You are on page 1of 100

REPLACEMENT OF NGBC

CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 1 of 23

CLIENT : PT SOUTH PASIFIC VISCOSE (SPV)

CONTRACT NO. : -

CONTRACTOR : PT REKAYASA ENGINEERING

LOCATION : PURWAKARTA - WEST JAVA

1 31-July-2019 Issued For Approval HH/EBR FS FS


0 25-Jun-2019 Issued For Review HH/EBR FS FS
PREPARED CHECKED APPROVED
REV. DATE DESCRIPTION
BY BY BY
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 2 of 23

REVISION HISTORICAL SHEET

Rev No Date Description


0 25-Jun-2019 Issued For Review
1 31-July-2019 Revise as per comment's client dated on 9 July 2019
Pile capacity analysis as per soil data provided on 15 July 2019
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 3 of 23

TABLE OF CONTENT

CONTENT PAGE
1. GENERAL 4
1.1 OUTLINE PROJECT AND SCOPE 4
1.2 CODE, STANDARDS, AND OTHER SPESIFICATIONS 4
1.3 DESIGN PHILOSOPHY 4
1.4 MATERIAL PROPERTIES 4
1.5 STABILITY OF PARAMETER 4

2. STRUCTURE OVERVIEW 5
2.1 GENERAL DESCRIPTION 5
2.2 DIMENSION 5
2.3 STRUCTURAL MODELLING 6
2.4 MEMBER PROPERTIES 7

3. LOADING CALCULATION 9
3.1 DEAD LOAD (D) 9
3.2 WIND LOAD (W) - refer to ASCE 7-10 10
3.3 SEISMIC LOAD (V) 12
3.4 LOAD COMBINATION (LC) 14

4. ANALYSIS RESULT 14
4.1 MAXIMUM STEEL STRUCTURE RATIO 14
4.2 HORIZONTAL DISPLACEMENT (COLUMN SWAY) 15
4.3 VERTICAL DISPLACEMENT (BEAM DEFLECTION) 16

5. CONCRETE REINFORCEMENT 16
5.1 PEDESTAL 16

6. PILE FOUNDATION ANALYSIS & DESIGN 17


6.1 PILE CAP DESIGN 17
6.2 LOADING DATA 18
6.3 PILE REACTION CHECK 18
6.4 REINFORCEMENT DESIGN FOR PILE CAP 22

ATTACHMENT
A ENGINEERING DRAWING
B SOIL DATA AND PILE CAPACITY
C STAADPRO INPUT AND OUTPUT
D BASE PLATE DESIGN
E STEEL CONNECTION
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 4 of 23 1.

1. GENERAL
1.1 OUTLINE PROJECT AND SCOPE
Facility : Pipe Rack Structure
Project : Replacement of NGBC Chimney
Location : Purwakarta, West Java
Structure : Steel Structure and Foundation

1.2 CODE, STANDARDS, AND OTHER SPESIFICATIONS


CODES & STANDARDS
a. ASCE 7-10 : Minimum Design Load for Building and Other Structure
b. SNI-03-1726-2012 : Tata Cara Perencanaan Ketahanan Gempa Untuk Bangunan Gedung
c. SNI-07-2052-2002 : Reinforcing Steel Bar
d. AISC ASD 14th 2011 : Manuals of Steel Construction
e. AISC 360-16 : Specification for Structural Steel Buildings
f. ACI 318-2014 : Building Code Requirements for Structural Concrete
g. AWS D1.1 : Structural Welding Code

PROJECT DOCUMENT REFERENCES


- A-CN-0-P-EQ-001 : Appendix 10 - Civil Design Criteria, RFQ for Piping Engineering Services of
NGBC New SRU Chimney
- A-CN-0-P-CA-101 : Piping Stress Analysis Replacement of NGBC Chimney with New Design

1.3 DESIGN PHILOSOPHY


Unit of measurement in metric units. Applied softwares in this calculation sheet are StaadPro for structural
analysis and MS Excel for other calculation. This Report covers analysis & design for steel structure and
Foundation of Pipe Rack.

1.4 MATERIAL PROPERTIES


Minimum yield strength of steel fys = 2400 kg/cm²
Unit weight of reinforcement concrete γc = 2400 kg/m³
Unit weight of Steel γsteel = 7850 kg/m³

1.5 STABILITY OF PARAMETER


> The maximum allowable vertical deflection and horizontal deflection are as follows (sect.1.2 ref.e) :
Elements Requirements
Beam/Floor of Building with Live Load L/360
Beam/Floor of Building with Dead Load + Live Load L/240
Runway Girder Top-Running CMAA Class A, B, and C Cranes L/600
Runway Girder Top-Running CMAA Class D Cranes L/800
Runway Girder Top-Running CMAA Class E & F Cranes L/1000
Runway Girder Under-Running CMAA Class A, B, and C Cranes L/450
Runway Girder Monorails L/450
where : L = Length of extent of the area to be inspected

> Maximum permissible horizontal deflection for structures and column shall be as follow :
• Equipment supporting structure, stanchion, and other structure : H/200
where : H = Height of structural column to be inspected
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 5 of 23 1.

2. STRUCTURE OVERVIEW
2.1 GENERAL DESCRIPTION
The perspective and 3D model of Steel Structure and Foundation are as follows.

Pipe Rack Perspective

2.2 DIMENSION

6.0m
6.0m

6.1m
4.1m

6.0m
5.1m

6.0m
1.8m

4.
8m
6.3m
6.3m

m
14.0
6.3m

Y
6.0m
X 5.0m Load 101
Z

Pipe Rack Dimension


REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 6 of 23 1.

2.3 STRUCTURAL MODELLING

51
95
89 52
45 96
93 90 137
87 46 138
39 94
91 88 135 141
85 119 40 136 142
31 92
86 120 127 139
32 128 48
140
123 50
117
124 118 42
33 44
83 125
81 34
25 84 126
80 82 121
78 54 26
76 79 62 122 36
74 77 61 56
72 75 60 68 38
70 73 59 67 149 28
19 71 58 66
69 57 65 151 30
53 20 64
15 55 63 148
99 150
161 97 18
163 9 100
166 101 98 153 22
167 12 155
105 5 102 24
164108 6 152
165 156
158 154
157 14
145 143 159
Y 160146 144 17
X 162 8
Z 11 Load 101
104 3
107 4

Structure Node Numbering

142 56
133 146202
274
59 201
200 143
288
140 49 199137 134 301
131 145198
272 60 284
52 136196
197 141
291 280
138 42 195 132 273 289
300
129228 194
246236
193144 139
53 286
278 285
45 135192 313 57
32 191 130229 247237 292
279 290
23224546 258
223 287 299
340 244 314 50
233 224 293
257 227 51
35
341 234
126 36 315
123 12819037 235
38 125189
188 230
127 256
1086225 187 124 342 43
105109114
175 39 231 316
102106 176122
115 10772170
65 255 44
99 103 177121
116 10471
163186
84 89
318 33
96 100
119178120
113
174 10170
164185
83 90
77
78
323 343
112
173
93 97118 98 69
165184
91
82 76 320 34
111
172
28 94117 95 68
166182
183
88
81 75 321
171 92 67
110 181
167
80 87
6116
63 29 180
86 74 317
179
85168
79 73 324
17169
64 66 319
150 1518 322
147 152269
327 26
357 363 20 149 268
267 151
332 325
368
364 367 266
153 10 22 148 329 27
358 19 155265 330
359361366369365 154 326
160 5 26421
335
338 333
360 336 328
302 294 331
303344 297 348 337 12
355 295
346 354 349 334
356362 7 14
304 296 347 353 339
Y 350 352 9
X 2
157 298
345
Z 159 4 351 Load 101

Structure Member Numbering


REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 7 of 23 1.

2.4 MEMBER PROPERTIES

Y
X
Z Load 51

Column H250x250x9x14

Y
X
Z Load 51

Beam WF350x175x7x11
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 8 of 23 1.

Y
X
Z Load 51

Beam WF250x125x6x9

Y
X
Z Load 51

Beam WF400x200x6x9
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 9 of 23 1.

Y
X
Z
Load 51

Bracing L80x80x6

Y
X
Z Load 51

Bracing L80x80x6 (double angle)


REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 10 of 23 1.

3. LOADING CALCULATION
3.1 DEAD LOAD (D)
1. Selfweight of structure is calculated automatically by Staad Pro. Using selfweight feature.

2. Maximum pipe loading data refer to pipe stress analysis report (doc.no.A-CN-0-P-CA-101)

2.1 Empty (PE)


Beam Fx Fy Fz Mx My Mz
Node
Staad (kg) (kg) (kg) (kg.m) (kg.m) (kg.m)
357 1 1051 -35 342 1600.8 -7054.2 1230.4
160 40 0 -2230 0 0 0 0
5 60 -97 -1547 -121 0 0 0
10 75 -35 -361 9 0 0 0
16 95 -14 -1501 7 0 0 0
119 97 -38 -649 -4 0 0 0
25 100 -72 -1023 -3 0 0 0
32 125 -222 -1534 3 0 0 0
42 127 197 -2265 0 0 0 0
49 130 166 -2586 0 0 0 0
56 135 0 -2271 0 0 0 0
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 11 of 23 1.

2.2 Operational (PO)


Beam Fx Fy Fz Mx My Mz
Node
Staad (kg) (kg) (kg) (kg.m) (kg.m) (kg.m)
357 1 3 -1549 107 -1442.6 32.6 79.2
160 40 0 -2230 0 0 0 0
5 60 -97 -1547 -121 0 0 0
10 75 5657 -2371 -334 0 0 0
16 95 -14 -1501 7 0 0 0
119 97 -38 -649 -4 0 0 0
25 100 0 -3944 0 0 0 0
32 125 -222 -1534 3 0 0 0
42 127 197 -2265 0 0 0 0
49 130 166 -2586 0 0 0 0
56 135 0 -4124 0 0 0 0

2.3 Test (PT)


Beam Fx Fy Fz Mx My Mz
Node
Staad (kg) (kg) (kg) (kg.m) (kg.m) (kg.m)
357 1 1164 -115 404 975.1 -7743.7 1296.5
160 40 0 -2139 0 0 0 0
5 60 -97 -1547 -121 0 0 0
10 75 -270 -2700 -5 0 0 0
16 95 14 -3031 17 0 0 0
119 97 -78 -2274 -5 0 0 0
25 100 -194 -2934 2 0 0 0
32 125 286 -4118 -1 0 0 0
42 127 197 -2265 0 0 0 0
49 130 166 -2586 0 0 0 0
56 135 0 -2271 0 0 0 0

3.2 WIND LOAD (W) - refer to ASCE 7-10


This load will be applied as joint load at each column for wind load on pipe and will be applied as
member load at beam and column for wind load on beam and column.
Velocity Pressure (qz) = 0.613*Kz*Kzt*Kd*V² sect.27.3.2
F = qz*G*Cf* b (due to structure)
F = qz*G*Cf*b*L (due to pipe)
where :
qz = velocity pressure
V = Basic wind speed = 37.5 m/s Client requirement
G = Gust Effect factor = 0.85 (due to structure)
= 0.70 (due to piping)
Exposure category = B sect.26.7
Kz = Velocity pressure exposure coefficient = 0.7 for z=9.1m table 27.3-1
Kzt = Topographic Factor = 1 sect. 26.8.2
Kd = Wind directionally Factor = 0.85 table 26.6-1
GCpi = Internal pressure coefficient = 0.55 partially enc.bldg table 26.11.1
b = Projected width of member
L = Framing spacing
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 12 of 23 1.

Table 3.3.1 Wind Z-direction (Wz) - Transversal direction - Due to Pipe


Pipe Elev qz L
No G GCpi b (m) F (kg)
(inch) (m) (kg/m²) (m)
1 24 +74.240 52.28 0.70 0.55 0.61 2.00 24.54
2 24 +74.240 52.28 0.70 0.55 0.61 2.50 30.68
3 24 +69.630 52.28 0.70 0.55 0.61 2.25 27.61

Table 3.3.2 Wind Z-direction (Wz) - Transversal direction - Due to Structure


Properties Height qz b F
No G GCpi
(mm) (m) (kg/m²) (m) (kg/m)
1 H250x250x9x14 +74.240 52.28 0.85 0.55 0.25 6.11
2 H400x200x8x13 +74.240 52.28 0.85 0.55 0.40 9.78

Table 3.3.3 Wind X-direction (Wx) - Longitudinal direction - Due to Structure


Properties Height qz b F
No G Cf
(mm) (m) (kg/m²) (m) (kg/m)
1 H250x250x9x14 +74.240 52.28 0.85 0.55 0.25 6.11
6.118 kg/m

6.118 kg/m 6.118 kg/m


6.118 kg/m
6.118 kg/m 6.118 kg/m
6.118 kg/m 6.118 kg/m
6.118 kg/m
6.118 kg/m 6.118 kg/m
6.118 kg/m 6.118 kg/m 6.118 kg/m
6.118 kg/m 6.118 kg/m
6.118 kg/m 6.118 kg/m
6.118 kg/m
6.118 kg/m 6.118 kg/m
6.118 kg/m 6.118 kg/m 6.118 kg/m
6.118 kg/m
6.118 kg/m 6.118 kg/m
6.118 kg/m 6.118 kg/m
6.118 kg/m
6.118 kg/m
6.118 kg/m 6.118 kg/m
6.118 kg/m
6.118 kg/m 6.118
6.118 kg/m
kg/m
6.118 kg/m 6.118 kg/m
6.118
6.118 kg/m
kg/m 6.118 kg/m
6.118 kg/m 6.118
6.118 kg/m
kg/m
6.118 kg/m 6.118 kg/m 6.118 kg/m
6.118 kg/m 6.118 kg/m
6.1186.118
kg/mkg/m
Y 6.118
6.118 kg/m 6.118 kg/m
kg/m 6.118 kg/m
6.118
X kg/m 6.118 kg/m
Z 6.118 kg/m
6.1186.118
kg/mkg/m Load 16
6.118 kg/m 6.118 kg/m

Wind Load X+ Direction assign

-6.118 kg/m

-6.118 kg/m -6.118 kg/m


-6.118 kg/m
-6.118 kg/m -6.118 kg/m
-6.118 kg/m -6.118 kg/m
-6.118 kg/m
-6.118 kg/m -6.118 kg/m
-6.118 k g/m -6.118 kg/m -6.118 kg/m
-6.118 kg/m -6.118 kg/m
-6.118 k g/m -6.118 kg/m
-6.118 kg/m
-6.118 kg/m -6.118 kg/m
-6.118 kg/m -6.118 k g/m -6.118 kg/m
-6.118 kg/m
-6.118 kg/m -6.118 kg/m
-6.118 kg/m -6.118 k g/m
-6.118 k g/m
-6.118 k g/m
-6.118 kg/m -6.118
-6.118 kg/m
kg/m
-6.118 kg/m -6.118
-6.118 kg/m
kg/m
-6.118 k g/m -6.118 kg/m
-6.118
-6.118 kg/m
k g/m -6.118 kg/m
-6.118 k g/m -6.118
-6.118 kg/m
k g/m
-6.118 kg/m -6.118 kg/m -6.118 kg/m
-6.118 kg/m -6.118 k g/m
-6.118
-6.118 kg/mkg/m
-6.118
-6.118 k g/m -6.118 kg/m
k g/m -6.118 kg/m
-6.118 kg/m -6.118 kg/m
-6.118 kg/m
-6.118
-6.118 kg/m kg/m
Y -6.118 k g/m -6.118 kg/m
X
Z Load 17

Wind Load X- Direction assign


REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 13 of 23 1.

24.54 k g
25.400
24.54 kkgg/m
25.400
24.54 kkg/m
g
25.400
24.54 kgkg/m
25.400
24.54 kg
k g/m
25.400
24.54 kkg/m
g
25.400
24.54 kgkg/m 6.118 k g/m
25.400
24.54
25.400 k g/m
kg
25.400
24.54 g kg/m
kkg/m 25.400 kg/m
25.400kg
24.54 k g/m 6.118 k g/m 6.118 k g/m
6.118 kg/m 6.118 kg/m
6.118 kg/m 25.400 kg/m
6.118 k g/m 6.118 k g/m
6.118 kg/m 6.118 kg/m
6.118 kg/m 6.118 kg/m
6.118 kg/m
25.400
24.54 kkg/m
g 6.118 k g/m
25.400
24.54 kgkg/m 6.118 kg/m 6.118 k g/m
25.400kkgg/m
24.54 6.118 kg/m 6.118 kg/m
25.400
24.54 kkg/m
g
25.400kg
24.54 k g/m 6.118 k g/m 6.118 kg/m
25.400 25.400
kkg/m
24.5425.400
g kg/m 6.118 kg/m
25.400 k g/mkg/mk g/m
24.5425.400
kg 6.118 kg/m
25.400kkgg/m
24.54 6.118 k g/m
25.400
24.54 kg 25.400 k g/m
kg/m 6.118 k g/m 6.118 kg/m
25.400
24.54 kg 25.400 k g/m
k g/m 6.118 k g/m
25.400 kg/m 6.118 kg/m
25.400 k g/m 6.118 k g/m 6.118 kg/m
27.61 kg 25.400
24.54 kkg/m
g 6.118 k g/m 6.118 k g/m
g 25.400
30.68 k 25.400
24.54 kg/m
kkgg/m 6.118 k g/m
27.61 kg25.400 kg/m 6.118 k g/m
6.118 k g/m 6.118
6.118 k
k g/m
g/m
25.400 k g/m 6.118
27.61 kg27.61 kg
25.400 kg/m 6.118 k g/m 6.118 k
k g/m
g/m
6.118 k g/m 6.118 k g/m
6.118
6.118 k g/m
k g/m 6.118 k g/m
6.118 kg/m 6.118
6.118 k g/m
k g/m
6.118 kg/m 6.118 k g/m 6.118 k g/m
6.118 kg/m 6.118 k g/m
6.1186.118
k g/mk g/m
6.118
6.118 kg/m 6.118 kg/m
kg/m 6.118 k g/m
6.118 kg/m 6.118 k g/m
Y 6.118 kg/m
6.118
6.118 k g/m k g/m
X 6.118 kg/m 6.118 kg/m
Z Load 18

Wind Load Z+ Direction assign

-6.118 kg/m
-24.54 kg
-6.118 kg/m -25.400 -24.54
-25.400kg
kg/m
-6.118
-24.54 kg/m
kg
kg/m
-6.118-24.54
kg/m kg
-25.400 kg/m
-6.118 kg/m -25.400 -24.54
-25.400kg
kg/m
-6.118
-24.54 kgkg/m
kg/m -6.118 kg/m
-6.118-24.54
-25.400
kg/m kg
kg/m
-6.118 kg/m -25.400 -24.54
-25.400
-25.400 kg/m -6.118 kg/m
kg
kg/m
-24.54
-6.118kg
kg/m
kg/m
-6.118-24.54
-25.400
kg/m kg
kg/m
-6.118 kg/m -6.118 kg/m
-6.118 kg/m -6.118 kg/m
-6.118 kg/m -6.118 kg/m
-6.118 kg/m
-6.118 kg/m -6.118 kg/m
-6.118 kg/m -24.54
-25.400
-6.118 kg
kg/m
kg/m -6.118 kg/m
-24.54 kg
-25.400 kg/m -6.118 kg/m
-24.54
-25.400kg
kg/m
-6.118 kg/m
-24.54
-25.400kg
kg/m-6.118 kg/m
-24.54 kg
-25.400 kg/m
-24.54
-25.400kg -25.400
-6.118
kg/m kg/m -6.118 kg/m
kg/m
-6.118 kg/m -24.54
-25.400kg -25.400 kg/m
kg/m
-6.118 kg/m -24.54 kg
-25.400 -25.400-6.118
kg/m kg/m kg/m
-6.118 kg/m
-6.118 kg/m
-24.54
-25.400kg -25.400 kg/m
kg/m
-6.118-24.54
kg/m kg
-25.400 -25.400
kg/m kg/m -6.118
-6.118 kg/m
kg/m
-25.400 kg/m
-25.400 kg/m
-6.118 kg/m -6.118 kg/m
-6.118
-6.118 kg/mkg/m
-24.54kg/m
-25.400kg
kg/m -6.118 kg/m
-25.400
-6.118-27.61
kg/m kg -24.54
-25.400 kg
kg/m
-6.118 kg/m
-6.118 kg/m -25.400-6.118
-6.118 kg/m kg/m kg/m
-25.400 kg/m -6.118
-30.68 kg kg/m
-25.400 -27.61
-6.118 kg
kg/m kg/m
-6.118
-6.118 k g/mkg/m
-27.61 kg
-27.61 kg -6.118 kg/m
-6.118
-6.118 kg/m -6.118 kg/m
kg/m -6.118 kg/m
Y -6.118 kg/m -6.118 kg/m
X -6.118 kg/m
-6.118
-6.118 k g/mkg/m
Z -6.118 kg/m -6.118 kg/m Load 19

Wind Load Z- Direction assign


REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 14 of 23 1.
3.3 SEISMIC LOAD (V)
Design respon spectra shall be follow SNI-03-1726-2012. where:
Loc = Purwakarta Lat. -6.497913°, Long.107.397665°
FA = 1.195 g Site Coefficient at short Period
Ss = 0.761 g MCE reponse spectra parameter at short period
Fv = 1.778 g Site Coefficient at 1 second
S1 = 0.311 g MCE reponse spectra parameter at 1 second
SMS = Fa x Ss = 0.909 MCE reponse spectra acceleration at short period
SM1 = Fv x S1 = 0.553 MCE reponse spectra acceleration at 1 second
Sa = SDS x (0.4 + 0.6 Tf/T0) Respon spectra acceleration for Tf < T0
Sa = SD1/Tf Respon spectra acceleration for Tf > Ts
T0 = 0.2 SD1/SDs = 0.122
Ts = SD1/SDs = 0.608
SDS = 0.607 (Site class : SD) Design respon spectra acceleration at short period
SD1 = 0.369 Design respon spectra acceleration at 1 second

Parameter to calculate structure period using empirical method shall be follow as table below:

Nilai parameter perioda pendekatan Ct, dan x

Respons Spectrum Diagram

Parameter for seismic importance factor and reduction factor shall be follow as table below:
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 15 of 23 1.
Importance Factor I = 1.25 (SNI Gempa, Table 2)
Reduction factor Rx = 4.5
Rz = 4.5

Distribution of seismic load is calculated by Staad Pro, using


auto seismic function of IBC 2003 that included in the software
with the following seismic parameters.

SDS . I
Cs =
R
So, Cs value for seismic calculation
dir value
Csx x 0.169
Csz z 0.169
IBC 2003 Seismic Parameters Input

38.07 kg
38.07 kg
40.71 kg
38.07
12.59 kg 40.71 kg 41.24 kg
38.07 kg kg 36.82 kg
40.71
12.59
34.46 kg 40.71 kg kg
kg 30.49 kg
34.46 kg 41.24 kg 11.12 kg
37.10 kg 36.82 kg 34.11 kg
37.10 kg 33.57 kg 9.76 kg
44.33 kg
39.86 kg 37.43 kg 12.47 kg
32.88 kg 11.05 kg
44.33 kg
39.86 kg 36.66 kg
25.20 kg 27.26 kg
41.08 kg
25.20 kg
29.45 kg 26.94 26.94 kg 24.52 kg5.72 kg
20.19 kg15.65 43.11 kg
kg
17.06 kg16.69 kgkgkg 27.26 kg
25.96
26.97 6.46 kg
17.70 kg kg 24.52 kg 5.72 kg
20.19 kg 17.38 kgkg
18.81 27.12
18.72
14.63 kgkg
17.86 kg 16.16 kg 6.46 kg
16.69
17.70 kg 18.91 kg
kg17.70 21.85 kg
15.65
21.35 kg14.63
kg kg kg 19.61 kg
18.65 kg18.72 kg 9.81 kg
73.32 kg 17.12 kg
23.85 kg 10.93 kg
75.07 19.60
kg kg 23.88 kg
22.37 20.96 kg 17.59 kg
19.37 kg kg 23.81kg
35.45 kg 15.73 kg
34.34 7.86 kg
16.74 kg 26.88 kgkg
20.33 kg 8.79 kg
21.64
15.77 kg kg
19.85
15.77 kg kg
16.74
21.64kgkg
Y 20.33 kg 19.85 kg
X
Z Load 51

Seismic Load X+ Direction assign

-38.07
-38.07 kg -
-38.07 kg -40.71 k g
-41.24
-40.71 kg kg
-34.46 kg
-34.46 k g -37.10 -44.33
kg kg -36.82 k
-37.10 kg
-12.59 k g
-44.33 kg -39.86 kg-33.57-37.43
kg
k
-12.59 kg -148.18 k g
-181.47-39.86
kg -32.88 k g
kg -175.54
-11.12 kkg
g
-179.38 k g -146.44
-36.66 k gk g -9.76
-176.90 k
-41.08 k g kg
-43.11 k g-12.47 k g
-25.20kkgg
-73.32 -179.36 kg k g
-27.26
-25.20 kg
-29.45 k g -75.07 -177.27 kg -11.05 k g
-26.94kkgg -24.52 kg
-26.94 k-27.26
g kg
-26.97 k gk g
-25.96
-20.19 k g -130.82 kgk g
-27.12 -24.52 k g
kg-15.65
-17.06-17.70 k gkg
kg
-20.19 k g-17.38
-16.69
k g kg -18.72
-18.81 k g -131.07 kg -5.72 kg
-14.63 -21.85 kg
-17.86 kg-16.16 k g -18.91
-17.70 k
-16.69 gk g kgk g -6.46 kg
-15.65 -21.35
kg k g
-17.70 kg -5.72
-19.61 kgkg
-18.65 kg -14.63
-18.72 k gkg -6.46 k g
-23.85 kg
-17.12
-35.45 kg kg k g
-23.88 -9.81 kg
-19.60 k g -10.93 k g
-22.37 kg -34.34
-20.96 kg kgk g
-23.81 k g -17.59
-19.37 kg -26.88 k g -15.73 k g
-16.74
-20.33 kg k g -21.64 kg
-7.86 k g
-15.77
-21.64 k g kg -19.85 k g-8.79 k g
-16.74
-20.33 kg k g-19.85
-15.77 kg
kg

Y
X
Z Load 53

Seismic Load X- Direction assign


REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 16 of 23 1.

