70 0.36 13.47 0.28
9 JNKI-046-CDU2B-MC-DG-157 J-68 19.49 0.52 3.32 0.35 13.69 0.61
10 JNKI-046-CDU2B-MC-DG-157 19.27 0.52 3.53 0.18 11.19 0.07
11 JNKI-046-CDU2B-MC-DG-157 J-66 19.12 0.52 3.41 0.04 13.83 0.41
12 JNKI-046-CDU2B-MC-DG-157 J-65 19.29 0.52 3.70 0.14 13.42 0.41
13 JNKI-046-CDU2B-MC-DG-157 J-64 18.98 0.52 3.79 0.22 13.55 0.26
14 JNKI-046-CDU2B-MC-DG-157 J-63 18.64 0.52 3.30 0.84 13.95 0.87
15 JNKI-046-CDU2B-MC-DG-157 19.06 0.52 3.14 0.32 12.58 0.24
16 JNKI-046-CDU2B-MC-DG-157 J-61 19.34 0.52 3.52 0.51 13.31 0.99
17 JNKI-046-CDU2B-MC-DG-157 J-60 19.41 0.52 3.18 0.76 13.67 0.34
18 JNKI-046-CDU2B-MC-DG-157 J-59 18.85 0.52 3.63 0.90 13.47 0.86
19 JNKI-046-CDU2B-MC-DG-157 J-58 19.25 0.52 3.08 1.00 13.26 0.56
20 JNKI-046-CDU2B-MC-DG-157 18.82 0.52 3.73 0.39 11.60 0.43
21 JNKI-046-CDU2B-MC-DG-157 J-56 18.51 0.52 3.52 0.75 13.05 0.16
22 JNKI-046-CDU2B-MC-DG-157 J-55 18.78 0.52 3.87 0.96 13.09 0.35
23 JNKI-046-CDU2B-MC-DG-157 J-54 18.97 0.52 3.64 0.39 13.37 0.01
24 JNKI-046-CDU2B-MC-DG-157 J-53 19.00 0.52 3.49 0.84 13.54 0.40
25 JNKI-046-CDU2B-MC-DG-157 J-52 19.27 0.52 3.90 0.83 13.93 0.45
26 JNKI-046-CDU2B-MC-DG-157 J-51 19.42 0.52 3.64 0.56 13.16 0.59
27 JNKI-046-CDU2B-MC-DG-157 J-50 18.59 0.52 3.77 0.78 13.76 0.62
28 JNKI-046-CDU2B-MC-DG-157 18.60 0.52 3.61 0.20 11.01 0.18
29 JNKI-046-CDU2B-MC-DG-157 J-48 19.49 0.52 3.81 0.61 13.45 0.42
30 JNKI-046-CDU2B-MC-DG-157 J-47 19.07 0.52 3.11 0.28 13.04 0.68
31 JNKI-046-CDU2B-MC-DG-157 J-45 18.78 0.52 3.86 0.05 13.52 0.80
32 JNKI-046-CDU2B-MC-DG-157 J-44 19.30 0.52 3.17 0.88 13.40 0.60
33 JNKI-046-CDU2B-MC-DG-157 J-43 19.19 0.52 3.29 0.60 13.16 0.31
34 JNKI-046-CDU2B-MC-DG-157 J-42 19.15 0.52 3.89 0.56 13.05 0.40
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 07.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #5 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
35 JNKI-046-CDU2B-MC-DG-157 J-42 18.91 0.46 3.30 0.79 13.91 0.45
36 JNKI-046-CDU2B-MC-DG-157 18.62 0.52 3.60 0.54 13.91 0.40
37 JNKI-046-CDU2B-MC-DG-157 J-40 19.43 0.52 3.99 0.98 13.91 0.73
38 JNKI-046-CDU2B-MC-DG-157 J-39 19.14 0.52 3.83 0.63 13.03 0.46
39 JNKI-046-CDU2B-MC-DG-157 J-37 18.57 0.52 3.02 0.78 12.15 0.09
40 JNKI-046-CDU2B-MC-DG-157 J-36 19.16 0.52 3.71 1.00 13.28 0.91
41 JNKI-046-CDU2B-MC-DG-157 J-35 19.09 0.52 3.31 0.44 13.20 0.36
42 JNKI-046-CDU2B-MC-DG-157 J-34 19.49 0.52 3.67 0.45 13.84 0.37
43 JNKI-046-CDU2B-MC-DG-157 19.02 0.52 3.55 0.03 13.06 0.26
44 JNKI-046-CDU2B-MC-DG-157 J-32 18.62 0.52 3.29 0.79 11.70 0.65
45 JNKI-046-CDU2B-MC-DG-157 J-31 19.14 0.52 3.06 0.38 13.73 0.47
46 JNKI-046-CDU2B-MC-DG-157 J-29 19.31 0.52 3.95 0.92 13.43 0.36
47 JNKI-046-CDU2B-MC-DG-157 J-28 19.34 0.52 3.80 0.07 13.16 0.88
48 JNKI-046-CDU2B-MC-DG-157 J-27 19.05 0.52 3.47 0.69 13.55 0.29
49 JNKI-046-CDU2B-MC-DG-157 J-26 19.30 0.52 3.74 0.00 13.58 0.37
50 JNKI-046-CDU2B-MC-DG-157 19.38 0.52 3.38 0.43 12.79 0.69
51 JNKI-046-CDU2B-MC-DG-157 J-24 19.33 0.52 3.95 0.60 13.37 0.67
52 JNKI-046-CDU2B-MC-DG-157 J-23 19.47 0.52 3.82 0.08 13.66 0.90
53 JNKI-046-CDU2B-MC-DG-157 18.95 0.52 3.67 0.19 11.60 0.46
54 JNKI-046-CDU2B-MC-DG-157 J-21 19.38 0.52 3.58 0.31 12.76 0.76
55 JNKI-046-CDU2B-MC-DG-157 J-20 19.01 0.52 3.07 0.83 13.30 0.38
56 JNKI-046-CDU2B-MC-DG-157 J-19 18.81 0.52 3.94 0.24 13.38 0.49
57 JNKI-046-CDU2B-MC-DG-157 J-18 18.71 0.52 3.49 0.67 13.03 0.80
58 JNKI-046-CDU2B-MC-DG-157 J-16 18.66 0.52 3.43 0.56 13.62 0.95
59 JNKI-046-CDU2B-MC-DG-157 J-15 19.47 0.52 3.30 0.18 13.09 0.16
60 JNKI-046-CDU2B-MC-DG-157 19.08 0.52 3.49 0.98 12.04 0.16
61 JNKI-046-CDU2B-MC-DG-157 J-13 18.87 0.52 3.90 0.41 13.20 0.22
62 JNKI-046-CDU2B-MC-DG-157 J-12 18.60 0.52 3.41 0.61 12.91 0.03
63 JNKI-046-CDU2B-MC-DG-157 J-11 19.39 0.52 3.68 0.70 13.80 0.60
64 JNKI-046-CDU2B-MC-DG-157 J-10 19.35 0.52 3.83 0.15 13.04 0.01
65 JNKI-046-CDU2B-MC-DG-157 19.46 0.52 3.63 0.32 12.40 0.63
66 JNKI-046-CDU2B-MC-DG-157 J-08 18.65 0.52 3.15 0.12 13.32 0.71
67 JNKI-046-CDU2B-MC-DG-157 F-03 18.75 0.52 3.04 0.80 13.19 0.54
68 JNKI-046-CDU2B-MC-DG-157 J-05 19.13 0.52 3.08 0.75 13.76 0.05
Prepared by JNKI TPIA
SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 07.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #5 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Mo +/- Ni +/- Remarks
69 JNKI-046-CDU2B-MC-DG-157 J-04 18.61 0.29 3.73 0.48 13.29 0.48
70 JNKI-046-CDU2B-MC-DG-157 J-03 19.44 0.52 3.11 0.16 13.80 0.47
71 JNKI-046-CDU2B-MC-DG-157 J-02 18.71 0.52 3.49 0.12 13.70 0.98
72 JNKI-046-CDU2B-MC-DG-157 F-01 18.78 0.52 3.04 0.76 13.66 0.81
73 JNKI-046-CDU2B-MC-DG-157 19.11 0.52 3.03 0.36 11.26 0.31
74 JNKI-046-CDU2B-MC-DG-157 F-01A 19.12 0.52 3.98 0.52 13.61 0.76
75 JNKI-046-CDU2B-MC-DG-157 J-01 18.74 0.52 3.30 0.21 13.65 0.21
76 JNKI-046-CDU2B-MC-DG-157 J-77 18.78 0.52 3.53 0.69 13.34 0.87
77 JNKI-046-CDU2B-MC-DG-157 J-78 19.34 0.52 3.40 0.47 13.73 0.47

