Professional Documents
Culture Documents
Monoblock for Chain Pulley Block
Drawing for TAG NO 101‐LZ‐501 TO 505,
101‐LZ‐562A/B/C
CLIENT B224-CDU-TPL-000-MP-
HPCL RAJASTHAN REFINERY LTD. GA-PR0013-0001
PMC
EPCC 01 JOB NO B224 ENGINEERS INDIA LTD.
HPCL RAJASTHAN REFINERY LTD
1. No Comments/Const. as per document
2. Proceed with Manufacturing
R Retained for Records
V Void
0
01 28-11-2022 APPROVAL A.P.T U.K.G. U.K.G.
REV DATE PURPOSE PREPARED CHECKED APPROVED
GAD Monoblock for Chain Pulley Block
Drawing for TAG NO 101‐LZ‐501 TO 505,
101‐LZ‐562A/B/C
CLIENT B224-CDU-TPL-000-MP-
HPCL RAJASTHAN REFINERY LTD. GA-PR0013-0001
PMC
EPCC 01 JOB NO B224 ENGINEERS INDIA LTD.
CHECKED/
REV DATE PURPOSE REVIEWED APPROVED
PREPARED BY
BY BY
Table of Contents
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
D A
E Supplier to ensure sufficient clearance is kept for installation w.r.t. the structural Beam
sizes furnished
C
B
10 11 B
remove this north.
Verify if G & F dimensions are correct, since in Table in next page, both are shown as 160
mm
C C
13
G
F
J
D D
E E
F F
3
H
5
G G
4 2
B I Ensure the load, chain , trolley chain meets the requirement
of lifting and drop levels.
H H
I
7 I
J
6 J
K K
PROJECTS LIMITED
MUMBAI
FLUOR DANIEL INTERNATIONAL
(MALAYSIA) SDN BHD
L
MECHANICAL 11 mtrs. L
A.P.T. B224
B224-CDU-TPL-000-MP-GA-PR0013-0001
U.K.G. -
U.K.G.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
NOTES :-
B B
1) THIS GAD IS FOR REFERENCE ONLY.
2) THIS CPB SHALL BE DESIGNED AS PER IS:3832 DUTY CLASS II AND EIL SPEC.6-61-0015
3) ALL DIMENSION ARE IN MM TOLERANCE ±10%.
4) EDITING IN DIMENSION AS WELL AS IN TECHNICAL DATA IS STRICTLY PROHIBITED AND
C C
WILL NOT BE CONSIDERED.
5) SUPPLY OF CPB WILL BE AS PER EIL SPECIFICATION 6-61-0015.
define these dimension 6) INSPECTION AND TESTING OF CPB AS PER APPROVED QAP.
7) TRAVEL PATH STRAIGHT.
D 8) POWDER COATED - 60 DFT Travel path inside SS-4 D
for tag no. 101-LZ-503, the path is not straight,
inside GIS room, is not
9) HOOK BRONZE COATED. straight. Plz verify.
revise the document in line with the data sheet
requirement.
10) THRUST SKF BRG.IN LOWER BLOCK.
11) ALL BRG SKF/FAG MAKE.
12) "TAG NO" & NON SPARKLING " MARKED ON NAME PLATE.
E E
13) STATIC TESTING SHALL BE DONE AT 7.5 TON.
F F
what is this ?same should be the clearnace. 6 m is clearnace b/w the floor and botom of the beam
add coulumn for height of lift. howver the actul working of chain pulley block will
be up to 100m so the diffence is `10.826.
G G
Kindly confirm and ensure
all parts of chain pulley
block is spark proof ,
accordingly revise the
tabe . material used in teh
table are not all spark
poof. Refer data sheet and
H comply with the H
requirement.
J
Add the name of the equipment these chain pulley blocks are serving. J
K K
PROJECTS LIMITED
MUMBAI
FLUOR DANIEL INTERNATIONAL
(MALAYSIA) SDN BHD
L
MECHANICAL 11 mtrs. L
A.P.T. B224
B224-CDU-TPL-000-MP-GA-PR0013-0001
U.K.G. -
U.K.G.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16