90 kg 148.18 k g 40.71 k g g
38.07 kg
146.44 kg 38.07 kg40.71 kgkg 36.82 kg
40.71 k41.24
g
34.46 kg
44.33
37.10 kg
34.46 kg kg 36.82 k g 30.49 kg
34.11 kg
37.10 kg
44.33 kg 39.86 kg 33.57 kg
37.43 kg
12.59 kg
39.86 kg 32.88 k gkg
12.59
73.32 kg 41.08 kg 36.66 kg
43.11 kg 11.12 k g
75.07 k g
9.76 kg
25.20 kg 27.26 kg 12.47 kg
25.20 kg
29.45 kg 26.94 kg
26.94 kg 24.52 kg 11.05 kg
26.97 kg kg
25.96 27.26 kg
20.19 kg 27.12 kg 24.52 kg
17.0617.70
k g 15.65 kg
k g kg kg
16.69
20.19 kg 17.38 kgkg 18.72
18.81 21.85 k g 5.72 kg
17.86 kg 16.16 kg 14.63 kg
17.70
21.35 16.69
kg k g 18.91
kg17.70 k g
kg
19.61 kg 6.46 kg
18.65
23.85 kg 15.65 k g
kg 5.72 kg
35.45 kg 14.63 kg
18.72 kg
23.88
17.12kgkg 6.46 kg
34.34 kg
19.60 kg 9.81 kg
22.37 kg 23.81 kg 20.96 kg17.59 kg 10.93 kg
19.37 kg 26.88 kg
15.73 kg
16.74 kg
20.33 kg 21.64 kg
7.86 kg
21.64 kg15.77 kg19.85 kg 8.79 kg
16.74
20.33 kg kg
19.85 kg15.77 kg

Y
X
Z Load 52

Seismic Load Z+ Direction assign

-38.07 kg
-12.59 kg -38.07 kg
-12.59 kg -38.07 kg -40.71
-41.2
-40.71 kg
-38.07 kg -30.49-36
-11.12 kg k
-34.46 kg -40.71 kg-9.76 kg
-34.46 kg -41.24 kg
-40.71 kg -34.
-37.10 kg-12.47 kg -36.82 kg
-37.10 kg -33.57 kg
-44.33 -11.05
kg kg
-37.43 kg
-32.88-39.86
kg kg
-25.20 kg -44.33
-39.86
kg
kg -36.66 kg
-25.20 kg -5.72 kg-27.26 kg
-26.94 kg
-41.08-6.46
kg kg -24.52 kg
kg -15.65
-17.06-20.19 kg kg -29.45 kg -26.94kgkg
-16.69
-17.70 kgkg -26.97-25.96-5.72
kg kg -27.26 kg-43.11 kg
-17.38 kg
-14.63
-18.81 kg -18.72
kg kg -24.52
-6.46 kg kg
-16.16
-17.86-20.19
kg kg kg -27.12 kg
-16.69
kgkg -18.91 kg -21.85 kg
-15.65-17.70
kg
-14.63-17.70
kg kg -19.61 kg
-18.65 kg-21.35 kg -9.81 kg
-17.12-18.72
kg kg -10.93 kg
-23.85 kg
-19.60 kg -23.88 kg
-17.59 kg
-19.37-22.37
kg kg -20.96 kg-15.73 kg
-23.81 kg -7.86 kg -73.32 kg
-16.74 kg -35.45 kg-8.79 kg
-26.88 kg-34.34 kg -75.07 kg
-20.33 kg -15.77 kg-21.64 kg
-16.74-21.64
kg -19.85
-15.77 kg kg
Y kg
X -20.33 kg -19.85 kg
Z Load 54

Seismic Load Z- Direction assign


REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 17 of 23 1.
3.4 LOAD COMBINATION (LC)
The critical load combination for stability check and soil bearing check shall be consideres as follows:
LC for Soil and Steel Structure
No LC Load Combination Notes:
100 1D D = Dead Load
101 1D+1PO PO = Load of pipe in operation condition
102 1D+1PT PT = Load of pipe in test condition
103 1D+1PE PE = Load of pipe in empty condition
104 1D+1PO+1WX+ WX = Wind load in X direction
105 1D+1PO+1WX- WZ = Wind load in Z direction
106 1D+1PO+1WZ+ VX = Seismic load in X direction
107 1D+1PO+1WZ- VZ = Seismic load in Z direction
108 1D+1PO+0.7VX
109 1D+1PO+0.7VZ
110 1D+1PO+-0.7VX
111 1D+1PO+-0.7VZ
112 0.9D+0.6PO+0.7VX
113 0.9D+0.6PO+0.7VZ
114 0.9D+0.6PO+-0.7VX
115 0.9D+0.6PO+-0.7VZ
116 1D+1PT+1WX+
117 1D+1PT+1WX-
118 1D+1PT+1WZ+
119 1D+1PT+1WZ-
120 1D+1PT+0.7VX
121 1D+1PT+0.7VZ
122 D+1PT+-0.7VX
123 D+1PT+-0.7VZ
124 1D+1PS+1WX+
125 1D+1PS+1WX-
126 1D+1PS+1WZ+
127 1D+1PS+1WZ-

4. ANALYSIS RESULT
4.1 MAXIMUM STEEL STRUCTURE RATIO
Steel stress ratio summary from staad pro as follow : ( Steel Ratio < 1 --> Safe )
No Property Memb. LC Max Ratio Status
1 WF400x200x8x13 357 114 0.853 OK
2 WF350x175x7x11 364 112 0.270 OK
3 WF250x125x6x9 122 112 0.530 OK
4 H250x250x9x14 27 112 0.222 OK
5 Brac.L80x80x6 368 114 0.670 OK
6 Brac.L80x80x6 double 352 113 0.239 OK
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 18 of 23 1.

0.0252
0.264
0.0272 0.023
0.0944
0.00415
0.0256 0.00791
0.00827 0.0266
0.0275
0.209 0.0285 0.335
0.00443
0.0398 0.104
0.0293 0.061
0.067
0.00503 0.0275 0.00972
0.0274 0.0203
0.0194 0.0289
0.306 0.114
0.0844 0.00403
0.0164 0.0303 0.086 0.549
0.0716 0.1810.0286
0.0149 0.00874 0.118
0.0713 0.126
0.00391
0.59
0.0125
0.0152 0.085 0.101 0.00519
0.0801
0.004460.07260.206 0.499 0.178
0.0516
0.145 0.0714 0.136
0.59 0.106 0.408
0.115 0.08
0.555 0.00733 0.00468 0.215
0.22 0.562 0.142
0.12 0.345 0.164
0.00818 0.146 0.555
0.127 0.00377 0.198
0.281 0.0891
0.13 0.417
WF250X125 0.0285
0.0267
0.0276
0.0431 0.0989
0.0269 0.0047
0.0136
0.0279 0.076
0.0275 0.00419
WF350X175 0.206 0.00386
0.0299 0.0291 0.443
0.145
0.0269
0.0281 0.0848 0.205
0.232 0.364
0.2250.231
0.53 0.476
0.205 0.143
0.0673
0.00395 0.087
0.0409 0.197
0.0491
0.146 0.00397 0.207
0.222 0.08050.153
0.0244 0.2250.043
0.367
0.00672
0.226 0.194
WF400X200 0.0174
0.0125
0.0655 0.0243
0.150.205
0.235
0.236 0.143 0.158
0.0881
0.232
0.0893
0.257 0.00462
0.0678
0.0122
0.08290.156 0.363 0.518
0.167 0.147
0.104
0.00396 0.185
0.0737 0.223
0.0197
0.0179 0.173 0.2
0.0874 0.206
0.1150.168
0.24 0.0532
0.0536
0.0190.0703
0.0896 0.15
0.128
0.00405
0.0825
0.1610.0119
0.148 0.187 0.00477
0.237
0.1650.0976
0.112 0.0048
0.104
0.168 0.0976
0.0402 0.0269
0.0942 0.203
0.00544
0.128 0.526
0.1670.0439
0.239 0.0844
L80X80 0.0462
0.167
0.0405 0.0948
0.17 0.0553
0.168 0.00587
0.0493
0.1640.294
0.0939 0.186
0.8530.185 0.0969 0.0323
0.0409 0.171
0.67
0.27 0.02470.0137 0.165 0.311
0.00636
0.148 0.0965
0.323
0.222
0.00583
0.07250.149 0.0249 0.0469 0.0979 0.00485
0.146 0.0869 0.00455
0.0269
0.117 0.1450.163 0.0484
0.125 0.0135 0.0794
0.467
H250X250
0.0271 0.269 0.0788
0.00446 0.142
0.16 0.16 0.00629
0.0695
0.128 0.169 0.01020.00378 0.135
0.103
0.0666 0.158
0.03030.00301 0.263
0.15 0.0157
0.0181 0.156
0.00491 0.00448 0.187
0.0294 0.409
0.186 0.143
0.239
0.15 0.16
0.23
0.146 0.2510.236
0.159 Load 101
Y L80x80 
X
Z (double)

Steel Ratio

4.2 HORIZONTAL DISPLACEMENT (COLUMN SWAY)


Displacement summary from staad
Hor. Ver. Hor. Rotation
Force Resultant
Node L/C X Y Z rX rY rZ
Max
(mm) (mm) (mm) (mm) (rad) (rad) (rad)
Max X 51 113 10.45 -0.08 -0.66 10.469 0.000 0.001 -0.003
Min X 52 149 -9.76 -0.04 -0.26 9.767 0.000 0.000 0.002
Max Y 91 112 10.37 0.08 1.46 10.467 0.000 0.000 0.000
Min Y 59 158 0.45 -6.01 -0.36 6.039 0.000 0.000 0.000
Max Z 163 112 -0.54 -0.08 6.00 6.021 0.001 -0.001 0.000
Min Z 105 126 -0.08 -0.02 -1.77 1.770 0.000 0.000 0.000
Max rX 146 112 0.39 0.02 2.73 2.760 0.001 0.000 0.000
Min rX 98 113 6.26 -0.64 -0.38 6.304 -0.001 0.000 0.000
Max rY 51 112 10.41 0.00 1.19 10.474 0.000 0.001 -0.003
Min rY 52 114 4.54 -0.02 -0.66 4.584 0.000 -0.001 -0.001
Max rZ 52 149 -9.76 -0.04 -0.26 9.767 0.000 0.000 0.002
Min rZ 51 113 10.45 -0.08 -0.66 10.469 0.000 0.001 -0.003
Max Rst 88 112 10.43 -0.57 1.39 10.534 0.000 0.000 0.000
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 19 of 23 1.
Allowable sway caused by seismic load is H/200
Displacement Elev. Allow
Displ. Node L/C Horiz Vertic. Horiz Result H Sway Check
X mm Y mm Z mm mm mm
Max X 51 113 10.447 -0.082 -0.662 10.469 6640 33.20 OK
Min X 52 149 -9.763 -0.037 -0.257 9.767 9240 46.20 OK
Max Z 163 112 -0.535 -0.078 5.996 6.021 8100 40.50 OK
Min Z 105 158 -0.078 -0.022 -1.769 1.770 9240 46.20 OK

4.3 VERTICAL DISPLACEMENT (BEAM DEFLECTION)


Allowable deflection for beam is L/240
Length (L) Deflection All. deflection
TYPE Beam L/C STATUS
mm (Δ) mm (Δall) mm
WF400x200x8x13 357 112 2000 0.87 8.3 OK
WF350x175x7x11 56 114 2000 0.63 8.3 OK
WF250x125x6x9 122 114 2000 1.99 8.3 OK

5. CONCRETE REINFORCEMENT
5.1 PEDESTAL
Max. Reinf. Req. Reinf. Used
Col L/C** Di
Force Main Ties n Area Ties Check
a
m
- No - mm2 Dia Spa As - mm2 Dia Spa As
m
Max Fx 13 340 1513 16 256 1570.8 8 16 1608.495 13 150 1769.76 OK
Min Fx 30 341 1513 16 256 1570.8 8 16 1608.495 13 150 1769.76 OK
Max Fy 55 336 1513 16 256 1570.8 8 16 1608.495 13 150 1769.76 OK
Min Fy 48 309 1513 16 256 1570.8 8 16 1608.495 13 150 1769.76 OK
Max Fz 11 360 1513 16 256 1570.8 8 16 1608.495 13 150 1769.76 OK
Min Fz 13 359 1513 16 256 1570.8 8 16 1608.495 13 150 1769.76 OK
Max Mx 24 360 1513 16 256 1570.8 8 16 1608.495 13 150 1769.76 OK
Min Mx 23 359 1513 16 256 1570.8 8 16 1608.495 13 150 1769.76 OK
Max My 13 359 1513 16 256 1570.8 8 16 1608.495 13 150 1769.76 OK
Min My 11 360 1513 16 256 1570.8 8 16 1608.495 13 150 1769.76 OK
Max Mz 55 336 1513 16 256 1570.8 8 16 1608.495 13 150 1769.76 OK
Min Mz 48 309 1513 16 256 1570.8 8 16 1608.495 13 150 1769.76 OK
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 20 of 23 1.

6. PILE FOUNDATION ANALYSIS & DESIGN


6.1 PILE CAP DESIGN
Pile Diameter D = 500 mm
Spacing Pile to edge of Foundation a = 600 mm

6.1.1 Material ( assume )


Concrete Comp Strength, fc'=350 kg/cm2 Unit weight soil γs = 1090 kg/m³
Concrete unit weight = 2400 kg/m3 Unit weight water γw = 1000 kg/m³
Steel yield strength = 4000 kg/cm2 Angle of internal friction θ = 0.8 degree
Steel unit weight = 7850 kg/m3 Unit weight saturated soil γsat = 1650 kg/m³
Undrained Shear Strength Cu = 2650 kg/m2
6.1.2 Pile Cap Dimension
Column Pile Cap
Column length bp = 0.55 m Pile Cap Length bf = 1.2 m
Column width dp = 0.55 m Pile Cap Width df = 1.2 m
Column height above ground ha = 0.50 m Pile Cap height hf = 0.5 m
Column height below ground hb = 0.30 m Foundation depth hu = 0.8 m
Column height ground hp = 0.80 m Water table depth hw = 1 m
Pile Cut off PCO = 300 mm
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 21 of 23 1.

bf Buoyancy Status =
OK, hw > hu, No buoyancy effect
bp D = Wf +Ws
Wf +Ws = 2.10 ton
h
dp

Uplift = h-hw*Af*ɣwater
df

hw = -0.288 ton
Status = D > Uplift --> OK

6.2 LOADING DATA


Soil Weight Ws = [(bf x df) - (bp x dp)] x hb x γs
= [(1.2m x 1.2m) - (0.55m x 0.55m)] x 0.3m x 1090kg/m3 = 371.96 kg
Footing Weight Wf = bf x df x hf x γc
= 1.2m x 1.2m x 0.5m x 2400kg/m3 = 1728.00 kg

6.3 PILE REACTION CHECK


A Location and Soil Properties
Critical location of Borehole : Loc. = BH-NGBC-6/15
2
Cohesion of soil c = 26.5 kN/m
Friction angle of soil f = 7.9 deg.
3
Unit weight of soil gs = 16.8 kN/m
Passive pressure coef. kp = tan(45 + f/2)2 kp = 1.32

B Number of Pile, Pile Capacity and Foundation Data


Number of Pile used np = 1 nos
Diameter of Pile dp = 0.5 m
Length of Pile used Lp = 15 m
Pile-head Type Ptyp = Fix
Distance of Piles sp = - m
Efficiency Pile group eg = 1 -
Allowable Pile Capacity : (Permanent Condition SF=3 )
( Permanent condition are when the structure does not accept seismic load and wind load )
Compression of Pile Pap = 1019 kN see attachment B - Soil data
Tension of Pile Ta = 865 kN & pile capacity
Lateral of Pile Ha = 180 kN

Allowable Pile Capacity : (Temporary Condition = 1.33 x Permanet Pile Capacity )


( Temporary condition are when the structure accept seismic load and wind load )
Compress. Of Pile Pat = 1356 kN
Tension of Pile Ta = 1151 kN
Lateral of Pile Ha = 239 kN
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 22 of 23 1.

C1 Check of Pile Capacity and Foundation Stability Permanent Condition


Reaction Summary : Permanent Condition
Horiz. Vertical Horiz. Moment
Forces Node L/C** Fx Fy Fz Mx My Mz Remark
kN kN kN kNm kNm kNm
Max Fx 4 154 1.04 17.42 0.1 0.232 0 0.328
Min Fx 24 154 -0.75 33.62 -0.33 -0.376 0 1.942
Max Fy 14 154 0.51 50.48 0.53 -0.491 0 -1.166
Min Fy 8 101 -0.68 11.04 0.0 0 0 0
Max Fz 14 154 0.51 50.48 0.53 -0.491 0 -1.166
Min Fz 17 154 0.52 49.25 -0.5 -0.534 0 -1.183
Max Mx 160 101 0.01 18.75 0.16 0.324 0 -0.266
Min Mx 17 154 0.52 49.25 -0.51 -0.534 0 -1.183
Max My 14 154 0.51 50.48 0.53 -0.491 0 -1.166
Min My 28 154 0.19 32.74 0.16 0.215 0 -0.558
Max Mz 24 154 -0.75 33.62 -0.33 -0.376 0 1.942
Min Mz 17 154 0.52 49.25 -0.51 -0.534 0 -1.183 np = 1 nos
Maximum (absolute) : 1.04 50.48 0.53 0.53 0.00 1.94

Check Compression Capacity of Pile


Vertical Moment Total Calculation Compression of Pile
Forces Node L/C** Fy Mx Mz Fyt Fyt/np ΣMi/Zi Pmax Pall Ratio Check
kN kNm kNm kN kN kN kN kN Pmax/Pal
Max Fx 4 154 17.42 0.23 0.33 38.42 38.42 0.33 38.75 1019 0.04 OK
Min Fx 24 154 33.62 -0.38 1.94 54.62 54.62 1.94 56.56 1019 0.06 OK
Max Fy 14 154 50.48 -0.49 -1.17 71.48 71.48 -1.17 70.31 1019 0.07 OK
Min Fy 8 101 11.04 0.00 0.00 32.04 32.04 0.00 32.04 1019 0.03 OK
Max Fz 14 154 50.48 -0.49 -1.17 71.48 71.48 -1.17 70.31 1019 0.07 OK
Min Fz 17 154 49.25 -0.53 -1.18 70.25 70.25 -1.18 69.07 1019 0.07 OK
Max Mx 160 101 18.75 0.32 -0.27 39.75 39.75 -0.27 39.48 1019 0.04 OK
Min Mx 17 154 49.25 -0.53 -1.18 70.25 70.25 -1.18 69.07 1019 0.07 OK
Max My 14 154 50.48 -0.49 -1.17 71.48 71.48 -1.17 70.31 1019 0.07 OK
Min My 28 154 32.74 0.22 -0.56 53.74 53.74 -0.56 53.18 1019 0.05 OK
Max Mz 24 154 33.62 -0.38 1.94 54.62 54.62 1.94 56.56 1019 0.06 OK
Min Mz 17 154 49.25 -0.53 -1.18 70.25 70.25 -1.18 69.07 1019 0.07 OK
Resume : Pmax < Pall --> OK 70.31 1019 0.07 OK
Fyt = Fy +Ws + Wf

Notes:
Fyt = Total vertical load
Ws = Weight of soil
Wf = Weight of foundation
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 23 of 23 1.

C2 Check of Pile Capacity and Foundation Stability Temporary Condition


Reaction Summary : Temporary Condition
Horiz. Vertical Horiz. Moment
Forces Node L/C** Fx Fy Fz Mx My Mz Remark
kN kN kN kNm kNm kNm
Max Fx 160 114 6.92 -9.53 -0.5 -2.58 0.00 -0.86
Min Fx 104 112 -10.52 56.84 -4.24 -13.97 0.00 0.56
Max Fy 38 112 -4.95 61.87 -7.14 -0.94 0.00 19.60
Min Fy 28 112 -5.01 -18.45 -0.5 -1.19 0.00 19.51
Max Fz 48 152 -0.95 42.60 8.73 1.37 0.00 5.18
Min Fz 48 112 -3.03 -13.05 -10.5 -1.87 -0.01 17.69
Max Mx 160 126 0.86 10.29 1.55 5.01 0.00 -0.25
Min Mx 107 112 -0.32 -8.69 -5.05 -16.60 0.00 0.89
Max My 50 114 -1.15 0.40 0.46 0.90 0.01 7.50
Min My 48 112 -3.03 -13.05 -10.51 -1.87 -0.01 17.69
Max Mz 30 112 -5.31 44.03 -7.87 -1.18 0.00 20.21
Min Mz 28 109 4.89 19.06 0.00 -0.15 0.00 -18.81 np = 1 nos
Maximum (absolute) : 10.52 61.87 10.51 16.60 0.01 20.21

Check Compression Capacity of Pile


Vertical Moment Total Calculation Compression of Pile
Forces Node L/C** Fy Mx Mz Fyt Fyt/np ΣMi/Zi Pmax Pall Ratio Check
kN kNm kNm kN kN kN kN kN Pmax/Pal
Max Fx 160 114 -9.53 -2.58 -0.86 11.5 11.47 -0.86 10.61 1356 0.01 OK
Min Fx 104 112 56.84 -13.97 0.56 77.8 77.84 0.56 78.40 1356 0.06 OK
Max Fy 38 112 61.87 -0.94 19.60 82.9 82.87 19.60 102.46 1356 0.08 OK
Min Fy 28 112 -18.45 -1.19 19.51 2.5 2.55 19.51 22.05 1356 0.02 OK
Max Fz 48 152 42.60 1.37 5.18 63.6 63.60 5.18 68.78 1356 0.05 OK
Min Fz 48 112 -13.05 -1.87 17.69 7.9 7.95 17.69 25.64 1356 0.02 OK
Max Mx 160 126 10.29 5.01 -0.25 31.3 31.29 -0.25 31.04 1356 0.02 OK
Min Mx 107 112 -8.69 -16.60 0.89 12.3 12.31 0.89 13.20 1356 0.01 OK
Max My 50 114 0.40 0.90 7.50 21.4 21.40 7.50 28.90 1356 0.02 OK
Min My 48 112 -13.05 -1.87 17.69 7.9 7.95 17.69 25.64 1356 0.02 OK
Max Mz 30 112 44.03 -1.18 20.21 65.0 65.03 20.21 85.24 1356 0.06 OK
Min Mz 28 109 19.06 -0.15 -18.81 40.1 40.06 -18.81 21.25 1356 0.02 OK
Resume : Pmax < Pall --> OK 102.46 1355.71 0.08 OK
Fyt = Fy +Ws + Wf

Notes:
Fyt = Total vertical load
Ws = Weight of soil
Wf = Weight of foundation
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 24 of 23 1.

C3 Check Tension Capacity of Pile


Permanent Condition :
Vertical Moment Total Calculation Tension of Pile
Forces Node L/C** Fy Mx Mz Fyt Fyt/np ΣMi/Zi Tmax Tall Ratio Check
kN kNm kNm kN kN kN kN kN Pmax/Pal
Max Fx 4 154 17.42 0.23 0.33 38.42 38.42 0.33 0 865 0 OK
Min Fx 24 154 33.62 -0.38 1.94 54.62 54.62 1.94 0 865 0 OK
Max Fy 14 154 50.48 -0.49 -1.17 71.48 71.48 -1.17 0 865 0 OK
Min Fy 8 101 11.04 0.00 0.00 32.04 32.04 0.00 0 865 0 OK
Max Fz 14 154 50.48 -0.49 -1.17 71.48 71.48 -1.17 0 865 0 OK
Min Fz 17 154 49.25 -0.53 -1.18 70.25 70.25 -1.18 0 865 0 OK
Max Mx 160 101 18.75 0.32 -0.27 39.75 39.75 -0.27 0 865 0 OK
Min Mx 17 154 49.25 -0.53 -1.18 70.25 70.25 -1.18 0 865 0 OK
Max My 14 154 50.48 -0.49 -1.17 71.48 71.48 -1.17 0 865 0 OK
Min My 28 154 32.74 0.22 -0.56 53.74 53.74 -0.56 0 865 0 OK
Max Mz 24 154 33.62 -0.38 1.94 54.62 54.62 1.94 0 865 0 OK
Min Mz 17 154 49.25 -0.53 -1.18 70.25 70.25 -1.18 0 865 0 OK
Resume : Tmax < Tall --> OK 0 865 0 OK

Temporary Condition :
Vertical Moment Total Calculation Tension of Pile
Forces Node L/C** Fy Mx Mz Fyt Fyt/np ΣMi/Zi Tmax Tall Ratio Check
kN kNm kNm kN kN kN kN kN Pmax/Pal
Max Fx 160 114 -9.53 -2.58 -0.86 11.47 11.47 -0.86 9.53 1151 0.01 OK
Min Fx 104 112 56.84 -13.97 0.56 77.84 77.84 0.56 0 1151 0.00 OK
Max Fy 38 112 61.87 -0.94 19.60 82.87 82.87 19.60 0 1151 0.00 OK
Min Fy 28 112 -18.45 -1.19 19.51 2.55 2.55 19.51 18.45 1151 0.02 OK
Max Fz 48 152 42.60 1.37 5.18 63.60 63.60 5.18 0 1151 0.00 OK
Min Fz 48 112 -13.05 -1.87 17.69 7.95 7.95 17.69 13.05 1151 0.01 OK
Max Mx 160 126 10.29 5.01 -0.25 31.29 31.29 -0.25 0 1151 0.00 OK
Min Mx 107 112 -8.69 -16.60 0.89 12.31 12.31 0.89 8.69 1151 0.01 OK
Max My 50 114 0.40 0.90 7.50 21.40 21.40 7.50 0 1151 0.00 OK
Min My 48 112 -13.05 -1.87 17.69 7.95 7.95 17.69 13.05 1151 0.01 OK
Max Mz 30 112 44.03 -1.18 20.21 65.03 65.03 20.21 0 1151 0.00 OK
Min Mz 28 109 19.06 -0.15 -18.81 40.06 40.06 -18.81 0 1151 0.00 OK
Resume : Tmax < Tall --> OK 18.45 1151 0.01603 OK
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 25 of 23 1.

C4 Check Lateral Capacity of Pile


Lateral Resistance from Pile Cap
Hrx = 0.5*gs*hb^2*kp*Lz + 2*c*hb*√kp*Lx Hrx = 0 kN
Hrz = 0.5*gs*hb^2*kp*Lx + 2*c*hb*√kp*Lz Hrz = 0 kN
Maximum Lateral force on support :
Fxm = max(|Fxmax|,|Fxmin|) Fxm = 10.52 kN
Fzm = max(|Fzmax|,|Fzmin|) Fzm = 10.51 kN
Maximum Lateral Force on Pile
Hpx = |(Fxm - Hrx)/np| Hpx = 10.52 kN
Hpz = |(Fzm - Hrz)/np| Hpz = 10.51 kN
Hmax = max(Hpx,Hpz) Hmax = 10.52 kN
Allowable Lateral of Pile Hall = 180 kN
Resume and Check Hmax < Hall --> OK
Ratio Hmax/Hall = 0.06

6.4 REINFORCEMENT DESIGN FOR PILE CAP

5.5 PUNCHING SHEAR CHECK

No need to check punching shear, since there is only one pile used on foundation, and the pile is located
exactly below the center line of column. No punching force act on the pile cap.

Hor Ver Hor Moment


Force Fx Fy Fz Mx My Mz
Node LC**
Max (kN) (kN) (kN) (kN m) (kN m) (kN m)
Max Fx 160 114 6.92 -9.53 -0.48 -0.03 0.00 -0.01
Min Fx 104 112 -10.52 56.84 -4.24 -0.14 0.00 0.01
Max Fy 38 112 -4.95 61.87 -7.14 -0.01 0.00 0.20
Min Fy 28 112 -5.01 -18.45 -0.49 -0.01 0.00 0.20
Max Fz 48 152 -0.95 42.60 8.73 0.01 0.00 0.05
Min Fz 48 112 -3.03 -13.05 -10.51 -0.02 0.00 0.18
Max Mx 160 126 0.86 10.29 1.55 0.05 0.00 0.00
Min Mx 107 112 -0.32 -8.69 -5.05 -0.17 0.00 0.01
Max My 50 114 -1.15 0.40 0.46 0.01 0.00 0.08
Min My 48 112 -3.03 -13.05 -10.51 -0.02 0.00 0.18
Max Mz 30 112 -5.31 44.03 -7.87 -0.01 0.00 0.20
Min Mz 28 109 4.89 19.06 0.00 0.00 0.00 -0.19
**noted : for load combination detail see attachment A
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page : 26 of 23 1.