Prepared by JNKI TPIA


SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B.
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 06.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #8 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-157 J-66 19.29 0.81 3.74 0.94 13.11 0.42
2 JNKI-046-CDU2B-MC-DG-157 J-63 18.97 0.92 3.58 0.56 13.62 0.02
3 JNKI-046-CDU2B-MC-DG-157 J-02 18.84 0.92 3.12 0.62 13.29 0.10
4 JNKI-046-CDU2B-MC-DG-157 J-07 18.77 0.92 3.23 0.58 13.00 0.97
5 JNKI-046-CDU2B-MC-DG-157 J-10 19.04 0.92 3.57 0.14 13.01 0.46
6 JNKI-046-CDU2B-MC-DG-157 18.76 0.92 3.66 0.59 13.68 0.54
7 JNKI-046-CDU2B-MC-DG-157 J-15 18.94 0.92 3.57 0.21 13.26 0.71
8 JNKI-046-CDU2B-MC-DG-157 J-18 18.82 0.92 3.13 0.48 13.00 0.45
9 JNKI-046-CDU2B-MC-DG-157 J-23 19.22 0.92 3.08 0.60 13.58 0.12
10 JNKI-046-CDU2B-MC-DG-157 J-26 18.62 0.92 3.06 0.45 13.46 0.94
11 JNKI-046-CDU2B-MC-DG-157 19.12 0.92 3.95 0.67 13.78 0.97
12 JNKI-046-CDU2B-MC-DG-157 J-31 19.49 0.92 3.14 0.53 13.30 0.72
13 JNKI-046-CDU2B-MC-DG-157 J-34 19.38 0.92 3.77 0.30 13.32 0.11
14 JNKI-046-CDU2B-MC-DG-157 J-39 18.63 0.92 3.46 0.10 13.43 0.87
15 JNKI-046-CDU2B-MC-DG-157 J-42 19.42 0.92 3.20 0.73 13.52 0.11
16 JNKI-046-CDU2B-MC-DG-157 18.50 0.92 3.85 0.27 13.26 0.89
17 JNKI-046-CDU2B-MC-DG-157 J-47 19.29 0.92 3.61 0.31 13.06 0.40
18 JNKI-046-CDU2B-MC-DG-157 J-50 19.06 0.92 3.57 0.67 13.09 0.57
19 JNKI-046-CDU2B-MC-DG-157 J-55 19.11 0.92 3.12 0.29 13.96 0.32
20 JNKI-046-CDU2B-MC-DG-157 J-58 18.90 0.92 3.06 0.42 13.07 0.15
21
22
23
24
25
26
27
28
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B.
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 06.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #6 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-157 J-66 19.37 0.14 3.11 0.23 13.37 0.13
2 JNKI-046-CDU2B-MC-DG-157 J-63 18.59 0.92 3.38 0.01 13.46 0.97
3 JNKI-046-CDU2B-MC-DG-157 J-02 18.55 0.92 3.91 0.44 13.83 0.05
4 JNKI-046-CDU2B-MC-DG-157 J-07 18.90 0.92 3.40 0.58 13.69 0.04
5 JNKI-046-CDU2B-MC-DG-157 J-10 18.90 0.92 3.98 0.85 13.89 0.27
6 JNKI-046-CDU2B-MC-DG-157 19.39 0.92 3.50 0.63 13.67 0.36
7 JNKI-046-CDU2B-MC-DG-157 J-15 19.17 0.92 3.05 0.61 13.19 0.04
8 JNKI-046-CDU2B-MC-DG-157 J-18 18.97 0.92 3.50 0.09 13.94 0.62
9 JNKI-046-CDU2B-MC-DG-157 J-23 18.97 0.92 3.62 0.32 13.65 0.94
10 JNKI-046-CDU2B-MC-DG-157 J-26 19.02 0.92 3.18 0.88 13.98 0.37
11 JNKI-046-CDU2B-MC-DG-157 19.47 0.92 3.55 0.52 13.40 0.67
12 JNKI-046-CDU2B-MC-DG-157 J-31 19.30 0.92 3.84 0.22 13.06 0.20
13 JNKI-046-CDU2B-MC-DG-157 J-34 19.10 0.92 3.52 0.41 13.21 0.61
14 JNKI-046-CDU2B-MC-DG-157 J-39 18.63 0.92 3.16 0.82 13.12 0.81
15 JNKI-046-CDU2B-MC-DG-157 J-42 18.61 0.92 3.12 0.19 13.38 0.29
16 JNKI-046-CDU2B-MC-DG-157 18.98 0.92 3.04 0.61 13.03 0.51
17 JNKI-046-CDU2B-MC-DG-157 J-47 19.14 0.92 3.03 0.79 13.28 0.07
18 JNKI-046-CDU2B-MC-DG-157 J-50 19.15 0.92 3.18 0.61 13.86 0.87
19 JNKI-046-CDU2B-MC-DG-157 J-55 19.03 0.92 3.19 0.56 13.93 0.80
20 JNKI-046-CDU2B-MC-DG-157 J-58 19.13 0.92 3.35 0.83 13.88 0.86
21
22
23
24
25
26
27
28
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B.
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 06.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #7 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-157 J-72 19.33 0.12 3.52 0.67 13.68 0.89
2 JNKI-046-CDU2B-MC-DG-157 J-67 18.82 0.92 3.76 0.57 13.68 0.05
3 JNKI-046-CDU2B-MC-DG-157 J-06 18.76 0.92 3.81 0.56 13.90 0.79
4 JNKI-046-CDU2B-MC-DG-157 J-09 19.03 0.92 3.13 0.43 13.47 0.65
5 JNKI-046-CDU2B-MC-DG-157 J-14 19.03 0.92 3.87 0.72 13.02 0.14
6 JNKI-046-CDU2B-MC-DG-157 19.33 0.92 3.02 0.41 13.20 0.92
7 JNKI-046-CDU2B-MC-DG-157 J-17 19.15 0.92 3.58 0.86 13.81 0.79
8 JNKI-046-CDU2B-MC-DG-157 J-22 19.27 0.92 3.38 0.39 13.90 0.91
