You are on page 1of 6

WABAG

WABAG HOUSE, 17, 200 Feet Radial Road,


S.Kolathur, Chennai - 600117, India. Format Number E-05 F / Rev. 0
PURCHASE REQUISITION (PR)
PROJECT No. 10P155 PR REQ. No.

DEVELOPMENT AND OPERATIONS OF SEWAGE TREATMENT PLANTS


PROJECT AND SEWARAGE NETWORK AT PATNA - BIHAR (100 MLD DIGHA EQPT./ITEM BALL VALVE - NON-METALLIC
SEWAGE TREATMENT PLANT)

LOCATION PATNA, BIHAR DISCIPLINE PIPING


BIHAR URBAN INFRASTRUCTURE DEVELOPMENT CORPORATION
CLIENT LIMITED PROJECT MANAGER MR. SUDHEER KUMAR M

CONSULTANT -
INDEX
S.
Description Shts Document no. Rev Remarks
No.
I Data sheet for
1 VALVE DATASHEET FOR NON-METALLIC BALL VALVE - DIGHA SEWAGE TREATMENT PLANT 1 10P155-P0003-2108 0

II Contract Specifications

III Other details


1 Vendor data req.-offer 1
2 Vendor data req. - after LOI 1
3 Compliance 1
4 Deviation list 1
Total No.of sheets 5

0 ISSUED FOR ENQUIRY 13-Jul-20 JP GE SK


REV. DESCRIPTION DATE PREP. BY CHKD. BY APPD. BY
VALVE DATASHEET FOR BALL VALVE
VA TECH WABAG
WABAG HOUSE, No : 17, 200 Feet Radial Road,
S.Kolathur, Chennai - 600117,India.

CLIENT BIHAR URBAN INFRASTRUCTURE DEVELOPMENT ISSUED for ENQUIRY


CORPORATION LIMITED
LOCATION PATNA, BIHAR PROJECT NO. 10P155

DEVELOPMENT AND OPERATIONS OF SEWAGE TREATMENT PIPE SPECIFICATION UPVC


PROJECT PLANTS AND SEWARAGE NETWORK AT PATNA - BIHAR (100
MLD DIGHA SEWAGE TREATMENT PLANT)

DESIGN DATA
LIQUID HANDLED POLYELECTROLYTE, TREATED WATER & CHLORINE
DESIGN CODE MFG STD
PRESSURE RATING PN 10
DESIGN TEMPERATURE °C 60
END CONNECTION FLANGED
DRILLING STANDARD BS EN 1092-1, PN 10
OPERATION MANUAL OPERATED
TYPE MFG STD
DESCRIPTION MATERIAL
BODY POLYPROPYLENE
BALL POLYPROPYLENE
SPINDLE POLYPROPYLENE
END PIECE POLYPROPYLENE
SEAT PTFE
SEALS (FLANGE & SPINDLE) EPDM
HAND LEVER MS POWDER COATED WITH FLEXIBLE PVC SLEEVE
FASTNERS SS304
TESTING INSPECTION
TESTING STANDARD : MFG STD
HYDRO BODY ( Kg/cm2) : # AS PER APPROVED QAP
HYDRO SEAT ( Kg/cm2) : #

TOTAL QUANTITY

SIZE IN NB QTY REMARKS

50 18

32 2 HOLD

NOTES
1) 1) # Vendor to furnish details
2) Valve shall be suitable for mounting in any position.
3) All hand lever shall be arranged to turn in a clockwise direction to close the valve and clearly marked with 'open' and 'closed' positions on
handwheels.
4) Vendor to furnish the compliance statement and deviation list (if any) & stamped Wabag Datasheet along with offer, without the same
offer will not be considered for evaluation.
5) Vendor to furnish the Catalogues, GA drawing and cross sectional drawing.

Prepared Checked Approved WABAG Doc No Sheet Rev Date


JP GE SK 10P155-P0003-2108 1 0 13-07-2020
Project No 10P155 PR Ref No.

DEVELOPMENT AND OPERATIONS OF SEWAGE


TREATMENT PLANTS AND SEWARAGE NETWORK
Project PR Date 13-07-2020
AT PATNA - BIHAR (100 MLD DIGHA SEWAGE
TREATMENT PLANT)

BIHAR URBAN INFRASTRUCTURE DEVELOPMENT


Client
CORPORATION LIMITED
Eqpt/Item BALL VALVE - NON-METALLIC

Consultant -
VENDOR DATA REQUIREMENT (WITH OFFER)
DOCUMENTS REQUIRED WITH THE OFFER:
Sr. no. Technical Document YES / NO Remarks
1 No. of offer copies to be submitted
2 Filled up datasheet ✘ Yes No
3 Performance curves Yes ✘ No Not applicable
4 P&I Diagram for the package Yes ✘ No Not applicable
5 Design calculations Yes ✘ No Not applicable
6 Compliance statement # ✘ Yes No
Ye
7 Deviation list # ✘
No In case of no deviation vendor to furnish this list stating "NO DEVIATION"
s
8 Technical specs duly signed & stamped ✘ Yes No Enquiry Technical specifications
9 Commissioning Spare parts ✘ Yes No Quote separately
10 Mandatory Spare parts ✘ Yes No Quote separately
11 Recommended Spare parts ✘ Yes No
12 Quality assurance plan ✘ Yes No
13 Typ. General arrangement drawing ✘ Yes No
14 Catalogues and brochures ✘ Yes No
Ye
15 Reference list for similar models ✘ No 2 nos. working satisfactorly for last 2 years
s
16 Manufacturing programme ✘ Yes No
17 Mfg. Progress report ✘ Yes No
18 Control Philosophy Yes ✘✘ No Not applicable
19 Control Architect Drawing- PLC/DCS Yes ✘ No Not applicable
20 Layout Diagram Yes ✘ No Not applicable
N
21 Sizing Sheet Control valve / Orifice Yes ✘ Not applicable
o
22 Others (If any)

NOTES:
1 Vendor to submit the complete details of manufacturing standard for painting finishes.
Project No 10P155 PR Ref No.