Force FX FY FZ MX MZ P comprs.
L/C
Max (ton) (ton) (ton) (ton.m) (ton.m) (ton)
Max Fx 114 0.69 -0.95 0.05 0.00 0.00 -0.95
Min Fx 112 1.05 5.68 0.42 0.01 0.00 5.70
Max Fy 112 0.50 6.19 0.71 0.00 0.02 6.19
Min Fy 112 0.50 -1.85 0.05 0.00 0.02 -1.84
Max Fz 152 0.10 4.26 0.87 0.00 0.01 4.26
Min Fz 112 0.30 -1.31 1.05 0.00 0.02 -1.30
Max Mx 126 0.09 1.03 0.16 0.01 0.00 1.03
Min Mx 112 0.03 -0.87 0.51 0.02 0.00 -0.86
Max My 114 0.12 0.04 0.05 0.00 0.01 0.04
Min My 112 0.30 -1.31 1.05 0.00 0.02 -1.30
Max Mz 112 0.53 4.40 0.79 0.00 0.02 4.40
Min Mz 109 0.49 1.91 0.00 0.00 -0.02 1.91
6.19

Arm moment
a = (Max(bf,df)-Min(bp,dp)) x 0.5
= 0.325 m

Mmax = Pmax x a
= 6187.79 x 0.325
= 2011 kg.m/m
Footing height Hf = 500 mm Concrete Strength fc' = 350 kg/cm2
Concrete cover cc = 50 mm Yield Strength of Rebar fy = 4000 kg/cm2
Effective depth d = 442 mm Concrete Strength fc' = 35 MPa
Width b = 1000 mm Yield Strength of Rebar fy = 400 MPa
Number of layer n = 2 layers Rebar Diameter D = 16 mm
Rebar Spacing S = 200 mm

Mmax 2011.030125
= = 12867.2 kg/m2 = 1.29 kg/cm2
Rn = 0.8xbxd^2 0.8x1x0.44^2
0.85  fc `  2Rn 

 1 1 ρcal = 0.0003232
fy  0.85  fc 
 

0.85 fc  0.85  600 


max 0.75 0.0284484 0.0018
fy  600 fy  ρmax = ρmin =
 

Asmin = ρmin x b x Hf / n Ascal = ρcal x b x d


= 0.0018 x 1000 x 500 x / 2 = 0.0003 x 1000 x 442
= 450 mm2 = 142.86 mm2

Asreq = max(Asmin, Ascal) Rebar Spacing S = 200 mm


= 450 mm2 b 1000
rebar number
i = rp = 200 = 5
Asb = i x 0.25 x π x d2 = 1005.3 mm2

Status = OK..!! Asbot > Asreq Pilecap reinforcement : use D16 @ 200mm
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page :

ATTACHMENT
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page :

ATTACHMENT A
ENGINEERING DRAWING
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page :

ATTACHMENT B
SOIL DATA AND PILE CAPACITY
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page :

1. Borehole reference : BH-NGBC-6/15


REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page :
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page :

2. Interpretation Soil Parameter

Depth Soil N- Su,kPa m, Pc e0 Cv Cc TxL UU Su Es


m description SPT 6xNSPT kN/m3 kN/m2 cm2/sec c  kN/m2 kN/m2
kPa deg
0 - 2 9 54
2 - 4 10 60
Firm to stiff,
4 - 6 7 42
CLAY
6 - 8 11 66 16.8 124.5 1.243 6.8E-03 0.311 26.2 7.9 45 11,215
8 - 10 8 48
10 - 12 V.stiff, CLAY 22 132 16.8
12 - 14 47 282
14 - 16 49 294
16 - 18 50 300
Hard, CLAY,
18 - 20 found 50 300
20 - 22 CLAYSTONE 50 300
22 from 15.50 m 300 16.9 113 1.023 7.7E-03 0.212 87 31 332 82,920
- 24 50
depth
24 - 26 50 300
26 - 28 50 300
28 - 30 50 300

ALL-PILE Version 6 CivilTech Software www.civiltech.com Licensed to

Concrete poured into drilled hole.


Diameter is limited to 24in (61cm).
FOUNDATION PROFILE & SOIL CONDITIONS

Depth FOUNDATION PROPERTIES SOIL PROPERTIES Depth


from from
Ground-m Ground-m
Depth Width-cm A'-cm2 Per.-cm I'-cm4 E -MP W -kN/m Depth  -kN/m3  C-kN/m2 k-MN/m3 e50 % Nspt
0 0
0.0 50 1963.5 157.1 306796.2 20683 4.516 0.0 16.8 0.0 45 60.5 1.00 8
Concrete (rough) Soft Clay

2 2

4 4

6 6

8 8

10 10
10.0 17 0.0 132 250.2 0.54 22
Stiff Clay

12 12
12.0 17 0.0 300 668.0 0.33 50
Stiff Clay

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30
30.0

Batter Angle=0 (Pile diameter not to scale) Surface Angle=0

CivilTech Replacement of NGBC Chimney, SPV-Lenzing, Purwakarta


Software Borepile capacity 500mm diameter Figure 1
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page :

3. Pile Capacity
- Type : Concrete Bore pile
- Dia. : 500 mm
- Factor of safety :
Compression 3
Tension 3

Depth Vertical Capacity, kN Lateral Capacity


m Compression Tension All.deflect. Lateral Load Max.Moment
Permanent Transient mm kN kN.m
12 1019 1356 865 12** 180 275
Note: allowable deflection taken as 12 mm as per SNI 8460-2017 section 9.7.3.1 Kapasitas Lateral ijin tiang

30
27

Figure 1
24
21
Foundation Depth, L -m
18
15
ALLOWABLE CAPACITY vs FOUNDATION DEPTH

12

Replacement of NGBC Chimney, SPV-Lenzing, Purwakarta


9
6

Borepile capacity 500mm diameter


3
0
4000

3600

3200

2800

2400

2000

1600

1200

800

400

U p lift C a p a c ity , Q u p -k N
30
27
24
21
Foundation Depth, L -m
Licensed to

18
15
12
www.civiltech.com

9
6
CivilTech Software

CivilTech
Software
0
4000

3600

3200

2800

2400

2000

1600

1200

800

400

0
ALL-PILE Version 6

C o m p r e s s io n C a p a c ity , Q d w -k N
ALL-PILE Version 6 CivilTech Software www.civiltech.com Licensed to

PILE DEFLECTION & FORCE vs DEPTH


Single Pile, Khead=5, Kbc=2

Depth (Zp) DEFLECTION, yt -cm MOMENT -kN-m SHEAR -kN Depth (Zp)
from from
Pile Top-m -5.00 0 +5.00 -500 0 +500 -500 0 +500  -kN/m3  C-kN/m2 k-MN/m3 e50 % Pile Top-m
0 0
16.8 0.0 45 60.5 1.00
Soft Clay

2 2

4 4

yt=0 at 5.6-m
6 6
St=0 at 6.7-m

8 8

10 10
17 0.0 132 250.2 0.54
Stiff Clay

12 12
17 0.0 300 668.0 0.33
Stiff Clay

14 14

16 16
CALCULATION FOR PIPE RACK STRUCTURE
CHIMNEY

18 18

20 20
REPLACEMENT OF NGBC

22 22
Page
Doc No.
Rev. No.

24 24
:
:
:
1

26 26

28 28

30 30
Tip yt=0E+0 Top yt=2.19E+0 Top Moment=-411.0 Top Shear=250.0
Max. yt=2.19E+0 Max. Moment=411.0 Max. Shear=250.0 E -MP=20683
Top St=0E+0 I'-cm4=306796

CivilTech Replacement of NGBC Chimney, SPV-Lenzing, Purwakarta


Software Borepile capacity 500mm diameter Figure 2
SPV-NGBC-CIV-CS-001
ALL-PILE Version 6 CivilTech Software www.civiltech.com Licensed to

LATERAL LOAD vs DEFLECTION & MAX. MOMENT

300 300

270 270

240 240

210 210

180 180

150 150

120 120

Lateral Load, P -kN


Lateral Load, P -kN
CALCULATION FOR PIPE RACK STRUCTURE
CHIMNEY

90 90

60 60

30 30
REPLACEMENT OF NGBC

0 0
Page

0.0 0.3 0.6 0.9 1.2 1.5 1.8 2.1 2.4 2.7 3.0 0 50 100 150 200 250 300 350 400 450 500
Doc No.
Rev. No.

Top Deflection, yt -cm Max. Moment in Single Pile, Mmax -kN-m


:
:
:
1

CivilTech Replacement of NGBC Chimney, SPV-Lenzing, Purwakarta


Software Borepile capacity 500mm diameter Figure 2
SPV-NGBC-CIV-CS-001
ALL-PILE Version 6 CivilTech Software www.civiltech.com Licensed to

Vertical Load vs. Settlement

20000

18000

16000

14000

12000

10000

8000
CALCULATION FOR PIPE RACK STRUCTURE
CHIMNEY

6000

Compression Load, Qdw -kN


4000
REPLACEMENT OF NGBC

2000
Page

0
Doc No.
Rev. No.

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
:
:
:

Settlement, X -cm
1

Total Side Tip

CivilTech Replacement of NGBC Chimney, SPV-Lenzing, Purwakarta


Software Borepile capacity 500mm diameter Figure 1
SPV-NGBC-CIV-CS-001
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page :

ATTACHMENT C
STAAD PRO. INPUT AND OUTPUT
Wednesday, July 31, 2019, 04:21 PM
PAGE NO. 1

****************************************************
* *
* STAAD.Pro V8i SELECTseries6 *
* Version 20.07.11.45 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= JUL 31, 2019 *
* Time= 13:48:44 *
* *
* USER ID: *
****************************************************

1. STAAD SPACE
INPUT FILE: D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\.. .STD
2. START JOB INFORMATION
3. ENGINEER DATE 13-JUN-19
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER KN
7. JOINT COORDINATES
8. 3 0 0.800002 0; 4 0 0.800002 2; 5 0 7.10001 0; 6 0 7.10001 2
9. 8 5.00001 0.800002 0; 9 5.00001 7.10001 0; 11 5.00001 0.800002 2
10. 12 5.00001 7.10001 2; 14 11 0.800002 0; 15 11 7.10001 0; 17 11 0.800002 2
11. 18 11 7.10001 2; 19 11 8.90002 0; 20 11 8.90002 2; 22 25 0.800002 0
12. 24 25 0.800002 2; 25 25 8.90002 0; 26 25 8.90002 2; 28 31.0001 3.80001 0
13. 30 31.0001 3.80001 2; 31 31.0001 13.04 0; 32 31.0001 13.04 2
14. 33 31.0001 8.90002 0; 34 31.0001 8.90002 2; 36 37.0001 3.80001 0
15. 38 37.0001 3.80001 2; 39 37.0001 13.04 0; 40 37.0001 13.04 2
16. 42 43.0001 6.40001 0; 44 43.0001 6.40001 2; 45 43.0001 13.04 0
17. 46 43.0001 13.04 2; 48 49.0001 6.90001 0; 50 49.0001 6.90001 2
18. 51 49.0001 13.04 0; 52 49.0001 13.04 2; 53 11 7.90002 0; 54 25 7.90002 0
19. 55 11 7.90002 2; 56 25 7.90002 2; 57 13 8.90002 2; 58 15 8.90002 2
20. 59 17 8.90002 2; 60 19 8.90002 2; 61 21 8.90002 2; 62 23 8.90002 2
21. 63 13 7.90002 2; 64 15 7.90002 2; 65 17 7.90002 2; 66 19 7.90002 2
22. 67 21 7.90002 2; 68 23 7.90002 2; 69 13 7.90002 0; 70 13 8.90002 0
23. 71 15 7.90002 0; 72 15 8.90002 0; 73 17 7.90002 0; 74 17 8.90002 0
24. 75 19 7.90002 0; 76 19 8.90002 0; 77 21 7.90002 0; 78 21 8.90002 0
25. 79 23 7.90002 0; 80 23 8.90002 0; 81 27.0001 8.90002 0; 82 27.0001 8.90002 2
26. 83 29.0001 8.90002 0; 84 29.0001 8.90002 2; 85 33.0001 13.04 0
27. 86 33.0001 13.04 2; 87 39.0001 13.04 0; 88 39.0001 13.04 2; 89 45.0001 13.04 0
28. 90 45.0001 13.04 2; 91 35.0001 13.04 0; 92 35.0001 13.04 2; 93 41.0001 13.04 0
29. 94 41.0001 13.04 2; 95 47.0001 13.04 0; 96 47.0001 13.04 2
30. 97 7.00001 7.10001 0; 98 7.00001 7.10001 2; 99 9.00002 7.10001 0
31. 100 9.00002 7.10001 2; 101 2.5 7.10001 0; 102 2.5 7.10001 2
32. 104 -1.5 0.800002 -0.415001; 105 -1.5 7.10001 -0.415001
33. 107 -3.50001 0.800002 -0.415001; 108 -3.50001 7.10001 -0.415001
34. 117 37.0001 8.90002 0; 118 37.0001 8.90002 2; 119 34.0001 13.04 0
35. 120 34.0001 13.04 2; 121 31.0001 6.35001 0; 122 31.0001 6.35001 2
36. 123 31.0001 10.97 0; 124 31.0001 10.97 2; 125 37.0001 6.35001 0
37. 126 37.0001 6.35001 2; 127 37.0001 10.97 0; 128 37.0001 10.97 2
38. 135 43.0001 11.04 0; 136 43.0001 11.04 2; 137 49.0001 11.04 0

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe RackPage


- 251 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 2

39. 138 49.0001 11.04 2; 139 43.0001 9.04 0; 140 43.0001 9.04 2
40. 141 49.0001 9.04 0; 142 49.0001 9.04 2; 143 0 3.95001 0; 144 0 3.95001 2
41. 145 -1.5 3.95001 -0.415001; 146 -3.50001 3.95001 -0.415001; 148 25 3.16667 0
42. 149 25 5.53335 0; 150 25 3.16667 2; 151 25 5.53335 2; 152 11 2.9 0
43. 153 11 5.00001 0; 154 11 2.9 2; 155 11 5.00001 2; 156 5.00001 3.95001 0
44. 157 5.00001 3.95001 2; 158 2.50001 3.95001 0; 159 2.50001 3.95001 2
45. 160 -1.5 0.800002 -5.215; 161 -1.5 7.10001 -5.215
46. 162 -3.50001 0.800002 -5.215; 163 -3.50001 7.10001 -5.215
47. 164 -1.5 3.95001 -5.215; 165 -3.50001 3.95001 -5.215; 166 -1.5 7.10001 -2.815
48. 167 -3.50001 7.10001 -2.815
49. MEMBER INCIDENCES
50. 2 3 143; 4 4 144; 5 5 6; 7 8 156; 9 11 157; 10 9 12; 12 14 152; 14 17 154
51. 15 15 18; 16 19 20; 17 15 53; 18 18 55; 19 5 101; 20 9 97; 21 6 102; 22 12 98
52. 25 25 26; 26 22 148; 27 24 150; 28 19 70; 29 20 57; 32 31 32; 33 28 121
53. 34 30 122; 35 33 123; 36 34 124; 37 33 34; 38 25 81; 39 26 82; 42 39 40
54. 43 36 125; 44 38 126; 45 31 85; 46 32 86; 49 45 46; 50 42 139; 51 44 140
55. 52 39 87; 53 40 88; 56 51 52; 57 48 141; 59 45 89; 60 46 90; 61 53 19
56. 62 54 25; 63 53 69; 64 55 20; 65 56 26; 66 55 63; 67 57 58; 68 58 59; 69 59 60
57. 70 60 61; 71 61 62; 72 62 26; 73 63 64; 74 64 65; 75 65 66; 76 66 67; 77 67 68
58. 78 68 56; 79 63 57; 80 64 58; 81 65 59; 82 66 60; 83 67 61; 84 68 62; 85 20 63
59. 86 57 64; 87 58 65; 88 59 66; 89 26 68; 90 62 67; 91 61 66; 92 69 71; 93 70 72
60. 94 69 70; 95 71 73; 96 72 74; 97 71 72; 98 73 75; 99 74 76; 100 73 74
61. 101 75 77; 102 76 78; 103 75 76; 104 77 79; 105 78 80; 106 77 78; 107 79 54
62. 108 80 25; 109 79 80; 110 19 69; 111 70 71; 112 72 73; 113 74 75; 114 25 79
63. 115 80 77; 116 78 75; 117 70 57; 118 72 58; 119 74 59; 120 76 60; 121 78 61
64. 122 80 62; 123 81 83; 124 82 84; 125 81 82; 126 83 33; 127 84 34; 128 83 84
65. 129 85 119; 130 86 120; 131 87 93; 132 88 94; 133 89 95; 134 90 96; 135 85 86
66. 136 87 88; 137 89 90; 138 91 39; 139 92 40; 140 93 45; 141 94 46; 142 95 51
67. 143 96 52; 144 91 92; 145 93 94; 146 95 96; 147 97 99; 148 98 100; 149 97 98
68. 150 99 15; 151 100 18; 152 99 100; 153 101 9; 154 102 12; 155 101 102
69. 157 104 145; 159 107 146; 160 108 105; 163 79 68; 164 77 67; 165 75 66
70. 166 73 65; 167 71 64; 168 69 63; 169 53 55; 170 54 56; 171 19 57; 172 57 72
71. 173 72 59; 174 59 76; 175 62 25; 176 78 62; 177 60 78; 178 74 60; 179 53 63
72. 180 63 71; 181 71 65; 182 65 75; 183 73 66; 184 66 77; 185 77 68; 186 68 54
73. 187 25 82; 188 82 83; 189 81 84; 190 84 33; 191 31 86; 192 86 91; 193 85 92
74. 194 92 39; 195 39 88; 196 88 93; 197 87 94; 198 94 45; 199 45 90; 200 90 95
75. 201 89 96; 202 96 51; 223 117 127; 224 118 128; 227 117 118; 228 119 91
76. 229 120 92; 230 121 33; 231 122 34; 232 123 31; 233 124 32; 234 125 117
77. 235 126 118; 236 127 39; 237 128 40; 244 124 86; 245 123 85; 246 127 91
78. 247 128 92; 255 121 122; 256 125 126; 257 123 124; 258 127 128; 264 5 102
79. 265 102 9; 266 9 98; 267 98 99; 268 97 100; 269 100 15; 272 135 45; 273 136 46
80. 274 137 51; 278 139 135; 279 140 136; 280 141 137; 284 137 138; 285 141 142
81. 286 135 136; 287 139 140; 288 52 137; 289 137 142; 290 142 48; 291 46 135
82. 292 135 140; 293 140 42; 294 143 5; 295 144 6; 296 143 144; 297 6 143
83. 298 143 4; 299 50 142; 300 142 138; 301 138 52; 302 145 105; 303 146 108
84. 304 146 145; 313 40 127; 314 127 118; 315 118 125; 316 125 38; 317 148 149
85. 318 149 54; 319 150 151; 320 151 56; 321 149 151; 322 148 150; 323 56 149
86. 324 149 150; 325 150 22; 326 152 153; 327 153 15; 328 154 155; 329 155 18
87. 330 153 155; 331 152 154; 332 18 153; 333 153 154; 334 154 14; 335 156 9
88. 336 157 12; 337 156 157; 338 12 156; 339 156 11; 340 32 123; 341 123 34
89. 342 34 121; 343 121 30; 344 105 146; 345 146 104; 346 143 158; 347 144 159
90. 348 158 156; 349 159 157; 350 3 158; 351 4 159; 352 159 11; 353 158 8
91. 354 158 159; 355 160 164; 356 162 165; 357 163 161; 358 164 161; 359 165 163
92. 360 165 164; 361 161 165; 362 165 160; 363 161 166; 364 163 167; 365 166 105
93. 366 167 108; 367 166 167; 368 163 166; 369 108 166
94. ***************************************************************************

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe RackPage


- 252 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 3

95. DEFINE MATERIAL START


96. ISOTROPIC STEEL
97. E 1.99947E+008
98. POISSON 0.3
99. DENSITY 76.8191
100. ALPHA 6.5E-006
101. DAMP 0.03
102. *TYPE STEEL
103. *STRENGTH RY 1.5 RT 1.2
104. ISOTROPIC CONCRETE
105. E 2.17184E+007
106. POISSON 0.17
107. DENSITY 23.5615
108. ALPHA 5.5E-006
109. DAMP 0.05
110. *TYPE CONCRETE
111. *STRENGTH FCU 27578.9
112. END DEFINE MATERIAL
113. ****************************************************************************
114. MEMBER PROPERTY JAPANESE
115. 15 37 117 TO 122 125 128 135 TO 137 144 TO 146 149 152 155 163 TO 170 227 -
116. 255 TO 258 284 TO 287 296 304 321 322 330 331 337 354 360 -
117. 367 TABLE ST H250X125X6
118. 5 10 16 19 TO 22 25 32 38 39 42 45 46 49 52 53 56 59 60 123 124 126 127 129 -
119. 130 TO 134 138 TO 143 147 148 150 151 153 154 160 228 229 346 TO 349 -
120. 363 TO 366 TABLE ST H350X175X7
121. 79 TO 91 94 97 100 103 106 109 TO 116 171 TO 202 266 TO 269 288 TO 293 313 -
122. 314 TO 316 323 TO 325 332 TO 334 340 TO 343 TABLE ST L80X80X6
123. MEMBER PROPERTY JAPANESE
124. 2 4 7 9 33 TO 36 43 44 50 51 57 157 159 223 224 230 TO 237 272 TO 274 278 -
125. 279 TO 280 294 295 299 TO 303 335 336 355 356 358 359 TABLE ST H250X250X9
126. 244 TO 247 TABLE ST L80X80X6
127. 28 29 63 66 TO 78 92 93 95 96 98 99 101 102 104 105 107 108 TABLE ST H250X125X6
128. 264 265 297 298 338 339 368 369 TABLE ST L80X80X6
129. 12 14 17 18 26 27 61 62 64 65 317 TO 320 326 TO 329 TABLE ST H250X250X9
130. 357 TABLE ST H400X200X8X13
131. 344 345 350 TO 353 361 362 TABLE SD L80X80X6 SP 0.01
132. CONSTANTS
133. BETA 90 MEMB 7 9 12 14 17 18 26 27 61 62 64 65 157 159 302 303 317 TO 320 -
134. 326 TO 329 335 336 355 356 358 359
135. BETA 0 MEMB 33 TO 36 43 44 223 224 230 TO 237
136. MATERIAL STEEL ALL
137. SUPPORTS
138. 3 4 8 11 14 17 22 24 28 30 36 38 42 44 48 50 104 107 160 162 FIXED
139. MEMBER RELEASE
140. 19 TO 22 28 29 38 39 45 46 52 53 59 60 63 66 117 TO 122 125 128 135 TO 137 -
141. 144 TO 146 149 152 155 227 255 TO 258 284 TO 287 296 304 321 322 330 331 -
142. 337 346 347 354 360 367 START MY MZ
143. 72 78 107 108 117 TO 122 125 TO 128 135 TO 146 149 TO 155 227 255 TO 258 284 -
144. 285 TO 287 296 304 321 322 330 331 337 348 349 354 360 367 END MY MZ
145. MEMBER TRUSS
146. 7 79 TO 91 94 97 100 103 106 109 TO 116 171 TO 202 244 TO 247 264 265 267 -
147. 268 TO 269 288 TO 293 297 298 313 TO 316 323 TO 325 332 TO 334 338 339 341 -
148. 342 TO 345 350 TO 353 361 362 368 369
149. *
150. START GROUP DEFINITION

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe RackPage


- 253 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 4

151. JOINT
152. _SWAY 5 6 9 12 19 20 25 26 31 32 39 40 45 46 51 52 105 108 135 TO 142
153. _REAKS_PELETAKAN 3 4 8 11 14 17 22 24 28 30 36 38 42 44 48 50 104 107 160 162
154. MEMBER
155. _L80X80 79 TO 91 94 97 100 103 106 109 TO 116 171 TO 202 244 TO 247 -
156. 264 TO 269 288 TO 293 297 298 313 TO 316 323 TO 325 332 TO 334 338 TO 343 -
157. 368 369
158. _L80X80SD 344 345 350 TO 353 361 362
159. _H250X250 2 4 7 9 12 14 17 18 26 27 33 TO 36 43 44 50 51 57 61 62 64 65 157 -
160. 159 223 224 230 TO 237 272 TO 274 278 TO 280 294 295 299 TO 303 317 TO 320 -
161. 326 TO 329 335 336 355 356 358 359
162. _WF350X175 5 10 16 19 TO 22 25 32 38 39 42 45 46 49 52 53 56 59 60 123 124 -
163. 126 127 129 TO 134 138 TO 143 147 148 150 151 153 154 160 228 229 -
164. 346 TO 349 363 TO 366
165. _WF250X125 15 37 63 66 73 TO 78 92 95 98 101 104 107 117 TO 122 125 128 135 -
166. 136 TO 137 144 TO 146 149 152 155 163 TO 170 227 255 TO 258 284 TO 287 296 -
167. 304 321 322 330 331 337 354 360 367
168. _MAXRATIO 27 122 352 357 364 368
169. END GROUP DEFINITION
170. *
171. UNIT METER KG
172. DEFINE REFERENCE LOADS
**WARNING- THIS STRUCTURE IS DISJOINTED. IGNORE IF
MASTER/SLAVE OR IF UNCONNECTED JOINTS.
173. LOAD R1 LOADTYPE DEAD TITLE ROOFING_LOAD
174. LOAD R2 LOADTYPE DEAD TITLE BRICKWALL
175. LOAD R3 LOADTYPE DEAD TITLE LL_ROOF
176. LOAD R4 LOADTYPE DEAD TITLE SW_SEISMIC
177. SELFWEIGHT Y -1
178. *
179. LOAD R5 LOADTYPE NONE TITLE ME
180. LOAD R6 LOADTYPE LIVE REDUCIBLE TITLE LL
181. LOAD R7 LOADTYPE DEAD TITLE SDL
182. LOAD R8 LOADTYPE LIVE REDUCIBLE TITLE LO
183. LOAD R9 LOADTYPE NONE TITLE PO
184. * OPERATION LOAD
185. MEMBER LOAD
186. 160 357 CON GY -2230
187. 5 CON GY -1547
188. 152 CON GY -2371
189. 16 CON GY -1501
190. 119 CON GY -649
191. 122 CON GY -3944
192. 32 CON GY -1534
193. 42 CON GY -2265
194. 49 CON GY -2586
195. 56 CON GY -4124
196. END DEFINE REFERENCE LOADS
197. DEFINE IBC 2003
198. SDS 0.607 SD1 0.369 S1 0.311 IE 1.25 RX 4.5 RZ 4.5 SCLASS 4 CT 0.0724
199. REFERENCE LOAD Y
200. R1 1.0 R4 1.0 R2 0.5 R7 1.0 R6 0.5 R9 1.0
201. ************************************************************
202. *****************DETAIL-LOADS*******************************
203. ************************************************************
204. UNIT METER KN

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe RackPage


- 254 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 5

205. LOAD 51 VX+


206. IBC LOAD X 1
207. PERFORM ANALYSIS

P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS 134 NUMBER OF MEMBERS 292


NUMBER OF PLATES 0 NUMBER OF SOLIDS 0
NUMBER OF SURFACES 0 NUMBER OF SUPPORTS 20

SOLVER USED IS THE OUT-OF-CORE BASIC SOLVER

ORIGINAL/FINAL BAND-WIDTH= 124/ 7/ 48 DOF


TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 684
TOTAL LOAD COMBINATION CASES = 0 SO FAR.
SIZE OF STIFFNESS MATRIX = 33 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 12.8/ 127974.3 MB

************************************************************
* IBC 2003 SEISMIC LOAD ALONG X : *
* CT = 0.030 Cu = 1.400 *
* TIME PERIODS : *
* Ta = 0.474 T = 0.469 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.469 *
* LOAD FACTOR = 1.000 *
* DESIGN BASE SHEAR = 1.000 X 0.169 X 464.30 *
* = 78.29 KN *
************************************************************

208. CHANGE
209. LOAD 52 VZ+
210. IBC LOAD Z 1
211. PERFORM ANALYSIS

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe RackPage


- 255 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 6

************************************************************
* IBC 2003 SEISMIC LOAD ALONG Z : *
* CT = 0.030 Cu = 1.400 *
* TIME PERIODS : *
* Ta = 0.474 T = 0.215 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.215 *
* LOAD FACTOR = 1.000 *
* DESIGN BASE SHEAR = 1.000 X 0.169 X 464.30 *
* = 78.29 KN *
************************************************************

212. CHANGE
213. LOAD 53 VX -
214. IBC LOAD X -1.
215. PERFORM ANALYSIS

************************************************************
* IBC 2003 SEISMIC LOAD ALONG X : *
* CT = 0.030 Cu = 1.400 *
* TIME PERIODS : *
* Ta = 0.474 T = 0.469 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.469 *
* LOAD FACTOR = -1.000 *
* DESIGN BASE SHEAR = -1.000 X 0.169 X 464.30 *
* = -78.29 KN *
************************************************************

216. CHANGE
217. LOAD 54 VZ -
218. IBC LOAD Z -1.
219. PERFORM ANALYSIS

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe RackPage


- 256 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 7

************************************************************
* IBC 2003 SEISMIC LOAD ALONG Z : *
* CT = 0.030 Cu = 1.400 *
* TIME PERIODS : *
* Ta = 0.474 T = 0.215 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.215 *
* LOAD FACTOR = -1.000 *
* DESIGN BASE SHEAR = -1.000 X 0.169 X 464.30 *
* = -78.29 KN *
************************************************************

220. CHANGE
221. ***********************************************************
222. LOAD 1 LOADTYPE NONE TITLE D
223. REFERENCE LOAD
224. R7 1.0 R1 1.0
225. SELFWEIGHT Y -1
226. ************************************************************
227. LOAD 2 LOADTYPE NONE TITLE PE
228. * EMPTY LOAD
229. UNIT METER KG
230. MEMBER LOAD
231. 160 357 CON GY -2230
232. 5 CON GY -1547
233. 152 CON GY -361
234. 16 CON GY -1501
235. 119 CON GY -649
236. 122 CON GY -1023
237. 32 CON GY -1534
238. 42 CON GY -2265
239. 49 CON GY -2586
240. 56 CON GY -2271
241. ************************************************************
242. LOAD 3 LOADTYPE NONE TITLE PO
243. * OPERATION LOAD
244. MEMBER LOAD
245. 160 357 CON GY -2230
246. 5 CON GY -1547
247. 152 CON GY -2371
248. 16 CON GY -1501
249. 119 CON GY -649
250. 122 CON GY -3944
251. 32 CON GY -1534
252. 42 CON GY -2265
253. 49 CON GY -2586
254. 56 CON GY -4124
255. ************************************************************
256. LOAD 4 LOADTYPE NONE TITLE PT
257. * TEST LOAD