9 JNKI-046-CDU2B-MC-DG-157 J-25 18.67 0.92 3.09 0.31 13.68 0.69
10 JNKI-046-CDU2B-MC-DG-157 J-30 18.59 0.92 3.50 0.42 13.45 0.80
11 JNKI-046-CDU2B-MC-DG-157 19.18 0.92 3.64 0.80 13.01 0.94
12 JNKI-046-CDU2B-MC-DG-157 J-33 18.85 0.92 3.26 0.70 13.66 0.19
13 JNKI-046-CDU2B-MC-DG-157 J-38 18.63 0.92 3.63 0.33 13.29 0.61
14 JNKI-046-CDU2B-MC-DG-157 J-41 19.03 0.92 3.62 0.97 13.21 0.07
15 JNKI-046-CDU2B-MC-DG-157 J-46 18.99 0.92 3.40 0.75 13.00 0.57
16 JNKI-046-CDU2B-MC-DG-157 19.21 0.92 3.41 0.63 13.30 0.02
17 JNKI-046-CDU2B-MC-DG-157 J-49 18.64 0.92 3.34 0.14 13.71 0.79
18 JNKI-046-CDU2B-MC-DG-157 J-54 19.01 0.92 3.03 0.10 13.23 0.52
19 JNKI-046-CDU2B-MC-DG-157 J-57 18.55 0.92 3.14 0.88 13.42 0.21
20 JNKI-046-CDU2B-MC-DG-157 J-62 19.41 0.92 3.95 0.49 13.07 0.18
21
22
23
24
25
26
27
28
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.CDU2B
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 06.06.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : CDU2B Radiant Coil
Description of Item Tested: Weld Metal (100%) & Base Metal (10%) For Pass #5 Radiant Coil
Material as per Drawing: ASTM SA/A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
No. Drawing No. Item No.
Cr +/- Mo +/- Ni +/- Remarks
1 JNKI-046-CDU2B-MC-DG-157 J-72 18.72 0.38 3.40 0.45 13.73 0.93
2 JNKI-046-CDU2B-MC-DG-157 J-67 18.57 0.92 3.65 0.83 13.90 0.67
3 JNKI-046-CDU2B-MC-DG-157 J-06 19.06 0.92 3.11 0.94 13.70 0.61
4 JNKI-046-CDU2B-MC-DG-157 J-09 19.16 0.92 3.37 0.60 13.48 0.58
5 JNKI-046-CDU2B-MC-DG-157 J-14 18.70 0.92 3.56 0.06 13.61 0.20
6 JNKI-046-CDU2B-MC-DG-157 19.29 0.92 3.56 0.45 13.06 0.82
7 JNKI-046-CDU2B-MC-DG-157 J-17 18.76 0.92 3.65 0.63 13.90 0.01
8 JNKI-046-CDU2B-MC-DG-157 J-22 19.26 0.92 3.11 0.64 13.09 0.38
9 JNKI-046-CDU2B-MC-DG-157 J-25 19.27 0.92 3.26 0.98 13.13 0.04
10 JNKI-046-CDU2B-MC-DG-157 J-30 18.94 0.92 3.32 0.33 13.65 0.39
11 JNKI-046-CDU2B-MC-DG-157 18.61 0.92 3.36 0.08 13.77 0.75
12 JNKI-046-CDU2B-MC-DG-157 J-33 19.38 0.92 3.74 0.93 13.79 0.17
13 JNKI-046-CDU2B-MC-DG-157 J-38 19.16 0.92 3.35 0.39 13.90 0.26
14 JNKI-046-CDU2B-MC-DG-157 J-41 19.26 0.92 3.70 0.88 13.94 0.97
15 JNKI-046-CDU2B-MC-DG-157 J-46 18.82 0.92 3.67 0.65 13.63 0.82
16 JNKI-046-CDU2B-MC-DG-157 19.14 0.92 3.80 0.75 13.78 0.59
17 JNKI-046-CDU2B-MC-DG-157 J-49 18.59 0.92 3.16 0.09 13.66 0.33
18 JNKI-046-CDU2B-MC-DG-157 J-54 19.03 0.92 3.23 0.88 13.68 0.58
19 JNKI-046-CDU2B-MC-DG-157 J-57 18.81 0.92 3.99 0.05 13.76 0.86
20 JNKI-046-CDU2B-MC-DG-157 J-62 18.85 0.92 3.27 0.96 13.43 0.66
21
22
23
24
25
26
27
28
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.ATM1B.ANC.006
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date:
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : ATM1B Anchors for CM-2
Description of Item Tested: AN1 (Stud + V-Anchor with Nuts) & AN7 (Split Y)
Material as per Drawing: ASTM A276 SS310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-Stud 22.92 0.15 15.48 0.16
2 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-V-Anchor 23.17 0.51 12.80 0.82
3 JNKI-046-ATM1B-MC-DG-281 (R2) AN7 23.93 0.35 12.91 0.60
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.ATM1B.ANC.004
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date:
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : ATM1B Anchors for CM-2
Description of Item Tested: AN2 (Stud + V-Anchor with Nuts) & AN4 (Stud + Corbels)
Material as per Drawing: ASTM A276 SS304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-ATM1B-MC-DG-281 (R2) AN2-Stud 19.72 0.65 10.50 0.46
2 JNKI-046-ATM1B-MC-DG-281 (R2) AN2-Stud 18.59 0.46 10.03 0.76
3 JNKI-046-ATM1B-MC-DG-281 (R2) AN2-Stud 19.39 0.99 9.67 0.50
4 JNKI-046-ATM1B-MC-DG-281 (R2) AN2-Stud 19.29 0.61 9.53 0.99
5 JNKI-046-ATM1B-MC-DG-281 (R2) AN2-Stud 19.47 0.22 8.62 0.37
