JURONG ISLAND MARKETING TERMINAL PROJECT Technical Quiry Ref. No.

:
Site Technical Query(STQ) JIMT-C02-STQ-001 Rev. 0
Name of Initiator (full name): Company: Date:
Martin Zeng CIWE 9th May 2018
Description of the proposed change (attach drawing if necessary):
For the fire water and foam branch pipe from main ring to product tank, sprinker system
from deluge valve to product pump and truck load bay,
we request to do service test for the lines mentioned above instead of hydro test of 1.5
times of design pressure because of the reason bellowings:

Reason for the proposed change:

1. The lines would not hold pressure


2. The welding joints were inspected
3. The Material was inspected and the certificate of the material is checked
4. 10% NDT was done and passed

Location: Discipline:
Whole plant Piping
Would this STQ affects other Disciplines? □ YES □ NO
(If Yes, please provide details)

Would this STQ have any impact on HSE? □ YES □ NO


(If Yes, please provide details)

Would this STQ have any impact on Operation & Maintenance? □ YES □ NO
(If Yes, please provide details)

Is QP (for C&S and M&E) endorsement required for this STQ? □ YES □ NO
(If Yes, please attach QP comments and endorsement)

Comment by PMC:

Comment by SPC:

Reviewed and endorsed by:


Design Engineer Project Manager Engineer (PMC) Project
(CIWE) (CIWE) *Accepted/Rejected Representative (SPC)
*Accepted/Rejected *Accepted/Rejected

(Name, date & sign) (Name, date & sign) (Name, date & sign)
(Name, date & sign)
(* delete whichever not applicable)

Notes: 1) All Site Technical Quiry(STQ) shall be copied to the Project Manager and Construction Managers.
2) STQ Ref. No. shall be recorded in running order (i.e. 001, 002, etc.), regardless of the disciplines.
3) If not sufficient space in the Form, provide the details in separate sheet of paper but indicate the STQ Ref. No.
4) All STQ shall be uploaded to the DMS only when it has been reviewed and endorsed by PMC.