You are on page 1of 95

COMMENT RESPONSE SHEET

PROJECT: CAP-2 OWNER: South Pacific Viscose

Discipline: Civil Structure Engineering


Document Title: Calculation for Service Platform
SPV Document No.: A-CA-2-C-CA-004 Revision: 0.1
TPE Document No.: 2924-G000-135A5-CAL-0004
Total Review Duration: 10 Working Days
Responsible / Consolidator: Danang Adiprabowo All:

Return Code: Reviewed with comments Document to be revised and resubmitted

Section/ By EPCm CONTRACTOR


No. Rev. No. OWNER Comments OWNER Closed out
Page No. (Initials) Response

Yes, the document is additional


1 0.1 41 is this document include MDR doc? AJL
deliverable.
YES

Base plate calculation detail will


49 Please check by comparing between steel anchor bolt cap and concrete cap. AJL be shown in 2924-G000-1350C- YES
CAL-0006.
Seismic calculation is shown in
58 Where is seismic definition? Where seismic static point load come from? AJL
Appendix C.
YES

Page 1 of 1
CS2 ADSORPTION PLANT 2
(CAP-2) PROJECT
PT. SOUTH PACIFIC VISCOSE

CALCULATION FOR SERVICE PLATFORM

Code Description
A Approved
B Approved with Comment
C Not Approved - Revise & Resubmit
D Cancelled
E Received as Information
Signature:
Danang Adiprabowo 14/01/22

0.0 Issued for Construction 14-Jan-22 AJL IHS MAH DA


0.1 Issued for Approval 8-Oct-21 AJL IHS MAH DA
Rev Reason for Issue Date Author Checked Approver OWNER

SPV Doc Number SPV Doc Number Contractor Doc Number

X-333004-023 A-CA-2-C-CA-004 2924-G000-135A5-CAL-0004


CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

Revision History
Revision Amender
Amendment Date Amendment
Number Name
14-Jan-22 0.0 AJL Change structure to 75-PLF-01

Holds
Hold Section
Short description of hold
No Number

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 2 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

Table of Contents
1 INTRODUCTION .............................................................................................................. 4
1.1 Project Background .......................................................................................................... 4
1.2 Project Location ................................................................................................................ 4
1.3 Reference Document ........................................................................................................ 4
2 PURPOSE ........................................................................................................................ 5
3 MATERIAL ...................................................................................................................... 5
3.1 Quality of Material ........................................................................................................... 5
3.2 Unit Weight of Material .................................................................................................... 5
4 CONCRETE DESIGN PARAMETER ..................................................................................... 5
5 ABBREVIATIONS ............................................................................................................. 6
6 ANALYSIS METHOD ........................................................................................................ 8
7 DESIGN RESULT SUMMARY ............................................................................................ 14

List of Tables
Table 1-1 Reference Document ………………………………………………………………………………………………………………………………….. 4
Table 3-1 Material Quality ………………………………………………………………………………………………………………………………….. 5
Table 3-2 Material Unit Weight …………………………………………………………………………………………………………………………………..5
Table 6-1 Load Combination for Strength Design ………………………………………………………………………………………………………………………………
11
Table 6-2 Load Combination for Allowable Stress Design …………………………………………………………………………………………………………………
12

List of Figures
Figure 1 Project Location …………………………………………………………………………………………………………………………………..
4
Figure 2 Foundation Layout …………………………………………………………………………………………………………………………………..
14

List of Appendix
Appendix A Location …………………………………………………………………………………………………………………….. 15
Appendix B Strucutre Modelling ……………………………………………………………………………………………………………………..
17
Appendix C Load Calculation …………………………………………………………………………………………………………………….. 24
Appendix D Displacement and Deflection Check ……………………………………………………………………………………………………………………..
34
Appendix E Steel Strength …………………………………………………………………………………………………………………….. 38
Appendix F Steel Connection Check ……………………………………………………………………………………………………………………..
42
Appendix G Material Take Off …………………………………………………………………………………………………………………….. 55
Appendix H STAAD.Pro Input …………………………………………………………………………………………………………………….. 57
Appendix I Support Reaction …………………………………………………………………………………………………………………….. 82

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 3 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

1 INTRODUCTION
1.1 Project Background
Lenzing (SPV) is intended to setup new Carbon Disulfide (CS2) Adsorption Plant (CAP-2) at
existing manufacturing site PT South Pacific Viscose (SPV), Purwakarta, Indonesia. The existing
site already has CAP-1 plant which is currently in operation.

Lenzing AG is intended to setup new Carbon Disulfide (CS2) Adsorption Plant (CAP-2) at existing
manufacturing site of PT South Pacific Viscose (SPV), Purwakarta, Indonesia. The existing SPV
facility includes an existing CAP-1 plant, which is running continuously.

SPV has conducted Basic Engineering of CAP-2 and is preparing for the execution phase. SPV is
hereby appointing EPCm Contractors for execution of CAP-2 Facilities.

Tripatra Engineering (CONSULTANT) has been awarded by PT SPV to perform EPCm Services
Carbon Disulfide 2 (CAP-2) Plant Project based upon Engineering Procurement and Construction
Management Contract of Carbon Disulfide Adsorption Plant - 2 between PT SOUTH PACIFIC
VISCOSE and PT TRIPATRA ENGINEERING.

1.2 Project Location

Figure 1 Project Location

1.3 Reference Document


The following documents shall be referred and followed.
Table 1-1 Reference Document
No Name Remark
1 PROJECT DOCUMENTS
1.1 Civil General Specification 2924-G000-13313-SPC-0001
1.2 Seismic and Wind Design Criteria 2924-G000-13313-SPC-0006
2 LOCAL STANDRADS
2.1 Persyaratan Perancangan Geoteknik SNI 8460-2017
2.2 Building Code Requirements for Structural Concrete SNI 2847-2013
2.3 Seismic Design Loads for Buildings and Other SNI 1726-2019
Structures
2.4 Minimum Design Loads for Buildings and Other SNI 1727–2020
Structures
2.5 Concrete Reinforcement SNI 2052-2017
3 INTERNATIONAL CODES
3.1 Building Code Requirements for Structural Concrete and ACI 318-14

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 4 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
3.2 Minimum Design Loads for Buildings and Other ASCE 7-16
3.3 Guidelines for Seismic Evaluation and Design of ASCE 41140
3.4 Wind Loads for Petrochemical and Other Industrial ASCE 41180

2 PURPOSE
This document presents the design calculation of Service Platform Structure at Carbon Disulfide 2
(CAP-2) Plant Project. Service Platform 75-PLF-01 will be used for typical design calculation of
service platform.

3 MATERIAL
3.1 Quality of Material
Table 3-1 Material Quality
Material Strength Unit
Concrete
Structural concrete f'c = 30.00 MPa
Concrete bore pile f'c = 35.00 MPa
Reinforcing Bar
Deformed Bar fy = 420.00 MPa
Anchor Bolt
ASTM A307 Grade B
Specified tensile stress of bolt Fut = 414.00 MPa
Specified yield strength of bolt Fy = 248.21 MPa
Nominal tensile stress of bolt Fnt = 310.26 MPa
Nominal shear stress of bolt Fnv = 188.00 MPa
Steel
- Standard Profile, JIS 3101 Gr SS 400 fus = 400.00 MPa
for thickness ≤ 16 mm fys = 245.00 * MPa
for thickness >16 mm and ≤ 40 mm fys = 235.00 * MPa
- High Grade Profile, ASTM A572 Gr.50 fus = 450.00 MPa
fys = 345.00 MPa
Connection
- High Strength Bolt, ASTM F3125/F3125M grade A325M
Nominal Tensile Strength ft = 620.00 MPa
Nominal Shear Strength fv = 372.00 MPa
- Mild Steel Bolt, ASTM A307
- Anchor Bolt for general use, ASTM A307 Grade B
Specified Tensile Stress of Bolt fu = 414.00 MPa
Specified Yield Strength of Bolt fy = 248.00 MPa
Nominal Tensile Stress of Bolt fnt = 310.00 MPa
Nominal Shear Stress of Bolt fnv = 165.00 MPa
* For simplify analysis, Fy taken for all member size is 235 Mpa (for standard steel)

3.2 Unit Weight of Material


Table 3-2 Material Unit Weight
Material Density Unit Weight
Reinforced Concrete γc = 2500 kg/m³ 24.53 kN/m³
Lean Concrete γcp = 2400 kg/m³ 23.54 kN/m³
Steel γst = 7850 kg/m³ 77.01 kN/m³
Soil, unless stated otherwise in section 1.6 γs = 1800 kg/m³ 17.66 kN/m³
Water γw = 1000 kg/m³ 9.81 kN/m³
Cement Mortar γcg = 2200 kg/m³ 21.58 kN/m³
Gravity acceleration g= 9.81 m/s²

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 5 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

4 CONCRETE DESIGN PARAMETER


Concrete elastic modulus, Ec = 4700 √f'c 25,742.96 MPa
Rebar elastic modulus, Es 200,000.00 MPa
Concrete factor, β1 (Sec.22.2.2.4.3 ACI 318-14) 0.836
Footing concrete cover, ccf 50.00 mm
Pedestal concrete cover, ccp 50.00 mm
Strength reduction factor for tension and flexure, Øm 0.90
Strength reduction factor for compression, Øc 0.65
Strength reduction factor for shear, Øv 0.75
Maximum aggregate size 20.00 mm

5 ABBREVIATIONS
The following abbreviations shall be used throughout this document:
Af Projected Area Wind Direction
AG Anchor/ Guide Support Load
As Area of Non-prestressed Longitudinal Tension Reinforcement
Av Area of Shear Reinforcement
b Width of Structural Member
CD Crane Dead Load
Cf Force Coefficient
CL Crane Lifting/ Impact Load
Cs Seismic Response Coefficient
Csx Seismic Response Coefficient X-Direction
Csz Seismic Response Coefficient Z-Direction
Cu Coefficient for Upper Limit on Calculated Period
D Diameter
d, d' Dis
tan
dbar Rebar Diameter
DL Dead Load
E Earthquake Load
Ec Modulus of elasticity for concrete
Es Modulus of elasticity for steel
Ex Earthquake Load X-Direction
Ey Earthquake Load Y-Direction
Ez Earthquake Load Z-Direction
f’c Specified Compressive Strength of Concrete at 28 Days
Fi Lateral Seismic Force
Fw Wind Force
fy Specified Minimum Yield Stress of Steel
G Gust Effect Factor
h Depth of Structural Member
hi The Height from the Base to Level i
Ie Importance Factor in Seismic
Kd Wind Directional Factor
Kz Velocity Pressure Coefficient
Kzt Topographic Factor
L Live Load
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 6 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Mu Factored Moment at Section
P Piping Load
p Wind Pressure
PE Piping Load Empty Condition
PO Piping Load Operating Condition
PT Piping Load Test Condition
Q Equipment Load
QE Equipment Load Empty Condition
QO Equipment Load Operating Condition
QT Equipment Load Test Condition
qz Velocity Pressure
Rx Response Modification Coefficient X-Direction
Rz Response Modification Coefficient Z-Direction
s,s1,s2,s3 Spacing between Shear Reinforcement
Sa Design Spectral Response Acceleration
Sax Design Spectral Response Acceleration X-Direction
Saz Design Spectral Response Acceleration Z-Direction
SD1 Design, 5% damped, Spectral Response Acceleration at Period of 1
SDS Design, 5% damped, Spectral Response Acceleration at Short Period
SL Surge Load
T Fundamental Period of Structure
Ta Approximate Building Period
TB Bundle Tube Load
TF Thermal Friction Load
TL Long-Period Transition Period
To 0.2 SD1 / SDS
Ts SD1 / SDS
Tx Period of Structure in X-Direction
Tz Period of Structure in Z-Direction
v Wind Speed
Vc Shear Capacity of Concrete Section
VL Vibration/ Dynamic Load
Vs Shear Capacity of Reinforcement Rebar
Vu Factored Shear at Section
Vx Seismic Base Shear Force X-Direction
Vz Seismic Base Shear Force Z-Direction
W Wind Load
Wi The Portion of the total Effective Seismic Weight Assigned to Level i
Wt The Effective Seismic Weight
WX Wind Load X-Direction
WZ Wind Load Z-Direction
z Height Above Ground Level
zg Nominal Height of the Atmospheric Standard
l Factor Related to Concrete Type
a 3-sec Gust-Speed Power Law Exponent
b1 Factor Relating Depth of Equivalent Rectangular Compressive Stress Block to
Neutral Axis Depth
Ø Shear Reduction Factor, 0.75
r Ratio of Rebar Reinforcement and Concrete Area

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 7 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
π phi value, 3.14
Φ Flexural Reduction Factor, 0.9
gc Density of Reinforced Concrete
gg Density of Cement Mortar
gL Density of Water
gpc Density of Plain Concrete
gs Density of Structural Steel
gso Density of Earth Fill

6 ANALYSIS METHOD
6.1 Structural Design Concept
1 Steel member shall be designed conforming to AISC LRFD (Load and Resistance Factor
Design) Method.
2 Seismic force resisting system of structure was designed refer to Table 15.4-1 for Non
Building Structures Similar to Building of ASCE 7-16 as:
a. Moment resisting frames system in transverse direction with Steel Ordinary Moment
Frames (OMF).
b. Concentrically braced frames in longitudinal direction with Steel Ordinary Concentrically
Braced Frames (OCBF).
3 The types of support are assigned as ‘fixed but’ type. It's mean as fixed in transverse direction
with rotational spring stiffness and as pinned in longitudinal directions.
4 Sesimic Force calculated by static equivalent lateral force analysis.
5 The loads considered in calculation consist of self-gravity loads, super imposed dead loads,
live loads, roof live loads (if any), pipe loads, equipment loads, notional load and
environmental loads.
6 Structural analysis using direct analysis method (DM) / second order analysis with considering
notional load, P-D and P-d effects.
7 The structure analyzed with STAAD.Pro V8i structural analysis computer programming with
non linear elastic analysis and as space frame.

6.2 Design Load


The following loads and forces are considered in the design of structure:
6.2.1 Dead Load (D)
Self-weight of concrete structure and foundation.

6.2.2 Live Load (L)


Any load which is not permanently fixed to the structure e.g. loading caused by personnel, tools
during maintenance.

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 8 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
6.2.3 Equipment Load (Q)
The weight of equipment or machinery including appurtenances and it is classified as an empty/
erection load QE, an operating load QO or a testing load QT. Any upset condition shall be
considered when applicable.

6.2.4 Piping Load (P)

The weight of pipe including appurtenances and it is classified as an empty/ erection load PE, an
operating load PO or a testing load PT. Any upset condition shall be considered when applicable.

6.2.5 Wind Load


The wind load is calculated based on reference “2924-G000-13313-SPC-0001, Civil General
Specification”, using the following parameter.

Exposure category C
Basic wind speed, V 35.00 m/s
Importance dactor, I 1.00

6.2.6 Seismic Load


The seismic load is calculated based on reference “2924-G000-13313-SPC-0001, Civil General
Specification”, the seismic load will be calculated in accordance with ASCE 7-16.

Risk Category III


Importance Factor 1.25
Site Class D
Ss 0.833140 g
S1 0.387950 g
Fa 1.167
Fv 1.912
SMS 0.972
SM1 0.742
SDS 0.648
SD1 0.495

6.2.7 Thermal Load


Thermal Load based on piping information shall be considered if applicable.

6.2.8 Notional Load


Notional loads shall be applied as lateral loads at all levels. The notional loads shall be additive to
other lateral loads and shall be applied in all load combinations. Notional load shall consider all
gravity loads and to be applied in the direction that provides the greatest destabilizing effect.

Notional load to be applied by:


Ni = 0.003 * a * Yi
where
a = 1.0 (LRFD); 1.6 (ASD)
Yi = gravity load applied at level i as applicable (kN)

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 9 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

6.3 Load Combination


General Design Loads Combinations for Reinforced Concrete & Steel Structure Design
Table 6-1 Load Combination for Strength Design
Pipe Short
Dead Live Roof Live Tube Cable Wind Seismic Load Seismic Load Anchor
Piping Load Equipment Load Friction Term Load Crane Load Notional Load
Load Load Load Bundle Tray Load (Operating) (Empty) Guide
(Surge Load)
Combo n°
LOAD CASE Cd Cvs Cz Cx Ci
D L RL PE PO PT QE QO QT TB CT Wx Wz Eox Eoz Eoy Eex Eez Eey Ffx Ffz Agx Agz Fys Fxs Fzs Nex Nez Nox Noz Ntx Ntz

1 2 3 4 5 6 7 8 9 10 11 21 22 31 32 33 34 35 36 41 42 43 44 45 46 47 51 52 53 54 55 71 72 73 74 75 76
F1111 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.0
OPERATING F1112 1.4 1.4 1.4 1.4 1.4 -1.4 1.4 1.4 1.4 -1.0
( FRICTION + ANCHOR ) F1113 1.4 1.4 1.4 1.4 -1.4 1.4 1.4 1.4 1.4 1.0
F1114 1.4 1.4 1.4 1.4 -1.4 -1.4 1.4 1.4 1.4 -1.0
PERMANENT
F1211 1.2 1.6 0.5 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.20 1.20 1.20 1.20 1.60 1.60 1.60 1.60 1.0
OPERATING
F1212 1.2 1.6 0.5 1.2 1.2 1.2 1.2 -1.2 1.2 1.2 1.20 1.20 1.20 1.20 1.60 -1.60 1.60 1.60 -1.0
( LIVE + FRICTION + ANCHOR + SURGE
LOAD ) F1213 1.2 1.6 0.5 1.2 1.2 1.2 -1.2 1.2 1.2 1.2 1.20 1.20 1.20 1.20 1.60 1.60 -1.60 1.60 1.0
F1214 1.2 1.6 0.5 1.2 1.2 1.2 -1.2 -1.2 1.2 1.2 1.20 1.20 1.20 1.20 1.60 -1.60 -1.60 1.60 -1.0
F2111 1.2 1.0 1.6 1.2 1.2 1.2 0.6 1.2 1.2 1.20 1.0
F2112 1.2 1.0 1.6 1.2 1.2 1.2 -0.6 1.2 1.2 1.20 -1.0
OPERATING + ANCHOR + WIND
F2113 1.2 1.0 1.6 1.2 1.2 1.2 0.6 1.2 1.2 1.20 1.0
F2114 1.2 1.0 1.6 1.2 1.2 1.2 -0.6 1.2 1.2 1.20 -1.0
F2121 1.2 1.0 0.5 1.0 1.0 1.2 1.0 1.0 1.0 1.20 1.00 1.00 1.00 1.00 1.0
F2122 1.2 1.0 0.5 1.0 1.0 1.2 1.0 1.0 1.0 1.20 1.00 -1.00 1.00 1.00 1.0
F2123 1.2 1.0 0.5 1.0 1.0 1.2 -1.0 1.0 1.0 1.20 1.00 1.00 -1.00 1.00 -1.0
OPERATING + ANCHOR + WIND +CRANE F2124 1.2 1.0 0.5 1.0 1.0 1.2 -1.0 1.0 1.0 1.20 1.00 -1.00 -1.00 1.00 -1.0
LOAD F2125 1.2 1.0 0.5 1.0 1.0 1.2 1.0 1.0 1.0 1.20 1.00 1.00 1.00 1.00 1.0
F2126 1.2 1.0 0.5 1.0 1.0 1.2 1.0 1.0 1.0 1.20 1.00 1.00 -1.00 1.00 1.0
F2127 1.2 1.0 0.5 1.0 1.0 1.2 -1.0 1.0 1.0 1.20 1.00 -1.00 1.00 1.00 -1.0
F2128 1.2 1.0 0.5 1.0 1.0 1.2 -1.0 1.0 1.0 1.20 1.00 -1.00 -1.00 1.00 -1.0
TEMPORARY (WIND)
F2211 0.9 0.9 0.9 0.9 1.0 0.9 1.0
F2212 0.9 0.9 0.9 0.9 -1.0 0.9 -1.0
EMPTY + WIND (UPLIFT)
F2213 0.9 0.9 0.9 0.9 1.0 0.9 1.0
F2214 0.9 0.9 0.9 0.9 -1.0 0.9 -1.0
F2215 0.9 0.9 0.9 0.9 1.0 1.0 1.0 0.9 1.0
F2216 0.9 0.9 0.9 0.9 -1.0 1.0 1.0 0.9 -1.0
OPERATING + WIND (UPLIFT)
F2217 0.9 0.9 0.9 0.9 1.0 1.0 1.0 0.9 1.0
F2218 0.9 0.9 0.9 0.9 -1.0 1.0 1.0 0.9 -1.0
F2311 1.2 1.6 1.2 1.2 1.2 0.6 1.20 1.0
F2312 1.2 1.6 1.2 1.2 1.2 -0.6 1.20 -1.0
TEST + PARTIAL WIND
F2313 1.2 1.6 1.2 1.2 1.2 0.6 1.20 1.0
F2314 1.2 1.6 1.2 1.2 1.2 -0.6 1.20 -1.0
F3111 1.33 1.0 1.33 1.33 1.33 1.0 0.3 1.2 1.2 1.33 1.0
OPERATING + ANCHOR + SEISMIC F3112 1.33 1.0 1.33 1.33 1.33 1.0 -0.3 1.2 1.2 1.33 1.0
F3113 1.33 1.0 1.33 1.33 1.33 -1.0 0.3 1.2 1.2 1.33 -1.0
SDS = F3114 1.33 1.0 1.33 1.33 1.33 -1.0 -0.3 1.2 1.2 1.33 -1.0
0.648040731 F3115 1.33 1.0 1.33 1.33 1.33 0.3 1.0 1.2 1.2 1.33 1.0
0.2*SDS = F3116 1.33 1.0 1.33 1.33 1.33 -0.3 1.0 1.2 1.2 1.33 1.0
0.129608146 F3117 1.33 1.0 1.33 1.33 1.33 0.3 -1.0 1.2 1.2 1.33 -1.0
F3118 1.33 1.0 1.33 1.33 1.33 -0.3 -1.0 1.2 1.2 1.33 -1.0
F3211 0.770 0.770 0.770 0.770 1.0 0.3 0.9 0.9 0.770 1.0
OPERATING + ANCHOR + SEISMIC (UPLIFT)
F3212 0.770 0.770 0.770 0.770 1.0 -0.3 0.9 0.9 0.770 1.0
F3213 0.770 0.770 0.770 0.770 -1.0 0.3 0.9 0.9 0.770 -1.0
TEMPORARY 0.9 - 0.2*SDS F3214 0.770 0.770 0.770 0.770 -1.0 -0.3 0.9 0.9 0.770 -1.0
(SEISMIC -
F3215 0.770 0.770 0.770 0.770 0.3 1.0 0.9 0.9 0.770 1.0
2/3 MCER )
F3216 0.770 0.770 0.770 0.770 -0.3 1.0 0.9 0.9 0.770 1.0
F3217 0.770 0.770 0.770 0.770 0.3 -1.0 0.9 0.9 0.770 -1.0
F3218 0.770 0.770 0.770 0.770 -0.3 -1.0 0.9 0.9 0.770 -1.0
F3311 0.770 0.770 0.770 0.770 1.0 0.3 0.770 1.0
EMPTY + SEISMIC (UPLIFT) F3312 0.770 0.770 0.770 0.770 1.0 -0.3 0.770 1.0
F3313 0.770 0.770 0.770 0.770 -1.0 0.3 0.770 -1.0
0.9 - 0.2*SDS F3314 0.770 0.770 0.770 0.770 -1.0 -0.3 0.770 -1.0
F3315 0.770 0.770 0.770 0.770 0.3 1.0 0.770 1.0
F3316 0.770 0.770 0.770 0.770 -0.3 1.0 0.770 1.0
F3317 0.770 0.770 0.770 0.770 0.3 -1.0 0.770 -1.0
F3318 0.770 0.770 0.770 0.770 -0.3 -1.0 0.770 -1.0

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 10 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

Table 6-1 Load Combination for Strength Design (cont'd)


Pipe Short
Dead Live Roof Live Tube Cable Wind Seismic Load Seismic Load Anchor
Piping Load Equipment Load Friction Term Load Crane Load Notional Load
Load Load Load Bundle Tray Load (Operating) (Empty) Guide
(Surge Load)
Combo n°
LOAD CASE Cd Cvs Cz Cx Ci
D L RL PE PO PT QE QO QT TB CT Wx Wz Eox Eoz Eoy Eex Eez Eey Ffx Ffz Agx Agz Fys Fxs Fzs Nex Nez Nox Noz Ntx Ntz

1 2 3 4 5 6 7 8 9 10 11 21 22 31 32 33 34 35 36 41 42 43 44 45 46 47 51 52 53 54 55 71 72 73 74 75 76
F5111 0.9 0.9 0.9 1.6 0.9 0.9 1.0

F5112 0.9 0.9 0.9 1.6 0.9 0.9 -1.0


MAINTENANCE (TUBE BUNDLE)
F5113 0.9 0.9 0.9 1.6 0.9 0.9 1.0

TEMPORARY F5114 0.9 0.9 0.9 1.6 0.9 0.9 -1.0


(MAINTENANCE)
F5115 1.2 1.2 1.2 1.6 1.2 1.2 1.0

F5116 1.2 1.2 1.2 1.6 1.2 1.2 -1.0


MAINTENANCE (TUBE BUNDLE)
F5117 1.2 1.2 1.2 1.6 1.2 1.2 1.0

F5118 1.2 1.2 1.2 1.6 1.2 1.2 -1.0


F7111 1.33 1.0 1.33 1.33 1.33 2.00 0.90 1.2 1.2 1.33 1.00 1.00 1.00 1.00 1.0
OPERATING + ANCHOR + SEISMIC
(CONNECTIONS CHECK)
F7112 1.33 1.0 1.33 1.33 1.33 2.00 -0.90 1.2 1.2 1.33 1.00 -1.00 1.00 1.00 1.0
F7113 1.33 1.0 1.33 1.33 1.33 -2.00 0.90 1.2 1.2 1.33 1.00 1.00 -1.00 1.00 -1.0
0,2 SDS = 0.129608146 F7114 1.33 1.0 1.33 1.33 1.33 -2.00 -0.90 1.2 1.2 1.33 1.00 -1.00 -1.00 1.00 -1.0
r = 1 F7115 1.33 1.0 1.33 1.33 1.33 0.60 3.00 1.2 1.2 1.33 1.00 1.00 1.00 1.00 1.0
W = 3 F7116 1.33 1.0 1.33 1.33 1.33 -0.60 3.00 1.2 1.2 1.33 1.00 1.00 -1.00 1.00 1.0
W = 2 F7117 1.33 1.0 1.33 1.33 1.33 0.60 -3.00 1.2 1.2 1.33 1.00 -1.00 1.00 1.00 -1.0
F7118 1.33 1.0 1.33 1.33 1.33 -0.60 -3.00 1.2 1.2 1.33 1.00 -1.00 -1.00 1.00 -1.0
F7211 0.770 0.770 0.770 0.770 2.00 0.90 0.9 0.9 0.770 1.0
F7212 0.770 0.770 0.770 0.770 2.00 -0.90 0.9 0.9 0.770 1.0
OPERATING + ANCHOR + EARTHQUAKE
(UPLIFT - CONNECTIONS CHECK)
F7213 0.770 0.770 0.770 0.770 -2.00 0.90 0.9 0.9 0.770 -1.0
F7214 0.770 0.770 0.770 0.770 -2.00 -0.90 0.9 0.9 0.770 -1.0
F7215 0.770 0.770 0.770 0.770 0.60 3.00 0.9 0.9 0.770 1.0
F7216 0.770 0.770 0.770 0.770 -0.60 3.00 0.9 0.9 0.770 1.0
F7217 0.770 0.770 0.770 0.770 0.60 -3.00 0.9 0.9 0.770 -1.0
CONNECTION CHECK
F7218 0.770 0.770 0.770 0.770 -0.60 -3.00 0.9 0.9 0.770 -1.0
F7311 0.770 0.770 0.770 0.770 2.00 0.90 0.770 1.0
F7312 0.770 0.770 0.770 0.770 2.00 -0.90 0.770 1.0
EMPTY + EARTHQUAKE (UPLIFT -
F7313 0.770 0.770 0.770 0.770 -2.00 0.90 0.770 -1.0
CONNECTIONS CHECK)
F7314 0.770 0.770 0.770 0.770 -2.00 -0.90 0.770 -1.0
F7315 0.770 0.770 0.770 0.770 0.60 3.00 0.770 1.0
F7316 0.770 0.770 0.770 0.770 -0.60 3.00 0.770 1.0
F7317 0.770 0.770 0.770 0.770 0.60 -3.00 0.770 -1.0
F7318 0.770 0.770 0.770 0.770 -0.60 -3.00 0.770 -1.0