DEVELOPMENT AND OPERATIONS OF SEWAGE


TREATMENT PLANTS AND SEWARAGE NETWORK
Project PR Date 13-07-2020
AT PATNA - BIHAR (100 MLD DIGHA SEWAGE
TREATMENT PLANT)

BIHAR URBAN INFRASTRUCTURE DEVELOPMENT


Client
CORPORATION LIMITED
Eqpt/Item BALL VALVE - NON-METALLIC

Consultant -
VENDOR DATA REQUIREMENT(After LOI) ✘
DOCUMENTS REQUIRED AFTER PLACEMENT OF LOI:
Sr. no. Technical Document Hard copy Soft copy Remarks
1 No. of copies to be submitted
2 Filled up datasheet ✘ Yes No ✘ Yes No
3 Performance curves Yes ✘ No Yes ✘ No Not Applicable
4 P&I Diagram for the package Yes ✘ No Yes ✘ No Not Applicable
5 Design calculations Yes ✘ No Yes ✘ No
6 Commissioning Spare parts ✘ Yes No ✘ Yes No Within One week on receipt of LOI
7 Mandatory Spare parts ✘ Yes No ✘ Yes No Within One week on receipt of LOI
8 Recommended Spare parts ✘ Yes No Yes No Within One week on receipt of LOI
9 Quality assurance plan ✘ Yes No ✘ Yes No Within One week on receipt of LOI
10 General arrangement drawing ✘ Yes No ✘ Yes No
11 Sectional drawings ✘ Yes No ✘ Yes No
12 Catalogues and brochures ✘ Yes No ✘ Yes No Within One week on receipt of LOI
13 Reference list for similar models ✘ Yes No ✘ Yes ✘ No Within One week on receipt of LOI
14 Detailed sectional drawings ✘ Yes No ✘ Yes No
15 Detailed Manufacturing programme ✘ Yes No ✘ Yes No Within One week on receipt of LOI
16 Mgf. Progress report ✘ Yes No ✘ Yes No
17 Wiring & Schematic drawing Yes No Yes No Not Applicable
18 Speed - torque curve Yes No ✘ Yes No Not Applicable
19 Motor curves Yes No Yes ✘ No Not Applicable
20 Inspection reports with release notes ✘ Yes No ✘ Yes No Note: 1
Ye ✘ Yes
21 Erection manual ✘ No No 2 Weeks before supply
s
✘ Yes
22 Schedule No ✘ Yes 2 Weeks before supply
No
23 Asbuilt Drawing ✘ Yes No ✘ Yes 1 Week before supply
No
24 Final Sizing Sheet Control Valve /Orifice Yes No Yes No Not applicable
25 Control Architect Drawing- PLC/DCS Yes No Yes No Not applicable
26 Terminal details / Panel Wiring Detail Yes No Yes No Not applicable
N N
27 Calibration and Test Certificates Yes ✘ Yes Receipt of Material
✘ Yes
oN oN
28 Warranty certificate ✘ Yes Receipt of Material
oN o
N
29 Hazardous / Intrinsic safe approvals ✘ Yes ✘ Yes
o o
30 Others (If any)

NOTES:

1) All the inspection reports shall be complied starting from material identification, in-process inspection to final inspection and release
notes issued by client/consultant. Material test certificates shall be furnished.

2) Inspection reports should include welding procedures & its records approved by the inspection authority and Procedure for hydrotest
COMPLIANCE STATEMENT
(Typical - To be submitted in vendor’s letter head)

DEVELOPMENT AND OPERATIONS OF SEWAGE TREATMENT PLANTS AND


Project SEWARAGE NETWORK AT PATNA - BIHAR (100 MLD DIGHA SEWAGE
TREATMENT PLANT)

Project no 10P155
Equipment BALL VALVE - NON-METALLIC

We confirm that our offer no:________________________________ dated :__________


is entirely in compliant to your enquiry ref: no.:10P155-P0003-2108
dated___________ and the subsequent correspondences listed herewith.

1) Letter 1 dated
2) Letter 2 dated

Name of the Company

Address for Communication

Authorized Signatory
Company name and seal
Project No 10P155 PR Ref No.

DEVELOPMENT AND OPERATIONS OF SEWAGE


TREATMENT PLANTS AND SEWARAGE
Project PR Date 13-07-2020
NETWORK AT PATNA - BIHAR (100 MLD DIGHA
SEWAGE TREATMENT PLANT)

BIHAR URBAN INFRASTRUCTURE


Client Eqpt/Item BALL VALVE - NON-METALLIC
DEVELOPMENT CORPORATION LIMITED

Consultant -

REFERENCE DEVIATION FORMAT


Sl. no. CLAUSE OF DESCRIPTION OF DEVIATION REASON FOR DEVIATION REMARKS
ENQUIRY

You might also like