QF-DGN-01

Cff3anl f3i5 UPIN.il@ ala ffl�t'"lll'i11 @:


POWER GRID COMPANY OF BANGLADESH LTD.
ISO 9001: 201 S (An Enterprise of Bangladesh Power Development Board)
CERTIFIED

TITLE: DOCUMENT/ DRAWING APPROVAL/ COMMENT TRANSMITAL

PROJECT:. "Design, Supply, Installation, Testing & Commissioning of 230/132kv & 132/33kv Substation on Turnkey Basis
(Package-1-1)".
CONTRACT REFERENCE: Contract No.: PGCB/KfW/BMZ.2014.67.976/2018/Package-1-1, Dated: 08-06-2020
DOCUMENT SUBMITTAL REF: EEGBPSP-CNTIC-S-PGCB-1620, Date: 04 July, 2023
SUBJECT: Acceptance on the Routine Test Report of 230kV & 132kV XLPE Cable for the above-mentioned project.
To, Copy to,

Project Director (CE)


EEGBPS Project, PGCB Ltd., Dhaka.
LJ Managing Director, PGCB

D Executive Director (P & Dl. PGCB


CJ:] CNTIC

Dear Sir,
[TI Master File

Issued by:
We are pleased to enclose the following documents for the purpose indicated below:

< 1 >In case of any modification


other than those desired are carried out, the same shall be .i>L Z>/d]-/Zo'2/J
(Syed Md. Sahriar Abdullah)
highlighted clearly in the Drawing/Document with full justification thereof and resubmitted
for approval. Superintending Engineer (A/C)
(Substation Design & Quality Contr�
<2>Approval/Comments/lnformation conveyed herein neither relieves the contractor of his PGCB Ltd., Dhaka •
� �
contractual obligation and his responsibilities for correctness of dimensions, material of
constructions, weight, quantities, design details, assemble fits, performance particulars Our Ref: 27 .21.0000.410.49.001.23.1198
and conformity of the supplies with the Statutory Laws of Bangladesh as may be Date: 25 July, 2023
applicable, nor does it limit the Employer's right under the contract."

Item Description of Drawing/ Document Number Drawing Revision Status Enclosed


No Documents Number
Accepted with
CD

Comments (AC) Yes

01. Routine Test Report of 230kV


& 132kV XLPE Cable
As per doc. As per
drawings.
As per
drawings.
Comments (C)

Request for re-


Submission (RR)
□ QJ No

For Information
(Fl)
D
Comments:
1. The Routine Test Report of 230kV & 132kV XLPE Cable for the subject mentioned project may be accepted.
2. The quantity of both type cables shall be as per contract to fulfill the actual site requirement.
3. All the Comments released from SSD, PGCB vide Letter No. 27.21.0000.410.49.00.21.1864, Date: 06.12.2021 shall be ensured

I ,_ro� �-
with compliance during supply and installation.

I
Please acknowledge receipt of documents:

Note:
<1>The above paragraph shall be added if the status of the document is AC/C/RR/FI.
<2>The above paragraph shall be added if the status of the document is A or AC

PGCB Bhaban, Avenue-3, Jahurul Islam City, Aftabnagar, Badda, Dhaka-1212


Web: www.pgcb.gov.bd, PABX: +88-02 55046731-35, Fax: +88-02 55046722, E-mail: info@pgcb.gov.bd