NOTE :
1. Fireproofing Load will be generated by STAADPro and assigned as Dead load
3. For local beam verification consider 30% as Ff. Consider all section resisting (not the half section)
Load Factor for pipe friction will be multiplied by 2 to consider only the top flange (1/2 beam inertia)
4. Seismic load case shall include the Redundancy factor ρ (=1.0) only for the horizontal component of earthquake
5. Load combinations 7111 to 7318 are for connections check: vertical bracing connections, base plates and splice column connection, and beam to column end moment connections
are included the following assumption:
5.1 Overstrength factor Ω 0 is to be used only for horizontal component of seismic load (ASCE 7-10 Sec. 12.4.3 and AISC 341-10 Sec. B2)
5.2 Load Factor for load combinations including Overstrength factor Ω 0 shall be reduced by the redundancy factor ρ as per ASCE 7-10 Par. 12.3.4
For LC 7111 to 7318, connection to be checked with Ω=2 and ro=1
being ro=1 in the basic E load, the load combo factor become 2/1=2.00
with coefficient 0.3 the factor is 0.3 x 2= 0.60
in longitudinal direction Ω=2 so that 2/1 = 2.00
with coefficient 0.3 the factor is 0.3 x 2.00= 0.60
7. Eo = seismic load in operating condition
Ee = seismic load in empty condition
Eoy = Vertical earthquake = 0.2*Sds*D (Par. 12.4.2.2 ASCE 7-10)
8. z = transverse direction
x = longitudinal direction
y = vertical direction
9. Crane Load
Cd = vertical dead load of the crane + trolley weight
Cvs = rated load capacity (lifting load)
Cz = crane impact load in Z-direction
Cx = crane impact load in X-direction
Side thrust (transversal Impact load) = 20% of the rated load capacity of the crane and the weight of the hoist and trolley (excluded the dead load of the crane bridge) (as per SAES-M-001 Par. 5.6.2)
Longitudinal traction (longitudinal Impact load) = 10% of the maximum wheel load ( = 0.1*Cvs) (as per SAES-M-001 Par. 5.6.2)
Ci = vertical impact = 25% of the maximum vertical wheel load ( = 0.25*Cvs) (as per SAES-M-001 Par. 5.6.2)

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 11 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

General Design Loads Combinations for Serviceability & Stability Check


Table 6-2 Load Combination for Allowable Stress Design
Tube
Dead Live Roof Live Cable Seismic Load Seismic Load Anchor Pipe Short Term
Piping Load Equipment Load Bundl Wind Load Friction Crane Load Notional Load
Load Load Load Tray (Operating) (Empty) Guide Load (Surge Load)
Combo n° e
LOAD CASE
Cd Cvs Cz Cx Ci
D L RL PE PO PT QE QO QT TB CT Wx Wz Eox Eoz Eoy Eex Eez Eey Ffx Ffz Agx Agz Fys Fxs Fzs Nex Nez Nox Noz Ntx Ntz

1 2 3 4 5 6 7 8 9 10 11 21 22 31 32 33 34 35 36 41 42 43 44 45 46 47 51 52 53 54 55 71 72 73 74 75 76
F111 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.7
OPERATING F112 1.0 1.0 1.0 1.0 1.0 -1.0 1.0 1.0 1.0 1.0 1.0 1.0 -0.7
F113 1.0 1.0 1.0 1.0 -1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.7
( FRICTION + ANCHOR + SURGE LOAD )
F114 1.0 1.0 1.0 1.0 -1.0 -1.0 1.0 1.0 1.0 1.0 1.0 1.0 -0.7
PERMANENT
F121 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.53
OPERATING F122 1.0 1.0 1.0 1.0 1.0 1.0 1.0 -1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 -1.0 1.0 1.0 -0.53
( LIVE + FRICTION + ANCHOR + SURGE F123 1.0 1.0 1.0 1.0 1.0 1.0 -1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 -1.0 1.0 0.53
LOAD) F124 1.0 1.0 1.0 1.0 1.0 1.0 -1.0 -1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 -1.0 -1.0 1.0 -0.53
TESTING F131 1.0 1.0 1.0 0.70
( DEAD LOAD + F132 1.0 1.0 1.0 0.70
PIPING (T) or EQUIPMENT (T) F133 1.0 1.0 1.0 1.0 -0.70
F134 1.0 1.0 1.0 1.0 -0.70
F211 1.0 0.75 0.75 1.0 1.0 1.0 0.45 1.0 1.0 1.00 1.0 1.00 1.00 1.0 0.53
F212 1.0 0.75 0.75 1.0 1.0 1.0 0.45 1.0 1.0 1.00 1.0 -1.00 1.00 1.0 0.53
F213 1.0 0.75 0.75 1.0 1.0 1.0 -0.45 1.0 1.0 1.00 1.0 1.00 -1.00 1.0 -0.53
F214 1.0 0.75 0.75 1.0 1.0 1.0 -0.45 1.0 1.0 1.00 1.0 -1.00 -1.00 1.0 -0.53
OPERATING + LIVE + ANCHOR + WIND
F215 1.0 0.75 0.75 1.0 1.0 1.0 0.45 1.0 1.0 1.00 1.0 1.00 1.00 1.0 0.53
F216 1.0 0.75 0.75 1.0 1.0 1.0 0.45 1.0 1.0 1.00 1.0 1.00 -1.00 1.0 0.53
F217 1.0 0.75 0.75 1.0 1.0 1.0 -0.45 1.0 1.0 1.00 1.0 -1.00 1.00 1.0 -0.53
F218 1.0 0.75 0.75 1.0 1.0 1.0 -0.45 1.0 1.0 1.00 1.0 -1.00 -1.00 1.0 -0.53
F231 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.60 0.7
F232 0.6 0.6 0.6 0.6 -0.6 0.6 0.6 0.60 -0.7
TEMPORARY (WIND) OPERATING + ANCHOR + WIND
F233 0.6 0.6 0.6 0.6 0.60 0.6 0.6 0.60 0.7
F234 0.6 0.6 0.6 0.6 -0.60 0.6 0.6 0.60 -0.7
F251 0.6 0.6 0.6 0.6 0.6 0.60 0.7
F252 0.6 0.6 0.6 0.6 -0.6 0.60 -0.7
EMPTY + WIND (UPLIFT)
F253 0.6 0.6 0.6 0.6 0.6 0.60 0.7
F254 0.6 0.6 0.6 0.6 -0.6 0.60 -0.7
F261 1.0 1.0 1.0 1.0 1.0 0.36 1.0 0.53
F262 1.0 1.0 1.0 1.0 1.0 -0.36 1.0 -0.53
TEST + PARTIAL WIND
F263 1.0 1.0 1.0 1.0 1.0 0.36 1.0 0.53
F264 1.0 1.0 1.0 1.0 1.0 -0.36 1.0 -0.53
F311 1.091 0.75 1.091 1.091 1.091 0.525 0.158 1.0 1.0 1.0 0.53
OPERATING + ANCHOR + SEISMIC F312 1.091 0.75 1.091 1.091 1.091 0.525 -0.158 1.0 1.0 1.0 0.53
F313 1.091 0.75 1.091 1.091 1.091 -0.525 0.158 1.0 1.0 1.0 -0.53
SDS = F314 1.091 0.75 1.091 1.091 1.091 -0.525 -0.158 1.0 1.0 1.0 -0.53
0.648040731 F315 1.091 0.75 1.091 1.091 1.091 0.158 0.525 1.0 1.0 1.0 0.53
0.7*0.2*SDS = F316 1.091 0.75 1.091 1.091 1.091 -0.158 0.525 1.0 1.0 1.0 0.53
0.090725702 F317 1.091 0.75 1.091 1.091 1.091 0.158 -0.525 1.0 1.0 1.0 -0.53
F318 1.091 0.75 1.091 1.091 1.091 -0.158 -0.525 1.0 1.0 1.0 -0.53
F321 0.90 0.90 0.90 0.90 0.7 0.21 0.9 0.9 1.0 0.53
OPERATING + ANCHOR + SEISMIC (UPLIFT)
F322 0.90 0.90 0.90 0.90 0.7 -0.21 0.9 0.9 1.0 0.53
F323 0.90 0.90 0.90 0.90 -0.7 0.21 0.9 0.9 1.0 -0.53
TEMPORARY (SEISMIC - F324 0.90 0.90 0.90 0.90 -0.7 -0.21 0.9 0.9 1.0 -0.53
2/3 MCER ) F325 0.90 0.90 0.90 0.90 0.21 0.7 0.9 0.9 1.0 0.53
F326 0.90 0.90 0.90 0.90 -0.21 0.7 0.9 0.9 1.0 0.53
F327 0.90 0.90 0.90 0.90 0.21 -0.7 0.9 0.9 1.0 -0.53
F328 0.90 0.90 0.90 0.90 -0.21 -0.7 0.9 0.9 1.0 -0.53
F331 0.90 0.90 0.90 0.90 0.7 0.21 1.0 0.53
EMPTY + SEISMIC (UPLIFT) F332 0.90 0.90 0.90 0.90 0.7 -0.21 1.0 0.53
F333 0.90 0.90 0.90 0.90 -0.7 0.21 1.0 -0.53
F334 0.90 0.90 0.90 0.90 -0.7 -0.21 1.0 -0.53
F335 0.90 0.90 0.90 0.90 0.21 0.7 1.0 0.53
F336 0.90 0.90 0.90 0.90 -0.21 0.7 1.0 0.53
F337 0.90 0.90 0.90 0.90 0.21 -0.7 1.0 -0.53
F338 0.90 0.90 0.90 0.90 -0.21 -0.7 1.0 -0.53

F511 1.0 1.0 1.0 1.0 1.0 1.0 0.7


TEMPORARY
MAINTENANCE (TUBE BUNDLE) F512 1.0 1.0 1.0 1.0 1.0 1.0 -0.7
(MAINTENANCE)
F513 1.0 1.0 1.0 1.0 1.0 1.0 0.7
F514 1.0 1.0 1.0 1.0 1.0 1.0 -0.7

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 12 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

NOTE :
1. Fireproofing Load will be generated by STAADPro and assigned as Dead load
2. L = Live Load shall not be considered as mass for calculation of seismic force
3. Crane Load
Cd = vertical dead load of the crane + trolley weight
Cvs = rated load capacity (lifting load)
Cz = crane impact load in Z-direction
Cx = crane impact load in X-direction
Side thrust (transversal Impact load) = 20% of the rated load capacity of the crane and the weight of the hoist and trolley (excluded the dead load of the crane bridge) (as per SAES-M-001 Par. 5.6.2)
Longitudinal traction (longitudinal Impact load) = 10% of the maximum wheel load ( = 0.1*Cvs) (as per SAES-M-001 Par. 5.6.2)
Ci = vertical impact = 25% of the maximum vertical wheel load ( = 0.25*Cvs) (as per SAES-M-001 Par. 5.6.2)

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 13 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

7 DESIGN RESULT SUMMARY


7.1 Upper Structure Design
Summary of steel structure design can be seen in Appendix E to G. All results are within the
allowable citeria.

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 14 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Appendix A Location

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 15 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

A. Platform Location

Refer to 2924-A000-13A37-PLT-0001 Plot Plan / Equipment layout (CAP2 Plant Area + Chimney).

75-PLF-01
Service Platform for
41.2.75.VE102

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 16 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Appendix B Strucutre Modelling

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 17 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

B. STAAD.Pro Model

B.1 3D, Plan and Section View

C'

B' 3

A 2

A' Typical Support


1 Type: Pinned

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 18 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

ELEVATION 1

ELEVATION 2

ELEVATION 3

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 19 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

ELEVATION A'

ELEVATION A

ELEVATION B' ELEVATION C'

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 20 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

ELEVATION B

0.800mR2

2.150m
R1 R7 R2

R8 R8
R1 0.750m
R1 R1 R1

1.950m
R1 R2 R2

R1 R1
1.050mR1 R1

1.150m
R1 R2

2.550m

R2

Y X
Z
Load 2
TOS EL +1.500

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 21 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

1.400m
R2

R8 R8
R2 R2 R2
1.000m
Y X R2 R2

Z
Load 31

1.850mR2

TOS EL +3.100

R1 R1 R1

2.625m
R2 R6 R4 R4 R6 R2

R2 R2 R2

R4 R2
2.625m
R2 R6 R4 R6

R3 R2

R4 R2 R7 R2

1.000m
1.150mR1 1.150mR1 1.150mR1 R2
1.000m R2
R8 R8

Y X
Z
Load 31
TOS EL +3.900

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 22 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
B.2 Member Properties

Table B-1 Member Properties


Property Size Remarks
R1 H250X125X6X9 Column & Main Beam
R2 H200X100X5.5X8 Column, Main & Sec. Beam
R3 H125X125X6.5X9 Secondary Beam
R4 H150X150X7X10 Joist
R5 PIP3 Vertical Bracing
R6 L75X75X6 Horizontal Bracing
R7 L60X60X6 Horizontal Bracing
R8 C200X80X7.5 Stair Stringer
R9 L65X65X6 Vertical Bracing

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 23 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Appendix C Load Calculation

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 24 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

C. Load Calculation

C.1 Dead Load


C.1.1 Self Weight
Dead load of structure including columns and beams will be calculated by software (STAAD.Pro) as
shown below.

C.1.2 Fireproofing
Dead load of fireproofing is not available for this calculation.

C.1.3 Dead Load of Grating + Joist


Grating to be used is type 30 x 5 mm serrated top at 40 mm centers and cross bars at 100 mm
centers.

Weight of steel grating = 34.00 kg/m2


= 0.33 kN/m2

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 25 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
C.1.4 Dead Load of Handrail

Weight of handrail = 0.16 kN/m2 (estimated as per standard


drawing)
Assignment of dead load is shown below.

C.2 Live Load


According to 2924-G000-13313-SPC-0001 Table 5-2, live load for oprating platform and stairway is
shown below.

Live load for operating platform = 5.00 kN/m2


Live load for walkways = 3.50 kN/m2
Live load for stairways = 2.50 kN/m2
Stair width = 0.80 m
= 2.5 * 0.8 / 2 (divided for 2 stringers)
= 1.00 kN/m

The load will be assigned as floor load and uniform load.

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 26 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

C.4 Wind Load


C.4.1 Wind Load of Structure
Risk Category = III (Ref. 1.1 Table 4-1)
Basic wind speed, V = 35 m/s (Ref. 1.1 Table 4-1)
Wind load parameters
Wind directionally factor Kd = 0.85 (Table 26.6-1 ASCE 7-16)
Exposure category = C (Ref. 1.1 Table 4-1)
Topographic factor KZT = 1 (Table 26.6-1 ASCE 7-16)
Building height, z = 5m
Building type = Open Structure
Importance factor = 1 (Ref. 1.1 Table 4-1)
External pressure coefficient, KZ
KZ = 2.01 * (z/zg)(2/a) (for 4.5 m ≤ z ≤ zg)
(2/a)
KZ = 2.01 * (4.5/zg) (for z < 4.5 m)
for exposure C,
a = 9.5 (Table 26.11-1 ASCE 7-16)
zg = 274.32 m (Table 26.11-1 ASCE 7-16)
z = 5.00 m (4.5 m ≤ z ≤ zg)
Kz = 0.865
Gust-effect factor, G = 0.85 (Sec. 26.11.1ASCE 7-16)

Velocity pressure,
qz = 0.613 * Kz * Kzt * Kd * v2 (Eq 26.10-1.si ASCE 7-16)
0.552 kN/m2

Cf = Force coefficient = 1.8 (Figure 29.4-1 ASCE 7-16)


FwS = Wind load due to structure = 0.84 * Af (Eq 29.3-1.si ASCE 7-16)
= qz * G * Cf * Af

All design wind force which impact on structure will be defined into Wind Definitions in STAAD Pro
and will be distributed by STAAD Pro automatically after assigning wind load at each direction. The
wind load will be applied on columns and beams.

Elevation (m) Kz qz (kPa) Fws/Af (kPa)


0 0.85 0.54 0.83
1 0.85 0.54 0.83
2 0.85 0.54 0.83
3 0.85 0.54 0.83
4 0.85 0.54 0.83
4.6 0.85 0.54 0.83
5 0.87 0.55 0.84

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 27 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

Wind Load X-dir

Wind Load Z-dir

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 28 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
C.5 Seismic Load
Refer to SNI-1726-2019, SPV site location has following earthquake design condition as follows:
Risk Category = III
Ie Importance factor 1.25 unitless
Site Class = D
Soil Type = Medium Soil (D)
Spectral response acceleration parameter = 0.648 g
at short period (SDS)
Spectral response acceleration parameter = 0.495 g
at a period at 1 (SD1)
Seismic Design Category (the severe =
condition) D (ASCE 7-16 Table 11.6-2)
Analysis Procedure = Equivalent Lateral Force
Seismic Force-Resisting System for Building :
Longitudinal (X) Direction : Steel ordinary concentrically braced frames
Transversal (Z) Direction : Steel ordinary moment frames
Response Modification Factor R x = 3.25 unitless (Ref. 1.2 Table 5-11)
R z = 3.50 unitless (Ref. 1.2 Table 5-11)
Deflection Amplification Cd x = 3.25 unitless (Ref. 1.2 Table 5-11)
Cd z = 3.00 unitless (Ref. 1.2 Table 5-11)
Over-Strength Factor (Ωo) Ωo x = 2.00 unitless (Ref. 1.2 Table 5-11)
Ωo z = 3.00 unitless (Ref. 1.2 Table 5-11)

Fundamental period (T)


The fundamental period of the nonbuilding structure shall be determined using the structural
properties and deformation characteristics of the resisting elements in a properly substantiated
analysis.

Table C-1 Fundamental Period Operating Condition


STAAD Output T in X Dir T in Z Dir
wi
Node d i (X Dir) d i (Z Dir)
(kN) (mm) (mm)
5 3.50 15.35 0.25 0.00 0.05 0.00 0.00
6 3.30 15.36 2.53 0.00 0.05 0.00 0.01
7 3.31 18.56 0.25 0.00 0.06 0.00 0.00
8 5.73 18.56 2.54 0.00 0.11 0.00 0.01
9 5.96 6.65 2.42 0.00 0.04 0.00 0.01
10 4.93 7.94 2.42 0.00 0.04 0.00 0.01
19 5.31 3.03 0.14 0.00 0.02 0.00 0.00
39 2.36 2.84 0.11 0.00 0.01 0.00 0.00
41 2.93 7.80 2.59 0.00 0.02 0.00 0.01
43 1.75 7.80 0.18 0.00 0.01 0.00 0.00

SUM 0.01 0.41 0.00 0.06


Period 0.235 0.098

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 29 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

Seismic response coefficient (Cs)

Longitudinal (X) Direction Cs-x = 0.249


Cs = SDS / (R/Ie) = 0.249

Cs max = SD1 / [Tx(R/Ie)] = 0.808 > 0.249 OK


Cs min = max(0.044SDSIe, 0.01) = 0.036 < 0.249 OK

Transversal (Z) Direction Cs-z = 0.231


Cs = SDS / (R/Ie) = 0.231

Cs max = SD1 / [Tz(R/Ie)] = 1.807 > 0.231 OK


Cs min = max(0.044SDSIe, 0.01) = 0.010 < 0.231 OK

Table C-2 Fundamental Period Empty Condition


STAAD Output T in X Dir T in Z Dir
wi
Node d i (X Dir) di (Z Dir)
(kN) (mm) (mm)
5 3.50 15.35 0.25 0.00 0.05 0.00 0.00
6 3.30 15.36 2.53 0.00 0.05 0.00 0.01
7 3.31 18.56 0.25 0.00 0.06 0.00 0.00
8 5.73 18.56 2.54 0.00 0.11 0.00 0.01
9 5.96 6.65 2.42 0.00 0.04 0.00 0.01
10 4.93 7.94 2.42 0.00 0.04 0.00 0.01
19 5.31 3.03 0.14 0.00 0.02 0.00 0.00
39 2.36 2.84 0.11 0.00 0.01 0.00 0.00
41 2.93 7.80 2.59 0.00 0.02 0.00 0.01
43 1.75 7.80 0.18 0.00 0.01 0.00 0.00

0.01 0.41 0.00 0.06


Period 0.235 0.098

Seismic response coefficient (Cs)

Longitudinal (X) Direction Cs-x = 0.249


Cs = SDS / (R/Ie) = 0.249

Cs max = SD1 / [Tx(R/Ie)] = 0.808 > 0.249 OK


Cs min = max(0.044SDSIe, 0.01) = 0.010 < 0.249 OK

Transversal (Z) Direction Cs-z = 0.231


Cs = SDS / (R/Ie) = 0.231

Cs max = SD1 / [Tz(R/Ie)] = 1.807 > 0.231 OK


Cs min = max(0.044SDSIe, 0.01) = 0.010 < 0.231 OK

Vz = r * Csz * ΣWt
Vx = r * Csx * ΣWt

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 30 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
For seismic load calculation of small structure and conservative design approach will use maximum
seismic response coefficient, Cs = Sds Ie / R, and redudancy factor r = 1.3 for moment frame
direction.

The total of seismic base shear (Vx or Vz) shall be distributed prorate as point load at each of
column in accordance with the following formula :
Fi = r * Wi * hi * Cs * ΣWt
Σ(Wi * hi)

Structure weight on each level (Wi) that was calculated for seismic design is total of Dead Load.

Table C-3 Seismic Load Operating Condition


Wi*Hi Seismic Load
Node Wi Hi Wi * Hi
S (Wi * Hi) Ex (kN) Ez (kN)
5 3.50 3.60 12.59 0.13626 1.75 2.11
6 3.30 3.60 11.89 0.12874 1.65 1.99
7 3.31 3.60 11.90 0.12886 1.65 2.00
8 5.73 3.60 20.62 0.22326 2.86 3.46
9 5.96 1.20 7.15 0.07743 0.99 1.20
10 4.93 1.20 5.91 0.06401 0.82 0.99
19 5.31 1.20 6.37 0.06892 0.88 1.07
39 2.36 1.20 2.83 0.03062 0.39 0.47
41 2.93 2.80 8.20 0.08882 1.14 1.38
43 1.75 2.80 4.90 0.05305 0.68 0.82

SUM 51.48 92.36

Table C-4 Seismic Load Empty Condition


Wi*Hi Seismic Load
Node Wi Hi Wi * Hi
S (Wi * Hi) Ex (kN) Ez (kN)
5 3.50 3.60 12.59 0.13626 1.75 2.11
6 3.30 3.60 11.89 0.12874 1.65 1.99
7 3.31 3.60 11.90 0.12886 1.65 2.00
8 5.73 3.60 20.62 0.22326 2.86 3.46
9 5.96 1.20 7.15 0.07743 0.99 1.20
10 4.93 1.20 5.91 0.06401 0.82 0.99
19 5.31 1.20 6.37 0.06892 0.88 1.07
39 2.36 1.20 2.83 0.03062 0.39 0.47
41 2.93 2.80 8.20 0.08882 1.14 1.38
43 1.75 2.80 4.90 0.05305 0.68 0.82

SUM 51.48 92.36

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 31 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
The load will be assigned as joint load.