6 JNKI-046-ATM1B-MC-DG-281 (R2) AN2-Stud 18.69 0.81 9.43 0.76
7 JNKI-046-ATM1B-MC-DG-281 (R2) AN2-V-anchor 19.60 0.80 9.85 0.73
8 JNKI-046-ATM1B-MC-DG-281 (R2) AN2-V-anchor 19.26 0.44 8.29 0.01
9 JNKI-046-ATM1B-MC-DG-281 (R2) AN2-V-anchor 18.27 0.83 8.94 0.93
10 JNKI-046-ATM1B-MC-DG-281 (R2) AN2-V-anchor 18.63 0.86 10.81 0.74
11 JNKI-046-ATM1B-MC-DG-281 (R2) AN2-V-anchor 19.86 0.72 8.36 0.10
12 JNKI-046-ATM1B-MC-DG-281 (R2) AN2-V-anchor 19.03 0.02 10.50 0.30
13 JNKI-046-ATM1B-MC-DG-281 (R2) AN4-Stud 18.31 0.73 9.54 0.70
14 JNKI-046-ATM1B-MC-DG-281 (R2) AN4-Stud 19.92 0.30 9.41 0.83
15 JNKI-046-ATM1B-MC-DG-281 (R2) AN4-Corbel 18.11 0.39 8.60 0.23
16 JNKI-046-ATM1B-MC-DG-281 (R2) AN4-Corbel 18.23 0.43 8.33 0.37
17
18
19
20
21
22
23
24
25
26
27
28
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.ATM1B.ANC.003
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date:
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : ATM1B Anchors for CM-2
Description of Item Tested: AN1 (Stud + V-Anchor with Nuts) + AN3 (Stud + Corbel)
Material as per Drawing: ASTM A276 SS310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-Stud 24.36 0.90 20.15 0.76
2 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-Stud 24.56 0.45 20.70 0.94
3 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-Stud 25.59 0.17 20.61 0.53
4 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-Stud 25.56 0.32 19.13 0.92
5 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-Stud 24.43 0.27 19.34 0.23
6 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-Stud 24.56 0.92 20.67 0.46
7 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-V-anchor 24.38 0.77 20.63 0.40
8 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-V-anchor 25.79 0.74 20.23 0.13
9 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-V-anchor 24.97 0.24 20.00 0.36
10 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-V-anchor 25.99 0.10 20.08 0.27
11 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-V-anchor 25.89 0.20 19.17 0.42
12 JNKI-046-ATM1B-MC-DG-281 (R2) AN1-V-anchor 25.59 0.98 20.68 0.09
13 JNKI-046-ATM1B-MC-DG-281 (R2) AN3-Stud 25.56 0.68 19.45 0.77
14 JNKI-046-ATM1B-MC-DG-281 (R2) AN3-Stud 24.04 0.96 19.12 0.45
15 JNKI-046-ATM1B-MC-DG-281 (R2) AN3-Corbel 25.79 0.86 19.69 0.40
16 JNKI-046-ATM1B-MC-DG-281 (R2) AN3-Corbel 24.14 0.70 19.50 0.74
17
18
19
20
21
22
23
24
25
26
27
28
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.ATM1A.ANC.005
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date:
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : ATM1A Anchors for CM-2
Description of Item Tested: AN1 (Stud + V-Anchor with Nuts) & AN7 (Split Y)
Material as per Drawing: ASTM A276 SS310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-Stud 22.11 0.68 15.08 0.55
2 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-V-Anchor 22.15 0.66 12.75 0.03
3 JNKI-046-ATM1A-MC-DG-281 (R1) AN7 23.98 0.29 14.32 0.38
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.ATM1A.ANC.004
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date:
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : ATM1A Anchors for CM-2
Description of Item Tested: AN2 (Stud + V-Anchor with Nuts) & AN4 (Stud + Corbels)
Material as per Drawing: ASTM A276 SS304
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-ATM1A-MC-DG-281 (R1) AN2-Stud 18.28 0.50 10.93 0.97
2 JNKI-046-ATM1A-MC-DG-281 (R1) AN2-Stud 19.06 0.08 9.94 0.81
3 JNKI-046-ATM1A-MC-DG-281 (R1) AN2-Stud 18.48 0.07 10.69 0.52
4 JNKI-046-ATM1A-MC-DG-281 (R1) AN2-Stud 19.52 0.11 9.02 0.24
5 JNKI-046-ATM1A-MC-DG-281 (R1) AN2-Stud 18.12 0.86 8.71 0.58
6 JNKI-046-ATM1A-MC-DG-281 (R1) AN2-Stud 18.95 0.16 8.94 0.80
7 JNKI-046-ATM1A-MC-DG-281 (R1) AN2-V-anchor 19.62 0.54 10.11 0.71