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe RackPage


- 257 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 8

258. MEMBER LOAD


259. 160 357 CON GY -2139
260. 5 CON GY -1547
261. 152 CON GY -2700
262. 16 CON GY -3031
263. 119 CON GY -2274
264. 122 CON GY -2934
265. 32 CON GY -4118
266. 42 CON GY -2265
267. 49 CON GY -2586
268. 56 CON GY -2271
269. ************************************************************
270. LOAD 5 LOADTYPE NONE TITLE EE
271. ************************************************************
272. LOAD 6 LOADTYPE NONE TITLE EO
273. ************************************************************
274. LOAD 7 LOADTYPE NONE TITLE ET
275. ************************************************************
276. LOAD 8 LOADTYPE NONE TITLE LR
277. REFERENCE LOAD
278. R3 1.0
279. ************************************************************
280. LOAD 9 LOADTYPE NONE TITLE LF
281. REFERENCE LOAD
282. R6 1.0 R8 1.0
283. ************************************************************
284. LOAD 10 LOADTYPE NONE TITLE LC
285. ************************************************************
286. LOAD 11 LOADTYPE NONE TITLE SP
287. ************************************************************
288. LOAD 12 LOADTYPE NONE TITLE T
289. ************************************************************
290. LOAD 13 LOADTYPE NONE TITLE B
291. ************************************************************
292. LOAD 14 LOADTYPE NONE TITLE I
293. ************************************************************
294. LOAD 15 LOADTYPE NONE TITLE WT
295. ************************************************************
296. LOAD 16 LOADTYPE NONE TITLE WX+
297. MEMBER LOAD
298. 2 4 17 18 33 TO 36 43 44 50 51 57 61 62 64 65 157 159 223 224 230 TO 237 272 -
299. 273 TO 274 278 TO 280 294 295 302 303 355 356 358 359 UNI GX 6.1183
300. 320 UNI GX 6.1183 0 2.36667
301. 319 UNI GX 6.1183 2.25834 2.36667
302. 319 UNI GX 6.1183 0 2.25834
303. 27 UNI GX 6.1183 2.15001 2.36667
304. 27 UNI GX 6.1183 0 2.15001
305. 318 UNI GX 6.1183 0 2.36667
306. 317 UNI GX 6.1183 2.25834 2.36667
307. 317 UNI GX 6.1183 0 2.25834
308. 26 UNI GX 6.1183 2.15001 2.36667
309. 26 UNI GX 6.1183 0 2.15001
310. 329 UNI GX 6.1183 0 2.1
311. 328 UNI GX 6.1183 1.05001 2.1
312. 328 UNI GX 6.1183 0 1.05001
313. 14 UNI GX 6.1183 0 2.1

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe RackPage


- 258 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 9

314. 327 UNI GX 6.1183 0 2.1


315. 326 UNI GX 6.1183 1.05001 2.1
316. 326 UNI GX 6.1183 0 1.05001
317. 12 UNI GX 6.1183 0 2.1
318. 336 UNI GX 6.1183 4.29153E-006 3.15
319. 336 UNI GX 6.1183 0 4.29153E-006
320. 9 UNI GX 6.1183 0 3.15
321. 335 UNI GX 6.1183 4.29153E-006 3.15
322. 335 UNI GX 6.1183 0 4.29153E-006
323. 7 UNI GX 6.1183 0 3.15
324. ************************************************************
325. LOAD 17 LOADTYPE NONE TITLE WX -
326. MEMBER LOAD
327. 2 4 17 18 33 TO 36 43 44 50 51 57 61 62 64 65 157 159 223 224 230 TO 237 272 -
328. 273 TO 274 278 TO 280 294 295 302 303 355 356 358 359 UNI GX -6.1183
329. 320 UNI GX -6.1183 0 2.36667
330. 319 UNI GX -6.1183 2.25834 2.36667
331. 319 UNI GX -6.1183 0 2.25834
332. 27 UNI GX -6.1183 2.15001 2.36667
333. 27 UNI GX -6.1183 0 2.15001
334. 318 UNI GX -6.1183 0 2.36667
335. 317 UNI GX -6.1183 2.25834 2.36667
336. 317 UNI GX -6.1183 0 2.25834
337. 26 UNI GX -6.1183 2.15001 2.36667
338. 26 UNI GX -6.1183 0 2.15001
339. 329 UNI GX -6.1183 0 2.1
340. 328 UNI GX -6.1183 1.05001 2.1
341. 328 UNI GX -6.1183 0 1.05001
342. 14 UNI GX -6.1183 0 2.1
343. 327 UNI GX -6.1183 0 2.1
344. 326 UNI GX -6.1183 1.05001 2.1
345. 326 UNI GX -6.1183 0 1.05001
346. 12 UNI GX -6.1183 0 2.1
347. 336 UNI GX -6.1183 4.29153E-006 3.15
348. 336 UNI GX -6.1183 0 4.29153E-006
349. 9 UNI GX -6.1183 0 3.15
350. 335 UNI GX -6.1183 4.29153E-006 3.15
351. 335 UNI GX -6.1183 0 4.29153E-006
352. 7 UNI GX -6.1183 0 3.15
353. ************************************************************
354. LOAD 18 LOADTYPE NONE TITLE WZ+
355. MEMBER LOAD
356. 16 25 32 42 49 56 117 TO 122 125 128 135 TO 137 144 TO 146 149 152 CON GZ 24.54
357. 10 CON GZ 30.68
358. 5 155 160 357 CON GZ 27.61
359. 2 4 17 18 33 TO 36 43 44 50 51 57 61 62 64 65 157 159 223 224 230 TO 237 272 -
360. 273 TO 274 278 TO 280 294 295 299 300 302 303 355 356 358 359 UNI GZ 6.1183
361. 320 UNI GZ 6.1183 0 2.36667
362. 319 UNI GZ 6.1183 2.25834 2.36667
363. 319 UNI GZ 6.1183 0 2.25834
364. 27 UNI GZ 6.1183 2.15001 2.36667
365. 27 UNI GZ 6.1183 0 2.15001
366. 318 UNI GZ 6.1183 0 2.36667
367. 317 UNI GZ 6.1183 2.25834 2.36667
368. 317 UNI GZ 6.1183 0 2.25834
369. 26 UNI GZ 6.1183 2.15001 2.36667

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe RackPage


- 259 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 10

370. 26 UNI GZ 6.1183 0 2.15001


371. 329 UNI GZ 6.1183 0 2.1
372. 328 UNI GZ 6.1183 1.05001 2.1
373. 328 UNI GZ 6.1183 0 1.05001
374. 14 UNI GZ 6.1183 0 2.1
375. 327 UNI GZ 6.1183 0 2.1
376. 326 UNI GZ 6.1183 1.05001 2.1
377. 326 UNI GZ 6.1183 0 1.05001
378. 12 UNI GZ 6.1183 0 2.1
379. 336 UNI GZ 6.1183 4.29153E-006 3.15
380. 336 UNI GZ 6.1183 0 4.29153E-006
381. 9 UNI GZ 6.1183 0 3.15
382. 335 UNI GZ 6.1183 4.29153E-006 3.15
383. 335 UNI GZ 6.1183 0 4.29153E-006
384. 7 UNI GZ 6.1183 0 3.15
385. 19 20 28 38 45 52 59 63 92 93 95 96 98 99 101 102 104 105 107 108 123 126 -
386. 129 131 133 138 140 142 150 153 228 299 300 UNI GZ 25.4
387. 147 UNI GZ 25.4 1.00001 2.00001
388. 147 UNI GZ 25.4 0 1.00001
389. ************************************************************
390. LOAD 19 LOADTYPE NONE TITLE WZ -
391. MEMBER LOAD
392. 16 25 32 42 49 56 117 TO 122 125 128 135 TO 137 144 TO 146 149 -
393. 152 CON GZ -24.54
394. 10 CON GZ -30.68
395. 5 155 160 357 CON GZ -27.61
396. 2 4 17 18 33 TO 36 43 44 50 51 57 61 62 64 65 157 159 223 224 230 TO 237 272 -
397. 273 TO 274 278 TO 280 294 295 302 303 355 356 358 359 UNI GZ -6.1183
398. 320 UNI GZ -6.1183 0 2.36667
399. 319 UNI GZ -6.1183 2.25834 2.36667
400. 319 UNI GZ -6.1183 0 2.25834
401. 27 UNI GZ -6.1183 2.15001 2.36667
402. 27 UNI GZ -6.1183 0 2.15001
403. 318 UNI GZ -6.1183 0 2.36667
404. 317 UNI GZ -6.1183 2.25834 2.36667
405. 317 UNI GZ -6.1183 0 2.25834
406. 26 UNI GZ -6.1183 2.15001 2.36667
407. 26 UNI GZ -6.1183 0 2.15001
408. 329 UNI GZ -6.1183 0 2.1
409. 328 UNI GZ -6.1183 1.05001 2.1
410. 328 UNI GZ -6.1183 0 1.05001
411. 14 UNI GZ -6.1183 0 2.1
412. 327 UNI GZ -6.1183 0 2.1
413. 326 UNI GZ -6.1183 1.05001 2.1
414. 326 UNI GZ -6.1183 0 1.05001
415. 12 UNI GZ -6.1183 0 2.1
416. 336 UNI GZ -6.1183 4.29153E-006 3.15
417. 336 UNI GZ -6.1183 0 4.29153E-006
418. 9 UNI GZ -6.1183 0 3.15
419. 335 UNI GZ -6.1183 4.29153E-006 3.15
420. 335 UNI GZ -6.1183 0 4.29153E-006
421. 7 UNI GZ -6.1183 0 3.15
422. 21 22 29 39 46 53 60 66 TO 78 124 127 130 132 134 139 141 143 151 154 -
423. 229 UNI GZ -25.4
424. 148 UNI GZ -25.4 1.00001 2.00001
425. 148 UNI GZ -25.4 0 1.00001

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
10 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 11

426. ************************************************************
427. UNIT METER KN
428. LOAD 20 LOADTYPE NONE TITLE VX(EQ)
429. ************************************************************
430. LOAD 21 LOADTYPE NONE TITLE VZ(EQ)
431. ************************************************************
432. LOAD 22 LOADTYPE NONE TITLE FA
433. ************************************************************
434. LOAD 23 LOADTYPE NONE TITLE FL
435. * FRICTION LOAD DIR-X
436. UNIT METER KG
437. MEMBER LOAD
438. 160 CON GX 223
439. 5 CON GX 464.1
440. 152 CON GX 711.3
441. 16 CON GX 450.3
442. 119 CON GX 194.7
443. 122 CON GX 1183.2
444. 32 CON GX 460.2
445. 42 CON GX 679.5
446. 49 CON GX 775.8
447. 56 CON GX 1237.2
448. * FRICTION LOAD DIR-Z
449. 160 CON GZ 669
450. 5 CON GZ 154.7
451. 152 CON GZ 237.1
452. 16 CON GZ 150.1
453. 119 CON GZ 64.9
454. 122 CON GZ 394.4
455. 32 CON GZ 153.4
456. 42 CON GZ 226.5
457. 49 CON GZ 258.6
458. 56 CON GZ 412.4
459. UNIT METER KN
460. 357 CMOM GY 70.54
461. 357 CMOM GX 12.96
462. 357 CMOM GZ 16
463. 357 CON GX 4.04
464. 357 CON GZ 11.64
465. ************************************************************
466. UNIT METER KG
467. LOAD 55 LOADTYPE NONE TITLE PSP
468. ************************************************************
469. ************************************************************
470. ******************************
471. *SUPPORT REACTION STABILITY*
472. ******************************
473. **********
474. *EMPTY*
475. **********
476. LOAD COMB 101 1D+1PE+1EE+1LF+1SP+0.6PSP
477. 1 1.0 2 1.0 5 1.0 9 1.0 11 1.0 55 0.6
478. LOAD COMB 102 1D+1PE+1EE+1SP+0.6PSP+0.6WX+

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
11 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 12

479. 1 1.0 2 1.0 5 1.0 11 1.0 55 0.6 16 0.6


480. LOAD COMB 103 1D+1PE+1EE+1SP+0.6PSP+0.6WX -
481. 1 1.0 2 1.0 5 1.0 11 1.0 55 0.6 17 0.6
482. LOAD COMB 104 1D+1PE+1EE+1SP+0.6PSP+0.6WX -
483. 1 1.0 2 1.0 5 1.0 11 1.0 55 0.6 17 0.6
484. LOAD COMB 105 1D+1PE+1EE+1SP+0.6PSP+0.6WZ+
485. 1 1.0 2 1.0 5 1.0 11 1.0 55 0.6 18 0.6
486. LOAD COMB 106 1D+1PE+1EE+1SP+0.6PSP+0.6WZ -
487. 1 1.0 2 1.0 5 1.0 11 1.0 55 0.6 19 0.6
488. LOAD COMB 107 1D+1PE+1EE+1SP+0.6PSP+0.7VX++0.21VZ+
489. 1 1.0 2 1.0 5 1.0 11 1.0 55 0.6 51 0.7 52 0.21
490. LOAD COMB 108 1D+1PE+1EE+1SP+0.6PSP+0.7VX++0.21VZ -
491. 1 1.0 2 1.0 5 1.0 11 1.0 55 0.6 51 0.7 54 0.21
492. LOAD COMB 109 1D+1PE+1EE+1SP+0.6PSP+0.7VX-+0.21VZ+
493. 1 1.0 2 1.0 5 1.0 11 1.0 55 0.6 53 0.7 52 0.21
494. LOAD COMB 110 1D+1PE+1EE+1SP+0.6PSP+0.7VX-+0.21VZ -
495. 1 1.0 2 1.0 5 1.0 11 1.0 55 0.6 53 0.7 54 0.21
496. LOAD COMB 111 1D+1PE+1EE+1SP+0.6PSP+0.7VZ++0.21VX -
497. 1 1.0 2 1.0 5 1.0 11 1.0 55 0.6 53 0.21 52 0.7
498. LOAD COMB 112 1D+1PE+1EE+1FA+0.6FL+0.7VZ++0.21VX+
499. 1 1.0 2 1.0 5 1.0 22 1.0 23 0.6 51 0.21 52 0.7
500. LOAD COMB 113 1D+1PE+1EE+1FA+0.6FL+0.7VZ-+0.21VX+
501. 1 1.0 2 1.0 5 1.0 22 1.0 23 0.6 51 0.21 54 0.7
502. LOAD COMB 114 1D+1PE+1EE+1FA+0.6FL+0.7VZ-+0.21VX -
503. 1 1.0 2 1.0 5 1.0 22 1.0 23 0.6 53 0.21 54 0.7
504. LOAD COMB 115 0.6D+0.6PE+0.6EE+1SP+0.6PSP+0.6WX+
505. 1 0.6 2 0.6 5 0.6 11 1.0 55 0.6 16 0.6
506. LOAD COMB 116 0.6D+0.6PE+0.6EE+1SP+0.6PSP+0.6WX -
507. 1 0.6 2 0.6 5 0.6 11 1.0 55 0.6 17 0.6
508. LOAD COMB 117 0.6D+0.6PE+0.6EE+1SP+0.6PSP+0.6WZ+
509. 1 0.6 2 0.6 5 0.6 11 1.0 55 0.6 18 0.6
510. LOAD COMB 118 0.6D+0.6PE+0.6EE+1SP+0.6PSP+0.6WZ -
511. 1 0.6 2 0.6 5 0.6 11 1.0 55 0.6 19 0.6
512. LOAD COMB 119 0.6D+0.6PE+0.6EE+1SP+0.6PSP+0.7VX++0.21VZ+
513. 1 0.6 2 0.6 5 0.6 11 1.0 55 0.6 51 0.7 52 0.21
514. LOAD COMB 120 0.6D+0.6PE+0.6EE+1SP+0.6PSP+0.7VX++0.21VZ -
515. 1 0.6 2 0.6 5 0.6 11 1.0 55 0.6 51 0.7 54 0.21
516. LOAD COMB 121 0.6D+0.6PE+0.6EE+1SP+0.6PSP+0.7VX-+0.21VZ+
517. 1 0.6 2 0.6 5 0.6 11 1.0 55 0.6 53 0.7 52 0.21
518. LOAD COMB 122 0.6D+0.6PE+0.6EE+1SP+0.6PSP+0.7VX-+0.21VZ -
519. 1 0.6 2 0.6 5 0.6 11 1.0 55 0.6 53 0.7 54 0.21
520. LOAD COMB 123 0.6D+0.6PE+0.6EE+1SP+0.6PSP+0.7VZ++0.21VX+
521. 1 0.6 2 0.6 5 0.6 11 1.0 55 0.6 52 0.7 51 0.21
522. LOAD COMB 124 0.6D+0.6PE+0.6EE+1SP+0.6PSP+0.7VZ++0.21VX -
523. 1 0.6 2 0.6 5 0.6 11 1.0 55 0.6 52 0.7 53 0.21
524. LOAD COMB 125 0.6D+0.6PE+0.6EE+1SP+0.6PSP+0.7VZ-+0.21VX+
525. 1 0.6 2 0.6 5 0.6 11 1.0 55 0.6 54 0.7 51 0.21
526. LOAD COMB 126 0.6D+0.6PE+0.6EE+1SP+0.6PSP+0.7VZ-+0.21VX -
527. 1 0.6 2 0.6 5 0.6 11 1.0 55 0.6 54 0.7 53 0.21
528. *=========*
529. *OPERATING*
530. *=========*
531. LOAD COMB 127 1D+1PO+1EO+1LF+1SP+0.6PSP+1T+1I
532. 1 1.0 3 1.0 6 1.0 9 1.0 11 1.0 55 0.6 12 1.0 14 1.0
533. LOAD COMB 128 1D+1PO+1EO+1LR+1SP+0.6PSP+1T
534. 1 1.0 3 1.0 6 1.0 8 1.0 11 1.0 55 0.6 12 1.0

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
12 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 13

535. LOAD COMB 129 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.75I


536. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 14 0.75
537. LOAD COMB 130 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.75I+0.45WX+
538. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 14 0.75 16 0.45
539. LOAD COMB 131 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.75I+0.45WX -
540. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 14 0.75 17 0.45
541. LOAD COMB 132 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.75I+0.45WZ+
542. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 14 0.75 18 0.45
543. LOAD COMB 133 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.75I+0.45WZ -
544. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 14 0.75 19 0.45
545. LOAD COMB 134 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.53VX++0.16VZ+
546. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 51 0.53 52 0.16
547. LOAD COMB 135 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.53VX++0.16VZ -
548. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 51 0.53 54 0.16
549. LOAD COMB 136 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.53VX-+0.16VZ+
550. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 53 0.53 52 0.16
551. LOAD COMB 137 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.53VX-+0.16VZ -
552. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 53 0.53 54 0.16
553. LOAD COMB 138 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.53VZ++0.16VX+
554. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 52 0.53 51 0.16
555. LOAD COMB 139 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.53VZ++0.16VX -
556. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 52 0.53 53 0.16
557. LOAD COMB 140 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.53VZ-+0.16VX+
558. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 54 0.53 51 0.16
559. LOAD COMB 141 1D+1PO+1EO+0.75LR+0.75LF+1SP+0.6PSP+1T+0.53VZ-+0.16VX -
560. 1 1.0 3 1.0 6 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 54 0.53 53 0.16
561. LOAD COMB 142 0.6D+0.6PO+0.6EO+1SP+0.6PSP+0.6T+0.6WX+
562. 1 0.6 3 0.6 6 0.6 11 1.0 55 0.6 12 0.6 16 0.6
563. LOAD COMB 143 0.6D+0.6PO+0.6EO+1SP+0.6PSP+0.6T+0.6WX -
564. 1 0.6 3 0.6 6 0.6 11 1.0 55 0.6 12 0.6 17 0.6
565. LOAD COMB 144 0.6D+0.6PO+0.6EO+1SP+0.6PSP+0.6T+0.6WZ+
566. 1 0.6 3 0.6 6 0.6 11 1.0 55 0.6 12 0.6 18 0.6
567. LOAD COMB 145 0.6D+0.6PO+0.6EO+1SP+0.6PSP+0.6T+0.6WZ -
568. 1 0.6 3 0.6 6 0.6 11 1.0 55 0.6 12 0.6 19 0.6
569. LOAD COMB 146 0.6D+0.6PO+0.6EO+1SP+0.6PSP+0.6T+0.7VX++0.21VZ+
570. 1 0.6 3 0.6 6 0.6 11 1.0 55 0.6 12 0.6 51 0.7 52 0.21
571. LOAD COMB 147 0.6D+0.6PO+0.6EO+1SP+0.6PSP+0.6T+0.7VX++0.21VZ -
572. 1 0.6 3 0.6 6 0.6 11 1.0 55 0.6 12 0.6 51 0.7 54 0.21
573. LOAD COMB 148 0.6D+0.6PO+0.6EO+1SP+0.6PSP+0.6T+0.7VX-+0.21VZ+
574. 1 0.6 3 0.6 6 0.6 11 1.0 55 0.6 12 0.6 53 0.7 52 0.21
575. LOAD COMB 149 0.6D+0.6PO+0.6EO+1SP+0.6PSP+0.6T+0.7VX-+0.21VZ -
576. 1 0.6 3 0.6 6 0.6 11 1.0 55 0.6 12 0.6 53 0.7 54 0.21
577. LOAD COMB 150 0.6D+0.6PO+0.6EO+1SP+0.6PSP+0.6T+0.7VZ++0.21VX+
578. 1 0.6 3 0.6 6 0.6 11 1.0 55 0.6 12 0.6 52 0.7 51 0.21
579. LOAD COMB 151 0.6D+0.6PO+0.6EO+1SP+0.6PSP+0.6T+0.7VZ++0.21VX -
580. 1 0.6 3 0.6 6 0.6 11 1.0 55 0.6 12 0.6 52 0.7 53 0.21
581. LOAD COMB 152 0.6D+0.6PO+0.6EO+1SP+0.6PSP+0.6T+0.7VZ-+0.21VX+
582. 1 0.6 3 0.6 6 0.6 11 1.0 55 0.6 12 0.6 54 0.7 51 0.21
583. LOAD COMB 153 0.6D+0.6PO+0.6EO+1SP+0.6PSP+0.6T+0.7VZ-+0.21VX -
584. 1 0.6 3 0.6 6 0.6 11 1.0 55 0.6 12 0.6 54 0.7 53 0.21
585. **====*
586. **TEST*
587. **====*
588. LOAD COMB 154 1D+1PT+1ET+1LF+1SP+0.6PSP+1T+1I
589. 1 1.0 4 1.0 7 1.0 9 1.0 11 1.0 55 0.6 12 1.0 14 1.0
590. LOAD COMB 155 1D+1PT+1ET+0.75LR+0.75LF+1SP+0.6PSP+1T+0.75I+0.45WX+

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
13 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 14

591. 1 1.0 4 1.0 7 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 14 0.75 16 0.45
592. LOAD COMB 156 1D+1PT+1ET+0.75LR+0.75LF+1SP+0.6PSP+1T+0.75I+0.45WX -
593. 1 1.0 4 1.0 7 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 14 0.75 17 0.45
594. LOAD COMB 157 1D+1PT+1ET+0.75LR+0.75LF+1SP+0.6PSP+1T+0.75I+0.45WZ+
595. 1 1.0 4 1.0 7 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 14 0.75 18 0.45
596. LOAD COMB 158 1D+1PT+1ET+0.75LR+0.75LF+1SP+0.6PSP+1T+0.75I+0.45WZ -
597. 1 1.0 4 1.0 7 1.0 8 0.75 9 0.75 11 1.0 55 0.6 12 1.0 14 0.75 19 0.45
598. LOAD COMB 159 1D+1PE+1EE+1LF+1LC+0.6SP+1PSP+1T+1I+1B
599. 1 1.0 2 1.0 5 1.0 9 1.0 10 1.0 11 0.6 55 1.0 12 1.0 14 1.0 13 1.0
600. LOAD COMB 160 1D+1PE+1EE+0.75LR+0.75LF+0.75LC+1SP+0.6PSP+1T+0.75I+0.75B+0.45WX+
601. 1 1.0 2 1.0 5 1.0 8 0.75 9 0.75 10 0.75 11 1.0 55 0.6 12 1.0 14 0.75 13 0.75 -
602. 16 0.45
WARNING- Load Command line is too long and will be truncated.
603. LOAD COMB 161 1D+1PE+1EE+0.75LR+0.75LF+0.75LC+1SP+0.6PSP+1T+0.75I+0.75B+0.45WX
604. 1 1.0 2 1.0 5 1.0 8 0.75 9 0.75 10 0.75 11 1.0 55 0.6 12 1.0 14 0.75 13 0.75 -
605. 17 0.45
606. LOAD COMB 162 1D+1PE+1EE+0.75LR+0.75LF+0.75LC+1SP+0.6PSP+1T+0.75I+0.75B+0.45WZ+
607. 1 1.0 2 1.0 5 1.0 8 0.75 9 0.75 10 0.75 11 1.0 55 0.6 12 1.0 14 0.75 13 0.75 -
608. 18 0.45
WARNING- Load Command line is too long and will be truncated.
609. LOAD COMB 163 1D+1PE+1EE+0.75LR+0.75LF+0.75LC+1SP+0.6PSP+1T+0.75I+0.75B+0.45WZ
610. 1 1.0 2 1.0 5 1.0 8 0.75 9 0.75 10 0.75 11 1.0 55 0.6 12 1.0 14 0.75 13 0.75 -
611. 19 0.45
612. ************************************************************
613. **********************************
614. *LOAD COMB CONCRETE REINFORCEMENT*
615. **********************************
616. *========*
617. *ERECTION*
618. *========*
619. LOAD COMB 301 1.4D+1.4PE+1.4EE+1.6SP+0.9PSP
620. 1 1.4 2 1.4 5 1.4 11 1.6 55 0.9
621. LOAD COMB 302 1.2D+1.2PE+1.2EE+1LR+0.5LF+1.6SP+0.9PSP+1WX+
622. 1 1.2 2 1.2 5 1.2 8 1.0 9 0.5 11 1.6 55 0.9 16 1.0
623. LOAD COMB 303 1.2D+1.2PE+1.2EE+1LR+0.5LF+1.6SP+0.9PSP+1WX -
624. 1 1.2 2 1.2 5 1.2 8 1.0 9 0.5 11 1.6 55 0.9 17 1.0
625. LOAD COMB 304 1.2D+1.2PE+1.2EE+1LR+0.5LF+1.6SP+0.9PSP+1WZ+
626. 1 1.2 2 1.2 5 1.2 8 1.0 9 0.5 11 1.6 55 0.9 18 1.0
627. LOAD COMB 305 1.2D+1.2PE+1.2EE+1LR+0.5LF+1.6SP+0.9PSP+1WZ+
628. 1 1.2 2 1.2 5 1.2 8 1.0 9 0.5 11 1.6 55 0.9 18 1.0
629. LOAD COMB 306 1.2D+1.2PE+1.2EE+1LF+1.6SP+0.9PSP+1VX++0.3VZ+
630. 1 1.2 2 1.2 5 1.2 9 1.0 11 1.6 55 0.9 51 1.0 52 0.3
631. LOAD COMB 307 1.2D+1.2PE+1.2EE+1LF+1.6SP+0.9PSP+1VX++0.3VZ -
632. 1 1.2 2 1.2 5 1.2 9 1.0 11 1.6 55 0.9 51 1.0 54 0.3
633. LOAD COMB 308 1.2D+1.2PE+1.2EE+1LF+1.6SP+0.9PSP+1VX-+0.3VZ+
634. 1 1.2 2 1.2 5 1.2 9 1.0 11 1.6 55 0.9 53 1.0 52 0.3
635. LOAD COMB 309 1.2D+1.2PE+1.2EE+1LF+1.6SP+0.9PSP+1VX-+0.3VZ -
636. 1 1.2 2 1.2 5 1.2 9 1.0 11 1.6 55 0.9 53 1.0 54 0.3
637. LOAD COMB 310 1.2D+1.2PE+1.2EE+1LF+1.6SP+0.9PSP+1VZ++0.3VX+
638. 1 1.2 2 1.2 5 1.2 9 1.0 11 1.6 55 0.9 52 1.0 51 0.3
639. LOAD COMB 311 1.2D+1.2PE+1.2EE+1LF+1.6SP+0.9PSP+1VZ++0.3VX -
640. 1 1.2 2 1.2 5 1.2 9 1.0 11 1.6 55 0.9 52 1.0 53 0.3
641. LOAD COMB 312 1.2D+1.2PE+1.2EE+1LF+1.6SP+0.9PSP+1VZ-+0.3VX+
642. 1 1.2 2 1.2 5 1.2 9 1.0 11 1.6 55 0.9 54 1.0 51 0.3
643. LOAD COMB 313 1.2D+1.2PE+1.2EE+1LF+1.6SP+0.9PSP+1VZ-+0.3VX -
644. 1 1.2 2 1.2 5 1.2 9 1.0 11 1.6 55 0.9 54 1.0 53 0.3