Operating Condition
X Direction

Z Direction

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 32 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Empty Condition
X Direction

Z Direction

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 33 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Appendix D Displacement and Deflection Check

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 34 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

D. Displacement and Deflection Check

D.1 Column Displacement


D.1.1 Without Seismic Condition
The deflection :
dx/z = Drift due to non seismic load - output from STAAD. Pro
The allowable displacement :
Da = hs / 200

Table D-1 Horizontal Displacement Without Seismic - X Direction


Story Height
Node LC dX (mm) Da (mm) Remark
Elev. (m)
1.500 1.20 39 262 4.90 6.00 OK
3.100 2.80 41 231 1.82 14.00 OK
3.900 3.60 8 232 3.56 18.00 OK

Table D-2 Horizontal Displacement Without Seismic - Z Direction


Story Height
Node LC dZ (mm) Da (mm) Remark
Elev. (m)
1.500 1.20 10 213 0.55 6.00 OK
3.100 2.80 41 262 0.61 14.00 OK
3.900 3.60 6 213 0.52 18.00 OK

D.1.2 With Seismic Condition


dx/z = The deflection in x or z direction = (Cd * dxe/ze) / Ie (Ref. 1.2 Sect. 5.3)
Cdx = Deflection amplification factor x-dir = 3.25 (Ref. 1.2 Table 5-11)
Cdz = Deflection amplification factor z-dir = 3.00 (Ref. 1.2 Table 5-11)
dxe/ze = Drift due to seismic load - output from STAAD. Pro
Ie = Importance factor = 1.25 (Ref. 1.2 Table 5-11)
Risk category = III
Type of structure = All other structures
Δa = The allowable deflection = 0.020 * hs (Ref. 1.2 Table 5-10)

Table D-3 Horizontal Displacement With Temporary Seismic - X Direction


Story Height
Node LC dxe (mm) dX (mm) Da (mm) Remark
Elev. (m)
1.500 1.20 39 314 4.18 10.87 24.00 OK
3.100 2.80 41 321 2.18 5.67 56.00 OK
3.900 3.60 8 323 5.97 15.52 72.00 OK

Table D-4 Horizontal Displacement With Temporary Seismic - Z Direction


Story Height
Node LC dze (mm) dZ (mm) Da (mm) Remark
Elev. (m)
1.500 1.20 10 323 0.95 2.28 24.00 OK
3.100 2.80 41 316 1.05 2.53 56.00 OK
3.900 3.60 8 326 1.00 2.39 72.00 OK

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 35 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
D.2 Beam Deflection

Beam deflection limit :


(a) For Beam that supporting Floor L / 240 or 25 mm

Vertical deflection check for members shown in the following table :

Maximum Ratio: 0.513 < 1.00 OK

Table D-5 Summary of Beam Deflection


Remark Profil Ratio Member LC
Main Beam H250X125X6X9 0.07 5 261
Main Beam H250X125X6X9 0.059 6 261
Main Beam H200X100X5.5X8 0.02 7 261
Main Beam H200X100X5.5X8 0.044 8 262
Main Beam H250X125X6X9 0.267 11 262
Main Beam H200X100X5.5X8 0.007 12 264
Secondary Beam H200X100X5.5X8 0.022 14 261
Main Beam H250X125X6X9 0.267 18 261
Main Beam H250X125X6X9 0.135 19 261
Secondary Beam H200X100X5.5X8 0.015 22 261
Main Beam H250X125X6X9 0.135 23 261
Secondary Beam H200X100X5.5X8 0.027 24 261
Main Beam H250X125X6X9 0.267 25 261
Main Beam H250X125X6X9 0.141 26 261
Main Beam H200X100X5.5X8 0.044 31 261
Secondary Beam H200X100X5.5X8 0.513 32 263
Main Beam H250X125X6X9 0.07 33 264
Main Beam H250X125X6X9 0.059 34 262
Secondary Beam H200X100X5.5X8 0.513 35 124
Joist H150X150X7X10 0.105 36 262
Joist H150X150X7X10 0.105 37 122
Main Beam H250X125X6X9 0.07 38 262
Main Beam H250X125X6X9 0.059 39 262
Secondary Beam H200X100X5.5X8 0.513 40 262
Joist H150X150X7X10 0.105 41 121

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 36 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Joist H150X150X7X10 0.097 42 261
Main Beam H200X100X5.5X8 0.02 55 261
Main Beam H250X125X6X9 0.141 65 264
Main Beam H200X100X5.5X8 0.003 67 231
Main Beam H200X100X5.5X8 0.023 68 263
Main Beam H200X100X5.5X8 0.012 69 261
Secondary Beam H200X100X5.5X8 0.016 70 263
Main Beam H200X100X5.5X8 0.044 72 261
Main Beam H200X100X5.5X8 0.009 73 312
Main Beam H200X100X5.5X8 0.002 74 262
Main Beam H200X100X5.5X8 0.012 75 317
Stair Stringer C200X80X7.5 0.035 76 261
Stair Stringer C200X80X7.5 0.029 77 262
Stair Stringer C200X80X7.5 0.001 78 316
Main Beam H250X125X6X9 0.135 79 261
Stair Stringer C200X80X7.5 0.002 80 121
Main Beam H200X100X5.5X8 0.023 81 261
Main Beam H200X100X5.5X8 0.023 83 261
Stair Stringer C200X80X7.5 0.005 84 261
Stair Stringer C200X80X7.5 0.005 85 261
Main Beam H200X100X5.5X8 0.012 86 317
Stair Stringer C200X80X7.5 0.001 88 215
Stair Stringer C200X80X7.5 0.001 89 122
Main Beam H200X100X5.5X8 0.013 90 261
Main Beam H200X100X5.5X8 0.026 92 232
Joist H150X150X7X10 0.097 94 261
Secondary Beam H125X125X6.5X9 0.009 95 261
Main Beam H250X125X6X9 0.141 100 264
Stair Stringer C200X80X7.5 0.018 101 262
Stair Stringer C200X80X7.5 0.014 102 316
Stair Stringer C200X80X7.5 0.001 103 336
Stair Stringer C200X80X7.5 0.001 104 262
Main Beam H250X125X6X9 0.008 105 317
Main Beam H250X125X6X9 0.005 106 261
Main Beam H200X100X5.5X8 0.026 107 232

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 37 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Appendix E Steel Strength

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 38 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

E. Steel Strength
Summary of steel strength ratio for all members is shown in the following table.

Maximum Ratio: 0.733 < 1.00 OK

Table E-1 Summary of Steel Strength Ratio


Remark Profil Ratio Clause Member LC
Column H250X125X6X9 0.201 Cl.F2.2 1 3113
Column H250X125X6X9 0.128 Eq.H1-3b 2 2311
Column H250X125X6X9 0.230 Cl.F2.2 3 3113
Column H250X125X6X9 0.151 Eq.H1-3b 4 2311
Main Beam H250X125X6X9 0.150 Eq.H1-3a(H1 5 3113
Main Beam H250X125X6X9 0.171 Eq.H1-3a(H1 6 3113
Main Beam H200X100X5.5X8 0.112 Eq.H1-1b 7 2311
Main Beam H200X100X5.5X8 0.150 Eq.H1-1b 8 2311
Column H250X125X6X9 0.172 Cl.F2.2 9 3112
Column H250X125X6X9 0.125 Eq.H1-3a(H1 10 3112
Main Beam H250X125X6X9 0.370 Eq.H1-1b 11 2312
Main Beam H200X100X5.5X8 0.085 Eq.H1-3a(H1 12 2313
Secondary Beam H200X100X5.5X8 0.079 Eq.H1-1b 14 2311
Column H250X125X6X9 0.094 Eq.H1-3a(H1 15 3115
Main Beam H250X125X6X9 0.297 Eq.H1-1b 18 2311
Main Beam H250X125X6X9 0.263 Eq.H1-1b 19 2314
Column H250X125X6X9 0.057 Eq.H1-3a(H1 20 2121
Secondary Beam H200X100X5.5X8 0.052 Eq.H1-1b 22 2311
Main Beam H250X125X6X9 0.263 Eq.H1-1b 23 2314
Secondary Beam H200X100X5.5X8 0.080 Cl.F2.2 24 1211
Main Beam H250X125X6X9 0.366 Eq.H1-1b 25 2312
Main Beam H250X125X6X9 0.248 Eq.H1-1b 26 2313
Main Beam H200X100X5.5X8 0.194 Eq.H1-1b 31 2311
Secondary Beam H200X100X5.5X8 0.721 Eq.H1-1b 32 2313
Main Beam H250X125X6X9 0.138 Eq.H1-3a(H1 33 2311
Main Beam H250X125X6X9 0.129 Eq.H1-3a(H1 34 2311
Secondary Beam H200X100X5.5X8 0.733 Eq.H1-1b 35 2313
Joist H150X150X7X10 0.168 Eq.H1-1b 36 2312
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 39 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Table E-1 Summary of Steel Strength Ratio
Remark Profil Ratio Clause Member LC
Joist H150X150X7X10 0.168 Eq.H1-1b 37 2312
Main Beam H250X125X6X9 0.153 Eq.H1-3a(H1 38 3112
Main Beam H250X125X6X9 0.194 Eq.H1-3a(H1 39 3112
Secondary Beam H200X100X5.5X8 0.712 Eq.H1-1b 40 2313
Joist H150X150X7X10 0.168 Eq.H1-1b 41 2312
Joist H150X150X7X10 0.139 Eq.H1-3a(H1 42 2311
Vertical Bracing PIP3 0.289 Cl.E3 43 2314
Vertical Bracing PIP3 0.296 Cl.E3 44 2313
Vertical Bracing PIP3 0.233 Cl.E3 45 2314
Vertical Bracing PIP3 0.255 Cl.E3 46 2313
Main Beam H200X100X5.5X8 0.112 Eq.H1-1b 55 2312
Horizontal Bracing L75X75X6 0.055 Eq.H2-1 58 2216
Horizontal Bracing L75X75X6 0.067 Eq.H2-1 59 2123
Horizontal Bracing L75X75X6 0.070 Eq.H2-1 60 2121
Horizontal Bracing L75X75X6 0.055 Eq.H2-1 61 2215
Horizontal Bracing L60X60X6 0.345 Eq.H2-1 64 3218
Main Beam H250X125X6X9 0.249 Eq.H1-1b 65 2314
Column H200X100X5.5X8 0.615 Eq.H1-1b 66 2312
Main Beam H200X100X5.5X8 0.007 Eq.H1-1b 67 2123
Main Beam H200X100X5.5X8 0.085 Eq.H1-3a(H1 68 3113
Main Beam H200X100X5.5X8 0.115 Eq.H1-1b 69 2313
Secondary Beam H200X100X5.5X8 0.052 Eq.H1-1b 70 2313
Column H200X100X5.5X8 0.187 Eq.H1-1b 71 2311
Main Beam H200X100X5.5X8 0.181 Eq.H1-1b 72 2311
Main Beam H200X100X5.5X8 0.079 Eq.H1-1b 73 2311
Main Beam H200X100X5.5X8 0.012 Eq.H1-1b 74 2311
Main Beam H200X100X5.5X8 0.144 Eq.H1-1b 75 3112
Stair Stringer C200X80X7.5 0.079 Eq.H1-1b 76 2311
Stair Stringer C200X80X7.5 0.063 Eq.H1-1b 77 2312
Stair Stringer C200X80X7.5 0.022 Eq.H1-1b 78 3113
Main Beam H250X125X6X9 0.218 Eq.H1-1b 79 2312
Stair Stringer C200X80X7.5 0.042 Eq.H1-1b 80 2311
Main Beam H200X100X5.5X8 0.073 Eq.H1-3a(H1 81 3111
Main Beam H200X100X5.5X8 0.072 Eq.H1-1b 83 3116
Stair Stringer C200X80X7.5 0.023 Eq.H1-1b 84 2312
Stair Stringer C200X80X7.5 0.022 Eq.H1-1b 85 2311
Main Beam H200X100X5.5X8 0.049 Eq.H1-1b 86 3117
Column H250X125X6X9 0.158 Eq.H1-3a(H1 87 3112
Stair Stringer C200X80X7.5 0.021 Eq.H1-1b 88 3116
Stair Stringer C200X80X7.5 0.019 Eq.H1-1b 89 3117
Main Beam H200X100X5.5X8 0.125 Eq.H1-1b 90 2311
Horizontal Bracing L60X60X6 0.074 Eq.H2-1 91 3117
Main Beam H200X100X5.5X8 0.044 Eq.H1-3b 92 2311
Column H200X100X5.5X8 0.598 Eq.H1-1b 93 2311
Joist H150X150X7X10 0.149 Eq.H1-1b 94 2311
Secondary Beam H125X125X6.5X9 0.093 Eq.H1-1b 95 2311
Vertical Bracing L65X65X6 0.103 Eq.H2-1 98 2311
Vertical Bracing L65X65X6 0.043 Eq.H2-1 99 2311
Main Beam H250X125X6X9 0.249 Eq.H1-1b 100 2314
Stair Stringer C200X80X7.5 0.049 Eq.H1-1b 101 2312
Stair Stringer C200X80X7.5 0.058 Eq.H1-1b 102 3117
Stair Stringer C200X80X7.5 0.047 Eq.H1-1b 103 3117
Stair Stringer C200X80X7.5 0.027 Eq.H1-1b 104 2312
Main Beam H250X125X6X9 0.125 Eq.H1-1b 105 2312
Main Beam H250X125X6X9 0.088 Eq.H1-3a(H1 106 3115
Main Beam H200X100X5.5X8 0.031 Eq.H1-1b 107 2121
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 40 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Appendix F Steel Connection Check

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 41 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

F. Steel Connection Check

F.1 Connection Capacity Calculation


Connection capacity calculation refer to doc. 2924-G000-1350C-CAL-0006 Steel Connection Calculation, with the following items:
1. Calculation for Column Base Plate Connection (BP)
2. Calculation for Beam to Column Moment End Plate Connection (ME)
3. Calculation for Beam to Column Single Shear Connection (SS)
4. Calculation for Beam to Beam Pinned Connection (BP)
5. Calculation for Vertical Bracing Connection
6. Calculation for Horizontal Bracing Connection

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 42 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

F.2 Beam to Column End Plate Moment Connection (ME)


Member connection capacity will be checked by interaction diagram according to calculation for beam to column moment connection as per doc. 2924-G000-
1350C-CAL-0006 Steel Connection Calculation within service area of the diagram. This connection shall be checked for Load Comb. 1111~2314 and
7111~7318.

F.2.1 Beam SH-250 to Column SH-250

Figure F-1 Diagram Interaction (service Area) of Axial Force (Pr) - Moment Force (Mr) for Main Beam SH-250 to Column SH-250

service area for required moment from


analysis structure
2000
Pr (kN)
leh g leh
Panel Zone Strength

1500 HSB

Pf
1000 Hb

500
Mr (kNm)

0
0 50 100 150 200 250

-500

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 43 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

Figure F-2 Diagram Interaction (service Area) of Flange Force (Ffr) - Shear Force (Vr) for Main Beam SH-250 to Column SH-250

2000
Ffu
(kN)
1500
service area for required shear
from analysis structure with R=1
1000

500

Vr (kNm)
0
0 50 100 150 200
-500

-1000

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 44 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

F.2.2 Beam SH-200 to Column SH-250

Figure F-3 Diagram Interaction (service Area) of Axial Force (Pr) - Moment Force (Mr) for Main Beam SH-200 to Column SH-250

service area for required moment from


analysis structure
2000
Pr (kN)
Panel Zone Strength leh g leh
1500 HSB

Pf
1000 Hb

500
Mr (kNm)

0
0 50 100 150 200 250

-500

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 45 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

Figure F-4 Diagram Interaction (service Area) of Flange Force (Ffr) - Shear Force (Vr) for Main Beam SH-200 to Column SH-250

2000
Ffu
(kN)
1500
service area for required shear
from analysis structure with R=1
1000

500

Vr (kNm)
0
0 50 100 150 200
-500

-1000

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 46 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

F.2.3 Beam SH-200 to Column SH-200

Figure F-5 Diagram Interaction (service Area) of Axial Force (Pr) - Moment Force (Mr) for Main Beam SH-200 to Column SH-200

1400
Pr (kN)
1200 Panel Zone Strength leh g leh
HSB
1000

800 Pf
Hb
600

400

200 Mr (kNm)

0
0 20 40 60 80 100 120 140
-200

-400

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 47 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

Figure F-6 Diagram Interaction (service Area) of Flange Force (Ffr) - Shear Force (Vr) for Main Beam SH-200 to Column SH-200

2000
Ffu
(kN)
1500
service area for required shear
from analysis structure with R=1
1000

500

Vr (kNm)
0
0 50 100 150 200
-500

-1000

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 48 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

F.3 Vertical Bracing


Vertical bracing connection will be checked due to L/C. 1111~2314 and 7111~7318 with the following criteria.

T Where : T = actual force


≤ 1
Tall Tall = allowable axial (tension/compression) force

Table F-1 Capacity of Vertical Bracing Connection


Available
Available Tension
Member Size Compression
kN kN
 - 2 95.61 163.02
 - 3 237.72 317.52
 - 4 528.71 489.6
 - 5 599.02 633.6
 - 6 843.35 843.89
 - 8 1043.87 1044.81
 - 10 1691.13 1692
 - 12 1789.53 1956.38
 - 14 2113.74 1996.5
L65X65X6 140.85 138.24

Table F-2 Vertical Bracing Connection Check


No. Member Beam L/C Max Axial Ratio Condition Remarks
R5 PIP3' 46 2313 38.08 0.16 Max Compression OK
43 7215 -11.39 0.04 Max Tension OK
R9 L65X65X6 98 7111 3.93 0.03 Max Compression OK
99 7111 -2.71 0.02 Max Tension OK

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 49 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

F.4 Horizontal Bracing


Horizontal bracing connection will be checked due to L/C 1111 to L/C 3318, with the following criteria.

T Where : T = actual force


≤ 1
Tall Tall = allowable axial (tension/compression) force

Table F-3 Capacity of Horizontal Bracing Connection


Available
Available Tension
Member Size Compression
kN kN
L60X60X6 146 133
L75X75X6 149 142

Table F-4 Horizontal Bracing Connection Check


No. Member Beam L/C Max Axial Ratio Condition Remarks
R6 L75X75X6 60 2121 2.19 0.01 Max Compression OK
58 2121 -2.15 0.02 Max Tension OK
R7 L60X60X6 64 2218 2.14 0.01 Max Compression OK
64 2313 -12.44 0.09 Max Tension OK

F.5 Column Base Plate

F.5.1 Base Plate Connection Check with Combination capacity of P vs V (Column SH-250 without shear key)
Refer to document 2924-G000-1350C-CAL-0006 Steel Connection Calculation, capacity for base plate pinned connection SH-250:
Beam = 1 To 4 15 20
Compression = 746.00 kN
Tension = 170.00 kN
Shear = 62.00 kN (tension condition)
= 62.00 kN (compression condition) OR 0.33*Fy (use the maximum value)

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 50 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

Below are summarize base plate connection check for Column SH-250.
Node Fx Fy Fz Axial Cap Shear Cap
Fx/Pn Vu/Vn Ratio Check
Beam L/C kN kN kN Pn Vn
Max Fx 4 2311 4 74.57 1.48 0.08 746.00 62.00 0.10 0.00 0.10 PASS
Min Fx 15 7218 39 -12.94 -7.41 0.00 170.00 62.00 0.08 0.00 0.08 PASS
Max Fy 15 7115 13 29.05 10.64 0.00 746.00 62.00 0.04 0.00 0.04 PASS
Min Fy 15 7218 13 -12.62 -7.41 0.00 170.00 62.00 0.07 0.00 0.07 PASS
Max Fz 4 7217 4 5.92 1.96 1.49 746.00 62.00 0.01 0.02 0.02 PASS
Min Fz 4 7116 4 55.53 -1.64 -1.58 746.00 62.00 0.07 0.03 0.07 PASS

F.5.2 Base Plate Connection Check with Combination capacity of P vs V (Column SH-200 without shear key)
Refer to document 2924-G000-1350C-CAL-0006 Steel Connection Calculation, capacity for base plate pinned connection SH-200:
Beam = 66 71
Compression = 508.00 kN
Tension = 146.00 kN
Shear = 62.00 kN (tension condition)
= 62.00 kN (compression condition) OR 0.33*Fy (use the maximum value)

Below are summarize base plate connection check for Column SH-200.
Node Fx Fy Fz Axial Cap Shear Cap
Fx/Pn Vu/Vn Ratio Check
Beam L/C kN kN kN Pn Vn
Max Fx 71 2311 45 18.68 1.02 -1.04 746.00 62.00 0.03 0.02 0.03 PASS
Min Fx 66 7211 41 -5.23 1.92 0.20 170.00 62.00 0.03 0.00 0.03 PASS
Max Fy 66 7212 40 -4.17 2.07 0.20 170.00 62.00 0.02 0.00 0.03 PASS
Min Fy 66 7113 40 15.80 -2.40 1.16 746.00 62.00 0.02 0.02 0.02 PASS
Max Fz 66 2313 41 11.52 -0.42 1.77 746.00 62.00 0.02 0.03 0.03 PASS
Min Fz 71 2314 63 16.62 0.38 -1.12 746.00 62.00 0.02 0.02 0.02 PASS

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 51 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

F.6 Beam to Column Pinned Connection (SS/DS)


location Start beam :
Figure F-7 Start of Beam to Column Pinned Connection

*start of beam to column pinned connection with red line

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 52 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

location End beam :


Figure F-8 End of Beam to Column Pinned Connection

*end of beam to column pinned connection with red line

Axial and shear of the member shall conform the below formula:

Vu Pu
+ ≤ 1
fVn fPn

Sample Calculation of Beam 7 Profile SH250 Joint 5 Connected to Column SH250

4 0.0
+ = 0 ≤ 1 ok
91 181

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 53 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

Table F-5 Checking Beam To Column Shear Connection (SS/DS)

Member- Connectd Memb. Sym


Load Pu Vu fPn-tens fPn-com fVn
Position Ratio
bol
Node Beam Column Case kN kN kN kN kN

7-5 SH250 SH250 SS Plan +3.9 2311 0.00 4.20 181.44 181.44 90.53 0.05
8-6 SH250 SH250 SS Plan +3.9 2312 0.00 3.56 181.44 181.44 90.53 0.04
11-9 SH250 SH250 DS Plan +1.5 2312 0.00 15.90 226.80 525.90 110.81 0.14
18-10 SH250 SH250 DS Plan +1.5 2312 0.00 17.14 226.80 525.90 110.81 0.15
55-7 SH250 SH250 SS Plan +3.9 2311 0.00 4.20 181.44 181.44 90.53 0.05
22-39 SH250 SH250 SS Plan +1.5 1211 0.00 3.62 181.44 181.44 90.53 0.04
22-19 SH250 SH250 SS Plan +1.5 1211 0.00 3.62 181.44 181.44 90.53 0.04
67-62 SH250 SH250 SS Plan +3.1 1111 0.00 0.24 181.44 181.44 90.53 0.00
67-41 SH250 SH250 SS Plan +3.1 1111 0.00 0.24 181.44 181.44 90.53 0.00
69-43 SH250 SH250 SS Plan +3.1 2313 0.00 0.72 181.44 181.44 90.53 0.01
88-8 C200 SH250 SS Plan +3.9 3116 0.00 3.92 147.15 151.20 45.17 0.09
90-41 SH250 SH250 SS Plan +3.1 2314 0.00 0.20 181.44 181.44 90.53 0.00
92-19 SH250 SH250 SS Plan +1.5 1111 0.00 0.44 181.44 181.44 90.53 0.00
92-63 SH250 SH250 SS Plan +1.5 1111 0.00 0.44 181.44 181.44 90.53 0.00
72-8 SH250 SH250 SS Plan +3.9 2312 0.00 11.09 181.44 181.44 90.53 0.12
80-43 C200 SH250 SS Plan +3.1 2313 0.00 7.05 147.15 151.20 45.17 0.16
104-39 C200 SH250 SS Plan +1.5 2313 0.00 8.05 147.15 151.20 45.17 0.18

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 54 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

F.7 Beam to Beam Shear Connection (BP)


location Start beam :
Figure F-9 Start of Beam to Beam Shear Connection

*start of beam to beam shear connection with red line

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

location End beam :


Figure F-10 End of Beam to Beam Shear Connection

*end of beam to beam shear connection with red line

Axial and shear of the member shall conform the below formula:

Vu Pu
+ ≤ 1
fVn fPn

Sample Calculation of Ratio Secondary Beam 19 Profile SH250 Joint 17 Connected to Primary Beam SH250

9 1
+ = 0.143 ≤ 1 ok
66 148

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

Table F-6 Checking Beam To Beam Shear Connection (BP)

Member- Connectd Beam Critical Pu Vu fPn-tens fPn-com fVn


Symbol Position Ratio
Node Secd Primr LC kN kN kN kN kN
19-17 SH250 SH250 BP Plan +1.5 2312 0.61 9.13 147.52 147.52 65.63 0.14
22-19 SH250 SH250 BP Plan +1.5 2313 3.17 3.62 147.52 147.52 65.63 0.08
26-21 SH250 SH250 BP Plan +1.5 2313 4.64 7.12 147.52 147.52 65.63 0.14
32-24 SH250 SH250 BP Plan +3.9 2312 -0.53 36.65 147.52 147.52 65.63 0.56
36-26 WH150 SH250 BP Plan +3.9 2313 0.60 10.47 73.76 73.76 15.91 0.67
36-28 WH150 SH250 BP Plan +3.9 2313 -0.60 10.47 73.76 73.76 15.91 0.67
37-28 WH150 SH250 BP Plan +3.9 2313 -0.64 10.47 73.76 73.76 15.91 0.67
37-27 WH150 SH250 BP Plan +3.9 2313 0.64 10.47 73.76 73.76 15.91 0.67
41-29 WH150 SH250 BP Plan +3.9 2313 -0.29 10.47 73.76 73.76 15.91 0.66
41-31 WH150 SH250 BP Plan +3.9 2313 0.29 10.47 73.76 73.76 15.91 0.66
42-31 WH150 SH250 BP Plan +3.9 2311 0.61 11.08 73.76 73.76 15.91 0.70
40-25 SH250 SH250 BP Plan +3.9 2311 0.55 36.31 147.52 147.52 65.63 0.56
14-11 SH250 SH250 BP Plan +1.5 3115 14.64 2.48 147.52 147.52 65.63 0.14
14-20 SH250 SH250 BP Plan +1.5 3115 -14.64 2.48 147.52 147.52 65.63 0.14
22-39 SH250 SH250 BP Plan +1.5 2313 -3.17 3.62 147.52 147.52 65.63 0.08
24-20 SH250 SH250 BP Plan +1.5 2314 9.06 6.03 147.52 147.52 65.63 0.15
24-15 SH250 SH250 BP Plan +1.5 2314 -9.06 6.03 147.52 147.52 65.63 0.15
70-42 SH250 SH250 BP Plan +3.1 2311 -0.10 3.28 147.52 147.52 65.63 0.05
70-44 SH250 SH250 BP Plan +3.1 2311 0.10 3.28 147.52 147.52 65.63 0.05
74-46 SH250 SH250 BP Plan +3.9 2314 -1.00 1.29 147.52 147.52 65.63 0.03
74-49 SH250 SH250 BP Plan +3.9 2314 1.00 1.29 147.52 147.52 65.63 0.03

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
Calculation for Service Platform

76-19 C200 SH250 BP Grid 3 2313 -2.77 3.30 147.15 156.60 29.62 0.13
77-53 C200 SH250 BP Grid 2-3 2311 4.32 2.77 147.15 156.60 29.62 0.12
89-59 C200 SH250 BP Plan +3.9 3117 -2.54 3.36 147.15 156.60 29.62 0.13
95-64 WH125 WH150 BP Plan +3.9 2311 -0.71 0.61 88.30 99.42 14.63 0.05
78-52 C200 SH250 BP Plan +3.1 3113 1.10 3.80 147.15 156.60 29.62 0.14
80-43 C200 SH250 BP Plan +3.1 2313 3.94 7.05 147.15 156.60 29.62 0.26
84-41 C200 SH250 BP Grid 2 3116 3.00 1.74 147.15 156.60 29.62 0.08
85-56 C200 SH250 BP Grid 2-3 2314 0.73 1.89 147.15 156.60 29.62 0.07
94-30 WH150 SH250 BP Plan +3.9 2313 -0.49 9.18 73.76 73.76 15.91 0.58
103-69 C200 SH250 BP Plan +1.5 3117 -13.04 6.70 147.15 156.60 29.62 0.31
104-39 C200 SH250 BP Plan +1.5 2313 6.92 8.05 147.15 156.60 29.62 0.32

2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Appendix G Material Take Off

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 55 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

G. Material Take Off


Table G-1 Steel Structure Material Take Off
Length Weight
No Profile
m kN Ton
1 H250X125X6X9 32.65 9.27 0.95
2 H200X100X5.5X8 39.05 8.00 0.82
3 H150X150X7X10 10.50 3.20 0.33
4 PIP3 16.02 1.77 0.18
5 L75X75X6 9.86 0.66 0.07
6 L60X60X6 3.71 0.20 0.02
7 C200X80X7.5 14.45 3.48 0.35
8 H125X125X6.5X9 1.15 0.27 0.03
9 L65X65X6 2.83 0.16 0.02

Total Weight (ton) 2.75

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 56 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Appendix H STAAD.Pro Input

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 57 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