8 JNKI-046-ATM1A-MC-DG-281 (R1) AN2-V-anchor 19.65 0.97 10.07 0.78
9 JNKI-046-ATM1A-MC-DG-281 (R1) AN2-V-anchor 18.70 0.37 10.84 0.07
10 JNKI-046-ATM1A-MC-DG-281 (R1) AN2-V-anchor 18.28 0.05 9.43 0.96
11 JNKI-046-ATM1A-MC-DG-281 (R1) AN2-V-anchor 18.49 0.41 8.17 0.66
12 JNKI-046-ATM1A-MC-DG-281 (R1) AN2-V-anchor 18.73 0.71 9.98 0.19
13 JNKI-046-ATM1A-MC-DG-281 (R1) AN4-Stud 19.86 0.45 9.84 0.05
14 JNKI-046-ATM1A-MC-DG-281 (R1) AN4-Stud 19.71 0.88 9.78 0.90
15 JNKI-046-ATM1A-MC-DG-281 (R1) AN4-Corbel 19.70 0.68 10.82 0.54
16 JNKI-046-ATM1A-MC-DG-281 (R1) AN4-Corbel 19.85 0.80 10.03 0.95
17
18
19
20
21
22
23
24
25
26
27
28
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.ATM1A.ANC.003
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date:
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : ATM1A Anchors for CM-2
Description of Item Tested: AN1 (Stud + V-Anchor with Nuts)
Material as per Drawing: ASTM A276 SS310
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-Stud 25.73 0.42 20.27 0.17
2 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-Stud 25.93 0.35 20.81 0.23
3 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-Stud 25.24 0.51 19.09 0.54
4 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-Stud 25.08 0.39 19.41 0.48
5 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-Stud 25.34 0.44 20.24 0.74
6 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-Stud 25.73 0.00 20.10 0.59
7 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-V-anchor 24.32 0.37 19.60 0.59
8 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-V-anchor 25.03 0.19 19.96 0.37
9 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-V-anchor 25.02 0.38 19.04 0.69
10 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-V-anchor 24.48 0.83 19.90 0.02
11 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-V-anchor 24.36 0.79 19.79 0.89
12 JNKI-046-ATM1A-MC-DG-281 (R1) AN1-V-anchor 25.64 0.98 19.37 0.48
13 JNKI-046-ATM1A-MC-DG-281 (R1) AN3-Stud 25.60 0.22 20.39 0.88
14 JNKI-046-ATM1A-MC-DG-281 (R1) AN3-Stud 25.77 0.77 19.27 0.74
15 JNKI-046-ATM1A-MC-DG-281 (R1) AN3-Corbel 25.56 0.78 20.31 0.47
16 JNKI-046-ATM1A-MC-DG-281 (R1) AN3-Corbel 24.47 0.26 20.08 0.10
17
18
19
20
21
22
23
24
25
26
27
28
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No: JNKI.MUN.PMI.ATM2B.CON.001
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 31.05.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : ATM2B Convection Coil
Description of Item Tested: Welded Joint Metal Deposit
Material as per DWG: A312 TP317L
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Mo +/- Remarks
1 JNKI-046-ATM2B-MC-DG-157 R2 Pass 1/ J-118 19.85 0.71 14.11 0.13 3.66 0.75
2 JNKI-046-ATM2B-MC-DG-157 R2 Pass 1/ J-121 18.76 0.26 14.61 0.33 3.18 0.59
3 JNKI-046-ATM2B-MC-DG-157 R2 Pass 2/J-218 19.02 0.68 13.45 0.75 3.66 0.94
4 JNKI-046-ATM2B-MC-DG-157 R2 Pass 2/J-221 18.70 0.47 13.23 0.10 3.06 0.28
5 JNKI-046-ATM2B-MC-DG-157 R2 Pass 3/J-310 19.09 0.80 14.23 0.30 3.68 0.55
6 JNKI-046-ATM2B-MC-DG-157 R2 Pass 3/J-313 18.87 0.86 13.43 0.33 3.14 0.77
7 JNKI-046-ATM2B-MC-DG-157 R2 Pass 3/J-318 20.30 0.24 14.39 0.98 3.82 0.76
8 JNKI-046-ATM2B-MC-DG-157 R2 Pass 3/J-321 19.16 0.58 14.20 0.22 3.82 0.62
9 JNKI-046-ATM2B-MC-DG-157 R2 Pass 4/J-410 20.36 0.25 14.71 0.29 3.14 0.12
10 JNKI-046-ATM2B-MC-DG-157 R2 Pass 4/J-413 18.92 0.47 13.95 0.84 3.69 0.00
11 JNKI-046-ATM2B-MC-DG-157 R2 Pass 4/J-418 19.82 0.34 13.95 0.05 3.37 0.15
12 JNKI-046-ATM2B-MC-DG-157 R2 Pass 4/J-421 19.41 0.07 13.38 0.95 3.03 0.73
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No:
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date:
Sr. No:814659
Machine Description: X-MET8000
Make
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : ATM1B-462-21MCM-01 0 0

