QF-DGN-01

TITLE: DOCUMENT/DRAWING APPROVAL/COMMENT TRANSMITAL

Project : Power Grid Network Strengthening Project under PGCB (GtoG).

Contract Number: PGCB/GtoG/01, Date: 10.10.2016


Document Submittal Ref: CEF/PGCB/G2G/PGNSP/TL-058; Date: 01.11.2018
Subject : COMMENTS ON FOUNDATION DESIGN DRAWING OF TOWER TYPE
"1DL+9M", "1D1+15M", "1D25+9M" and"1DT6+9M".

Copy to
To
Project Director & Chief Engineer Managing Director, PGCB
Power Grid Network Strengthening Project under PGCB (GtoG)
Power Grid Company of Bangladesh Limited (PGCB) √ Executive Director (P & D), PGCB
House-29, Block-D, Aftabnagar
Dhaka-1212. √ Chief Engineer (P & D/Project), PGCB

√ CCCE-ETERN-FEPEC Consortium
Kind Attn :

Dear Sir √ Executive Engr. (Civil Design), PGCB

We are pleased to enclose the following documents for the purpose indicated Master File

below:

In case of any modification other than those desired are carried out, the same
shall be highlighted clearly in the Drawing/Document with full justification Issued by:
thereof and resubmitted for approval.

Approval/Comments/Information conveyed herein neither relieves the (Engr. Md. Delowar Hossain)
contractor of his contractual obligation and his responsibilities for correctness Superintending Engineer
Civil Design, P&D.
of dimensions, material of constructions, weight, quantities, design details,
assemble fits, performance particulars and conformity of the supplies with Our Ref: 27.21.0000.412.49.001.18.708
the Statutory Laws of Bangladesh as may be applicable, nor does it limit the
Employer’s right under the contract. Date: 12/12/2018

Item Description of Document Drawing Number Revision Status Enclosed


No Drawing/ Documents Number

Approved (A)
Yes
Approved with
Comment /
Please refer to Annexure -1 Correction (C)

Request for re- No


Submission (RR)

For information
(FI)

Please acknowledge receipt of documents:


Received by Date
Ref No. 27.21.0000.412.49.001.18.708 Date:
12/12/2018

Annexure-1

Sl Description Drawing Number Comments Remarks


No.
01. Tower Type: 1DL+9M PGCB/GtoG/1DL/WB/02, Following information shall have Not Approved
Details Drawing of 3, 4 to be considered during tower
Piling & Pilecap Sheet:1/1, Rev:00 foundation design:
Foundation for Soil 1. Two pile system:
Category-2, 3, 4
02. Tower Type: PGCB/GtoG/1D1/WB/02, i) Longitudinal Direction Not Approved
1D1+15M 3, 4 moment should be
Details Drawing of Sheet:1/1, Rev:00 taken in case of pile
Piling & Pilecap design.
Foundation for Soil ii) Minimum rebar for
Category-2, 3, 4 pilecap should be
03. Tower Type: PGCB/GtoG/1D25/WB/02, provided for pilecap Not Approved
1D25+9M 3, 4 beam action of
Details Drawing of Sheet:1/1, Rev:00 pilecap.
Piling & Pilecap iii) Punching shear
Foundation for Soil area should be
Category-2, 3, 4 contributing area.
04. Tower Type: PGCB/GtoG/1DT6/WB/02, Not Approved
1DT6+9M 3, 4 2. Residual force should be
Details Drawing of Sheet:1/1, Rev:00 considered along with Leg
Piling & Pilecap component during calculation of
Foundation for Soil fixity moment.
Category-2, 3, 4