H. STAAD.Pro Input
STAAD SPACE
START JOB INFORMATION
JOB NAME CS2 ADSORPTION PLANT 2
JOB CLIENT PT South Pacific Viscose
JOB NO 2924
JOB REV R00
JOB PART Service Platform 75-PLF-01
ENGINEER NAME AJL
CHECKER NAME IHS
APPROVED NAME MAH
ENGINEER DATE 10/6/2021
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0.300001 0; 2 3.45001 0.300001 0; 3 0 0.300001 5.25001;
4 3.45001 0.300001 5.25001; 5 0 3.90001 0; 6 3.45001 3.90001 0;
7 0 3.90001 5.25001; 8 3.45001 3.90001 5.25001; 9 3.45001 1.5 0;
10 3.45001 1.5 5.25001; 11 4.25001 1.5 0; 13 5.30001 0.300001 2.15;
15 4.25001 1.5 4.10001; 16 5.30001 0.300001 4.10001; 17 3.45001 1.5 4.10001;
19 5.30001 1.5 4.10001; 20 4.25001 1.5 2.15; 21 3.45001 1.5 2.15;
24 0 3.90001 2.62501; 25 3.45001 3.90001 2.62501; 26 1.15 3.90001 0;
27 1.15 3.90001 5.25001; 28 1.15 3.90001 2.62501; 29 2.30001 3.90001 0;
30 2.30001 3.90001 5.25001; 31 2.30001 3.90001 2.62501; 39 5.30001 1.5 2.15;
40 3.45001 0.300001 6.65001; 41 3.45001 3.10001 6.65001;
42 3.45001 3.10001 7.65002; 43 5.30001 3.10001 6.65002;
44 5.30001 3.10001 7.65002; 45 5.30001 0.300001 6.65001;
46 4.45001 3.9 4.25001; 47 3.45001 3.90001 4.25001; 49 4.45001 3.9 5.25001;
52 4.50001 3.10001 6.65001; 53 4.50001 1.5 4.10001; 54 4.50001 3.10001 6.35001;
55 5.30001 3.10001 6.35001; 56 4.25001 3.10001 6.65001;
59 4.25001 3.90001 5.25001; 60 3.45001 3.90001 5.55001;
61 4.25001 3.90001 5.55001; 62 3.45001 3.10001 5.25001; 63 5.30001 1.5 6.65001;
64 2.30001 3.90001 4.25001; 69 4.50001 1.5 2.15; 70 4.50001 1.5 1.85;
71 5.30001 1.5 1.85; 72 5.30001 0.300001 0; 73 4.50001 0.300001 -4.26331e-06;
74 5.00001 1.5 4.10001; 75 5.00001 1.5 2.15; 76 5.30001 1.5 5.37501;
MEMBER INCIDENCES
1 1 5; 2 2 9; 3 3 7; 4 4 10; 5 5 26; 6 7 27; 7 5 24; 8 6 25; 9 9 6; 10 10 62;
11 9 21; 12 9 11; 14 11 20; 15 13 39; 18 17 10; 19 17 15; 20 16 19; 22 75 74;
23 15 53; 24 20 15; 25 21 17; 26 21 20; 31 25 47; 32 24 28; 33 26 29; 34 27 30;
35 28 31; 36 26 28; 37 28 27; 38 29 6; 39 30 8; 40 31 25; 41 29 31; 42 31 64;
43 1 24; 44 24 3; 45 9 25; 46 25 10; 55 24 7; 58 5 28; 59 7 28; 60 31 6;
61 31 8; 64 11 21; 65 20 69; 66 40 41; 67 62 41; 68 41 56; 69 43 44; 70 42 44;
71 45 63; 72 47 8; 73 47 46; 74 46 49; 75 8 59; 76 19 55; 77 53 54; 78 54 52;
79 53 74; 80 55 43; 81 52 43; 83 56 52; 84 60 41; 85 61 56; 86 59 49; 87 62 8;
88 8 60; 89 59 61; 90 41 42; 91 46 8; 92 19 76; 93 63 43; 94 64 30; 95 64 47;
98 45 76; 99 16 76; 100 69 75; 101 72 71; 102 73 70; 103 70 69; 104 71 39;
105 74 19; 106 75 39; 107 76 63;
START GROUP DEFINITION
MEMBER
_COLUMN 1 TO 4 9 10 15 20 66 71 87 93
_MAIN_BEAM 5 TO 8 11 12 18 19 23 25 26 31 33 34 38 39 55 65 67 TO 69 -
72 TO 75 79 81 83 86 90 92 100 105 TO 107
_SEC_BEAM 14 22 24 32 35 40 70 95
_JOIST 36 37 41 42 94
_V_BRACE 43 TO 46 98 99
_ALL_BEAM 5 TO 8 11 12 14 18 19 22 TO 26 31 TO 42 55 65 67 TO 70 72 TO 81 -