Description of Item Tested: ANCHOR (ITME NO. AN1 - Lower and upper Anchor)
Material as per DWG: JNKI-046-ATM1B-MC-DG-272
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.75 0.84 19.18 0.63
2 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 22.82 0.54 19.90 0.97
3 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.90 0.68 20.61 0.04
4 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.98 0.36 19.22 0.90
5 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.84 0.07 20.70 0.52
6 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 22.24 0.20 19.51 0.06
7 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.54 0.77 19.88 0.58
8 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 22.64 0.41 20.90 0.52
9 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 22.73 0.90 20.20 0.62
10 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.93 0.55 20.99 0.92
11 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.52 0.02 20.61 0.19
12 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.30 0.72 20.72 0.66
13 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.99 0.39 20.76 0.18
14 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.61 0.68 19.40 0.23
15 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.57 0.91 20.14 0.33
16 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.75 0.02 20.21 0.84
17 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 22.26 0.31 19.80 0.02
18 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 22.45 0.96 19.49 0.19
19 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 22.62 0.52 19.58 0.06
20 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.03 0.16 20.56 0.10
21
22
23
24
25
26
27

Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No:
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date:
Machine Description: X-MET8000
Make
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : ATM1B-462-21MCM-01 1800
Description of Item Tested: ANCHOR (ITME NO. AN1 - Lower and upper Anchor)
Material as per DWG: JNKI-046-ATM1B-MC-DG-272
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.07 0.19 20.70 0.38
2 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.47 0.57 19.05 0.21
3 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 22.66 0.48 20.21 0.68
4 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 22.74 0.81 19.82 0.35
5 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.40 0.24 19.17 0.54
6 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.12 0.37 19.35 0.77
7 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.14 0.79 20.86 0.67
8 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.57 0.98 20.12 0.93
9 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.14 0.87 20.98 0.08
10 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 22.96 0.99 20.15 0.94
11 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 22.76 0.24 20.39 0.35
12 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.41 0.75 20.06 0.50
13 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 22.26 0.09 19.65 0.45
14 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 22.11 0.68 19.84 0.10
15 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.66 0.10 19.84 0.95
16 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.65 0.79 20.99 0.59
17 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.27 0.34 20.68 0.50
18 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 22.36 0.81 20.96 0.78
19 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.36 0.23 19.29 0.13
20 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.90 0.49 19.78 0.31
21
22
23
24
25
26
27

Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No:
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date:
Machine Description: X-MET8000
Make
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : ATM1B-462-21MCM-01 900
Description of Item Tested: ANCHOR (ITME NO. AN1 - Lower and upper Anchor)
Material as per DWG: JNKI-046-ATM1B-MC-DG-272
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 22.30 0.19 20.77 0.97
2 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.76 0.66 20.44 0.18
3 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 22.99 0.14 20.19 0.75
4 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.60 0.52 19.46 0.13
5 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.45 0.32 20.17 0.61
6 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.07 0.54 20.79 0.54
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No:
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date:
Machine Description: X-MET8000
Make
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022
Mark No. : ATM1B-462-21MCM-01 2700
Description of Item Tested: ANCHOR (ITME NO. AN1 - Lower and upper Anchor)
Material as per DWG: JNKI-046-ATM1B-MC-DG-272
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.83 0.16 19.48 0.84
2 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.21 0.87 19.70 0.61
3 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Lower) 23.11 0.54 19.26 0.51
4 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.23 0.49 20.75 0.95
5 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 22.83 0.82 20.90 0.72
6 JNKI-046-ATM1B-MC-DG-272 Rev 01 AN1 (Upper) 23.05 0.81 20.95 0.42
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No:JNK/MUN/PMI-11
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 26.02.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022

