I Data sheet for
1 VALVE DATASHEET FOR NON-METALLIC BALL VALVE - DIGHA SEWAGE TREATMENT PLANT 1 10P155-P0003-2108 0
II Contract Specifications
DESIGN DATA
LIQUID HANDLED POLYELECTROLYTE, TREATED WATER & CHLORINE
DESIGN CODE MFG STD
PRESSURE RATING PN 10
DESIGN TEMPERATURE °C 60
END CONNECTION FLANGED
DRILLING STANDARD BS EN 1092-1, PN 10
OPERATION MANUAL OPERATED
TYPE MFG STD
DESCRIPTION MATERIAL
BODY POLYPROPYLENE
BALL POLYPROPYLENE
SPINDLE POLYPROPYLENE
END PIECE POLYPROPYLENE
SEAT PTFE
SEALS (FLANGE & SPINDLE) EPDM
HAND LEVER MS POWDER COATED WITH FLEXIBLE PVC SLEEVE
FASTNERS SS304
TESTING INSPECTION
TESTING STANDARD : MFG STD
HYDRO BODY ( Kg/cm2) : # AS PER APPROVED QAP
HYDRO SEAT ( Kg/cm2) : #
TOTAL QUANTITY
50 18
32 2 HOLD
NOTES
1) 1) # Vendor to furnish details
2) Valve shall be suitable for mounting in any position.
3) All hand lever shall be arranged to turn in a clockwise direction to close the valve and clearly marked with 'open' and 'closed' positions on
handwheels.
4) Vendor to furnish the compliance statement and deviation list (if any) & stamped Wabag Datasheet along with offer, without the same
offer will not be considered for evaluation.
5) Vendor to furnish the Catalogues, GA drawing and cross sectional drawing.
Consultant -
VENDOR DATA REQUIREMENT (WITH OFFER)
DOCUMENTS REQUIRED WITH THE OFFER:
Sr. no. Technical Document YES / NO Remarks
1 No. of offer copies to be submitted
2 Filled up datasheet ✘ Yes No
3 Performance curves Yes ✘ No Not applicable
4 P&I Diagram for the package Yes ✘ No Not applicable
5 Design calculations Yes ✘ No Not applicable
6 Compliance statement # ✘ Yes No
Ye
7 Deviation list # ✘
No In case of no deviation vendor to furnish this list stating "NO DEVIATION"
s
8 Technical specs duly signed & stamped ✘ Yes No Enquiry Technical specifications
9 Commissioning Spare parts ✘ Yes No Quote separately
10 Mandatory Spare parts ✘ Yes No Quote separately
11 Recommended Spare parts ✘ Yes No
12 Quality assurance plan ✘ Yes No
13 Typ. General arrangement drawing ✘ Yes No
14 Catalogues and brochures ✘ Yes No
Ye
15 Reference list for similar models ✘ No 2 nos. working satisfactorly for last 2 years
s
16 Manufacturing programme ✘ Yes No
17 Mfg. Progress report ✘ Yes No
18 Control Philosophy Yes ✘✘ No Not applicable
19 Control Architect Drawing- PLC/DCS Yes ✘ No Not applicable
20 Layout Diagram Yes ✘ No Not applicable
N
21 Sizing Sheet Control valve / Orifice Yes ✘ Not applicable
o
22 Others (If any)
NOTES:
1 Vendor to submit the complete details of manufacturing standard for painting finishes.
Project No 10P155 PR Ref No.
Consultant -
VENDOR DATA REQUIREMENT(After LOI) ✘
DOCUMENTS REQUIRED AFTER PLACEMENT OF LOI:
Sr. no. Technical Document Hard copy Soft copy Remarks
1 No. of copies to be submitted
2 Filled up datasheet ✘ Yes No ✘ Yes No
3 Performance curves Yes ✘ No Yes ✘ No Not Applicable
4 P&I Diagram for the package Yes ✘ No Yes ✘ No Not Applicable
5 Design calculations Yes ✘ No Yes ✘ No
6 Commissioning Spare parts ✘ Yes No ✘ Yes No Within One week on receipt of LOI
7 Mandatory Spare parts ✘ Yes No ✘ Yes No Within One week on receipt of LOI
8 Recommended Spare parts ✘ Yes No Yes No Within One week on receipt of LOI
9 Quality assurance plan ✘ Yes No ✘ Yes No Within One week on receipt of LOI
10 General arrangement drawing ✘ Yes No ✘ Yes No
11 Sectional drawings ✘ Yes No ✘ Yes No
12 Catalogues and brochures ✘ Yes No ✘ Yes No Within One week on receipt of LOI
13 Reference list for similar models ✘ Yes No ✘ Yes ✘ No Within One week on receipt of LOI
14 Detailed sectional drawings ✘ Yes No ✘ Yes No
15 Detailed Manufacturing programme ✘ Yes No ✘ Yes No Within One week on receipt of LOI
16 Mgf. Progress report ✘ Yes No ✘ Yes No
17 Wiring & Schematic drawing Yes No Yes No Not Applicable
18 Speed - torque curve Yes No ✘ Yes No Not Applicable
19 Motor curves Yes No Yes ✘ No Not Applicable
20 Inspection reports with release notes ✘ Yes No ✘ Yes No Note: 1
Ye ✘ Yes
21 Erection manual ✘ No No 2 Weeks before supply
s
✘ Yes
22 Schedule No ✘ Yes 2 Weeks before supply
No
23 Asbuilt Drawing ✘ Yes No ✘ Yes 1 Week before supply
No
24 Final Sizing Sheet Control Valve /Orifice Yes No Yes No Not applicable
25 Control Architect Drawing- PLC/DCS Yes No Yes No Not applicable
26 Terminal details / Panel Wiring Detail Yes No Yes No Not applicable
N N
27 Calibration and Test Certificates Yes ✘ Yes Receipt of Material
✘ Yes
oN oN
28 Warranty certificate ✘ Yes Receipt of Material
oN o
N
29 Hazardous / Intrinsic safe approvals ✘ Yes ✘ Yes
o o
30 Others (If any)
NOTES:
1) All the inspection reports shall be complied starting from material identification, in-process inspection to final inspection and release
notes issued by client/consultant. Material test certificates shall be furnished.
2) Inspection reports should include welding procedures & its records approved by the inspection authority and Procedure for hydrotest
COMPLIANCE STATEMENT
(Typical - To be submitted in vendor’s letter head)
Project no 10P155
Equipment BALL VALVE - NON-METALLIC
1) Letter 1 dated
2) Letter 2 dated
Authorized Signatory
Company name and seal