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 58 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
83 TO 86 88 TO 90 92 94 95 100 TO 107
_H_BRACE 58 TO 61 64 91
_EM_TO_SH250 5 6 12 38 39 75 79 100 105 106
_SS_START 7 8 11 22 67 69 88 90 92 107
_SS_END 18 22 55 67 72 80 92 104 107
_BP_START 14 19 22 24 26 32 36 37 41 42 70 74 76 77 89 95
_BP_END 14 22 24 36 37 40 41 70 74 78 80 84 85 94 103 104
_BPL_SH250 1 TO 4 15 20
_EM_TO_SH200 68 81
_BPL_SH200 66 71
FLOOR
_GRATING 5 TO 8 11 12 14 19 22 TO 26 31 TO 42 55 65 68 TO 70 72 TO 75 79 81 -
83 86 90 94 95 100 105 106
JOINT
_DRIFT_+1.5 9 10 19 39
_DRIFT_+3.1 41 43
_DRIFT_+3.9 5 TO 8
END GROUP DEFINITION
START USER TABLE
TABLE 1
UNIT METER KN
PIPE
PIP4
0.1143 0.10226 0 0
PIP5
0.1413 0.1282 0 0
PIP3
0.0889 0.07792 0 0
TABLE 2
UNIT METER KN
ANGLE
L60X60X6
0.06 0.06 0.006 0.011795 0.00024 0.00024
END
DEFINE MATERIAL START
ISOTROPIC STEEL
E 1.99947e+08
POISSON 0.3
DENSITY 76.8191
ALPHA 6.5e-06
DAMP 0.03
TYPE STEEL
STRENGTH RY 1.5 RT 1.2
END DEFINE MATERIAL
REFERENCE
MEMBER PROPERTY JAPANESELOADS *
1 TO 6 9 TO 11 15 18 TO 20 23 25 26 33 34 38 39 65 79 87 100 105 -
106 TABLE ST H250X125X6X9
7 8 12 14 22 24 31 32 35 40 55 66 TO 75 81 83 86 90 92 93 -
107 TABLE ST H200X100X5.5X8
95 TABLE ST H125X125X6.5X9
36 37 41 42 94 TABLE ST H150X150X7X10
MEMBER PROPERTY JAPANESE
43 TO 46 UPTABLE 1 PIP3
58 TO 61 TABLE ST L75X75X6
MEMBER PROPERTY JAPANESE
64 91 UPTABLE 2 L60X60X6
76 TO 78 80 84 85 88 89 101 TO 104 TABLE ST C200X80X7.5
98 99 TABLE ST L65X65X6
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 59 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
CONSTANTS
MATERIAL STEEL ALL
MEMBER RELEASE
7 8 11 14 19 24 32 67 70 74 77 88 89 92 95 START MY MZ
14 18 24 40 55 67 70 72 74 78 80 84 85 103 104 107 END MY MZ
22 26 36 37 41 42 76 START MY MZ
22 36 37 41 94 END MY MZ
SUPPORTS
1 TO 4 13 16 40 45 72 73 PINNED
*for seismic*
*5 TO 10 19 39 41 43 PINNED
MEMBER TRUSS
43 TO 46 58 TO 61 64 91 98 99
MEMBER OFFSET
58 TO 61 START LOCAL 0.2 0 0
58 TO 61 END LOCAL -0.2 0 0
DEFINE REFERENCE LOADS
*
**************************************************
LOAD R1 LOADTYPE Dead TITLE REF LOAD CASE 1 DEAD
**************************************************
SELFWEIGHT Y -1.2 LIST ALL
FLOOR LOAD
_GRATING FLOAD -0.33 GY
MEMBER LOAD
5 TO 8 12 14 19 22 23 31 33 34 38 39 55 65 69 70 73 74 76 TO 78 80 83 TO 86 -
88 TO 90 101 TO 104 UNI GY -0.16
*******************************************************
LOAD R2 LOADTYPE Live TITLE REF LOAD CASE 2 LIVE LOAD
FLOOR LOAD
_GRATING FLOAD -5 GY
MEMBER LOAD
76 TO 78 80 84 85 88 89 101 TO 104 UNI GY -1
***************************************************
LOAD R3 LOADTYPE None TITLE REF LOAD CASE 3 P(E)
**************************************************
LOAD R4 LOADTYPE None TITLE REF LOAD CASE 4 P(O)
***************************************************
LOAD R5 LOADTYPE None TITLE REF LOAD CASE 5 P(T)
***************************************************
LOAD R6 LOADTYPE None TITLE REF LOAD CASE 6 Q(E)
**************************************************
**************************************************
LOAD R7 LOADTYPE None TITLE REF LOAD CASE 7 Q(O)
**************************************************
**************************************************
LOAD R8 LOADTYPE None TITLE REF LOAD CASE 8 Q(T)
**************************************************
***************************************************************
LOAD R9 LOADTYPE None TITLE REF LOAD CASE 9 BUNDLE LOAD (TB)
***************************************************************
***************************************************************
LOAD R10 LOADTYPE None TITLE REF LOAD CASE 10 CABLE TRAY (CT)
********************************************************************
LOAD R11 LOADTYPE None TITLE REF LOAD CASE 11 EQUIPMENT WIND X DIR
********************************************************************
********************************************************************
LOAD R12 LOADTYPE None TITLE REF LOAD CASE 12 EQUIPMENT WIND Z DIR
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 60 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
********************************************************************
****************************************************************
LOAD R13 LOADTYPE None TITLE REF LOAD CASE 13 PIPE WIND X DIR
****************************************************************
***************************************************************
LOAD R14 LOADTYPE None TITLE REF LOAD CASE 14 PIPE WIND Z DIR
***************************************************************
LOAD R15 LOADTYPE None TITLE REF LOAD CASE 15 FRICTION LONGX LOAD
*****************************************************************
LOAD R16 LOADTYPE None TITLE REF LOAD CASE 16 FRICTION LONGZ LOAD
*****************************************************************
LOAD R17 LOADTYPE None TITLE REF LOAD CASE 17 ANCHOR/GUIDE X-DIR LOAD
*****************************************************************
*******************************************************************
LOAD R18 LOADTYPE None TITLE REF LOAD CASE 18 ANCHOR/GUIDE Z-DIR LOAD
*******************************************************************
***************************************************************************
LOAD R19 LOADTYPE Seismic TITLE REF LOAD CASE 19 STATIC EQUIV EMP 2/3MCER X
***************************************************************************
JOINT LOAD
5 FX 1.75
6 FX 1.65
7 FX 1.65
8 FX 2.86
9 FX 0.99
10 FX 0.82
19 FX 0.88
39 FX 0.39
41 FX 1.14
43 FX 0.68
***************************************************************************
LOAD R20 LOADTYPE Seismic TITLE REF LOAD CASE 20 STATIC EQUIV EMP 2/3MCER Z
***************************************************************************
JOINT LOAD
5 FZ 2.11
6 FZ 1.99
7 FZ 2
8 FZ 3.46
9 FZ 1.2
10 FZ 0.99
19 FZ 1.07
39 FZ 0.47
41 FZ 1.38
43 FZ 0.82
****************************************************************************
LOAD R21 LOADTYPE Seismic TITLE REF LOAD CASE 21 STATIC EQUIV OPRT 2/3MCER X
****************************************************************************
JOINT LOAD
5 FX 1.75
6 FX 1.65
7 FX 1.65
8 FX 2.86
9 FX 0.99
10 FX 0.82
19 FX 0.88
39 FX 0.39
41 FX 1.14
43 FX 0.68
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 61 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
****************************************************************************
LOAD R22 LOADTYPE Seismic TITLE REF LOAD CASE 22 STATIC EQUIV OPRT 2/3MCER Z
****************************************************************************
JOINT LOAD
5 FZ 2.11
6 FZ 1.99
7 FZ 2
8 FZ 3.46
9 FZ 1.2
10 FZ 0.99
19 FZ 1.07
39 FZ 0.47
41 FZ 1.38
43 FZ 0.82
**********************************************************
LOAD R23 LOADTYPE Live TITLE REF LOAD CASE 23 CRANE DEAD LOAD
**********************************************************
*****************************************************************
LOAD R24 LOADTYPE Live TITLE REF LOAD CASE 24 CRANE LIFTING LIVE LOAD
*****************************************************************
*****************************************************************
LOAD R25 LOADTYPE Live TITLE REF LOAD CASE 25 CRANE IMPACT Z-DIR LOAD
*****************************************************************
*****************************************************************
LOAD R26 LOADTYPE Live TITLE REF LOAD CASE 26 CRANE IMPACT X-DIR LOAD
*****************************************************************
*****************************************************************
LOAD R27 LOADTYPE Live TITLE REF LOAD CASE 27 CRANE IMPACT VERTICAL Y-DIR LOAD
*****************************************************************
***********************************************************************
LOAD R28 LOADTYPE None TITLE REF LOAD CASE 28 BLAST LOAD X DIR
***********************************************************************
***********************************************************************
LOAD R29 LOADTYPE None TITLE REF LOAD CASE 29 BLAST LOAD Z DIR
***********************************************************************
****************************************************
LOAD R30 LOADTYPE Mass TITLE RAYLEIGH EMPTY X DIR
****************************************************
JOINT LOAD
5 FX 3.496
6 FX 3.303
7 FX 3.306
8 FX 5.728
9 FX 5.96
10 FX 4.927
19 FX 5.305
39 FX 2.357
41 FX 2.93
43 FX 1.75
****************************************************
LOAD R31 LOADTYPE Mass TITLE RAYLEIGH EMPTY Z DIR
****************************************************
JOINT LOAD
5 FZ 3.496
6 FZ 3.303
7 FZ 3.306
8 FZ 5.728
9 FZ 5.96
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 62 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
10 FZ 4.927
19 FZ 5.305
39 FZ 2.357
41 FZ 2.93
43 FZ 1.75
********************************************************
LOAD R32 LOADTYPE Mass TITLE RAYLEIGH OPERATING X DIR
********************************************************
JOINT LOAD
5 FX 3.496
6 FX 3.303
7 FX 3.306
8 FX 5.728
9 FX 5.96
10 FX 4.927
19 FX 5.305
39 FX 2.357
41 FX 2.93
43 FX 1.75
********************************************************
LOAD R33 LOADTYPE Mass TITLE RAYLEIGH OPERATING Z DIR
********************************************************
JOINT LOAD
5 FZ 3.496
6 FZ 3.303
7 FZ 3.306
8 FZ 5.728
9 FZ 5.96
10 FZ 4.927
19 FZ 5.305
39 FZ 2.357
41 FZ 2.93
43 FZ 1.75
*****************************************************************************
LOAD R34 LOADTYPE Seismic TITLE REF LOAD CASE 34 STATIC EQUIV EMPTY OBE XDIR
*****************************************************************************
*****************************************************************************
LOAD R35 LOADTYPE Seismic TITLE REF LOAD CASE 35 STATIC EQUIV EMPTY OBE ZDIR
*****************************************************************************
****************************************************************************
LOAD R36 LOADTYPE Seismic TITLE REF LOAD CASE 36 STATIC EQUIV OPRT OBE XDIR
****************************************************************************
****************************************************************************
LOAD R37 LOADTYPE Seismic TITLE REF LOAD CASE 37 STATIC EQUIV OPRT OBE ZDIR
****************************************************************************
*********************************************************************
LOAD R40 LOADTYPE None TITLE REF LOAD CASE 40 PIPE SHORT TERM Y DIR
*********************************************************************
**********************************************************************
LOAD R41 LOADTYPE None TITLE REF LOAD CASE 41 PIPE SHORT TERM X DIR
**********************************************************************
**********************************************************************
LOAD R42 LOADTYPE None TITLE REF LOAD CASE 42 PIPE SHORT TERM Z DIR
**********************************************************************
*****************************************************************************
LOAD R101 LOADTYPE Seismic TITLE REF LOAD CASE 101 OPRT SEISMIC ONLY (FYW2)
*****************************************************************************
**************************************************************
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 63 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
LOAD R50 LOADTYPE Roof Live TITLE REF LOAD CASE 50 ROOF LIVE LOAD
***********************************************************************
LOAD R60 LOADTYPE Seismic TITLE REF LOAD CASE 60 EQP SEISMIC (X-DIR)
***********************************************************************
***********************************************************************
LOAD R61 LOADTYPE Seismic TITLE REF LOAD CASE 61 EQP SEISMIC (Z-DIR)
***********************************************************************
LOAD R81 LOADTYPE Temperature TITLE REF LOAD CASE 81 TEMP LOAD (EXPANSION)
LOAD R82 LOADTYPE Temperature TITLE REF LOAD CASE 82 TEMP LOAD (SHRINKAGE)
END DEFINE REFERENCE LOADS
DEFINE DIRECT ANALYSIS
FLEX 0.8 MEMB 5 TO 8 11 12 14 18 19 22 TO 26 31 TO 42 55 65 67 TO 70 -
72 TO 81 83 TO 86 88 TO 90 92 100 TO 107
FYLD 235000 MEMB 1 TO 12 14 15 18 TO 20 22 TO 26 31 TO 46 55 58 TO 61 -
64 TO 81 83 TO 93 98 TO 107
AXIAL MEMB 1 TO 4 9 10 15 20 66 71 87 93
END
DEFINE WIND LOAD
TYPE 1 WIND 1
INT 0.83 0.83 0.83 0.83 0.83 0.83 0.84 HEIG 0 1 2 3 4 4.6 5
*
**************************************************************
* DEFINE WIND LOAD *
**************************************************************
**************************************************************
LOAD 31 LOADTYPE Seismic TITLE SEISMIC STATIC 2/3 MCER (EXO)
REFERENCE LOAD
R21 1.0 R60 1.0
*IBC LOAD X 1
*PERFORM ANALYSIS
*CHANGE
**************************************************************
*IBC LOAD X 1
*
**************************************************************
LOAD 32 LOADTYPE Seismic TITLE SEISMIC STATIC 2/3 MCER (EZO)
REFERENCE LOAD
R22 1.0 R61 1.0
*IBC LOAD Z 1
*PERFORM ANALYSIS
*CHANGE
**************************************************************
**************************************************************
LOAD 34 LOADTYPE Seismic TITLE SEISMIC STATIC 2/3 MCER (EXE)
REFERENCE LOAD
R19 1.0 R60 1.0
*IBC LOAD X 1
*PERFORM ANALYSIS
*CHANGE
**************************************************************
*
*
**************************************************************
LOAD 35 LOADTYPE Seismic TITLE SEISMIC STATIC 2/3 MCER (EZE)
REFERENCE LOAD
R20 1.0 R61 1.0
*IBC LOAD Z 1
*PERFORM ANALYSIS
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 64 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
*CHANGE
**************************************************************
LOAD 91 LOADTYPE Mass TITLE RAYLEIGH EMPTY X DIR
***********************************************************
REFERENCE LOAD
R30 1.0
CALCULATE RAYLEIGH FREQUENCY
*
*
***********************************************************
LOAD 92 LOADTYPE Mass TITLE RAYLEIGH EMPTY Z DIR
***********************************************************
REFERENCE LOAD
R31 1.0
CALCULATE RAYLEIGH FREQUENCY
*
*
***********************************************************
LOAD 93 LOADTYPE Mass TITLE RAYLEIGH OPERATING X DIR
***********************************************************
REFERENCE LOAD
R32 1.0
CALCULATE RAYLEIGH FREQUENCY
*
*
***********************************************************
LOAD 94 LOADTYPE Mass TITLE RAYLEIGH OPERATING Z DIR
***********************************************************
REFERENCE LOAD
R33 1.0
CALCULATE RAYLEIGH FREQUENCY
*
*
*******************************************
LOAD 1 LOADTYPE Dead TITLE DEAD LOAD (D)
*******************************************
REFERENCE LOAD
R1 1.0
*
*
*******************************************
LOAD 2 LOADTYPE Live TITLE LIVE LOAD (L)
*******************************************
REFERENCE LOAD
R2 1.0
*
*
*******************************************
LOAD 3 LOADTYPE Live TITLE ROOF LIVE LOAD (RL)
*******************************************
REFERENCE LOAD
R50 1.0
**************************************************
LOAD 4 LOADTYPE None TITLE PIPE EMPTY LOAD (PE)
**************************************************
REFERENCE LOAD
R3 1.0
*
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 65 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
*
******************************************************
LOAD 5 LOADTYPE None TITLE PIPE OPERATING LOAD (PO)
******************************************************
REFERENCE LOAD
R4 1.0
*
*
*************************************************
LOAD 6 LOADTYPE None TITLE PIPE TEST LOAD (PT)
*************************************************
REFERENCE LOAD
R5 1.0
*
*
**************************************************
LOAD 7 LOADTYPE None TITLE EQUIP EMPTY LOAD (QE)
**************************************************
REFERENCE LOAD
R6 1.0
*
*
******************************************************
LOAD 8 LOADTYPE None TITLE EQUIP OPERATING LOAD (QO)
******************************************************
REFERENCE LOAD
R7 1.0
*
*
*************************************************
LOAD 9 LOADTYPE None TITLE EQUIP TEST LOAD (QT)
*************************************************
REFERENCE LOAD
R8 1.0
*
*
**********************************************
LOAD 10 LOADTYPE None TITLE BUNDLE LOAD (TB)
**********************************************
REFERENCE LOAD
R9 1.0
*
*
***************************************************
LOAD 11 LOADTYPE None TITLE CABLE TRAY LOAD (CT)
***************************************************
REFERENCE LOAD
R10 1.0
*
*
**********************************
LOAD 21 LOADTYPE Wind TITLE WIND LOAD X (+WX)
**********************************
REFERENCE LOAD
R11 1.0 R13 1.0
WIND LOAD X 1 TYPE 1 OPEN
*
************************************
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 66 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
LOAD 22 LOADTYPE Wind TITLE WIND LOAD Z (+WZ)
************************************
REFERENCE LOAD
R12 1.0 R14 1.0
WIND LOAD Z 1 TYPE 1 OPEN
*
***************************************************
LOAD 51 LOADTYPE Dead TITLE CRANE DEAD LOAD (CD)
***************************************************
REFERENCE LOAD
R23 1.0
*
*
***************************************************
LOAD 52 LOADTYPE Live TITLE CRANE LIFTING LIVE LOAD (CVS)
***************************************************
REFERENCE LOAD
R24 1.0
*
*
******************************************************
LOAD 53 LOADTYPE Live TITLE CRANE SIDE IMPACT Z-DIR (CSZ)
******************************************************
REFERENCE LOAD
R25 1.0
*
*
******************************************************
LOAD 54 LOADTYPE Live TITLE CRANE IMPACT X-DIR (CLX))
******************************************************
REFERENCE LOAD
R26 1.0
*
*
******************************************************
LOAD 55 LOADTYPE Live TITLE CRANE VERT IMPACT (CI)
******************************************************
*
**================================================*
** Longitudinal Impact = 25 % CVS *
**================================================*
REFERENCE LOAD
R27 1.0
*
*
******************************************************
LOAD 41 LOADTYPE None TITLE FRICTION LOAD LONG-X DIR
******************************************************
REFERENCE LOAD
R15 1.0
******************************************************
LOAD 42 LOADTYPE None TITLE FRICTION LOAD LONG-Z DIR
REFERENCE LOAD
R16 1.0
LOAD 43 LOADTYPE None TITLE ANCHOR/GUIDE X-DIR LOAD (AGX)
REFERENCE LOAD
R17 1.0
**********************************************
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 67 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
LOAD 44 LOADTYPE None TITLE ANCHOR/GUIDE Z-DIR LOAD (AGZ)
**********************************************
REFERENCE LOAD
R18 1.0
*
*
********************************************************
LOAD 45 LOADTYPE None TITLE PIPE SHORT TERM LOAD Y DIR
********************************************************
REFERENCE LOAD
R40 1.0
*
*
********************************************************
LOAD 46 LOADTYPE None TITLE PIPE SHORT TERM LOAD X DIR
********************************************************
REFERENCE LOAD
R41 1.0
*
*
********************************************************
LOAD 47 LOADTYPE None TITLE PIPE SHORT TERM LOAD Z DIR
********************************************************
REFERENCE LOAD
R42 1.0
*
*
***********************************************************
LOAD 61 LOADTYPE None TITLE BLAST LOAD X DIR
***********************************************************
REFERENCE LOAD
R28 1.0
*
*
***********************************************************
LOAD 62 LOADTYPE None TITLE BLAST LOAD Z DIR
***********************************************************
REFERENCE LOAD
R29 1.0
*
*
***********************************************************
LOAD 71 LOADTYPE Imperfection TITLE NOTIONAL LOAD X NX(E)
***********************************************************
NOTIONAL LOAD
R1 X 0.003 R3 X 0.003 R6 X 0.003 R10 X 0.003 R23 X 0.003
*
*
***********************************************************
LOAD 72 LOADTYPE Imperfection TITLE NOTIONAL LOAD Z NZ(E)
***********************************************************
NOTIONAL LOAD