Description of Item Tested: WELD DEPOSIT FOR CONVECTION COIL


Material as per DWG: JNKI-046-ATM1A-MC-DG-157 Rev 05
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-ATM1A-MC-DG-157 Rev 05 P1 / J-104 19.0641 0.9565 13.3403505 0.17705723
2 JNKI-046-ATM1A-MC-DG-157 Rev 05 P1 / J-105 18.8467 0.5903 13.4715011 0.54849662
3 JNKI-046-ATM1A-MC-DG-157 Rev 05 P1 / J-106 18.8023 0.2795 14.2030508 0.67965295
4 JNKI-046-ATM1A-MC-DG-157 Rev 05 P1 / J-107 19.1028 0.2814 13.3265461 0.95669504 Weld Metal
5 JNKI-046-ATM1A-MC-DG-157 Rev 05

6 JNKI-046-ATM1A-MC-DG-157 Rev 05 P3 / J-310 19.7798 0.4808 14.4617394 0.21613694


7 JNKI-046-ATM1A-MC-DG-157 Rev 05 P3 / J-311 19.9451 0.8105 14.4338962 0.65181515
8 JNKI-046-ATM1A-MC-DG-157 Rev 05 P3 / J-312 20.3436 0.2266 13.2755294 0.36060769
9 JNKI-046-ATM1A-MC-DG-157 Rev 05 P3 / J-313 20.1385 0.0378 13.5042983 0.31721653
10 JNKI-046-ATM1A-MC-DG-157 Rev 05 P4 / J-410 19.5068 0.1732 13.2580216 0.86924709
11 JNKI-046-ATM1A-MC-DG-157 Rev 05 P4 / J-411 19.0188 0.7345 13.8814387 0.20809799
12 JNKI-046-ATM1A-MC-DG-157 Rev 05 P4 / J-412 19.6883 0.0204 13.8788491 0.69163283
13 JNKI-046-ATM1A-MC-DG-157 Rev 05 P4 / J-413 20.2330 0.6477 13.3660584 0.21838048
14 JNKI-046-ATM1A-MC-DG-157 Rev 05 Weld Metal
15 JNKI-046-ATM1A-MC-DG-157 Rev 05 P2 / J-218 18.7049 0.7406 14.928044 0.93016701
16 JNKI-046-ATM1A-MC-DG-157 Rev 05 P2 / J-219 19.6584 0.0204 14.9354103 0.29146894
17 JNKI-046-ATM1A-MC-DG-157 Rev 05 P2 / J-220 19.4154 0.5984 14.3098491 0.7783475
18 JNKI-046-ATM1A-MC-DG-157 Rev 05 P2 / J-221 19.8435 0.0283 13.2487504 0.82687579
19 JNKI-046-ATM1A-MC-DG-157 Rev 05 P3 / J-318 19.4224 0.6103 13.1221453 0.55346373
20 JNKI-046-ATM1A-MC-DG-157 Rev 05 P3 / J-319 18.7123 0.4800 14.3324187 0.66563593
21 JNKI-046-ATM1A-MC-DG-157 Rev 05 P3 / J-320 19.4597 0.0334 14.9420614 0.74302091
22 JNKI-046-ATM1A-MC-DG-157 Rev 05 P3 / J-321 19.7469 0.7170 14.8209125 0.47138944
23 JNKI-046-ATM1A-MC-DG-157 Rev 05 P4 / J-404 18.8682 0.4308 13.7131348 0.26694583
24 JNKI-046-ATM1A-MC-DG-157 Rev 05 P4 / J-405 19.3013 0.6300 13.6936453 0.02481908
25 JNKI-046-ATM1A-MC-DG-157 Rev 05 P4 / J-406 20.1675 0.1486 13.8805279 0.83576474
26 JNKI-046-ATM1A-MC-DG-157 Rev 05 P4 / J-407 19.5501 0.1851 13.2131386 0.082046
27 JNKI-046-ATM1A-MC-DG-157 Rev 05 Weld Metal

Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No:JNK/MUN/PMI-12
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 26.02.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022

Description of Item Tested: WELD DEPOSIT FOR CONVECTION COIL


Material as per DWG: JNKI-046-ATM1A-MC-DG-157 Rev 05
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
29 JNKI-046-ATM1A-MC-DG-157 Rev 05 P3 / J-304
30 JNKI-046-ATM1A-MC-DG-157 Rev 05 P3 / J-305
31 JNKI-046-ATM1A-MC-DG-157 Rev 05 P3 / J-306
32 JNKI-046-ATM1A-MC-DG-157 Rev 05 P3 / J-307
33 JNKI-046-ATM1A-MC-DG-157 Rev 05

34 JNKI-046-ATM1A-MC-DG-157 Rev 05 P1 / J-118


35 JNKI-046-ATM1A-MC-DG-157 Rev 05 P1 / J-119
36 JNKI-046-ATM1A-MC-DG-157 Rev 05 P1 / J-120
37 JNKI-046-ATM1A-MC-DG-157 Rev 05 P1 / J-121
38 JNKI-046-ATM1A-MC-DG-157 Rev 05 P2 / J-204
39 JNKI-046-ATM1A-MC-DG-157 Rev 05 P2 / J-205
40 JNKI-046-ATM1A-MC-DG-157 Rev 05 P2 / J-206
41 JNKI-046-ATM1A-MC-DG-157 Rev 05 P2 / J-207
42
43
44
45
46
47
48
49
50
51
52
53
54
55

Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No:JNK/MUN/PMI-10
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 26.02.2022
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022