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
14 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 15

645. LOAD COMB 314 0.9D+0.9PE+0.9EE+1.6SP+0.9PSP+1WX+


646. 1 0.9 2 0.9 5 0.9 11 1.6 55 0.9 16 1.0
647. LOAD COMB 315 0.9D+0.9D+0.9EE+1.6SP+0.9PSP+1WX -
648. 1 0.9 1 0.9 5 0.9 11 1.6 55 0.9 17 1.0
649. LOAD COMB 316 0.9D+0.9PE+0.9EE+1.6SP+0.9PSP+1WZ+
650. 1 0.9 2 0.9 5 0.9 11 1.6 55 0.9 18 1.0
651. LOAD COMB 317 0.9D+0.9PE+0.9EE+1.6SP+0.9PSP+1WZ -
652. 1 0.9 2 0.9 5 0.9 11 1.6 55 0.9 19 1.0
653. LOAD COMB 318 0.9D+0.9PE+0.9EE+1.6SP+0.9PSP+1VX++0.3VZ+
654. 1 0.9 2 0.9 5 0.9 11 1.6 55 0.9 51 1.0 52 0.3
655. LOAD COMB 319 0.9D+0.9PE+0.9EE+1.6SP+0.9PSP+1VX++0.3VZ -
656. 1 0.9 2 0.9 5 0.9 11 1.6 55 0.9 51 1.0 54 0.3
657. LOAD COMB 320 0.9D+0.9PE+0.9EE+1.6SP+0.9PSP+1VX-+0.3VZ+
658. 1 0.9 2 0.9 5 0.9 11 1.6 55 0.9 53 1.0 52 0.3
659. LOAD COMB 321 0.9D+0.9PE+0.9EE+1.6SP+0.9PSP+1VX-+0.3VZ -
660. 1 0.9 2 0.9 5 0.9 11 1.6 55 0.9 53 1.0 54 0.3
661. LOAD COMB 322 0.9D+0.9PE+0.9EE+1.6SP+0.9PSP+1VZ++0.3VX+
662. 1 0.9 2 0.9 5 0.9 11 1.6 55 0.9 52 1.0 51 0.3
663. LOAD COMB 323 0.9D+0.9PE+0.9EE+1.6SP+0.9PSP+1VZ++0.3VX -
664. 1 0.9 2 0.9 5 0.9 11 1.6 55 0.9 52 1.0 53 0.3
665. LOAD COMB 324 0.9D+0.9PE+0.9EE+1.6SP+0.9PSP+1VZ-+0.3VX+
666. 1 0.9 2 0.9 5 0.9 11 1.6 55 0.9 54 1.0 51 0.3
667. LOAD COMB 325 0.9D+0.9PE+0.9EE+1.6SP+0.9PSP+1VZ-+0.3VX -
668. 1 0.9 2 0.9 5 0.9 11 1.6 55 0.9 54 1.0 53 0.3
669. *=========*
670. *OPERATION*
671. *=========*
672. LOAD COMB 326 1.2D+1.2PO+1.2EO+0.5LR+1.6LF+1.6SP+0.9PSP+1.2T+1.6I
673. 1 1.2 3 1.2 6 1.2 8 0.5 9 1.6 11 1.6 55 0.9 12 1.2 14 1.6
674. LOAD COMB 327 1.2D+1.2PO+1.2EO+1LR+1.6LF+1.6SP+0.9PSP+1.2T+1I
675. 1 1.2 3 1.2 6 1.2 8 1.0 9 1.6 11 1.6 55 0.9 12 1.2 14 1.0
676. LOAD COMB 328 1.2D+1.2PO+1.2EO+1.6LR+1.6SP+0.9PSP+1.2T+0.5WX+
677. 1 1.2 3 1.2 6 1.2 8 1.6 11 1.6 55 0.9 12 1.2 16 0.5
678. LOAD COMB 329 1.2D+1.2PO+1.2EO+1.6LR+1.6SP+0.9PSP+1.2T+0.5WX -
679. 1 1.2 3 1.2 6 1.2 8 1.6 11 1.6 55 0.9 12 1.2 17 0.5
680. LOAD COMB 330 1.2D+1.2PO+1.2EO+1.6LR+1.6SP+0.9PSP+1.2T+0.5WZ+
681. 1 1.2 3 1.2 6 1.2 8 1.6 11 1.6 55 0.9 12 1.2 18 0.5
682. LOAD COMB 331 1.2D+1.2PO+1.2EO+1.6LR+1.6SP+0.9PSP+1.2T+0.5WZ -
683. 1 1.2 3 1.2 6 1.2 8 1.6 11 1.6 55 0.9 12 1.2 19 0.5
684. LOAD COMB 332 1.2D+1.2PO+1.2EO+1LR+0.5LF+1.6SP+1.2T+1I+1WX+
685. 1 1.2 3 1.2 6 1.2 8 1.0 9 0.5 11 1.6 12 1.2 14 1.0 16 1.0
686. LOAD COMB 333 1.2D+1.2PO+1.2EO+1LR+0.5LF+1.6SP+1.2T+1I+1WX -
687. 1 1.2 3 1.2 6 1.2 8 1.0 9 0.5 11 1.6 12 1.2 14 1.0 17 1.0
688. LOAD COMB 334 1.2D+1.2PO+1.2EO+1LR+0.5LF+1.6SP+1.2T+1I+1WZ+
689. 1 1.2 3 1.2 6 1.2 8 1.0 9 0.5 11 1.6 12 1.2 14 1.0 18 1.0
690. LOAD COMB 335 1.2D+1.2PO+1.2EO+1LR+0.5LF+1.6SP+1.2T+1I+1WZ -
691. 1 1.2 3 1.2 6 1.2 8 1.0 9 0.5 11 1.6 12 1.2 14 1.0 19 1.0
692. LOAD COMB 336 1.2D+1.2PO+1.2EO+1LF+1.6SP+0.9PSP+1.2T+1VX++0.3VZ+
693. 1 1.2 3 1.2 6 1.2 9 1.0 11 1.6 55 0.9 12 1.2 51 1.0 52 0.3
694. LOAD COMB 337 1.2D+1.2PO+1.2EO+1LF+1.6SP+0.9PSP+1.2T+1VX++0.3VZ -
695. 1 1.2 3 1.2 6 1.2 9 1.0 11 1.6 55 0.9 12 1.2 51 1.0 54 0.3
696. LOAD COMB 338 1.2D+1.2PO+1.2EO+1LF+1.6SP+0.9PSP+1.2T+1VX-+0.3VZ+
697. 1 1.2 3 1.2 6 1.2 9 1.0 11 1.6 55 0.9 12 1.2 53 1.0 52 0.3
698. LOAD COMB 339 1.2D+1.2PO+1.2EO+1LF+1.6SP+0.9PSP+1.2T+1VX-+0.3VZ -
699. 1 1.2 3 1.2 6 1.2 9 1.0 11 1.6 55 0.9 12 1.2 53 1.0 54 0.3
700. LOAD COMB 340 1.2D+1.2PO+1.2EO+1LF+1.6SP+0.9PSP+1.2T+1VZ++0.3VX+

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
15 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 16

701. 1 1.2 3 1.2 6 1.2 9 1.0 11 1.6 55 0.9 12 1.2 52 1.0 51 0.3
702. LOAD COMB 341 1.2D+1.2PO+1.2EO+1LF+1.6SP+0.9PSP+1.2T+1VZ++0.3VX -
703. 1 1.2 3 1.2 6 1.2 9 1.0 11 1.6 55 0.9 12 1.2 52 1.0 53 0.3
704. LOAD COMB 342 1.2D+1.2PO+1.2EO+1LF+1.6SP+0.9PSP+1.2T+1VZ-+0.3VX+
705. 1 1.2 3 1.2 6 1.2 9 1.0 11 1.6 55 0.9 12 1.2 54 1.0 51 0.3
706. LOAD COMB 343 1.2D+1.2PO+1.2EO+1LF+1.6SP+0.9PSP+1.2T+1VZ-+0.3VX -
707. 1 1.2 3 1.2 6 1.2 9 1.0 11 1.6 55 0.9 12 1.2 54 1.0 53 0.3
708. LOAD COMB 344 0.9D+0.9PO+0.9EO+1.6SP+0.9PSP+0.9T+1WX+
709. 1 0.9 3 0.9 6 0.9 11 1.6 55 0.9 12 0.9 16 1.0
710. LOAD COMB 345 0.9D+0.9PO+0.9EO+1.6SP+0.9PSP+0.9T+1WX -
711. 1 0.9 3 0.9 6 0.9 11 1.6 55 0.9 12 0.9 17 1.0
712. LOAD COMB 346 0.9D+0.9PO+0.9EO+1.6SP+0.9PSP+0.9T+1WZ+
713. 1 0.9 3 0.9 6 0.9 11 1.6 55 0.9 12 0.9 18 1.0
714. LOAD COMB 347 0.9D+0.9PO+0.9EO+1.6SP+0.9PSP+0.9T+1WZ -
715. 1 0.9 3 0.9 6 0.9 11 1.6 55 0.9 12 0.9 19 1.0
716. LOAD COMB 348 0.9D+0.9PO+0.9EO+1.6SP+0.9PSP+1T+1VX++0.3VZ+
717. 1 0.9 3 0.9 6 0.9 11 1.6 55 0.9 12 1.0 51 1.0 52 0.3
718. LOAD COMB 349 0.9D+0.9PO+0.9EO+1.6SP+0.9PSP+1T+1VX++0.3VZ -
719. 1 0.9 3 0.9 6 0.9 11 1.6 55 0.9 12 1.0 51 1.0 54 0.3
720. LOAD COMB 350 0.9D+0.9PO+0.9EO+1.6SP+0.9PSP+1T+1VX-+0.3VZ+
721. 1 0.9 3 0.9 6 0.9 11 1.6 55 0.9 12 1.0 53 1.0 52 0.3
722. LOAD COMB 351 0.9D+0.9PO+0.9EO+1.6SP+0.9PSP+1T+1VX-+0.3VZ -
723. 1 0.9 3 0.9 6 0.9 11 1.6 55 0.9 12 1.0 53 1.0 54 0.3
724. LOAD COMB 352 0.9D+0.9PO+0.9EO+1.6SP+0.9PSP+1T+1VZ++0.3VX+
725. 1 0.9 3 0.9 6 0.9 11 1.6 55 0.9 12 1.0 52 1.0 51 0.3
726. LOAD COMB 353 0.9D+0.9PO+0.9EO+1.6SP+0.9PSP+1T+1VZ++0.3VX -
727. 1 0.9 3 0.9 6 0.9 11 1.6 55 0.9 12 1.0 52 1.0 53 0.3
728. LOAD COMB 354 0.9D+0.9PO+0.9EO+1.6FA+0.9PSP+1T+1VZ-+0.3VX+
729. 1 0.9 3 0.9 6 0.9 22 1.6 55 0.9 12 1.0 54 1.0 51 0.3
730. LOAD COMB 355 0.9D+0.9PO+0.9EO+1.6FA+0.9PSP+1T+1VZ-+0.3VX -
731. 1 0.9 3 0.9 6 0.9 22 1.6 55 0.9 12 1.0 54 1.0 53 0.3
732. **===========*
733. **TEST*
734. **===========*
735. LOAD COMB 356 1.2D+1.2PT+1.2ET+0.5LR+1.6LF+1.6SP+1.2T+1.6I
736. 1 1.2 4 1.2 7 1.2 8 0.5 9 1.6 11 1.6 12 1.2 14 1.6
737. LOAD COMB 357 1.2D+1.2PT+1.2ET+0.5LR+1LF+1.6SP+1.2T+1I+1WX+
738. 1 1.2 4 1.2 7 1.2 8 0.5 9 1.0 11 1.6 12 1.2 14 1.0 16 1.0
739. LOAD COMB 358 1.2D+1.2PT+1.2ET+0.5LR+1LF+1.6SP+1.2T+1I+1WX -
740. 1 1.2 4 1.2 7 1.2 8 0.5 9 1.0 11 1.6 12 1.2 14 1.0 17 1.0
741. LOAD COMB 359 1.2D+1.2PT+1.2ET+0.5LR+1LF+1.6WZ++1.2T+1I+1WZ+
742. 1 1.2 4 1.2 7 1.2 8 0.5 9 1.0 18 1.6 12 1.2 14 1.0 18 1.0
743. LOAD COMB 360 1.2D+1.2PT+1.2ET+0.5LR+1LF+1.6WZ-+1.2T+1I+1WZ -
744. 1 1.2 4 1.2 7 1.2 8 0.5 9 1.0 19 1.6 12 1.2 14 1.0 19 1.0
745. **===========*
746. **CONSTRUCTION*
747. **===========*
748. LOAD COMB 361 1.2D+1.2PE+1.2EE+0.5LR+1.6LF+1.6LC+1.6SP+1.6B+1.6I
749. 1 1.2 2 1.2 5 1.2 8 0.5 9 1.6 10 1.6 11 1.6 13 1.6 14 1.6
750. LOAD COMB 362 1.2D+1.2PE+1.2EE+0.5LR+1LF+1LC+1.6SP+1B+1I+1WX+
751. 1 1.2 2 1.2 5 1.2 8 0.5 9 1.0 10 1.0 11 1.6 13 1.0 14 1.0 16 1.0
752. LOAD COMB 363 1.2D+1.2PE+1.2EE+0.5LR+1LF+1LC+1.6SP+1B+1I+1WX -
753. 1 1.2 2 1.2 5 1.2 8 0.5 9 1.0 10 1.0 11 1.6 13 1.0 14 1.0 17 1.0
754. LOAD COMB 364 1.2D+1.2PE+1.2EE+0.5LR+1LF+1LC+1.6SP+1B+1I+1WZ+
755. 1 1.2 2 1.2 5 1.2 8 0.5 9 1.0 10 1.0 11 1.6 13 1.0 14 1.0 18 1.0
756. LOAD COMB 365 1.2D+1.2PE+1.2EE+0.5LR+1LF+1LC+1.6SP+1B+1I+1WZ+

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
16 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 17

757. 1 1.2 2 1.2 5 1.2 8 0.5 9 1.0 10 1.0 11 1.6 13 1.0 14 1.0 18 1.0
758. ************************************************************
759. PERFORM ANALYSIS

760. DEFINE ENVELOPE


761. 101 TO 159 ENVELOPE 1 TYPE SERVICEABILITY
762. 301 TO 365 ENVELOPE 2 TYPE STRENGTH
763. ***PERMANENT
764. *101 127 TO 129 154 159 ENVELOPE 3 TYPE SERVICEABILITY
765. ***TEMPORARY
766. *102 TO 126 130 TO 153 155 TO 158 160 TO 163 ENVELOPE 4 TYPE SERVICEABILITY
767. END DEFINE ENVELOPE
768. ************************************************************
769. UNIT METER KN
770. LOAD LIST 101 TO 159
771. PARAMETER 1
772. CODE AISC
773. FYLD 240000 MEMB 2 4 5 7 9 10 12 14 TO 22 25 TO 29 32 TO 39 42 TO 46 -
774. 49 TO 53 56 57 59 TO 146 149 TO 155 157 159 160 163 TO 202 223 224 -
775. 227 TO 237 244 TO 247 255 TO 258 264 TO 269 272 TO 274 278 TO 280 -
776. 284 TO 304 313 TO 345 355 TO 362
777. LZ 6.3 MEMB 2 4 7 9 12 14 157 159 294 295 302 303 326 TO 329 335 336 355 356 -
778. 358 359
779. LY 7.1 MEMB 26 27 317 TO 320
780. LZ 6.64 MEMB 50 51 272 273 278 279
781. LZ 6.14 MEMB 57 274 280 299 TO 301
782. MAIN 1 MEMB 2 4 5 7 9 10 12 14 TO 22 25 TO 29 32 TO 39 42 TO 46 49 TO 53 56 -
783. 57 59 TO 146 149 TO 155 157 159 160 163 TO 202 223 224 227 TO 237 -
784. 244 TO 247 255 TO 258 264 TO 269 272 TO 274 278 TO 280 284 TO 304 -
785. 313 TO 345 355 TO 362
786. CHECK CODE ALL

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
17 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 18

STAAD.Pro CODE CHECKING - (AISC 9TH EDITION) v1.0


***********************

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

2 ST H250X250X9 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.160 113
16.11 C -0.11 19.43 3.15
4 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.159 112
15.68 C 0.31 18.79 3.15
5 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.125 113
0.65 T 1.36 -6.92 1.00
7 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.018 140
19.55 C 0.00 0.00 0.00
9 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.143 112
13.62 C 6.82 0.01 3.15
10 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.014 112
3.29 C -0.00 1.14 2.00
12 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.135 110
34.07 C -5.27 0.45 0.00
14 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.156 112
56.11 C 4.15 -3.41 0.00
15 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.055 112
3.76 C -0.00 2.09 2.00
16 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.112 112
3.07 C 1.31 -5.24 1.00
17 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.167 109
18.72 C 7.89 0.24 0.80
18 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.168 110
18.94 C 7.96 -0.19 0.80
19 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.025 110
5.40 C -0.01 -1.87 2.50
20 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.097 157
0.67 C 0.03 -11.53 2.00
21 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.027 109
4.96 C -0.01 -2.15 2.50

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
18 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 19

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

22 ST H350X175X7 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.098 158
0.34 C -0.04 -11.68 2.00
25 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.027 112
3.42 C 0.00 2.73 2.00
26 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.186 113
35.38 C 6.57 1.44 0.00
27 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.222 112
52.23 C 6.54 -3.22 0.00
28 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.087 155
25.68 C -0.07 -0.74 2.00
29 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.094 158
25.84 C -0.11 -0.78 2.00
32 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.145 157
2.26 C 0.00 -17.33 1.00
33 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.194 113
33.09 C -0.95 19.97 0.00
34 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.200 112
33.83 C 1.18 20.21 0.00
35 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.127 110
21.71 C -0.19 14.25 2.07
36 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.130 109
20.43 C 0.37 14.32 2.07
37 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.028 112
1.62 C 0.00 1.06 2.00
38 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.027 105
1.48 C 0.06 -2.70 2.00
39 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.028 106
1.27 C -0.05 -2.91 2.00
42 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.181 112
2.74 C 2.00 -9.64 1.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
19 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 20

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

43 ST H250X250X9 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.205 113
48.99 C -0.99 19.60 0.00
44 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.207 112
52.08 C 0.94 19.59 0.00
45 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.080 107
7.80 C -0.01 -8.44 2.00
46 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.080 108
7.52 C -0.01 -8.50 2.00
49 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.209 112
5.36 C 2.28 -10.94 1.00
50 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.164 113
34.44 C -0.99 15.23 0.00
51 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.198 112
52.88 C 1.89 15.23 0.00
52 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.027 113
4.58 T 0.00 -2.70 2.00
53 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.029 112
4.40 T -0.00 -2.91 2.00
56 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.264 112
4.27 C 3.63 -9.63 1.00
57 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.178 113
30.79 C -0.99 17.76 0.00
59 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.026 112
2.47 T -0.01 -2.70 2.00
60 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.027 113
2.64 T 0.02 -2.91 2.00
61 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.165 109
18.38 C 7.89 -0.10 0.00
62 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.145 112
13.60 C -6.83 -0.64 0.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
20 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 21

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

63 ST H250X125X6 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.040 109
13.55 C -0.01 -0.27 1.50
64 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.167 110
18.60 C 7.96 0.08 0.00
65 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.146 112
19.16 C -6.51 -0.92 0.00
66 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.041 110
13.59 C -0.00 -0.31 1.50
67 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.161 158
51.97 C 0.07 -1.16 1.67
68 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.240 158
69.74 C -0.09 -3.12 2.00
69 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.223 155
60.45 C -0.05 -3.12 0.00
70 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.205 158
67.33 C -0.09 -1.56 0.00
71 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.225 133
51.92 C -0.12 -3.82 2.00
72 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.197 133
40.20 C -0.12 -3.82 0.00
73 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.084 157
26.52 T -0.07 -1.22 2.00
74 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.168 157
50.83 T 0.06 -2.97 2.00
75 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.187 157
63.78 T 0.01 -2.97 0.00
76 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.150 157
56.02 T 0.08 -1.63 0.00
77 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.156 136
41.32 T 0.07 -3.21 2.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
21 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 22

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

78 ST H250X125X6 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.088 135
7.44 C 0.02 -3.10 0.00
79 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.128 158
13.17 C 0.00 0.00 0.00
80 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.104 158
10.70 C 0.00 0.00 0.00
81 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.090 156
9.25 C 0.00 0.00 0.00
82 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.018 157
1.85 C 0.00 0.00 0.00
83 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.068 157
7.00 C 0.00 0.00 0.00
84 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.226 134
23.32 C 0.00 0.00 0.00
85 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.239 158
32.12 T 0.00 0.00 0.00
86 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.203 156
27.28 T 0.00 0.00 0.00
87 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.148 158
19.90 T 0.00 0.00 0.00
88 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.070 113
3.37 C 0.00 0.00 2.24
89 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.367 134
49.34 T 0.00 0.00 0.00
90 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.143 157
19.15 T 0.00 0.00 0.00
91 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.083 157
11.13 T 0.00 0.00 0.00
92 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.082 158
25.75 T -0.05 -1.28 2.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
22 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 23

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

93 ST H250X125X6 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.167 157
51.28 C 0.13 -1.18 2.00
94 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.128 157
13.19 C 0.00 0.00 0.00
95 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.168 158
50.86 T 0.07 -2.94 2.00
96 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.232 157
70.01 C -0.01 -3.10 2.00
97 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.104 157
10.73 C 0.00 0.00 0.00
98 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.185 158
63.33 T 0.02 -2.94 0.00
99 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.222 155
60.23 C -0.05 -3.09 0.00
100 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.089 156
9.22 C 0.00 0.00 0.00
101 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.150 157
53.15 T 0.11 -1.70 0.00
102 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.205 157
67.49 C 0.13 -1.31 2.00
103 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.017 158
1.80 C 0.00 0.00 0.00
104 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.153 137
40.96 T 0.06 -3.14 2.00
105 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.232 139
55.10 C -0.11 -3.82 2.00
106 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.067 158
6.94 C 0.00 0.00 0.00
107 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.087 134
7.57 C 0.01 -3.06 0.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
23 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 24

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

108 ST H250X125X6 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.206 139
44.57 C -0.11 -3.82 0.00
109 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.225 135
23.23 C 0.00 0.00 0.00
110 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.237 157
31.85 T 0.00 0.00 0.00
111 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.206 157
27.62 T 0.00 0.00 0.00
112 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.147 157
19.69 T 0.00 0.00 0.00
113 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.065 112
3.14 C 0.00 0.00 2.24
114 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.364 135
48.90 T 0.00 0.00 0.00
115 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.143 158
19.21 T 0.00 0.00 0.00
116 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.081 158
10.82 T 0.00 0.00 0.00
117 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.004 105
0.42 C 0.00 -0.14 1.17
118 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.004 106
0.34 C 0.00 -0.14 1.00
119 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.257 158
5.04 T 0.00 -11.29 1.00
120 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.013 158
5.06 T 0.00 -0.14 1.17
121 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.004 106
0.34 C 0.00 -0.14 1.00
122 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.530 112
2.28 C 3.48 -5.16 1.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
24 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 25

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

123 ST H350X175X7 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.028 112
2.85 C -0.01 -2.94 1.17
124 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.029 114
2.23 C 0.01 -3.15 1.00
125 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.004 112
0.40 T 0.00 -0.14 1.00
126 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.027 112
2.48 C -0.03 -2.70 0.00
127 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.028 112
1.91 C -0.02 -2.91 0.00
128 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.005 105
0.68 C 0.00 -0.14 1.17
129 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.071 107
1.40 T -0.01 -8.44 0.00
130 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.071 107
1.85 T -0.01 -8.39 0.00
131 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.029 113
4.00 T 0.02 -2.94 1.17
132 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.030 112
3.50 T -0.01 -3.14 1.17
133 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.027 113
2.26 T 0.01 -2.95 1.00
134 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.029 112
1.92 T -0.01 -3.15 1.00
135 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.004 112
0.55 C 0.00 -0.14 1.00
136 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.004 105
0.41 C 0.00 -0.14 1.17
137 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.004 112
0.54 C 0.00 -0.14 1.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
25 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 26

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

138 ST H350X175X7 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.084 109
11.96 C -0.01 -8.30 0.00
139 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.085 110
11.67 C -0.02 -8.40 0.00
140 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.027 113
3.74 T 0.02 -2.70 0.00
141 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.029 113
3.51 T 0.02 -2.91 0.00
142 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.025 105
0.52 C 0.05 -2.70 0.00
143 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.027 113
2.01 T 0.01 -2.91 0.00
144 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.004 105
0.36 C 0.00 -0.14 1.17
145 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.005 112
0.78 C 0.00 -0.14 1.00
146 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.004 105
0.46 C 0.00 -0.14 1.17
147 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.164 157
0.72 C 0.04 -20.36 2.00
148 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.165 158
0.82 C -0.04 -20.53 2.00
149 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.006 112
1.32 C 0.00 -0.14 1.00
150 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.170 157
0.86 C 0.04 -20.36 0.00
151 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.171 158
0.62 C -0.04 -20.53 0.00
152 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.294 157
0.11 C 0.00 -13.38 1.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
26 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 27

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

153 ST H350X175X7 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.025 110
5.23 C -0.01 -1.87 0.00
154 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.027 109
4.83 C -0.01 -2.15 0.00
155 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.005 105
0.62 C 0.00 -0.14 1.17
157 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.150 112
39.21 C 0.56 -13.97 0.00
159 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.146 112
8.52 T 0.89 -16.60 0.00
160 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.163 113
8.45 C -1.43 -9.91 1.00
163 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.007 132
0.33 C -0.04 -0.04 1.83
164 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.005 158
0.37 C 0.01 -0.13 1.33
165 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.020 157
5.33 C 0.06 0.00 2.00
166 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.019 157
5.36 C -0.04 -0.04 1.83
167 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.005 158
0.34 C -0.01 -0.11 1.50
168 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.005 157
0.31 C 0.02 -0.08 1.67
169 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.046 112
1.18 T 0.01 1.93 2.00
170 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.049 112
3.35 C -0.00 1.85 2.00
171 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.098 125
2.92 C 0.00 0.00 0.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
27 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 28

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

172 ST L80X80X6 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.115 112
3.44 C 0.00 0.00 0.00
173 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.074 125
2.21 C 0.00 0.00 0.00
174 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.236 157
7.06 C 0.00 0.00 0.00
175 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.231 153
6.92 C 0.00 0.00 0.00
176 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.041 105
1.23 C 0.00 0.00 0.00
177 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.024 112
0.73 C 0.00 0.00 0.00
178 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.235 158
7.04 C 0.00 0.00 0.00
179 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.044 145
1.32 C 0.00 0.00 0.00
180 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.027 117
0.81 C 0.00 0.00 0.00
181 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.012 118
0.36 C 0.00 0.00 0.00
182 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.053 155
7.15 T 0.00 0.00 0.00
183 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.054 155
7.20 T 0.00 0.00 0.00
184 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.012 113
0.36 C 0.00 0.00 0.00
185 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.024 117
0.73 C 0.00 0.00 0.00
186 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.043 106
1.29 C 0.00 0.00 0.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
28 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 29

