COMMENT RESPONSE SHEET

PROJECT: CAP-2 OWNER: South Pacific Viscose

Discipline: Rotating
Document Title: HVAC Cause & Effect Diagram
SPV Document No.: XXXXX Revision: 2.0
TPE Document No.: XXXXX
Total Review Duration: 10 Working Days
Responsible / Consolidator: All:

Return Code:

Section/ By
No. Rev. No. OWNER Comments Vendor Response OWNER Closed out
Page No. (Initials)

1 1.0 cover it must be 1.0 instead of 0.1 please be aware about revision number..!! Nic updated

2 1.0 cover If First Issuance is IFI for next issuance is Re-IFI not For Approval Nic updated

3 1.0 5 duplicate? Nic updated

4 1.0 5 is it compressor? Nic compressor and fan motor

filled with blank (no action).


5 1.0 5 ST Nic
Indoor unit is always operating

10

11

12

13

14

15

Page 1 of 1
CS2 ADSORPTION PLANT 2
(CAP-2)

PO Number : 44691417 & 44691419


ANUTTARA
Equipment / Matrerial : HVAC PACKAGE

HVAC CAUSE & EFFECT DIAGRAM

Code Description
A Approved
B Approved With Comment
C Not Approved - Revise & Resubmit
D Cancelled
E Received as Information
Name: Signature:

2.0 Re-issued For Information 18-06-22 SAL MAY SUG


1.0 Re-issued For Information 21-05-22 SAL MAY SUG
0.0 Issued For Information 08-04-22 SAL MAY SUG
Rev Issue Purpose Date Author Checked Approver

OWNER Doc Number EPCm VENDOR Doc Number


X-333004-023
2924-ATT-1388C-DWG-0011
CS2 ADSORPTION PLANT 2 (CAP-2)
HVAC CAUSE & EFFECT DIAGRAM

Revision History
Revision Amender
Amendment Date Amendment
Number Name

Holds
Hold Section
Short description of hold
No Number

2924-ATT-1388C-DWG-0011 Page 2 of 5 Rev No: 2.0


CS2 ADSORPTION PLANT 2 (CAP-2)
HVAC CAUSE & EFFECT DIAGRAM

Table of Contents
1 INTRODUCTION ...................................................................................................................4
1.1 Project Background ............................................................................................................... 4
1.2 Project Location ..................................................................................................................... 4
1.3 Reference Document ............................................................................................................. 4
2 HVAC Cause and Effect Diagram ...........................................................................................5

List of Tables
Table 1-1 Reference Document ...............................................................................................4
List of Figures
Figure 1 HVAC Cause & Effect Diagram ..................................................................................5

2924-ATT-1388C-DWG-0011 Page 3 of 5 Rev No: 2.0


CS2 ADSORPTION PLANT 2 (CAP-2)
HVAC CAUSE & EFFECT DIAGRAM

1 INTRODUCTION

1.1 Project Background


Lenzing (SPV) is intended to setup new Carbon Disulfide (CS2) Adsorption Plant (CAP- 2) at existing
manufacturing site PT South Pacific Viscose (SPV), Purwakarta, Indonesia. The existing site already
has CAP-1 plant which is currently in operation.
Lenzing AG is intended to setup new Carbon Disulfide (CS2) Adsorption Plant (CAP-2) at existing
manufacturing site of PT. South Pacific Viscose (SPV), Purwakarta, Indonesia. The existing SPV
facility includes an existing CAP-1 plant, which are running continuously.
SPV has conducted Basic Engineering of CAP-2 and is preparing for the execution phase. SPV is
hereby appointing EPCm Contractors for execution of CAP-2 Facilities.
Tripatra Engineering (CONSULTANT) has been awarded by PT SPV to perform EPCm Services
Carbon Disulfide 2 (CAP-2) Plant Project based upon Engineering Procurement and Construction
Management Contract of Carbon Disulfide Adsorption Plant -2 between PT SOUTH PACIFIC
VISCOSE and PT. TRIPATRA ENGINEERING.

1.2 Project Location

Figure 1. Project Location

1.3 Reference Document


The following documents shall be referred and followed.
Table 1-1 Reference Document

NO NAME DESCRIPTION
1 2924-ATT-1388C-DWG-0010 Instrument Schedule w/Tag Numbers

2 HVAC Cause and Effect Diagram


This document consists of cause and effect diagram of the HVAC instrumentation for Control room, DCS Room,
LV switchgear room, MV switchgear room, and MCC Nash Plant. See figure 1 below

2924-ATT-1388C-DWG-0011 Page 4 of 5 Rev No: 2.0


CS2 ADSORPTION PLANT 2 (CAP-2)
HVAC CAUSE & EFFECT DIAGRAM

all fire smoke damper actuator

volume damper for fresh air


INSTRUMENT / EQUIPMENT
Legend

Fresh air Intake fan


Heater controller
Filter unit alarm
AC outdoor unit
O = open

AC indoor unit

Intake fan
C = close

EFFECT
CAUSE & EFFECT DIAGRAM ST = start
TR = trip
MA = manual
adjust

CAUSE

INSTRUMENT DESCRIPTION VALUE UNIT

Thermostat temperature rise 24 ᴼC ST

filter airflow switch air pressure drop 200 Pa ST

fire / smoke signal fire / smoke detected TR C TR TR

heater airflow switch air pressure drop 20 Pa TR

high limit switch temperature rise 52 ᴼC TR

RH transmitter RH rise 60 % ST

Differential pressure
room pressure drop 0 Pa MA
gauge

Figure 1. HVAC Cause and Effect Diagram

2924-ATT-1388C-DWG-0011 Page 5 of 5 Rev No: 2.0