You are on page 1of 44

Oil and Natural Gas Corporation Ltd.

REVIVAL/REVAMP OF GS-23-1 PLATFORM


Carlton Industrial Engineers
INSTRUMENT HOOKUP & INSTALLATION DRAWING Page:
1 of 44
DOCUMENT NO: K07NC19004-IN-D-LAY-40009 REV.A

Oil and Natural Gas Corporation Ltd.


REVIVAL/REVAMP OF GS-23-1 PLATFORMS
CONTRACT NO:
EOA/MM/REVAMP/GS-23-1/2018-19/K07NC19004

DOCUMENT TITLE:
INSTRUMENT HOOKUP & INSTALLATION DRAWING

No. of Pages ( Including Cover Page ) : 044 ONGC/Consultant


ONGC/Consultant Approval Signature: ___________________
Name: ___________________
1 Approved
Date: ___________________
2 Accepted with Comments,
Resubmit,
Work may proceed
3 Rejected, Resubmit, Work May TPICA
Not Signature: __________________
Proceed Name: __________________
4 Information only, Review Not
Required, Work May Proceed Date: __________________

Note: Approval/ Review by PMC/OWNER/Engineering Consultant shall not absolve the CONTRACTOR of his CONTRACTUAL obligations CONTRACTOR is fully
responsible for complying with the requirement of the CONTRACT & other relevant documents & codes / standards. Acceptance of any document shall not
be interpreted as permitting any deviation & shall in no way relieve / absolve the CONTRACTOR of his CONTRACTUAL obligations under the terms of the
CONTRACT, for correct design & execution of work.

A 20.02.2020 Issued for Review NGS KS JR

Rev No. Date Description Prepared By Checked By Approved By


CLIENT ONGC Consultant: EPC Contractor EPC Consultant:

TITLE DOC. No. :


HOOKUP & INSTALLATION DRAWING K07NC19004-IN-D-LAY-40009

PROJECT PROJECT No. SHEET REV


REVIVAL OF GS-23-1 MONOPOD PLATFORM AT EASTERN OFFSHORE ASSETS
K07NC19004 2 OF 44 A

INDEX SHEET

SHEET NO. DESCRIPTION A

1 COVER SHEET 07.02.2020

2 INDEX SHEET 07.02.2020

3 REVISION SHEET 07.02.2020

4 NOTES 07.02.2020

5 HOOKUP & INSTALLATION DRAWING 07.02.2020


CLIENT ONGC Consultant: EPC Contractor EPC Consultant:

TITLE DOC. No. :


HOOKUP & INSTALLATION DRAWING K07NC19004-IN-D-LAY-40009

PROJECT REVIVAL OF GS-23-1 MONOPOD PLATFORM AT EASTERN OFFSHORE PROJECT No. SHEET REV
ASSETS K07NC19004 3 OF 44 A

REVISION RECORD SHEET

REV.No. DESCRIPTION REMARKS

A ISSUED FOR REVIEW FIRST ISSUE


DOCUMENT TITLE ITEM / TAG NO. DATASHEET NO.
HOOKUP & INSTALLATION DRAWING -
PROJECT DESCRIPTION PROJECT NO: SPECIFICATION NO.

REVIVAL OF GS-23 -1 MONOPOD PLATFORM AT EASTERN OFFSHORE ASSET (EOA) - KAKINADA K07NC19004 3507;Rev No-6

CONTRACTOR CONSULTANT SUPPLIER DOC NO PURCHASE ORDER NO. REV SHT.NO


CARLTON INDUSTRIAL ENGINEERS, PETROKENS ENGINEERING AND
- -
MUMBAI SERVICES PVT LTD A 4 of 44
CLIENT NAME REV No. PRP BY DATE CKD DATE APP. DATE DESCRIPTION
ONGC A NGS 07.02.2020 KS 07.02.2020 JR 07.02.2020 ISSUED FOR APPROVAL
EOA/MM/REVAMP/GS-23-1/2018-
CONTR DOC .No
19/K07NC19004
ORIGINATOR ORIG. DATE
NGS 07.02.2020
NOTES:
1) All Tubings and fittings shall be imperial sizes, expressed in nominal outside diameter (OD) and all threads shall be NPT. All threaded fittings shall have NPT threads as per
ANSI B1.20.1
2) Fittings shall be of 316 SS material to ASTM A 276 or equivalent (i.e., BS 970-316-S31, DIN4401 or ASME SA 479-316).
3) Stainless Steel Tube Fittings made from bar stock (straight configurations) should meet ASTM A276/ ASME SA479 standards and those made from forgings (including elbows,
crosses and tees) should meet ASTM A182/ ASME SA182, BS 970-316-S31, DIN4401 standards.
4) Tubing’ shall be of TP 316/316L (dual certified) material to ASTM ‘A 269’ or equivalent (i.e. BS 970-316-S31, DIN4401 or ASME SA 479-316), unless otherwise specified.
Molybdenum content shall be 2.5% minimum and carbon content of ≤ 0.03%. The minimum size shall be ¼” OD.
5) Tolerance on OD : +/- 0.08 mm (As Per EN10305-1/DIN 2391)
6) Tolerance on wall thickness : +/- 10% (As Per EN10305-1/DIN 2391)
7) Roughness value on OD: 1.2 Micron RA (max.)
8) Concentricity : As per EN 10305(≤ 0.1)
9) Tube Hardness : Up to 80 HRB As per NACE MR 0175 Certification
10).Have to maintain the standard slope of 1:12 for all impulse tubing.

A 07.02.2020 Issued for Review NGS KS JR


Rev no. Date Description Prepared By Checked By Approved By
Client Project ONGC Consultant EPC Contractor EPC consultant
REVIVAL/REVAMP OF GS-23-1 PLATFORMS OFFSHORE
ASSET (EOA) - KAKINADA