R1 Z 0.003 R3 Z 0.003 R6 Z 0.003 R10 Z 0.003 R23 Z 0.003
*
*
*---------Operating Load---------
***********************************************************
LOAD 73 LOADTYPE Imperfection TITLE NOTIONAL LOAD X NX(O)
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 68 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
***********************************************************
NOTIONAL LOAD
R1 X 0.003 R2 X 0.003 R4 X 0.003 R7 X 0.003 R10 X 0.003 R23 X 0.003 -
R24 X 0.003 R27 X 0.003 R50 X 0.003
*
*
***********************************************************
LOAD 74 LOADTYPE Imperfection TITLE NOTIONAL LOAD Z NZ(O)
***********************************************************
NOTIONAL LOAD
R1 Z 0.003 R2 Z 0.003 R4 Z 0.003 R7 Z 0.003 R10 Z 0.003 R23 Z 0.003 -
R24 Z 0.003 R27 Z 0.003 R50 Z 0.003
*---------Test Load---------
***********************************************************
LOAD 75 LOADTYPE Imperfection TITLE NOTIONAL LOAD X NX(T)
***********************************************************
NOTIONAL LOAD
R1 X 0.003 R3 X 0.003 R5 X 0.003 R8 X 0.003 R10 X 0.003 R33 X 0.003
*
*
***********************************************************
LOAD 76 LOADTYPE Imperfection TITLE NOTIONAL LOAD Z NZ(T)
***********************************************************
NOTIONAL LOAD
R1 Z 0.003 R3 Z 0.003 R5 Z 0.003 R8 Z 0.003 R10 Z 0.003 R33 Z 0.003
*
*
LOAD 81 LOADTYPE None TITLE TEMPERATURE LOAD (EXPN)
REFERENCE LOAD
R81 1.0
***************************************
***************************************
LOAD 82 LOADTYPE None TITLE TEMPERATURE LOAD (SHRNK)
REFERENCE LOAD
R82 1.0
***************************************
***************************************
LOAD 101 LOADTYPE None TITLE OPR_FYW2
***************************************
REFERENCE LOAD
R101 1.0
*
*====================================================================*
* CHECK EMPTY BASE SHEAR STATIC *
* DL incl.CT+CraneEmpty, Pe+Ee *
*====================================================================*
LOAD 1000 LOADTYPE Dead TITLE 1.0 (D+PE+QE+CT+CD)
REPEAT LOAD
1 1.0 4 1.0 11 1.0 51 1.0 7 1.0
*====================================================================*
* CHECK OPERATING BASE SHEAR STATIC *
* DL incl.CT+CraneEmpty, Po+Eo *
*====================================================================*
LOAD 1001 LOADTYPE Dead TITLE 1.0 (D+PO+QO+CT+CD)
REPEAT LOAD
1 1.0 11 1.0 101 1.0 51 1.0 8 1.0
LOAD 95 LOADTYPE None TITLE STIFFNESS X
CALCULATE RAYLEIGH FREQUENCY
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 69 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
LOAD 96 LOADTYPE None TITLE STIFFNESS Z
CALCULATE RAYLEIGH FREQUENCY
*=========================================================================*
* STRENGTH DESIGN - LRFD *
* LC 1111 TO 7318 *
* PERFORM ANALYSIS - WITH NOTIONAL LOAD, STATIC EQV *
*=========================================================================*
*=====================================================================*
* PERMANENT CONDITION *
*=====================================================================*
LOAD COMB 1111 1.4D+1.4PO+1.4QO+1.4CT+1.4FFX+1.4FFZ+1.4AGX+1.4AGZ+1.4CD+1NOX
1 1.4 5 1.4 8 1.4 11 1.4 41 1.4 42 1.4 43 1.4 44 1.4 51 1.4 73 1.0
LOAD COMB 1112 1.4D+1.4PO+1.4QO+1.4CT+1.4FFX-1.4FFZ+1.4AGX+1.4AGZ+1.4CD-1NOZ
1 1.4 5 1.4 8 1.4 11 1.4 41 1.4 42 -1.4 43 1.4 44 1.4 51 1.4 74 -1.0
LOAD COMB 1113 1.4D+1.4PO+1.4QO+1.4CT-1.4FFX+1.4FFZ+1.4AGX+1.4AGZ+1.4CD+1NOZ
1 1.4 5 1.4 8 1.4 11 1.4 41 -1.4 42 1.4 43 1.4 44 1.4 51 1.4 74 1.0
LOAD COMB 1114 1.4D+1.4PO+1.4QO+1.4CT-1.4FFX-1.4FFZ+1.4AGX+1.4AGZ+1.4CD-1NOX
1 1.4 5 1.4 8 1.4 11 1.4 41 -1.4 42 -1.4 43 1.4 44 1.4 51 1.4 73 -1.0
LOAD COMB 1211 1.2D+1.6L+0.5RL+1.2PO+1.2QO+1.2CT+1.2FFX+1.2FFZ+1.2AGX+1.2AGZ+..
1 1.2 2 1.6 3 0.5 5 1.2 8 1.2 11 1.2 41 1.2 42 1.2 43 1.2 44 1.2 45 1.2 -
46 1.2 47 1.2 51 1.2 52 1.6 53 1.6 54 1.6 55 1.6 73 1.0
LOAD COMB 1212 1.2D+1.6L+0.5RL+1.2PO+1.2QO+1.2CT+1.2FFX-1.2FFZ+1.2AGX+1.2AGZ+..
1 1.2 2 1.6 3 0.5 5 1.2 8 1.2 11 1.2 41 1.2 42 -1.2 43 1.2 44 1.2 45 1.2 -
46 1.2 47 1.2 51 1.2 52 1.6 53 -1.6 54 1.6 55 1.6 74 -1.0
LOAD COMB 1213 1.2D+1.6L+0.5RL+1.2PO+1.2QO+1.2CT-1.2FFX+1.2FFZ+1.2AGX+1.2AGZ+..
1 1.2 2 1.6 3 0.5 5 1.2 8 1.2 11 1.2 41 -1.2 42 1.2 43 1.2 44 1.2 45 1.2 -
46 1.2 47 1.2 51 1.2 52 1.6 53 1.6 54 -1.6 55 1.6 74 1.0
LOAD COMB 1214 1.2D+1.6L+0.5RL+1.2PO+1.2QO+1.2CT-1.2FFX-1.2FFZ+1.2AGX+1.2AGZ+..
1 1.2 2 1.6 3 0.5 5 1.2 8 1.2 11 1.2 41 -1.2 42 -1.2 43 1.2 44 1.2 45 1.2 -
46 1.2 47 1.2 51 1.2 52 1.6 53 -1.6 54 -1.6 55 1.6 73 -1.0
*LOAD COMB 9111 1.4D+1.4PO+1.4QO+1.4CT+1.4FFX+1.4FFZ+1.4AGX+1.4AGZ+1.4CD+1NOX+..
*1 1.4 5 1.4 8 1.4 11 1.4 41 1.4 42 1.4 43 1.4 44 1.4 51 1.4 73 1.0 81 1.4
*LOAD COMB 9112 1.4D+1.4PO+1.4QO+1.4CT+1.4FFX-1.4FFZ+1.4AGX+1.4AGZ+1.4CD-1NOZ+..
*1 1.4 5 1.4 8 1.4 11 1.4 41 1.4 42 -1.4 43 1.4 44 1.4 51 1.4 74 -1.0 81 1.4
*LOAD COMB 9113 1.4D+1.4PO+1.4QO+1.4CT-1.4FFX+1.4FFZ+1.4AGX+1.4AGZ+1.4CD+1NOZ+..
*1 1.4 5 1.4 8 1.4 11 1.4 41 -1.4 42 1.4 43 1.4 44 1.4 51 1.4 74 1.0 81 1.4
*LOAD COMB 9114 1.4D+1.4PO+1.4QO+1.4CT-1.4FFX-1.4FFZ+1.4AGX+1.4AGZ+1.4CD-1NOX+..
*1 1.4 5 1.4 8 1.4 11 1.4 41 -1.4 42 -1.4 43 1.4 44 1.4 51 1.4 73 -1.0 81 1.4
*LOAD COMB 9211 1.2D+1.6L+0.5RL+1.2PO+1.2QO+1.2CT+1.2FFX+1.2FFZ+1.2AGX+1.2AGZ+..
*1 1.2 2 1.6 3 0.5 5 1.2 8 1.2 11 1.2 41 1.2 42 1.2 43 1.2 44 1.2 45 1.2 -
*46 1.2 47 1.2 51 1.2 52 1.6 53 1.6 54 1.6 55 1.6 73 1.0 81 1.2
*LOAD COMB 9212 1.2D+1.6L+0.5RL+1.2PO+1.2QO+1.2CT+1.2FFX-1.2FFZ+1.2AGX+1.2AGZ+..
*1 1.2 2 1.6 3 0.5 5 1.2 8 1.2 11 1.2 41 1.2 42 -1.2 43 1.2 44 1.2 45 1.2 -
*46 1.2 47 1.2 51 1.2 52 1.6 53 -1.6 54 1.6 55 1.6 74 -1.0 81 1.2
*LOAD COMB 9213 1.2D+1.6L+0.5RL+1.2PO+1.2QO+1.2CT-1.2FFX+1.2FFZ+1.2AGX+1.2AGZ+..
*1 1.2 2 1.6 3 0.5 5 1.2 8 1.2 11 1.2 41 -1.2 42 1.2 43 1.2 44 1.2 45 1.2 -
*46 1.2 47 1.2 51 1.2 52 1.6 53 1.6 54 -1.6 55 1.6 74 1.0 81 1.2
*LOAD COMB 9214 1.2D+1.6L+0.5RL+1.2PO+1.2QO+1.2CT-1.2FFX-1.2FFZ+1.2AGX+1.2AGZ+..
*1 1.2 2 1.6 3 0.5 5 1.2 8 1.2 11 1.2 41 -1.2 42 -1.2 43 1.2 44 1.2 45 1.2 -
*46 1.2 47 1.2 51 1.2 52 1.6 53 -1.6 54 -1.6 55 1.6 73 -1.0 81 1.2
*LOAD COMB 9311 1.4D+1.4PO+1.4QO+1.4CT+1.4FFX+1.4FFZ+1.4AGX+1.4AGZ+1.4CD+1NOX+..
*1 1.4 5 1.4 8 1.4 11 1.4 41 1.4 42 1.4 43 1.4 44 1.4 51 1.4 73 1.0 82 1.4
*LOAD COMB 9312 1.4D+1.4PO+1.4QO+1.4CT+1.4FFX-1.4FFZ+1.4AGX+1.4AGZ+1.4CD-1NOZ+..
*1 1.4 5 1.4 8 1.4 11 1.4 41 1.4 42 -1.4 43 1.4 44 1.4 51 1.4 74 -1.0 82 1.4
*LOAD COMB 9313 1.4D+1.4PO+1.4QO+1.4CT-1.4FFX+1.4FFZ+1.4AGX+1.4AGZ+1.4CD+1NOZ+..
*1 1.4 5 1.4 8 1.4 11 1.4 41 -1.4 42 1.4 43 1.4 44 1.4 51 1.4 74 1.0 82 1.4
*LOAD COMB 9314 1.4D+1.4PO+1.4QO+1.4CT-1.4FFX-1.4FFZ+1.4AGX+1.4AGZ+1.4CD-1NOX+..
*1 1.4 5 1.4 8 1.4 11 1.4 41 -1.4 42 -1.4 43 1.4 44 1.4 51 1.4 73 -1.0 82 1.4
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 70 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
*LOAD COMB 9411 1.2D+1.6L+0.5RL+1.2PO+1.2QO+1.2CT+1.2FFX+1.2FFZ+1.2AGX+1.2AGZ+..
*1 1.2 2 1.6 3 0.5 5 1.2 8 1.2 11 1.2 41 1.2 42 1.2 43 1.2 44 1.2 45 1.2 -
*46 1.2 47 1.2 51 1.2 52 1.6 53 1.6 54 1.6 55 1.6 73 1.0 82 1.2
*LOAD COMB 9412 1.2D+1.6L+0.5RL+1.2PO+1.2QO+1.2CT+1.2FFX-1.2FFZ+1.2AGX+1.2AGZ+..
*1 1.2 2 1.6 3 0.5 5 1.2 8 1.2 11 1.2 41 1.2 42 -1.2 43 1.2 44 1.2 45 1.2 -
*46 1.2 47 1.2 51 1.2 52 1.6 53 -1.6 54 1.6 55 1.6 74 -1.0 82 1.2
*LOAD COMB 9413 1.2D+1.6L+0.5RL+1.2PO+1.2QO+1.2CT-1.2FFX+1.2FFZ+1.2AGX+1.2AGZ+..
*1 1.2 2 1.6 3 0.5 5 1.2 8 1.2 11 1.2 41 -1.2 42 1.2 43 1.2 44 1.2 45 1.2 -
*46 1.2 47 1.2 51 1.2 52 1.6 53 1.6 54 -1.6 55 1.6 74 1.0 82 1.2
*LOAD COMB 9414 1.2D+1.6L+0.5RL+1.2PO+1.2QO+1.2CT-1.2FFX-1.2FFZ+1.2AGX+1.2AGZ+..
*1 1.2 2 1.6 3 0.5 5 1.2 8 1.2 11 1.2 41 -1.2 42 -1.2 43 1.2 44 1.2 45 1.2 -
*46 1.2 47 1.2 51 1.2 52 1.6 53 -1.6 54 -1.6 55 1.6 73 -1.0 82 1.2
LOAD COMB 2111 1.2D+1L+1.6RL+1.2PO+1.2QO+1.2CT+0.6WX+1.2AGX+1.2AGZ+1.2CD+1NOX
1 1.2 2 1.0 3 1.6 5 1.2 8 1.2 11 1.2 21 0.6 43 1.2 44 1.2 51 1.2 73 1.0
LOAD COMB 2112 1.2D+1L+1.6RL+1.2PO+1.2QO+1.2CT-0.6WX+1.2AGX+1.2AGZ+1.2CD-1NOX
1 1.2 2 1.0 3 1.6 5 1.2 8 1.2 11 1.2 21 -0.6 43 1.2 44 1.2 51 1.2 73 -1.0
LOAD COMB 2113 1.2D+1L+1.6RL+1.2PO+1.2QO+1.2CT+0.6WZ+1.2AGX+1.2AGZ+1.2CD+1NOZ
1 1.2 2 1.0 3 1.6 5 1.2 8 1.2 11 1.2 22 0.6 43 1.2 44 1.2 51 1.2 74 1.0
LOAD COMB 2114 1.2D+1L+1.6RL+1.2PO+1.2QO+1.2CT-0.6WZ+1.2AGX+1.2AGZ+1.2CD-1NOZ
1 1.2 2 1.0 3 1.6 5 1.2 8 1.2 11 1.2 22 -0.6 43 1.2 44 1.2 51 1.2 74 -1.0
LOAD COMB 2121 1.2D+1L+0.5RL+1PO+1QO+1.2CT+1WX+1AGX+1AGZ+1.2CD+1CVS+1CZ+1CX+..
1 1.2 2 1.0 3 0.5 5 1.0 8 1.0 11 1.2 21 1.0 43 1.0 44 1.0 51 1.2 52 1.0 -
53 1.0 54 1.0 55 1.0 73 1.0
LOAD COMB 2122 1.2D+1L+0.5RL+1PO+1QO+1.2CT+1WX+1AGX+1AGZ+1.2CD+1CVS-1CZ+1CX+..
1 1.2 2 1.0 3 0.5 5 1.0 8 1.0 11 1.2 21 1.0 43 1.0 44 1.0 51 1.2 52 1.0 -
53 -1.0 54 1.0 55 1.0 73 1.0
LOAD COMB 2123 1.2D+1L+0.5RL+1PO+1QO+1.2CT-1WX+1AGX+1AGZ+1.2CD+1CVS+1CZ-1CX+..
1 1.2 2 1.0 3 0.5 5 1.0 8 1.0 11 1.2 21 -1.0 43 1.0 44 1.0 51 1.2 52 1.0 -
53 1.0 54 -1.0 55 1.0 73 -1.0
LOAD COMB 2124 1.2D+1L+0.5RL+1PO+1QO+1.2CT-1WX+1AGX+1AGZ+1.2CD+1CVS-1CZ-1CX+..
1 1.2 2 1.0 3 0.5 5 1.0 8 1.0 11 1.2 21 -1.0 43 1.0 44 1.0 51 1.2 52 1.0 -
53 -1.0 54 -1.0 55 1.0 73 -1.0
LOAD COMB 2125 1.2D+1L+0.5RL+1PO+1QO+1.2CT+1WZ+1AGX+1AGZ+1.2CD+1CVS+1CZ+1CX+..
1 1.2 2 1.0 3 0.5 5 1.0 8 1.0 11 1.2 22 1.0 43 1.0 44 1.0 51 1.2 52 1.0 -
53 1.0 54 1.0 55 1.0 74 1.0
LOAD COMB 2126 1.2D+1L+0.5RL+1PO+1QO+1.2CT+1WZ+1AGX+1AGZ+1.2CD+1CVS+1CZ-1CX+..
1 1.2 2 1.0 3 0.5 5 1.0 8 1.0 11 1.2 22 1.0 43 1.0 44 1.0 51 1.2 52 1.0 -
53 1.0 54 -1.0 55 1.0 74 1.0
LOAD COMB 2127 1.2D+1L+0.5RL+1PO+1QO+1.2CT-1WZ+1AGX+1AGZ+1.2CD+1CVS-1CZ+1CX+..
1 1.2 2 1.0 3 0.5 5 1.0 8 1.0 11 1.2 22 -1.0 43 1.0 44 1.0 51 1.2 52 1.0 -
53 -1.0 54 1.0 55 1.0 74 -1.0
LOAD COMB 2128 1.2D+1L+0.5RL+1PO+1QO+1.2CT-1WZ+1AGX+1AGZ+1.2CD+1CVS-1CZ-1CX+..
1 1.2 2 1.0 3 0.5 5 1.0 8 1.0 11 1.2 22 -1.0 43 1.0 44 1.0 51 1.2 52 1.0 -
53 -1.0 54 -1.0 55 1.0 74 -1.0
LOAD COMB 2211 0.9D+0.9PE+0.9QE+0.9CT+1WX+0.9CD+1NEX
1 0.9 4 0.9 7 0.9 11 0.9 21 1.0 51 0.9 71 1.0
LOAD COMB 2212 0.9D+0.9PE+0.9QE+0.9CT-1WX+0.9CD-1NEX
1 0.9 4 0.9 7 0.9 11 0.9 21 -1.0 51 0.9 71 -1.0
LOAD COMB 2213 0.9D+0.9PE+0.9QE+0.9CT+1WZ+0.9CD+1NEZ
1 0.9 4 0.9 7 0.9 11 0.9 22 1.0 51 0.9 72 1.0
LOAD COMB 2214 0.9D+0.9PE+0.9QE+0.9CT-1WZ+0.9CD-1NEZ
1 0.9 4 0.9 7 0.9 11 0.9 22 -1.0 51 0.9 72 -1.0
LOAD COMB 2215 0.9D+0.9PO+0.9QO+0.9CT+1WX+1AGX+1AGZ+0.9CD+1NOX
1 0.9 5 0.9 8 0.9 11 0.9 21 1.0 43 1.0 44 1.0 51 0.9 73 1.0
LOAD COMB 2216 0.9D+0.9PO+0.9QO+0.9CT-1WX+1AGX+1AGZ+0.9CD-1NOX
1 0.9 5 0.9 8 0.9 11 0.9 21 -1.0 43 1.0 44 1.0 51 0.9 73 -1.0
LOAD COMB 2217 0.9D+0.9PO+0.9QO+0.9CT+1WZ+1AGX+1AGZ+0.9CD+1NOZ
1 0.9 5 0.9 8 0.9 11 0.9 22 1.0 43 1.0 44 1.0 51 0.9 74 1.0
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 71 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
LOAD COMB 2218 0.9D+0.9PO+0.9QO+0.9CT-1WZ+1AGX+1AGZ+0.9CD-1NOZ
1 0.9 5 0.9 8 0.9 11 0.9 22 -1.0 43 1.0 44 1.0 51 0.9 74 -1.0
LOAD COMB 2311 1.2D+1.6L+1.2PT+1.2QT+1.2CT+0.6WX+1.2CD+1NTX
1 1.2 2 1.6 6 1.2 9 1.2 11 1.2 21 0.6 51 1.2 75 1.0
LOAD COMB 2312 1.2D+1.6L+1.2PT+1.2QT+1.2CT-0.6WX+1.2CD-1NTX
1 1.2 2 1.6 6 1.2 9 1.2 11 1.2 21 -0.6 51 1.2 75 -1.0
LOAD COMB 2313 1.2D+1.6L+1.2PT+1.2QT+1.2CT+0.6WZ+1.2CD+1NTZ
1 1.2 2 1.6 6 1.2 9 1.2 11 1.2 22 0.6 51 1.2 76 1.0
LOAD COMB 2314 1.2D+1.6L+1.2PT+1.2QT+1.2CT-0.6WZ+1.2CD-1NTZ
1 1.2 2 1.6 6 1.2 9 1.2 11 1.2 22 -0.6 51 1.2 76 -1.0
LOAD COMB 3111 1.33D+1L+1.33PO+1.33QO+1.33CT+1EOX+0.3EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 1.0 32 0.3 43 1.2 44 1.2 51 1.33 -
73 1.0
LOAD COMB 3112 1.33D+1L+1.33PO+1.33QO+1.33CT+1EOX-0.3EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 1.0 32 -0.3 43 1.2 44 1.2 51 1.33 -
73 1.0
LOAD COMB 3113 1.33D+1L+1.33PO+1.33QO+1.33CT-1EOX+0.3EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 -1.0 32 0.3 43 1.2 44 1.2 51 1.33 -
73 -1.0
LOAD COMB 3114 1.33D+1L+1.33PO+1.33QO+1.33CT-1EOX-0.3EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 -1.0 32 -0.3 43 1.2 44 1.2 51 1.33 -
73 -1.0
LOAD COMB 3115 1.33D+1L+1.33PO+1.33QO+1.33CT+0.3EOX+1EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 0.3 32 1.0 43 1.2 44 1.2 51 1.33 -
74 1.0
LOAD COMB 3116 1.33D+1L+1.33PO+1.33QO+1.33CT-0.3EOX+1EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 -0.3 32 1.0 43 1.2 44 1.2 51 1.33 -
74 1.0
LOAD COMB 3117 1.33D+1L+1.33PO+1.33QO+1.33CT+0.3EOX-1EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 0.3 32 -1.0 43 1.2 44 1.2 51 1.33 -
74 -1.0
LOAD COMB 3118 1.33D+1L+1.33PO+1.33QO+1.33CT-0.3EOX-1EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 -0.3 32 -1.0 43 1.2 44 1.2 51 1.33 -
74 -1.0
LOAD COMB 3211 0.77D+0.77PO+0.77QO+0.77CT+1EOX+0.3EOZ+0.9AGX+0.9AGZ+0.77CD+1NOX
1 0.77 5 0.77 8 0.77 11 0.77 31 1.0 32 0.3 43 0.9 44 0.9 51 0.77 73 1.0
LOAD COMB 3212 0.77D+0.77PO+0.77QO+0.77CT+1EOX-0.3EOZ+0.9AGX+0.9AGZ+0.77CD+1NOX
1 0.77 5 0.77 8 0.77 11 0.77 31 1.0 32 -0.3 43 0.9 44 0.9 51 0.77 73 1.0
LOAD COMB 3213 0.77D+0.77PO+0.77QO+0.77CT-1EOX+0.3EOZ+0.9AGX+0.9AGZ+0.77CD-1NOX
1 0.77 5 0.77 8 0.77 11 0.77 31 -1.0 32 0.3 43 0.9 44 0.9 51 0.77 73 -1.0
LOAD COMB 3214 0.77D+0.77PO+0.77QO+0.77CT-1EOX-0.3EOZ+0.9AGX+0.9AGZ+0.77CD-1NOX
1 0.77 5 0.77 8 0.77 11 0.77 31 -1.0 32 -0.3 43 0.9 44 0.9 51 0.77 73 -1.0
LOAD COMB 3215 0.77D+0.77PO+0.77QO+0.77CT+0.3EOX+1EOZ+0.9AGX+0.9AGZ+0.77CD+1NOZ
1 0.77 5 0.77 8 0.77 11 0.77 31 0.3 32 1.0 43 0.9 44 0.9 51 0.77 74 1.0
LOAD COMB 3216 0.77D+0.77PO+0.77QO+0.77CT-0.3EOX+1EOZ+0.9AGX+0.9AGZ+0.77CD+1NOZ
1 0.77 5 0.77 8 0.77 11 0.77 31 -0.3 32 1.0 43 0.9 44 0.9 51 0.77 74 1.0
LOAD COMB 3217 0.77D+0.77PO+0.77QO+0.77CT+0.3EOX-1EOZ+0.9AGX+0.9AGZ+0.77CD-1NOZ
1 0.77 5 0.77 8 0.77 11 0.77 31 0.3 32 -1.0 43 0.9 44 0.9 51 0.77 74 -1.0
LOAD COMB 3218 0.77D+0.77PO+0.77QO+0.77CT-0.3EOX-1EOZ+0.9AGX+0.9AGZ+0.77CD-1NOZ
1 0.77 5 0.77 8 0.77 11 0.77 31 -0.3 32 -1.0 43 0.9 44 0.9 51 0.77 74 -1.0
LOAD COMB 3311 0.77D+0.77PE+0.77QE+0.77CT+1EEX+0.3EEZ+0.77CD+1NEX
1 0.77 4 0.77 7 0.77 11 0.77 34 1.0 35 0.3 51 0.77 71 1.0
LOAD COMB 3312 0.77D+0.77PE+0.77QE+0.77CT+1EEX-0.3EEZ+0.77CD+1NEX
1 0.77 4 0.77 7 0.77 11 0.77 34 1.0 35 -0.3 51 0.77 71 1.0
LOAD COMB 3313 0.77D+0.77PE+0.77QE+0.77CT-1EEX+0.3EEZ+0.77CD-1NEX
1 0.77 4 0.77 7 0.77 11 0.77 34 -1.0 35 0.3 51 0.77 71 -1.0
LOAD COMB 3314 0.77D+0.77PE+0.77QE+0.77CT-1EEX-0.3EEZ+0.77CD-1NEX
1 0.77 4 0.77 7 0.77 11 0.77 34 -1.0 35 -0.3 51 0.77 71 -1.0
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 72 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
LOAD COMB 3315 0.77D+0.77PE+0.77QE+0.77CT+0.3EEX+1EEZ+0.77CD+1NEZ
1 0.77 4 0.77 7 0.77 11 0.77 34 0.3 35 1.0 51 0.77 72 1.0
LOAD COMB 3316 0.77D+0.77PE+0.77QE+0.77CT-0.3EEX+1EEZ+0.77CD+1NEZ
1 0.77 4 0.77 7 0.77 11 0.77 34 -0.3 35 1.0 51 0.77 72 1.0
LOAD COMB 3317 0.77D+0.77PE+0.77QE+0.77CT+0.3EEX-1EEZ+0.77CD-1NEZ
1 0.77 4 0.77 7 0.77 11 0.77 34 0.3 35 -1.0 51 0.77 72 -1.0
LOAD COMB 3318 0.77D+0.77PE+0.77QE+0.77CT-0.3EEX-1EEZ+0.77CD-1NEZ
1 0.77 4 0.77 7 0.77 11 0.77 34 -0.3 35 -1.0 51 0.77 72 -1.0
*LOAD COMB 4111 1D+0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+1BLX
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 61 1.0
*LOAD COMB 4112 1D+0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+1BLX
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 61 1.0
*LOAD COMB 4113 1D+0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+1BLX
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 61 1.0
*LOAD COMB 4114 1D+0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+1BLX
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 61 1.0
*LOAD COMB 4115 1D+0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+1BLZ
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 62 1.0
*LOAD COMB 4116 1D+0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+1BLZ
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 62 1.0
*LOAD COMB 4117 1D+0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+1BLZ
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 62 1.0
*LOAD COMB 4118 1D+0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+1BLZ
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 62 1.0
LOAD COMB 5111 0.9D+0.9PE+0.9QE+1.6TB+0.9CT+0.9CD+1NEX
1 0.9 4 0.9 7 0.9 10 1.6 11 0.9 51 0.9 71 1.0
LOAD COMB 5112 0.9D+0.9PE+0.9QE+1.6TB+0.9CT+0.9CD-1NEX
1 0.9 4 0.9 7 0.9 10 1.6 11 0.9 51 0.9 71 -1.0
LOAD COMB 5113 0.9D+0.9PE+0.9QE+1.6TB+0.9CT+0.9CD+1NEZ
1 0.9 4 0.9 7 0.9 10 1.6 11 0.9 51 0.9 72 1.0
LOAD COMB 5114 0.9D+0.9PE+0.9QE+1.6TB+0.9CT+0.9CD-1NEZ
1 0.9 4 0.9 7 0.9 10 1.6 11 0.9 51 0.9 72 -1.0
LOAD COMB 5115 1.2D+1.2PE+1.2QE+1.6TB+1.2CT+1.2CD+1NEX
1 1.2 4 1.2 7 1.2 10 1.6 11 1.2 51 1.2 71 1.0
LOAD COMB 5116 1.2D+1.2PE+1.2QE+1.6TB+1.2CT+1.2CD-1NEX
1 1.2 4 1.2 7 1.2 10 1.6 11 1.2 51 1.2 71 -1.0
LOAD COMB 5117 1.2D+1.2PE+1.2QE+1.6TB+1.2CT+1.2CD+1NEZ
1 1.2 4 1.2 7 1.2 10 1.6 11 1.2 51 1.2 72 1.0
LOAD COMB 5118 1.2D+1.2PE+1.2QE+1.6TB+1.2CT+1.2CD-1NEZ
1 1.2 4 1.2 7 1.2 10 1.6 11 1.2 51 1.2 72 -1.0
LOAD COMB 7111 1.33D+1L+1.33PO+1.33QO+1.33CT+2EOX+0.9EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 2.0 32 0.9 43 1.2 44 1.2 51 1.33 -
52 1.0 53 1.0 54 1.0 55 1.0 73 1.0
LOAD COMB 7112 1.33D+1L+1.33PO+1.33QO+1.33CT+2EOX-0.9EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 2.0 32 -0.9 43 1.2 44 1.2 51 1.33 -
52 1.0 53 -1.0 54 1.0 55 1.0 73 1.0
LOAD COMB 7113 1.33D+1L+1.33PO+1.33QO+1.33CT-2EOX+0.9EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 -2.0 32 0.9 43 1.2 44 1.2 51 1.33 -
52 1.0 53 1.0 54 -1.0 55 1.0 73 -1.0
LOAD COMB 7114 1.33D+1L+1.33PO+1.33QO+1.33CT-2EOX-0.9EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 -2.0 32 -0.9 43 1.2 44 1.2 51 1.33 -
52 1.0 53 -1.0 54 -1.0 55 1.0 73 -1.0
LOAD COMB 7115 1.33D+1L+1.33PO+1.33QO+1.33CT+0.6EOX+3EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 0.6 32 3.0 43 1.2 44 1.2 51 1.33 -
52 1.0 53 1.0 54 1.0 55 1.0 74 1.0
LOAD COMB 7116 1.33D+1L+1.33PO+1.33QO+1.33CT-0.6EOX+3EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 -0.6 32 3.0 43 1.2 44 1.2 51 1.33 -
52 1.0 53 1.0 54 -1.0 55 1.0 74 1.0
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 73 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
LOAD COMB 7117 1.33D+1L+1.33PO+1.33QO+1.33CT+0.6EOX-3EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 0.6 32 -3.0 43 1.2 44 1.2 51 1.33 -
52 1.0 53 -1.0 54 1.0 55 1.0 74 -1.0
LOAD COMB 7118 1.33D+1L+1.33PO+1.33QO+1.33CT-0.6EOX-3EOZ+1.2AGX+1.2AGZ+1.33CD+.
1 1.33 2 1.0 5 1.33 8 1.33 11 1.33 31 -0.6 32 -3.0 43 1.2 44 1.2 51 1.33 -
52 1.0 53 -1.0 54 -1.0 55 1.0 74 -1.0
LOAD COMB 7211 0.77D+0.77PO+0.77QO+0.77CT+2EOX+0.9EOZ+0.9AGX+0.9AGZ+0.77CD+1NOX
1 0.77 5 0.77 8 0.77 11 0.77 31 2.0 32 0.9 43 0.9 44 0.9 51 0.77 73 1.0
LOAD COMB 7212 0.77D+0.77PO+0.77QO+0.77CT+2EOX-0.9EOZ+0.9AGX+0.9AGZ+0.77CD+1NOX
1 0.77 5 0.77 8 0.77 11 0.77 31 2.0 32 -0.9 43 0.9 44 0.9 51 0.77 73 1.0
LOAD COMB 7213 0.77D+0.77PO+0.77QO+0.77CT-2EOX+0.9EOZ+0.9AGX+0.9AGZ+0.77CD-1NOX
1 0.77 5 0.77 8 0.77 11 0.77 31 -2.0 32 0.9 43 0.9 44 0.9 51 0.77 73 -1.0
LOAD COMB 7214 0.77D+0.77PO+0.77QO+0.77CT-2EOX-0.9EOZ+0.9AGX+0.9AGZ+0.77CD-1NOX
1 0.77 5 0.77 8 0.77 11 0.77 31 -2.0 32 -0.9 43 0.9 44 0.9 51 0.77 73 -1.0
LOAD COMB 7215 0.77D+0.77PO+0.77QO+0.77CT+0.6EOX+3EOZ+0.9AGX+0.9AGZ+0.77CD+1NOZ
1 0.77 5 0.77 8 0.77 11 0.77 31 0.6 32 3.0 43 0.9 44 0.9 51 0.77 74 1.0
LOAD COMB 7216 0.77D+0.77PO+0.77QO+0.77CT-0.6EOX+3EOZ+0.9AGX+0.9AGZ+0.77CD+1NOZ
1 0.77 5 0.77 8 0.77 11 0.77 31 -0.6 32 3.0 43 0.9 44 0.9 51 0.77 74 1.0
LOAD COMB 7217 0.77D+0.77PO+0.77QO+0.77CT+0.6EOX-3EOZ+0.9AGX+0.9AGZ+0.77CD-1NOZ
1 0.77 5 0.77 8 0.77 11 0.77 31 0.6 32 -3.0 43 0.9 44 0.9 51 0.77 74 -1.0
LOAD COMB 7218 0.77D+0.77PO+0.77QO+0.77CT-0.6EOX-3EOZ+0.9AGX+0.9AGZ+0.77CD-1NOZ
1 0.77 5 0.77 8 0.77 11 0.77 31 -0.6 32 -3.0 43 0.9 44 0.9 51 0.77 74 -1.0
LOAD COMB 7311 0.77D+0.77PE+0.77QE+0.77CT+2EEX+0.9EEZ+0.77CD+1NEX
1 0.77 4 0.77 7 0.77 11 0.77 34 2.0 35 0.9 51 0.77 71 1.0
LOAD COMB 7312 0.77D+0.77PE+0.77QE+0.77CT+2EEX-0.9EEZ+0.77CD+1NEX
1 0.77 4 0.77 7 0.77 11 0.77 34 2.0 35 -0.9 51 0.77 71 1.0
LOAD COMB 7313 0.77D+0.77PE+0.77QE+0.77CT-2EEX+0.9EEZ+0.77CD-1NEX
1 0.77 4 0.77 7 0.77 11 0.77 34 -2.0 35 0.9 51 0.77 71 -1.0
LOAD COMB 7314 0.77D+0.77PE+0.77QE+0.77CT-2EEX-0.9EEZ+0.77CD-1NEX
1 0.77 4 0.77 7 0.77 11 0.77 34 -2.0 35 -0.9 51 0.77 71 -1.0
LOAD COMB 7315 0.77D+0.77PE+0.77QE+0.77CT+0.6EEX+3EEZ+0.77CD+1NEZ
1 0.77 4 0.77 7 0.77 11 0.77 34 0.6 35 3.0 51 0.77 72 1.0
LOAD COMB 7316 0.77D+0.77PE+0.77QE+0.77CT-0.6EEX+3EEZ+0.77CD+1NEZ