Description of Item Tested: WELD DEPOSIT FOR CONVECTION COIL


Material as per DWG: JNKI-046-ATM1A-MC-DG-157 Rev 05
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Drawing No. Item No.
No. Cr +/- Ni +/- Remarks
1 JNKI-046-ATM1A-MC-DG-157 (R5) P-1/ J-118 18.7964 0.9857 13.8622027 0.25882231 WELD
2 JNKI-046-ATM1A-MC-DG-157 (R5) P-1/ J-127 19.0939 0.8363 14.0270 0.3129 WELD
3 JNKI-046-ATM1A-MC-DG-157 (R5) P-1/ J-104 19.1144 0.4936 13.9493 0.9192 WELD
4 JNKI-046-ATM1A-MC-DG-157 (R5) P-1/ J-107 19.4711 0.8402 14.6874 0.4767 WELD
5 JNKI-046-ATM1A-MC-DG-157 (R5) P-2/ J-210 19.2912 0.3906 14.2001 0.2875 WELD
6 JNKI-046-ATM1A-MC-DG-157 (R5) P-2/ J-213 18.9765 0.8638 13.4759 0.5430 WELD
7 JNKI-046-ATM1A-MC-DG-157 (R5) P-3/ J-304 18.3556 0.6844 13.7756 0.9591 WELD
8 JNKI-046-ATM1A-MC-DG-157 (R5) P-3/ J-307 19.2776 0.1064 14.8549 0.2236 WELD
9 JNKI-046-ATM1A-MC-DG-157 (R5) P-3/ J-318 19.8213 0.6664 13.5351 0.8582 WELD
10 JNKI-046-ATM1A-MC-DG-157 (R5) P-3/ J-321 18.0251 0.2246 13.5215 0.6595 WELD
11 JNKI-046-ATM1A-MC-DG-157 (R5) P-4/ J-404 19.5527 0.1277 13.8349 0.5745 WELD
12 JNKI-046-ATM1A-MC-DG-157 (R5) P-4/ J-407 19.5713 0.6693 14.0743 0.4057 WELD
13 JNKI-046-ATM1A-MC-DG-157 (R5) P-4/ J-410 19.0451 0.3891 13.1222 0.6528 WELD
14 JNKI-046-ATM1A-MC-DG-157 (R5) P-4/ J-413 18.6731 0.3395 14.8193 0.3750 WELD
15 JNKI-046-ATM1A-MC-DG-157 (R5) P-1/ J-127 18.5435 0.3118 14.7038 0.5528 Base Metal
16 JNKI-046-ATM1A-MC-DG-157 (R5) P-3/ J-318 19.5309 0.9083 13.4622 0.4622 Base Metal
17
18
19
20
21
22
23
24
25
26
27
28
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No:JNK/MUN/PMI-CDU1B-CC02
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 21.12.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022

Description of Item Tested: Convection Coil (Base Metal & Weld Metal)
Material as per DWG: JNKI-046-CDU1B-MC-DG-158 Rev 04
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Line No. Joint No.
No. Cr Mn Fe Ni Remarks
1 Pass No. 1 J-45 18.2826 1.6334 62.6105 13.6259
2 Pass No. 3 J-45 18.5579 1.753 62.8388 12.7891
3 Pass No. 4 J-45 18.1314 1.332 64.7996 11.816
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: PTI-INFRASTRUCTURE DE DESEROLLO, SA.C.V. Report No:JNK/MUN/PMI-CDU1A-CC01
Project: DESARROLLO DEL PAQUETTE 1 DE LA REFINERIA DOS BOCAS Date: 21.12.2021
Machine
Make Description: X-MET8000
Calibration date: 02/12/2021
Make: HITACHI Calibration due date: 30/11/2022

Description of Item Tested: Convection Coil (Base Metal & Weld Metal)
Material as per DWG: JNKI-046-CDU1A-MC-DG-158 Rev 06
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Sl. Value of Chemical Composition in %
Line No. Joint No.
No. Cr Mn Fe Ni Remarks
1 Pass No. 2 J-22 18.319 1.4879 64.8117 11.5945 Weld
2 Pass No. 1 J-23 19.0755 1.6696 62.8829 12.6268 Weld
3 Pass No. 2 J-29 18.0226 1.5393 62.9809 13.6145 Weld
4 Pass No. 7 J-29 19.0015 1.8302 62.098 13.1688 Weld
5 Pass No. 2 J-16 18.5056 1.5797 63.6986 12.3899 Weld
6 Pass No. 1 J-10 18.0636 1.4553 64.689 11.9637 Weld
7 Pass No. 2 J-07 18.6273 1.7017 62.497 13.3273 Weld
8 Pass No. 7 J-27 18.1477 1.3881 62.0095 14.4514 Weld
9 Pass No. 7 J-30 18.361 1.4898 63.1581 13.2763 Weld
10 Pass No. 3 J-08 18.1817 1.4994 64.6904 11.7772 Weld
11 Pass No. 4 J-14 18.5354 1.7894 62.6056 13.2032 Weld
12 Pass No. 8 J-08 18.0443 1.4858 62.5015 13.8224 Weld
13 Pass No. 5 J-22 19.1717 1.801 62.3468 12.816 Weld
14 Pass No. 4 J-23 18.3188 1.4161 64.7977 11.6297 Weld
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Prepared by JNKI TPIA

SIGNATURE
NAME
DATE
JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
JNK INDIA PVT. LTD.
POSITIVE MATERIAL IDENTIFICATION REPORT
Client: Report No:
Project: Date:
Machine
Make Description:
Calibration date:
Make: Calibration due date:

Description of Item Tested:


Material as per DWG:
Format no. JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021
Readings of Machine
Value of Chemical Composition in %
Line No. Joint No.
Cr Mn Fe Ni Remarks

JNK.FM.MUNDRA.QC.27, ISSUE NO.01, REV.0, Eff. Date 23/07/2021