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

187 ST L80X80X6 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.030 112
0.90 C 0.00 0.00 0.00
188 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.014 126
0.41 C 0.00 0.00 0.00
189 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.028 112
0.84 C 0.00 0.00 0.00
190 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.043 126
1.29 C 0.00 0.00 0.00
191 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.052 152
1.55 C 0.00 0.00 0.00
192 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.015 111
0.46 C 0.00 0.00 0.00
193 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.013 153
0.38 C 0.00 0.00 0.00
194 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.015 118
0.45 C 0.00 0.00 0.00
195 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.016 145
0.49 C 0.00 0.00 0.00
196 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.019 126
0.58 C 0.00 0.00 0.00
197 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.020 151
0.61 C 0.00 0.00 0.00
198 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.061 125
1.83 C 0.00 0.00 0.00
199 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.040 126
1.19 C 0.00 0.00 0.00
200 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.008 151
0.25 C 0.00 0.00 0.00
201 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.008 126
0.24 C 0.00 0.00 0.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
29 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 30

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

202 ST L80X80X6 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.023 145
0.69 C 0.00 0.00 0.00
223 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.142 113
32.30 C -0.35 -14.76 2.07
224 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.146 112
30.61 C 0.63 -14.75 2.07
227 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.004 111
0.27 C 0.00 -0.14 1.00
228 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.072 109
2.57 C -0.01 -8.30 1.00
229 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.073 110
2.46 C -0.02 -8.40 1.00
230 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.076 110
27.38 C 0.18 -6.68 0.00
231 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.085 112
29.96 C -0.74 -6.13 2.55
232 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.115 110
7.20 C -0.23 14.24 0.00
233 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.120 109
8.41 C 0.37 14.32 0.00
234 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.089 113
35.83 C 0.27 7.24 0.00
235 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.099 112
50.01 C 0.14 7.24 0.00
236 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.126 113
12.50 C -0.35 -14.76 0.00
237 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.136 112
18.05 C 0.63 -14.75 0.00
244 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.562 109
16.25 C 0.00 0.00 0.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
30 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 31

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

245 ST L80X80X6 (JAPANESE SECTIONS)


PASS AISC- H1-1 0.555 110
16.07 C 0.00 0.00 0.00
246 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.590 112
17.08 C 0.00 0.00 0.00
247 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.590 113
17.06 C 0.00 0.00 0.00
255 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.004 154
0.46 T 0.00 -0.14 1.00
256 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.004 113
0.57 T 0.00 -0.14 1.00
257 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.008 157
2.70 T 0.00 -0.14 1.00
258 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.007 112
2.24 T 0.00 -0.14 1.00
264 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.048 112
1.13 C 0.00 0.00 0.00
265 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.047 126
1.10 C 0.00 0.00 0.00
266 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.148 141
1.68 C -0.00 0.12 0.00
267 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.041 111
1.23 C 0.00 0.00 0.00
268 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.032 126
0.97 C 0.00 0.00 0.00
269 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.049 153
1.48 C 0.00 0.00 0.00
272 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.067 141
17.65 C 2.65 -0.00 2.00
273 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.086 112
25.91 C -3.23 -0.00 2.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
31 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 32

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

274 ST H250X250X9 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.094 140
23.28 C 3.84 -0.00 2.00
278 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.101 113
32.30 C 0.24 9.00 0.00
279 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.106 112
29.01 C -0.65 8.99 0.00
280 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.114 113
29.01 C 0.15 11.42 0.00
284 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.010 138
3.52 T 0.00 -0.14 1.00
285 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.005 140
0.84 C 0.00 -0.14 1.00
286 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.009 112
2.99 T 0.00 -0.14 1.00
287 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.005 140
0.64 C 0.00 -0.14 1.00
288 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.335 152
10.04 C 0.00 0.00 2.83
289 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.549 112
16.46 C 0.00 0.00 2.83
290 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.408 152
11.39 C 0.00 0.00 2.93
291 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.306 126
9.18 C 0.00 0.00 2.83
292 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.499 112
14.95 C 0.00 0.00 2.83
293 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.555 126
12.14 C 0.00 0.00 3.31
294 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.160 112
11.43 C -0.18 19.74 0.00

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
32 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 33

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

295 ST H250X250X9 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.158 112
14.96 C 0.31 18.79 0.00
296 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.004 111
0.73 T 0.00 -0.14 1.00
297 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.169 152
2.91 C 0.00 0.00 3.73
298 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.251 112
4.33 C 0.00 0.00 3.73
299 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.215 112
50.29 C 1.98 17.75 0.00
300 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.118 112
26.82 C -0.45 11.41 0.00
301 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.104 139
28.62 C -4.06 -0.00 2.00
302 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.160 112
34.50 C -2.15 11.85 3.15
303 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.128 112
17.99 C 0.38 14.19 3.15
304 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.005 102
0.96 T 0.00 -0.14 1.00
313 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.206 126
5.96 C 0.00 0.00 2.88
314 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.345 112
9.99 C 0.00 0.00 2.88
315 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.417 126
9.51 C 0.00 0.00 3.24
316 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.476 112
10.86 C 0.00 0.00 3.24
317 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.098 135
35.49 C -2.36 -0.33 2.37

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
33 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 34

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

318 ST H250X250X9 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.158 134
28.54 C -6.04 0.36 2.37
319 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.095 134
33.25 C -2.36 -0.39 2.37
320 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.173 112
30.01 C -6.51 0.93 2.37
321 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.005 138
0.88 T 0.00 -0.14 1.00
322 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.006 112
1.47 T 0.00 -0.14 1.00
323 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.363 152
9.07 C 0.00 0.00 3.10
324 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.526 112
13.13 C 0.00 0.00 3.10
325 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.323 152
8.07 C 0.00 0.00 3.10
326 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.079 113
35.82 C 2.27 0.40 0.00
327 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.094 137
32.78 C 3.32 0.05 2.10
328 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.079 112
38.55 C 2.26 -0.02 0.00
329 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.097 136
34.07 C 3.31 0.27 2.10
330 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.005 157
0.92 T 0.00 -0.14 1.00
331 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.006 112
1.69 T 0.00 -0.14 1.00
332 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.311 153
8.88 C 0.00 0.00 2.90

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
34 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 35

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

333 ST L80X80X6 (JAPANESE SECTIONS)


PASS AISC- H1-1 0.467 112
13.30 C 0.00 0.00 2.90
334 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.263 153
7.48 C 0.00 0.00 2.90
335 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.014 141
8.22 C 0.08 -0.59 3.15
336 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.142 112
12.90 C 6.82 0.01 0.00
337 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.004 140
0.35 T 0.00 -0.14 1.00
338 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.269 152
4.63 C 0.00 0.00 3.73
339 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.409 112
7.05 C 0.00 0.00 3.73
340 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.220 152
5.70 C -0.00 0.03 2.88
341 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.281 112
8.12 C 0.00 0.00 2.88
342 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.443 126
10.11 C 0.00 0.00 3.24
343 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.518 112
11.82 C 0.00 0.00 3.24
344 SD L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.069 113
18.66 T 0.00 0.00 0.00
345 SD L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.230 112
19.49 C 0.00 0.00 3.73
346 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.030 113
14.67 C 0.13 0.43 2.50
347 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.029 112
14.05 C -0.13 0.43 2.50

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
35 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 36

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

348 ST H350X175X7 (JAPANESE SECTIONS)


PASS AISC- H2-1 0.010 113
0.04 T 0.13 0.43 0.00
349 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.016 112
5.24 T -0.13 0.43 0.00
350 SD L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.186 110
13.59 C 0.00 0.00 0.00
351 SD L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.236 109
17.20 C 0.00 0.00 0.00
352 SD L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.239 113
17.43 C 0.00 0.00 4.02
353 SD L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.187 112
13.67 C 0.00 0.00 4.02
354 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.003 101
0.00 T 0.00 -0.14 1.00
355 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.103 112
0.13 T -0.67 -12.21 0.00
356 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.150 112
32.86 C -0.44 -15.10 0.00
357 ST H400X200X8X13 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.853 114
9.07 T -23.92 -15.22 1.00
358 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.072 112
4.84 T -0.37 8.36 3.15
359 ST H250X250X9 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.117 112
12.20 C 1.30 10.96 3.15
360 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.004 102
0.72 T 0.00 -0.14 1.00
361 SD L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.146 114
12.38 C 0.00 0.00 3.73
362 SD L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.067 108
5.65 C 0.00 0.00 3.73

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
36 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 37

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

363 ST H350X175X7 (JAPANESE SECTIONS)


PASS AISC- H2-1 0.185 112
21.52 T -1.15 -12.25 0.00
364 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.270 112
11.18 C -2.62 -14.85 0.00
365 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.149 112
0.43 C -0.95 11.85 2.40
366 ST H350X175X7 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.145 112
11.31 C 0.13 14.19 2.40
367 ST H250X125X6 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.006 114
1.55 T 0.00 -0.14 1.00
368 ST L80X80X6 (JAPANESE SECTIONS)
PASS AISC- H1-1 0.670 114
16.45 C 0.00 0.00 0.00
369 ST L80X80X6 (JAPANESE SECTIONS)
PASS TENSION 0.087 113
12.07 T 0.00 0.00 0.00

787. STEEL MEMBER TAKE OFF ALL

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
37 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 38

STEEL TAKE-OFF
--------------

PROFILE LENGTH(METE) WEIGHT(KN )

ST H250X250X9 145.32 102.067


ST H350X175X7 107.60 52.000
ST H250X125X6 148.00 42.032
ST L80X80X6 244.25 17.500
SD L80X80X6 31.01 4.444
ST H400X200X8X13 2.00 1.281
----------------
TOTAL = 219.323

MEMBER PROFILE LENGTH WEIGHT


(METE) (KN )

2 ST H250X250X9 3.15 2.212


4 ST H250X250X9 3.15 2.212
5 ST H350X175X7 2.00 0.967
7 ST H250X250X9 3.15 2.212
9 ST H250X250X9 3.15 2.212
10 ST H350X175X7 2.00 0.967
12 ST H250X250X9 2.10 1.475
14 ST H250X250X9 2.10 1.475
15 ST H250X125X6 2.00 0.568
16 ST H350X175X7 2.00 0.967
17 ST H250X250X9 0.80 0.562
18 ST H250X250X9 0.80 0.562
19 ST H350X175X7 2.50 1.208
20 ST H350X175X7 2.00 0.967
21 ST H350X175X7 2.50 1.208
22 ST H350X175X7 2.00 0.967
25 ST H350X175X7 2.00 0.967
26 ST H250X250X9 2.37 1.662
27 ST H250X250X9 2.37 1.662
28 ST H250X125X6 2.00 0.568
29 ST H250X125X6 2.00 0.568
32 ST H350X175X7 2.00 0.967
33 ST H250X250X9 2.55 1.791
34 ST H250X250X9 2.55 1.791
35 ST H250X250X9 2.07 1.454
36 ST H250X250X9 2.07 1.454
37 ST H250X125X6 2.00 0.568
38 ST H350X175X7 2.00 0.967
39 ST H350X175X7 2.00 0.967
42 ST H350X175X7 2.00 0.967
43 ST H250X250X9 2.55 1.791
44 ST H250X250X9 2.55 1.791
45 ST H350X175X7 2.00 0.967
46 ST H350X175X7 2.00 0.967
49 ST H350X175X7 2.00 0.967

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
38 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 39

50 ST H250X250X9 2.64 1.854


51 ST H250X250X9 2.64 1.854
52 ST H350X175X7 2.00 0.967
53 ST H350X175X7 2.00 0.967
56 ST H350X175X7 2.00 0.967
57 ST H250X250X9 2.14 1.503
59 ST H350X175X7 2.00 0.967
60 ST H350X175X7 2.00 0.967
61 ST H250X250X9 1.00 0.702
62 ST H250X250X9 1.00 0.702
63 ST H250X125X6 2.00 0.568
64 ST H250X250X9 1.00 0.702
65 ST H250X250X9 1.00 0.702
66 ST H250X125X6 2.00 0.568
67 ST H250X125X6 2.00 0.568
68 ST H250X125X6 2.00 0.568
69 ST H250X125X6 2.00 0.568
70 ST H250X125X6 2.00 0.568
71 ST H250X125X6 2.00 0.568
72 ST H250X125X6 2.00 0.568
73 ST H250X125X6 2.00 0.568
74 ST H250X125X6 2.00 0.568
75 ST H250X125X6 2.00 0.568
76 ST H250X125X6 2.00 0.568
77 ST H250X125X6 2.00 0.568
78 ST H250X125X6 2.00 0.568
79 ST L80X80X6 1.00 0.072
80 ST L80X80X6 1.00 0.072
81 ST L80X80X6 1.00 0.072
82 ST L80X80X6 1.00 0.072
83 ST L80X80X6 1.00 0.072
84 ST L80X80X6 1.00 0.072
85 ST L80X80X6 2.24 0.160
86 ST L80X80X6 2.24 0.160
87 ST L80X80X6 2.24 0.160
88 ST L80X80X6 2.24 0.160
89 ST L80X80X6 2.24 0.160
90 ST L80X80X6 2.24 0.160
91 ST L80X80X6 2.24 0.160
92 ST H250X125X6 2.00 0.568
93 ST H250X125X6 2.00 0.568
94 ST L80X80X6 1.00 0.072
95 ST H250X125X6 2.00 0.568
96 ST H250X125X6 2.00 0.568
97 ST L80X80X6 1.00 0.072
98 ST H250X125X6 2.00 0.568
99 ST H250X125X6 2.00 0.568
100 ST L80X80X6 1.00 0.072
101 ST H250X125X6 2.00 0.568
102 ST H250X125X6 2.00 0.568
103 ST L80X80X6 1.00 0.072
104 ST H250X125X6 2.00 0.568
105 ST H250X125X6 2.00 0.568
106 ST L80X80X6 1.00 0.072
107 ST H250X125X6 2.00 0.568
108 ST H250X125X6 2.00 0.568

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
39 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 40

109 ST L80X80X6 1.00 0.072


110 ST L80X80X6 2.24 0.160
111 ST L80X80X6 2.24 0.160
112 ST L80X80X6 2.24 0.160
113 ST L80X80X6 2.24 0.160
114 ST L80X80X6 2.24 0.160
115 ST L80X80X6 2.24 0.160
116 ST L80X80X6 2.24 0.160
117 ST H250X125X6 2.00 0.568
118 ST H250X125X6 2.00 0.568
119 ST H250X125X6 2.00 0.568
120 ST H250X125X6 2.00 0.568
121 ST H250X125X6 2.00 0.568
122 ST H250X125X6 2.00 0.568
123 ST H350X175X7 2.00 0.967
124 ST H350X175X7 2.00 0.967
125 ST H250X125X6 2.00 0.568
126 ST H350X175X7 2.00 0.967
127 ST H350X175X7 2.00 0.967
128 ST H250X125X6 2.00 0.568
129 ST H350X175X7 1.00 0.483
130 ST H350X175X7 1.00 0.483
131 ST H350X175X7 2.00 0.967
132 ST H350X175X7 2.00 0.967
133 ST H350X175X7 2.00 0.967
134 ST H350X175X7 2.00 0.967
135 ST H250X125X6 2.00 0.568
136 ST H250X125X6 2.00 0.568
137 ST H250X125X6 2.00 0.568
138 ST H350X175X7 2.00 0.967
139 ST H350X175X7 2.00 0.967
140 ST H350X175X7 2.00 0.967
141 ST H350X175X7 2.00 0.967
142 ST H350X175X7 2.00 0.967
143 ST H350X175X7 2.00 0.967
144 ST H250X125X6 2.00 0.568
145 ST H250X125X6 2.00 0.568
146 ST H250X125X6 2.00 0.568
147 ST H350X175X7 2.00 0.967
148 ST H350X175X7 2.00 0.967
149 ST H250X125X6 2.00 0.568
150 ST H350X175X7 2.00 0.967
151 ST H350X175X7 2.00 0.967
152 ST H250X125X6 2.00 0.568
153 ST H350X175X7 2.50 1.208
154 ST H350X175X7 2.50 1.208
155 ST H250X125X6 2.00 0.568
157 ST H250X250X9 3.15 2.212
159 ST H250X250X9 3.15 2.212
160 ST H350X175X7 2.00 0.967
163 ST H250X125X6 2.00 0.568
164 ST H250X125X6 2.00 0.568
165 ST H250X125X6 2.00 0.568
166 ST H250X125X6 2.00 0.568
167 ST H250X125X6 2.00 0.568
168 ST H250X125X6 2.00 0.568

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
40 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 41

169 ST H250X125X6 2.00 0.568


170 ST H250X125X6 2.00 0.568
171 ST L80X80X6 2.83 0.203
172 ST L80X80X6 2.83 0.203
173 ST L80X80X6 2.83 0.203
174 ST L80X80X6 2.83 0.203
175 ST L80X80X6 2.83 0.203
176 ST L80X80X6 2.83 0.203
177 ST L80X80X6 2.83 0.203
178 ST L80X80X6 2.83 0.203
179 ST L80X80X6 2.83 0.203
180 ST L80X80X6 2.83 0.203
181 ST L80X80X6 2.83 0.203
182 ST L80X80X6 2.83 0.203
183 ST L80X80X6 2.83 0.203
184 ST L80X80X6 2.83 0.203
185 ST L80X80X6 2.83 0.203
186 ST L80X80X6 2.83 0.203
187 ST L80X80X6 2.83 0.203
188 ST L80X80X6 2.83 0.203
189 ST L80X80X6 2.83 0.203
190 ST L80X80X6 2.83 0.203
191 ST L80X80X6 2.83 0.203
192 ST L80X80X6 2.83 0.203
193 ST L80X80X6 2.83 0.203
194 ST L80X80X6 2.83 0.203
195 ST L80X80X6 2.83 0.203
196 ST L80X80X6 2.83 0.203
197 ST L80X80X6 2.83 0.203
198 ST L80X80X6 2.83 0.203
199 ST L80X80X6 2.83 0.203
200 ST L80X80X6 2.83 0.203
201 ST L80X80X6 2.83 0.203
202 ST L80X80X6 2.83 0.203
223 ST H250X250X9 2.07 1.454
224 ST H250X250X9 2.07 1.454
227 ST H250X125X6 2.00 0.568
228 ST H350X175X7 1.00 0.483
229 ST H350X175X7 1.00 0.483
230 ST H250X250X9 2.55 1.791
231 ST H250X250X9 2.55 1.791
232 ST H250X250X9 2.07 1.454
233 ST H250X250X9 2.07 1.454
234 ST H250X250X9 2.55 1.791
235 ST H250X250X9 2.55 1.791
236 ST H250X250X9 2.07 1.454
237 ST H250X250X9 2.07 1.454
244 ST L80X80X6 2.88 0.206
245 ST L80X80X6 2.88 0.206
246 ST L80X80X6 2.88 0.206
247 ST L80X80X6 2.88 0.206
255 ST H250X125X6 2.00 0.568
256 ST H250X125X6 2.00 0.568
257 ST H250X125X6 2.00 0.568
258 ST H250X125X6 2.00 0.568
264 ST L80X80X6 3.20 0.229

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
41 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 42

265 ST L80X80X6 3.20 0.229


266 ST L80X80X6 2.83 0.203
267 ST L80X80X6 2.83 0.203
268 ST L80X80X6 2.83 0.203
269 ST L80X80X6 2.83 0.203
272 ST H250X250X9 2.00 1.405
273 ST H250X250X9 2.00 1.405
274 ST H250X250X9 2.00 1.405
278 ST H250X250X9 2.00 1.405
279 ST H250X250X9 2.00 1.405
280 ST H250X250X9 2.00 1.405
284 ST H250X125X6 2.00 0.568
285 ST H250X125X6 2.00 0.568
286 ST H250X125X6 2.00 0.568
287 ST H250X125X6 2.00 0.568
288 ST L80X80X6 2.83 0.203
289 ST L80X80X6 2.83 0.203
290 ST L80X80X6 2.93 0.210
291 ST L80X80X6 2.83 0.203
292 ST L80X80X6 2.83 0.203
293 ST L80X80X6 3.31 0.237
294 ST H250X250X9 3.15 2.212
295 ST H250X250X9 3.15 2.212
296 ST H250X125X6 2.00 0.568
297 ST L80X80X6 3.73 0.267
298 ST L80X80X6 3.73 0.267
299 ST H250X250X9 2.14 1.503
300 ST H250X250X9 2.00 1.405
301 ST H250X250X9 2.00 1.405
302 ST H250X250X9 3.15 2.212
303 ST H250X250X9 3.15 2.212
304 ST H250X125X6 2.00 0.568
313 ST L80X80X6 2.88 0.206
314 ST L80X80X6 2.88 0.206
315 ST L80X80X6 3.24 0.232
316 ST L80X80X6 3.24 0.232
317 ST H250X250X9 2.37 1.662
318 ST H250X250X9 2.37 1.662
319 ST H250X250X9 2.37 1.662
320 ST H250X250X9 2.37 1.662
321 ST H250X125X6 2.00 0.568
322 ST H250X125X6 2.00 0.568
323 ST L80X80X6 3.10 0.222
324 ST L80X80X6 3.10 0.222
325 ST L80X80X6 3.10 0.222
326 ST H250X250X9 2.10 1.475
327 ST H250X250X9 2.10 1.475
328 ST H250X250X9 2.10 1.475
329 ST H250X250X9 2.10 1.475
330 ST H250X125X6 2.00 0.568
331 ST H250X125X6 2.00 0.568
332 ST L80X80X6 2.90 0.208
333 ST L80X80X6 2.90 0.208
334 ST L80X80X6 2.90 0.208
335 ST H250X250X9 3.15 2.212
336 ST H250X250X9 3.15 2.212

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
42 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 43

337 ST H250X125X6 2.00 0.568


338 ST L80X80X6 3.73 0.267
339 ST L80X80X6 3.73 0.267
340 ST L80X80X6 2.88 0.206
341 ST L80X80X6 2.88 0.206
342 ST L80X80X6 3.24 0.232
343 ST L80X80X6 3.24 0.232
344 SD L80X80X6 3.73 0.535
345 SD L80X80X6 3.73 0.535
346 ST H350X175X7 2.50 1.208
347 ST H350X175X7 2.50 1.208
348 ST H350X175X7 2.50 1.208
349 ST H350X175X7 2.50 1.208
350 SD L80X80X6 4.02 0.576
351 SD L80X80X6 4.02 0.576
352 SD L80X80X6 4.02 0.576
353 SD L80X80X6 4.02 0.576
354 ST H250X125X6 2.00 0.568
355 ST H250X250X9 3.15 2.212
356 ST H250X250X9 3.15 2.212
357 ST H400X200X8X13 2.00 1.281
358 ST H250X250X9 3.15 2.212
359 ST H250X250X9 3.15 2.212
360 ST H250X125X6 2.00 0.568
361 SD L80X80X6 3.73 0.535
362 SD L80X80X6 3.73 0.535
363 ST H350X175X7 2.40 1.160
364 ST H350X175X7 2.40 1.160
365 ST H350X175X7 2.40 1.160
366 ST H350X175X7 2.40 1.160
367 ST H250X125X6 2.00 0.568
368 ST L80X80X6 3.12 0.224
369 ST L80X80X6 3.12 0.224
----------------
TOTAL = 219.323

************ END OF DATA FROM INTERNAL STORAGE ************

788. ************************************************************
789. *LOAD LIST 301 TO 365
790. *START CONCRETE DESIGN
791. *CODE ACI 2005
792. *END CONCRETE DESIGN
793. *PERFORM ANALYSIS
794. FINISH

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
43 JULI
of 44 19(up
Wednesday, July 31, 2019, 04:21 PM
STAAD SPACE -- PAGE NO. 44

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= JUL 31,2019 TIME= 13:49: 4 ****

************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://selectservices.bentley.com/en-US/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help->Technical Support *
* *
* Copyright (c) 1997-2015 Bentley Systems, Inc.
* http://www.bentley.com *
************************************************************

D:\MY PROJECT\Rekayasa Engineering\SPV-NGBC Chimney replacement\pipe rack SPV-Calculation\staad\Pipe Rack


Page
- 25
44 JULI
of 44 19(up
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page :

ATTACHMENT D
BASE PLATE DESIGN
BASE PLATE DESIGN untuk FIXED SUPPORTS (Sesuai dengan AISC 360-05 )
Nama Base Plate : BP-1 Nama Model : Pipe Rack

1 - Input data

(a) Material Properties

Kuat Leleh Baja untuk Baseplate Fy : 240 N/mm2

(Clause 10.1.1 Civil & Structural Desain Basis)

Spesifikasi Kuat Tekan Beton fc : 25 N/mm2

(Clause 9.2.1 Civil & Structural Desain Basis)


Faktor Reduksi Kuat Tekan Beton fc : 0.6

0.6 as per AISC 360-05 J8

0.65 as per ACI 318-08 section 9.3


Faktor Tahanan untuk kondisi Lentur pada Baja fs : 0.9

Nomor klasifikasi Electrode FExx : 480 N/mm2


Recommended

(b) Tipe Baseplate h= 500 mm

Tipe Base plate : Fixed bf = 255 mm

Tebal Baseplate : 16 mm tf = 14 mm

(c) Penampang Kolom dan Dimensi Baseplate tw = 8.6 mm

H 250 x 250 x 9 x 14
Column section A= ### cm2

Width of base plate B : 450 mm 430 OK

Length of base plate L : 450 mm 455

Width of Pedestal Bp : 700 mm 680

Depth of Pedestal Lp : 700 mm 690

Thickness of Gusset plate / wing plate tg : 11 mm

Thickness of Rib plate tr : 10 mm

Thickness of Grout tgr : 25 mm Section Parameters

(d) Anchor Bolt Details d= 250 mm

No. of anchor bolts yang digunakan N : 6 Nos. bf = 450 mm

as per Doc. No. ELM-PUL-ST-DWG-0029 tf = 14 mm

Tipe anchor bolt : Type 2 tw = 9 mm


Diameter anchor bolts  : 24 mm A= 91 cm2

Jarak anchor ke Tepi fixed base plate d' : 50 mm 45

C/C jarak antar bolts d'' : 170 mm 168

No. gusset plates (paralel pada flange) : 2 Nos. 2 Wing Plate Required

No. of rib plates (tegak lurus flange) fixed base plate : 2 Nos. 0/2/4

Tinggi Stiffener hs : 200 mm

Shear Key provided ( Type 'Y' for yes & 'N' for no) : N

Diameter lubang Bolt : 28 mm

(e) Kapasitas Anchor Bolt

Kapasitas Tarik bolt (ultimate) : 76.3 KN

Kapasitas Geser bolt (ultimate) : 19.0 KN

Jarak Anchor bolt ke tepi pedestal Edb : 170.0 mm


Nama Base Plate : BP-1 Nama Model : Pipe Rack

Summary
Tipe Fixed Comment OK
Lebar Baseplate 450 mm No. gusset plates (paralel flange) 2
Panjang Baseplate 450 mm OK No. of rib plates (perpendicular to flange) 2
Tebal Baseplate yang dibutuhkan 16 mm OK Tebal gusset plate 11 mm OK
Tebal Rib plate 10 mm OK
Tipe anchor bolt Type 2 OK
No. anchor bolts 6 Tinggi Gusset / rib plate 200 mm OK
Dia. Anchor Bolts 24 mm
Jarak anchor ke tepi Base plate 50 mm Las antara Kolom dan Base Plate 1 mm digunakan 7 mm
c/c Jarak antar bolts 170 mm Las antara Rib plate dan Kolom 2 mm digunakan 7 mm
Las antara Gusset dan Kolom 2 mm digunakan 7 mm
Shear Key Provided N
Cek pada
Kapasitas Kapasitas Aktual Aktual
Sr. Node Bearing Bearing Tebal Baseplate Coexistant Tension per Geser per Tension Geser Interaksi Cek Interaksi
No. No LC Pressure Pressure yg dibutuhkan Shear bolt bolt per Bolt Bolt Rasio Rasio
1 160 101 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
2 160 102 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
3 160 103 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
4 160 104 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
5 160 105 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
6 160 106 0.1 OK 1.5 0.5 76.3 19.0 0.0 0.0 0.00 OK
7 160 107 0.1 OK 1.8 2.8 76.3 19.0 0.0 0.0 0.00 OK
8 160 108 0.1 OK 1.8 2.8 76.3 19.0 0.0 0.0 0.00 OK
9 160 109 0.1 OK 1.1 2.8 76.3 19.0 0.0 0.0 0.00 OK
10 160 110 0.1 OK 1.2 2.9 76.3 19.0 0.0 0.0 0.00 OK
11 160 111 0.1 OK 1.4 1.5 76.3 19.0 0.0 0.0 0.00 OK
12 160 112 0.0 OK 2.4 6.1 76.3 19.0 1.9 1.0 0.08 OK
13 160 113 0.0 OK 2.1 5.1 76.3 19.0 1.4 0.9 0.06 OK
14 160 114 0.0 OK 2.7 6.8 76.3 19.0 2.4 1.1 0.09 OK
15 160 115 0.1 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
16 160 116 0.1 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
17 160 117 0.1 OK 1.2 0.2 76.3 19.0 0.0 0.0 0.00 OK
18 160 118 0.1 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
19 160 119 0.1 OK 1.5 2.8 76.3 19.0 0.0 0.0 0.00 OK
20 160 120 0.1 OK 1.5 2.8 76.3 19.0 0.0 0.0 0.00 OK
21 160 121 0.1 OK 1.2 2.8 76.3 19.0 0.0 0.5 0.02 OK
22 160 122 0.0 OK 1.5 2.8 76.3 19.0 0.0 0.5 0.02 OK
23 160 123 0.1 OK 1.2 1.6 76.3 19.0 0.0 0.0 0.00 OK
24 160 124 0.0 OK 1.0 1.6 76.3 19.0 0.0 0.0 0.00 OK
25 160 125 0.1 OK 1.4 1.7 76.3 19.0 0.0 0.0 0.00 OK
26 160 126 0.1 OK 1.2 1.7 76.3 19.0 0.0 0.0 0.00 OK
27 160 127 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
28 160 128 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
29 160 129 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
30 160 130 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
31 160 131 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
32 160 132 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
33 160 133 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
34 160 134 0.1 OK 1.7 2.1 76.3 19.0 0.0 0.0 0.00 OK
35 160 135 0.1 OK 1.7 2.2 76.3 19.0 0.0 0.0 0.00 OK
36 160 136 0.1 OK 1.3 2.1 76.3 19.0 0.0 0.0 0.00 OK
37 160 137 0.1 OK 1.3 2.2 76.3 19.0 0.0 0.0 0.00 OK
38 160 138 0.1 OK 1.5 1.1 76.3 19.0 0.0 0.0 0.00 OK
39 160 139 0.1 OK 1.4 1.1 76.3 19.0 0.0 0.0 0.00 OK
40 160 140 0.1 OK 1.6 1.4 76.3 19.0 0.0 0.0 0.00 OK
41 160 141 0.1 OK 1.5 1.4 76.3 19.0 0.0 0.0 0.00 OK
42 160 142 0.1 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
43 160 143 0.1 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
44 160 144 0.1 OK 1.2 0.2 76.3 19.0 0.0 0.0 0.00 OK
45 160 145 0.1 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
46 160 146 0.1 OK 1.5 2.8 76.3 19.0 0.0 0.0 0.00 OK
47 160 147 0.1 OK 1.5 2.8 76.3 19.0 0.0 0.0 0.00 OK
48 160 148 0.1 OK 1.2 2.8 76.3 19.0 0.0 0.5 0.02 OK
Cek pada
Kapasitas Kapasitas Aktual Aktual
Sr. Node Bearing Bearing Tebal Baseplate Coexistant Tension per Geser per Tension Geser Interaksi Cek Interaksi
No. No LC Pressure Pressure yg dibutuhkan Shear bolt bolt per Bolt Bolt Rasio Rasio