1 0.77 4 0.77 7 0.77 11 0.77 34 -0.6 35 3.0 51 0.77 72 1.0
LOAD COMB 7317 0.77D+0.77PE+0.77QE+0.77CT+0.6EEX-3EEZ+0.77CD-1NEZ
1 0.77 4 0.77 7 0.77 11 0.77 34 0.6 35 -3.0 51 0.77 72 -1.0
LOAD COMB 7318 0.77D+0.77PE+0.77QE+0.77CT-0.6EEX-3EEZ+0.77CD-1NEZ
1 0.77 4 0.77 7 0.77 11 0.77 34 -0.6 35 -3.0 51 0.77 72 -1.0
PERFORM ANALYSIS
CHANGE
*=====================================================================*
* LOAD COMBINATION FOR FOUNDATION STABILITY & DISPLACEMENT *
* *
*=====================================================================*
*=====================================================================*
* PERMANENT CONDITION *
*=====================================================================*
*
LOAD COMB 111 1D+1PO+1QO+1CT+1FFX+1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+0.7NOX
1 1.0 5 1.0 8 1.0 11 1.0 41 1.0 42 1.0 43 1.0 44 1.0 45 1.0 46 1.0 47 1.0 -
51 1.0 73 0.7
LOAD COMB 112 1D+1PO+1QO+1CT+1FFX-1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD-0.7NOZ
1 1.0 5 1.0 8 1.0 11 1.0 41 1.0 42 -1.0 43 1.0 44 1.0 45 1.0 46 1.0 47 1.0 -
51 1.0 74 -0.7
LOAD COMB 113 1D+1PO+1QO+1CT-1FFX+1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+0.7NOZ
1 1.0 5 1.0 8 1.0 11 1.0 41 -1.0 42 1.0 43 1.0 44 1.0 45 1.0 46 1.0 47 1.0 -
51 1.0 74 0.7
LOAD COMB 114 1D+1PO+1QO+1CT-1FFX-1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD-0.7NOX
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 74 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
1 1.0 5 1.0 8 1.0 11 1.0 41 -1.0 42 -1.0 43 1.0 44 1.0 45 1.0 46 1.0 47 1.0 -
51 1.0 73 -0.7
LOAD COMB 121 1D1L+1RL+1PO+1QO+1CT+1FFX+1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+
1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 11 1.0 41 1.0 42 1.0 43 1.0 44 1.0 45 1.0 -
46 1.0 47 1.0 51 1.0 52 1.0 53 1.0 54 1.0 55 1.0 73 0.53
LOAD COMB 122 1D1L+1RL+1PO+1QO+1CT+1FFX-1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+
1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 11 1.0 41 1.0 42 -1.0 43 1.0 44 1.0 45 1.0 -
46 1.0 47 1.0 51 1.0 52 1.0 53 -1.0 54 1.0 55 1.0 74 -0.53
LOAD COMB 123 1D1L+1RL+1PO+1QO+1CT-1FFX+1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+1CVS+
1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 11 1.0 41 -1.0 42 1.0 43 1.0 44 1.0 45 1.0 -
46 1.0 47 1.0 51 1.0 52 1.0 53 1.0 54 -1.0 55 1.0 74 0.53
LOAD COMB 124 1D1L+1RL+1PO+1QO+1CT-1FFX-1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+1CVS-
1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 11 1.0 41 -1.0 42 -1.0 43 1.0 44 1.0 45 1.0 -
46 1.0 47 1.0 51 1.0 52 1.0 53 -1.0 54 -1.0 55 1.0 73 -0.53
*LOAD COMB 911 1D+1PO+1QO+1CT+1FFX+1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+0.7NOX+1EXP
*1 1.0 5 1.0 8 1.0 11 1.0 41 1.0 42 1.0 43 1.0 44 1.0 45 1.0 46 1.0 47 1.0 -
*51 1.0 73 0.7 81 1.0
*LOAD COMB 912 1D+1PO+1QO+1CT+1FFX-1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD-0.7NOZ+1EXP
*1 1.0 5 1.0 8 1.0 11 1.0 41 1.0 42 -1.0 43 1.0 44 1.0 45 1.0 46 1.0 47 1.0 -
*51 1.0 74 -0.7 81 1.0
*LOAD COMB 913 1D+1PO+1QO+1CT-1FFX+1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+0.7NOZ+1EXP
*1 1.0 5 1.0 8 1.0 11 1.0 41 -1.0 42 1.0 43 1.0 44 1.0 45 1.0 46 1.0 47 1.0 -
*51 1.0 74 0.7 81 1.0
*LOAD COMB 914 1D+1PO+1QO+1CT-1FFX-1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD-0.7NOX+1EXP
*1 1.0 5 1.0 8 1.0 11 1.0 41 -1.0 42 -1.0 43 1.0 44 1.0 45 1.0 46 1.0 47 1.0 -
*51 1.0 73 -0.7 81 1.0
*LOAD COMB 921 1D1L+1RL+1PO+1QO+1CT+1FFX+1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+1CVS+
*1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 11 1.0 41 1.0 42 1.0 43 1.0 44 1.0 45 1.0 -
*46 1.0 47 1.0 51 1.0 52 1.0 53 1.0 54 1.0 55 1.0 73 0.53 81 1.0
*LOAD COMB 922 1D1L+1RL+1PO+1QO+1CT+1FFX-1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+1CVS-
*1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 11 1.0 41 1.0 42 -1.0 43 1.0 44 1.0 45 1.0 -
*46 1.0 47 1.0 51 1.0 52 1.0 53 -1.0 54 1.0 55 1.0 74 -0.53 81 1.0
*LOAD COMB 923 1D1L+1RL+1PO+1QO+1CT-1FFX+1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+1CVS+
*1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 11 1.0 41 -1.0 42 1.0 43 1.0 44 1.0 45 1.0 -
*46 1.0 47 1.0 51 1.0 52 1.0 53 1.0 54 -1.0 55 1.0 74 0.53 81 1.0
*LOAD COMB 924 1D1L+1RL+1PO+1QO+1CT-1FFX-1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+1CVS-
*1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 11 1.0 41 -1.0 42 -1.0 43 1.0 44 1.0 45 1.0 -
*46 1.0 47 1.0 51 1.0 52 1.0 53 -1.0 54 -1.0 55 1.0 73 -0.53 81 1.0
*LOAD COMB 931 1D+1PO+1QO+1CT+1FFX+1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+0.7NOX+1SHR
*1 1.0 5 1.0 8 1.0 11 1.0 41 1.0 42 1.0 43 1.0 44 1.0 45 1.0 46 1.0 47 1.0 -
*51 1.0 73 0.7 82 1.0
*LOAD COMB 932 1D+1PO+1QO+1CT+1FFX-1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD-0.7NOZ+1SHR
*1 1.0 5 1.0 8 1.0 11 1.0 41 1.0 42 -1.0 43 1.0 44 1.0 45 1.0 46 1.0 47 1.0 -
*51 1.0 74 -0.7 82 1.0
*LOAD COMB 933 1D+1PO+1QO+1CT-1FFX+1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+0.7NOZ+1SHR
*1 1.0 5 1.0 8 1.0 11 1.0 41 -1.0 42 1.0 43 1.0 44 1.0 45 1.0 46 1.0 47 1.0 -
*51 1.0 74 0.7 82 1.0
*LOAD COMB 934 1D+1PO+1QO+1CT-1FFX-1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD-0.7NOX+1SHR
*1 1.0 5 1.0 8 1.0 11 1.0 41 -1.0 42 -1.0 43 1.0 44 1.0 45 1.0 46 1.0 47 1.0 -
*51 1.0 73 -0.7 82 1.0
*LOAD COMB 941 1D1L+1RL+1PO+1QO+1CT+1FFX+1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+1CVS+
*1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 11 1.0 41 1.0 42 1.0 43 1.0 44 1.0 45 1.0 -
*46 1.0 47 1.0 51 1.0 52 1.0 53 1.0 54 1.0 55 1.0 73 0.53 82 1.0
*LOAD COMB 942 1D1L+1RL+1PO+1QO+1CT+1FFX-1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+1CVS-
*1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 11 1.0 41 1.0 42 -1.0 43 1.0 44 1.0 45 1.0 -
*46 1.0 47 1.0 51 1.0 52 1.0 53 -1.0 54 1.0 55 1.0 74 -0.53 82 1.0
*LOAD COMB 943 1D1L+1RL+1PO+1QO+1CT-1FFX+1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+1CVS+
*1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 11 1.0 41 -1.0 42 1.0 43 1.0 44 1.0 45 1.0 -
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 75 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
*46 1.0 47 1.0 51 1.0 52 1.0 53 1.0 54 -1.0 55 1.0 74 0.53 82 1.0
*LOAD COMB 944 1D1L+1RL+1PO+1QO+1CT-1FFX-1FFZ+1AGX+1AGZ+1FYS+1FXS+1FZS+1CD+1CVS-
*1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 11 1.0 41 -1.0 42 -1.0 43 1.0 44 1.0 45 1.0 -
*46 1.0 47 1.0 51 1.0 52 1.0 53 -1.0 54 -1.0 55 1.0 73 -0.53 82 1.0
LOAD COMB 131 1D+1PT+1CD+0.7NTX
1 1.0 6 1.0 51 1.0 75 0.7
LOAD COMB 132 1D+1QT+1CD+0.7NTZ
1 1.0 9 1.0 51 1.0 76 0.7
LOAD COMB 133 1D+1PT+1CT+1CD-0.7NTX
1 1.0 6 1.0 11 1.0 51 1.0 75 -0.7
LOAD COMB 134 1D+1QT+1CT+1CD-0.7NTZ
1 1.0 9 1.0 11 1.0 51 1.0 76 -0.7
LOAD COMB 211 1D0.75L+0.75RL+1PO+1QO+1CT+0.45WX+1AGX+1AGZ+1CD+1CVS+1CZ+1CX+1CI+
1 1.0 2 0.75 3 0.75 5 1.0 8 1.0 11 1.0 21 0.45 43 1.0 44 1.0 51 1.0 52 1.0 -
53 1.0 54 1.0 55 1.0 73 0.53
LOAD COMB 212 1D0.75L+0.75RL+1PO+1QO+1CT+0.45WX+1AGX+1AGZ+1CD+1CVS-1CZ+1CX+1CI+
1 1.0 2 0.75 3 0.75 5 1.0 8 1.0 11 1.0 21 0.45 43 1.0 44 1.0 51 1.0 52 1.0 -
53 -1.0 54 1.0 55 1.0 73 0.53
LOAD COMB 213 1D0.75L+0.75RL+1PO+1QO+1CT-0.45WX+1AGX+1AGZ+1CD+1CVS+1CZ-1CX+1CI-
1 1.0 2 0.75 3 0.75 5 1.0 8 1.0 11 1.0 21 -0.45 43 1.0 44 1.0 51 1.0 52 1.0 -
53 1.0 54 -1.0 55 1.0 73 -0.53
LOAD COMB 214 1D0.75L+0.75RL+1PO+1QO+1CT-0.45WX+1AGX+1AGZ+1CD+1CVS-1CZ-1CX+1CI-
1 1.0 2 0.75 3 0.75 5 1.0 8 1.0 11 1.0 21 -0.45 43 1.0 44 1.0 51 1.0 52 1.0 -
53 -1.0 54 -1.0 55 1.0 73 -0.53
LOAD COMB 215 1D0.75L+0.75RL+1PO+1QO+1CT+0.45WZ+1AGX+1AGZ+1CD+1CVS+1CZ+1CX+1CI+
1 1.0 2 0.75 3 0.75 5 1.0 8 1.0 11 1.0 22 0.45 43 1.0 44 1.0 51 1.0 52 1.0 -
53 1.0 54 1.0 55 1.0 74 0.53
LOAD COMB 216 1D0.75L+0.75RL+1PO+1QO+1CT+0.45WZ+1AGX+1AGZ+1CD+1CVS+1CZ-1CX+1CI+
1 1.0 2 0.75 3 0.75 5 1.0 8 1.0 11 1.0 22 0.45 43 1.0 44 1.0 51 1.0 52 1.0 -
53 1.0 54 -1.0 55 1.0 74 0.53
LOAD COMB 217 1D0.75L+0.75RL+1PO+1QO+1CT-0.45WZ+1AGX+1AGZ+1CD+1CVS-1CZ+1CX+1CI-
1 1.0 2 0.75 3 0.75 5 1.0 8 1.0 11 1.0 22 -0.45 43 1.0 44 1.0 51 1.0 52 1.0 -
53 -1.0 54 1.0 55 1.0 74 -0.53
LOAD COMB 218 1D0.75L+0.75RL+1PO+1QO+1CT-0.45WZ+1AGX+1AGZ+1CD+1CVS-1CZ-1CX+1CI-
1 1.0 2 0.75 3 0.75 5 1.0 8 1.0 11 1.0 22 -0.45 43 1.0 44 1.0 51 1.0 52 1.0 -
53 -1.0 54 -1.0 55 1.0 74 -0.53
LOAD COMB 231 0.6D+0.6PO+0.6QO+0.6CT+0.6WX+0.6AGX+0.6AGZ+0.6CD+0.7NOX
1 0.6 5 0.6 8 0.6 11 0.6 21 0.6 43 0.6 44 0.6 51 0.6 73 0.7
LOAD COMB 232 0.6D+0.6PO+0.6QO+0.6CT-0.6WX+0.6AGX+0.6AGZ+0.6CD-0.7NOX
1 0.6 5 0.6 8 0.6 11 0.6 21 -0.6 43 0.6 44 0.6 51 0.6 73 -0.7
LOAD COMB 233 0.6D+0.6PO+0.6QO+0.6CT+0.6WZ+0.6AGX+0.6AGZ+0.6CD+0.7NOZ
1 0.6 5 0.6 8 0.6 11 0.6 22 0.6 43 0.6 44 0.6 51 0.6 74 0.7
LOAD COMB 234 0.6D+0.6PO+0.6QO+0.6CT-0.6WZ+0.6AGX+0.6AGZ+0.6CD-0.7NOZ
1 0.6 5 0.6 8 0.6 11 0.6 22 -0.6 43 0.6 44 0.6 51 0.6 74 -0.7
LOAD COMB 251 0.6D+0.6PE+0.6QE+0.6CT+0.6WX+0.6CD+0.7NEX
1 0.6 4 0.6 7 0.6 11 0.6 21 0.6 51 0.6 71 0.7
LOAD COMB 252 0.6D+0.6PE+0.6QE+0.6CT-0.6WX+0.6CD-0.7NEX
1 0.6 4 0.6 7 0.6 11 0.6 21 -0.6 51 0.6 71 -0.7
LOAD COMB 253 0.6D+0.6PE+0.6QE+0.6CT+0.6WZ+0.6CD+0.7NEZ
1 0.6 4 0.6 7 0.6 11 0.6 22 0.6 51 0.6 72 0.7
LOAD COMB 254 0.6D+0.6PE+0.6QE+0.6CT-0.6WZ+0.6CD-0.7NEZ
1 0.6 4 0.6 7 0.6 11 0.6 22 -0.6 51 0.6 72 -0.7
LOAD COMB 261 1D1L+1PT+1QT+1CT+0.36WX+1CD+0.53NTX
1 1.0 2 1.0 6 1.0 9 1.0 11 1.0 21 0.36 51 1.0 75 0.53
LOAD COMB 262 1D1L+1PT+1QT+1CT-0.36WX+1CD-0.53NTX
1 1.0 2 1.0 6 1.0 9 1.0 11 1.0 21 -0.36 51 1.0 75 -0.53
LOAD COMB 263 1D1L+1PT+1QT+1CT+0.36WZ+1CD+0.53NTZ
1 1.0 2 1.0 6 1.0 9 1.0 11 1.0 22 0.36 51 1.0 76 0.53
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 76 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
LOAD COMB 264 1D1L+1PT+1QT+1CT-0.36WZ+1CD-0.53NTZ
1 1.0 2 1.0 6 1.0 9 1.0 11 1.0 22 -0.36 51 1.0 76 -0.53
LOAD COMB 311 1.09D0.75L+1.09PO+1.09QO+1.09CT+0.53EOX+0.16EOZ+1AGX+1AGZ+1CD+
1 1.09 2 0.75 5 1.09 8 1.09 11 1.09 31 0.53 32 0.16 43 1.0 44 1.0 51 1.0 -
73 0.53
LOAD COMB 312 1.09D0.75L+1.09PO+1.09QO+1.09CT+0.53EOX-0.16EOZ+1AGX+1AGZ+1CD+
1 1.09 2 0.75 5 1.09 8 1.09 11 1.09 31 0.53 32 -0.16 43 1.0 44 1.0 51 1.0 -
73 0.53
LOAD COMB 313 1.09D0.75L+1.09PO+1.09QO+1.09CT-0.53EOX+0.16EOZ+1AGX+1AGZ+1CD-
1 1.09 2 0.75 5 1.09 8 1.09 11 1.09 31 -0.53 32 0.16 43 1.0 44 1.0 51 1.0 -
73 -0.53
LOAD COMB 314 1.09D0.75L+1.09PO+1.09QO+1.09CT-0.53EOX-0.16EOZ+1AGX+1AGZ+1CD-
1 1.09 2 0.75 5 1.09 8 1.09 11 1.09 31 -0.53 32 -0.16 43 1.0 44 1.0 51 1.0 -
73 -0.53
LOAD COMB 315 1.09D0.75L+1.09PO+1.09QO+1.09CT+0.16EOX+0.53EOZ+1AGX+1AGZ+1CD+
1 1.09 2 0.75 5 1.09 8 1.09 11 1.09 31 0.16 32 0.53 43 1.0 44 1.0 51 1.0 -
74 0.53
LOAD COMB 316 1.09D0.75L+1.09PO+1.09QO+1.09CT-0.16EOX+0.53EOZ+1AGX+1AGZ+1CD+
1 1.09 2 0.75 5 1.09 8 1.09 11 1.09 31 -0.16 32 0.53 43 1.0 44 1.0 51 1.0 -
74 0.53
LOAD COMB 317 1.09D0.75L+1.09PO+1.09QO+1.09CT+0.16EOX-0.53EOZ+1AGX+1AGZ+1CD-
1 1.09 2 0.75 5 1.09 8 1.09 11 1.09 31 0.16 32 -0.53 43 1.0 44 1.0 51 1.0 -
74 -0.53
LOAD COMB 318 1.09D0.75L+1.09PO+1.09QO+1.09CT-0.16EOX-0.53EOZ+1AGX+1AGZ+1CD-
1 1.09 2 0.75 5 1.09 8 1.09 11 1.09 31 -0.16 32 -0.53 43 1.0 44 1.0 51 1.0 -
74 -0.53
LOAD COMB 321 0.9D+0.9PO+0.9QO+0.9CT+0.7EOX+0.21EOZ+0.9AGX+0.9AGZ+1CD+0.53NOX
1 0.9 5 0.9 8 0.9 11 0.9 31 0.7 32 0.21 43 0.9 44 0.9 51 1.0 73 0.53
LOAD COMB 322 0.9D+0.9PO+0.9QO+0.9CT+0.7EOX-0.21EOZ+0.9AGX+0.9AGZ+1CD+0.53NOX
1 0.9 5 0.9 8 0.9 11 0.9 31 0.7 32 -0.21 43 0.9 44 0.9 51 1.0 73 0.53
LOAD COMB 323 0.9D+0.9PO+0.9QO+0.9CT-0.7EOX+0.21EOZ+0.9AGX+0.9AGZ+1CD-0.53NOX
1 0.9 5 0.9 8 0.9 11 0.9 31 -0.7 32 0.21 43 0.9 44 0.9 51 1.0 73 -0.53
LOAD COMB 324 0.9D+0.9PO+0.9QO+0.9CT-0.7EOX-0.21EOZ+0.9AGX+0.9AGZ+1CD-0.53NOX
1 0.9 5 0.9 8 0.9 11 0.9 31 -0.7 32 -0.21 43 0.9 44 0.9 51 1.0 73 -0.53
LOAD COMB 325 0.9D+0.9PO+0.9QO+0.9CT+0.21EOX+0.7EOZ+0.9AGX+0.9AGZ+1CD+0.53NOZ
1 0.9 5 0.9 8 0.9 11 0.9 31 0.21 32 0.7 43 0.9 44 0.9 51 1.0 74 0.53
LOAD COMB 326 0.9D+0.9PO+0.9QO+0.9CT-0.21EOX+0.7EOZ+0.9AGX+0.9AGZ+1CD+0.53NOZ
1 0.9 5 0.9 8 0.9 11 0.9 31 -0.21 32 0.7 43 0.9 44 0.9 51 1.0 74 0.53
LOAD COMB 327 0.9D+0.9PO+0.9QO+0.9CT+0.21EOX-0.7EOZ+0.9AGX+0.9AGZ+1CD-0.53NOZ
1 0.9 5 0.9 8 0.9 11 0.9 31 0.21 32 -0.7 43 0.9 44 0.9 51 1.0 74 -0.53
LOAD COMB 328 0.9D+0.9PO+0.9QO+0.9CT-0.21EOX-0.7EOZ+0.9AGX+0.9AGZ+1CD-0.53NOZ
1 0.9 5 0.9 8 0.9 11 0.9 31 -0.21 32 -0.7 43 0.9 44 0.9 51 1.0 74 -0.53
LOAD COMB 331 0.9D+0.9PE+0.9QE+0.9CT+0.7EEX+0.21EEZ+1CD+0.53NEX
1 0.9 4 0.9 7 0.9 11 0.9 34 0.7 35 0.21 51 1.0 71 0.53
LOAD COMB 332 0.9D+0.9PE+0.9QE+0.9CT+0.7EEX-0.21EEZ+1CD+0.53NEX
1 0.9 4 0.9 7 0.9 11 0.9 34 0.7 35 -0.21 51 1.0 71 0.53
LOAD COMB 333 0.9D+0.9PE+0.9QE+0.9CT-0.7EEX+0.21EEZ+1CD-0.53NEX
1 0.9 4 0.9 7 0.9 11 0.9 34 -0.7 35 0.21 51 1.0 71 -0.53
LOAD COMB 334 0.9D+0.9PE+0.9QE+0.9CT-0.7EEX-0.21EEZ+1CD-0.53NEX
1 0.9 4 0.9 7 0.9 11 0.9 34 -0.7 35 -0.21 51 1.0 71 -0.53
LOAD COMB 335 0.9D+0.9PE+0.9QE+0.9CT+0.21EEX+0.7EEZ+1CD+0.53NEZ
1 0.9 4 0.9 7 0.9 11 0.9 34 0.21 35 0.7 51 1.0 72 0.53
LOAD COMB 336 0.9D+0.9PE+0.9QE+0.9CT-0.21EEX+0.7EEZ+1CD+0.53NEZ
1 0.9 4 0.9 7 0.9 11 0.9 34 -0.21 35 0.7 51 1.0 72 0.53
LOAD COMB 337 0.9D+0.9PE+0.9QE+0.9CT+0.21EEX-0.7EEZ+1CD-0.53NEZ
1 0.9 4 0.9 7 0.9 11 0.9 34 0.21 35 -0.7 51 1.0 72 -0.53
LOAD COMB 338 0.9D+0.9PE+0.9QE+0.9CT-0.21EEX-0.7EEZ+1CD-0.53NEZ
1 0.9 4 0.9 7 0.9 11 0.9 34 -0.21 35 -0.7 51 1.0 72 -0.53
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 77 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
*LOAD COMB 411 1D0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+0.7BLX
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 61 0.7
*LOAD COMB 412 1D0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+0.7BLX
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 61 0.7
*LOAD COMB 413 1D0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+0.7BLX
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 61 0.7
*LOAD COMB 414 1D0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+0.7BLX
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 61 0.7
*LOAD COMB 415 1D0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+0.7BLZ
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 62 0.7
*LOAD COMB 416 1D0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+0.7BLZ
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 62 0.7
*LOAD COMB 417 1D0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+0.7BLZ
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 62 0.7
*LOAD COMB 418 1D0.25L+1PO+1QO+1CT+1AGX+1AGZ+1CD+0.7BLZ
*1 1.0 2 0.25 5 1.0 8 1.0 11 1.0 43 1.0 44 1.0 51 1.0 62 0.7
LOAD COMB 511 1D+1PE+1QE+1TB+1CT+1CD+0.7NEX
1 1.0 4 1.0 7 1.0 10 1.0 11 1.0 51 1.0 71 0.7
LOAD COMB 512 1D+1PE+1QE+1TB+1CT+1CD-0.7NEX
1 1.0 4 1.0 7 1.0 10 1.0 11 1.0 51 1.0 71 -0.7
LOAD COMB 513 1D+1PE+1QE+1TB+1CT+1CD+0.7NEZ
1 1.0 4 1.0 7 1.0 10 1.0 11 1.0 51 1.0 72 0.7
LOAD COMB 514 1D+1PE+1QE+1TB+1CT+1CD-0.7NEZ
1 1.0 4 1.0 7 1.0 10 1.0 11 1.0 51 1.0 72 -0.7
PERFORM ANALYSIS
CHANGE
DEFINE ENVELOPE
**============BASIC LOAD COMB===============================================**
*1.STRENGTH (PERMANENT)
1111 TO 1114 1211 TO 1214 ENVELOPE 1 TYPE STRENGTH
*1111 TO 1114 1211 TO 1214 9111 TO 9114 9211 TO 9214 9311 TO 9314 9411 TO 9413 -
*9414 ENVELOPE 1 TYPE STRENGTH
**2.STRENGTH (TEMPORARY)
2111 TO 2114 2121 TO 2128 2211 TO 2218 2311 TO 2314 3111 TO 3118 3211 TO 3218 -
3311 TO 3318 5111 TO 5118 ENVELOPE 2 TYPE STRENGTH
***===========================================================================**
*3.SERVICEABILITY (PERMANENT)
111 TO 114 121 TO 124 131 TO 134 ENVELOPE 3 TYPE SERVICEABILITY
*111 TO 114 121 TO 124 131 TO 134 911 TO 914 921 TO 923 -
*924 ENVELOPE 3 TYPE SERVICEABILITY
*4.SERVICEABILITY (TEMPORARY)
211 TO 218 231 TO 234 251 TO 254 261 TO 264 311 TO 318 321 TO 328 331 TO 338 -
511 TO 514 ENVELOPE 4 TYPE SERVICEABILITY
*
**===========================================================================**
**-----LOAD COMB FOR CONNECTION CHECK---------------------------------------**
*---ENV 100 FOR SHEAR CONNECTION/H-BRACE/COLUMN POST---***
*1111 TO 1114 1211 TO 1214 -
*2111 TO 2114 2121 TO 2128 2211 TO 2218 2311 TO 2314 3111 TO 3118 3211 TO 3218 -
*3311 to 3318 5111 to 5118 9111 to 9114 9211 to 9214 9311 to 9314 -
*9411 to 9414 ENVELOPE 100 TYPE CONNECTION
**---ENV 101 FOR BASE PLATE MOMENT V-BRACE SPLICE---***
*1111 TO 1114 1211 TO 1214 -
*2111 TO 2114 2121 TO 2128 2211 TO 2218 2311 TO 2314 -
*7111 TO 7118 7211 TO 7218 7311 TO 7318 9111 to 9114 9211 to 9214 9311 to 9314 -
*9411 to 9414 ENVELOPE 101 TYPE CONNECTION
***---ENV 5 FOR ENDPLATE MOMENT, BASE PLATE MOMENT CONN---***
*1111 TO 1114 1211 TO 1214 2111 TO 2114 2121 TO 2128 2211 TO 2218 2311 TO 2314 -
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 78 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
7111 TO 7118 7211 TO 7218 7311 TO 7318 ENVELOPE 5 TYPE CONNECTION
*---ENV 6 H-BRACE---***
*1111 TO 1114 1211 TO 1214 -
*2111 TO 2114 2121 TO 2128 2211 TO 2218 2311 TO 2314 3111 TO 3118 3211 TO 3218 -
*3311 to 3318 ENVELOPE 6 TYPE CONNECTION
**===========================================================================**
*
**===========================================================================**
**===========================================================================**
END DEFINE ENVELOPE
LOAD LIST ENV 1 2
PARAMETER 1
CODE AISC UNIFIED 2016
METHOD LRFD
FU 400000 ALL
FYLD 235000 ALL
RATIO 1 ALL
MAIN 200 MEMB _H_BRACE
MAIN 200 MEMB _V_BRACE
TRACK 2 ALL
****** COLUMN PARAMETER ******
LZ 3.6 MEMB 4 10 87
LZ 2.8 MEMB 71 93
****** BEAM PARAMETER ******
*-------------------------------------------EL. 1.5 METE
LZ 1.85 MEMB 26 65 100 106
LZ 1.85 MEMB 19 23 79 105
DJ1 21 MEMB 26 65 100 106
DJ2 39 MEMB 26 65 100 106
DJ1 17 MEMB 19 23 79 105
DJ2 19 MEMB 19 23 79 105
*-------------------------------------------EL. 1.5 METE
LZ 5.25001 MEMB 11 18 25
LY 2.55 MEMB 92 107
LZ 2.55 MEMB 92 107
DJ1 19 MEMB 92 107
DJ2 63 MEMB 92 107
DJ1 9 MEMB 11 18 25
DJ2 10 MEMB 11 18 25
*-------------------------------------------EL. 3.10001 METE
LZ 1.85 MEMB 68 81 83
DJ1 41 MEMB 68 81 83
DJ2 43 MEMB 68 81 83
*-------------------------------------------EL. 3.90001 METE
LZ 3.45001 MEMB 5 33 38
LZ 3.45001 MEMB 32 35 40
LZ 3.45001 MEMB 6 34 39
LZ 1 MEMB 75 86
DJ1 8 MEMB 75 86
DJ2 49 MEMB 75 86
DJ1 5 MEMB 5 33 38
DJ2 6 MEMB 5 33 38
DJ1 24 MEMB 32 35 40
DJ2 25 MEMB 32 35 40
DJ1 7 MEMB 6 34 39
DJ2 8 MEMB 6 34 39
*-------------------------------------------EL. 3.90001 METE
LZ 5.25001 MEMB 7 55
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 79 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
LZ 5.25001 MEMB 8 31 72
LZ 2.625 MEMB 42 94
DJ1 31 MEMB 42 94
DJ2 30 MEMB 42 94
DJ1 5 MEMB 7 55
DJ2 7 MEMB 7 55
DJ1 6 MEMB 8 31 72
DJ2 8 MEMB 8 31 72
CHECK CODE ALL
STEEL TAKE OFF LIST ALL
PERFORM DIRECT ANALYSIS LRFD ITERATION 5 TAUTOL 0.01 DISPTOL 0.01 PDITER 5 -
REDUCEDEI 0
FINISH
************************************************************************
* BEAM DEFLECTION CHECK *
************************************************************************
LOAD LIST ENV 3 4
PARAMETER 2
CODE AISC UNIFIED 2016
METHOD LRFD
CAN 0 MEMB _ALL_BEAM
DFF 240 MEMB _ALL_BEAM
TRACK 2 MEMB _ALL_BEAM
RATIO 1 MEMB _ALL_BEAM
** BEAM PARAMETER **
*-------------------------------------------EL. 1.5 METE
LZ 1.85 MEMB 26 65 100
LZ 1.85 MEMB 19 23 79
DJ1 21 MEMB 26 65 100
DJ2 39 MEMB 26 65 100
DJ1 17 MEMB 19 23 79
DJ2 19 MEMB 19 23 79
*-------------------------------------------EL. 1.5 METE
LZ 5.25001 MEMB 11 18 25
LY 2.55 MEMB 92 107
LZ 2.55 MEMB 92 107
DJ1 19 MEMB 92 107
DJ2 63 MEMB 92 107
DJ1 9 MEMB 11 18 25
DJ2 10 MEMB 11 18 25
*-------------------------------------------EL. 3.10001 METE
LZ 1.85 MEMB 68 81 83
DJ1 41 MEMB 68 81 83
DJ2 43 MEMB 68 81 83
*-------------------------------------------EL. 3.90001 METE
LZ 3.45001 MEMB 5 33 38
LZ 3.45001 MEMB 32 35 40
LZ 3.45001 MEMB 6 34 39
LZ 1 MEMB 75 86
DJ1 8 MEMB 75 86
DJ2 49 MEMB 75 86
DJ1 5 MEMB 5 33 38
DJ2 6 MEMB 5 33 38
DJ1 24 MEMB 32 35 40
DJ2 25 MEMB 32 35 40
DJ1 7 MEMB 6 34 39
DJ2 8 MEMB 6 34 39
*-------------------------------------------EL. 3.90001 METE
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 80 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
LZ 5.25001 MEMB 7 55
LZ 5.25001 MEMB 8 31 72
LZ 2.625 MEMB 42 94
DJ1 31 MEMB 42 94
DJ2 30 MEMB 42 94
DJ1 5 MEMB 7 55
DJ2 7 MEMB 7 55
DJ1 6 MEMB 8 31 72
DJ2 8 MEMB 8 31 72
CHECK CODE MEMB _ALL_BEAM
FINISH

