PROJECT:. "Design, Supply, Installation, Testing & Commissioning of 230/132kv & 132/33kv Substation on Turnkey Basis
(Package-1-1)".
CONTRACT REFERENCE: Contract No.: PGCB/KfW/BMZ.2014.67.976/2018/Package-1-1, Dated: 08-06-2020
DOCUMENT SUBMITTAL REF: EEGBPSP-CNTIC-S-PGCB-1620, Date: 04 July, 2023
SUBJECT: Acceptance on the Routine Test Report of 230kV & 132kV XLPE Cable for the above-mentioned project.
To, Copy to,
Dear Sir,
[TI Master File
Issued by:
We are pleased to enclose the following documents for the purpose indicated below:
□
No Documents Number
Accepted with
CD
□
Comments (AC) Yes
For Information
(Fl)
D
Comments:
1. The Routine Test Report of 230kV & 132kV XLPE Cable for the subject mentioned project may be accepted.
2. The quantity of both type cables shall be as per contract to fulfill the actual site requirement.
3. All the Comments released from SSD, PGCB vide Letter No. 27.21.0000.410.49.00.21.1864, Date: 06.12.2021 shall be ensured
I ,_ro� �-
with compliance during supply and installation.
I
Please acknowledge receipt of documents:
Note:
<1>The above paragraph shall be added if the status of the document is AC/C/RR/FI.
<2>The above paragraph shall be added if the status of the document is A or AC