49 160 149 0.0 OK 1.5 2.8 76.3 19.0 0.0 0.5 0.02 OK
50 160 150 0.1 OK 1.2 1.6 76.3 19.0 0.0 0.0 0.00 OK
51 160 151 0.0 OK 1.0 1.6 76.3 19.0 0.0 0.0 0.00 OK
52 160 152 0.1 OK 1.4 1.7 76.3 19.0 0.0 0.0 0.00 OK
53 160 153 0.1 OK 1.2 1.7 76.3 19.0 0.0 0.0 0.00 OK
54 160 154 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
55 160 155 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
56 160 156 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
57 160 157 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
58 160 158 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
59 160 159 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
60 160 160 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
61 160 161 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
62 160 162 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
63 160 163 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
64 162 101 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
65 162 102 0.1 OK 1.4 0.2 76.3 19.0 0.0 0.0 0.00 OK
66 162 103 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
67 162 104 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
68 162 105 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
69 162 106 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
70 162 107 0.1 OK 1.1 0.3 76.3 19.0 0.0 0.0 0.00 OK
71 162 108 0.1 OK 1.1 0.6 76.3 19.0 0.0 0.0 0.00 OK
72 162 109 0.1 OK 1.8 0.3 76.3 19.0 0.0 0.0 0.00 OK
73 162 110 0.1 OK 1.8 0.6 76.3 19.0 0.0 0.0 0.00 OK
74 162 111 0.1 OK 1.5 1.3 76.3 19.0 0.0 0.0 0.00 OK
75 162 112 0.2 OK 2.0 4.2 76.3 19.0 0.0 0.0 0.00 OK
76 162 113 0.2 OK 2.1 1.3 76.3 19.0 0.0 0.0 0.00 OK
77 162 114 0.2 OK 2.3 1.3 76.3 19.0 0.0 0.0 0.00 OK
78 162 115 0.1 OK 1.1 0.1 76.3 19.0 0.0 0.0 0.00 OK
79 162 116 0.1 OK 1.2 0.1 76.3 19.0 0.0 0.0 0.00 OK
80 162 117 0.1 OK 1.1 0.2 76.3 19.0 0.0 0.0 0.00 OK
81 162 118 0.1 OK 1.1 0.4 76.3 19.0 0.0 0.0 0.00 OK
82 162 119 0.0 OK 0.6 0.4 76.3 19.0 0.0 0.0 0.00 OK
83 162 120 0.0 OK 1.0 0.5 76.3 19.0 0.0 0.0 0.00 OK
84 162 121 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
85 162 122 0.1 OK 1.6 0.5 76.3 19.0 0.0 0.0 0.00 OK
86 162 123 0.0 OK 0.9 1.4 76.3 19.0 0.0 0.0 0.00 OK
87 162 124 0.1 OK 1.2 1.4 76.3 19.0 0.0 0.0 0.00 OK
88 162 125 0.0 OK 1.1 1.5 76.3 19.0 0.0 0.0 0.00 OK
89 162 126 0.1 OK 1.3 1.5 76.3 19.0 0.0 0.0 0.00 OK
90 162 127 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
91 162 128 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
92 162 129 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
93 162 130 0.1 OK 1.4 0.2 76.3 19.0 0.0 0.0 0.00 OK
94 162 131 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
95 162 132 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
96 162 133 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
97 162 134 0.1 OK 1.2 0.2 76.3 19.0 0.0 0.0 0.00 OK
98 162 135 0.1 OK 1.2 0.5 76.3 19.0 0.0 0.0 0.00 OK
99 162 136 0.1 OK 1.7 0.2 76.3 19.0 0.0 0.0 0.00 OK
100 162 137 0.1 OK 1.7 0.5 76.3 19.0 0.0 0.0 0.00 OK
101 162 138 0.1 OK 1.3 0.9 76.3 19.0 0.0 0.0 0.00 OK
102 162 139 0.1 OK 1.5 0.9 76.3 19.0 0.0 0.0 0.00 OK
103 162 140 0.1 OK 1.4 1.2 76.3 19.0 0.0 0.0 0.00 OK
104 162 141 0.1 OK 1.6 1.2 76.3 19.0 0.0 0.0 0.00 OK
105 162 142 0.1 OK 1.1 0.1 76.3 19.0 0.0 0.0 0.00 OK
106 162 143 0.1 OK 1.2 0.1 76.3 19.0 0.0 0.0 0.00 OK
107 162 144 0.1 OK 1.1 0.2 76.3 19.0 0.0 0.0 0.00 OK
108 162 145 0.1 OK 1.1 0.4 76.3 19.0 0.0 0.0 0.00 OK
109 162 146 0.0 OK 0.6 0.4 76.3 19.0 0.0 0.0 0.00 OK
110 162 147 0.0 OK 1.0 0.5 76.3 19.0 0.0 0.0 0.00 OK
111 162 148 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
Cek pada
Kapasitas Kapasitas Aktual Aktual
Sr. Node Bearing Bearing Tebal Baseplate Coexistant Tension per Geser per Tension Geser Interaksi Cek Interaksi
No. No LC Pressure Pressure yg dibutuhkan Shear bolt bolt per Bolt Bolt Rasio Rasio

112 162 149 0.1 OK 1.6 0.5 76.3 19.0 0.0 0.0 0.00 OK
113 162 150 0.0 OK 0.9 1.4 76.3 19.0 0.0 0.0 0.00 OK
114 162 151 0.1 OK 1.2 1.4 76.3 19.0 0.0 0.0 0.00 OK
115 162 152 0.0 OK 1.1 1.5 76.3 19.0 0.0 0.0 0.00 OK
116 162 153 0.1 OK 1.3 1.5 76.3 19.0 0.0 0.0 0.00 OK
117 162 154 0.1 OK 1.4 0.1 76.3 19.0 0.0 0.0 0.00 OK
118 162 155 0.1 OK 1.4 0.2 76.3 19.0 0.0 0.0 0.00 OK
119 162 156 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
120 162 157 0.1 OK 1.4 0.1 76.3 19.0 0.0 0.0 0.00 OK
121 162 158 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
122 162 159 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
123 162 160 0.1 OK 1.4 0.2 76.3 19.0 0.0 0.0 0.00 OK
124 162 161 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
125 162 162 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
126 162 163 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
127 104 101 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
128 104 102 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
129 104 103 0.1 OK 1.5 0.5 76.3 19.0 0.0 0.0 0.00 OK
130 104 104 0.1 OK 1.5 0.5 76.3 19.0 0.0 0.0 0.00 OK
131 104 105 0.1 OK 1.5 0.5 76.3 19.0 0.0 0.0 0.00 OK
132 104 106 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
133 104 107 0.1 OK 1.8 2.8 76.3 19.0 0.0 0.0 0.00 OK
134 104 108 0.1 OK 1.8 2.7 76.3 19.0 0.0 0.0 0.00 OK
135 104 109 0.1 OK 1.2 2.9 76.3 19.0 0.0 0.0 0.00 OK
136 104 110 0.1 OK 2.5 2.9 76.3 19.0 0.0 0.5 0.02 OK
137 104 111 0.1 OK 1.5 1.8 76.3 19.0 0.0 0.0 0.00 OK
138 104 112 0.3 OK 2.6 11.1 76.3 19.0 0.0 0.0 0.00 OK
139 104 113 0.3 OK 2.5 10.4 76.3 19.0 0.0 0.0 0.00 OK
140 104 114 0.2 OK 2.4 8.8 76.3 19.0 0.0 0.0 0.00 OK
141 104 115 0.1 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
142 104 116 0.1 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
143 104 117 0.1 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
144 104 118 0.1 OK 1.2 0.2 76.3 19.0 0.0 0.0 0.00 OK
145 104 119 0.1 OK 1.5 2.8 76.3 19.0 0.0 0.0 0.00 OK
146 104 120 0.1 OK 1.5 2.7 76.3 19.0 0.0 0.0 0.00 OK
147 104 121 0.0 OK 1.1 2.9 76.3 19.0 0.0 0.5 0.03 OK
148 104 122 0.1 OK 1.7 2.8 76.3 19.0 0.0 0.5 0.02 OK
149 104 123 0.1 OK 1.4 1.7 76.3 19.0 0.0 0.0 0.00 OK
150 104 124 0.1 OK 1.2 1.7 76.3 19.0 0.0 0.0 0.00 OK
151 104 125 0.1 OK 1.2 1.5 76.3 19.0 0.0 0.0 0.00 OK
152 104 126 0.0 OK 1.0 1.6 76.3 19.0 0.0 0.0 0.00 OK
153 104 127 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
154 104 128 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
155 104 129 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
156 104 130 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
157 104 131 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
158 104 132 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
159 104 133 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
160 104 134 0.1 OK 1.7 2.1 76.3 19.0 0.0 0.0 0.00 OK
161 104 135 0.1 OK 1.7 2.0 76.3 19.0 0.0 0.0 0.00 OK
162 104 136 0.1 OK 1.3 2.2 76.3 19.0 0.0 0.0 0.00 OK
163 104 137 0.1 OK 1.3 2.2 76.3 19.0 0.0 0.0 0.00 OK
164 104 138 0.1 OK 1.6 1.4 76.3 19.0 0.0 0.0 0.00 OK
165 104 139 0.1 OK 1.5 1.4 76.3 19.0 0.0 0.0 0.00 OK
166 104 140 0.1 OK 1.5 1.1 76.3 19.0 0.0 0.0 0.00 OK
167 104 141 0.1 OK 1.4 1.2 76.3 19.0 0.0 0.0 0.00 OK
168 104 142 0.1 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
169 104 143 0.1 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
170 104 144 0.1 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
171 104 145 0.1 OK 1.2 0.2 76.3 19.0 0.0 0.0 0.00 OK
172 104 146 0.1 OK 1.5 2.8 76.3 19.0 0.0 0.0 0.00 OK
173 104 147 0.1 OK 1.5 2.7 76.3 19.0 0.0 0.0 0.00 OK
174 104 148 0.0 OK 1.1 2.9 76.3 19.0 0.0 0.5 0.03 OK
Cek pada
Kapasitas Kapasitas Aktual Aktual
Sr. Node Bearing Bearing Tebal Baseplate Coexistant Tension per Geser per Tension Geser Interaksi Cek Interaksi
No. No LC Pressure Pressure yg dibutuhkan Shear bolt bolt per Bolt Bolt Rasio Rasio

175 104 149 0.1 OK 1.7 2.8 76.3 19.0 0.0 0.5 0.02 OK
176 104 150 0.1 OK 1.4 1.7 76.3 19.0 0.0 0.0 0.00 OK
177 104 151 0.1 OK 1.2 1.7 76.3 19.0 0.0 0.0 0.00 OK
178 104 152 0.1 OK 1.2 1.5 76.3 19.0 0.0 0.0 0.00 OK
179 104 153 0.0 OK 1.0 1.6 76.3 19.0 0.0 0.0 0.00 OK
180 104 154 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
181 104 155 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
182 104 156 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
183 104 157 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
184 104 158 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
185 104 159 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
186 104 160 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
187 104 161 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
188 104 162 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
189 104 163 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
190 107 101 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
191 107 102 0.1 OK 1.4 0.2 76.3 19.0 0.0 0.0 0.00 OK
192 107 103 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
193 107 104 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
194 107 105 0.1 OK 1.5 0.5 76.3 19.0 0.0 0.0 0.00 OK
195 107 106 0.1 OK 1.4 0.2 76.3 19.0 0.0 0.0 0.00 OK
196 107 107 0.1 OK 1.2 0.6 76.3 19.0 0.0 0.0 0.00 OK
197 107 108 0.1 OK 1.1 0.3 76.3 19.0 0.0 0.0 0.00 OK
198 107 109 0.1 OK 1.8 0.6 76.3 19.0 0.0 0.0 0.00 OK
199 107 110 0.1 OK 1.8 0.3 76.3 19.0 0.0 0.0 0.00 OK
200 107 111 0.1 OK 1.6 1.6 76.3 19.0 0.0 0.0 0.00 OK
201 107 112 0.0 OK 2.7 5.0 76.3 19.0 2.3 0.8 0.07 OK
202 107 113 0.0 OK 3.0 2.1 76.3 19.0 2.8 0.4 0.06 OK
203 107 114 0.0 OK 2.4 2.1 76.3 19.0 1.8 0.4 0.04 OK
204 107 115 0.1 OK 1.1 0.1 76.3 19.0 0.0 0.0 0.00 OK
205 107 116 0.1 OK 1.2 0.1 76.3 19.0 0.0 0.0 0.00 OK
206 107 117 0.1 OK 1.1 0.4 76.3 19.0 0.0 0.0 0.00 OK
207 107 118 0.1 OK 1.1 0.2 76.3 19.0 0.0 0.0 0.00 OK
208 107 119 0.0 OK 0.7 0.5 76.3 19.0 0.0 0.0 0.00 OK
209 107 120 0.0 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
210 107 121 0.1 OK 1.6 0.5 76.3 19.0 0.0 0.0 0.00 OK
211 107 122 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
212 107 123 0.1 OK 1.1 1.5 76.3 19.0 0.0 0.0 0.00 OK
213 107 124 0.1 OK 1.3 1.5 76.3 19.0 0.0 0.0 0.00 OK
214 107 125 0.0 OK 0.9 1.4 76.3 19.0 0.0 0.0 0.00 OK
215 107 126 0.1 OK 1.2 1.4 76.3 19.0 0.0 0.0 0.00 OK
216 107 127 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
217 107 128 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
218 107 129 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
219 107 130 0.1 OK 1.4 0.2 76.3 19.0 0.0 0.0 0.00 OK
220 107 131 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
221 107 132 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
222 107 133 0.1 OK 1.4 0.1 76.3 19.0 0.0 0.0 0.00 OK
223 107 134 0.1 OK 1.2 0.5 76.3 19.0 0.0 0.0 0.00 OK
224 107 135 0.1 OK 1.2 0.2 76.3 19.0 0.0 0.0 0.00 OK
225 107 136 0.1 OK 1.7 0.5 76.3 19.0 0.0 0.0 0.00 OK
226 107 137 0.1 OK 1.7 0.2 76.3 19.0 0.0 0.0 0.00 OK
227 107 138 0.1 OK 1.4 1.2 76.3 19.0 0.0 0.0 0.00 OK
228 107 139 0.1 OK 1.6 1.2 76.3 19.0 0.0 0.0 0.00 OK
229 107 140 0.1 OK 1.3 1.0 76.3 19.0 0.0 0.0 0.00 OK
230 107 141 0.1 OK 1.5 0.9 76.3 19.0 0.0 0.0 0.00 OK
231 107 142 0.1 OK 1.1 0.1 76.3 19.0 0.0 0.0 0.00 OK
232 107 143 0.1 OK 1.2 0.1 76.3 19.0 0.0 0.0 0.00 OK
233 107 144 0.1 OK 1.1 0.4 76.3 19.0 0.0 0.0 0.00 OK
234 107 145 0.1 OK 1.1 0.2 76.3 19.0 0.0 0.0 0.00 OK
235 107 146 0.0 OK 0.7 0.5 76.3 19.0 0.0 0.0 0.00 OK
236 107 147 0.0 OK 1.2 0.4 76.3 19.0 0.0 0.0 0.00 OK
237 107 148 0.1 OK 1.6 0.5 76.3 19.0 0.0 0.0 0.00 OK
Cek pada
Kapasitas Kapasitas Aktual Aktual
Sr. Node Bearing Bearing Tebal Baseplate Coexistant Tension per Geser per Tension Geser Interaksi Cek Interaksi
No. No LC Pressure Pressure yg dibutuhkan Shear bolt bolt per Bolt Bolt Rasio Rasio

238 107 149 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
239 107 150 0.1 OK 1.1 1.5 76.3 19.0 0.0 0.0 0.00 OK
240 107 151 0.1 OK 1.3 1.5 76.3 19.0 0.0 0.0 0.00 OK
241 107 152 0.0 OK 0.9 1.4 76.3 19.0 0.0 0.0 0.00 OK
242 107 153 0.1 OK 1.2 1.4 76.3 19.0 0.0 0.0 0.00 OK
243 107 154 0.1 OK 1.4 0.2 76.3 19.0 0.0 0.0 0.00 OK
244 107 155 0.1 OK 1.4 0.2 76.3 19.0 0.0 0.0 0.00 OK
245 107 156 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
246 107 157 0.1 OK 1.4 0.4 76.3 19.0 0.0 0.0 0.00 OK
247 107 158 0.1 OK 1.4 0.1 76.3 19.0 0.0 0.0 0.00 OK
248 107 159 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
249 107 160 0.1 OK 1.4 0.2 76.3 19.0 0.0 0.0 0.00 OK
250 107 161 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
251 107 162 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
252 107 163 0.1 OK 1.4 0.1 76.3 19.0 0.0 0.0 0.00 OK
253 14 101 0.2 OK 1.9 0.4 76.3 19.0 0.0 0.0 0.00 OK
254 14 102 0.1 OK 1.9 0.3 76.3 19.0 0.0 0.0 0.00 OK
255 14 103 0.2 OK 2.0 0.6 76.3 19.0 0.0 0.0 0.00 OK
256 14 104 0.2 OK 2.0 0.6 76.3 19.0 0.0 0.0 0.00 OK
257 14 105 0.1 OK 1.5 2.9 76.3 19.0 0.0 0.0 0.00 OK
258 14 106 0.2 OK 2.3 3.5 76.3 19.0 0.0 0.0 0.00 OK
259 14 107 0.7 OK 3.8 1.8 76.3 19.0 0.0 0.0 0.00 OK
260 14 108 0.3 OK 2.7 2.0 76.3 19.0 0.0 0.0 0.00 OK
261 14 109 12.8 OK 15.9 1.9 76.3 19.0 0.0 0.0 0.00 OK
262 14 110 0.5 OK 4.1 2.6 76.3 19.0 0.0 0.0 0.00 OK
263 14 111 12.8 OK 15.9 5.3 76.3 19.0 0.4 0.9 0.05 OK
264 14 112 0.0 OK 3.9 7.4 76.3 19.0 4.7 1.2 0.13 OK
265 14 113 0.4 OK 2.7 4.1 76.3 19.0 0.0 0.0 0.00 OK
266 14 114 0.2 OK 2.4 4.1 76.3 19.0 0.0 0.0 0.00 OK
267 14 115 0.1 OK 1.4 0.2 76.3 19.0 0.0 0.0 0.00 OK
268 14 116 0.1 OK 1.6 0.4 76.3 19.0 0.0 0.0 0.00 OK
269 14 117 0.0 OK 1.5 3.0 76.3 19.0 0.0 0.5 0.03 OK
270 14 118 0.2 OK 1.9 3.4 76.3 19.0 0.0 0.0 0.00 OK
271 14 119 12.8 OK 15.9 1.9 76.3 19.0 1.8 0.0 0.02 OK
272 14 120 0.6 OK 3.5 2.0 76.3 19.0 0.0 0.0 0.00 OK
273 14 121 12.8 OK 15.9 1.9 76.3 19.0 1.9 0.0 0.03 OK
274 14 122 1.1 OK 4.6 2.4 76.3 19.0 0.0 0.0 0.00 OK
275 14 123 0.0 OK 2.5 5.5 76.3 19.0 1.9 0.9 0.07 OK
276 14 124 0.0 OK 2.7 5.4 76.3 19.0 2.4 0.9 0.08 OK
277 14 125 0.2 OK 2.2 5.8 76.3 19.0 0.0 0.0 0.00 OK
278 14 126 0.2 OK 2.4 5.9 76.3 19.0 0.0 0.0 0.00 OK
279 14 127 0.2 OK 2.2 0.5 76.3 19.0 0.0 0.0 0.00 OK
280 14 128 0.2 OK 2.2 0.5 76.3 19.0 0.0 0.0 0.00 OK
281 14 129 0.2 OK 2.2 0.5 76.3 19.0 0.0 0.0 0.00 OK
282 14 130 0.2 OK 2.2 0.5 76.3 19.0 0.0 0.0 0.00 OK
283 14 131 0.2 OK 2.2 0.6 76.3 19.0 0.0 0.0 0.00 OK
284 14 132 0.2 OK 1.9 2.0 76.3 19.0 0.0 0.0 0.00 OK
285 14 133 0.2 OK 2.4 2.8 76.3 19.0 0.0 0.0 0.00 OK
286 14 134 0.2 OK 2.8 1.1 76.3 19.0 0.0 0.0 0.00 OK
287 14 135 0.3 OK 5.2 1.6 76.3 19.0 0.0 0.0 0.00 OK
288 14 136 0.4 OK 5.3 1.5 76.3 19.0 0.0 0.0 0.00 OK
289 14 137 0.4 OK 2.8 2.2 76.3 19.0 0.0 0.0 0.00 OK
290 14 138 0.1 OK 1.6 3.9 76.3 19.0 0.0 0.0 0.00 OK
291 14 139 0.2 OK 1.8 3.9 76.3 19.0 0.0 0.0 0.00 OK
292 14 140 0.3 OK 2.5 4.6 76.3 19.0 0.0 0.0 0.00 OK
293 14 141 0.3 OK 2.8 4.7 76.3 19.0 0.0 0.0 0.00 OK
294 14 142 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
295 14 143 0.1 OK 1.8 0.5 76.3 19.0 0.0 0.0 0.00 OK
296 14 144 0.1 OK 1.2 3.0 76.3 19.0 0.0 0.0 0.00 OK
297 14 145 0.2 OK 2.1 3.4 76.3 19.0 0.0 0.0 0.00 OK
298 14 146 12.8 OK 15.9 1.9 76.3 19.0 0.8 0.0 0.01 OK
299 14 147 0.4 OK 3.5 2.0 76.3 19.0 0.0 0.0 0.00 OK
300 14 148 12.8 OK 15.9 1.9 76.3 19.0 1.1 0.0 0.01 OK
Cek pada
Kapasitas Kapasitas Aktual Aktual
Sr. Node Bearing Bearing Tebal Baseplate Coexistant Tension per Geser per Tension Geser Interaksi Cek Interaksi
No. No LC Pressure Pressure yg dibutuhkan Shear bolt bolt per Bolt Bolt Rasio Rasio