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 81 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Appendix I Support Reaction

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 82 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform

I. Support Reaction

Typical Support
Type: Pinned

Table I-1 Support Reaction for Basic Load Case


Fx Fy Fz Mx My Mz
Node Basic Load Case
kN kN kN kN.m kN.m kN.m
1 1 DEAD LOAD (D) 0.23 6.51 1.80 0.00 0.00 0.00
1 2 LIVE LOAD (L) 1.16 22.38 8.64 0.00 0.00 0.00
1 3 ROOF LIVE LOAD (RL) 0.00 0.00 0.00 0.00 0.00 0.00
1 4 PIPE EMPTY LOAD (PE) 0.00 0.00 0.00 0.00 0.00 0.00
1 5 PIPE OPERATING LOAD (PO) 0.00 0.00 0.00 0.00 0.00 0.00
1 6 PIPE TEST LOAD (PT) 0.00 0.00 0.00 0.00 0.00 0.00
1 7 EQUIP EMPTY LOAD (QE) 0.00 0.00 0.00 0.00 0.00 0.00
1 8 EQUIP OPERATING LOAD (QO) 0.00 0.00 0.00 0.00 0.00 0.00
1 9 EQUIP TEST LOAD (QT) 0.00 0.00 0.00 0.00 0.00 0.00
1 10 BUNDLE LOAD (TB) 0.00 0.00 0.00 0.00 0.00 0.00
1 11 CABLE TRAY LOAD (CT) 0.00 0.00 0.00 0.00 0.00 0.00
1 21 WIND LOAD X (+WX) -1.63 -2.60 0.04 0.00 0.00 0.00
1 22 WIND LOAD Z (+WZ) 0.07 -1.76 -1.86 0.00 0.00 0.00
1 31 SEISMIC STATIC 2/3 MCER (EXO) -1.80 -3.81 -0.05 0.00 0.00 0.00
1 32 SEISMIC STATIC 2/3 MCER (EZO) 0.16 -3.43 -2.66 0.00 0.00 0.00
1 34 SEISMIC STATIC 2/3 MCER (EXE) -1.80 -3.81 -0.05 0.00 0.00 0.00
1 35 SEISMIC STATIC 2/3 MCER (EZE) 0.16 -3.43 -2.66 0.00 0.00 0.00
1 41 FRICTION LOAD LONG-X DIR 0.00 0.00 0.00 0.00 0.00 0.00
1 42 FRICTION LOAD LONG-Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
1 43 ANCHOR/GUIDE X-DIR LOAD (AGX) 0.00 0.00 0.00 0.00 0.00 0.00
1 44 ANCHOR/GUIDE Z-DIR LOAD (AGZ) 0.00 0.00 0.00 0.00 0.00 0.00
1 45 PIPE SHORT TERM LOAD Y DIR 0.00 0.00 0.00 0.00 0.00 0.00
1 46 PIPE SHORT TERM LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
1 47 PIPE SHORT TERM LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 83 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Table I-1 Support Reaction for Basic Load Case
Fx Fy Fz Mx My Mz
Node Basic Load Case
kN kN kN kN.m kN.m kN.m
1 51 CRANE DEAD LOAD (CD) 0.00 0.00 0.00 0.00 0.00 0.00
1 52 CRANE LIFTING LIVE LOAD (CVS) 0.00 0.00 0.00 0.00 0.00 0.00
1 53 CRANE SIDE IMPACT Z-DIR (CSZ) 0.00 0.00 0.00 0.00 0.00 0.00
1 54 CRANE IMPACT X-DIR (CLX)) 0.00 0.00 0.00 0.00 0.00 0.00
1 55 CRANE VERT IMPACT (CI) 0.00 0.00 0.00 0.00 0.00 0.00
1 61 BLAST LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
1 62 BLAST LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
1 71 NOTIONAL LOAD X NX(E) -0.02 -0.04 0.00 0.00 0.00 0.00
1 72 NOTIONAL LOAD Z NZ(E) 0.00 -0.03 -0.02 0.00 0.00 0.00
1 73 NOTIONAL LOAD X NX(O) -0.08 -0.16 0.00 0.00 0.00 0.00
1 74 NOTIONAL LOAD Z NZ(O) 0.00 -0.13 -0.11 0.00 0.00 0.00
1 75 NOTIONAL LOAD X NX(T) -0.02 -0.04 0.00 0.00 0.00 0.00
1 76 NOTIONAL LOAD Z NZ(T) 0.00 -0.03 -0.02 0.00 0.00 0.00
2 1 DEAD LOAD (D) 0.32 9.44 -0.02 0.00 0.00 0.00
2 2 LIVE LOAD (L) 0.71 31.63 -0.04 0.00 0.00 0.00
2 3 ROOF LIVE LOAD (RL) 0.00 0.00 0.00 0.00 0.00 0.00
2 4 PIPE EMPTY LOAD (PE) 0.00 0.00 0.00 0.00 0.00 0.00
2 5 PIPE OPERATING LOAD (PO) 0.00 0.00 0.00 0.00 0.00 0.00
2 6 PIPE TEST LOAD (PT) 0.00 0.00 0.00 0.00 0.00 0.00
2 7 EQUIP EMPTY LOAD (QE) 0.00 0.00 0.00 0.00 0.00 0.00
2 8 EQUIP OPERATING LOAD (QO) 0.00 0.00 0.00 0.00 0.00 0.00
2 9 EQUIP TEST LOAD (QT) 0.00 0.00 0.00 0.00 0.00 0.00
2 10 BUNDLE LOAD (TB) 0.00 0.00 0.00 0.00 0.00 0.00
2 11 CABLE TRAY LOAD (CT) 0.00 0.00 0.00 0.00 0.00 0.00
2 21 WIND LOAD X (+WX) -1.48 1.66 0.21 0.00 0.00 0.00
2 22 WIND LOAD Z (+WZ) 0.75 -0.78 -0.18 0.00 0.00 0.00
2 31 SEISMIC STATIC 2/3 MCER (EXO) -1.71 2.87 0.32 0.00 0.00 0.00
2 32 SEISMIC STATIC 2/3 MCER (EZO) 1.64 -2.22 -0.30 0.00 0.00 0.00
2 34 SEISMIC STATIC 2/3 MCER (EXE) -1.71 2.87 0.32 0.00 0.00 0.00
2 35 SEISMIC STATIC 2/3 MCER (EZE) 1.64 -2.22 -0.30 0.00 0.00 0.00
2 41 FRICTION LOAD LONG-X DIR 0.00 0.00 0.00 0.00 0.00 0.00
2 42 FRICTION LOAD LONG-Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
2 43 ANCHOR/GUIDE X-DIR LOAD (AGX) 0.00 0.00 0.00 0.00 0.00 0.00
2 44 ANCHOR/GUIDE Z-DIR LOAD (AGZ) 0.00 0.00 0.00 0.00 0.00 0.00
2 45 PIPE SHORT TERM LOAD Y DIR 0.00 0.00 0.00 0.00 0.00 0.00
2 46 PIPE SHORT TERM LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
2 47 PIPE SHORT TERM LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
2 51 CRANE DEAD LOAD (CD) 0.00 0.00 0.00 0.00 0.00 0.00
2 52 CRANE LIFTING LIVE LOAD (CVS) 0.00 0.00 0.00 0.00 0.00 0.00
2 53 CRANE SIDE IMPACT Z-DIR (CSZ) 0.00 0.00 0.00 0.00 0.00 0.00
2 54 CRANE IMPACT X-DIR (CLX)) 0.00 0.00 0.00 0.00 0.00 0.00
2 55 CRANE VERT IMPACT (CI) 0.00 0.00 0.00 0.00 0.00 0.00
2 61 BLAST LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
2 62 BLAST LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
2 71 NOTIONAL LOAD X NX(E) -0.02 0.03 0.00 0.00 0.00 0.00
2 72 NOTIONAL LOAD Z NZ(E) 0.01 -0.01 0.00 0.00 0.00 0.00
2 73 NOTIONAL LOAD X NX(O) -0.07 0.13 0.01 0.00 0.00 0.00
2 74 NOTIONAL LOAD Z NZ(O) 0.05 -0.07 -0.01 0.00 0.00 0.00
2 75 NOTIONAL LOAD X NX(T) -0.02 0.03 0.00 0.00 0.00 0.00
2 76 NOTIONAL LOAD Z NZ(T) 0.01 -0.01 0.00 0.00 0.00 0.00
3 1 DEAD LOAD (D) 0.21 6.47 -1.87 0.00 0.00 0.00
3 2 LIVE LOAD (L) 1.12 22.33 -8.88 0.00 0.00 0.00
3 3 ROOF LIVE LOAD (RL) 0.00 0.00 0.00 0.00 0.00 0.00
3 4 PIPE EMPTY LOAD (PE) 0.00 0.00 0.00 0.00 0.00 0.00
3 5 PIPE OPERATING LOAD (PO) 0.00 0.00 0.00 0.00 0.00 0.00
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 84 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Table I-1 Support Reaction for Basic Load Case
Fx Fy Fz Mx My Mz
Node Basic Load Case
kN kN kN kN.m kN.m kN.m
3 6 PIPE TEST LOAD (PT) 0.00 0.00 0.00 0.00 0.00 0.00
3 7 EQUIP EMPTY LOAD (QE) 0.00 0.00 0.00 0.00 0.00 0.00
3 8 EQUIP OPERATING LOAD (QO) 0.00 0.00 0.00 0.00 0.00 0.00
3 9 EQUIP TEST LOAD (QT) 0.00 0.00 0.00 0.00 0.00 0.00
3 10 BUNDLE LOAD (TB) 0.00 0.00 0.00 0.00 0.00 0.00
3 11 CABLE TRAY LOAD (CT) 0.00 0.00 0.00 0.00 0.00 0.00
3 21 WIND LOAD X (+WX) -1.88 -3.26 0.05 0.00 0.00 0.00
3 22 WIND LOAD Z (+WZ) 0.16 2.22 -1.86 0.00 0.00 0.00
3 31 SEISMIC STATIC 2/3 MCER (EXO) -2.23 -4.61 -0.03 0.00 0.00 0.00
3 32 SEISMIC STATIC 2/3 MCER (EZO) 0.34 4.42 -2.66 0.00 0.00 0.00
3 34 SEISMIC STATIC 2/3 MCER (EXE) -2.23 -4.61 -0.03 0.00 0.00 0.00
3 35 SEISMIC STATIC 2/3 MCER (EZE) 0.34 4.42 -2.66 0.00 0.00 0.00
3 41 FRICTION LOAD LONG-X DIR 0.00 0.00 0.00 0.00 0.00 0.00
3 42 FRICTION LOAD LONG-Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
3 43 ANCHOR/GUIDE X-DIR LOAD (AGX) 0.00 0.00 0.00 0.00 0.00 0.00
3 44 ANCHOR/GUIDE Z-DIR LOAD (AGZ) 0.00 0.00 0.00 0.00 0.00 0.00
3 45 PIPE SHORT TERM LOAD Y DIR 0.00 0.00 0.00 0.00 0.00 0.00
3 46 PIPE SHORT TERM LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
3 47 PIPE SHORT TERM LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
3 51 CRANE DEAD LOAD (CD) 0.00 0.00 0.00 0.00 0.00 0.00
3 52 CRANE LIFTING LIVE LOAD (CVS) 0.00 0.00 0.00 0.00 0.00 0.00
3 53 CRANE SIDE IMPACT Z-DIR (CSZ) 0.00 0.00 0.00 0.00 0.00 0.00
3 54 CRANE IMPACT X-DIR (CLX)) 0.00 0.00 0.00 0.00 0.00 0.00
3 55 CRANE VERT IMPACT (CI) 0.00 0.00 0.00 0.00 0.00 0.00
3 61 BLAST LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
3 62 BLAST LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
3 71 NOTIONAL LOAD X NX(E) -0.02 -0.04 0.00 0.00 0.00 0.00
3 72 NOTIONAL LOAD Z NZ(E) 0.00 0.04 -0.02 0.00 0.00 0.00
3 73 NOTIONAL LOAD X NX(O) -0.10 -0.21 0.00 0.00 0.00 0.00
3 74 NOTIONAL LOAD Z NZ(O) 0.01 0.16 -0.11 0.00 0.00 0.00
3 75 NOTIONAL LOAD X NX(T) -0.02 -0.04 0.00 0.00 0.00 0.00
3 76 NOTIONAL LOAD Z NZ(T) 0.00 0.04 -0.02 0.00 0.00 0.00
4 1 DEAD LOAD (D) 0.01 11.64 -0.02 0.00 0.00 0.00
4 2 LIVE LOAD (L) -0.31 37.10 -0.07 0.00 0.00 0.00
4 3 ROOF LIVE LOAD (RL) 0.00 0.00 0.00 0.00 0.00 0.00
4 4 PIPE EMPTY LOAD (PE) 0.00 0.00 0.00 0.00 0.00 0.00
4 5 PIPE OPERATING LOAD (PO) 0.00 0.00 0.00 0.00 0.00 0.00
4 6 PIPE TEST LOAD (PT) 0.00 0.00 0.00 0.00 0.00 0.00
4 7 EQUIP EMPTY LOAD (QE) 0.00 0.00 0.00 0.00 0.00 0.00
4 8 EQUIP OPERATING LOAD (QO) 0.00 0.00 0.00 0.00 0.00 0.00
4 9 EQUIP TEST LOAD (QT) 0.00 0.00 0.00 0.00 0.00 0.00
4 10 BUNDLE LOAD (TB) 0.00 0.00 0.00 0.00 0.00 0.00
4 11 CABLE TRAY LOAD (CT) 0.00 0.00 0.00 0.00 0.00 0.00
4 21 WIND LOAD X (+WX) -1.58 2.03 0.31 0.00 0.00 0.00
4 22 WIND LOAD Z (+WZ) 0.09 0.80 -0.27 0.00 0.00 0.00
4 31 SEISMIC STATIC 2/3 MCER (EXO) -2.19 4.35 0.47 0.00 0.00 0.00
4 32 SEISMIC STATIC 2/3 MCER (EZO) 0.20 1.73 -0.38 0.00 0.00 0.00
4 34 SEISMIC STATIC 2/3 MCER (EXE) -2.19 4.35 0.47 0.00 0.00 0.00
4 35 SEISMIC STATIC 2/3 MCER (EZE) 0.20 1.73 -0.38 0.00 0.00 0.00
4 41 FRICTION LOAD LONG-X DIR 0.00 0.00 0.00 0.00 0.00 0.00
4 42 FRICTION LOAD LONG-Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
4 43 ANCHOR/GUIDE X-DIR LOAD (AGX) 0.00 0.00 0.00 0.00 0.00 0.00
4 44 ANCHOR/GUIDE Z-DIR LOAD (AGZ) 0.00 0.00 0.00 0.00 0.00 0.00
4 45 PIPE SHORT TERM LOAD Y DIR 0.00 0.00 0.00 0.00 0.00 0.00
4 46 PIPE SHORT TERM LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 85 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Table I-1 Support Reaction for Basic Load Case
Fx Fy Fz Mx My Mz
Node Basic Load Case
kN kN kN kN.m kN.m kN.m
4 47 PIPE SHORT TERM LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
4 51 CRANE DEAD LOAD (CD) 0.00 0.00 0.00 0.00 0.00 0.00
4 52 CRANE LIFTING LIVE LOAD (CVS) 0.00 0.00 0.00 0.00 0.00 0.00
4 53 CRANE SIDE IMPACT Z-DIR (CSZ) 0.00 0.00 0.00 0.00 0.00 0.00
4 54 CRANE IMPACT X-DIR (CLX)) 0.00 0.00 0.00 0.00 0.00 0.00
4 55 CRANE VERT IMPACT (CI) 0.00 0.00 0.00 0.00 0.00 0.00
4 61 BLAST LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
4 62 BLAST LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
4 71 NOTIONAL LOAD X NX(E) -0.02 0.03 0.00 0.00 0.00 0.00
4 72 NOTIONAL LOAD Z NZ(E) 0.00 0.01 0.00 0.00 0.00 0.00
4 73 NOTIONAL LOAD X NX(O) -0.08 0.15 0.02 0.00 0.00 0.00
4 74 NOTIONAL LOAD Z NZ(O) 0.01 0.05 -0.01 0.00 0.00 0.00
4 75 NOTIONAL LOAD X NX(T) -0.02 0.03 0.00 0.00 0.00 0.00
4 76 NOTIONAL LOAD Z NZ(T) 0.00 0.01 0.00 0.00 0.00 0.00
13 1 DEAD LOAD (D) -0.58 2.73 0.00 0.00 0.00 0.00
13 2 LIVE LOAD (L) -2.05 6.90 0.00 0.00 0.00 0.00
13 3 ROOF LIVE LOAD (RL) 0.00 0.00 0.00 0.00 0.00 0.00
13 4 PIPE EMPTY LOAD (PE) 0.00 0.00 0.00 0.00 0.00 0.00
13 5 PIPE OPERATING LOAD (PO) 0.00 0.00 0.00 0.00 0.00 0.00
13 6 PIPE TEST LOAD (PT) 0.00 0.00 0.00 0.00 0.00 0.00
13 7 EQUIP EMPTY LOAD (QE) 0.00 0.00 0.00 0.00 0.00 0.00
13 8 EQUIP OPERATING LOAD (QO) 0.00 0.00 0.00 0.00 0.00 0.00
13 9 EQUIP TEST LOAD (QT) 0.00 0.00 0.00 0.00 0.00 0.00
13 10 BUNDLE LOAD (TB) 0.00 0.00 0.00 0.00 0.00 0.00
13 11 CABLE TRAY LOAD (CT) 0.00 0.00 0.00 0.00 0.00 0.00
13 21 WIND LOAD X (+WX) -1.87 1.33 0.00 0.00 0.00 0.00
13 22 WIND LOAD Z (+WZ) -1.09 2.39 -0.12 0.00 0.00 0.00
13 31 SEISMIC STATIC 2/3 MCER (EXO) -1.15 0.73 0.00 0.00 0.00 0.00
13 32 SEISMIC STATIC 2/3 MCER (EZO) -2.34 4.61 0.00 0.00 0.00 0.00
13 34 SEISMIC STATIC 2/3 MCER (EXE) -1.15 0.73 0.00 0.00 0.00 0.00
13 35 SEISMIC STATIC 2/3 MCER (EZE) -2.34 4.61 0.00 0.00 0.00 0.00
13 41 FRICTION LOAD LONG-X DIR 0.00 0.00 0.00 0.00 0.00 0.00
13 42 FRICTION LOAD LONG-Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
13 43 ANCHOR/GUIDE X-DIR LOAD (AGX) 0.00 0.00 0.00 0.00 0.00 0.00
13 44 ANCHOR/GUIDE Z-DIR LOAD (AGZ) 0.00 0.00 0.00 0.00 0.00 0.00
13 45 PIPE SHORT TERM LOAD Y DIR 0.00 0.00 0.00 0.00 0.00 0.00
13 46 PIPE SHORT TERM LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
13 47 PIPE SHORT TERM LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
13 51 CRANE DEAD LOAD (CD) 0.00 0.00 0.00 0.00 0.00 0.00
13 52 CRANE LIFTING LIVE LOAD (CVS) 0.00 0.00 0.00 0.00 0.00 0.00
13 53 CRANE SIDE IMPACT Z-DIR (CSZ) 0.00 0.00 0.00 0.00 0.00 0.00
13 54 CRANE IMPACT X-DIR (CLX)) 0.00 0.00 0.00 0.00 0.00 0.00
13 55 CRANE VERT IMPACT (CI) 0.00 0.00 0.00 0.00 0.00 0.00
13 61 BLAST LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
13 62 BLAST LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
13 71 NOTIONAL LOAD X NX(E) -0.02 0.01 0.00 0.00 0.00 0.00
13 72 NOTIONAL LOAD Z NZ(E) -0.02 0.04 0.00 0.00 0.00 0.00
13 73 NOTIONAL LOAD X NX(O) -0.08 0.06 0.00 0.00 0.00 0.00
13 74 NOTIONAL LOAD Z NZ(O) -0.07 0.16 0.00 0.00 0.00 0.00
13 75 NOTIONAL LOAD X NX(T) -0.02 0.01 0.00 0.00 0.00 0.00
13 76 NOTIONAL LOAD Z NZ(T) -0.02 0.04 0.00 0.00 0.00 0.00
16 1 DEAD LOAD (D) -0.19 2.42 -0.07 0.00 0.00 0.00
16 2 LIVE LOAD (L) -0.61 4.01 -1.04 0.00 0.00 0.00
16 3 ROOF LIVE LOAD (RL) 0.00 0.00 0.00 0.00 0.00 0.00
16 4 PIPE EMPTY LOAD (PE) 0.00 0.00 0.00 0.00 0.00 0.00
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 86 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Table I-1 Support Reaction for Basic Load Case
Fx Fy Fz Mx My Mz
Node Basic Load Case
kN kN kN kN.m kN.m kN.m
16 5 PIPE OPERATING LOAD (PO) 0.00 0.00 0.00 0.00 0.00 0.00
16 6 PIPE TEST LOAD (PT) 0.00 0.00 0.00 0.00 0.00 0.00
16 7 EQUIP EMPTY LOAD (QE) 0.00 0.00 0.00 0.00 0.00 0.00
16 8 EQUIP OPERATING LOAD (QO) 0.00 0.00 0.00 0.00 0.00 0.00
16 9 EQUIP TEST LOAD (QT) 0.00 0.00 0.00 0.00 0.00 0.00
16 10 BUNDLE LOAD (TB) 0.00 0.00 0.00 0.00 0.00 0.00
16 11 CABLE TRAY LOAD (CT) 0.00 0.00 0.00 0.00 0.00 0.00
16 21 WIND LOAD X (+WX) -2.21 1.47 -0.05 0.00 0.00 0.00
16 22 WIND LOAD Z (+WZ) 0.01 -0.60 -0.28 0.00 0.00 0.00
16 31 SEISMIC STATIC 2/3 MCER (EXO) -1.91 1.21 -0.37 0.00 0.00 0.00
16 32 SEISMIC STATIC 2/3 MCER (EZO) 0.00 -1.00 -0.12 0.00 0.00 0.00
16 34 SEISMIC STATIC 2/3 MCER (EXE) -1.91 1.21 -0.37 0.00 0.00 0.00
16 35 SEISMIC STATIC 2/3 MCER (EZE) 0.00 -1.00 -0.12 0.00 0.00 0.00
16 41 FRICTION LOAD LONG-X DIR 0.00 0.00 0.00 0.00 0.00 0.00
16 42 FRICTION LOAD LONG-Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
16 43 ANCHOR/GUIDE X-DIR LOAD (AGX) 0.00 0.00 0.00 0.00 0.00 0.00
16 44 ANCHOR/GUIDE Z-DIR LOAD (AGZ) 0.00 0.00 0.00 0.00 0.00 0.00
16 45 PIPE SHORT TERM LOAD Y DIR 0.00 0.00 0.00 0.00 0.00 0.00
16 46 PIPE SHORT TERM LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
16 47 PIPE SHORT TERM LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
16 51 CRANE DEAD LOAD (CD) 0.00 0.00 0.00 0.00 0.00 0.00
16 52 CRANE LIFTING LIVE LOAD (CVS) 0.00 0.00 0.00 0.00 0.00 0.00
16 53 CRANE SIDE IMPACT Z-DIR (CSZ) 0.00 0.00 0.00 0.00 0.00 0.00
16 54 CRANE IMPACT X-DIR (CLX)) 0.00 0.00 0.00 0.00 0.00 0.00
16 55 CRANE VERT IMPACT (CI) 0.00 0.00 0.00 0.00 0.00 0.00
16 61 BLAST LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
16 62 BLAST LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
16 71 NOTIONAL LOAD X NX(E) -0.02 0.02 0.00 0.00 0.00 0.00
16 72 NOTIONAL LOAD Z NZ(E) 0.00 -0.01 0.00 0.00 0.00 0.00
16 73 NOTIONAL LOAD X NX(O) -0.09 0.06 -0.01 0.00 0.00 0.00
16 74 NOTIONAL LOAD Z NZ(O) 0.00 -0.03 0.01 0.00 0.00 0.00
16 75 NOTIONAL LOAD X NX(T) -0.02 0.02 0.00 0.00 0.00 0.00
16 76 NOTIONAL LOAD Z NZ(T) 0.00 -0.01 0.00 0.00 0.00 0.00
40 1 DEAD LOAD (D) 0.07 2.83 0.26 0.00 0.00 0.00
40 2 LIVE LOAD (L) 0.20 5.67 0.82 0.00 0.00 0.00
40 3 ROOF LIVE LOAD (RL) 0.00 0.00 0.00 0.00 0.00 0.00
40 4 PIPE EMPTY LOAD (PE) 0.00 0.00 0.00 0.00 0.00 0.00
40 5 PIPE OPERATING LOAD (PO) 0.00 0.00 0.00 0.00 0.00 0.00
40 6 PIPE TEST LOAD (PT) 0.00 0.00 0.00 0.00 0.00 0.00
40 7 EQUIP EMPTY LOAD (QE) 0.00 0.00 0.00 0.00 0.00 0.00
40 8 EQUIP OPERATING LOAD (QO) 0.00 0.00 0.00 0.00 0.00 0.00
40 9 EQUIP TEST LOAD (QT) 0.00 0.00 0.00 0.00 0.00 0.00
40 10 BUNDLE LOAD (TB) 0.00 0.00 0.00 0.00 0.00 0.00
40 11 CABLE TRAY LOAD (CT) 0.00 0.00 0.00 0.00 0.00 0.00
40 21 WIND LOAD X (+WX) -0.95 -2.61 0.00 0.00 0.00 0.00
40 22 WIND LOAD Z (+WZ) 0.04 -0.22 -0.23 0.00 0.00 0.00
40 31 SEISMIC STATIC 2/3 MCER (EXO) -1.01 -3.26 0.00 0.00 0.00 0.00
40 32 SEISMIC STATIC 2/3 MCER (EZO) 0.08 -0.30 0.00 0.00 0.00 0.00
40 34 SEISMIC STATIC 2/3 MCER (EXE) -1.01 -3.26 0.00 0.00 0.00 0.00
40 35 SEISMIC STATIC 2/3 MCER (EZE) 0.08 -0.30 0.00 0.00 0.00 0.00
40 41 FRICTION LOAD LONG-X DIR 0.00 0.00 0.00 0.00 0.00 0.00
40 42 FRICTION LOAD LONG-Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
40 43 ANCHOR/GUIDE X-DIR LOAD (AGX) 0.00 0.00 0.00 0.00 0.00 0.00
40 44 ANCHOR/GUIDE Z-DIR LOAD (AGZ) 0.00 0.00 0.00 0.00 0.00 0.00
40 45 PIPE SHORT TERM LOAD Y DIR 0.00 0.00 0.00 0.00 0.00 0.00
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 87 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Table I-1 Support Reaction for Basic Load Case
Fx Fy Fz Mx My Mz
Node Basic Load Case
kN kN kN kN.m kN.m kN.m
40 46 PIPE SHORT TERM LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
40 47 PIPE SHORT TERM LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
40 51 CRANE DEAD LOAD (CD) 0.00 0.00 0.00 0.00 0.00 0.00
40 52 CRANE LIFTING LIVE LOAD (CVS) 0.00 0.00 0.00 0.00 0.00 0.00
40 53 CRANE SIDE IMPACT Z-DIR (CSZ) 0.00 0.00 0.00 0.00 0.00 0.00
40 54 CRANE IMPACT X-DIR (CLX)) 0.00 0.00 0.00 0.00 0.00 0.00
40 55 CRANE VERT IMPACT (CI) 0.00 0.00 0.00 0.00 0.00 0.00
40 61 BLAST LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
40 62 BLAST LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
40 71 NOTIONAL LOAD X NX(E) -0.01 -0.03 0.00 0.00 0.00 0.00
40 72 NOTIONAL LOAD Z NZ(E) 0.00 0.00 0.00 0.00 0.00 0.00
40 73 NOTIONAL LOAD X NX(O) -0.03 -0.10 0.00 0.00 0.00 0.00
40 74 NOTIONAL LOAD Z NZ(O) 0.00 0.00 0.00 0.00 0.00 0.00
40 75 NOTIONAL LOAD X NX(T) -0.01 -0.03 0.00 0.00 0.00 0.00
40 76 NOTIONAL LOAD Z NZ(T) 0.00 0.00 0.00 0.00 0.00 0.00
45 1 DEAD LOAD (D) -0.07 4.30 -0.78 0.00 0.00 0.00
45 2 LIVE LOAD (L) -0.21 9.16 -1.66 0.00 0.00 0.00
45 3 ROOF LIVE LOAD (RL) 0.00 0.00 0.00 0.00 0.00 0.00
45 4 PIPE EMPTY LOAD (PE) 0.00 0.00 0.00 0.00 0.00 0.00
45 5 PIPE OPERATING LOAD (PO) 0.00 0.00 0.00 0.00 0.00 0.00
45 6 PIPE TEST LOAD (PT) 0.00 0.00 0.00 0.00 0.00 0.00
45 7 EQUIP EMPTY LOAD (QE) 0.00 0.00 0.00 0.00 0.00 0.00
45 8 EQUIP OPERATING LOAD (QO) 0.00 0.00 0.00 0.00 0.00 0.00
45 9 EQUIP TEST LOAD (QT) 0.00 0.00 0.00 0.00 0.00 0.00
45 10 BUNDLE LOAD (TB) 0.00 0.00 0.00 0.00 0.00 0.00
45 11 CABLE TRAY LOAD (CT) 0.00 0.00 0.00 0.00 0.00 0.00
45 21 WIND LOAD X (+WX) -1.05 2.25 -0.08 0.00 0.00 0.00
45 22 WIND LOAD Z (+WZ) -0.04 0.74 -0.22 0.00 0.00 0.00
45 31 SEISMIC STATIC 2/3 MCER (EXO) -0.82 2.48 -0.40 0.00 0.00 0.00
45 32 SEISMIC STATIC 2/3 MCER (EZO) -0.08 1.34 -0.13 0.00 0.00 0.00
45 34 SEISMIC STATIC 2/3 MCER (EXE) -0.82 2.48 -0.40 0.00 0.00 0.00
45 35 SEISMIC STATIC 2/3 MCER (EZE) -0.08 1.34 -0.13 0.00 0.00 0.00
45 41 FRICTION LOAD LONG-X DIR 0.00 0.00 0.00 0.00 0.00 0.00
45 42 FRICTION LOAD LONG-Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
45 43 ANCHOR/GUIDE X-DIR LOAD (AGX) 0.00 0.00 0.00 0.00 0.00 0.00
45 44 ANCHOR/GUIDE Z-DIR LOAD (AGZ) 0.00 0.00 0.00 0.00 0.00 0.00
45 45 PIPE SHORT TERM LOAD Y DIR 0.00 0.00 0.00 0.00 0.00 0.00
45 46 PIPE SHORT TERM LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
45 47 PIPE SHORT TERM LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
45 51 CRANE DEAD LOAD (CD) 0.00 0.00 0.00 0.00 0.00 0.00
45 52 CRANE LIFTING LIVE LOAD (CVS) 0.00 0.00 0.00 0.00 0.00 0.00
45 53 CRANE SIDE IMPACT Z-DIR (CSZ) 0.00 0.00 0.00 0.00 0.00 0.00
45 54 CRANE IMPACT X-DIR (CLX)) 0.00 0.00 0.00 0.00 0.00 0.00
45 55 CRANE VERT IMPACT (CI) 0.00 0.00 0.00 0.00 0.00 0.00
45 61 BLAST LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
45 62 BLAST LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
45 71 NOTIONAL LOAD X NX(E) -0.01 0.03 0.00 0.00 0.00 0.00
45 72 NOTIONAL LOAD Z NZ(E) 0.00 0.01 0.00 0.00 0.00 0.00
45 73 NOTIONAL LOAD X NX(O) -0.03 0.09 -0.01 0.00 0.00 0.00
45 74 NOTIONAL LOAD Z NZ(O) 0.00 0.04 0.01 0.00 0.00 0.00
45 75 NOTIONAL LOAD X NX(T) -0.01 0.03 0.00 0.00 0.00 0.00
45 76 NOTIONAL LOAD Z NZ(T) 0.00 0.01 0.00 0.00 0.00 0.00
72 1 DEAD LOAD (D) 0.00 0.42 -0.32 0.00 0.00 0.00
72 2 LIVE LOAD (L) 0.00 0.71 -1.13 0.00 0.00 0.00
72 3 ROOF LIVE LOAD (RL) 0.00 0.00 0.00 0.00 0.00 0.00
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 88 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Table I-1 Support Reaction for Basic Load Case
Fx Fy Fz Mx My Mz
Node Basic Load Case
kN kN kN kN.m kN.m kN.m
72 4 PIPE EMPTY LOAD (PE) 0.00 0.00 0.00 0.00 0.00 0.00
72 5 PIPE OPERATING LOAD (PO) 0.00 0.00 0.00 0.00 0.00 0.00
72 6 PIPE TEST LOAD (PT) 0.00 0.00 0.00 0.00 0.00 0.00
72 7 EQUIP EMPTY LOAD (QE) 0.00 0.00 0.00 0.00 0.00 0.00
72 8 EQUIP OPERATING LOAD (QO) 0.00 0.00 0.00 0.00 0.00 0.00
72 9 EQUIP TEST LOAD (QT) 0.00 0.00 0.00 0.00 0.00 0.00
72 10 BUNDLE LOAD (TB) 0.00 0.00 0.00 0.00 0.00 0.00
72 11 CABLE TRAY LOAD (CT) 0.00 0.00 0.00 0.00 0.00 0.00
72 21 WIND LOAD X (+WX) -0.22 0.06 0.12 0.00 0.00 0.00
72 22 WIND LOAD Z (+WZ) 0.00 -0.23 -0.46 0.00 0.00 0.00
72 31 SEISMIC STATIC 2/3 MCER (EXO) 0.00 0.00 -0.01 0.00 0.00 0.00
72 32 SEISMIC STATIC 2/3 MCER (EZO) 0.00 -0.36 -0.68 0.00 0.00 0.00
72 34 SEISMIC STATIC 2/3 MCER (EXE) 0.00 0.00 -0.01 0.00 0.00 0.00
72 35 SEISMIC STATIC 2/3 MCER (EZE) 0.00 -0.36 -0.68 0.00 0.00 0.00
72 41 FRICTION LOAD LONG-X DIR 0.00 0.00 0.00 0.00 0.00 0.00
72 42 FRICTION LOAD LONG-Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
72 43 ANCHOR/GUIDE X-DIR LOAD (AGX) 0.00 0.00 0.00 0.00 0.00 0.00
72 44 ANCHOR/GUIDE Z-DIR LOAD (AGZ) 0.00 0.00 0.00 0.00 0.00 0.00
72 45 PIPE SHORT TERM LOAD Y DIR 0.00 0.00 0.00 0.00 0.00 0.00
72 46 PIPE SHORT TERM LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
72 47 PIPE SHORT TERM LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
72 51 CRANE DEAD LOAD (CD) 0.00 0.00 0.00 0.00 0.00 0.00
72 52 CRANE LIFTING LIVE LOAD (CVS) 0.00 0.00 0.00 0.00 0.00 0.00
72 53 CRANE SIDE IMPACT Z-DIR (CSZ) 0.00 0.00 0.00 0.00 0.00 0.00
72 54 CRANE IMPACT X-DIR (CLX)) 0.00 0.00 0.00 0.00 0.00 0.00
72 55 CRANE VERT IMPACT (CI) 0.00 0.00 0.00 0.00 0.00 0.00
72 61 BLAST LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
72 62 BLAST LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
72 71 NOTIONAL LOAD X NX(E) 0.00 0.00 0.00 0.00 0.00 0.00
72 72 NOTIONAL LOAD Z NZ(E) 0.00 0.00 -0.01 0.00 0.00 0.00
72 73 NOTIONAL LOAD X NX(O) -0.01 0.00 0.00 0.00 0.00 0.00
72 74 NOTIONAL LOAD Z NZ(O) 0.00 -0.01 -0.03 0.00 0.00 0.00
72 75 NOTIONAL LOAD X NX(T) 0.00 0.00 0.00 0.00 0.00 0.00
72 76 NOTIONAL LOAD Z NZ(T) 0.00 0.00 -0.01 0.00 0.00 0.00
73 1 DEAD LOAD (D) 0.00 1.12 0.99 0.00 0.00 0.00
73 2 LIVE LOAD (L) -0.01 3.10 3.33 0.00 0.00 0.00
73 3 ROOF LIVE LOAD (RL) 0.00 0.00 0.00 0.00 0.00 0.00
73 4 PIPE EMPTY LOAD (PE) 0.00 0.00 0.00 0.00 0.00 0.00
73 5 PIPE OPERATING LOAD (PO) 0.00 0.00 0.00 0.00 0.00 0.00
73 6 PIPE TEST LOAD (PT) 0.00 0.00 0.00 0.00 0.00 0.00
73 7 EQUIP EMPTY LOAD (QE) 0.00 0.00 0.00 0.00 0.00 0.00
73 8 EQUIP OPERATING LOAD (QO) 0.00 0.00 0.00 0.00 0.00 0.00
73 9 EQUIP TEST LOAD (QT) 0.00 0.00 0.00 0.00 0.00 0.00
73 10 BUNDLE LOAD (TB) 0.00 0.00 0.00 0.00 0.00 0.00
73 11 CABLE TRAY LOAD (CT) 0.00 0.00 0.00 0.00 0.00 0.00
73 21 WIND LOAD X (+WX) -0.22 -0.33 -0.61 0.00 0.00 0.00
73 22 WIND LOAD Z (+WZ) 0.00 -2.48 -4.65 0.00 0.00 0.00
73 31 SEISMIC STATIC 2/3 MCER (EXO) 0.00 0.03 0.06 0.00 0.00 0.00
73 32 SEISMIC STATIC 2/3 MCER (EZO) 0.00 -4.65 -8.66 0.00 0.00 0.00
73 34 SEISMIC STATIC 2/3 MCER (EXE) 0.00 0.03 0.06 0.00 0.00 0.00
73 35 SEISMIC STATIC 2/3 MCER (EZE) 0.00 -4.65 -8.66 0.00 0.00 0.00
73 41 FRICTION LOAD LONG-X DIR 0.00 0.00 0.00 0.00 0.00 0.00
73 42 FRICTION LOAD LONG-Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
73 43 ANCHOR/GUIDE X-DIR LOAD (AGX) 0.00 0.00 0.00 0.00 0.00 0.00
73 44 ANCHOR/GUIDE Z-DIR LOAD (AGZ) 0.00 0.00 0.00 0.00 0.00 0.00
_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 89 of 90
CS2 ADSORPTION PLANT 2 (CAP-2) PROJECT
_________________________________________________________________________________
Calculation for Service Platform
Table I-1 Support Reaction for Basic Load Case
Fx Fy Fz Mx My Mz
Node Basic Load Case
kN kN kN kN.m kN.m kN.m
73 45 PIPE SHORT TERM LOAD Y DIR 0.00 0.00 0.00 0.00 0.00 0.00
73 46 PIPE SHORT TERM LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
73 47 PIPE SHORT TERM LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
73 51 CRANE DEAD LOAD (CD) 0.00 0.00 0.00 0.00 0.00 0.00
73 52 CRANE LIFTING LIVE LOAD (CVS) 0.00 0.00 0.00 0.00 0.00 0.00
73 53 CRANE SIDE IMPACT Z-DIR (CSZ) 0.00 0.00 0.00 0.00 0.00 0.00
73 54 CRANE IMPACT X-DIR (CLX)) 0.00 0.00 0.00 0.00 0.00 0.00
73 55 CRANE VERT IMPACT (CI) 0.00 0.00 0.00 0.00 0.00 0.00
73 61 BLAST LOAD X DIR 0.00 0.00 0.00 0.00 0.00 0.00
73 62 BLAST LOAD Z DIR 0.00 0.00 0.00 0.00 0.00 0.00
73 71 NOTIONAL LOAD X NX(E) 0.00 0.00 -0.01 0.00 0.00 0.00
73 72 NOTIONAL LOAD Z NZ(E) 0.00 -0.04 -0.08 0.00 0.00 0.00
73 73 NOTIONAL LOAD X NX(O) -0.01 -0.01 -0.02 0.00 0.00 0.00
73 74 NOTIONAL LOAD Z NZ(O) 0.00 -0.17 -0.32 0.00 0.00 0.00
73 75 NOTIONAL LOAD X NX(T) 0.00 0.00 -0.01 0.00 0.00 0.00
73 76 NOTIONAL LOAD Z NZ(T) 0.00 -0.04 -0.08 0.00 0.00 0.00

_________________________________________________________________________________________
2924-G000-135A5-CAL-0004 A-CA-2-C-CA-004
Rev. No: 0.0 Page 90 of 90

You might also like