To/ (Client) (M&E Engineer) (Architect)
cc:
☐ ☐ ☐
(Quantity Surveyor) (C&S Engineer) (Others)
Priority A reply is expected by:
: ☐ Urgent ☒ Normal (dd/mm/yyyy)
15-01-2018
Refer to attached picture, at grid line 15 F ceiling, there is sewer pipe affecting the ceiling partition.
What we like to propose is that we modify the sewer pipe to the inside of the partition so that we
can cover up the place and make good. But there is a cost implication. Please advise .
Bron Saw/
Requested 10-01-2018
by:
Engineer
(Name/ Designation) Signature Date of Request
Consultants’ Comments:
Returned
by:
(Name/ Designation) Signature Date Returned
For ACROMEC usage only:
Received
by:
(Name/ Designation) Signature Date of Receipt
Page 1 of 2
IMS-PJ-02-13-R2 Request for Information