301 14 149 0.6 OK 3.5 2.5 76.3 19.0 0.0 0.0 0.00 OK
302 14 150 0.0 OK 1.7 5.4 76.3 19.0 0.9 0.9 0.06 OK
303 14 151 12.8 OK 15.9 5.4 76.3 19.0 1.4 0.9 0.07 OK
304 14 152 0.2 OK 2.4 5.8 76.3 19.0 0.0 0.0 0.00 OK
305 14 153 0.3 OK 2.6 5.9 76.3 19.0 0.0 0.0 0.00 OK
306 14 154 0.3 OK 2.5 0.7 76.3 19.0 0.0 0.0 0.00 OK
307 14 155 0.3 OK 2.5 0.6 76.3 19.0 0.0 0.0 0.00 OK
308 14 156 0.3 OK 2.6 0.8 76.3 19.0 0.0 0.0 0.00 OK
309 14 157 0.2 OK 2.3 1.9 76.3 19.0 0.0 0.0 0.00 OK
310 14 158 0.3 OK 2.7 3.0 76.3 19.0 0.0 0.0 0.00 OK
311 14 159 0.2 OK 1.9 0.4 76.3 19.0 0.0 0.0 0.00 OK
312 14 160 0.1 OK 1.9 0.3 76.3 19.0 0.0 0.0 0.00 OK
313 14 161 0.2 OK 2.0 0.5 76.3 19.0 0.0 0.0 0.00 OK
314 14 162 0.1 OK 1.6 2.1 76.3 19.0 0.0 0.0 0.00 OK
315 14 163 0.2 OK 2.2 2.7 76.3 19.0 0.0 0.0 0.00 OK
316 28 101 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
317 28 102 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
318 28 103 0.1 OK 3.0 0.5 76.3 19.0 0.0 0.0 0.00 OK
319 28 104 0.1 OK 3.0 0.5 76.3 19.0 0.0 0.0 0.00 OK
320 28 105 0.1 OK 1.2 0.3 76.3 19.0 0.0 0.0 0.00 OK
321 28 106 0.1 OK 1.9 0.3 76.3 19.0 0.0 0.0 0.00 OK
322 28 107 12.8 OK 15.9 4.4 76.3 19.0 13.9 0.7 0.22 OK
323 28 108 12.8 OK 15.9 4.5 76.3 19.0 11.2 0.0 0.15 OK
324 28 109 12.8 OK 15.9 4.8 76.3 19.0 12.4 0.0 0.16 OK
325 28 110 12.8 OK 15.9 4.8 76.3 19.0 9.5 0.0 0.12 OK
326 28 111 0.0 OK 4.5 1.7 76.3 19.0 6.6 0.3 0.10 OK
327 28 112 0.0 OK 8.2 4.9 76.3 19.0 21.6 0.8 0.33 OK
328 28 113 12.8 OK 15.9 5.1 76.3 19.0 10.7 0.0 0.14 OK
329 28 114 12.8 OK 15.9 2.4 76.3 19.0 0.7 0.0 0.01 OK
330 28 115 0.1 OK 1.3 0.2 76.3 19.0 0.0 0.0 0.00 OK
331 28 116 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
332 28 117 0.0 OK 0.9 0.2 76.3 19.0 0.0 0.0 0.00 OK
333 28 118 0.1 OK 1.5 0.3 76.3 19.0 0.0 0.0 0.00 OK
334 28 119 0.0 OK 7.4 4.5 76.3 19.0 17.5 0.7 0.27 OK
335 28 120 12.8 OK 15.9 4.5 76.3 19.0 12.8 0.8 0.21 OK
336 28 121 12.8 OK 15.9 4.7 76.3 19.0 13.7 0.8 0.22 OK
337 28 122 12.8 OK 15.9 4.7 76.3 19.0 10.7 0.0 0.14 OK
338 28 123 0.0 OK 4.8 1.3 76.3 19.0 7.3 0.2 0.11 OK
339 28 124 0.0 OK 4.9 1.6 76.3 19.0 7.7 0.3 0.11 OK
340 28 125 0.5 OK 3.3 1.5 76.3 19.0 0.0 0.0 0.00 OK
341 28 126 0.5 OK 4.8 1.5 76.3 19.0 0.0 0.0 0.00 OK
342 28 127 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
343 28 128 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
344 28 129 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
345 28 130 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
346 28 131 0.1 OK 3.3 0.5 76.3 19.0 0.0 0.0 0.00 OK
347 28 132 0.1 OK 1.4 0.3 76.3 19.0 0.0 0.0 0.00 OK
348 28 133 0.1 OK 1.8 0.3 76.3 19.0 0.0 0.0 0.00 OK
349 28 134 12.8 OK 15.9 3.2 76.3 19.0 9.4 0.5 0.15 OK
350 28 135 12.8 OK 15.9 3.3 76.3 19.0 7.4 0.0 0.10 OK
351 28 136 12.8 OK 15.9 3.7 76.3 19.0 8.7 0.0 0.11 OK
352 28 137 12.8 OK 15.9 3.7 76.3 19.0 6.4 0.0 0.08 OK
353 28 138 0.0 OK 3.3 0.8 76.3 19.0 3.4 0.1 0.05 OK
354 28 139 12.8 OK 15.9 1.4 76.3 19.0 3.8 0.2 0.06 OK
355 28 140 0.3 OK 2.6 1.0 76.3 19.0 0.0 0.0 0.00 OK
356 28 141 0.4 OK 3.0 1.3 76.3 19.0 0.0 0.0 0.00 OK
357 28 142 0.1 OK 1.3 0.2 76.3 19.0 0.0 0.0 0.00 OK
358 28 143 0.1 OK 1.5 0.5 76.3 19.0 0.0 0.0 0.00 OK
359 28 144 0.0 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
360 28 145 0.1 OK 1.6 0.3 76.3 19.0 0.0 0.0 0.00 OK
361 28 146 0.0 OK 7.4 4.4 76.3 19.0 17.4 0.7 0.27 OK
362 28 147 12.8 OK 15.9 4.5 76.3 19.0 12.8 0.7 0.21 OK
363 28 148 12.8 OK 15.9 4.8 76.3 19.0 13.7 0.8 0.22 OK
Cek pada
Kapasitas Kapasitas Aktual Aktual
Sr. Node Bearing Bearing Tebal Baseplate Coexistant Tension per Geser per Tension Geser Interaksi Cek Interaksi
No. No LC Pressure Pressure yg dibutuhkan Shear bolt bolt per Bolt Bolt Rasio Rasio

364 28 149 12.8 OK 15.9 4.7 76.3 19.0 10.8 0.0 0.14 OK
365 28 150 0.0 OK 4.8 1.2 76.3 19.0 7.3 0.2 0.11 OK
366 28 151 0.0 OK 4.9 1.6 76.3 19.0 7.8 0.3 0.12 OK
367 28 152 0.5 OK 3.4 1.4 76.3 19.0 0.0 0.0 0.00 OK
368 28 153 0.5 OK 4.5 1.5 76.3 19.0 0.0 0.0 0.00 OK
369 28 154 0.2 OK 2.0 0.2 76.3 19.0 0.0 0.0 0.00 OK
370 28 155 0.2 OK 2.0 0.2 76.3 19.0 0.0 0.0 0.00 OK
371 28 156 0.2 OK 2.1 0.5 76.3 19.0 0.0 0.0 0.00 OK
372 28 157 0.1 OK 1.9 0.2 76.3 19.0 0.0 0.0 0.00 OK
373 28 158 0.2 OK 2.2 0.3 76.3 19.0 0.0 0.0 0.00 OK
374 28 159 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
375 28 160 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
376 28 161 0.1 OK 3.7 0.4 76.3 19.0 0.0 0.0 0.00 OK
377 28 162 0.1 OK 1.4 0.2 76.3 19.0 0.0 0.0 0.00 OK
378 28 163 0.1 OK 1.8 0.3 76.3 19.0 0.0 0.0 0.00 OK
379 48 101 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
380 48 102 0.1 OK 1.7 0.3 76.3 19.0 0.0 0.0 0.00 OK
381 48 103 0.1 OK 1.6 0.3 76.3 19.0 0.0 0.0 0.00 OK
382 48 104 0.1 OK 1.6 0.3 76.3 19.0 0.0 0.0 0.00 OK
383 48 105 0.1 OK 1.4 1.2 76.3 19.0 0.0 0.0 0.00 OK
384 48 106 0.1 OK 1.6 1.1 76.3 19.0 0.0 0.0 0.00 OK
385 48 107 12.8 OK 15.9 3.9 76.3 19.0 12.3 0.6 0.20 OK
386 48 108 12.8 OK 15.9 4.1 76.3 19.0 9.6 0.0 0.13 OK
387 48 109 12.8 OK 15.9 3.9 76.3 19.0 12.1 0.6 0.19 OK
388 48 110 12.8 OK 15.9 4.0 76.3 19.0 9.3 0.0 0.12 OK
389 48 111 0.0 OK 4.3 8.3 76.3 19.0 5.8 1.4 0.15 OK
390 48 112 0.0 OK 7.7 10.7 76.3 19.0 19.0 1.8 0.34 OK
391 48 113 12.8 OK 15.9 7.1 76.3 19.0 8.1 0.0 0.11 OK
392 48 114 2.0 OK 6.3 6.5 76.3 19.0 0.0 0.0 0.00 OK
393 48 115 0.1 OK 1.9 0.3 76.3 19.0 0.0 0.0 0.00 OK
394 48 116 0.1 OK 2.7 0.2 76.3 19.0 0.0 0.0 0.00 OK
395 48 117 0.0 OK 1.0 1.3 76.3 19.0 0.0 0.0 0.00 OK
396 48 118 0.1 OK 1.3 1.0 76.3 19.0 0.0 0.0 0.00 OK
397 48 119 12.8 OK 15.9 3.9 76.3 19.0 13.6 0.7 0.21 OK
398 48 120 12.8 OK 15.9 4.1 76.3 19.0 10.9 0.0 0.14 OK
399 48 121 12.8 OK 15.9 3.9 76.3 19.0 13.6 0.7 0.21 OK
400 48 122 12.8 OK 15.9 4.0 76.3 19.0 10.8 0.0 0.14 OK
401 48 123 0.0 OK 4.7 8.3 76.3 19.0 7.2 1.4 0.17 OK
402 48 124 0.0 OK 4.7 8.4 76.3 19.0 7.1 1.4 0.17 OK
403 48 125 0.5 OK 4.2 8.5 76.3 19.0 0.0 0.0 0.00 OK
404 48 126 0.5 OK 4.9 8.5 76.3 19.0 0.0 0.0 0.00 OK
405 48 127 0.1 OK 1.8 0.3 76.3 19.0 0.0 0.0 0.00 OK
406 48 128 0.1 OK 1.8 0.3 76.3 19.0 0.0 0.0 0.00 OK
407 48 129 0.1 OK 1.8 0.3 76.3 19.0 0.0 0.0 0.00 OK
408 48 130 0.2 OK 1.9 0.3 76.3 19.0 0.0 0.0 0.00 OK
409 48 131 0.2 OK 1.9 0.3 76.3 19.0 0.0 0.0 0.00 OK
410 48 132 0.1 OK 1.7 0.8 76.3 19.0 0.0 0.0 0.00 OK
411 48 133 0.2 OK 1.9 1.0 76.3 19.0 0.0 0.0 0.00 OK
412 48 134 12.8 OK 15.9 2.8 76.3 19.0 6.7 0.0 0.09 OK
413 48 135 12.8 OK 15.9 3.2 76.3 19.0 4.6 0.0 0.06 OK
414 48 136 12.8 OK 15.9 2.8 76.3 19.0 6.6 0.0 0.09 OK
415 48 137 12.8 OK 15.9 3.2 76.3 19.0 4.5 0.0 0.06 OK
416 48 138 12.8 OK 15.9 6.1 76.3 19.0 1.6 1.0 0.07 OK
417 48 139 12.8 OK 15.9 6.1 76.3 19.0 1.5 1.0 0.07 OK
418 48 140 0.4 OK 3.2 6.7 76.3 19.0 0.0 0.0 0.00 OK
419 48 141 0.4 OK 3.7 6.7 76.3 19.0 0.0 0.0 0.00 OK
420 48 142 0.1 OK 1.6 0.3 76.3 19.0 0.0 0.0 0.00 OK
421 48 143 0.1 OK 1.6 0.3 76.3 19.0 0.0 0.0 0.00 OK
422 48 144 0.1 OK 1.3 1.2 76.3 19.0 0.0 0.0 0.00 OK
423 48 145 0.1 OK 1.5 1.1 76.3 19.0 0.0 0.0 0.00 OK
424 48 146 12.8 OK 15.9 3.8 76.3 19.0 12.6 0.6 0.20 OK
425 48 147 12.8 OK 15.9 4.1 76.3 19.0 9.8 0.0 0.13 OK
426 48 148 12.8 OK 15.9 3.9 76.3 19.0 12.6 0.6 0.20 OK
Cek pada
Kapasitas Kapasitas Aktual Aktual
Sr. Node Bearing Bearing Tebal Baseplate Coexistant Tension per Geser per Tension Geser Interaksi Cek Interaksi
No. No LC Pressure Pressure yg dibutuhkan Shear bolt bolt per Bolt Bolt Rasio Rasio

427 48 149 12.8 OK 15.9 4.0 76.3 19.0 9.8 0.0 0.13 OK
428 48 150 0.0 OK 4.4 8.3 76.3 19.0 6.2 1.4 0.15 OK
429 48 151 0.0 OK 4.4 8.3 76.3 19.0 6.2 1.4 0.15 OK
430 48 152 0.5 OK 6.6 8.6 76.3 19.0 0.0 0.0 0.00 OK
431 48 153 0.4 OK 7.0 8.6 76.3 19.0 0.0 0.0 0.00 OK
432 48 154 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
433 48 155 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
434 48 156 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
435 48 157 0.1 OK 1.4 0.9 76.3 19.0 0.0 0.0 0.00 OK
436 48 158 0.1 OK 1.6 0.8 76.3 19.0 0.0 0.0 0.00 OK
437 48 159 0.1 OK 1.5 0.1 76.3 19.0 0.0 0.0 0.00 OK
438 48 160 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
439 48 161 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
440 48 162 0.1 OK 1.4 0.9 76.3 19.0 0.0 0.0 0.00 OK
441 48 163 0.1 OK 1.6 0.8 76.3 19.0 0.0 0.0 0.00 OK
442 50 101 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
443 50 102 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
444 50 103 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
445 50 104 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
446 50 105 0.1 OK 1.6 0.5 76.3 19.0 0.0 0.0 0.00 OK
447 50 106 0.1 OK 1.4 0.1 76.3 19.0 0.0 0.0 0.00 OK
448 50 107 12.8 OK 15.9 3.1 76.3 19.0 9.6 0.0 0.13 OK
449 50 108 12.8 OK 15.9 3.1 76.3 19.0 12.4 0.0 0.16 OK
450 50 109 12.8 OK 15.9 3.1 76.3 19.0 9.3 0.0 0.12 OK
451 50 110 12.8 OK 15.9 3.0 76.3 19.0 12.1 0.0 0.16 OK
452 50 111 0.4 OK 3.2 1.4 76.3 19.0 0.0 0.0 0.00 OK
453 50 112 12.8 OK 15.9 3.2 76.3 19.0 5.7 0.0 0.07 OK
454 50 113 12.8 OK 15.9 3.0 76.3 19.0 14.8 0.5 0.22 OK
455 50 114 12.8 OK 15.9 1.2 76.3 19.0 6.2 0.2 0.09 OK
456 50 115 0.1 OK 2.7 0.2 76.3 19.0 0.0 0.0 0.00 OK
457 50 116 0.1 OK 1.3 0.1 76.3 19.0 0.0 0.0 0.00 OK
458 50 117 0.1 OK 1.3 0.5 76.3 19.0 0.0 0.0 0.00 OK
459 50 118 0.0 OK 1.0 0.0 76.3 19.0 0.0 0.0 0.00 OK
460 50 119 12.8 OK 15.9 3.1 76.3 19.0 10.9 0.0 0.14 OK
461 50 120 12.8 OK 15.9 3.1 76.3 19.0 13.7 0.5 0.21 OK
462 50 121 12.8 OK 15.9 3.1 76.3 19.0 10.7 0.0 0.14 OK
463 50 122 12.8 OK 15.9 3.1 76.3 19.0 13.5 0.5 0.20 OK
464 50 123 0.5 OK 4.2 1.3 76.3 19.0 0.0 0.0 0.00 OK
465 50 124 0.5 OK 4.9 1.3 76.3 19.0 0.0 0.0 0.00 OK
466 50 125 0.0 OK 4.8 1.2 76.3 19.0 7.2 0.2 0.10 OK
467 50 126 0.0 OK 4.7 1.2 76.3 19.0 7.1 0.2 0.10 OK
468 50 127 0.1 OK 1.8 0.3 76.3 19.0 0.0 0.0 0.00 OK
469 50 128 0.1 OK 1.8 0.3 76.3 19.0 0.0 0.0 0.00 OK
470 50 129 0.1 OK 1.8 0.3 76.3 19.0 0.0 0.0 0.00 OK
471 50 130 0.2 OK 1.9 0.3 76.3 19.0 0.0 0.0 0.00 OK
472 50 131 0.1 OK 1.9 0.3 76.3 19.0 0.0 0.0 0.00 OK
473 50 132 0.2 OK 1.9 0.6 76.3 19.0 0.0 0.0 0.00 OK
474 50 133 0.1 OK 1.7 0.2 76.3 19.0 0.0 0.0 0.00 OK
475 50 134 12.8 OK 15.9 2.4 76.3 19.0 4.7 0.0 0.06 OK
476 50 135 12.8 OK 15.9 2.3 76.3 19.0 6.8 0.0 0.09 OK
477 50 136 12.8 OK 15.9 2.4 76.3 19.0 4.5 0.0 0.06 OK
478 50 137 12.8 OK 15.9 2.3 76.3 19.0 6.6 0.0 0.09 OK
479 50 138 0.4 OK 3.2 1.2 76.3 19.0 0.0 0.0 0.00 OK
480 50 139 0.4 OK 3.6 1.2 76.3 19.0 0.0 0.0 0.00 OK
481 50 140 12.8 OK 15.9 0.8 76.3 19.0 1.7 0.0 0.02 OK
482 50 141 12.8 OK 15.9 0.8 76.3 19.0 1.5 0.0 0.02 OK
483 50 142 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
484 50 143 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
485 50 144 0.1 OK 1.5 0.5 76.3 19.0 0.0 0.0 0.00 OK
486 50 145 0.1 OK 1.3 0.1 76.3 19.0 0.0 0.0 0.00 OK
487 50 146 12.8 OK 15.9 3.1 76.3 19.0 9.9 0.0 0.13 OK
488 50 147 12.8 OK 15.9 3.1 76.3 19.0 12.7 0.5 0.19 OK
489 50 148 12.8 OK 15.9 3.1 76.3 19.0 9.8 0.0 0.13 OK
Cek pada
Kapasitas Kapasitas Aktual Aktual
Sr. Node Bearing Bearing Tebal Baseplate Coexistant Tension per Geser per Tension Geser Interaksi Cek Interaksi
No. No LC Pressure Pressure yg dibutuhkan Shear bolt bolt per Bolt Bolt Rasio Rasio

490 50 149 12.8 OK 15.9 3.1 76.3 19.0 12.6 0.5 0.19 OK
491 50 150 0.5 OK 6.6 1.4 76.3 19.0 0.0 0.0 0.00 OK
492 50 151 0.4 OK 7.0 1.4 76.3 19.0 0.0 0.0 0.00 OK
493 50 152 0.0 OK 4.4 1.1 76.3 19.0 6.3 0.2 0.09 OK
494 50 153 0.0 OK 4.4 1.1 76.3 19.0 6.2 0.2 0.09 OK
495 50 154 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
496 50 155 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
497 50 156 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
498 50 157 0.1 OK 1.6 0.4 76.3 19.0 0.0 0.0 0.00 OK
499 50 158 0.1 OK 1.4 0.1 76.3 19.0 0.0 0.0 0.00 OK
500 50 159 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
501 50 160 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
502 50 161 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
503 50 162 0.1 OK 1.6 0.4 76.3 19.0 0.0 0.0 0.00 OK
504 50 163 0.1 OK 1.4 0.1 76.3 19.0 0.0 0.0 0.00 OK
505 30 101 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
506 30 102 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
507 30 103 0.1 OK 3.2 0.5 76.3 19.0 0.0 0.0 0.00 OK
508 30 104 0.1 OK 3.2 0.5 76.3 19.0 0.0 0.0 0.00 OK
509 30 105 0.1 OK 1.9 2.5 76.3 19.0 0.0 0.0 0.00 OK
510 30 106 0.1 OK 1.3 2.3 76.3 19.0 0.0 0.0 0.00 OK
511 30 107 12.8 OK 15.9 4.9 76.3 19.0 11.2 0.0 0.15 OK
512 30 108 12.8 OK 15.9 4.8 76.3 19.0 14.0 0.8 0.22 OK
513 30 109 12.8 OK 15.9 5.2 76.3 19.0 9.2 0.0 0.12 OK
514 30 110 12.8 OK 15.9 5.1 76.3 19.0 12.1 0.0 0.16 OK
515 30 111 0.5 OK 3.2 6.8 76.3 19.0 0.0 0.0 0.00 OK
516 30 112 12.8 OK 15.9 9.3 76.3 19.0 9.1 0.0 0.12 OK
517 30 113 0.0 OK 8.0 7.2 76.3 19.0 20.2 1.2 0.33 OK
518 30 114 0.0 OK 5.3 5.6 76.3 19.0 9.0 0.9 0.17 OK
519 30 115 0.1 OK 1.3 0.2 76.3 19.0 0.0 0.0 0.00 OK
520 30 116 0.1 OK 1.5 0.4 76.3 19.0 0.0 0.0 0.00 OK
521 30 117 0.1 OK 1.6 2.5 76.3 19.0 0.0 0.0 0.00 OK
522 30 118 0.0 OK 0.9 2.3 76.3 19.0 0.0 0.4 0.02 OK
523 30 119 12.8 OK 15.9 4.9 76.3 19.0 12.9 0.8 0.21 OK
524 30 120 0.0 OK 7.4 4.9 76.3 19.0 17.5 0.8 0.27 OK
525 30 121 12.8 OK 15.9 5.1 76.3 19.0 10.5 0.0 0.14 OK
526 30 122 12.8 OK 15.9 5.0 76.3 19.0 13.5 0.8 0.22 OK
527 30 123 0.5 OK 3.3 6.7 76.3 19.0 0.0 0.0 0.00 OK
528 30 124 0.5 OK 5.0 6.7 76.3 19.0 0.0 0.0 0.00 OK
529 30 125 0.0 OK 4.8 6.5 76.3 19.0 7.4 1.1 0.15 OK
530 30 126 0.0 OK 4.9 6.5 76.3 19.0 7.6 1.1 0.16 OK
531 30 127 0.1 OK 1.7 0.3 76.3 19.0 0.0 0.0 0.00 OK
532 30 128 0.1 OK 1.7 0.3 76.3 19.0 0.0 0.0 0.00 OK
533 30 129 0.1 OK 1.7 0.3 76.3 19.0 0.0 0.0 0.00 OK
534 30 130 0.1 OK 1.5 0.2 76.3 19.0 0.0 0.0 0.00 OK
535 30 131 0.1 OK 3.5 0.5 76.3 19.0 0.0 0.0 0.00 OK
536 30 132 0.1 OK 1.8 2.0 76.3 19.0 0.0 0.0 0.00 OK
537 30 133 0.1 OK 1.5 1.6 76.3 19.0 0.0 0.0 0.00 OK
538 30 134 12.8 OK 15.9 3.6 76.3 19.0 7.3 0.0 0.10 OK
539 30 135 12.8 OK 15.9 3.5 76.3 19.0 9.4 0.6 0.15 OK
540 30 136 12.8 OK 15.9 4.0 76.3 19.0 6.2 0.0 0.08 OK
541 30 137 12.8 OK 15.9 3.9 76.3 19.0 8.5 0.0 0.11 OK
542 30 138 0.3 OK 2.6 5.1 76.3 19.0 0.0 0.0 0.00 OK
543 30 139 0.4 OK 2.8 5.2 76.3 19.0 0.0 0.0 0.00 OK
544 30 140 0.0 OK 3.3 4.8 76.3 19.0 3.4 0.8 0.09 OK
545 30 141 12.8 OK 15.9 4.9 76.3 19.0 3.7 0.8 0.09 OK
546 30 142 0.1 OK 1.3 0.2 76.3 19.0 0.0 0.0 0.00 OK
547 30 143 0.1 OK 1.5 0.5 76.3 19.0 0.0 0.0 0.00 OK
548 30 144 0.1 OK 1.6 2.5 76.3 19.0 0.0 0.0 0.00 OK
549 30 145 0.0 OK 2.2 2.3 76.3 19.0 0.0 0.4 0.02 OK
550 30 146 12.8 OK 15.9 4.9 76.3 19.0 12.8 0.8 0.21 OK
551 30 147 0.0 OK 7.4 4.8 76.3 19.0 17.5 0.8 0.27 OK
552 30 148 12.8 OK 15.9 5.1 76.3 19.0 10.6 0.0 0.14 OK
Cek pada
Kapasitas Kapasitas Aktual Aktual
Sr. Node Bearing Bearing Tebal Baseplate Coexistant Tension per Geser per Tension Geser Interaksi Cek Interaksi
No. No LC Pressure Pressure yg dibutuhkan Shear bolt bolt per Bolt Bolt Rasio Rasio

553 30 149 12.8 OK 15.9 5.1 76.3 19.0 13.5 0.8 0.22 OK
554 30 150 0.5 OK 3.5 6.7 76.3 19.0 0.0 0.0 0.00 OK
555 30 151 0.5 OK 4.8 6.7 76.3 19.0 0.0 0.0 0.00 OK
556 30 152 0.0 OK 4.8 6.5 76.3 19.0 7.3 1.1 0.15 OK
557 30 153 0.0 OK 4.9 6.5 76.3 19.0 7.6 1.1 0.16 OK
558 30 154 0.2 OK 2.0 0.3 76.3 19.0 0.0 0.0 0.00 OK
559 30 155 0.2 OK 2.0 0.2 76.3 19.0 0.0 0.0 0.00 OK
560 30 156 0.2 OK 2.2 0.5 76.3 19.0 0.0 0.0 0.00 OK
561 30 157 0.2 OK 2.2 2.0 76.3 19.0 0.0 0.0 0.00 OK
562 30 158 0.1 OK 1.9 1.6 76.3 19.0 0.0 0.0 0.00 OK
563 30 159 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
564 30 160 0.1 OK 1.6 0.2 76.3 19.0 0.0 0.0 0.00 OK
565 30 161 0.1 OK 3.9 0.4 76.3 19.0 0.0 0.0 0.00 OK
566 30 162 0.1 OK 1.8 1.9 76.3 19.0 0.0 0.0 0.00 OK
567 30 163 0.1 OK 1.4 1.7 76.3 19.0 0.0 0.0 0.00 OK
REPLACEMENT OF NGBC
CHIMNEY

Doc No. : SPV-NGBC-CIV-CS-001


CALCULATION FOR PIPE RACK STRUCTURE Rev. No. : 1
Page :

ATTACHMENT E
STEEL CONNECTION
Connection Beam and Column (End Momen Connection)

Beam WF350x175 and Column H250x250

Beam Column
Size H350X175X7 Size H250X250X9
A = 62.91 cm2 A = 91.43 cm2
D = 350 mm D = 250 mm
B = 175 mm B = 250 mm
tf = 11 mm tf = 14 mm
tw = 7 mm tw = 9 mm
r = 18 mm
Load
Bolt Beam 366
Size M 16 LC 112
db = 16 mm α = 0 degree
Ab = 2.011 cm2 P = 2.195 ton
Fy = 2397 kg/cm2 V = 2.203 ton
Fu = 4080 kg/cm2 M = 2.053 ton m
Fvbolt = 1195 kg/cm2 Weld
Ftbolt = 3094 kg/cm2 Sc = 20 mm
n = 12 EA g = 5 mm
Fuw = 5062 kg/cm2

Allowable shear 

a.  Shear allowable Bolts  (V1)
V1 = Ab x n x Fvb
= 28832 kg
= 28.83 ton > 2.20 ton OK

b. Shear allowable of  Connection Beam (V2)
V2 = (d ‐ 2tf ‐ 2Sc) x tw x 0.4 x fy
= 24334 kg
= 24.33 ton > 2.20 ton OK

c.  Shear allowable dari Weld (V3)
V3 = 0.7071 x g x 2 x (d – 2.tf – 2.Sc) x 0.3 x Fuw
= 30281 kg
= 30.28 ton > 2.20 ton OK
d. Shear allowable of Plate Strength Support  (V4)
V4 = n. db. tp. Fp 

Fp = 1.2 Fu                                                if Lv   > 1.5 db and S > 3db


Fp = 0.5.Fu (s/db ‐ 0.5)                               if Lv   > 1.5 db and S < 3db.
Fp = (Lv x Fu)/2.db  < 1.2 Fu                       if Lv  < 1.5 db 

Lv = 80 mm
1.5db = 24 mm Lv > 1.5db

s = 150 mm
3db = 48 mm s > 3db

V4 = 131604.48 kg
= 131.60 ton > 2.203 ton OK

Vmin = min(V1,V2,V3,V4) = 24.33 ton

Allowable Moment 

1 2
Weff x d  Z Ab x Y
2

3
Weff . d
2 1
I yb   Ab.y 
3

Data End plate:
Length (p) = 665 mm
Width (Weff) = 200 mm
y1 = 85 mm
y2 = 205 mm
y3 = 274 mm
y4 = 344 mm

1 2
Weff x d  Z Ab x Y
2
200 x  0.5   x  51.81 ^2 = 402.12 33.19 153.19 222.2 292.2
268444    = 268444 0

neutral line  (d1)  = 51.81 mm (from bottom)

Iyb = 6371211854 mm4


Sb = 21805149 mm3
= 21805 cm3

a. Moment allowable due to tension Bolts (M1)

M 1  Ft x Sb

2 2
Ft = 3039 - 4.39 fv

Ft = 3093 kg/cm2

M1 = 674433.09 kg.cm
= 6.74 ton.m > 2.05 ton.m OK

b. Moment allowable end plate  (M2)

M2 = Ff (M – 2.b – 2.a1 – tf)

tp = 22 mm Af = 5500 mm2
M = 665 mm Aw = 2296 mm2
N = 200 mm b = 40 mm
Cb = 0.935 mm Pe = 36 mm
a1 = 40 mm

Me = 1/6. N. tp2. 0.75. Fy
= 290037 kg.mm
αm = ca x cb x ( Af / Aw ) 1 / 3 x ( Pe / db ) 1 / 4
= 0.795549733

Ff = 40508.25739 kg

M2 = 20011079 kgmm
= 20.01 ton.m > 2.05 ton.m OK

c. Moment allowable at Connection Beam (M3)

M3 = 0.6. Fy . Wx
Wx = 864 cm3

M3 = 1242605 kgcm
= 12.43 ton.m > 2.05 ton.m OK

You might also like